SlideShare a Scribd company logo
1 of 16
Download to read offline
Portfolio
 Vitaliy Horishnyy
 BEng degree in Building Services Engineering
 Waterford Institute of Technology
https://no.linkedin.com/in/vitaliy-horishnyy-732a13108
www.facebook.com/vitaliy.horishnyy
 I started my career in London as plumber/pipe fitter at the beginning of 90’s. Working in
domestic and industrial construction cities and have been involved in a variety of projects
and has a long and successful track of installing different types of system for buildings of
every type, from domestic house estates to hospital complex, shopping centres, schools,
industrial and commercial estates.
Projects:
1996-The 5-star Bentley Hotel is situated in Kensington/ Chelsea, London
Installation and testing of MWS, HWS, CWS, plant and pipe work. Sprinkler system installation, fit
out though to commission and handover-completion.
1998- Refurbishing 5- star Claridge’s Hotel, Bond Street, London.
Installation AHU’s with LPHW heating and cooling system. Plant Room.
2001-Medical Research Centre in north London. GlaxoSmithKline laboratories.
Plant room, stainless steel welding process. Working as welder/pipefitter.
2003-Multi-use sports complex with a gym and dance studio in Docklands, London
Plant room, Gas welding process
2004- New Park Hotel Kilkenny, Ireland
Supply, installation and testing of HVAC plant and pipe work. Tig/Mig welding process
2005- new 20mln. mansion for Irish billionaire JP Mc Manus, Martinstown, Ireland, contract with
‘’SISK Ireland’’
Installation heating, water, sewage systems, fan coil units served via chilled water and LTHW heating
system for cooling and heat, ground source heat pumps system.
2006- New facilities for Templemore Garda College, Ireland.
Team Leader. Supervise and coordinate the services construction
“ SISK Ireland ”, “JRE Engineering”, ‘’MITTIE Enginering’’
Contracts with
Welding course.FAS, Ireland
2005
Hold test weld certificate.
Gas Oxy-Acetylene welding process, Arc welding, Tig/Mig welding process. The test weld
was assessed visually and by x-radiography to the quality requirements of BS2640 and
found to be acceptable.
In 2011 finished study in engineering at Waterford Institute of Technology with BEng
degree in Building Services Engineering. This specialises in the mechanical and
electrical services associated within the buildings, ventilation, air conditioning and
energy assessment in buildings.
Commissioning and maintaining the quality temperature and humidity of air within modern
building.
Course subjects include:
 Application of the wiring regulations and the principles associated with design and
electrical installations, energy efficient lighting design.
 The principles of fire safety standards and codes relating to a fire alarms and fire
equipment in the workplace. Basic sprinkler system design, content is based on LPS1048
Rules.
 Acoustics and Transmission of Sound. Regulations and legislation.
 Renewable Energy Technologies.
 Engineering management, include project planning, budgeting and final pricing.
 Engineering Ethics and Communication Technologies(ICT’s)including oral presentation,
report writing.
ComputerAided Drafting and Design
 AutoCad 2016
 Revit MEP 2013
 Quickpen Duct Designer 2014
 AutoCad MEP 2014
 Navis 2014
I am a highly motivated engineer with a Bachelor of
Engineering and four years of practical on-site
engineering experience, worked in the Norwegian
company specialising in mechanical building
services. The company specialises in the design,
supply, installation and maintenance large
commercial and industrial projects developing and
managing new technologies to integrate
sustainability throughout its design.
I have developed key
project management
skills and the ability to
improve communication
with the broader project
team.
I am very confident in planning and designing
projects using latest version AutoCAD
software producing design drawings, diagrams
and schematics, project specifications and
schedules for Building Services design that
comply with Irish and European Standards,
Building Regulations and CIBSE guidelines, and
contributing to the budgeting process. I enjoy
this type of role, including checking the
technical aspects of drawings and equipment
designs.
2011-2015 Project Engineer Wien og Lie AS
Holmengata 28,1394, Neusbru, Norway
Phone:004766 84 54 80
lars.erik@wienoglie.no
The company specialising in designing mechanical building services. Project Management and Surveying.
Energy assessment and environment mapping. The company specialises in the design, supply, installation
and maintenance large commercial and industrial geothermal heating systems, sprinkler fire protection
systems.
Roles and Responsibilities:
• Working on CAD drawings, HVAC calculations, project scheduling, compiling project documentation,
procuring materials for site.
• Managed all procurement and site deliveries, negotiate deals with equipment suppliers
• Negotiate deals with equipment suppliers
• Engaged with sub-contractors to ensure project deadlines were hit
• Attend weekly services meetings, prepare weekly project progress reports
• Prepare equipment submittals for client approval compiled technical operation and maintenance
manuals
• Commissioning,resolving any unexpected technical difficulties.
New hospital project in Drammen, Norway: Project Engineering on Air Handling unit and HVAC,
Medical gas, Sprinkler systems fit out and installation, through to handover. Planning the work and
efficiently organising the plant and site facilities in order to meet an agreed programme of deadlines.
New cement factory in south of Oslo: Design and installation
Geothermal heat pump system, ventilation: working with
detailed diagrams, plans and drawings. Commissioning,
organizing and assessing the work of contractors.
New medical laboratory in Furuset, Oslo. Furst. Medical liquid piping design, AHU, heating,
ventilation system, rainwater, drainage and waste harvesting system.
New Building Office for Malling & Co, Sandvika, Geotermal Heating System. Ventilation.
Sprinkler System. Designing site-specific equipment as required,overseeing and supervising the
installation of building systems and specifying maintenance and operating procedures.
Norway aims to become the world's first oil-free country by 2020. I have good experience in
the design, installation and maintenance large commercial and industrial geothermal heat
pump systems.
Supermarket in Oslo energy saving refrigeration systems.
Fire Fighting systems

More Related Content

What's hot

What's hot (19)

Curriculum vite 2
Curriculum vite 2Curriculum vite 2
Curriculum vite 2
 
My Resume
My ResumeMy Resume
My Resume
 
Linkedin Resume
Linkedin ResumeLinkedin Resume
Linkedin Resume
 
cjhcv @ 15
cjhcv @ 15cjhcv @ 15
cjhcv @ 15
 
Michael malliagh
Michael malliagh  Michael malliagh
Michael malliagh
 
CV UPDATED Aug 2015 (1)
CV UPDATED Aug  2015 (1)CV UPDATED Aug  2015 (1)
CV UPDATED Aug 2015 (1)
 
JJ du Toit - CV - Rev 2
JJ du Toit - CV - Rev 2JJ du Toit - CV - Rev 2
JJ du Toit - CV - Rev 2
 
cv bernard baruch.wps
cv bernard baruch.wpscv bernard baruch.wps
cv bernard baruch.wps
 
Simon McLean CV 2017
Simon McLean CV 2017Simon McLean CV 2017
Simon McLean CV 2017
 
CV
CVCV
CV
 
Gerry_McGee_CV
Gerry_McGee_CVGerry_McGee_CV
Gerry_McGee_CV
 
Curriculum vitae vn
Curriculum vitae   vnCurriculum vitae   vn
Curriculum vitae vn
 
SLOMO VARGHESE
SLOMO VARGHESE SLOMO VARGHESE
SLOMO VARGHESE
 
Tim Oldland CV
Tim Oldland CVTim Oldland CV
Tim Oldland CV
 
CV john Halpin 6.4latest 30-01-17
CV john Halpin 6.4latest 30-01-17CV john Halpin 6.4latest 30-01-17
CV john Halpin 6.4latest 30-01-17
 
Simon McLean CV 2017 (Repaired)
Simon McLean CV 2017 (Repaired)Simon McLean CV 2017 (Repaired)
Simon McLean CV 2017 (Repaired)
 
CV17
CV17CV17
CV17
 
MAIN CV Trevor Harrison16 - Copy[4762] - Copy
MAIN CV Trevor Harrison16 - Copy[4762] - CopyMAIN CV Trevor Harrison16 - Copy[4762] - Copy
MAIN CV Trevor Harrison16 - Copy[4762] - Copy
 
MJEmployer reference letter.docx (003)
MJEmployer reference letter.docx (003)MJEmployer reference letter.docx (003)
MJEmployer reference letter.docx (003)
 

Viewers also liked

Dawn Elkins' Resume 2015
Dawn Elkins' Resume 2015Dawn Elkins' Resume 2015
Dawn Elkins' Resume 2015Dawn Elkins
 
Allied presentation pd jan 2015
Allied presentation  pd jan 2015Allied presentation  pd jan 2015
Allied presentation pd jan 2015Paul W Davies
 
Gender wage gap in China after the economic reform - 9th semester project - ...
Gender wage gap in China after the economic reform -  9th semester project - ...Gender wage gap in China after the economic reform -  9th semester project - ...
Gender wage gap in China after the economic reform - 9th semester project - ...Moira Mastrone
 
Unlocking the Wealth of Rural Markets
Unlocking the Wealth of Rural MarketsUnlocking the Wealth of Rural Markets
Unlocking the Wealth of Rural MarketsYana Cherepashenskaya
 
Professional Persona Project - Full Sail University
Professional Persona Project - Full Sail UniversityProfessional Persona Project - Full Sail University
Professional Persona Project - Full Sail UniversityBeth Patton
 
Tecnologías de la información y la comunicación
Tecnologías de la información y la comunicaciónTecnologías de la información y la comunicación
Tecnologías de la información y la comunicaciónrosiithaa
 
Colorado's Solar Thermal Workforce Challenge
Colorado's Solar Thermal Workforce ChallengeColorado's Solar Thermal Workforce Challenge
Colorado's Solar Thermal Workforce ChallengeLeslie Martel Baer
 
Assessing Faculty Perspectives on Rewards and Incentives for Community-Engage...
Assessing Faculty Perspectives on Rewards and Incentives for Community-Engage...Assessing Faculty Perspectives on Rewards and Incentives for Community-Engage...
Assessing Faculty Perspectives on Rewards and Incentives for Community-Engage...Talloires Network
 
Ficha 9 -_limites e continuidade
Ficha 9 -_limites e continuidadeFicha 9 -_limites e continuidade
Ficha 9 -_limites e continuidadeMaria Joao Sargento
 
Sijil penghargaan sijil
Sijil penghargaan   sijilSijil penghargaan   sijil
Sijil penghargaan sijilmahzuna-1985
 
History of civil society
History of civil societyHistory of civil society
History of civil societyemhe
 
John 16 commentary
John 16 commentaryJohn 16 commentary
John 16 commentaryGLENN PEASE
 
20151119法務部:「行政執行檢討與策進作為」報告
20151119法務部:「行政執行檢討與策進作為」報告20151119法務部:「行政執行檢討與策進作為」報告
20151119法務部:「行政執行檢討與策進作為」報告R.O.C.Executive Yuan
 
Angelo bautista buahmerahmix
Angelo bautista   buahmerahmixAngelo bautista   buahmerahmix
Angelo bautista buahmerahmixAngelo Bautista
 
Course syllabus
Course syllabusCourse syllabus
Course syllabusctle1
 
Pete Downton, 7digital: The Three Ages of Digital Music
Pete Downton, 7digital: The Three Ages of Digital MusicPete Downton, 7digital: The Three Ages of Digital Music
Pete Downton, 7digital: The Three Ages of Digital MusicMME 4.5 / Music 4.5 / 2Pears
 

Viewers also liked (20)

HRM
HRMHRM
HRM
 
Dawn Elkins' Resume 2015
Dawn Elkins' Resume 2015Dawn Elkins' Resume 2015
Dawn Elkins' Resume 2015
 
2016 Winter Saratogan
2016 Winter Saratogan2016 Winter Saratogan
2016 Winter Saratogan
 
ARAVIND G
ARAVIND GARAVIND G
ARAVIND G
 
Allied presentation pd jan 2015
Allied presentation  pd jan 2015Allied presentation  pd jan 2015
Allied presentation pd jan 2015
 
Gender wage gap in China after the economic reform - 9th semester project - ...
Gender wage gap in China after the economic reform -  9th semester project - ...Gender wage gap in China after the economic reform -  9th semester project - ...
Gender wage gap in China after the economic reform - 9th semester project - ...
 
Unlocking the Wealth of Rural Markets
Unlocking the Wealth of Rural MarketsUnlocking the Wealth of Rural Markets
Unlocking the Wealth of Rural Markets
 
Jesucristo
JesucristoJesucristo
Jesucristo
 
Professional Persona Project - Full Sail University
Professional Persona Project - Full Sail UniversityProfessional Persona Project - Full Sail University
Professional Persona Project - Full Sail University
 
Tecnologías de la información y la comunicación
Tecnologías de la información y la comunicaciónTecnologías de la información y la comunicación
Tecnologías de la información y la comunicación
 
Colorado's Solar Thermal Workforce Challenge
Colorado's Solar Thermal Workforce ChallengeColorado's Solar Thermal Workforce Challenge
Colorado's Solar Thermal Workforce Challenge
 
Assessing Faculty Perspectives on Rewards and Incentives for Community-Engage...
Assessing Faculty Perspectives on Rewards and Incentives for Community-Engage...Assessing Faculty Perspectives on Rewards and Incentives for Community-Engage...
Assessing Faculty Perspectives on Rewards and Incentives for Community-Engage...
 
Ficha 9 -_limites e continuidade
Ficha 9 -_limites e continuidadeFicha 9 -_limites e continuidade
Ficha 9 -_limites e continuidade
 
Sijil penghargaan sijil
Sijil penghargaan   sijilSijil penghargaan   sijil
Sijil penghargaan sijil
 
History of civil society
History of civil societyHistory of civil society
History of civil society
 
John 16 commentary
John 16 commentaryJohn 16 commentary
John 16 commentary
 
20151119法務部:「行政執行檢討與策進作為」報告
20151119法務部:「行政執行檢討與策進作為」報告20151119法務部:「行政執行檢討與策進作為」報告
20151119法務部:「行政執行檢討與策進作為」報告
 
Angelo bautista buahmerahmix
Angelo bautista   buahmerahmixAngelo bautista   buahmerahmix
Angelo bautista buahmerahmix
 
Course syllabus
Course syllabusCourse syllabus
Course syllabus
 
Pete Downton, 7digital: The Three Ages of Digital Music
Pete Downton, 7digital: The Three Ages of Digital MusicPete Downton, 7digital: The Three Ages of Digital Music
Pete Downton, 7digital: The Three Ages of Digital Music
 

Similar to Portfolio

Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes
 
Allied consultants (final)
Allied consultants (final)Allied consultants (final)
Allied consultants (final)jemshy
 
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to OilJames Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to OilJames Nolan
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume Arun Das
 
I.a.fletcher c.v. may 2016
I.a.fletcher c.v.  may 2016I.a.fletcher c.v.  may 2016
I.a.fletcher c.v. may 2016ivan fletcher
 
mechenical engineer 123
mechenical engineer 123mechenical engineer 123
mechenical engineer 123abdul suboor
 
Trevor Reece - CV 30.1.15
Trevor Reece - CV 30.1.15Trevor Reece - CV 30.1.15
Trevor Reece - CV 30.1.15Trevor Reece
 
DENNIS OSAWA OWADE Updated CV(1)
DENNIS OSAWA OWADE Updated CV(1)DENNIS OSAWA OWADE Updated CV(1)
DENNIS OSAWA OWADE Updated CV(1)Dennis Osawa
 
Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16Mark Simms
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWstuart johnson
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWstuart johnson
 
MEC Engineers Company Profiles f
MEC Engineers Company Profiles fMEC Engineers Company Profiles f
MEC Engineers Company Profiles fRAVICHANDER
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 

Similar to Portfolio (20)

Alistair Haley CV
Alistair Haley CVAlistair Haley CV
Alistair Haley CV
 
CV 2015_3
CV 2015_3CV 2015_3
CV 2015_3
 
Nithin-CV
Nithin-CVNithin-CV
Nithin-CV
 
Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes MEP manager.
Lee Scholes MEP manager.
 
Allied consultants (final)
Allied consultants (final)Allied consultants (final)
Allied consultants (final)
 
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to OilJames Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
I.a.fletcher c.v. may 2016
I.a.fletcher c.v.  may 2016I.a.fletcher c.v.  may 2016
I.a.fletcher c.v. may 2016
 
mechenical engineer 123
mechenical engineer 123mechenical engineer 123
mechenical engineer 123
 
RICHARD HEATH-CV3a
RICHARD HEATH-CV3aRICHARD HEATH-CV3a
RICHARD HEATH-CV3a
 
Trevor Reece - CV 30.1.15
Trevor Reece - CV 30.1.15Trevor Reece - CV 30.1.15
Trevor Reece - CV 30.1.15
 
DENNIS OSAWA OWADE Updated CV(1)
DENNIS OSAWA OWADE Updated CV(1)DENNIS OSAWA OWADE Updated CV(1)
DENNIS OSAWA OWADE Updated CV(1)
 
Bassam Shamkhi - UAE
Bassam Shamkhi - UAEBassam Shamkhi - UAE
Bassam Shamkhi - UAE
 
Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEW
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEW
 
C V
C VC V
C V
 
MEC Engineers Company Profiles f
MEC Engineers Company Profiles fMEC Engineers Company Profiles f
MEC Engineers Company Profiles f
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 

Recently uploaded

Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentBharaniDharan195623
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 

Recently uploaded (20)

Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managament
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 

Portfolio

  • 1. Portfolio  Vitaliy Horishnyy  BEng degree in Building Services Engineering  Waterford Institute of Technology https://no.linkedin.com/in/vitaliy-horishnyy-732a13108 www.facebook.com/vitaliy.horishnyy
  • 2.  I started my career in London as plumber/pipe fitter at the beginning of 90’s. Working in domestic and industrial construction cities and have been involved in a variety of projects and has a long and successful track of installing different types of system for buildings of every type, from domestic house estates to hospital complex, shopping centres, schools, industrial and commercial estates.
  • 3. Projects: 1996-The 5-star Bentley Hotel is situated in Kensington/ Chelsea, London Installation and testing of MWS, HWS, CWS, plant and pipe work. Sprinkler system installation, fit out though to commission and handover-completion. 1998- Refurbishing 5- star Claridge’s Hotel, Bond Street, London. Installation AHU’s with LPHW heating and cooling system. Plant Room. 2001-Medical Research Centre in north London. GlaxoSmithKline laboratories. Plant room, stainless steel welding process. Working as welder/pipefitter. 2003-Multi-use sports complex with a gym and dance studio in Docklands, London Plant room, Gas welding process 2004- New Park Hotel Kilkenny, Ireland Supply, installation and testing of HVAC plant and pipe work. Tig/Mig welding process 2005- new 20mln. mansion for Irish billionaire JP Mc Manus, Martinstown, Ireland, contract with ‘’SISK Ireland’’ Installation heating, water, sewage systems, fan coil units served via chilled water and LTHW heating system for cooling and heat, ground source heat pumps system. 2006- New facilities for Templemore Garda College, Ireland. Team Leader. Supervise and coordinate the services construction
  • 4. “ SISK Ireland ”, “JRE Engineering”, ‘’MITTIE Enginering’’ Contracts with
  • 5. Welding course.FAS, Ireland 2005 Hold test weld certificate. Gas Oxy-Acetylene welding process, Arc welding, Tig/Mig welding process. The test weld was assessed visually and by x-radiography to the quality requirements of BS2640 and found to be acceptable.
  • 6. In 2011 finished study in engineering at Waterford Institute of Technology with BEng degree in Building Services Engineering. This specialises in the mechanical and electrical services associated within the buildings, ventilation, air conditioning and energy assessment in buildings. Commissioning and maintaining the quality temperature and humidity of air within modern building. Course subjects include:  Application of the wiring regulations and the principles associated with design and electrical installations, energy efficient lighting design.  The principles of fire safety standards and codes relating to a fire alarms and fire equipment in the workplace. Basic sprinkler system design, content is based on LPS1048 Rules.  Acoustics and Transmission of Sound. Regulations and legislation.  Renewable Energy Technologies.  Engineering management, include project planning, budgeting and final pricing.  Engineering Ethics and Communication Technologies(ICT’s)including oral presentation, report writing.
  • 7. ComputerAided Drafting and Design  AutoCad 2016  Revit MEP 2013  Quickpen Duct Designer 2014  AutoCad MEP 2014  Navis 2014
  • 8. I am a highly motivated engineer with a Bachelor of Engineering and four years of practical on-site engineering experience, worked in the Norwegian company specialising in mechanical building services. The company specialises in the design, supply, installation and maintenance large commercial and industrial projects developing and managing new technologies to integrate sustainability throughout its design. I have developed key project management skills and the ability to improve communication with the broader project team. I am very confident in planning and designing projects using latest version AutoCAD software producing design drawings, diagrams and schematics, project specifications and schedules for Building Services design that comply with Irish and European Standards, Building Regulations and CIBSE guidelines, and contributing to the budgeting process. I enjoy this type of role, including checking the technical aspects of drawings and equipment designs.
  • 9. 2011-2015 Project Engineer Wien og Lie AS Holmengata 28,1394, Neusbru, Norway Phone:004766 84 54 80 lars.erik@wienoglie.no The company specialising in designing mechanical building services. Project Management and Surveying. Energy assessment and environment mapping. The company specialises in the design, supply, installation and maintenance large commercial and industrial geothermal heating systems, sprinkler fire protection systems. Roles and Responsibilities: • Working on CAD drawings, HVAC calculations, project scheduling, compiling project documentation, procuring materials for site. • Managed all procurement and site deliveries, negotiate deals with equipment suppliers • Negotiate deals with equipment suppliers • Engaged with sub-contractors to ensure project deadlines were hit • Attend weekly services meetings, prepare weekly project progress reports • Prepare equipment submittals for client approval compiled technical operation and maintenance manuals • Commissioning,resolving any unexpected technical difficulties.
  • 10. New hospital project in Drammen, Norway: Project Engineering on Air Handling unit and HVAC, Medical gas, Sprinkler systems fit out and installation, through to handover. Planning the work and efficiently organising the plant and site facilities in order to meet an agreed programme of deadlines.
  • 11. New cement factory in south of Oslo: Design and installation Geothermal heat pump system, ventilation: working with detailed diagrams, plans and drawings. Commissioning, organizing and assessing the work of contractors.
  • 12. New medical laboratory in Furuset, Oslo. Furst. Medical liquid piping design, AHU, heating, ventilation system, rainwater, drainage and waste harvesting system.
  • 13. New Building Office for Malling & Co, Sandvika, Geotermal Heating System. Ventilation. Sprinkler System. Designing site-specific equipment as required,overseeing and supervising the installation of building systems and specifying maintenance and operating procedures.
  • 14. Norway aims to become the world's first oil-free country by 2020. I have good experience in the design, installation and maintenance large commercial and industrial geothermal heat pump systems.
  • 15. Supermarket in Oslo energy saving refrigeration systems.