Baixar para ler offline
 Current Practice Study
• Project Culture
• Project Standards
 System Requirement Study
 On site and Remote Assistance
 Local SME Representation
 End to End
PETRONAS PROJECT GOVERNANCE REQUIREMENTS
1
Petronas requires a System Integrator dealing with various projects and armed with the
latest technologies that can compliment most of the existing systems out in the market.
ENGAGE
ANALYSE
DESIGN
DEVELOP
DEPLOY
SUPPORT
 Stakeholders
 Identify Enterprise needs
 Suit Clients Requirements
 Customizable
 Simulation &
Pilot Phase
 Gap Analysis
 Flexible
 Best Practice
GOVERNANCE  MONITORING  COMMISSIONING
Client Customization
Network
Architecture
On-Site
Training
2
SUPPORT
& GUIDE
REVIEW &
BENCHMARK
STANDARDIZE
PLAN
IMPLEMENT
PARADIGM SHIFT APPROACH
Level 2:
DATA ANALYSIS
LEVEL 1:
OVERSIGHT & MONITORING
LEVEL 3
REPORTING
LEVEL 4
SCHEDULE & TASK MANAGEMENT
LEVEL 5
ON-SITE JOB COMPLETION
TRADITIONAL
APPROACH
TRANSFORMATIONAL
SHIFT
3
PRODUCT
SUITE
Safety Risk
Management System
(SRMS)
Operability
Development
Management
System (ODMS)
Labour,
Equipment
& Materials
Management
System
(LEMS)
Project
Governance
Management
System
Single access point
and database for all
information ensuring
standardization and
consistency.
MASTER
ASSET & TAG
MANAGER
Manage through
standards and
naming convention,
approval, revocation,
workflows and a
structured MOC
tailored to the
Enterprise Client.
Assign and track the
completion of
preservation tasks
simply by providing
information on the
equipment, tools and
consumables.
ASSET
PRESERVATION
& WARRANTY
Identify steps,
resources, tools and
documents required
to perform any job.
Develop and maintain
job and task libraries
for both asset and
work activities.
STANDARD
JOB & TASK
MODELLING
Manage project
involvement,
purchasing
information and
track scheduling for
Vendors, Suppliers
and Manufacturers.
RESOURCE
MANAGER
MOC oversees the
assigning, tracking,
reporting and approval
of action items required
to implement changes
in highly regulated
industrial environments.
MANAGEMENT
OF CHANGE
(MOC)
5 Product
Suites
The System is a comprehensive enterprise level cloud software suite that
enables an industrial enterprise to report and oversee multi-discipline
tasks being performed in real-time globally.
DOCUMENT
& DRAWING
CORE MODULE
Commissioning &
Completions
Management
System (CCMS)
Core Modules
PROJECT GOVERNANCE SYSTEM REQUIREMENT
LEVEL 1 – DASHBOARDS & BUSINESS REPORTS
 With Project Governance Management System (PGMS), it is simple.
View the right information, from the right groups, at the right time. Binding the
entire suite of applications, comprising of the Completion & Commissioning (CCMS),
Safety Risk (SRMS), Operability Development (ODMS) and Labour, Equipment &
Material (LEMS) Management Systems. PGMS allows management to roll up Level 5
data for any phase or discipline of a project. Everything that is needed by the
management team to plan, estimate, execute and control project outcomes are
visible via:
 Project Summary Dashboards
 Project Performance Reporting
 Real-time Data Report
 Alerts & Intervention
 Location Alerts
4
Business Unit / Projects Lifecycle Dashboard
Monthly Executive Reports
Analysis Reports
LEVEL 1 – DASHBOARDS DESIGN
5
LEVEL 1 – ALERTS & INTERVENTION
6
User is able to drill down the information of
each project by clicking on the alerts.
Under Control
Warning
Needs intervention
Performance Summaries
Report Publication and Review
Phase Readiness Reviews / EVM Analysis
Project Reviews & Definition Rating
Reports
LEVEL 2 – ARTIFICIAL INTELLIGENCE
 Data analysis
7
 Consolidated reporting  Trending & Forecasting
LEVEL 3 – DATA ENTRY & REPORTING
 Easy data-entry
8
 Customized Reporting  Customized Workflows
and Approvals
WBS Setup
Risks / Issues / Lessons Learned
Collaboration – Contracts / RFIs
Management of Change
Procurement Estimating & Costing
KEY TAKE-AWAYS
The System Integrator will enable Petronas to :
 Gain ownership and control of all project information
 Have stringent management and full auditable governance
process
 Track responsibilities and accountabilities of project’s
stakeholders
 Detailed and reliable data from top to bottom
9
PROJECT GOVERNANCE FRAMEWORK
10

Mais conteúdo relacionado

Mais procurados

Principles of program governance
Principles of program governancePrinciples of program governance
Principles of program governanceGlen Alleman
 
Mohr circle mohr circle anaysisand application
Mohr circle     mohr circle anaysisand applicationMohr circle     mohr circle anaysisand application
Mohr circle mohr circle anaysisand applicationShivam Jain
 
First class mine manager exam (UR) legislation question papers 2002-10
First class mine manager exam (UR)  legislation question papers 2002-10First class mine manager exam (UR)  legislation question papers 2002-10
First class mine manager exam (UR) legislation question papers 2002-10Mohit Singh
 
Mass Mining Services and Statement of Qualification
Mass Mining Services and Statement of QualificationMass Mining Services and Statement of Qualification
Mass Mining Services and Statement of QualificationAydar Kairbekov
 
Third-Party Risk Management
Third-Party Risk ManagementThird-Party Risk Management
Third-Party Risk ManagementMark Scales
 
rotary drilling.pptx
rotary drilling.pptxrotary drilling.pptx
rotary drilling.pptxTuralEmirli
 
PMO View Interactive Dashboard
PMO View Interactive DashboardPMO View Interactive Dashboard
PMO View Interactive DashboardMatt Angerer
 
4. COFFERDAM (ACE) 2160601 GTU
4. COFFERDAM (ACE) 2160601 GTU4. COFFERDAM (ACE) 2160601 GTU
4. COFFERDAM (ACE) 2160601 GTUVATSAL PATEL
 
How to conduct an AML risk assessment
How to conduct an AML risk assessmentHow to conduct an AML risk assessment
How to conduct an AML risk assessmentAsia Pacific AML
 
Secondary Blasting Standard Operating Procedure
Secondary Blasting Standard Operating ProcedureSecondary Blasting Standard Operating Procedure
Secondary Blasting Standard Operating ProcedureCollins Sikanyika
 
  Fabricação de protótipo miniatura de Tunnel Boring Machine, construção de b...
 Fabricação de protótipo miniatura de Tunnel Boring Machine, construção de b... Fabricação de protótipo miniatura de Tunnel Boring Machine, construção de b...
  Fabricação de protótipo miniatura de Tunnel Boring Machine, construção de b...Cesar Pinheiro
 
Ey prm-predicting-project-risks
Ey prm-predicting-project-risksEy prm-predicting-project-risks
Ey prm-predicting-project-risksdrrb1331
 

Mais procurados (20)

Principles of program governance
Principles of program governancePrinciples of program governance
Principles of program governance
 
Mohr circle mohr circle anaysisand application
Mohr circle     mohr circle anaysisand applicationMohr circle     mohr circle anaysisand application
Mohr circle mohr circle anaysisand application
 
First class mine manager exam (UR) legislation question papers 2002-10
First class mine manager exam (UR)  legislation question papers 2002-10First class mine manager exam (UR)  legislation question papers 2002-10
First class mine manager exam (UR) legislation question papers 2002-10
 
P30 information management system webinar
P30 information management system webinarP30 information management system webinar
P30 information management system webinar
 
Mass Mining Services and Statement of Qualification
Mass Mining Services and Statement of QualificationMass Mining Services and Statement of Qualification
Mass Mining Services and Statement of Qualification
 
Design of weir on river cauvery near thottilpatti village
Design of weir on river cauvery near thottilpatti villageDesign of weir on river cauvery near thottilpatti village
Design of weir on river cauvery near thottilpatti village
 
Agile & Lean PMO
Agile & Lean PMOAgile & Lean PMO
Agile & Lean PMO
 
Third-Party Risk Management
Third-Party Risk ManagementThird-Party Risk Management
Third-Party Risk Management
 
Audit Methodology
Audit MethodologyAudit Methodology
Audit Methodology
 
rotary drilling.pptx
rotary drilling.pptxrotary drilling.pptx
rotary drilling.pptx
 
Engineering Hydrology
Engineering HydrologyEngineering Hydrology
Engineering Hydrology
 
PMO View Interactive Dashboard
PMO View Interactive DashboardPMO View Interactive Dashboard
PMO View Interactive Dashboard
 
4. COFFERDAM (ACE) 2160601 GTU
4. COFFERDAM (ACE) 2160601 GTU4. COFFERDAM (ACE) 2160601 GTU
4. COFFERDAM (ACE) 2160601 GTU
 
How to conduct an AML risk assessment
How to conduct an AML risk assessmentHow to conduct an AML risk assessment
How to conduct an AML risk assessment
 
Air Blast Mine Safety
Air Blast Mine SafetyAir Blast Mine Safety
Air Blast Mine Safety
 
Secondary Blasting Standard Operating Procedure
Secondary Blasting Standard Operating ProcedureSecondary Blasting Standard Operating Procedure
Secondary Blasting Standard Operating Procedure
 
PMP Exam Notes
PMP Exam NotesPMP Exam Notes
PMP Exam Notes
 
  Fabricação de protótipo miniatura de Tunnel Boring Machine, construção de b...
 Fabricação de protótipo miniatura de Tunnel Boring Machine, construção de b... Fabricação de protótipo miniatura de Tunnel Boring Machine, construção de b...
  Fabricação de protótipo miniatura de Tunnel Boring Machine, construção de b...
 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniques
 
Ey prm-predicting-project-risks
Ey prm-predicting-project-risksEy prm-predicting-project-risks
Ey prm-predicting-project-risks
 

Destaque

Oil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
Oil and Gas Company PETRONAS BERHAD Microeconomics and MacroeconomicsOil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
Oil and Gas Company PETRONAS BERHAD Microeconomics and MacroeconomicsAbdul Hamzzah
 
Assignment 2
Assignment 2 Assignment 2
Assignment 2 Nur Azura
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Easwaran Kanason
 
Bab6jana ekonomi malaysia dgn minyak gas dan tenaga
Bab6jana ekonomi malaysia dgn minyak gas dan tenagaBab6jana ekonomi malaysia dgn minyak gas dan tenaga
Bab6jana ekonomi malaysia dgn minyak gas dan tenagaAlFakir Fikri AlTakiri
 
Best practices in chemical management webinar
Best practices in chemical management webinarBest practices in chemical management webinar
Best practices in chemical management webinarSiteHawk
 
Agile Transformation Governance Model
Agile Transformation Governance ModelAgile Transformation Governance Model
Agile Transformation Governance ModelACM
 
Chemical Safety made easy for SHO
Chemical Safety made easy for SHOChemical Safety made easy for SHO
Chemical Safety made easy for SHOMarini Ghafar
 
Occupational safety and health (use and standards of exposure of chemicals ha...
Occupational safety and health (use and standards of exposure of chemicals ha...Occupational safety and health (use and standards of exposure of chemicals ha...
Occupational safety and health (use and standards of exposure of chemicals ha...blackwhitecat
 
Working safely with chemicals
Working safely with chemicalsWorking safely with chemicals
Working safely with chemicalsAkshay Wilson
 
APM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challengesAPM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challengesAssociation for Project Management
 
Project governance
Project governanceProject governance
Project governanceGlen Alleman
 
Petronas exploration guidelines
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelinesEaswaran Kanason
 
Project Governance Model
Project Governance ModelProject Governance Model
Project Governance ModelConstient
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Hussain Bandukwala
 
HAZARDOUS WASTE MANAGEMENT---PPT
HAZARDOUS WASTE MANAGEMENT---PPTHAZARDOUS WASTE MANAGEMENT---PPT
HAZARDOUS WASTE MANAGEMENT---PPTMAHAMMED RAFI
 

Destaque (17)

Oil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
Oil and Gas Company PETRONAS BERHAD Microeconomics and MacroeconomicsOil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
Oil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
 
Assignment 2
Assignment 2 Assignment 2
Assignment 2
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)
 
Bab6jana ekonomi malaysia dgn minyak gas dan tenaga
Bab6jana ekonomi malaysia dgn minyak gas dan tenagaBab6jana ekonomi malaysia dgn minyak gas dan tenaga
Bab6jana ekonomi malaysia dgn minyak gas dan tenaga
 
Best practices in chemical management webinar
Best practices in chemical management webinarBest practices in chemical management webinar
Best practices in chemical management webinar
 
Agile Transformation Governance Model
Agile Transformation Governance ModelAgile Transformation Governance Model
Agile Transformation Governance Model
 
Chemical Safety made easy for SHO
Chemical Safety made easy for SHOChemical Safety made easy for SHO
Chemical Safety made easy for SHO
 
Occupational safety and health (use and standards of exposure of chemicals ha...
Occupational safety and health (use and standards of exposure of chemicals ha...Occupational safety and health (use and standards of exposure of chemicals ha...
Occupational safety and health (use and standards of exposure of chemicals ha...
 
Working safely with chemicals
Working safely with chemicalsWorking safely with chemicals
Working safely with chemicals
 
APM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challengesAPM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challenges
 
Project governance
Project governanceProject governance
Project governance
 
Petronas exploration guidelines
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelines
 
PPM Global survey (with outputs)
PPM Global survey (with outputs)PPM Global survey (with outputs)
PPM Global survey (with outputs)
 
Project Governance Model
Project Governance ModelProject Governance Model
Project Governance Model
 
Project governance
Project governanceProject governance
Project governance
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)
 
HAZARDOUS WASTE MANAGEMENT---PPT
HAZARDOUS WASTE MANAGEMENT---PPTHAZARDOUS WASTE MANAGEMENT---PPT
HAZARDOUS WASTE MANAGEMENT---PPT
 

Semelhante a Petronas Project Governance and Management Systems deal

Marlabs Capabilities Overview: Application Maintenance Support Services
Marlabs Capabilities Overview: Application Maintenance Support Services Marlabs Capabilities Overview: Application Maintenance Support Services
Marlabs Capabilities Overview: Application Maintenance Support Services Marlabs
 
MuneerKhanResume v1
MuneerKhanResume v1MuneerKhanResume v1
MuneerKhanResume v1muneer khan
 
Srinivas pendam resume-nyc
Srinivas pendam resume-nycSrinivas pendam resume-nyc
Srinivas pendam resume-nycspendam
 
Brad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application LifecycleBrad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application LifecycleSoftware Guru
 
Pwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learnedPwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learnedAvi Kumar
 
Evolution of Software Engineering in NCTR Projects
Evolution of Software Engineering in NCTR  Projects   Evolution of Software Engineering in NCTR  Projects
Evolution of Software Engineering in NCTR Projects Mohammed Abbas
 
ADEPP & Other Software
ADEPP & Other SoftwareADEPP & Other Software
ADEPP & Other SoftwareFabienne Salimi
 
Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?Jauhari Ismail
 
SDLC Models and Their Implementation
SDLC Models and Their ImplementationSDLC Models and Their Implementation
SDLC Models and Their ImplementationSonal Tiwari
 
Using Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A SimplifiedUsing Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A Simplifiedcbb010
 
Company Operations Management PowerPoint Presentation Slides
Company Operations Management PowerPoint Presentation SlidesCompany Operations Management PowerPoint Presentation Slides
Company Operations Management PowerPoint Presentation SlidesSlideTeam
 
Lecture 6 & 7.pdf
Lecture 6 & 7.pdfLecture 6 & 7.pdf
Lecture 6 & 7.pdfRaoShahid10
 

Semelhante a Petronas Project Governance and Management Systems deal (20)

Marlabs Capabilities Overview: Application Maintenance Support Services
Marlabs Capabilities Overview: Application Maintenance Support Services Marlabs Capabilities Overview: Application Maintenance Support Services
Marlabs Capabilities Overview: Application Maintenance Support Services
 
MuneerKhanResume v1
MuneerKhanResume v1MuneerKhanResume v1
MuneerKhanResume v1
 
Srinivas pendam resume-nyc
Srinivas pendam resume-nycSrinivas pendam resume-nyc
Srinivas pendam resume-nyc
 
Brad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application LifecycleBrad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application Lifecycle
 
Pwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learnedPwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learned
 
Evolution of Software Engineering in NCTR Projects
Evolution of Software Engineering in NCTR  Projects   Evolution of Software Engineering in NCTR  Projects
Evolution of Software Engineering in NCTR Projects
 
ADEPP & Other Software
ADEPP & Other SoftwareADEPP & Other Software
ADEPP & Other Software
 
Software Development Life Cycle Part II
Software Development Life Cycle Part IISoftware Development Life Cycle Part II
Software Development Life Cycle Part II
 
Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)
 
Harvinder Singh-Resume
Harvinder Singh-ResumeHarvinder Singh-Resume
Harvinder Singh-Resume
 
Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?
 
Louie Relano
Louie RelanoLouie Relano
Louie Relano
 
Maria Managment Spectrum
Maria Managment SpectrumMaria Managment Spectrum
Maria Managment Spectrum
 
CV -UmerAslam
CV -UmerAslamCV -UmerAslam
CV -UmerAslam
 
SDLC Models and Their Implementation
SDLC Models and Their ImplementationSDLC Models and Their Implementation
SDLC Models and Their Implementation
 
Saurabh Malhotra-CV
Saurabh Malhotra-CVSaurabh Malhotra-CV
Saurabh Malhotra-CV
 
Using Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A SimplifiedUsing Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A Simplified
 
Company Operations Management PowerPoint Presentation Slides
Company Operations Management PowerPoint Presentation SlidesCompany Operations Management PowerPoint Presentation Slides
Company Operations Management PowerPoint Presentation Slides
 
I nearshore
I nearshore I nearshore
I nearshore
 
Lecture 6 & 7.pdf
Lecture 6 & 7.pdfLecture 6 & 7.pdf
Lecture 6 & 7.pdf
 

Petronas Project Governance and Management Systems deal

  • 1.  Current Practice Study • Project Culture • Project Standards  System Requirement Study  On site and Remote Assistance  Local SME Representation  End to End PETRONAS PROJECT GOVERNANCE REQUIREMENTS 1 Petronas requires a System Integrator dealing with various projects and armed with the latest technologies that can compliment most of the existing systems out in the market. ENGAGE ANALYSE DESIGN DEVELOP DEPLOY SUPPORT  Stakeholders  Identify Enterprise needs  Suit Clients Requirements  Customizable  Simulation & Pilot Phase  Gap Analysis  Flexible  Best Practice GOVERNANCE  MONITORING  COMMISSIONING Client Customization Network Architecture On-Site Training
  • 2. 2 SUPPORT & GUIDE REVIEW & BENCHMARK STANDARDIZE PLAN IMPLEMENT PARADIGM SHIFT APPROACH Level 2: DATA ANALYSIS LEVEL 1: OVERSIGHT & MONITORING LEVEL 3 REPORTING LEVEL 4 SCHEDULE & TASK MANAGEMENT LEVEL 5 ON-SITE JOB COMPLETION TRADITIONAL APPROACH TRANSFORMATIONAL SHIFT
  • 3. 3 PRODUCT SUITE Safety Risk Management System (SRMS) Operability Development Management System (ODMS) Labour, Equipment & Materials Management System (LEMS) Project Governance Management System Single access point and database for all information ensuring standardization and consistency. MASTER ASSET & TAG MANAGER Manage through standards and naming convention, approval, revocation, workflows and a structured MOC tailored to the Enterprise Client. Assign and track the completion of preservation tasks simply by providing information on the equipment, tools and consumables. ASSET PRESERVATION & WARRANTY Identify steps, resources, tools and documents required to perform any job. Develop and maintain job and task libraries for both asset and work activities. STANDARD JOB & TASK MODELLING Manage project involvement, purchasing information and track scheduling for Vendors, Suppliers and Manufacturers. RESOURCE MANAGER MOC oversees the assigning, tracking, reporting and approval of action items required to implement changes in highly regulated industrial environments. MANAGEMENT OF CHANGE (MOC) 5 Product Suites The System is a comprehensive enterprise level cloud software suite that enables an industrial enterprise to report and oversee multi-discipline tasks being performed in real-time globally. DOCUMENT & DRAWING CORE MODULE Commissioning & Completions Management System (CCMS) Core Modules PROJECT GOVERNANCE SYSTEM REQUIREMENT
  • 4. LEVEL 1 – DASHBOARDS & BUSINESS REPORTS  With Project Governance Management System (PGMS), it is simple. View the right information, from the right groups, at the right time. Binding the entire suite of applications, comprising of the Completion & Commissioning (CCMS), Safety Risk (SRMS), Operability Development (ODMS) and Labour, Equipment & Material (LEMS) Management Systems. PGMS allows management to roll up Level 5 data for any phase or discipline of a project. Everything that is needed by the management team to plan, estimate, execute and control project outcomes are visible via:  Project Summary Dashboards  Project Performance Reporting  Real-time Data Report  Alerts & Intervention  Location Alerts 4 Business Unit / Projects Lifecycle Dashboard Monthly Executive Reports Analysis Reports
  • 5. LEVEL 1 – DASHBOARDS DESIGN 5
  • 6. LEVEL 1 – ALERTS & INTERVENTION 6 User is able to drill down the information of each project by clicking on the alerts. Under Control Warning Needs intervention
  • 7. Performance Summaries Report Publication and Review Phase Readiness Reviews / EVM Analysis Project Reviews & Definition Rating Reports LEVEL 2 – ARTIFICIAL INTELLIGENCE  Data analysis 7  Consolidated reporting  Trending & Forecasting
  • 8. LEVEL 3 – DATA ENTRY & REPORTING  Easy data-entry 8  Customized Reporting  Customized Workflows and Approvals WBS Setup Risks / Issues / Lessons Learned Collaboration – Contracts / RFIs Management of Change Procurement Estimating & Costing
  • 9. KEY TAKE-AWAYS The System Integrator will enable Petronas to :  Gain ownership and control of all project information  Have stringent management and full auditable governance process  Track responsibilities and accountabilities of project’s stakeholders  Detailed and reliable data from top to bottom 9