PMBOK 4th Edition              PMI-CCVC Time managment PMP Prep                                      6/18/2011




                                      Progressive elaboration where near term work is planned in detail and
  1       Define Activities       a
                                      future work is planned at a higher level of the WBS.

                                      The process of estimating the type and quantities of material, people,
  2     Sequence Activities       b
                                      equipment, or supplies required to perform each activity.

         Estimate Activity            The process of monitoring the status of the project to update project
  3                               c
             Resources                progress and managing changes to the schedule baseline.

         Estimate Activity            Specify when and how long identified project resources are available.
  4                               d
             Durations                This includes resource skill level and geographical locations of orgin.
                                      The process of identifying and documenting relationships among the
  5      Develop Schedule         e
                                      project activities.
                                      Preferred logic, preferential logic, or soft logic. When fast tracking
  6      Control Schedule         f   techniques are used, these should be reviewed and considered for
                                      modification or removal.
                                      A project schedule developed from the schedule network analysis. It is
      Finalized and Approved          accepted and approved by the project management team as the
  7                               g
              Schedule                schedule with start and finish dates. It is a component of the project
                                      management plan.
                                      Uses Most likely, Optimistic and Pessimistic values for Three-Point
  8       Decomposition           h
                                      Estimates.
                                      Resource need is estimated and the quantities are totaled for each
  9    Rolling Wave Planning      i
                                      activitiy's resources.
                                      Uses parameters such as duration, budget, size, weight and complexity
 10      Activity Attributes      j   from a previous project as the basis for estimating the same parameter
                                      for a future project.
            Precedence
                                      Used for schedule development and for selecting, ordering, and sorting
 11    Diagramming Method         k
                                      the planned activities in reports.
              (PDM)
           Discretionary
 12                               l   The baseline that is used in the Control Schedule process.
           dependencies
                                      Subdividing the project work packages into smaller, more manageable
 13     Resource Calendars        m
                                      compoents called activities.
                                      Uses boxes, referred to as nodes, to represent activities, and connects
 14    Bottom-Up Estimating       n   them with arrows that show the logical relationships that exist
                                      between them. This technique is also called Activity-On-Node (AON).

       Resource Breakdown             A structure of identified resources by resource category and resource
 15                               o
            Structure                 type.

                                      A schedule network analysis technique applied to a schedule that has
 16    Analogous Estimating       p been analysised by critical path method. Can be used when shared
                                      resources are only available at certain times or limited quantities.

      Program Evaluation and
                                      Schedule performance measurements (SV, SPI) are used to assess the
 17      Review Technique         q
                                      changes from the original schedule baseline.
              (PERT)

                                           Page 1 of 2
PMBOK 4th Edition            PMI-CCVC Time managment PMP Prep                                      6/18/2011


         Schedule Network           Uses analytical techniques such as critical path method, critical chain
 18                             r
             Analysis               method and resource leveling for generating a project schedule.

                                    The process of approximating the number of work periods needed to
 19      Resource Leveling      s
                                    complete individual activities with estimated resources.

                                    The process of analyzing activity sequences, durations, resource
 20      Schedule Baseline      t
                                    requirements, and schedule constraints to create the project schedule.
                                    The process of identifying the specific actions to be performed to
 21      Variance Analysis      v
                                    produce the project deliverables.




                                         Page 2 of 2

Mais conteúdo relacionado

Mais procurados

Harvey.tony
Harvey.tonyHarvey.tony
Harvey.tony
NASAPMC
 
Harrison.g.poole.k
Harrison.g.poole.kHarrison.g.poole.k
Harrison.g.poole.k
NASAPMC
 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarie
NASAPMC
 
Sally.godfrey
Sally.godfrey Sally.godfrey
Sally.godfrey
NASAPMC
 
Greathouse
GreathouseGreathouse
Greathouse
NASAPMC
 
Schedule levels-as-presented 02-may11
Schedule levels-as-presented  02-may11Schedule levels-as-presented  02-may11
Schedule levels-as-presented 02-may11
PMA Consultants
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.cioletti
NASAPMC
 

Mais procurados (19)

Harvey.tony
Harvey.tonyHarvey.tony
Harvey.tony
 
Harrison.g.poole.k
Harrison.g.poole.kHarrison.g.poole.k
Harrison.g.poole.k
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Pmbok 4th edition chapter 6 - Project Time Management
Pmbok 4th edition   chapter 6 - Project Time Management Pmbok 4th edition   chapter 6 - Project Time Management
Pmbok 4th edition chapter 6 - Project Time Management
 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarie
 
Resource allocation and smoothing
Resource allocation and smoothingResource allocation and smoothing
Resource allocation and smoothing
 
Sally.godfrey
Sally.godfrey Sally.godfrey
Sally.godfrey
 
Greathouse
GreathouseGreathouse
Greathouse
 
Pmbok6
Pmbok6Pmbok6
Pmbok6
 
105 project time management
105 project time management105 project time management
105 project time management
 
Schedule Design AACE
Schedule Design AACESchedule Design AACE
Schedule Design AACE
 
Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineering
 
PM Session 6
PM Session 6PM Session 6
PM Session 6
 
Ch6 resources
Ch6 resourcesCh6 resources
Ch6 resources
 
Qimonda Pm Foils
Qimonda Pm FoilsQimonda Pm Foils
Qimonda Pm Foils
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
 
Back to Basics: Resource planning
Back to Basics: Resource planningBack to Basics: Resource planning
Back to Basics: Resource planning
 
Schedule levels-as-presented 02-may11
Schedule levels-as-presented  02-may11Schedule levels-as-presented  02-may11
Schedule levels-as-presented 02-may11
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.cioletti
 

Destaque

Gender and Something 2016
Gender and Something 2016Gender and Something 2016
Gender and Something 2016
Ross Logan
 

Destaque (18)

Ritetrac consulting training calender in 2017
Ritetrac consulting training calender in 2017Ritetrac consulting training calender in 2017
Ritetrac consulting training calender in 2017
 
O Q U E F A Z E M O S M I L I T A R E S E M I
O  Q U E  F A Z E M  O S  M I L I T A R E S    E M IO  Q U E  F A Z E M  O S  M I L I T A R E S    E M I
O Q U E F A Z E M O S M I L I T A R E S E M I
 
T353 Web
T353 WebT353 Web
T353 Web
 
T326
T326T326
T326
 
Pmp integration management
Pmp integration managementPmp integration management
Pmp integration management
 
Pmp exam prep Pdf- 2
Pmp exam prep Pdf- 2Pmp exam prep Pdf- 2
Pmp exam prep Pdf- 2
 
Famílias imigrantes
Famílias imigrantesFamílias imigrantes
Famílias imigrantes
 
Prevención y detección de amenazas avanzadas
Prevención y detección de amenazas avanzadasPrevención y detección de amenazas avanzadas
Prevención y detección de amenazas avanzadas
 
Gender and Something 2016
Gender and Something 2016Gender and Something 2016
Gender and Something 2016
 
Vías de las pentosas 1
Vías de las pentosas 1Vías de las pentosas 1
Vías de las pentosas 1
 
Presentación trabajo colaborativo
Presentación trabajo colaborativoPresentación trabajo colaborativo
Presentación trabajo colaborativo
 
Prezentacija o sokobanji
Prezentacija o sokobanji Prezentacija o sokobanji
Prezentacija o sokobanji
 
Madrid Agudelo Juliana_AporteIndividual
Madrid Agudelo Juliana_AporteIndividualMadrid Agudelo Juliana_AporteIndividual
Madrid Agudelo Juliana_AporteIndividual
 
Gissela sociologia proyecto
Gissela sociologia proyectoGissela sociologia proyecto
Gissela sociologia proyecto
 
CV-A.MOGHAZY 2
CV-A.MOGHAZY  2CV-A.MOGHAZY  2
CV-A.MOGHAZY 2
 
Next-L Enju 開発ワークショップ #57
Next-L Enju 開発ワークショップ #57Next-L Enju 開発ワークショップ #57
Next-L Enju 開発ワークショップ #57
 
Sexualidad e instinto sexual slideshare
Sexualidad e instinto sexual  slideshareSexualidad e instinto sexual  slideshare
Sexualidad e instinto sexual slideshare
 
初一科学第九章:太阳和太阳系
初一科学第九章:太阳和太阳系初一科学第九章:太阳和太阳系
初一科学第九章:太阳和太阳系
 

Semelhante a Capm time mgmt matching exercise

Ipao great houseetc-programmatic analysis ll
Ipao great houseetc-programmatic analysis llIpao great houseetc-programmatic analysis ll
Ipao great houseetc-programmatic analysis ll
NASAPMC
 
Projectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit PayalProjectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit Payal
AMIT PAYAL
 

Semelhante a Capm time mgmt matching exercise (20)

Session 8 4th edition PMP
Session 8 4th edition PMPSession 8 4th edition PMP
Session 8 4th edition PMP
 
CHAPTER 1.pptx
CHAPTER 1.pptxCHAPTER 1.pptx
CHAPTER 1.pptx
 
CHAPTER 1.pptx
CHAPTER 1.pptxCHAPTER 1.pptx
CHAPTER 1.pptx
 
Ipao great houseetc-programmatic analysis ll
Ipao great houseetc-programmatic analysis llIpao great houseetc-programmatic analysis ll
Ipao great houseetc-programmatic analysis ll
 
TIME MANAGEMENT chapter(6), PMBOK5
TIME MANAGEMENT chapter(6), PMBOK5TIME MANAGEMENT chapter(6), PMBOK5
TIME MANAGEMENT chapter(6), PMBOK5
 
PROJECT PLANNING METHODOLOGIES.pdf
PROJECT  PLANNING METHODOLOGIES.pdfPROJECT  PLANNING METHODOLOGIES.pdf
PROJECT PLANNING METHODOLOGIES.pdf
 
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise EnvironmentPMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
 
Projectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit PayalProjectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit Payal
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Topic 11 - Project Schedule Management.pdf
Topic 11 - Project Schedule Management.pdfTopic 11 - Project Schedule Management.pdf
Topic 11 - Project Schedule Management.pdf
 
Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
 
Pmbok 5th planning process group part two
Pmbok 5th planning process group part twoPmbok 5th planning process group part two
Pmbok 5th planning process group part two
 
Project Management.pptx
 Project  Management.pptx Project  Management.pptx
Project Management.pptx
 
Project Management Presentation material
Project Management Presentation material Project Management Presentation material
Project Management Presentation material
 
PRINCE2
PRINCE2PRINCE2
PRINCE2
 
OR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGOR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULING
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Management
 
Slides chapters 24-25
Slides chapters 24-25Slides chapters 24-25
Slides chapters 24-25
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 

Mais de University High School - Fresno (12)

Capm time mgmt fas track as
Capm time mgmt fas track asCapm time mgmt fas track as
Capm time mgmt fas track as
 
Capm test taking preparation hints
Capm test taking preparation hintsCapm test taking preparation hints
Capm test taking preparation hints
 
Capm process cheat sheet
Capm process cheat sheetCapm process cheat sheet
Capm process cheat sheet
 
Capm time 150 question final key
Capm time 150 question final keyCapm time 150 question final key
Capm time 150 question final key
 
Capm scenario identifying the critical path answers
Capm scenario identifying the critical path   answersCapm scenario identifying the critical path   answers
Capm scenario identifying the critical path answers
 
Capm scenario identifying the critical path answers
Capm scenario identifying the critical path   answersCapm scenario identifying the critical path   answers
Capm scenario identifying the critical path answers
 
Simple perl scripts
Simple perl scriptsSimple perl scripts
Simple perl scripts
 
Zoskctr hints tips 20090723doc
Zoskctr hints tips 20090723docZoskctr hints tips 20090723doc
Zoskctr hints tips 20090723doc
 
Simple perl scripts
Simple perl scriptsSimple perl scripts
Simple perl scripts
 
Source code examples
Source code examplesSource code examples
Source code examples
 
Business computing survey
Business computing surveyBusiness computing survey
Business computing survey
 
Watson
WatsonWatson
Watson
 

Último

!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
laloo_007
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 

Último (20)

Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna Exports
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 

Capm time mgmt matching exercise

  • 1. PMBOK 4th Edition PMI-CCVC Time managment PMP Prep 6/18/2011 Progressive elaboration where near term work is planned in detail and 1 Define Activities a future work is planned at a higher level of the WBS. The process of estimating the type and quantities of material, people, 2 Sequence Activities b equipment, or supplies required to perform each activity. Estimate Activity The process of monitoring the status of the project to update project 3 c Resources progress and managing changes to the schedule baseline. Estimate Activity Specify when and how long identified project resources are available. 4 d Durations This includes resource skill level and geographical locations of orgin. The process of identifying and documenting relationships among the 5 Develop Schedule e project activities. Preferred logic, preferential logic, or soft logic. When fast tracking 6 Control Schedule f techniques are used, these should be reviewed and considered for modification or removal. A project schedule developed from the schedule network analysis. It is Finalized and Approved accepted and approved by the project management team as the 7 g Schedule schedule with start and finish dates. It is a component of the project management plan. Uses Most likely, Optimistic and Pessimistic values for Three-Point 8 Decomposition h Estimates. Resource need is estimated and the quantities are totaled for each 9 Rolling Wave Planning i activitiy's resources. Uses parameters such as duration, budget, size, weight and complexity 10 Activity Attributes j from a previous project as the basis for estimating the same parameter for a future project. Precedence Used for schedule development and for selecting, ordering, and sorting 11 Diagramming Method k the planned activities in reports. (PDM) Discretionary 12 l The baseline that is used in the Control Schedule process. dependencies Subdividing the project work packages into smaller, more manageable 13 Resource Calendars m compoents called activities. Uses boxes, referred to as nodes, to represent activities, and connects 14 Bottom-Up Estimating n them with arrows that show the logical relationships that exist between them. This technique is also called Activity-On-Node (AON). Resource Breakdown A structure of identified resources by resource category and resource 15 o Structure type. A schedule network analysis technique applied to a schedule that has 16 Analogous Estimating p been analysised by critical path method. Can be used when shared resources are only available at certain times or limited quantities. Program Evaluation and Schedule performance measurements (SV, SPI) are used to assess the 17 Review Technique q changes from the original schedule baseline. (PERT) Page 1 of 2
  • 2. PMBOK 4th Edition PMI-CCVC Time managment PMP Prep 6/18/2011 Schedule Network Uses analytical techniques such as critical path method, critical chain 18 r Analysis method and resource leveling for generating a project schedule. The process of approximating the number of work periods needed to 19 Resource Leveling s complete individual activities with estimated resources. The process of analyzing activity sequences, durations, resource 20 Schedule Baseline t requirements, and schedule constraints to create the project schedule. The process of identifying the specific actions to be performed to 21 Variance Analysis v produce the project deliverables. Page 2 of 2