SlideShare uma empresa Scribd logo
1 de 71
Baixar para ler offline
Flexibla spårvagnlösningar
förtillgänglig och attraktiv kollektivtrafik


      Tramway and Tram-Train platform

                               Roland SCHEICH
                                13 January 2010


                                   TRANSPORT
Agenda


                                                          ALSTOM Group / Transport / Sweden


                                                         Tramway solutions - Introduction


                                                         Tramway platform


                                                         Tram-Train platform


                                                         Flexibility in Power Supply


                                                         Tramway solutions – Creativity tool


ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM Gruppen




                                                           ALSTOM
                                                     Gruppen och aktiviteter

                                                                                        2008 / 2009



ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM Gruppen
Två huvudaktiviteter

• Utrustning & service for energiframställning



                                                                                                     • Alstom Transport




      • Alstom Power Systems &
      Service
                                                                                                      • Utrustning & service för järnvägstransport



 ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
 Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM Gruppen
 Översikt

                                                        Orders by region and activity in 2008/09
                                                                                                                              18.7%
                                                                                                                                              32.9%




                                                                                                    Europe                            48.4%
                                                                                                     (48%)
                                                                                                                           Total orders €24.6 bn

                                           North America
                                               (10%)
                                                                                                                                 Asia
                                                                                                                                (10%)
                                                                                                              Africa &
                                 Systems
                                                                                                             Middle East
 Power                                                              Latin America                              (25%)
                                 Service
                                                                         (7%)
 Transport

                                          81,500 employees in over 70 countries
ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM Transport
    Stort sortiment av produkter och tjänster (1/2)
                     Urban                                           Suburban                           Regional                          Main Lines
                                                                                                               Locomotives
Long distance


                                                                                                                                                Very high speed
                                                                                                                             High speed

                                                                                                            Regional

                                                     Tram-train                            Interurban




                                                                 Metro
                          Tram




                                                                                                                                                       Speed

ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM Transport
     Stort sortiment av produkter och tjänster (2/2)
•… och utveckling av nyckelfärdiga system
•Infrastruktur                                                                                       •Service och underhåll




                   •Signalsystem




 ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
 Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM Transport
   Förmåga att leverera helhetslösningar en nyckelfaktor


                                                                                                    Turnkey system
                                                                                                          &
                                                                                                       Underhåll


                                                   Projektledning, Integration & Systemutveckling




           Signalsys                           Elektrifiering                                   Spår           E&M   Underhåll   Rolling Stock

                         Alstom har lång erfarenhet av Turnkey projekt inklusive underhåll

ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM Transport: världsledande
inom höghastighetståg

•TGV Duplex (Frankrike)                                                           •AVE (Spanien)                       •New Pendolino (Italien)




                   •Virgin West Coast Pendolino (SB)                                                 •KTX (Sydkorea)




 ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
 Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM Transport
Teknologiskt ledande produkter
•ERTMS Revolution                                                                                    •Integrerade kontrollcenter
inom "interoperatibla" körsystem                                                                     Global övervakning av komplexa transport system




  •APS                                                                                                •AGV (360 km/h)
  Spårvagn elektrifierad från markplan                                                                •Fjärde generationen höghastighetståg




 ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
 Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM Transport Sverige




                                                                    ALSTOM i Sverige

                                                                                           2008/2009




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Alstom in Sweden – an overview today




     840 employees in total                                                                         Inhabitants/km2
      500 within Power Service
      200 within ECS                                                                                     >1000
      60 within Alstom Hydro                                                                             >500
      80 within Transport                                                                                >250
                                                                                                         >100
                                                                                                         >50
     Alstom offices in 12 cities from north to south                                                     >1
                                                                                                         <1




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM Transport i Sverige
 Nordiska referenser - (1/3)




Arlanda Express
• Startade 1998                                                                                                              Coradia Nordic X61/62
• 7 tåg (4-vagnars)                                                      Coradia Duplex X40 för SJ                               Skånetrafiken
• max fart 200 km/h                                                      • Startade 2005               X40 maintenance           Östgötatrafik
                                                                         • 42 dubbeldeckare tåg        • fram till 2010          Jönköpings Länstrafik
                                                                         • max fart 200 km/h           • 42 tåg (113 cars)       Norrtåg
                                                                                                       • Depå i Västerås         Västtrafik
                                                                                                                             • Regional tåg
                                                                                                                             • Start 2009-2011
Coradia Nordic X60 for                                                                                                       • 79 tåg (4-vagnars)
SL                                                                                                                           • max fart 160/180 km/h
• Pendel tåg
• Startade 2005
                                                                                                                                X61 Skåne FFM
• 71 tåg (6-vagnars)
• max fart 160 km/h                                                                                                             • med Mantena

   ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
   Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM Transport
Nordiska referenser – (2/3)

                                                                                                                            Signal

                                                                                           S-Tog Köpenhamn                  • Växeldriv för Banverket
                                                                                                                            • Växeldriv för Botniabanan med
                                                                                           • Service startade 1996          Vossloh / Strukton
                                                                                           • 105 tåg (8-vagnars)            • Växeldriv för JBV
                                                                                           • 31 tåg (4-vagnars)             • Växeldriv för BaneDK
                                                                                           • max fart 120 km/h              • Digi code för SL



                                                                        LINT DMU för 3 privata danska operatörer

                                                                        • Service startade 2004
                                                                        • 70 tåg (2-vagnars)
                                                                        • Lågt golv
                                                                        • max fart 120 km/h
                                                                                                     Strömmatning

 ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
                                                                                                     • “Bybanan” i Bergen
 Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM Transport
  Nordiska referenser – (3/3)

                                                                                                 Sm6 Pendolino för Karelian
                                                                                                 Trains

                                                                                                 • Kontrakt datum : 2007
                                                                                                 • Service startar 2010
                                                                                                 • 4 tåg (7-vagnar)
                                                                                                 • Kapacitet : 352+2 säten
                                                                                                 • Max hastighet 220 km/h

Sm 3 Pendolino lutande tåg för VR
                                                                                                                              Sm 4 Pendeltåg för VR
• Kontrakt datum : 1995, 2002
                                                                                                                              • Kontrakt datum : 1996, 2002
• Service startade 1999
                                                                                                                              • Service startade 1999
• 18 tåg (6-vagnar)
                                                                                                                              • 20 tåg (2-vagnar)
• Kapacitet : 262 säten
                                                                                                                              • Kapacitet : 196 säten
• Max hastighet 220 km/h
                                                                                                                              • Lågt golv
                                                                                                                              • Max hastighet 160 km/h

   ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
   Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM




                                                                 Tramway solutions

                                                                                         Introduction




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
The tramway is a long story …

                                                                                                    •   First horse tramway in 1832
                                                                                                    •   3000 systems worldwide in 1920
                                                                                                    •   Only 300 in around 1970
                                                                                                    •   Today 400 trams system in operation
                                                                                                        and >100 under construction




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.                                         17
The beginning of a new era




                           In 1987 the tram for Grenoble starts the commercial service
                                                                World Premiere of LOW FLOOR Access

ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
ALSTOM Tramway baseline history




                                                                                                               From Germany
                             From France
                                                                                                    Magdeburg, Darmstadt = Partial low floor
                    Nantes = High floor
                                                                                                          Würzburg = Full low floor
               (upgraded to partial low floor)
                                                                                                        Hannover, London Docklands
        St Etienne, Paris, Rouen = Partial low floor
                                                                                                                 High Floor




                                                                                                                    From Poland
                                                                                                               Tramwaj 105 = High floor
                                                                                                            Tramwaj 116 = Partial low floor


                          From Italy
          Turin, Rome = Partial low floor
       Turin, Messina, Rome = Full low floor

ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Standardisation but Flexibility and Attractiveness

                … out of the complexity of the tramway market!
                                 Tram / Tramway / Streetcar / Light Rail / LRV / Strassenbahn / Stadtbahn
Operational
philosophy




                                                          Low floor                                                                             High floor

                            Full low floor                                  Partial low floor                       For low platform                    For high platform


 ISSUES of Clearance gauge, Track, Power supply,                                                                                           signalling, operation mode, national rules
                    Body width                                                 Track gauge                             Climatic conditions                  Uni-directional / bi-directional
       ... / 2300 / 2400 / 2500 / 2650 mm                        …. / 1000 / … / 1435 / … / 1524 mm               Ice, snow / cold / hot / sand, dust        Number of doors / seat proportions

                      Length                                                     Axle load                                  Max speed                               Signalling system
                Fixed / Extensible                                             8 / 10 / 12,5 t                           70 / 80 / 100 kph              driving-by-sight / … / ATP / ATC / driverless

    Curves radii : horizontal/vertical                                           Gradients                                 Power supply                    Segregated track / mixed traffic
           Platform height                                                      0 … 7% />7%                        City line / main line 1,5 … 25 kV       Mixed operation with railways

                                                                                       Specific national standards / rules / safety



     Tramway CITADIS                                  Tram-Train DUALIS                                  Train-Tram Regio CITADIS                                     Metro METROPOLIS
    ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
    Reproduction, use or disclosure to third parties without express authority is strictly forbidden.                                                                                                   21
CITADIS ™ Tramway Platform




                                                                                              CITADIS

                                                                    10 years of growing success

                                  through Flexibility and Attractiveness
                                             by Modularity


ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
     Flexibility and Attractiveness by Modularity

     Modularity of external and
                                                                                                    Modularity of capacity
     internal design




                                                                                                    Modularity of power supply
                                                                                                    Classic catenary
                                                                                                    Ground power supply
                                                                                                    Battery
ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
                                                                                                    Flywheel, Super capacitors
CITADIS ™
     Flexibility and Attractiveness by Modularity

  Modularity of layout and architecture



                                                                                                    Type X01




                                                                                                    Type X02




                                                                                                    Type X03




                                                                                                    Type X04


ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
     Flexibility and Attractiveness with Reliability

              MODULARITY - STANDARDISATION - CUSTOMISATION


         CARBODY
         MODULES


                 MOTOR                              TRAILER
                 BOGIE                               BOGIE                                    PARTNERS   ADAPTABLE ZONES

             TRACTION
                                                       TCMS
            CONVERTER

             AUXILIARY                            TRACTION                                    SERVICES                     l
            CONVERTER                              MOTOR
                          EQUIPEMENT                                                                               L

ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
       Flexibility and Attractiveness
Interior Design modularity




   ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
   Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
       Flexibility and Attractiveness
Exterior Design modularity




   ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
   Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
     a 10 year saga

          1997                    1st Citadis sold – Montpellier, France – 30 trainsets




                                  2004, 24 new trainsets ordered




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
     a 10 year saga
     1999                        1st Citadis exported – Dublin, Ireland – 26+32 trainsets




  2000                           1st turnkey project – Barcelona, Spain – 37 trainsets, tracks, signaling, maintenance




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
     a 10 year saga
  2000                          1st wireless tram – Bordeaux, France – 1.5 km ground power supply




                                1st Citadis sold in Asia Pacific – Melbourne, Australia – 31+5 trainsets




                                Birth of the new tram-train concept:Regio-Citadis, Kassel, Germany
ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
     a 10 year saga
          2003                  500th Citadis sold – Tram is back in Paris 70 years after its disappearance – 21+34 trainsets




          2004                  1st Citadis sold in North Africa – Tunis – 30+9 trainsets




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
     a 10 year saga
          2004                  1st Citadis equipped with battery – Nice, France – 20 trainsets




          2005                  1st Citadis equipped with a flywheel – Rotterdam, Netherlands (R&D - test)




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
     a 10 year saga
          2007                  1st Citadis in Latin America – Buenos-Aires, Argentina – experimentation




                                Birth of the new cross-over concept: Citadis Dualis Tram-train




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
     a 10 year saga

          2007                  25th City to order a Citadis – Istanbul – 30 trainsets




                                1000th Citadis sold – Lyon City (France)




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
     … and the saga continues …

          2008                  Conquest of North Africa: Oran + Constatine (Algeria), Rabat (Morocco) – 30+27+22 trainsets


                                1st tramway in the Gulf region - Al-Safooh (Dubai) – 11 + 14 trainsets (2 phases)




          2009                  1st order from South America - Brasilia – 20 trainsets

                                1st cumulated order - Brest + Dijon (France) – 52 trainsets

                                                                                                    … to be continued …
ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
     a worldwide reference




                                                                                               Rotterdam
                                                                                           Dublin
                                                                                                                   France: 17 cities
                                                                                 Spain
                                                                             Barcelona                                            Istanbul
                                                                               Madrid
                                                                              Tenerife                                        Jerusalem
                                                                                                      Algiers Tunis
                                                                                                                Constantine
                                                                                                    Rabat Oran
                                                                             Brasilia
                                                                                                                                 Dubai
     33 cities
     12 countries
     1,264 trams ordered                                                                                                                     Melbourne

     >700 trams in service
     >120 million km traveled
     >1.8 billion passengers transported
ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™
    Flexibility and Attractiveness
                                                                                                    Versatility of exterior design




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Tram-Train Platform




                                                                                      Tram-Train

                                                                     Conquering the countryside

                                         with Flexibility and Attractiveness
                                                   by Modularity


ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Tram-Train Platform
     a step further …

  Need for greater fluidity of transport between urban and regional areas

                                                                                                    • Continuous operation without change of train
  Link between a city centre, suburbs
                                                                                                    • Hybrid operation (electric + diesel)
  and countryside
                                                                                                    • Coexistence with city trams / mainline trains

                                                                                                    • Reduced weight
                                                                                                    • Tight curve capability
  Advantages of the tram
                                                                                                    • Short headway
                                                                                                    • Low floor

                                                                                                    • Higher speed (up to 100 km/h)
  Advantages of the train
                                                                                                    • Comfort on long trips


ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Tram-Train
       The need of flexibility and attractiveness
                                                                                                                Attractive link between city and
                                                                                                                region requires:
                                                                                                                • Track link mainline to city
                                    15 kV

                                                                                                                • Dual-voltage operation

                                                                                                        750 V
                                                                                                                • Diesel-hybrid operation

                                                                                                                                     750 V

                                  Diesel

                                                                                                750 V



                                                                                                                                       City network
Regional network
                                                                 15 kV


  ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
  Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Regio CITADIS ™/ CITADIS ™ Dualis
     a flexible and attractive concept

  Alstoms answer to this challenge

                                                                                                    • Continuous operation without change of train
  Regio CITADIS                                                                                     • Hybrid operation (electric + diesel)
                                                                                                    • Coexistence with city trams / mainline trains

                                                                                                    • Reduced weight
                                                                                                    • Tight curve capability
  DUALIS
                                                                                                    • Short headway
                                                                                                    • Low floor

                                                                                                    • Higher speed (up to 100 km/h)
  Advantages of the train
                                                                                                    • Comfort on long trips


ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Regio CITADIS ™
     a new way of travelling

  2004                          1st Dual voltage Regio CITADIS tram-train in service – Kassel, Germany




  2005                          1st Hybrid tram-train in service – Kassel, Germany – 10 trainsets




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Regio CITADIS ™
     a new way of travelling

  2006                          Regio CITADIS starts service in and around Den Haag, Netherlands – 54 trainsets




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™ Dualis:
      Alstom’s new tram-train

     SNCF for French regions

       2007 contract
       31 trainsets
       169 conditional options




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Tram-Train
  Flexibility of Power Supply
                                                                                                    Single-Voltage
                                                                                                          (E)
                                                                                                      600/750 V DC


                                                    Dual-Voltage
                                                       (E-E)
                                                                                                              E
                                           600/750 V DC + 15 kV 162/3 Hz                                                   E        E




                                            600/750 V DC + 25 kV 50 Hz                                        E-E     E    E   E    E




                                             600/750 V DC + 1500 V DC                                         E-DE    DE   E   DE   E




                                             600/750 V DC + 3000 V DC                                        Future   ?    E   ?    E




                                                     Hybrid Vehicle
                                                        (E-DE)

                                     600/750 V DC + diesel power pack

ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Tram-Train
     Flexibility of Comfort arrangements
                                                                                                    Multipurpose areas and comfort for all




             Various door and seating arangements

ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
RegioTram Kassel
                       Impressions




                                                                                                    Tram operation
                                       Operation on
                                      mainline tracks




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™ Tramway Platform




                                              Flexibility of Power Supply

   for attractive city integration and technical flexibility




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Flexibility of power supply
            CITADIS with APS in Bordeaux / France




• Same performances as with Overhead Catenary
• Safety for all road users
• Preservation & Beautifying of urban environment
• Compatible with all types of ground surfaces
• Extendable without interruption
    ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
    Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Flexibility of power supply
        CITADIS with APS in Bordeaux / France




                                                                                                    Opens up the urban horizon

ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Flexibility of power supply
     CITADIS with APS in Bordeaux / France

   In revenue service since 2003
   3 lines : 44 km, 70 vehicles
   Phase 1 : 25 km, 47 stations, 44 rames 10.5 km d'APS
   Phase 2 : 44 km, 84 stations, 70 rames 13.7 km d'APS




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Flexibility of power supply
        CITADIS with APS



                                                                 collector shoes and
                                                                          antennaes




                                 conductor                                                     conductor     Running rail
                                                                   insulated
                                 section 0V                                                   section 750V
                                                                    section
                               (not powered)                                                   (powered)      burried
                                                                      3m
                                    8m                                                             8m        Power Box




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
APS New orders
     Reims

    New LRT line 10 km in concession
    Contract July 2006
    2 km APS in city centre
    Construction: Alstom, Bouygues, Colas
    Alstom scope: 18 Citadis, APS, infrastructure




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
APS New orders
     Angers

New LRT line 12 km
Contract July 2006
APS in city centre - 7.4% gradient &
single track - and in Avrillé suburb
Alstom scope : APS and 17 Citadis




                                                                                                    APS
ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
APS New orders
     Orléans


    Line 1 in operation with Citadis fleet since 2000
    New contract August 2006: line 2 partially with APS
    Alstom scope: 27 CITADIS, APS, tracks, railway signaling




                                                                                                    APS



ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
APS New orders
     Dubai

Phase 1: 11 tramways, 10 kms track, 13 stations
Contract July 2008
Phase 2: 14 tramways, 4 kms track, 6 stations
The first city in the Gulf region to be equipped with a tramway
transit system




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS with batteries – modularity of power supply
  Nice / France




                                                                              Roof mounted             Commercial service since early 2007
                                                                              battey box
                                                                                                          No overhead wires on 2 squares

NiMH-Batteries                                                                                                    Place Masséna: ~435 m
The solution for short wireless section                                                                           Place Garibaldi: ~485 m
Reduced acceleration and max. speed is sufficient to city
centre requirements
   ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
   Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Wireless sections and energy optimization

                                                                                                                           Flywheel system :
                                                                                                    carbon-fiber rotor to store cinetic energy
                                                                                                                            up to 22,000 rpm




    Rotterdam CITADIS equipped with flywheel

SYSTEM TESTING : RATP Paris in 2008
                                                                                                               • With pantograph lowered:
 Energy and power performances
 adapted to city center : reduced speed                                                                                 Crosses Erasmus bridge
                                                                                                                        Reaches 50 km/h
 Storage of braking energy                                                                                              Runs 2 km
 Quick loading during stations stop : « station hopping »                                                      • Energy optimisation
 R&D : height reduced for roof installation on low-floor tramways
ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
CITADIS ™ Tramway Platform




                                                                   Tramway solutions

                         A tool to create an attractive and new city




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
The tramway
     a tool to create an attractive and new city

                  Before




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
The tramway
     a tool to create an attractive and new city

                  After




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
The tramway
     a tool to create an attractive and new city

                  Before




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
The tramway
     a tool to create an attractive and new city

                  After




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
The tramway
     a tool to create an attractive and new city
                 Line B
                  Before




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
The tramway
     a tool to create an attractive and new city

                  AfterB
                   Line




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
The tramway
     a tool to create an attractive and new city

                  Before
                  Line B




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
The tramway
     a tool to create an attractive and new city

                  After
                  Line B




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
The tramway
     a tool to create an attractive and new city

                  Before




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
The tramway
     a tool to create an attractive and new city

                  After




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
The tramway
     a tool to create an attractive and new city

                  Before
                   Line B




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
The tramway
     a tool to create an attractive and new city

                  After




ALSTOM © 2007. We reserve all rights in this document and in the information contained therein.
Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Tack så mycket !


www.alstom.com

Mais conteúdo relacionado

Mais de Transportforum (VTI)

Abstract session 64 Per Olof Bylund
Abstract session 64 Per Olof BylundAbstract session 64 Per Olof Bylund
Abstract session 64 Per Olof BylundTransportforum (VTI)
 

Mais de Transportforum (VTI) (20)

Session 28 Irene Isaksson-Hellman
Session 28 Irene Isaksson-HellmanSession 28 Irene Isaksson-Hellman
Session 28 Irene Isaksson-Hellman
 
Session 40 simon gripner
Session 40 simon gripnerSession 40 simon gripner
Session 40 simon gripner
 
Abstract session 64 Per Olof Bylund
Abstract session 64 Per Olof BylundAbstract session 64 Per Olof Bylund
Abstract session 64 Per Olof Bylund
 
Session 64 Per Olof Bylund
Session 64 Per Olof BylundSession 64 Per Olof Bylund
Session 64 Per Olof Bylund
 
Session 7 Leif Blomqvist
Session 7 Leif BlomqvistSession 7 Leif Blomqvist
Session 7 Leif Blomqvist
 
Session 7 Leif Blomqvist.ppt
Session 7 Leif Blomqvist.pptSession 7 Leif Blomqvist.ppt
Session 7 Leif Blomqvist.ppt
 
Session 28 Per Tyllgren
Session 28 Per TyllgrenSession 28 Per Tyllgren
Session 28 Per Tyllgren
 
Session 69 Tor Skoglund
Session 69 Tor SkoglundSession 69 Tor Skoglund
Session 69 Tor Skoglund
 
Session 69 Peter von Heidenstam
Session 69 Peter von HeidenstamSession 69 Peter von Heidenstam
Session 69 Peter von Heidenstam
 
Session 69 Marie-Louise Lundgren
Session 69 Marie-Louise LundgrenSession 69 Marie-Louise Lundgren
Session 69 Marie-Louise Lundgren
 
Session 69 Isak Jarlebring
Session 69 Isak JarlebringSession 69 Isak Jarlebring
Session 69 Isak Jarlebring
 
Session 69 Christian Udin
Session 69 Christian UdinSession 69 Christian Udin
Session 69 Christian Udin
 
Session 69 Marika Jenstav
Session 69 Marika JenstavSession 69 Marika Jenstav
Session 69 Marika Jenstav
 
Session 69 Jana Sochor
Session 69 Jana SochorSession 69 Jana Sochor
Session 69 Jana Sochor
 
Session 69 Göran Erskérs
Session 69 Göran ErskérsSession 69 Göran Erskérs
Session 69 Göran Erskérs
 
Session 69 Cees de Wijs
Session 69 Cees de WijsSession 69 Cees de Wijs
Session 69 Cees de Wijs
 
Session 69 Björn Dramsvik
Session 69 Björn DramsvikSession 69 Björn Dramsvik
Session 69 Björn Dramsvik
 
Session 69 Bengt Andersson
Session 69 Bengt AnderssonSession 69 Bengt Andersson
Session 69 Bengt Andersson
 
Session 68 Sigurdur Erlingsson
Session 68 Sigurdur ErlingssonSession 68 Sigurdur Erlingsson
Session 68 Sigurdur Erlingsson
 
Session 68 Klas Hansson
Session 68 Klas HanssonSession 68 Klas Hansson
Session 68 Klas Hansson
 

Último

8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 

Último (20)

8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 

Session 4 Roland Scheich

  • 1. Flexibla spårvagnlösningar förtillgänglig och attraktiv kollektivtrafik Tramway and Tram-Train platform Roland SCHEICH 13 January 2010 TRANSPORT
  • 2. Agenda ALSTOM Group / Transport / Sweden Tramway solutions - Introduction Tramway platform Tram-Train platform Flexibility in Power Supply Tramway solutions – Creativity tool ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 3. ALSTOM Gruppen ALSTOM Gruppen och aktiviteter 2008 / 2009 ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 4. ALSTOM Gruppen Två huvudaktiviteter • Utrustning & service for energiframställning • Alstom Transport • Alstom Power Systems & Service • Utrustning & service för järnvägstransport ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 5. ALSTOM Gruppen Översikt Orders by region and activity in 2008/09 18.7% 32.9% Europe 48.4% (48%) Total orders €24.6 bn North America (10%) Asia (10%) Africa & Systems Middle East Power Latin America (25%) Service (7%) Transport 81,500 employees in over 70 countries ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 6. ALSTOM Transport Stort sortiment av produkter och tjänster (1/2) Urban Suburban Regional Main Lines Locomotives Long distance Very high speed High speed Regional Tram-train Interurban Metro Tram Speed ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 7. ALSTOM Transport Stort sortiment av produkter och tjänster (2/2) •… och utveckling av nyckelfärdiga system •Infrastruktur •Service och underhåll •Signalsystem ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 8. ALSTOM Transport Förmåga att leverera helhetslösningar en nyckelfaktor Turnkey system & Underhåll Projektledning, Integration & Systemutveckling Signalsys Elektrifiering Spår E&M Underhåll Rolling Stock Alstom har lång erfarenhet av Turnkey projekt inklusive underhåll ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 9. ALSTOM Transport: världsledande inom höghastighetståg •TGV Duplex (Frankrike) •AVE (Spanien) •New Pendolino (Italien) •Virgin West Coast Pendolino (SB) •KTX (Sydkorea) ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 10. ALSTOM Transport Teknologiskt ledande produkter •ERTMS Revolution •Integrerade kontrollcenter inom "interoperatibla" körsystem Global övervakning av komplexa transport system •APS •AGV (360 km/h) Spårvagn elektrifierad från markplan •Fjärde generationen höghastighetståg ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 11. ALSTOM Transport Sverige ALSTOM i Sverige 2008/2009 ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 12. Alstom in Sweden – an overview today 840 employees in total Inhabitants/km2 500 within Power Service 200 within ECS >1000 60 within Alstom Hydro >500 80 within Transport >250 >100 >50 Alstom offices in 12 cities from north to south >1 <1 ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 13. ALSTOM Transport i Sverige Nordiska referenser - (1/3) Arlanda Express • Startade 1998 Coradia Nordic X61/62 • 7 tåg (4-vagnars) Coradia Duplex X40 för SJ Skånetrafiken • max fart 200 km/h • Startade 2005 X40 maintenance Östgötatrafik • 42 dubbeldeckare tåg • fram till 2010 Jönköpings Länstrafik • max fart 200 km/h • 42 tåg (113 cars) Norrtåg • Depå i Västerås Västtrafik • Regional tåg • Start 2009-2011 Coradia Nordic X60 for • 79 tåg (4-vagnars) SL • max fart 160/180 km/h • Pendel tåg • Startade 2005 X61 Skåne FFM • 71 tåg (6-vagnars) • max fart 160 km/h • med Mantena ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 14. ALSTOM Transport Nordiska referenser – (2/3) Signal S-Tog Köpenhamn • Växeldriv för Banverket • Växeldriv för Botniabanan med • Service startade 1996 Vossloh / Strukton • 105 tåg (8-vagnars) • Växeldriv för JBV • 31 tåg (4-vagnars) • Växeldriv för BaneDK • max fart 120 km/h • Digi code för SL LINT DMU för 3 privata danska operatörer • Service startade 2004 • 70 tåg (2-vagnars) • Lågt golv • max fart 120 km/h Strömmatning ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. • “Bybanan” i Bergen Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 15. ALSTOM Transport Nordiska referenser – (3/3) Sm6 Pendolino för Karelian Trains • Kontrakt datum : 2007 • Service startar 2010 • 4 tåg (7-vagnar) • Kapacitet : 352+2 säten • Max hastighet 220 km/h Sm 3 Pendolino lutande tåg för VR Sm 4 Pendeltåg för VR • Kontrakt datum : 1995, 2002 • Kontrakt datum : 1996, 2002 • Service startade 1999 • Service startade 1999 • 18 tåg (6-vagnar) • 20 tåg (2-vagnar) • Kapacitet : 262 säten • Kapacitet : 196 säten • Max hastighet 220 km/h • Lågt golv • Max hastighet 160 km/h ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 16. ALSTOM Tramway solutions Introduction ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 17. The tramway is a long story … • First horse tramway in 1832 • 3000 systems worldwide in 1920 • Only 300 in around 1970 • Today 400 trams system in operation and >100 under construction ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 17
  • 18. The beginning of a new era In 1987 the tram for Grenoble starts the commercial service World Premiere of LOW FLOOR Access ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 19. ALSTOM Tramway baseline history From Germany From France Magdeburg, Darmstadt = Partial low floor Nantes = High floor Würzburg = Full low floor (upgraded to partial low floor) Hannover, London Docklands St Etienne, Paris, Rouen = Partial low floor High Floor From Poland Tramwaj 105 = High floor Tramwaj 116 = Partial low floor From Italy Turin, Rome = Partial low floor Turin, Messina, Rome = Full low floor ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 20. Standardisation but Flexibility and Attractiveness … out of the complexity of the tramway market! Tram / Tramway / Streetcar / Light Rail / LRV / Strassenbahn / Stadtbahn Operational philosophy Low floor High floor Full low floor Partial low floor For low platform For high platform ISSUES of Clearance gauge, Track, Power supply, signalling, operation mode, national rules Body width Track gauge Climatic conditions Uni-directional / bi-directional ... / 2300 / 2400 / 2500 / 2650 mm …. / 1000 / … / 1435 / … / 1524 mm Ice, snow / cold / hot / sand, dust Number of doors / seat proportions Length Axle load Max speed Signalling system Fixed / Extensible 8 / 10 / 12,5 t 70 / 80 / 100 kph driving-by-sight / … / ATP / ATC / driverless Curves radii : horizontal/vertical Gradients Power supply Segregated track / mixed traffic Platform height 0 … 7% />7% City line / main line 1,5 … 25 kV Mixed operation with railways Specific national standards / rules / safety Tramway CITADIS Tram-Train DUALIS Train-Tram Regio CITADIS Metro METROPOLIS ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 21
  • 21. CITADIS ™ Tramway Platform CITADIS 10 years of growing success through Flexibility and Attractiveness by Modularity ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 22. CITADIS ™ Flexibility and Attractiveness by Modularity Modularity of external and Modularity of capacity internal design Modularity of power supply Classic catenary Ground power supply Battery ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. Flywheel, Super capacitors
  • 23. CITADIS ™ Flexibility and Attractiveness by Modularity Modularity of layout and architecture Type X01 Type X02 Type X03 Type X04 ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 24. CITADIS ™ Flexibility and Attractiveness with Reliability MODULARITY - STANDARDISATION - CUSTOMISATION CARBODY MODULES MOTOR TRAILER BOGIE BOGIE PARTNERS ADAPTABLE ZONES TRACTION TCMS CONVERTER AUXILIARY TRACTION SERVICES l CONVERTER MOTOR EQUIPEMENT L ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 25. CITADIS ™ Flexibility and Attractiveness Interior Design modularity ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 26. CITADIS ™ Flexibility and Attractiveness Exterior Design modularity ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 27. CITADIS ™ a 10 year saga 1997 1st Citadis sold – Montpellier, France – 30 trainsets 2004, 24 new trainsets ordered ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 28. CITADIS ™ a 10 year saga 1999 1st Citadis exported – Dublin, Ireland – 26+32 trainsets 2000 1st turnkey project – Barcelona, Spain – 37 trainsets, tracks, signaling, maintenance ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 29. CITADIS ™ a 10 year saga 2000 1st wireless tram – Bordeaux, France – 1.5 km ground power supply 1st Citadis sold in Asia Pacific – Melbourne, Australia – 31+5 trainsets Birth of the new tram-train concept:Regio-Citadis, Kassel, Germany ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 30. CITADIS ™ a 10 year saga 2003 500th Citadis sold – Tram is back in Paris 70 years after its disappearance – 21+34 trainsets 2004 1st Citadis sold in North Africa – Tunis – 30+9 trainsets ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 31. CITADIS ™ a 10 year saga 2004 1st Citadis equipped with battery – Nice, France – 20 trainsets 2005 1st Citadis equipped with a flywheel – Rotterdam, Netherlands (R&D - test) ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 32. CITADIS ™ a 10 year saga 2007 1st Citadis in Latin America – Buenos-Aires, Argentina – experimentation Birth of the new cross-over concept: Citadis Dualis Tram-train ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 33. CITADIS ™ a 10 year saga 2007 25th City to order a Citadis – Istanbul – 30 trainsets 1000th Citadis sold – Lyon City (France) ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 34. CITADIS ™ … and the saga continues … 2008 Conquest of North Africa: Oran + Constatine (Algeria), Rabat (Morocco) – 30+27+22 trainsets 1st tramway in the Gulf region - Al-Safooh (Dubai) – 11 + 14 trainsets (2 phases) 2009 1st order from South America - Brasilia – 20 trainsets 1st cumulated order - Brest + Dijon (France) – 52 trainsets … to be continued … ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 35. CITADIS ™ a worldwide reference Rotterdam Dublin France: 17 cities Spain Barcelona Istanbul Madrid Tenerife Jerusalem Algiers Tunis Constantine Rabat Oran Brasilia Dubai 33 cities 12 countries 1,264 trams ordered Melbourne >700 trams in service >120 million km traveled >1.8 billion passengers transported ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 36. CITADIS ™ Flexibility and Attractiveness Versatility of exterior design ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 37. Tram-Train Platform Tram-Train Conquering the countryside with Flexibility and Attractiveness by Modularity ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 38. Tram-Train Platform a step further … Need for greater fluidity of transport between urban and regional areas • Continuous operation without change of train Link between a city centre, suburbs • Hybrid operation (electric + diesel) and countryside • Coexistence with city trams / mainline trains • Reduced weight • Tight curve capability Advantages of the tram • Short headway • Low floor • Higher speed (up to 100 km/h) Advantages of the train • Comfort on long trips ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 39. Tram-Train The need of flexibility and attractiveness Attractive link between city and region requires: • Track link mainline to city 15 kV • Dual-voltage operation 750 V • Diesel-hybrid operation 750 V Diesel 750 V City network Regional network 15 kV ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 40. Regio CITADIS ™/ CITADIS ™ Dualis a flexible and attractive concept Alstoms answer to this challenge • Continuous operation without change of train Regio CITADIS • Hybrid operation (electric + diesel) • Coexistence with city trams / mainline trains • Reduced weight • Tight curve capability DUALIS • Short headway • Low floor • Higher speed (up to 100 km/h) Advantages of the train • Comfort on long trips ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 41. Regio CITADIS ™ a new way of travelling 2004 1st Dual voltage Regio CITADIS tram-train in service – Kassel, Germany 2005 1st Hybrid tram-train in service – Kassel, Germany – 10 trainsets ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 42. Regio CITADIS ™ a new way of travelling 2006 Regio CITADIS starts service in and around Den Haag, Netherlands – 54 trainsets ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 43. CITADIS ™ Dualis: Alstom’s new tram-train SNCF for French regions 2007 contract 31 trainsets 169 conditional options ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 44. Tram-Train Flexibility of Power Supply Single-Voltage (E) 600/750 V DC Dual-Voltage (E-E) E 600/750 V DC + 15 kV 162/3 Hz E E 600/750 V DC + 25 kV 50 Hz E-E E E E E 600/750 V DC + 1500 V DC E-DE DE E DE E 600/750 V DC + 3000 V DC Future ? E ? E Hybrid Vehicle (E-DE) 600/750 V DC + diesel power pack ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 45. Tram-Train Flexibility of Comfort arrangements Multipurpose areas and comfort for all Various door and seating arangements ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 46. RegioTram Kassel Impressions Tram operation Operation on mainline tracks ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 47. CITADIS ™ Tramway Platform Flexibility of Power Supply for attractive city integration and technical flexibility ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 48. Flexibility of power supply CITADIS with APS in Bordeaux / France • Same performances as with Overhead Catenary • Safety for all road users • Preservation & Beautifying of urban environment • Compatible with all types of ground surfaces • Extendable without interruption ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 49. Flexibility of power supply CITADIS with APS in Bordeaux / France Opens up the urban horizon ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 50. Flexibility of power supply CITADIS with APS in Bordeaux / France In revenue service since 2003 3 lines : 44 km, 70 vehicles Phase 1 : 25 km, 47 stations, 44 rames 10.5 km d'APS Phase 2 : 44 km, 84 stations, 70 rames 13.7 km d'APS ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 51. Flexibility of power supply CITADIS with APS collector shoes and antennaes conductor conductor Running rail insulated section 0V section 750V section (not powered) (powered) burried 3m 8m 8m Power Box ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 52. APS New orders Reims New LRT line 10 km in concession Contract July 2006 2 km APS in city centre Construction: Alstom, Bouygues, Colas Alstom scope: 18 Citadis, APS, infrastructure ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 53. APS New orders Angers New LRT line 12 km Contract July 2006 APS in city centre - 7.4% gradient & single track - and in Avrillé suburb Alstom scope : APS and 17 Citadis APS ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 54. APS New orders Orléans Line 1 in operation with Citadis fleet since 2000 New contract August 2006: line 2 partially with APS Alstom scope: 27 CITADIS, APS, tracks, railway signaling APS ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 55. APS New orders Dubai Phase 1: 11 tramways, 10 kms track, 13 stations Contract July 2008 Phase 2: 14 tramways, 4 kms track, 6 stations The first city in the Gulf region to be equipped with a tramway transit system ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 56. CITADIS with batteries – modularity of power supply Nice / France Roof mounted Commercial service since early 2007 battey box No overhead wires on 2 squares NiMH-Batteries Place Masséna: ~435 m The solution for short wireless section Place Garibaldi: ~485 m Reduced acceleration and max. speed is sufficient to city centre requirements ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 57. Wireless sections and energy optimization Flywheel system : carbon-fiber rotor to store cinetic energy up to 22,000 rpm Rotterdam CITADIS equipped with flywheel SYSTEM TESTING : RATP Paris in 2008 • With pantograph lowered: Energy and power performances adapted to city center : reduced speed Crosses Erasmus bridge Reaches 50 km/h Storage of braking energy Runs 2 km Quick loading during stations stop : « station hopping » • Energy optimisation R&D : height reduced for roof installation on low-floor tramways ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 58. CITADIS ™ Tramway Platform Tramway solutions A tool to create an attractive and new city ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 59. The tramway a tool to create an attractive and new city Before ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 60. The tramway a tool to create an attractive and new city After ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 61. The tramway a tool to create an attractive and new city Before ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 62. The tramway a tool to create an attractive and new city After ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 63. The tramway a tool to create an attractive and new city Line B Before ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 64. The tramway a tool to create an attractive and new city AfterB Line ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 65. The tramway a tool to create an attractive and new city Before Line B ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 66. The tramway a tool to create an attractive and new city After Line B ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 67. The tramway a tool to create an attractive and new city Before ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 68. The tramway a tool to create an attractive and new city After ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 69. The tramway a tool to create an attractive and new city Before Line B ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 70. The tramway a tool to create an attractive and new city After ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  • 71. Tack så mycket ! www.alstom.com