SlideShare a Scribd company logo
1 of 3
Salford City College
Eccles Sixth Form Centre
BTec Level 3
Extended Diploma in Creative Media Production
Games Design
FMP - Production Log
Name Thomas Giblin
Date: 03.02.14
Week 1- The first thing that I did for my FMP is think of an idea and create a scenario based around the idea that I thought to do. I choose to make a armour set
for multiple characters from World of Warcraft. I decided to do this because I am a big fan of the game and know what kind of thing to do for a design, this gave
me a small stepping stone to create my designs but I also did research on different armours from World of Warcraft and other games that are similar as well as
doing research on different armour over history and from films and television programmes. Whilst I gathered the research I made sure that I was collecting the
correct research that would help me with the rest of my FMP. I also put up a questionnaire so that people could give me feedback on what they would like to see
in the armour sets. As well as doing the previous things I also started my production log and my schedule for the project. This helped me to manage my project
and see what need to be done and when also it helped me to keep track of what I would have done in weeks prior to the one that I would currently be on. I
decided that it would be best to update my production log and my schedule weekly so that I could keep track and on top of everything that I had to do.
Date: 10.02.14
Week 2- This week I set myself the task of creating some ideas for my final major project. I did this my making a mind map with the four classes that I was
creating armour on in each corner on the mind map. Then (thanks to the research that I compiled) I was able to look into each class and list the main features for
each class and (judged from popular feedback) was able to list some of the features that the community would enjoy to see implemented into the designs. After
brainstorming ideas onto my mind map I started to plan how I was going to design my project and the best ways to go about doing so.
Date: 17.02.14
Week 3- Even though I was away on holiday this week late night on the Sunday that I returned I continued planning my project and analysing what had to be
done. Also I refined my research so that it was more condensed and more tuned to what I need from the feedback that I had received on how people wanted
the classes to be designed.
Date: 24.02.14
Week 4- On my first week back from holiday I choose to finish what was left to do of my planning so that I knew everything that I was meant to do for the
remainder of the project. Alongside doing this I pitched my idea. For this I showed the research that I had done along with everything else that I had done up to
this point in the project. I showed my scenario and plans on how to do this in my pitch as well. After I had finished my planning and my pitch I decided to start
production of my project. The first thing that I did was make a basic outline from the current World of Warcraft model. I did this so that the armour that I design
for the characters would fit right on the characters, this also would help me get a feel for what the character would look like wearing it in game. I design the
basic outline using the pen tool in Illustrator.
Date: 03.03.14
Week 5- After I had design the basic outlines for my four characters using the pen tool in Illustrator to do so I choose to start designing what the armour would
look like and how I wanted the armour to look like. To do this I hand drew some of the main features that each character would be known for/ their signature
armour. After I had drew all four I scanned them in and imported them into Illustrator so that I would have basic lines to base my core armour from.
Date: 10.03.14
Week 6- I tried to fit as much of my hand drawn work into the digital drawing as I could but some things didn't fit right and how I wanted it to look so I didn't use
all of my hand drawn resources. I continued to work on my first character throughout the week and managed to finish the first character without colour by the
end of the week.
Date: 17.03.14
Week 7- At the beginning of the week I managed to finish my first character of with colour and got started on my second character straight away using the same
techniques that I used on my first character design and by the end of the week I managed to finish the second character of with colour and get a start on my
third character.
Date: 24.03.14
Week 8- I continued to create my characters but I faced some problems because my Illustrator file had been corrupted for my third character so it took me the
entire week to fix the problem and complete my character with colour and using the same techniques that I used on the other characters.
Date: 31.03.14
Week 9- Deadline Week-- In this week I finished my fourth character with colour using the pen tool on Illustrator. The other things that I used was the bucket
tool and the selector tool. These were my essential tools that I used on Illustrator. No problems occurred with my fourth character like they did with my third
character because I saved and backed up my work more frequently than I did previously. Also in this week I presented my work and got some feedback on how
to improve it and any small errors that I had done. It took a few days for the feedback to arrive back to me so I didn't manage to correct the mistakes that I had
made or make any further improvements on my work.
Date: 07.04.14
Week 10- Currently over my deadline I look at my feedback that I had received and started to make the changes and improvements from what the feedback said
about my work. After making the improvements that I needed to make on my work and some that didn't doing yet I did them because it brought my work to a
more professional and polished standard, I choose to start my evaluation of my work but I didn't manage to finish it in the week because I had limited time to do
so due to other reasons.
Date: 28.04.14
Week 11- After I returned from my from my 2 week holiday I got back to work and finished my evaluation. Next I started to make sure that I had everything that
I needed to do complete and change anything that needed to be changed. The first thing that I worked on was my scenario because I noticed that it was a bit
unclear and confusing in parts so I made it simpler and more to the point that it previously was. This is all I had time for in this week.
Date: 05.05.14
Week 12- Everything was finishing up nicely although it was 5 weeks over due but in this week I neatened everything up and add more research because I
realised that it was very limited due what I had done previously. So after adding more research I gathered everything that I had done as well as finishing my
production log and my schedule and I uploaded everything to my blog using Slideshare and YouTube to help with some of my uploading. After I uploaded
everything I presented it neatly on my blog making sure that everything was present and correct.

More Related Content

What's hot

Final major project_production_diary_
Final major project_production_diary_Final major project_production_diary_
Final major project_production_diary_BigCheese1
 
Noah ashworth schedule
Noah ashworth scheduleNoah ashworth schedule
Noah ashworth schedulenoah_ashworth
 
Fmp development diary
Fmp development diary Fmp development diary
Fmp development diary Tom Batty
 
Senior project proposal
Senior project proposalSenior project proposal
Senior project proposalashleybridges
 
Aaron thomas schedule template
Aaron thomas schedule   templateAaron thomas schedule   template
Aaron thomas schedule templateAaron Thomas
 
Unit66 production log_060314
Unit66 production log_060314Unit66 production log_060314
Unit66 production log_060314Deightonater
 
Presentation1
Presentation1Presentation1
Presentation106rali
 
Reflection on wiki
Reflection on wikiReflection on wiki
Reflection on wikialkaabi922
 
Evaluation question 7
Evaluation question 7Evaluation question 7
Evaluation question 706rali
 
Evaluation question 7
Evaluation question 7Evaluation question 7
Evaluation question 706rali
 
Schedule - Liam De Costa
Schedule - Liam De CostaSchedule - Liam De Costa
Schedule - Liam De Costaliam1811
 
Targets and reflections september to december 2015
Targets and reflections september to december 2015Targets and reflections september to december 2015
Targets and reflections september to december 2015meganflood2
 
Senior Project Proposal Form
Senior Project Proposal FormSenior Project Proposal Form
Senior Project Proposal Formashleybridges
 
Schedule liam de costa
Schedule   liam de costaSchedule   liam de costa
Schedule liam de costaliam1811
 
Kate mather final major project production diary 25.02.13
Kate mather final major project production diary  25.02.13Kate mather final major project production diary  25.02.13
Kate mather final major project production diary 25.02.13Taikusproductions
 

What's hot (20)

Final major project_production_diary_
Final major project_production_diary_Final major project_production_diary_
Final major project_production_diary_
 
W.b 01. 04.13
W.b 01. 04.13W.b 01. 04.13
W.b 01. 04.13
 
Noah ashworth schedule
Noah ashworth scheduleNoah ashworth schedule
Noah ashworth schedule
 
W.b 04. 03.13
W.b 04. 03.13W.b 04. 03.13
W.b 04. 03.13
 
Fmp development diary
Fmp development diary Fmp development diary
Fmp development diary
 
Senior project proposal
Senior project proposalSenior project proposal
Senior project proposal
 
Aaron thomas schedule template
Aaron thomas schedule   templateAaron thomas schedule   template
Aaron thomas schedule template
 
W.b 18. 03.13
W.b 18. 03.13W.b 18. 03.13
W.b 18. 03.13
 
Unit66 production log_060314
Unit66 production log_060314Unit66 production log_060314
Unit66 production log_060314
 
Presentation1
Presentation1Presentation1
Presentation1
 
Reflection on wiki
Reflection on wikiReflection on wiki
Reflection on wiki
 
Evaluation question 7
Evaluation question 7Evaluation question 7
Evaluation question 7
 
Evaluation question 7
Evaluation question 7Evaluation question 7
Evaluation question 7
 
Schedule - Liam De Costa
Schedule - Liam De CostaSchedule - Liam De Costa
Schedule - Liam De Costa
 
Targets and reflections september to december 2015
Targets and reflections september to december 2015Targets and reflections september to december 2015
Targets and reflections september to december 2015
 
Senior Project Proposal Form
Senior Project Proposal FormSenior Project Proposal Form
Senior Project Proposal Form
 
Photoshoot diary
Photoshoot diary Photoshoot diary
Photoshoot diary
 
Schedule liam de costa
Schedule   liam de costaSchedule   liam de costa
Schedule liam de costa
 
Kate mather final major project production diary 25.02.13
Kate mather final major project production diary  25.02.13Kate mather final major project production diary  25.02.13
Kate mather final major project production diary 25.02.13
 
Photoshoot diary
Photoshoot diary Photoshoot diary
Photoshoot diary
 

Viewers also liked

Penn Valley Network Announcements 5-4-14
Penn Valley Network Announcements 5-4-14Penn Valley Network Announcements 5-4-14
Penn Valley Network Announcements 5-4-14PennValleyChurch
 
Ամենամեծ մեդուզան
Ամենամեծ մեդուզանԱմենամեծ մեդուզան
Ամենամեծ մեդուզանFedo Mkrtchyan
 
Cara beradab bersama keluarga
Cara beradab bersama keluargaCara beradab bersama keluarga
Cara beradab bersama keluargasazimi
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
My music influences
My music influencesMy music influences
My music influencesLauraJaneLee
 
использование сервисов Web 2
использование сервисов Web 2использование сервисов Web 2
использование сервисов Web 2Ksuchha
 
Elit 48 c class 17 exam 1
Elit 48 c class 17 exam 1Elit 48 c class 17 exam 1
Elit 48 c class 17 exam 1jordanlachance
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
Circuite Europa - Avion
Circuite Europa - AvionCircuite Europa - Avion
Circuite Europa - AvionJ'Info Tours
 
Konsep Dasar Sistem Informasi
Konsep Dasar Sistem Informasi Konsep Dasar Sistem Informasi
Konsep Dasar Sistem Informasi Christian Rosandhy
 

Viewers also liked (13)

L'isola d'oro 3
L'isola d'oro 3L'isola d'oro 3
L'isola d'oro 3
 
Penn Valley Network Announcements 5-4-14
Penn Valley Network Announcements 5-4-14Penn Valley Network Announcements 5-4-14
Penn Valley Network Announcements 5-4-14
 
Ամենամեծ մեդուզան
Ամենամեծ մեդուզանԱմենամեծ մեդուզան
Ամենամեծ մեդուզան
 
Cara beradab bersama keluarga
Cara beradab bersama keluargaCara beradab bersama keluarga
Cara beradab bersama keluarga
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
poster_davidnew
poster_davidnewposter_davidnew
poster_davidnew
 
My music influences
My music influencesMy music influences
My music influences
 
использование сервисов Web 2
использование сервисов Web 2использование сервисов Web 2
использование сервисов Web 2
 
Elit 48 c class 17 exam 1
Elit 48 c class 17 exam 1Elit 48 c class 17 exam 1
Elit 48 c class 17 exam 1
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Circuite Europa - Avion
Circuite Europa - AvionCircuite Europa - Avion
Circuite Europa - Avion
 
Konsep Dasar Sistem Informasi
Konsep Dasar Sistem Informasi Konsep Dasar Sistem Informasi
Konsep Dasar Sistem Informasi
 
Brgy. ginebra
Brgy. ginebraBrgy. ginebra
Brgy. ginebra
 

Similar to Fmp production log_050514

6. Production Reflection
6. Production Reflection6. Production Reflection
6. Production ReflectionMel Nuttall
 
Production Reflection
Production ReflectionProduction Reflection
Production ReflectionCharlie Atkin
 
6. production reflection
6. production reflection6. production reflection
6. production reflectionJude McMichan
 
FMP: Weekly Reflection Finished
FMP: Weekly Reflection FinishedFMP: Weekly Reflection Finished
FMP: Weekly Reflection FinishedEwanWild
 
FMP Reflective Journal
FMP Reflective JournalFMP Reflective Journal
FMP Reflective JournalShaniceYates
 
Ha2 production log
Ha2 production logHa2 production log
Ha2 production logsoulsama
 
Fmp production log
Fmp production logFmp production log
Fmp production logdontask5555
 
FMP: Weekly Reflection
FMP: Weekly ReflectionFMP: Weekly Reflection
FMP: Weekly ReflectionEwanWild
 
FMP Production Log
FMP Production LogFMP Production Log
FMP Production LogMartinDevney
 
Complete FMP Development Diary
Complete FMP Development DiaryComplete FMP Development Diary
Complete FMP Development DiaryJack Ward
 
production reflection
production reflectionproduction reflection
production reflectionTom Batty
 
Reflective diary V3
Reflective diary V3Reflective diary V3
Reflective diary V3Ben Harris
 
Reflective diary (NEEDS finishing)
Reflective diary (NEEDS finishing)Reflective diary (NEEDS finishing)
Reflective diary (NEEDS finishing)Ben Harris
 

Similar to Fmp production log_050514 (20)

Fmp production log_240214
Fmp production log_240214Fmp production log_240214
Fmp production log_240214
 
Fmp production log_030314
Fmp production log_030314Fmp production log_030314
Fmp production log_030314
 
Fmp production log_170214
Fmp production log_170214Fmp production log_170214
Fmp production log_170214
 
6. Production Reflection
6. Production Reflection6. Production Reflection
6. Production Reflection
 
Fmp production log_100214
Fmp production log_100214Fmp production log_100214
Fmp production log_100214
 
Production Reflection
Production ReflectionProduction Reflection
Production Reflection
 
Production Log
Production LogProduction Log
Production Log
 
6. production reflection
6. production reflection6. production reflection
6. production reflection
 
Production reflection
Production reflectionProduction reflection
Production reflection
 
FMP: Weekly Reflection Finished
FMP: Weekly Reflection FinishedFMP: Weekly Reflection Finished
FMP: Weekly Reflection Finished
 
FMP Reflective Journal
FMP Reflective JournalFMP Reflective Journal
FMP Reflective Journal
 
Ha2 production log
Ha2 production logHa2 production log
Ha2 production log
 
Fmp production log
Fmp production logFmp production log
Fmp production log
 
FMP: Weekly Reflection
FMP: Weekly ReflectionFMP: Weekly Reflection
FMP: Weekly Reflection
 
FMP Production Log
FMP Production LogFMP Production Log
FMP Production Log
 
Production diaries
Production diariesProduction diaries
Production diaries
 
Complete FMP Development Diary
Complete FMP Development DiaryComplete FMP Development Diary
Complete FMP Development Diary
 
production reflection
production reflectionproduction reflection
production reflection
 
Reflective diary V3
Reflective diary V3Reflective diary V3
Reflective diary V3
 
Reflective diary (NEEDS finishing)
Reflective diary (NEEDS finishing)Reflective diary (NEEDS finishing)
Reflective diary (NEEDS finishing)
 

More from Thomas_Giblin_16

Forza Horizon 2 Sound Analysis
Forza Horizon 2 Sound AnalysisForza Horizon 2 Sound Analysis
Forza Horizon 2 Sound AnalysisThomas_Giblin_16
 
Abridged Walkthrough Full Unit 72
Abridged Walkthrough Full Unit 72Abridged Walkthrough Full Unit 72
Abridged Walkthrough Full Unit 72Thomas_Giblin_16
 
Characters powerpoint Task 2
Characters powerpoint Task 2 Characters powerpoint Task 2
Characters powerpoint Task 2 Thomas_Giblin_16
 
Task 5 screenshots of character Work
Task 5 screenshots of character WorkTask 5 screenshots of character Work
Task 5 screenshots of character WorkThomas_Giblin_16
 
Schedule from Start to finish
Schedule from Start to finishSchedule from Start to finish
Schedule from Start to finishThomas_Giblin_16
 
Ig2 task 1 work sheet thomas giblin
Ig2 task 1 work sheet thomas giblinIg2 task 1 work sheet thomas giblin
Ig2 task 1 work sheet thomas giblinThomas_Giblin_16
 
Unit 73 ig3 assignment programming sound assets to a game 2013_y2
Unit 73 ig3 assignment programming sound assets to a game 2013_y2Unit 73 ig3 assignment programming sound assets to a game 2013_y2
Unit 73 ig3 assignment programming sound assets to a game 2013_y2Thomas_Giblin_16
 
Fmp world of warcraft armour sets design tg
Fmp  world of warcraft armour sets design tgFmp  world of warcraft armour sets design tg
Fmp world of warcraft armour sets design tgThomas_Giblin_16
 

More from Thomas_Giblin_16 (20)

Destiny Sound Analysis
Destiny Sound AnalysisDestiny Sound Analysis
Destiny Sound Analysis
 
Fifa 15 Sound Analysis
Fifa 15 Sound AnalysisFifa 15 Sound Analysis
Fifa 15 Sound Analysis
 
Forza Horizon 2 Sound Analysis
Forza Horizon 2 Sound AnalysisForza Horizon 2 Sound Analysis
Forza Horizon 2 Sound Analysis
 
Abridged Presentation
Abridged PresentationAbridged Presentation
Abridged Presentation
 
Abridged Walkthrough Full Unit 72
Abridged Walkthrough Full Unit 72Abridged Walkthrough Full Unit 72
Abridged Walkthrough Full Unit 72
 
Image links task 1
Image links task 1Image links task 1
Image links task 1
 
Characters powerpoint Task 2
Characters powerpoint Task 2 Characters powerpoint Task 2
Characters powerpoint Task 2
 
Taks 1 powerpoint
Taks 1 powerpointTaks 1 powerpoint
Taks 1 powerpoint
 
Task 5 screenshots of character Work
Task 5 screenshots of character WorkTask 5 screenshots of character Work
Task 5 screenshots of character Work
 
Schedule from Start to finish
Schedule from Start to finishSchedule from Start to finish
Schedule from Start to finish
 
Fmp production log_030214
Fmp production log_030214Fmp production log_030214
Fmp production log_030214
 
Ig2 task 1 work sheet thomas giblin
Ig2 task 1 work sheet thomas giblinIg2 task 1 work sheet thomas giblin
Ig2 task 1 work sheet thomas giblin
 
Unit 73 ig3 assignment programming sound assets to a game 2013_y2
Unit 73 ig3 assignment programming sound assets to a game 2013_y2Unit 73 ig3 assignment programming sound assets to a game 2013_y2
Unit 73 ig3 assignment programming sound assets to a game 2013_y2
 
Schedule fmp
Schedule fmp Schedule fmp
Schedule fmp
 
Final major projectg
Final major projectg Final major projectg
Final major projectg
 
Fmp world of warcraft armour sets design tg
Fmp  world of warcraft armour sets design tgFmp  world of warcraft armour sets design tg
Fmp world of warcraft armour sets design tg
 
Task 1 schedule
Task 1 scheduleTask 1 schedule
Task 1 schedule
 
Sound effect 2 evidence
Sound effect 2 evidenceSound effect 2 evidence
Sound effect 2 evidence
 
Sound effect 3 evidence
Sound effect 3 evidenceSound effect 3 evidence
Sound effect 3 evidence
 
Sound effect 4 evidence
Sound effect 4 evidenceSound effect 4 evidence
Sound effect 4 evidence
 

Fmp production log_050514

  • 1. Salford City College Eccles Sixth Form Centre BTec Level 3 Extended Diploma in Creative Media Production Games Design FMP - Production Log Name Thomas Giblin Date: 03.02.14 Week 1- The first thing that I did for my FMP is think of an idea and create a scenario based around the idea that I thought to do. I choose to make a armour set for multiple characters from World of Warcraft. I decided to do this because I am a big fan of the game and know what kind of thing to do for a design, this gave me a small stepping stone to create my designs but I also did research on different armours from World of Warcraft and other games that are similar as well as doing research on different armour over history and from films and television programmes. Whilst I gathered the research I made sure that I was collecting the correct research that would help me with the rest of my FMP. I also put up a questionnaire so that people could give me feedback on what they would like to see in the armour sets. As well as doing the previous things I also started my production log and my schedule for the project. This helped me to manage my project and see what need to be done and when also it helped me to keep track of what I would have done in weeks prior to the one that I would currently be on. I decided that it would be best to update my production log and my schedule weekly so that I could keep track and on top of everything that I had to do. Date: 10.02.14 Week 2- This week I set myself the task of creating some ideas for my final major project. I did this my making a mind map with the four classes that I was creating armour on in each corner on the mind map. Then (thanks to the research that I compiled) I was able to look into each class and list the main features for each class and (judged from popular feedback) was able to list some of the features that the community would enjoy to see implemented into the designs. After brainstorming ideas onto my mind map I started to plan how I was going to design my project and the best ways to go about doing so. Date: 17.02.14 Week 3- Even though I was away on holiday this week late night on the Sunday that I returned I continued planning my project and analysing what had to be done. Also I refined my research so that it was more condensed and more tuned to what I need from the feedback that I had received on how people wanted the classes to be designed.
  • 2. Date: 24.02.14 Week 4- On my first week back from holiday I choose to finish what was left to do of my planning so that I knew everything that I was meant to do for the remainder of the project. Alongside doing this I pitched my idea. For this I showed the research that I had done along with everything else that I had done up to this point in the project. I showed my scenario and plans on how to do this in my pitch as well. After I had finished my planning and my pitch I decided to start production of my project. The first thing that I did was make a basic outline from the current World of Warcraft model. I did this so that the armour that I design for the characters would fit right on the characters, this also would help me get a feel for what the character would look like wearing it in game. I design the basic outline using the pen tool in Illustrator. Date: 03.03.14 Week 5- After I had design the basic outlines for my four characters using the pen tool in Illustrator to do so I choose to start designing what the armour would look like and how I wanted the armour to look like. To do this I hand drew some of the main features that each character would be known for/ their signature armour. After I had drew all four I scanned them in and imported them into Illustrator so that I would have basic lines to base my core armour from. Date: 10.03.14 Week 6- I tried to fit as much of my hand drawn work into the digital drawing as I could but some things didn't fit right and how I wanted it to look so I didn't use all of my hand drawn resources. I continued to work on my first character throughout the week and managed to finish the first character without colour by the end of the week. Date: 17.03.14 Week 7- At the beginning of the week I managed to finish my first character of with colour and got started on my second character straight away using the same techniques that I used on my first character design and by the end of the week I managed to finish the second character of with colour and get a start on my third character. Date: 24.03.14 Week 8- I continued to create my characters but I faced some problems because my Illustrator file had been corrupted for my third character so it took me the entire week to fix the problem and complete my character with colour and using the same techniques that I used on the other characters. Date: 31.03.14 Week 9- Deadline Week-- In this week I finished my fourth character with colour using the pen tool on Illustrator. The other things that I used was the bucket tool and the selector tool. These were my essential tools that I used on Illustrator. No problems occurred with my fourth character like they did with my third
  • 3. character because I saved and backed up my work more frequently than I did previously. Also in this week I presented my work and got some feedback on how to improve it and any small errors that I had done. It took a few days for the feedback to arrive back to me so I didn't manage to correct the mistakes that I had made or make any further improvements on my work. Date: 07.04.14 Week 10- Currently over my deadline I look at my feedback that I had received and started to make the changes and improvements from what the feedback said about my work. After making the improvements that I needed to make on my work and some that didn't doing yet I did them because it brought my work to a more professional and polished standard, I choose to start my evaluation of my work but I didn't manage to finish it in the week because I had limited time to do so due to other reasons. Date: 28.04.14 Week 11- After I returned from my from my 2 week holiday I got back to work and finished my evaluation. Next I started to make sure that I had everything that I needed to do complete and change anything that needed to be changed. The first thing that I worked on was my scenario because I noticed that it was a bit unclear and confusing in parts so I made it simpler and more to the point that it previously was. This is all I had time for in this week. Date: 05.05.14 Week 12- Everything was finishing up nicely although it was 5 weeks over due but in this week I neatened everything up and add more research because I realised that it was very limited due what I had done previously. So after adding more research I gathered everything that I had done as well as finishing my production log and my schedule and I uploaded everything to my blog using Slideshare and YouTube to help with some of my uploading. After I uploaded everything I presented it neatly on my blog making sure that everything was present and correct.