2. WHO WE ARE
About The Design Partnership
• Founded in 1979
• 45 Employees
• Expertise in Science & Technology, Education,
Healthcare,
Public, Master Planning
• BIM/Lean / IPD Leadership
• Over $1 Billion Designed in BIM
• Using BIM since 2005; 100% BIM since 2006
• 2008 AIASF Integrated Practice Honor Award
Recipient
3. REDUCING RISK WITH BIM
1 What is Risk?
2 Technology Introduction
3 Construction Technology
4 Case Study: VA Puget Sound
5 Case Study: Stanford Cath Labs
6 Case Study: Robbins Hall
Renovation
4. WHAT IS RISK?
• Altering “Risk = Cost” Equation
• Increase in Architect’s Exposure
• Decrease in Contractor’s Risk
• Decrease in Owner’s Risk
• Reduced Risk for All = Reduced
Cost
The Design Partnership LLP
Architects + Planners
5.
6. Increase in Architect’s
Exposure
Unknown Consequences Of Sharing BIM
Information
Design Only Information In BIM Model
Extensive Pre-coordination
Fabrication From Design Models
Increased Exposure to Risk
The Design Partnership LLP
Architects + Planners
8. Decrease in Owner’s Risk
Reduced Bidding Costs Due To Reduced
Contractor Risks
Reduced Risk Of
– Change Orders From Unknown Conditions
– Coordination Changes
– Fighting Among AEC Entities
Reduced User Changes Due To Better
Pre-visualization And Planning
The Design Partnership LLP
Architects + Planners
9. Architect’s Exposure
However
Architect’s Risk
Reduced Risk for All = Reduced Cost
The Design Partnership LLP
Architects + Planners
10. TECHNOLOGY
INTRODUCTION
• Building Information Modeling
(BIM)
• Virtual Simulation / Pre-
visualization
• 3D Laser Survey
• Clash Detection & Coordination
The Design Partnership LLP
Architects + Planners
12. Project Delivery Improvement
Automatic Document Coordination
3D Systems Coordination
Virtual Building Simulation
Direct Fabrication
The Design Partnership LLP
Architects + Planners
30. 3D Capable Trades
• HVAC
• Plumbing
• Structural Steel
• Precast Concrete
• Rebar
• Steel Stud Walls
• Curtain Walls, etc.
• Millwork
• Unit Restrooms
• Laboratories
The Design Partnership LLP
Architects + Planners
31. Relative Sophistication Disparity
General Contractors (Very Low to Low)
Engineers (Very Low to Moderate)
Architects (Low to Moderate)
Subcontractors (Varies, some extremely high)
Maximize advantage of sophisticated players
Enhance process for Subs already using 3D
Mentor less advanced members
Integrated Project Delivery
The Design Partnership LLP
Architects + Planners
32. CASE STUDY: VA PUGET
SOUND
• Design of VA Puget Sound Mental
Health & Research Project
The Design Partnership LLP
Architects + Planners
33. VA PUGET SOUND CAMPUS PROJECT
Campus expansion of four distinct projects that are linked to
Mental Health Treatment and Research. Associate Architect
Mental Health & Research Bldg. $104M 200,000 gsf
Existing Hospital Seismic Upgrade $28M 162,000 gsf
Parking Structure (1000 stalls) $37M 400,000 gsf
Site Work $8M 367,000 gsf
Total $177M 1,129,000 gsf
34. VA PUGET SOUND CAMPUS PROJECT
Site Plan
A B
D
C
A Mental Health & Research Bldg.
B Existing Hospital Seismic Upgrade
C Parking Structure
D Site Work
35. VA PUGET SOUND CAMPUS PROJECT
Mental Health & Research Building
Exterior Renderings
55. Construction Cost
BIM Use $/SF % from CAD
Cath Lab 7 CAD 2,153 $/SF
Cath Lab 9 2” Standard 1,829 $/SF -15.0%
Cath Lab 10 Everything 2,065 $/SF -4.1%
*All figures in 2010 Relative Value
Change Order Cost
BIM Use $/SF % of Total
Cath Lab 7 CAD 267 $/SF 12.4%
Cath Lab 9 2” Standard 148 $/SF 8.1%
Cath Lab 10 Everything 16 $/SF <0.1%
*All figures in 2010 Relative Value
The Design Partnership LLP
Architects + Planners
56. Construction Cost
BIM Use Unit Cost
Cath Lab 7 CAD Only 2,153 $/SF
Cath Lab 9 2” Standard 1,613 $/SF
Cath Lab 10 Everything 2,065 $/SF
Change Order Cost
BIM Use Change Rate
Cath Lab 7 CAD Only 12.4%
Cath Lab 9 2” Standard 7.8%
Cath Lab 10 Everything <0.1%
*All figures in 2010 Relative Value
57. ROBBINS HALL RENOVATION
• BIM Use on UC Davis Robbins Hall
Phase 1 Renovation
- (E) and (N) Casework Database
- Equipment Documentation
- Arch/Mech Coordination
The Design Partnership LLP
Architects + Planners
58.
59. First Floor Plan - PROJECT PROGRAM
The Design Partnership LLP
Architects + Planners
65. First Floor - EQUIPMENT PLAN
JORGE DUBCOVSKY
JAN DVORAK
ABHAYA DANDEKAR
DAVID NEALE
JEFFREY IBARRA
PAM RONALD
GENERAL EQUIPMENT
The Design Partnership LLP
Architects + Planners
66. First Floor - EQUIPMENT AXONOMETRIC
JORGE DUBCOVSKY
JAN DVORAK
ABHAYA DANDEKAR
DAVID NEALE
JEFFREY IBARRA
PAM RONALD
GENERAL EQUIPMENT
The Design Partnership LLP
Architects + Planners
67. Construction Cost
$ %
Change Orders $812,438 11.60%
Final Construction Cost $7,004,281
Change Order Summary
$ %
User Additions $230,954 3.30%
Engineering & Operations $191,182 2.73%
Infrastructure Improvements $183,337 2.62%
Unforeseen Field Conditions $122,938 1.76%
A/E Coordination $84,027 1.20%
The Design Partnership LLP
Architects + Planners
68. Thanks!
Questions?
Find the slides from this presentation on SlideShare.
Search for us by name: TheDesignPartnership
Or by our public profile: http://www.slideshare.net/TheDesignPartnership
THE DESIGN
PA R T N E R S H I P
A R C H I T www.dpsf.comL A N N E R S
ECTS + P
Editor's Notes
ADD IMAGEto produce clear documents, showing a buildable design.We use:Again, reliance on a coordinated and integrated team including the Cost Management consultant.And BIM allows us to make our documents fastidiously coordinated and accurate.The BIM model starts with the site and builds from there.The model is shared by all disciplines, and clash detection sessions are regularly scheduled throughout design and document production. We were early implementers of BIM in our industry and began with it 7 years ago.Quantity takeoffs are continuous, estimates revised all the time; major systems updates during design : mechanical & electrical, structural, site, building envelopeAlso take a friendly approach to the constructor to clearly indicate we want him on our team to build a successful project for everyone involved.