WHO WE ARE


About The Design Partnership

• Founded in 1979
• 45 Employees
• Expertise in Science & Technology, Education,
Healthcare,
  Public, Master Planning
• BIM/Lean / IPD Leadership
• Over $1 Billion Designed in BIM
• Using BIM since 2005; 100% BIM since 2006
• 2008 AIASF Integrated Practice Honor Award
Recipient
REDUCING RISK WITH BIM
1 What is Risk?
2 Technology Introduction
3 Construction Technology
4 Case Study: VA Puget Sound
5 Case Study: Stanford Cath Labs
6 Case Study: Robbins Hall
Renovation
WHAT IS RISK?
                  •          Altering “Risk = Cost” Equation
                  •          Increase in Architect’s Exposure
                  •          Decrease in Contractor’s Risk
                  •          Decrease in Owner’s Risk
                  •          Reduced Risk for All = Reduced
                             Cost




The Design Partnership LLP

Architects + Planners
Increase in Architect’s
                    Exposure
 Unknown Consequences Of Sharing BIM
  Information
 Design Only Information In BIM Model
 Extensive Pre-coordination
 Fabrication From Design Models

 Increased Exposure to Risk

The Design Partnership LLP

Architects + Planners
Decrease in Contractor’s Risk
 Reduced Coordination Errors
 Reduced Unknown Conditions
 More Efficient Workflow
 Cooperation & Collaboration
 Reduced Contingency

 Increased Confidence &  Reduced Risk

The Design Partnership LLP

Architects + Planners
Decrease in Owner’s Risk
 Reduced Bidding Costs Due To Reduced
  Contractor Risks
 Reduced Risk Of
      – Change Orders From Unknown Conditions
      – Coordination Changes
      – Fighting Among AEC Entities
 Reduced User Changes Due To Better
  Pre-visualization And Planning
The Design Partnership LLP

Architects + Planners
Architect’s Exposure 
                                      However
                                 Architect’s Risk 



        Reduced Risk for All = Reduced Cost



The Design Partnership LLP 
Architects + Planners
TECHNOLOGY
                  INTRODUCTION
                  •      Building Information Modeling
                         (BIM)
                  •      Virtual Simulation / Pre-
                         visualization
                  •      3D Laser Survey
                  •      Clash Detection & Coordination


The Design Partnership LLP

Architects + Planners
The Big BIM/IPD/Lean Idea




The Design Partnership LLP

Architects + Planners
Project Delivery Improvement
                    Automatic Document Coordination

                    3D Systems Coordination

                    Virtual Building Simulation

                    Direct Fabrication
The Design Partnership LLP

Architects + Planners
Building Information Modeling
                 (BIM)




The Design Partnership LLP

Architects + Planners
BIM is a 3D Database




The Design Partnership LLP

Architects + Planners
Design Visualization




The Design Partnership LLP

Architects + Planners
Design Visualization




The Design Partnership LLP

Architects + Planners
Virtual Equipment Simulation




The Design Partnership LLP 
Architects + Planners
The Design Partnership LLP 
Architects + Planners
3D Laser Survey




The Design Partnership LLP

Architects + Planners
Clash Detection & Coordination



Structural Plan




                                  Where is the
                               coordination error?
Mechanical Plan

The Design Partnership LLP 
Architects + Planners
Clash Detection & Coordination




The Design Partnership LLP 
Architects + Planners
CONSTRUCTION
                   TECHNOLOGY
                   •           Direct Fabrication
                   •           Prefabrication
                   •           Capabilities




The Design Partnership LLP 
Architects + Planners
Direct Fabrication




The Design Partnership LLP 
Architects + Planners                        Images courtesy of Marelich Mechanical
Direct Fabrication




The Design Partnership LLP 
Architects + Planners
Prefabrication




The Design Partnership LLP 
Architects + Planners
The Design Partnership LLP 
Architects + Planners          Image courtesy of Marelich Mechanical
The Design Partnership LLP 
Architects + Planners
The Design Partnership LLP 
Architects + Planners          Image courtesy of Marelich Mechanical
The Design Partnership LLP 
Architects + Planners
3D Capable Trades
•   HVAC
•   Plumbing
•   Structural Steel
•   Precast Concrete
•   Rebar
•   Steel Stud Walls
•   Curtain Walls, etc.
•   Millwork
•   Unit Restrooms
•   Laboratories

The Design Partnership LLP 
Architects + Planners
Relative Sophistication Disparity
       General Contractors (Very Low to Low)
       Engineers (Very Low to Moderate)
      Architects (Low to Moderate)
       Subcontractors (Varies, some extremely high)

       Maximize advantage of sophisticated players
       Enhance process for Subs already using 3D
       Mentor less advanced members
       Integrated Project Delivery


The Design Partnership LLP 
Architects + Planners
CASE STUDY: VA PUGET
                   SOUND
                   •       Design of VA Puget Sound Mental
                           Health & Research Project




The Design Partnership LLP 
Architects + Planners
VA PUGET SOUND CAMPUS PROJECT
Campus expansion of four distinct projects that are linked to
Mental Health Treatment and Research.       Associate Architect


Mental Health & Research Bldg.        $104M        200,000 gsf
Existing Hospital Seismic Upgrade     $28M         162,000 gsf
Parking Structure (1000 stalls)          $37M      400,000 gsf
Site Work                             $8M          367,000 gsf
Total                                 $177M        1,129,000 gsf
VA PUGET SOUND CAMPUS PROJECT
Site Plan



                                            A       B



                                                D

                                        C




A   Mental Health & Research Bldg.
B   Existing Hospital Seismic Upgrade
C   Parking Structure
D   Site Work
VA PUGET SOUND CAMPUS PROJECT
Mental Health & Research Building




Exterior Renderings
STRUCTURAL




             BUILDING SYSTEMS
MECHANICAL




             BUILDING SYSTEMS
MECHANICAL




             BUILDING SYSTEMS
ELECTRICAL




             BUILDING SYSTEMS
TELECOM




          BUILDING SYSTEMS
LABORATORY




             BUILDING SYSTEMS
CASE STUDY: STANFORD CATH
                   LABS
                   •       Comparison of Cath Labs 7, 9, & 10




The Design Partnership LLP 
Architects + Planners
7
7       Cath Lab 7: Siemens Biplane Cath Lab
    Construction Start: 2006
             BIM Use: CAD Only
7




9
9       Cath Lab 9: Siemens Biplane Hybrid OR
    Construction Start: 2009
             BIM Use: Laser Scanning & Modeling to 2”
3D Laser Scanning




The Design Partnership LLP 
Architects + Planners
Existing Conditions Model to 2”




The Design Partnership LLP 
Architects + Planners
New Work Model to 2”




The Design Partnership LLP 
Architects + Planners
Construct




The Design Partnership LLP 
Architects + Planners
7




9



10
10 Construction Start: Siemens Biplane Pediatric Cath Lab
      Cath Lab 10:
                       20010
             BIM Use: Laser Scanning & Modeling Everything
Model Everything




The Design Partnership LLP 
Architects + Planners
Construction Cost
                             BIM Use             $/SF    % from CAD

 Cath Lab 7                  CAD           2,153 $/SF
 Cath Lab 9                  2” Standard   1,829 $/SF      -15.0%
 Cath Lab 10                 Everything    2,065 $/SF       -4.1%
 *All figures in 2010 Relative Value



Change Order Cost
                             BIM Use              $/SF    % of Total

 Cath Lab 7                  CAD            267 $/SF        12.4%
 Cath Lab 9                  2” Standard    148 $/SF         8.1%
 Cath Lab 10                 Everything      16 $/SF        <0.1%
 *All figures in 2010 Relative Value



The Design Partnership LLP 
Architects + Planners
Construction Cost
                           BIM Use          Unit Cost

Cath Lab 7                 CAD Only      2,153 $/SF
Cath Lab 9                 2” Standard   1,613 $/SF
Cath Lab 10                Everything    2,065 $/SF


Change Order Cost
                           BIM Use        Change Rate

Cath Lab 7                 CAD Only          12.4%
Cath Lab 9                 2” Standard         7.8%
Cath Lab 10                Everything        <0.1%


*All figures in 2010 Relative Value
ROBBINS HALL RENOVATION
                   •       BIM Use on UC Davis Robbins Hall
                           Phase 1 Renovation
                             - (E) and (N) Casework Database
                             - Equipment Documentation
                             - Arch/Mech Coordination




The Design Partnership LLP 
Architects + Planners
First Floor Plan - PROJECT PROGRAM




The Design Partnership LLP 
Architects + Planners
Casework Documentation




The Design Partnership LLP 
Architects + Planners
Casework Documentation




The Design Partnership LLP 
Architects + Planners
Casework Documentation




The Design Partnership LLP 
Architects + Planners
First Floor - EQUIPMENT PLAN

                                                              JORGE DUBCOVSKY

                                                              JAN DVORAK

                                                              ABHAYA DANDEKAR

                                                              DAVID NEALE

                                                              JEFFREY IBARRA

                                                              PAM RONALD

                                                              GENERAL EQUIPMENT




The Design Partnership LLP 
Architects + Planners
First Floor - EQUIPMENT AXONOMETRIC
           JORGE DUBCOVSKY

           JAN DVORAK

           ABHAYA DANDEKAR

           DAVID NEALE

           JEFFREY IBARRA

           PAM RONALD

           GENERAL EQUIPMENT




The Design Partnership LLP 
Architects + Planners
Construction Cost
                                        $       %
Change Orders                   $812,438    11.60%
Final Construction Cost        $7,004,281


Change Order Summary
                                        $       %
User Additions                  $230,954     3.30%
Engineering & Operations        $191,182     2.73%
Infrastructure Improvements     $183,337     2.62%
Unforeseen Field Conditions     $122,938     1.76%
A/E Coordination                 $84,027     1.20%


The Design Partnership LLP 
Architects + Planners
Thanks!
              Questions?
Find the slides from this presentation on SlideShare.
            Search for us by name: TheDesignPartnership

Or by our public profile: http://www.slideshare.net/TheDesignPartnership



                      THE DESIGN
                     PA R T N E R S H I P
                 A R C H I T www.dpsf.comL A N N E R S
                             ECTS + P

More Related Content

What's hot

GEA-NZ v3.1 Application and ICT Services Reference Model and Taxonomy
GEA-NZ v3.1 Application and ICT Services Reference Model and TaxonomyGEA-NZ v3.1 Application and ICT Services Reference Model and Taxonomy
GEA-NZ v3.1 Application and ICT Services Reference Model and TaxonomyRegine Deleu
 
Building information modeling & value to the AEC industry Part 1 v1
Building information modeling &  value to the AEC industry   Part 1 v1Building information modeling &  value to the AEC industry   Part 1 v1
Building information modeling & value to the AEC industry Part 1 v1Stephen Au
 
Iron Mountain: The Essential Guide To Understanding Digital Transformation
Iron Mountain: The Essential Guide To Understanding Digital TransformationIron Mountain: The Essential Guide To Understanding Digital Transformation
Iron Mountain: The Essential Guide To Understanding Digital TransformationMighty Guides, Inc.
 
IPD using BIM BY Pisut Aunwong
IPD using BIM BY Pisut Aunwong  IPD using BIM BY Pisut Aunwong
IPD using BIM BY Pisut Aunwong Roman Shrestha
 
Managing multiple projects
Managing multiple projectsManaging multiple projects
Managing multiple projectsKarim El-Dash
 
9.0 Project Resource Management Overview
9.0 Project Resource Management Overview9.0 Project Resource Management Overview
9.0 Project Resource Management OverviewDavidMcLachlan1
 
Estrategia de Transformación Digital
Estrategia de Transformación DigitalEstrategia de Transformación Digital
Estrategia de Transformación DigitalAurelien Domont, MBA
 
Best PMO in Europe 2019 - Triglav Group | FuturePMO 2019
Best PMO in Europe 2019 - Triglav Group | FuturePMO 2019Best PMO in Europe 2019 - Triglav Group | FuturePMO 2019
Best PMO in Europe 2019 - Triglav Group | FuturePMO 2019Wellingtone
 
What is Digital Transformation?
What is Digital Transformation?What is Digital Transformation?
What is Digital Transformation?Lucy Newman
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource managementejlp12
 
Sustainable design &amp; bim technology
Sustainable design &amp; bim technologySustainable design &amp; bim technology
Sustainable design &amp; bim technologyOmar Selim
 
Green BIM - Sustainability Through Integration
Green BIM - Sustainability Through IntegrationGreen BIM - Sustainability Through Integration
Green BIM - Sustainability Through IntegrationDimitris Farmakis
 
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012HOCHTIEF ViCon
 
Industry 4.0 Quality 4.0 and New Product Development
Industry 4.0 Quality 4.0 and New Product DevelopmentIndustry 4.0 Quality 4.0 and New Product Development
Industry 4.0 Quality 4.0 and New Product DevelopmentSergio Salimbeni
 
Flow of PMBOK 4th Edition in English - Black and White
Flow of PMBOK 4th Edition in English - Black and WhiteFlow of PMBOK 4th Edition in English - Black and White
Flow of PMBOK 4th Edition in English - Black and WhiteRicardo Viana Vargas
 

What's hot (20)

BIM case study
BIM case studyBIM case study
BIM case study
 
BIMmetrik Profile
BIMmetrik ProfileBIMmetrik Profile
BIMmetrik Profile
 
GEA-NZ v3.1 Application and ICT Services Reference Model and Taxonomy
GEA-NZ v3.1 Application and ICT Services Reference Model and TaxonomyGEA-NZ v3.1 Application and ICT Services Reference Model and Taxonomy
GEA-NZ v3.1 Application and ICT Services Reference Model and Taxonomy
 
Building information modeling & value to the AEC industry Part 1 v1
Building information modeling &  value to the AEC industry   Part 1 v1Building information modeling &  value to the AEC industry   Part 1 v1
Building information modeling & value to the AEC industry Part 1 v1
 
Iron Mountain: The Essential Guide To Understanding Digital Transformation
Iron Mountain: The Essential Guide To Understanding Digital TransformationIron Mountain: The Essential Guide To Understanding Digital Transformation
Iron Mountain: The Essential Guide To Understanding Digital Transformation
 
IPD using BIM BY Pisut Aunwong
IPD using BIM BY Pisut Aunwong  IPD using BIM BY Pisut Aunwong
IPD using BIM BY Pisut Aunwong
 
Managing multiple projects
Managing multiple projectsManaging multiple projects
Managing multiple projects
 
9.0 Project Resource Management Overview
9.0 Project Resource Management Overview9.0 Project Resource Management Overview
9.0 Project Resource Management Overview
 
Estrategia de Transformación Digital
Estrategia de Transformación DigitalEstrategia de Transformación Digital
Estrategia de Transformación Digital
 
Best PMO in Europe 2019 - Triglav Group | FuturePMO 2019
Best PMO in Europe 2019 - Triglav Group | FuturePMO 2019Best PMO in Europe 2019 - Triglav Group | FuturePMO 2019
Best PMO in Europe 2019 - Triglav Group | FuturePMO 2019
 
BIM Execution Plan
BIM Execution PlanBIM Execution Plan
BIM Execution Plan
 
What is Digital Transformation?
What is Digital Transformation?What is Digital Transformation?
What is Digital Transformation?
 
4D bim
4D bim4D bim
4D bim
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource management
 
Sustainable design &amp; bim technology
Sustainable design &amp; bim technologySustainable design &amp; bim technology
Sustainable design &amp; bim technology
 
Center of Excellence
Center of Excellence Center of Excellence
Center of Excellence
 
Green BIM - Sustainability Through Integration
Green BIM - Sustainability Through IntegrationGreen BIM - Sustainability Through Integration
Green BIM - Sustainability Through Integration
 
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
 
Industry 4.0 Quality 4.0 and New Product Development
Industry 4.0 Quality 4.0 and New Product DevelopmentIndustry 4.0 Quality 4.0 and New Product Development
Industry 4.0 Quality 4.0 and New Product Development
 
Flow of PMBOK 4th Edition in English - Black and White
Flow of PMBOK 4th Edition in English - Black and WhiteFlow of PMBOK 4th Edition in English - Black and White
Flow of PMBOK 4th Edition in English - Black and White
 

Viewers also liked

BIM for Risk Management
BIM for Risk ManagementBIM for Risk Management
BIM for Risk ManagementBiswajit Kundu
 
Innovative Detailing and BIM workflows- Reduce risk, compress schedule
Innovative Detailing and BIM workflows- Reduce risk, compress scheduleInnovative Detailing and BIM workflows- Reduce risk, compress schedule
Innovative Detailing and BIM workflows- Reduce risk, compress scheduleBDS VirCon
 
Flevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process MappingFlevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process MappingDavid Tracy
 
Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10friscozephyr
 
Anthony N Dauginas
Anthony N DauginasAnthony N Dauginas
Anthony N Dauginasdauginas
 
Communication &amp; Coordination on a Construction Project Through Building I...
Communication &amp; Coordination on a Construction Project Through Building I...Communication &amp; Coordination on a Construction Project Through Building I...
Communication &amp; Coordination on a Construction Project Through Building I...muhammad87
 
Trusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationTrusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationClearEdge3D Inc
 
BIM COORDINATION PORTOFOLIOOO
BIM COORDINATION PORTOFOLIOOOBIM COORDINATION PORTOFOLIOOO
BIM COORDINATION PORTOFOLIOOOMohab Magdy,PMP
 
Bim101 Aec
Bim101 AecBim101 Aec
Bim101 Aecmarybk
 
BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 StrucSoft Solutions
 
A Team Plumbing and Drainage Systems
A Team Plumbing and Drainage SystemsA Team Plumbing and Drainage Systems
A Team Plumbing and Drainage SystemsGodwin2012
 
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01saed saffarini
 
Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?Eric Peabody
 
081204 Virtual Design & Construction
081204 Virtual Design & Construction081204 Virtual Design & Construction
081204 Virtual Design & ConstructionRocio Gonzalez
 
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process PresentationBIM & Coordination Work Process Presentation
BIM & Coordination Work Process PresentationIndranath Sinha
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 

Viewers also liked (20)

BIM for Risk Management
BIM for Risk ManagementBIM for Risk Management
BIM for Risk Management
 
Innovative Detailing and BIM workflows- Reduce risk, compress schedule
Innovative Detailing and BIM workflows- Reduce risk, compress scheduleInnovative Detailing and BIM workflows- Reduce risk, compress schedule
Innovative Detailing and BIM workflows- Reduce risk, compress schedule
 
Flevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process MappingFlevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process Mapping
 
Bim Facades.Final
Bim Facades.FinalBim Facades.Final
Bim Facades.Final
 
Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10
 
Anthony N Dauginas
Anthony N DauginasAnthony N Dauginas
Anthony N Dauginas
 
Communication &amp; Coordination on a Construction Project Through Building I...
Communication &amp; Coordination on a Construction Project Through Building I...Communication &amp; Coordination on a Construction Project Through Building I...
Communication &amp; Coordination on a Construction Project Through Building I...
 
Trusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationTrusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project Coordination
 
BIM COORDINATION PORTOFOLIOOO
BIM COORDINATION PORTOFOLIOOOBIM COORDINATION PORTOFOLIOOO
BIM COORDINATION PORTOFOLIOOO
 
Bim101 Aec
Bim101 AecBim101 Aec
Bim101 Aec
 
BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9
 
A Team Plumbing and Drainage Systems
A Team Plumbing and Drainage SystemsA Team Plumbing and Drainage Systems
A Team Plumbing and Drainage Systems
 
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01
 
Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?
 
081204 Virtual Design & Construction
081204 Virtual Design & Construction081204 Virtual Design & Construction
081204 Virtual Design & Construction
 
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process PresentationBIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
BIM, Prefabrication & Design Build
BIM, Prefabrication & Design BuildBIM, Prefabrication & Design Build
BIM, Prefabrication & Design Build
 
HKIBIM Building Information Modelling (BIM) awareness Seminar
HKIBIM Building Information Modelling (BIM) awareness SeminarHKIBIM Building Information Modelling (BIM) awareness Seminar
HKIBIM Building Information Modelling (BIM) awareness Seminar
 
How BIM Enhances the Design Process
How BIM Enhances the Design ProcessHow BIM Enhances the Design Process
How BIM Enhances the Design Process
 

Similar to Reducing Risk with BIM

IFMA Presentation: BIM Making the Facility Manager's Life Easier
IFMA Presentation: BIM Making the Facility Manager's Life EasierIFMA Presentation: BIM Making the Facility Manager's Life Easier
IFMA Presentation: BIM Making the Facility Manager's Life EasierThe Design Partnership
 
BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9Eric Peabody
 
Experimental BIM Use Comparison on Stanford Hospital Cath Labs
Experimental BIM Use Comparison on Stanford Hospital Cath LabsExperimental BIM Use Comparison on Stanford Hospital Cath Labs
Experimental BIM Use Comparison on Stanford Hospital Cath LabsEric Peabody
 
Leaning Project Delivery: Altering the Cost = Risk Equation
Leaning Project Delivery: Altering the Cost = Risk EquationLeaning Project Delivery: Altering the Cost = Risk Equation
Leaning Project Delivery: Altering the Cost = Risk EquationEric Peabody
 
Cc 2009 091202
Cc 2009 091202Cc 2009 091202
Cc 2009 091202apartridge
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahem Naeem
 
Rapier Ecobuild Presentation
Rapier Ecobuild PresentationRapier Ecobuild Presentation
Rapier Ecobuild Presentationmocathe1st
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxcooperapleh
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxeubanksnefen
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxhelzerpatrina
 
Bim Enabled Ipd
Bim Enabled IpdBim Enabled Ipd
Bim Enabled Ipdmarybk
 
BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014Stephen Au
 
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...Virtual ULI
 
Ode Consultants Pvt. Ltd.
Ode Consultants Pvt. Ltd.Ode Consultants Pvt. Ltd.
Ode Consultants Pvt. Ltd.Kushagra Singh
 
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015Aconex
 

Similar to Reducing Risk with BIM (20)

IFMA Presentation: BIM Making the Facility Manager's Life Easier
IFMA Presentation: BIM Making the Facility Manager's Life EasierIFMA Presentation: BIM Making the Facility Manager's Life Easier
IFMA Presentation: BIM Making the Facility Manager's Life Easier
 
BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9
 
Experimental BIM Use Comparison on Stanford Hospital Cath Labs
Experimental BIM Use Comparison on Stanford Hospital Cath LabsExperimental BIM Use Comparison on Stanford Hospital Cath Labs
Experimental BIM Use Comparison on Stanford Hospital Cath Labs
 
Leaning Project Delivery: Altering the Cost = Risk Equation
Leaning Project Delivery: Altering the Cost = Risk EquationLeaning Project Delivery: Altering the Cost = Risk Equation
Leaning Project Delivery: Altering the Cost = Risk Equation
 
Cc 2009 091202
Cc 2009 091202Cc 2009 091202
Cc 2009 091202
 
Using an openBim Workflow
Using an openBim WorkflowUsing an openBim Workflow
Using an openBim Workflow
 
Alastair Gardner: BIM Overview
Alastair Gardner: BIM OverviewAlastair Gardner: BIM Overview
Alastair Gardner: BIM Overview
 
Bim
BimBim
Bim
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio
 
AEC Digital Solutions (Retail)
AEC Digital Solutions (Retail)AEC Digital Solutions (Retail)
AEC Digital Solutions (Retail)
 
Rapier Ecobuild Presentation
Rapier Ecobuild PresentationRapier Ecobuild Presentation
Rapier Ecobuild Presentation
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docx
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docx
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docx
 
Bim Enabled Ipd
Bim Enabled IpdBim Enabled Ipd
Bim Enabled Ipd
 
BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014
 
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
 
Ode Consultants Pvt. Ltd.
Ode Consultants Pvt. Ltd.Ode Consultants Pvt. Ltd.
Ode Consultants Pvt. Ltd.
 
AEC Digital Solutions (Scan to BIM)
AEC Digital Solutions (Scan to BIM)AEC Digital Solutions (Scan to BIM)
AEC Digital Solutions (Scan to BIM)
 
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
 

More from The Design Partnership

More from The Design Partnership (9)

Collaborative Architecture; Architecture for the Senses
Collaborative Architecture; Architecture for the SensesCollaborative Architecture; Architecture for the Senses
Collaborative Architecture; Architecture for the Senses
 
Achieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFAchieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSF
 
Shenshen Nanshan Hospital Expansion Competition Jury
Shenshen Nanshan Hospital Expansion Competition JuryShenshen Nanshan Hospital Expansion Competition Jury
Shenshen Nanshan Hospital Expansion Competition Jury
 
Advancing Healing Design to the Next Level
Advancing Healing Design to the Next LevelAdvancing Healing Design to the Next Level
Advancing Healing Design to the Next Level
 
CSHE High-Tech - Old Infrastructure
CSHE High-Tech - Old InfrastructureCSHE High-Tech - Old Infrastructure
CSHE High-Tech - Old Infrastructure
 
Navisworks Clash Course
Navisworks Clash CourseNavisworks Clash Course
Navisworks Clash Course
 
High-Tech vs. Old Infrastruction
High-Tech vs. Old InfrastructionHigh-Tech vs. Old Infrastruction
High-Tech vs. Old Infrastruction
 
Labs 21 BIM & Sustainability
Labs 21 BIM & SustainabilityLabs 21 BIM & Sustainability
Labs 21 BIM & Sustainability
 
Set-Based Concurrent Desgin
Set-Based Concurrent DesginSet-Based Concurrent Desgin
Set-Based Concurrent Desgin
 

Recently uploaded

"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024The Digital Insurer
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 

Recently uploaded (20)

"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 

Reducing Risk with BIM

  • 1. T H E D E S I G N PA R T N E R S H I P R E D U C I N G R I S K W I T For UC Davis Design & Construction Management O c t o b e r 4 2 0 11
  • 2. WHO WE ARE About The Design Partnership • Founded in 1979 • 45 Employees • Expertise in Science & Technology, Education, Healthcare, Public, Master Planning • BIM/Lean / IPD Leadership • Over $1 Billion Designed in BIM • Using BIM since 2005; 100% BIM since 2006 • 2008 AIASF Integrated Practice Honor Award Recipient
  • 3. REDUCING RISK WITH BIM 1 What is Risk? 2 Technology Introduction 3 Construction Technology 4 Case Study: VA Puget Sound 5 Case Study: Stanford Cath Labs 6 Case Study: Robbins Hall Renovation
  • 4. WHAT IS RISK? • Altering “Risk = Cost” Equation • Increase in Architect’s Exposure • Decrease in Contractor’s Risk • Decrease in Owner’s Risk • Reduced Risk for All = Reduced Cost The Design Partnership LLP  Architects + Planners
  • 5.
  • 6. Increase in Architect’s Exposure  Unknown Consequences Of Sharing BIM Information  Design Only Information In BIM Model  Extensive Pre-coordination  Fabrication From Design Models  Increased Exposure to Risk The Design Partnership LLP  Architects + Planners
  • 7. Decrease in Contractor’s Risk  Reduced Coordination Errors  Reduced Unknown Conditions  More Efficient Workflow  Cooperation & Collaboration  Reduced Contingency  Increased Confidence &  Reduced Risk The Design Partnership LLP  Architects + Planners
  • 8. Decrease in Owner’s Risk  Reduced Bidding Costs Due To Reduced Contractor Risks  Reduced Risk Of – Change Orders From Unknown Conditions – Coordination Changes – Fighting Among AEC Entities  Reduced User Changes Due To Better Pre-visualization And Planning The Design Partnership LLP  Architects + Planners
  • 9. Architect’s Exposure  However Architect’s Risk  Reduced Risk for All = Reduced Cost The Design Partnership LLP  Architects + Planners
  • 10. TECHNOLOGY INTRODUCTION • Building Information Modeling (BIM) • Virtual Simulation / Pre- visualization • 3D Laser Survey • Clash Detection & Coordination The Design Partnership LLP  Architects + Planners
  • 11. The Big BIM/IPD/Lean Idea The Design Partnership LLP  Architects + Planners
  • 12. Project Delivery Improvement Automatic Document Coordination 3D Systems Coordination Virtual Building Simulation Direct Fabrication The Design Partnership LLP  Architects + Planners
  • 13. Building Information Modeling (BIM) The Design Partnership LLP  Architects + Planners
  • 14. BIM is a 3D Database The Design Partnership LLP  Architects + Planners
  • 15. Design Visualization The Design Partnership LLP  Architects + Planners
  • 16. Design Visualization The Design Partnership LLP  Architects + Planners
  • 17. Virtual Equipment Simulation The Design Partnership LLP  Architects + Planners
  • 18. The Design Partnership LLP  Architects + Planners
  • 19. 3D Laser Survey The Design Partnership LLP  Architects + Planners
  • 20. Clash Detection & Coordination Structural Plan Where is the coordination error? Mechanical Plan The Design Partnership LLP  Architects + Planners
  • 21. Clash Detection & Coordination The Design Partnership LLP  Architects + Planners
  • 22. CONSTRUCTION TECHNOLOGY • Direct Fabrication • Prefabrication • Capabilities The Design Partnership LLP  Architects + Planners
  • 23. Direct Fabrication The Design Partnership LLP  Architects + Planners Images courtesy of Marelich Mechanical
  • 24. Direct Fabrication The Design Partnership LLP  Architects + Planners
  • 25. Prefabrication The Design Partnership LLP  Architects + Planners
  • 26. The Design Partnership LLP  Architects + Planners Image courtesy of Marelich Mechanical
  • 27. The Design Partnership LLP  Architects + Planners
  • 28. The Design Partnership LLP  Architects + Planners Image courtesy of Marelich Mechanical
  • 29. The Design Partnership LLP  Architects + Planners
  • 30. 3D Capable Trades • HVAC • Plumbing • Structural Steel • Precast Concrete • Rebar • Steel Stud Walls • Curtain Walls, etc. • Millwork • Unit Restrooms • Laboratories The Design Partnership LLP  Architects + Planners
  • 31. Relative Sophistication Disparity  General Contractors (Very Low to Low)  Engineers (Very Low to Moderate) Architects (Low to Moderate)  Subcontractors (Varies, some extremely high)  Maximize advantage of sophisticated players  Enhance process for Subs already using 3D  Mentor less advanced members  Integrated Project Delivery The Design Partnership LLP  Architects + Planners
  • 32. CASE STUDY: VA PUGET SOUND • Design of VA Puget Sound Mental Health & Research Project The Design Partnership LLP  Architects + Planners
  • 33. VA PUGET SOUND CAMPUS PROJECT Campus expansion of four distinct projects that are linked to Mental Health Treatment and Research. Associate Architect Mental Health & Research Bldg. $104M 200,000 gsf Existing Hospital Seismic Upgrade $28M 162,000 gsf Parking Structure (1000 stalls) $37M 400,000 gsf Site Work $8M 367,000 gsf Total $177M 1,129,000 gsf
  • 34. VA PUGET SOUND CAMPUS PROJECT Site Plan A B D C A Mental Health & Research Bldg. B Existing Hospital Seismic Upgrade C Parking Structure D Site Work
  • 35. VA PUGET SOUND CAMPUS PROJECT Mental Health & Research Building Exterior Renderings
  • 36. STRUCTURAL BUILDING SYSTEMS
  • 37. MECHANICAL BUILDING SYSTEMS
  • 38. MECHANICAL BUILDING SYSTEMS
  • 39. ELECTRICAL BUILDING SYSTEMS
  • 40. TELECOM BUILDING SYSTEMS
  • 41. LABORATORY BUILDING SYSTEMS
  • 42. CASE STUDY: STANFORD CATH LABS • Comparison of Cath Labs 7, 9, & 10 The Design Partnership LLP  Architects + Planners
  • 43.
  • 44. 7
  • 45. 7 Cath Lab 7: Siemens Biplane Cath Lab Construction Start: 2006 BIM Use: CAD Only
  • 46. 7 9
  • 47. 9 Cath Lab 9: Siemens Biplane Hybrid OR Construction Start: 2009 BIM Use: Laser Scanning & Modeling to 2”
  • 48. 3D Laser Scanning The Design Partnership LLP  Architects + Planners
  • 49. Existing Conditions Model to 2” The Design Partnership LLP  Architects + Planners
  • 50. New Work Model to 2” The Design Partnership LLP  Architects + Planners
  • 51. Construct The Design Partnership LLP  Architects + Planners
  • 53. 10 Construction Start: Siemens Biplane Pediatric Cath Lab Cath Lab 10: 20010 BIM Use: Laser Scanning & Modeling Everything
  • 54. Model Everything The Design Partnership LLP  Architects + Planners
  • 55. Construction Cost BIM Use $/SF % from CAD Cath Lab 7 CAD 2,153 $/SF Cath Lab 9 2” Standard 1,829 $/SF -15.0% Cath Lab 10 Everything 2,065 $/SF -4.1% *All figures in 2010 Relative Value Change Order Cost BIM Use $/SF % of Total Cath Lab 7 CAD 267 $/SF 12.4% Cath Lab 9 2” Standard 148 $/SF 8.1% Cath Lab 10 Everything 16 $/SF <0.1% *All figures in 2010 Relative Value The Design Partnership LLP  Architects + Planners
  • 56. Construction Cost BIM Use Unit Cost Cath Lab 7 CAD Only 2,153 $/SF Cath Lab 9 2” Standard 1,613 $/SF Cath Lab 10 Everything 2,065 $/SF Change Order Cost BIM Use Change Rate Cath Lab 7 CAD Only 12.4% Cath Lab 9 2” Standard 7.8% Cath Lab 10 Everything <0.1% *All figures in 2010 Relative Value
  • 57. ROBBINS HALL RENOVATION • BIM Use on UC Davis Robbins Hall Phase 1 Renovation - (E) and (N) Casework Database - Equipment Documentation - Arch/Mech Coordination The Design Partnership LLP  Architects + Planners
  • 58.
  • 59. First Floor Plan - PROJECT PROGRAM The Design Partnership LLP  Architects + Planners
  • 60.
  • 61. Casework Documentation The Design Partnership LLP  Architects + Planners
  • 62. Casework Documentation The Design Partnership LLP  Architects + Planners
  • 63. Casework Documentation The Design Partnership LLP  Architects + Planners
  • 64.
  • 65. First Floor - EQUIPMENT PLAN JORGE DUBCOVSKY JAN DVORAK ABHAYA DANDEKAR DAVID NEALE JEFFREY IBARRA PAM RONALD GENERAL EQUIPMENT The Design Partnership LLP  Architects + Planners
  • 66. First Floor - EQUIPMENT AXONOMETRIC JORGE DUBCOVSKY JAN DVORAK ABHAYA DANDEKAR DAVID NEALE JEFFREY IBARRA PAM RONALD GENERAL EQUIPMENT The Design Partnership LLP  Architects + Planners
  • 67. Construction Cost $ % Change Orders $812,438 11.60% Final Construction Cost $7,004,281 Change Order Summary $ % User Additions $230,954 3.30% Engineering & Operations $191,182 2.73% Infrastructure Improvements $183,337 2.62% Unforeseen Field Conditions $122,938 1.76% A/E Coordination $84,027 1.20% The Design Partnership LLP  Architects + Planners
  • 68. Thanks! Questions? Find the slides from this presentation on SlideShare. Search for us by name: TheDesignPartnership Or by our public profile: http://www.slideshare.net/TheDesignPartnership THE DESIGN PA R T N E R S H I P A R C H I T www.dpsf.comL A N N E R S ECTS + P

Editor's Notes

  1. ADD IMAGEto produce clear documents, showing a buildable design.We use:Again, reliance on a coordinated and integrated team including the Cost Management consultant.And BIM allows us to make our documents fastidiously coordinated and accurate.The BIM model starts with the site and builds from there.The model is shared by all disciplines, and clash detection sessions are regularly scheduled throughout design and document production. We were early implementers of BIM in our industry and began with it 7 years ago.Quantity takeoffs are continuous, estimates revised all the time; major systems updates during design : mechanical &amp; electrical, structural, site, building envelopeAlso take a friendly approach to the constructor to clearly indicate we want him on our team to build a successful project for everyone involved.