SlideShare uma empresa Scribd logo
1 de 52
Be A Game Changer ,[object Object],[object Object],[object Object],“ To exist is to change, to change is to mature, to mature is to go on creating oneself endlessly.” H. Bergson
Carrier Hamilton Sundstrand Otis Sikorsky UTC Fire & Security Pratt & Whitney V. Subramaniam Director – IT & CIO (India & Gulf Area) Otis Elevator Company (India) Limited (A United Technologies Company) A Great Company is like a Work of Art No one single item makes the whole thing work It’s the entire work, all the Process & Systems Together &  People Working together as a  Synergetic TEAM Create an overall effect. That leads to overall Greatness
Visit Us At  www.utc.com  and  www.otis.com
Email & IM Peripherals (MFD…) IT Security Servers & Data Storage Network  (LAN & WAN) Suppliers/ partners connect Data centers & Computer  Room PC’s (Desktops & Laptops) Handheld devices Remote access Customers Partners Employees System Architecture for for
IT…Delivering Business Value… Continually Information Technology
Leadership & Project Management LEAD inspire win
The Agile Enterprise Customer Service Supply Chain  ERP Human Resources Financial Services Customers Partners Employees
 
Project Management Principles Technology People Process Discipline Of Execution Quality Speed Agility ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Reliability Integrity Urgency
The Project Management Life Cycle A Complete Step-by-Step Methodology for  Initiating, Planning, Executing and Closing a Project Successfully Future State Current State Transformation
What is a project? A project is: A unique undertaking to produce a set of deliverables  within clearly specified time, cost and quality constraints. Projects  differ from o perational  activities as they: - are  unique ; - have a defined  timescale ; - have an approved  budget ; - involve limited  resources ; - have an element of  risk ; - achieve beneficial  change . Project Life Cycle Overview
What is project management? Project management is: The skills, tools and management processes required  to undertake a project successfully. Project management comprises: - A set of  skills , specialist knowledge and experience. - A set of  tools  used to improve the chances of success. - A set of  processes  for monitoring and controlling a project.
What is the project life cycle? The project life cycle is: The phases, activities and tasks required to successfully  deliver a project. There are four phases within the project life cycle: 1) Project initiation 2) Project planning 3) Project execution 4) Project closure
Phase 1: Project initiation The initiation phase essentially involves the start-up of the project. To initiate a project, you need to: - Develop a  business case  to justify the new project. - Undertake a  feasibility study  to measure the solution feasibility. - Establish the  terms of reference  by defining the project boundaries. - Appoint a  project team  with the right skills and experience. - Set up a  project office  with the required facilities and tools. - Perform a  stage-gate review  to request approval to proceed.
To plan a project, you need to: - Create a  project plan  defining the work breakdown structure. - Create a  resource plan  listing the quantities of resource needed. - Create a  financial plan  identifying the budget required. - Create a  risk plan  identifying key risks and mitigating actions. - Create a  quality plan  including quality assurance and control reviews.  - Create an  acceptance plan  to gain customer acceptance. - Create a  communication plan  to keep stakeholders informed. - Create a  procurement plan  to procure products from suppliers.  - Contract  suppliers  to the project. - Perform a  phase review  to request approval to proceed. Phase 2: Project planning The planning phase involves the detailed planning of the project.
Phase 3: Project execution The execution phase involves the construction of the project deliverables and the monitoring and control of the project delivery. To execute a project, you need to: - Build the project deliverables. - Monitor and control the project by performing: - time management; - cost management; - quality management; - change management; - risk management; - issue management; - procurement management; - acceptance management; - communications management.
Phase 4: Project closure The closure phase involves the closure and review of the success of the project. To close a project, you need to: - Perform  project closure  by creating a  project closure report ; - Review  project completion  by undertaking a  post implementation review.
Project Execution Future State Current State Transformation
What is project execution? - it is the third phase in the project life   cycle; - it involves creating project deliverables - within this phase the deliverables are    built and signed off by the customer.   The project manager monitors and    controls the project by executing a suite    of management processes.  Which activities are undertaken? The following diagram depicts the activities involved in executing a project:
Step 1: Build deliverables A deliverable is: A quantifiable outcome of a project which results in the partial or full achievement of the project  objectives. To build project deliverables, you need to: - delegate the building of deliverables to project staff; - physically construct each project deliverable; - measure the deliverables against the quality targets set; - request acceptance of deliverables by the customer.
Step 2: Monitor and control During the execution of the project, you need to monitor and control the project delivery by performing: - time management; - cost management; - quality management; - change management; - risk management; - issue management; - procurement management; - acceptance management; - communications management.
Perform time management Time management is: The process of recording and  quantifying time spent completing  tasks on a project. Time management involves: - completing and approving timesheets; - recording time spent, within a timesheet    register and project plan; - identifying and resolving exceptions.
Perform cost management Cost management is: The process by which costs (ie  expenses) incurred on a project are  identified, approved and paid. Cost management involves: - completing and approving expense forms; - recording expenditure, within an    expense register and project plan; - resolving expense issues.
Perform quality management Quality management is: The process by which the  quality of the deliverables  and management processes  is assured and controlled. Quality management involves: - setting quality targets; - measuring deliverable quality; - performing quality assurance; - performing quality control; - resolving quality issues. TURN BACKS ESCAPES
Quality…A Way Of Work Life ACE Tools Process Management Quality Clinic Process Chart Relentless Root Cause Analysis Mistake Proofing Market Feedback Analysis Standard Work Total Productive Maintenance New 5S Value Stream mapping Passport System Process Certification
Perform change management Change management is: The process by which changes to  the project scope, deliverables,  timescales or resources are approved  and managed. Change management involves: - completing change requests; - assessing change feasibility; - approving change requests; - scheduling change requests; - implementing change requests.  “ When the rate of change outside exceeds the rate of change inside, the end is in sight”....Jack Welch ,[object Object],[object Object],[object Object],[object Object],[object Object]
Ingredients of Change Frustration Gradual Change Anxiety False Start Confusion Vision Motivation Skills Resources Action Plan Change Vision Motivation Skills Resources Action Plan Vision Motivation Skills Resources Action Plan Vision Motivation Skills Resources Action Plan Vision Motivation Skills Resources Action Plan Vision Motivation Skills Resources Action Plan
If You Do Not Change, You Can Become Extinct The Quicker You Let Go Of Old Cheese, The Sooner you Find New Cheese. Old Beliefs Do Not Lead You To New Cheese. When You See That You Can Find And Enjoy New Cheese, You Change Course. Noticing Small Changes Early Helps You Adapt To The Bigger Changes That Are To Come. ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Movement In A New Direction Helps You Find New Cheese. When You Move Beyond Your Fear, You Feel Free. Imagining Myself Enjoying New Cheese, Even Before I Find It, Leads Me To It. Who Moved My Cheese?
Perform risk management Risk management is: The process of identifying, quantifying  and mitigating risks throughout a  project. Risk management involves: - identifying project risks; - completing risk forms; - reviewing and assessing risks; - implementing risk mitigation actions; - constantly reviewing the risk status.
Perform issue management Issue management is: The process by which issues are  formally identified, reviewed and  resolved. Issue management involves: - identifying project issues; - completing issue forms; - reviewing and assessing issues; - implementing issue resolution actions; - constantly reviewing the issue status
Perform procurement management Procurement management is: The process of  procuring products from external suppliers. Procurement management involves: - issuing purchase orders; - fulfilling purchase orders; - managing supplier contracts.
Perform acceptance management Acceptance management is: The process by which project  deliverables are reviewed and  accepted by the customer. Acceptance management involves: - identifying the completion of deliverables; - requesting customer acceptance tests; - completing acceptance tests; - accepting final deliverables.
Perform communications management Communications management is: The process of keeping stakeholders  informed of the progress of the project. Communications management involves: - identifying communication required; - creating communications messages; - dispatching communications messages; - reviewing communication effectiveness.
Step 3: Perform a stage gate  A stage gate is: A checkpoint at the end of the project phase to ensure  that the project has achieved its stated objectives and  deliverables. To perform a stage gate, you need to: - identify the stage-gate review criteria; - undertake the stage-gate review; - complete the stage-gate review form; - seek approval to proceed.
Project Team Plan Review Execute Project Organization (Team) Project Office / Space Strengths and Limitations Project Risks and Mitigation Milestones and Tasks Time Lines PROJECT Method of Execution Turn Around Strategy Quick Wins Point Of Failures Point Of Success Change Management Governance Model Change Control Dash Boards / Metrics Project Check / Passport Communication Celebrate Success
Project Team On Site Team Virtual Team Management Team – Roles & Responsibilities Skills and Competencies Contingency / Back Fill Adaptability Stress Management Technology Can Be Put In Place, People Make IT Happen Sponsor Role Involvement & Decision Committed Communication / Update Project Incentive Review Team – Roles & Resp. Skills and Competencies Culture Time Zones Review Mechanism ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Plan For Execution Project Plan What Who How Why When GO / NO GO
PROJECT SUCCESS FAILURE HOLD Critical Success Factors Key Learning’s Doings things differently Valid Reasons for Hold Revive of Project Turn Around Critical Failure Factors Key Learning’s Revive and Turn Around
5C’s For Project Excellence EFFECTIVENESS Communication Collaboration Co - Operation Co - Creation Co Ordination
Project Team Partners Project success Management Team Strategic Execution - Support Role Execution Support Role Strategic Facilitator Role Successful  Implementation People processes Implementation Methodology Technology
ERP EVALUATE BEYOND EXECUTE Vendor -> Partner Package Team Business Case Approvals Project Organization Team &Organization Readiness Requirement Phase (As Is) To Be Processes - BRD Infrastructure Readiness Interface Readiness Enhancements / Developments Data Migration Security (R&R) Walk Through & Training Testing – UAT / IUAT Documentation Contingency Plan Support Model Go Live Readiness Post Go Live - Usage Leverage & Effective Usage Information to Insights Upgrades Enhancements
L isten E mpathize A pologize R esolve N otify Customer…Compliant & Management Call Back / Turn Back / Escapes RRCA – Relentless Root Cause Analysis Mistake Proof Solution Feedback &  Continual Improvements
Confidentiality Ensure protection of user information and transmission of Data Integrity Ensure accuracy  Transparency Controls & Compliance A Secured System leads to Secured Enterprise
Leadership Lead & Be Loyal to the role Energetic & Enthusiasm  Adaptability & Agile Dynamic, Discipline & Dedication & Determination Excellence (Will to WIN & Can Do) & Execution (Focus) Remarkable & Result Oriented (Customer Centric) Shape the Future & Significance to the role Humble, Holistic and Happening (Make Things Happen) Integrity, Inspire and Invest in Self+People Performance & People Oriented
Lead the  Business Leadership is by Choice, not by options Stephen R Covey Mission Goals Strategic  Objectives Execution Results Lead the people Grow Yourself
TEAM WORK Attitude…Skills…Knowledge T otal Commitment (Committed) E xcellence A daptability M otivated W ill to Win O rganized / Systematic R esult Oriented K nowledge ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],12 Cs of  Team Work
BEHAVIOUR! ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],T ruth R esponsibility U nderstanding S haring T eamwork
Project Management Mantra DOMAIN EXPERTISE & BUSINESS ACUMEN LEADERSHIP MANAGEMENT PROJECT PLANNING ORGANIZED RESULT JOYFUL EXECUTION COLLABORATION TURN AROUND
“ WINNERS DON’T DO  DIFFERENT THINGS THEY DO THINGS DIFFERENTLY” “ WINNERS recognize their limitations But focus on their strengths Losers recognize their strengths But focus on their limitations … .Shiv Khera “ WINNing is inspiration to work harder A winner gives hope to ordinary people & inspire them to Move to extra…ordinary” The WINNING EDGE
A demanding customer is very similar to a coach. Not only does he demand the best and expect nothing else, but he also appreciates it when he gets the best.
When you are inspired by  some great purpose , some  extraordinary project ,  all  your thoughts break their bonds .  Your mind transcends limitations ,  your consciousness expands  in every direction, and  you find yourself in a new, great and wonderful world .  Dormant forces ,  faculties and talents become alive , and you discover  yourself to be a greater person by far than you ever dreamed yourself to be . Patanjali (1 st  – 3 rd  Century BC)
Subbu

Mais conteúdo relacionado

Mais procurados

Project management slide - Introduction
Project management slide - IntroductionProject management slide - Introduction
Project management slide - IntroductionAlbert Poghosyan
 
Pmp – pmbok 5th edition chapter7 project cost management
Pmp – pmbok 5th edition chapter7 project cost managementPmp – pmbok 5th edition chapter7 project cost management
Pmp – pmbok 5th edition chapter7 project cost managementYudha Pratama, PMP
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality ManagementSAJJAD KHUDHUR ABBAS
 
Lecture 5 project management introduction
Lecture 5   project management introductionLecture 5   project management introduction
Lecture 5 project management introductionHafiz JUNAID
 
7 Themes of Prince2
7 Themes of Prince27 Themes of Prince2
7 Themes of Prince2Barry Hodge
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTSAJJAD KHUDHUR ABBAS
 
Pmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementPmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementHossam Maghrabi
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration managementejlp12
 
Management control of project
Management control of projectManagement control of project
Management control of projectSai Mahesh
 
01 introductiontoframework
01 introductiontoframework01 introductiontoframework
01 introductiontoframeworkDhamo daran
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part twoHossam Maghrabi
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycleSAJID ALI RUK
 

Mais procurados (20)

Project management slide - Introduction
Project management slide - IntroductionProject management slide - Introduction
Project management slide - Introduction
 
4 integration
4 integration4 integration
4 integration
 
Pmp – pmbok 5th edition chapter7 project cost management
Pmp – pmbok 5th edition chapter7 project cost managementPmp – pmbok 5th edition chapter7 project cost management
Pmp – pmbok 5th edition chapter7 project cost management
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
My MBA Course on Project Quality Management
My MBA Course on Project Quality ManagementMy MBA Course on Project Quality Management
My MBA Course on Project Quality Management
 
Session 22 4th edition PMP
Session 22 4th edition PMPSession 22 4th edition PMP
Session 22 4th edition PMP
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
 
PROJECT MANAGEMENT
PROJECT MANAGEMENTPROJECT MANAGEMENT
PROJECT MANAGEMENT
 
3 project life cycle
3   project life cycle3   project life cycle
3 project life cycle
 
Lecture 5 project management introduction
Lecture 5   project management introductionLecture 5   project management introduction
Lecture 5 project management introduction
 
PM FrameWork: Module 4
PM FrameWork: Module 4PM FrameWork: Module 4
PM FrameWork: Module 4
 
7 Themes of Prince2
7 Themes of Prince27 Themes of Prince2
7 Themes of Prince2
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
 
Chap08 project quality management
Chap08 project quality  managementChap08 project quality  management
Chap08 project quality management
 
Pmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementPmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk Management
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration management
 
Management control of project
Management control of projectManagement control of project
Management control of project
 
01 introductiontoframework
01 introductiontoframework01 introductiontoframework
01 introductiontoframework
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part two
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 

Semelhante a Project life cycle_management by Subbu

Project lifecycle
Project lifecycleProject lifecycle
Project lifecycleAyo Apampa
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycleAndrei Crăciun
 
It project management and best practices
It project management and best practicesIt project management and best practices
It project management and best practicesNaresh Pokhriyal
 
Final Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptxFinal Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptxGeorgeKabongah2
 
Topic 4 - Project Management Process.pdf
Topic 4 - Project Management Process.pdfTopic 4 - Project Management Process.pdf
Topic 4 - Project Management Process.pdfHuyNguyen657394
 
Intro to Project Management
Intro to Project ManagementIntro to Project Management
Intro to Project ManagementNoman Aftab
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its PhasesGaurav Sukhija
 
209560525-PMP-Study-Sheet.pdf
209560525-PMP-Study-Sheet.pdf209560525-PMP-Study-Sheet.pdf
209560525-PMP-Study-Sheet.pdfUmarFarooq29531
 
Final Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptxFinal Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptxGeorgeKabongah2
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project ManagementTrue Corporation
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementMohamad Ashrafi
 
Topic 12 - Project Cost Management.pdf
Topic 12 - Project Cost Management.pdfTopic 12 - Project Cost Management.pdf
Topic 12 - Project Cost Management.pdfHuyNguyen657394
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management Qussay Karam
 
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfx-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfEidTahir
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementPinta Florin
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementN Raghuraman
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementPinta Florin
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-managementSavaş Şakar
 

Semelhante a Project life cycle_management by Subbu (20)

Project lifecycle
Project lifecycleProject lifecycle
Project lifecycle
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
It project management and best practices
It project management and best practicesIt project management and best practices
It project management and best practices
 
PROJECT MANAGEMENT
PROJECT MANAGEMENTPROJECT MANAGEMENT
PROJECT MANAGEMENT
 
Final Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptxFinal Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptx
 
Topic 4 - Project Management Process.pdf
Topic 4 - Project Management Process.pdfTopic 4 - Project Management Process.pdf
Topic 4 - Project Management Process.pdf
 
Intro to Project Management
Intro to Project ManagementIntro to Project Management
Intro to Project Management
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
209560525-PMP-Study-Sheet.pdf
209560525-PMP-Study-Sheet.pdf209560525-PMP-Study-Sheet.pdf
209560525-PMP-Study-Sheet.pdf
 
Final Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptxFinal Class Presentation on Project Execution.ppt.pptx
Final Class Presentation on Project Execution.ppt.pptx
 
D.K. Saini....
D.K. Saini....D.K. Saini....
D.K. Saini....
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
Topic 12 - Project Cost Management.pdf
Topic 12 - Project Cost Management.pdfTopic 12 - Project Cost Management.pdf
Topic 12 - Project Cost Management.pdf
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management
 
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfx-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-management
 

Mais de TechGigDotCom

Welcome speech_Efficient project management - Girish Kelkar
Welcome speech_Efficient project management - Girish KelkarWelcome speech_Efficient project management - Girish Kelkar
Welcome speech_Efficient project management - Girish KelkarTechGigDotCom
 
Mrityunjay Singh_PMI Key Note
Mrityunjay Singh_PMI Key NoteMrityunjay Singh_PMI Key Note
Mrityunjay Singh_PMI Key NoteTechGigDotCom
 
Nirmalendu Jajodia - Project and change management
Nirmalendu Jajodia  - Project and change managementNirmalendu Jajodia  - Project and change management
Nirmalendu Jajodia - Project and change managementTechGigDotCom
 
Suzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteSuzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteTechGigDotCom
 
Life time achievement awards gsk pre-corrections
Life time achievement awards   gsk pre-correctionsLife time achievement awards   gsk pre-corrections
Life time achievement awards gsk pre-correctionsTechGigDotCom
 
Life time achievement awards v3 finalversion
Life time achievement awards v3 finalversionLife time achievement awards v3 finalversion
Life time achievement awards v3 finalversionTechGigDotCom
 
Tech gig presentation - pmi
Tech gig presentation - pmiTech gig presentation - pmi
Tech gig presentation - pmiTechGigDotCom
 

Mais de TechGigDotCom (8)

Welcome speech_Efficient project management - Girish Kelkar
Welcome speech_Efficient project management - Girish KelkarWelcome speech_Efficient project management - Girish Kelkar
Welcome speech_Efficient project management - Girish Kelkar
 
Mrityunjay Singh_PMI Key Note
Mrityunjay Singh_PMI Key NoteMrityunjay Singh_PMI Key Note
Mrityunjay Singh_PMI Key Note
 
Nirmalendu Jajodia - Project and change management
Nirmalendu Jajodia  - Project and change managementNirmalendu Jajodia  - Project and change management
Nirmalendu Jajodia - Project and change management
 
Suzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteSuzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya Gumaste
 
Noriyasu Sugimura
Noriyasu SugimuraNoriyasu Sugimura
Noriyasu Sugimura
 
Life time achievement awards gsk pre-corrections
Life time achievement awards   gsk pre-correctionsLife time achievement awards   gsk pre-corrections
Life time achievement awards gsk pre-corrections
 
Life time achievement awards v3 finalversion
Life time achievement awards v3 finalversionLife time achievement awards v3 finalversion
Life time achievement awards v3 finalversion
 
Tech gig presentation - pmi
Tech gig presentation - pmiTech gig presentation - pmi
Tech gig presentation - pmi
 

Último

CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 

Último (20)

CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 

Project life cycle_management by Subbu

  • 1.
  • 2. Carrier Hamilton Sundstrand Otis Sikorsky UTC Fire & Security Pratt & Whitney V. Subramaniam Director – IT & CIO (India & Gulf Area) Otis Elevator Company (India) Limited (A United Technologies Company) A Great Company is like a Work of Art No one single item makes the whole thing work It’s the entire work, all the Process & Systems Together & People Working together as a Synergetic TEAM Create an overall effect. That leads to overall Greatness
  • 3. Visit Us At www.utc.com and www.otis.com
  • 4. Email & IM Peripherals (MFD…) IT Security Servers & Data Storage Network (LAN & WAN) Suppliers/ partners connect Data centers & Computer Room PC’s (Desktops & Laptops) Handheld devices Remote access Customers Partners Employees System Architecture for for
  • 5. IT…Delivering Business Value… Continually Information Technology
  • 6. Leadership & Project Management LEAD inspire win
  • 7. The Agile Enterprise Customer Service Supply Chain ERP Human Resources Financial Services Customers Partners Employees
  • 8.  
  • 9.
  • 10. The Project Management Life Cycle A Complete Step-by-Step Methodology for Initiating, Planning, Executing and Closing a Project Successfully Future State Current State Transformation
  • 11. What is a project? A project is: A unique undertaking to produce a set of deliverables within clearly specified time, cost and quality constraints. Projects differ from o perational activities as they: - are unique ; - have a defined timescale ; - have an approved budget ; - involve limited resources ; - have an element of risk ; - achieve beneficial change . Project Life Cycle Overview
  • 12. What is project management? Project management is: The skills, tools and management processes required to undertake a project successfully. Project management comprises: - A set of skills , specialist knowledge and experience. - A set of tools used to improve the chances of success. - A set of processes for monitoring and controlling a project.
  • 13. What is the project life cycle? The project life cycle is: The phases, activities and tasks required to successfully deliver a project. There are four phases within the project life cycle: 1) Project initiation 2) Project planning 3) Project execution 4) Project closure
  • 14. Phase 1: Project initiation The initiation phase essentially involves the start-up of the project. To initiate a project, you need to: - Develop a business case to justify the new project. - Undertake a feasibility study to measure the solution feasibility. - Establish the terms of reference by defining the project boundaries. - Appoint a project team with the right skills and experience. - Set up a project office with the required facilities and tools. - Perform a stage-gate review to request approval to proceed.
  • 15. To plan a project, you need to: - Create a project plan defining the work breakdown structure. - Create a resource plan listing the quantities of resource needed. - Create a financial plan identifying the budget required. - Create a risk plan identifying key risks and mitigating actions. - Create a quality plan including quality assurance and control reviews. - Create an acceptance plan to gain customer acceptance. - Create a communication plan to keep stakeholders informed. - Create a procurement plan to procure products from suppliers. - Contract suppliers to the project. - Perform a phase review to request approval to proceed. Phase 2: Project planning The planning phase involves the detailed planning of the project.
  • 16. Phase 3: Project execution The execution phase involves the construction of the project deliverables and the monitoring and control of the project delivery. To execute a project, you need to: - Build the project deliverables. - Monitor and control the project by performing: - time management; - cost management; - quality management; - change management; - risk management; - issue management; - procurement management; - acceptance management; - communications management.
  • 17. Phase 4: Project closure The closure phase involves the closure and review of the success of the project. To close a project, you need to: - Perform project closure by creating a project closure report ; - Review project completion by undertaking a post implementation review.
  • 18. Project Execution Future State Current State Transformation
  • 19. What is project execution? - it is the third phase in the project life cycle; - it involves creating project deliverables - within this phase the deliverables are built and signed off by the customer. The project manager monitors and controls the project by executing a suite of management processes. Which activities are undertaken? The following diagram depicts the activities involved in executing a project:
  • 20. Step 1: Build deliverables A deliverable is: A quantifiable outcome of a project which results in the partial or full achievement of the project objectives. To build project deliverables, you need to: - delegate the building of deliverables to project staff; - physically construct each project deliverable; - measure the deliverables against the quality targets set; - request acceptance of deliverables by the customer.
  • 21. Step 2: Monitor and control During the execution of the project, you need to monitor and control the project delivery by performing: - time management; - cost management; - quality management; - change management; - risk management; - issue management; - procurement management; - acceptance management; - communications management.
  • 22. Perform time management Time management is: The process of recording and quantifying time spent completing tasks on a project. Time management involves: - completing and approving timesheets; - recording time spent, within a timesheet register and project plan; - identifying and resolving exceptions.
  • 23. Perform cost management Cost management is: The process by which costs (ie expenses) incurred on a project are identified, approved and paid. Cost management involves: - completing and approving expense forms; - recording expenditure, within an expense register and project plan; - resolving expense issues.
  • 24. Perform quality management Quality management is: The process by which the quality of the deliverables and management processes is assured and controlled. Quality management involves: - setting quality targets; - measuring deliverable quality; - performing quality assurance; - performing quality control; - resolving quality issues. TURN BACKS ESCAPES
  • 25. Quality…A Way Of Work Life ACE Tools Process Management Quality Clinic Process Chart Relentless Root Cause Analysis Mistake Proofing Market Feedback Analysis Standard Work Total Productive Maintenance New 5S Value Stream mapping Passport System Process Certification
  • 26.
  • 27. Ingredients of Change Frustration Gradual Change Anxiety False Start Confusion Vision Motivation Skills Resources Action Plan Change Vision Motivation Skills Resources Action Plan Vision Motivation Skills Resources Action Plan Vision Motivation Skills Resources Action Plan Vision Motivation Skills Resources Action Plan Vision Motivation Skills Resources Action Plan
  • 28.
  • 29. Perform risk management Risk management is: The process of identifying, quantifying and mitigating risks throughout a project. Risk management involves: - identifying project risks; - completing risk forms; - reviewing and assessing risks; - implementing risk mitigation actions; - constantly reviewing the risk status.
  • 30. Perform issue management Issue management is: The process by which issues are formally identified, reviewed and resolved. Issue management involves: - identifying project issues; - completing issue forms; - reviewing and assessing issues; - implementing issue resolution actions; - constantly reviewing the issue status
  • 31. Perform procurement management Procurement management is: The process of procuring products from external suppliers. Procurement management involves: - issuing purchase orders; - fulfilling purchase orders; - managing supplier contracts.
  • 32. Perform acceptance management Acceptance management is: The process by which project deliverables are reviewed and accepted by the customer. Acceptance management involves: - identifying the completion of deliverables; - requesting customer acceptance tests; - completing acceptance tests; - accepting final deliverables.
  • 33. Perform communications management Communications management is: The process of keeping stakeholders informed of the progress of the project. Communications management involves: - identifying communication required; - creating communications messages; - dispatching communications messages; - reviewing communication effectiveness.
  • 34. Step 3: Perform a stage gate A stage gate is: A checkpoint at the end of the project phase to ensure that the project has achieved its stated objectives and deliverables. To perform a stage gate, you need to: - identify the stage-gate review criteria; - undertake the stage-gate review; - complete the stage-gate review form; - seek approval to proceed.
  • 35. Project Team Plan Review Execute Project Organization (Team) Project Office / Space Strengths and Limitations Project Risks and Mitigation Milestones and Tasks Time Lines PROJECT Method of Execution Turn Around Strategy Quick Wins Point Of Failures Point Of Success Change Management Governance Model Change Control Dash Boards / Metrics Project Check / Passport Communication Celebrate Success
  • 36.
  • 37. Plan For Execution Project Plan What Who How Why When GO / NO GO
  • 38. PROJECT SUCCESS FAILURE HOLD Critical Success Factors Key Learning’s Doings things differently Valid Reasons for Hold Revive of Project Turn Around Critical Failure Factors Key Learning’s Revive and Turn Around
  • 39. 5C’s For Project Excellence EFFECTIVENESS Communication Collaboration Co - Operation Co - Creation Co Ordination
  • 40. Project Team Partners Project success Management Team Strategic Execution - Support Role Execution Support Role Strategic Facilitator Role Successful Implementation People processes Implementation Methodology Technology
  • 41. ERP EVALUATE BEYOND EXECUTE Vendor -> Partner Package Team Business Case Approvals Project Organization Team &Organization Readiness Requirement Phase (As Is) To Be Processes - BRD Infrastructure Readiness Interface Readiness Enhancements / Developments Data Migration Security (R&R) Walk Through & Training Testing – UAT / IUAT Documentation Contingency Plan Support Model Go Live Readiness Post Go Live - Usage Leverage & Effective Usage Information to Insights Upgrades Enhancements
  • 42. L isten E mpathize A pologize R esolve N otify Customer…Compliant & Management Call Back / Turn Back / Escapes RRCA – Relentless Root Cause Analysis Mistake Proof Solution Feedback & Continual Improvements
  • 43. Confidentiality Ensure protection of user information and transmission of Data Integrity Ensure accuracy Transparency Controls & Compliance A Secured System leads to Secured Enterprise
  • 44. Leadership Lead & Be Loyal to the role Energetic & Enthusiasm Adaptability & Agile Dynamic, Discipline & Dedication & Determination Excellence (Will to WIN & Can Do) & Execution (Focus) Remarkable & Result Oriented (Customer Centric) Shape the Future & Significance to the role Humble, Holistic and Happening (Make Things Happen) Integrity, Inspire and Invest in Self+People Performance & People Oriented
  • 45. Lead the Business Leadership is by Choice, not by options Stephen R Covey Mission Goals Strategic Objectives Execution Results Lead the people Grow Yourself
  • 46.
  • 47.
  • 48. Project Management Mantra DOMAIN EXPERTISE & BUSINESS ACUMEN LEADERSHIP MANAGEMENT PROJECT PLANNING ORGANIZED RESULT JOYFUL EXECUTION COLLABORATION TURN AROUND
  • 49. “ WINNERS DON’T DO DIFFERENT THINGS THEY DO THINGS DIFFERENTLY” “ WINNERS recognize their limitations But focus on their strengths Losers recognize their strengths But focus on their limitations … .Shiv Khera “ WINNing is inspiration to work harder A winner gives hope to ordinary people & inspire them to Move to extra…ordinary” The WINNING EDGE
  • 50. A demanding customer is very similar to a coach. Not only does he demand the best and expect nothing else, but he also appreciates it when he gets the best.
  • 51. When you are inspired by some great purpose , some extraordinary project , all your thoughts break their bonds . Your mind transcends limitations , your consciousness expands in every direction, and you find yourself in a new, great and wonderful world . Dormant forces , faculties and talents become alive , and you discover yourself to be a greater person by far than you ever dreamed yourself to be . Patanjali (1 st – 3 rd Century BC)
  • 52. Subbu

Notas do Editor

  1. We set out with a mission to identify the connection between our people and processes and tools over the course of executing an order. While the initiative was targeted for New Sales equipment, it can readily be applied to our modernization and service order.
  2. Company private, Otis Elevator Co.
  3. 02/13/12 13:31
  4. 02/13/12 13:31
  5. 02/13/12 13:31
  6. 3 2 Delivering Business Benefit successfully will only come from addressing all 3 components - Business, People & Technology. The Business change programme requires a holistic view of the changes necessary in all of the elements.
  7. 02/13/12 13:31
  8. 02/13/12 13:31 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
  9. Company private, Otis Elevator Co.