2. Disclaimer
• The information contained in this presentation has been prepared by MacPhersons Reward Gold Ltd (MRP).
This presentation is not an offer, invitation, solicitation or other recommendation with respect to the
subscription for, purchase or sale of any securities in MRP. This presentation has been made available for
information purposes only and does not constitute a prospectus, short form prospectus, profile statement or
offer information statement. This presentation is not subject to the disclosure requirements affecting disclosure
documents under Chapter 6D of the Corporations Act.
• While the information contained in this presentation has been prepared in good faith, neither MRP or any of its
directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in
this presentation. Accordingly, to the maximum extent permitted by law, none of MRP, its directors, employees
or agents, advisers, nor any other person accepts any liability whether direct or indirect, express or limited,
contractual, tortuous, statutory or otherwise, in respect of, the accuracy or completeness of the information or
for any of the opinions contained in this presentation or for any errors, omissions or misstatements or for any
loss, howsoever arising, from the use of this presentation.
• This presentation may contain statements that may be deemed ‘forward looking statements’. Forward risks,
uncertainties and other factors, many of which are outside the control of MRP can cause actual results to differ
materially from such statements. Such risks and uncertainties include, but are not limited to, gold price
volatility, increased production costs and variances in ore grade recovery rates from those assumed in mining
plans, as well as political and operational risks and governmental regulation and judicial outcomes. MRP makes
no undertaking to update or revise such statements, but has made every endeavour to ensure that they are fair
and reasonable at the time of making the presentation.
• Investors are cautioned that any forward-looking statements are not guarantees of future performance and
that actual results or developments may differ materially from those projected in any forward-looking
statements made.
• Exploration targets are conceptual in nature and drilling may not convert these to resources.
November 2011 Update: Building a Gold – Silver – Zinc House 2
3. Today’s Message
• Nimbus – Boorara Silver-Gold-Zinc-Copper-Lead
• Existing silver-gold-zinc deposits
• New polymetallic extensions
• Current plan for 2011-2012
• Coolgardie Gold Projects
• Tycho JORC update and mine plan
• MacPhersons – A-Cap – Salvo ongoing drilling
• Plan to production
November 2011 Update: Building a Gold – Silver – Zinc House 3
4. Heart of the Goldfields
November 2011 Update: Building a Gold – Silver – Zinc House 4
5. People
Chairman (Executive) Managing Director (Executive)
Ashok Aaron Parekh Morrie David Goodz
BBUS, FCA, AIMM, FTIA MSc (Mining Geol), MBA, Cert Mine
Chartered Accountant Manager, FAIMM
32 years experience Geologist – 33 years experience
Coordinate assets for IPOs Discovered/Designed 4 decline mines
Non-Executive Director Company Secretary
Jeffrey Wayne Williams Stephen Hewitt-Dutton
BSc (Mining Eng), MBA, FAIMM BBus, CA, SA Fin
Mining Engineer – 38 yrs experience Chartered Acct – 17 yrs experience
Founder – Mineral Deposits (MDL) Specialist – Mergers & Acquisitions
Operations Management Prospecting Adviser
Ray Wright Bill Powell
Cert Mine Manager Mine Owner / Operator
45 years experience 56 years experience
Owner/Operator of 4 producing mines Discovered Powell/MacPherson mines
November 2011 Update: Building a Gold – Silver – Zinc House 5
6. Corporate
ASX Code: MRP
ASX Listed: December 2010
Ordinary Shares: 214 million
Unlisted Options: 20 million MRP
Market Cap: A$68 m at 32 cents
Cash: A$17m
XSO
PROJECTS
100% Gold Operations at Coolgardie
100% Nimbus Silver-Gold-Zinc-Cu-Pb Deposit
100% Boorara Gold & Ag-Au-Zn mining leases
Substantial Shareholders XSO= small cap stocks - daily (blue line)
MRP= MacPhersons share price - daily (red line)
Directors/associates 36%
November 2011 Update: Building a Gold – Silver – Zinc House 6
7. Our Targets*
• The Directors are currently planning
operations with a target of moving from
Explorer to Producer in 7 months
• 2012 - 25,000 oz gold
• 2013 - 50,000 oz gold / 1 Moz silver
• 2014 - 75,000oz gold / 1+ Moz silver
- zinc-silver-gold-lead concentrate
* Note – exploration targets are conceptual in nature and drilling may not convert these to resources.
November 2011 Update: Building a Gold – Silver – Zinc House 7
8. Nimbus – 6 Moz Ag Target*
6 Moz Ag
7m @ 112g/t Au
84,600 oz Au Mill
* Note – exploration targets are conceptual in nature and drilling may not convert these to resources.
November 2011 Update: Building a Gold – Silver – Zinc House 8
9. Silver Upside
November 2011 Update: Building a Gold – Silver – Zinc House 9
10. Nimbus Silver Mine & Mill
• Largest Silver Mine in Kalgoorlie Goldfields – unique Ag-Au-Zn-Cu-Pb opportunity
• Closed in 2007 – ave silver price US$9/oz; A$10m cash from 3.6 Moz
• 3.6 Million ounces silver at 353g/t (11.4 oz/t silver or 9 g/t gold equiv)
November 2011 Update: Building a Gold – Silver – Zinc House 10
11. Nimbus Exploration Potential
5 or more
VHMS deposits
Ag-Au-Zn-Cu-Pb
Mineralisation
Wireframes
To 300m Depth
November 2011 Update: Building a Gold – Silver – Zinc House 11
12. Ag-Au-Zn-Cu-Pb to 300m
A’
A
November 2011 Update: Building a Gold – Silver – Zinc House 12
13. November 2011 Update: assays a Gold – Silver – Zinc House
Limited Zn-Cu-Pb Building up to 39%-6%-16% per 13
metre respectively)
14. 10m Zn-Pb-Ag Massive Sulphides
November 2011 Update: Building a Gold – Silver – Zinc House 14
15. Boorara
SignificantWireframes >350 g/t Silver
Gold Deposit
Within 2km of Nimbus
7m @ 112g/t Gold
(incl 1m @ 738 g/t Gold)
500m north of CAT
November 2011 Update: Building a Gold – Silver – Zinc House 15
16. Pit 1 Optimisation on 45Koz JORC
Spider 1 Spider 2
November 2011 Update: Building a Gold – Silver – Zinc House 16
20. Pit Design Study underway
Q4 2011 Projects
• Tycho JORC
Update
• Metallurgical
Testwork
• Pit Model Study Rib Pillar to
be removed
• Complete MacP
Drill Program
November 2011 Update: Building a Gold – Silver – Zinc House 20
21. Key Assets -Points of Difference
• ASX-MRP
• Price: 32 cents
• Mkt Cap: A$68m
www.macphersonsreward.com.au
November 2011 Update: Building a Gold – Silver – Zinc House 21
22. Competent Person Statement
The information in this presentation that relates to mineral resources and
exploration results is based on information compiled by Mr Morrie Goodz who is
a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Morrie Goodz
is a full time officer of MRP and has sufficient experience which is relevant to the
style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking and to the activity which he is undertaking to
qualify as a Competent Person as defined in the 2004 edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves”. Mr Goodz has given his consent to the inclusion in this
presentation of the matters based on the information in the form and context in
which it appears.
November 2011 Update: Building a Gold – Silver – Zinc House 22
23. Our Opportunities
Nimbus Silver Gold Zinc Copper Lead Targets*……
• 6 million ounce silver exploration target*
Tonnes Grade Ounces Ag
Oxide and primary zones
550,000 –
140 – 210 g/t Ag 2.5M – 4.7M
700,000
Tailings
170,000 –
50 – 150 g/t Ag 0.3M – 1.1M
320,000
Unprocessed stockpiles 40,000 –
50 – 200 g/t Ag 0.13M – 0.16M
55,000
November 2011 Update: Building a Gold – Silver – Zinc House 23
24. Our Opportunities
Nimbus Silver Gold Zinc Copper Lead Targets*……
• Primary zinc-copper-lead-silver at depth to 370 metres
up to 20m thick VHMS breccia with HGZ >20% Zinc,
>1500g/t Silver, and >5% Lead over 2-3m core width;
copper grades up to 6%
• Existing silver plant will be expanded and modified
• Drilling underway to determine:
metallurgy/plant changes/resource
Boorara Silver Gold Zinc Copper Lead Targets*……
• Brindabella, Condor, Gretel and Tramways
* Note – exploration targets are conceptual in nature and drilling may not convert these to resources.
November 2011 Update: Building a Gold – Silver – Zinc House 24
25. Our Opportunities
Gold Targets*……
• Coolgardie
Tycho JORC Resource Update
Open Pit planning
Metallurgical Testing underway
MacPherson Pit Drilling to be completed in
October
* Note – exploration targets are conceptual in nature and drilling may not convert these to resources.
November 2011 Update: Building a Gold – Silver – Zinc House 25
26. Our Opportunities
Gold Targets*……
• Nimbus Gold – multiple 10g/t
intersections
• Boorara Gold – 84,600 oz JORC resource
2km WSW from the Nimbus Mill
• Boorara Gold – New Northern extension
2km West from the Nimbus Mill
7m @ 112 g/t gold from 56m downhole
* Note – exploration targets are conceptual in nature and drilling may not convert these to resources.
November 2011 Update: Building a Gold – Silver – Zinc House 26
27. Nimbus Silver Pits
• Mining completed 2006 – 2007 to top of supergene zone
• 3.6 Million ounces silver at 353g/t (11.4 oz/t silver or 9 g/t gold equiv)
• Ore was still exposed in all 4 leading pit faces and pit floor
November 2011 Update: Building a Gold – Silver – Zinc House 27
28. 13m Zn-Pb-Ag Massive Sulphides
November 2011 Update: Building a Gold – Silver – Zinc House 28
29. 33m Zn Semi Massive & Breccia Sulphides
November 2011 Update: Building a Gold – Silver – Zinc House 29