SlideShare uma empresa Scribd logo
1 de 12
Just-in-Time SystemsJust-in-Time Systems
Reducing Waste and Lead Time in the Supply ChainReducing Waste and Lead Time in the Supply Chain
BYBY
SUDHIR REDDY S.V.RSUDHIR REDDY S.V.R
Topics to be CoveredTopics to be Covered
 Review of JIT & WasteReview of JIT & Waste
 JIT PrinciplesJIT Principles
 BENEFITS OF JITBENEFITS OF JIT
 JIT RELATION TO F.M.SJIT RELATION TO F.M.S
WasteWaste is ‘anything other thanis ‘anything other than
thethe minimumminimum amount ofamount of
equipment, materials, parts,equipment, materials, parts,
space, and worker’s time,space, and worker’s time,
which are absolutelywhich are absolutely
essential toessential to add valueadd value to theto the
product.’product.’
—— Shoichiro ToyodaShoichiro Toyoda
President, ToyotaPresident, Toyota © 1995 Corel Corp.
Introductory QuotationIntroductory Quotation
What is JIT?What is JIT?
 A corporate system designed to produceA corporate system designed to produce
output within the minimum lead time and atoutput within the minimum lead time and at
the lowest total cost by continuouslythe lowest total cost by continuously
identifying and eliminating all forms ofidentifying and eliminating all forms of
corporate waste.corporate waste.
 It is used to describe stockless productionIt is used to describe stockless production
manufacturing approach, where only rightmanufacturing approach, where only right
parts are completed at right time.parts are completed at right time.
 Focus of JIT:Focus of JIT:
•• Stockless production.Stockless production.
Seven Basic Types of WasteSeven Basic Types of Waste
 Transportation wasteTransportation waste
 Process WasteProcess Waste
 Inventory WasteInventory Waste
 Waste of motionWaste of motion
 Waste from product defectsWaste from product defects
 Waiting timeWaiting time
 OverproductionOverproduction
Push versus PullPush versus Pull
 PushPush system: material issystem: material is pushedpushed intointo
downstream workstations regardless ofdownstream workstations regardless of
whether resources are availablewhether resources are available
 PullPull system: material issystem: material is pulledpulled to ato a
workstation just as it is neededworkstation just as it is needed
JIT is a pull system.JIT is a pull system.
Pull System
 Material is pulled through the system whenMaterial is pulled through the system when
neededneeded
 Reversal of traditional push system whereReversal of traditional push system where
material is pushed according to a schedulematerial is pushed according to a schedule
 Forces cooperationForces cooperation
 Prevent over and underproductionPrevent over and underproduction
 While push systems rely on a predetermined
schedule, pull systems rely on customer
requests.
 Part is produced on the authorization referred to
as a KANBAN is issued from the next
workstation
What is kanban?What is kanban?
 Developed at Toyota 1950s to manage lineDeveloped at Toyota 1950s to manage line
material flows.material flows.
 Kanban ( Kan=card, Ban= signal )Kanban ( Kan=card, Ban= signal )
 simple movement systemsimple movement system
 Boxes/containers to take “lots” of parts from one workBoxes/containers to take “lots” of parts from one work
station to another (client-server).station to another (client-server).
 ““Cards” to signal & communicate reorder informationCards” to signal & communicate reorder information
What is kanban?What is kanban?
 Server only delivers components to client work station asServer only delivers components to client work station as
& when needed (called/pulled).& when needed (called/pulled).
 Minimise storage in the production area.Minimise storage in the production area.
 Workstations only produce/deliver components whenWorkstations only produce/deliver components when
called (they receive card + empty container).called (they receive card + empty container).
 The work-station produces enough to fill the containerThe work-station produces enough to fill the container
 Kanban = an authorization to produce more inventoryKanban = an authorization to produce more inventory
 We thus limit the amount of inventory in process.We thus limit the amount of inventory in process.
BENEFITS OF JITBENEFITS OF JIT
 Reduced inventoryReduced inventory
 Reduced working progressReduced working progress
 Improved qualityImproved quality
 Reduced direct laborReduced direct labor
 Reduced floor spaceReduced floor space
 Minimum tool repair costMinimum tool repair cost
 Reduced material handling and increaseReduced material handling and increase
in overall through put.in overall through put.
JIT RELATION TO FMSJIT RELATION TO FMS
 JIT can be either a cause or an effect ofJIT can be either a cause or an effect of
F.M.SF.M.S
 Achievement of true results of F.M.SAchievement of true results of F.M.S
without implementing JIT is difficult.without implementing JIT is difficult.
 Results due to incorporation of JIT inResults due to incorporation of JIT in
F.M.S are decreased lead times, less workF.M.S are decreased lead times, less work
in process on shop floor, smaller finishedin process on shop floor, smaller finished
part inventory and increased customerpart inventory and increased customer
satisfaction.satisfaction.
THANQTHANQ

Mais conteúdo relacionado

Mais procurados

Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line BalancingAlan Wei Teck
 
22d2 optimal assembly line balancing222
22d2 optimal assembly line balancing22222d2 optimal assembly line balancing222
22d2 optimal assembly line balancing222harkesh singh
 
04 assemblylinebalancing
04 assemblylinebalancing04 assemblylinebalancing
04 assemblylinebalancingSonali Guha
 
Reduce SMT Changeover Time
Reduce SMT Changeover TimeReduce SMT Changeover Time
Reduce SMT Changeover TimeDamian Denis
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancingRohit Goutam
 
How to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase ThroughputHow to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase ThroughputOH!Manufacturing
 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Ishan Parekh
 

Mais procurados (9)

Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
22d2 optimal assembly line balancing222
22d2 optimal assembly line balancing22222d2 optimal assembly line balancing222
22d2 optimal assembly line balancing222
 
04 assemblylinebalancing
04 assemblylinebalancing04 assemblylinebalancing
04 assemblylinebalancing
 
Reduce SMT Changeover Time
Reduce SMT Changeover TimeReduce SMT Changeover Time
Reduce SMT Changeover Time
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
 
Line balancing & EOQ
Line balancing & EOQLine balancing & EOQ
Line balancing & EOQ
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
How to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase ThroughputHow to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase Throughput
 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)
 

Destaque

Destaque (7)

Laser_ arc hybrid welding
Laser_ arc hybrid weldingLaser_ arc hybrid welding
Laser_ arc hybrid welding
 
Seminor on air motors
Seminor on air motorsSeminor on air motors
Seminor on air motors
 
Introduction to microprocessor
Introduction to microprocessorIntroduction to microprocessor
Introduction to microprocessor
 
Welding symbol
Welding symbolWelding symbol
Welding symbol
 
Weld joint geometry and welding symbols
Weld joint geometry and welding symbolsWeld joint geometry and welding symbols
Weld joint geometry and welding symbols
 
04 wis5 symbol
04 wis5 symbol04 wis5 symbol
04 wis5 symbol
 
0 twi introduction
0  twi introduction0  twi introduction
0 twi introduction
 

Semelhante a Just in-time systems

TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)Prasanna3804
 
Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...
Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...
Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...IndiaMART InterMESH Limited
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jitajithsrc
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)Ashima Kandari
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jitsree19881988
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturingAdeel Javaid
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systemsAyman Aljahdali
 
Toyota production system
Toyota production systemToyota production system
Toyota production systemDeepak25
 
Basics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.pptBasics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.pptvenkatmie
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production Systemjasonhian
 
Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory managementiWriteEssays
 

Semelhante a Just in-time systems (20)

Ppt jit
Ppt jitPpt jit
Ppt jit
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 
Just-In-Time
Just-In-TimeJust-In-Time
Just-In-Time
 
jit
jitjit
jit
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
 
Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...
Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...
Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...
 
Basic Elements of Lean
Basic Elements of LeanBasic Elements of Lean
Basic Elements of Lean
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jit
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jit
 
Jit systems
Jit systemsJit systems
Jit systems
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturing
 
Just In Time - JIT
Just In Time - JITJust In Time - JIT
Just In Time - JIT
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Basics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.pptBasics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.ppt
 
Just in Time
Just in TimeJust in Time
Just in Time
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
 
JIT.ppt
JIT.pptJIT.ppt
JIT.ppt
 
Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory management
 

Mais de Sudhir Reddy

Pumps & pumping systems
Pumps & pumping systemsPumps & pumping systems
Pumps & pumping systemsSudhir Reddy
 
Programming logic controllers (plc)
Programming  logic controllers (plc)Programming  logic controllers (plc)
Programming logic controllers (plc)Sudhir Reddy
 
Manipulator kinematics
Manipulator kinematicsManipulator kinematics
Manipulator kinematicsSudhir Reddy
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systemsSudhir Reddy
 
Cadcam considerations about fms
Cadcam considerations about fmsCadcam considerations about fms
Cadcam considerations about fmsSudhir Reddy
 
Assembly systems & line balance
Assembly systems & line balanceAssembly systems & line balance
Assembly systems & line balanceSudhir Reddy
 
Application of robot’s
Application of robot’sApplication of robot’s
Application of robot’sSudhir Reddy
 

Mais de Sudhir Reddy (12)

Pumps & pumping systems
Pumps & pumping systemsPumps & pumping systems
Pumps & pumping systems
 
Programming logic controllers (plc)
Programming  logic controllers (plc)Programming  logic controllers (plc)
Programming logic controllers (plc)
 
Manipulator kinematics
Manipulator kinematicsManipulator kinematics
Manipulator kinematics
 
L20
L20L20
L20
 
Gear pump
Gear pumpGear pump
Gear pump
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systems
 
Cadcam considerations about fms
Cadcam considerations about fmsCadcam considerations about fms
Cadcam considerations about fms
 
Assembly systems & line balance
Assembly systems & line balanceAssembly systems & line balance
Assembly systems & line balance
 
Application of robot’s
Application of robot’sApplication of robot’s
Application of robot’s
 
Accumulators
AccumulatorsAccumulators
Accumulators
 
10 mech seminars
10 mech seminars10 mech seminars
10 mech seminars
 
Nc programming
Nc programmingNc programming
Nc programming
 

Último

Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxleah joy valeriano
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 

Último (20)

Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 

Just in-time systems

  • 1. Just-in-Time SystemsJust-in-Time Systems Reducing Waste and Lead Time in the Supply ChainReducing Waste and Lead Time in the Supply Chain BYBY SUDHIR REDDY S.V.RSUDHIR REDDY S.V.R
  • 2. Topics to be CoveredTopics to be Covered  Review of JIT & WasteReview of JIT & Waste  JIT PrinciplesJIT Principles  BENEFITS OF JITBENEFITS OF JIT  JIT RELATION TO F.M.SJIT RELATION TO F.M.S
  • 3. WasteWaste is ‘anything other thanis ‘anything other than thethe minimumminimum amount ofamount of equipment, materials, parts,equipment, materials, parts, space, and worker’s time,space, and worker’s time, which are absolutelywhich are absolutely essential toessential to add valueadd value to theto the product.’product.’ —— Shoichiro ToyodaShoichiro Toyoda President, ToyotaPresident, Toyota © 1995 Corel Corp. Introductory QuotationIntroductory Quotation
  • 4. What is JIT?What is JIT?  A corporate system designed to produceA corporate system designed to produce output within the minimum lead time and atoutput within the minimum lead time and at the lowest total cost by continuouslythe lowest total cost by continuously identifying and eliminating all forms ofidentifying and eliminating all forms of corporate waste.corporate waste.  It is used to describe stockless productionIt is used to describe stockless production manufacturing approach, where only rightmanufacturing approach, where only right parts are completed at right time.parts are completed at right time.  Focus of JIT:Focus of JIT: •• Stockless production.Stockless production.
  • 5. Seven Basic Types of WasteSeven Basic Types of Waste  Transportation wasteTransportation waste  Process WasteProcess Waste  Inventory WasteInventory Waste  Waste of motionWaste of motion  Waste from product defectsWaste from product defects  Waiting timeWaiting time  OverproductionOverproduction
  • 6. Push versus PullPush versus Pull  PushPush system: material issystem: material is pushedpushed intointo downstream workstations regardless ofdownstream workstations regardless of whether resources are availablewhether resources are available  PullPull system: material issystem: material is pulledpulled to ato a workstation just as it is neededworkstation just as it is needed JIT is a pull system.JIT is a pull system.
  • 7. Pull System  Material is pulled through the system whenMaterial is pulled through the system when neededneeded  Reversal of traditional push system whereReversal of traditional push system where material is pushed according to a schedulematerial is pushed according to a schedule  Forces cooperationForces cooperation  Prevent over and underproductionPrevent over and underproduction  While push systems rely on a predetermined schedule, pull systems rely on customer requests.  Part is produced on the authorization referred to as a KANBAN is issued from the next workstation
  • 8. What is kanban?What is kanban?  Developed at Toyota 1950s to manage lineDeveloped at Toyota 1950s to manage line material flows.material flows.  Kanban ( Kan=card, Ban= signal )Kanban ( Kan=card, Ban= signal )  simple movement systemsimple movement system  Boxes/containers to take “lots” of parts from one workBoxes/containers to take “lots” of parts from one work station to another (client-server).station to another (client-server).  ““Cards” to signal & communicate reorder informationCards” to signal & communicate reorder information
  • 9. What is kanban?What is kanban?  Server only delivers components to client work station asServer only delivers components to client work station as & when needed (called/pulled).& when needed (called/pulled).  Minimise storage in the production area.Minimise storage in the production area.  Workstations only produce/deliver components whenWorkstations only produce/deliver components when called (they receive card + empty container).called (they receive card + empty container).  The work-station produces enough to fill the containerThe work-station produces enough to fill the container  Kanban = an authorization to produce more inventoryKanban = an authorization to produce more inventory  We thus limit the amount of inventory in process.We thus limit the amount of inventory in process.
  • 10. BENEFITS OF JITBENEFITS OF JIT  Reduced inventoryReduced inventory  Reduced working progressReduced working progress  Improved qualityImproved quality  Reduced direct laborReduced direct labor  Reduced floor spaceReduced floor space  Minimum tool repair costMinimum tool repair cost  Reduced material handling and increaseReduced material handling and increase in overall through put.in overall through put.
  • 11. JIT RELATION TO FMSJIT RELATION TO FMS  JIT can be either a cause or an effect ofJIT can be either a cause or an effect of F.M.SF.M.S  Achievement of true results of F.M.SAchievement of true results of F.M.S without implementing JIT is difficult.without implementing JIT is difficult.  Results due to incorporation of JIT inResults due to incorporation of JIT in F.M.S are decreased lead times, less workF.M.S are decreased lead times, less work in process on shop floor, smaller finishedin process on shop floor, smaller finished part inventory and increased customerpart inventory and increased customer satisfaction.satisfaction.