Using lean methodologies to
improve performance
Contents
Introduction 1
Lean principles 2
A transformation to lean  3
Graphical representation  4
Starting a new programme 5
Leading from the top  5
Mapping and analysing the value stream  7
The basic features of a flow cell  7
Model cell – 1 item flow  8
Building model cells – Lowest cost  9
Building model cells – Process control board  9
Building model cells – 5S  10
Linking model cells  11
Evaluation and organisational transformationError! Bookmark not
defined.
Accelerating the lean transformation  Error! Bookmark not defined.
Expanding the lean transformation  Error! Bookmark not defined.
Extending the lean transformation  Error! Bookmark not defined.
Summary 12
2 
   
  Using Lean methodologies to improve performance
 
 
1 
Introduction
Lean thinking has developed rapidly in the last twenty years from its
traditional roots in manufacturing, particularly in automotive production. It
has been extended successfully to back-office, administrative functions the
health service and many other sectors. A number of organisations have now
successfully applied lean principles across its full operating structure and
throughout its supply chain.
Lean is the name for a set of tools, techniques and values, initially involving
specialists who work with other managers and the staff to take diverse
measurements and integrate them into a broad assessment of the whole
business. The aim is to make it self-sufficient in continuous improvement.
Lean is the heir of Method Study, Work Measurement, and Value Chain
Analysis; of manufacturing engineering and of workplace design; and of some
behavioural techniques developed continuously since the 1930s. These tools
have had three aims
 Economy – to reduce the cost of inputs to processes
 Efficiency – to reduce the time and cost per unit from processes
 Effectiveness – to increase the value added to the output - its utility
and quality from the customer's perspective.
Lean, the latest and most focused of all efforts to boost productivity, places a
distinctive emphasis on defining waste and wastefulness, aiming also to reduce
inputs and increase outputs to match customers' demands.
Adopting a lean approach is unlike most other traditional improvement
activities. It demands active involvement by senior executives, commitment of
full-time resources and a significant re-thinking of current ways of doing
things. And, at the outset an ‘Education’ phase is essential to introduce lean
ideas and demonstrate how they will improve performance.
A full transformation to lean has these characteristics:
 it is based on established and proven methods
 there is a high degree of engagement with employees (consultants
facilitate and coach, rather than lead)
 substantial improvements in performance are achievable – much
faster processing time, reduced waste, increased capacity and lower
costs
 the initial focus on one set of activities (a value stream) can be scaled
up later to embrace the whole organisation
 continuous improvement is an integral part of the programme.
   
 
 
2 
Lean principles
Since the 1990s lean thinking has been distilled into five key principles:
Lean always defines value or output from the perspective of the customer. An
activity that adds value is any operation that directly and positively changes
what is done to meet customers’ demands. Conversely, any activity that does
not add value is deemed wasteful. Practitioners in Lean learn how to
distinguish between activities that do and do not add value for the customer.
Waste is a key concept in Lean. It takes many forms. People and processes
waste time, space, buildings, products, services, and so on. In any business
that is failing, the waste may get so dense that it 'strangles' the organisation.
Once employees and managers absorb and act on the notion that waste is
'everything and anything that does not add value' all kinds of waste can be
revealed. People who could see no waste before begin to see excess in the way
most operations are performed.
Waste is broken down into three types:
'Muri' or Overburden waste occurs when
 people or machines are pushed beyond their capacity
 excessive demands are placed on people or machines
'Mura' or Waste arising from unevenness or inconsistency occurs when
 the use of a person or a machine is irregular or inconsistent
   
  Using Lean methodologies to improve performance
 
 
3 
 there are imbalances or fluctuations in the pace of production
'Muda' or Operational waste occurs when
 activities take place that do not add value to the product or service
 overburden and unevenness inevitably create different types of
operational waste.
A transformation to lean
Leaders should realise that change is not an event but a process. Progress is
in phases that take time to work through and complete. But skipping stages
Seven categories of 'operational provision' waste
 over-production - producing goods too soon, or when they have not
been ordered
 inventory – all aspects of the business: buildings, services,
unnecessary raw materials, work in progress, finished stocks etc
 transportation – Moving things in and between facilities, picking
them up, shifting them around, setting them down and stacking them
 overly complex processing - unnecessary processing, procedures or
steps (work done that adds no value)
 idle time - People or equipment that are waiting to work cannot
be adding value: idle time disrupts the flow of effort and slows
productivity
 re-working - of defective units that should have been right first time
 motion - the movement of people that adds no value to the product
Five categories of 'consumption' waste
 don't waste my time - customers needing to queue and wait to be
serviced
 deliver where I want – providers not delivering a product or service at
a convenient location
 deliver when I want – providers not delivering a product or service at
a time convenient for the customer.
 reduce the number of decisions I must make - unnecessary processing,
procedures or decision required to be performed by the customer
(work done that adds no value)
 solve my problem completely - the service or product does not fulfil
the full requirements of the customer
   
 
 
4 
creates only the illusion of speed, rarely a satisfying result. And if victory is
declared too soon, momentum and hard-won gains can be lost and the desired
change thwarted.
There are seven primary phases within the transformation to lean.
 Phase 1 'Get ready'– managers seek possible ways to improve and to
give the employees at least an inkling that the status quo is not
acceptable.
 Phase 2 'Steady' – leaders set a programme and a method of
improvement and encourage employees to contribute to any analysis
and to question and test the proposed solutions.
 Phase 3 'Go' – improvement is made in fits and starts as employees
learn how best to do it. Emphasis is on raising the performance of
one product or service rather than them all. Leaders, accepting that
mistakes can be made, demand worthwhile results - ‘half the bad,
double the good’ - and that benefits are reflected in the bottom line.
 Phase 4 'Go quicker' – after the first improvements, the same
products or services are given a tougher challenge – to improve as
much again, but faster. Only once the staff has become proficient and
learned the lessons can it move on to other products or services.
 Phase 5 'Go broader' – now there is sufficient competence and
confidence, it is time to spread new skills throughout the firm - to
improve all products and services in all departments and functions.
Leaders should clearly enunciate a new ETHOS: there is no going
back! Increased productivity and service are noticed by customers
and can speed up growth.
 Phase 6 'Go deeper' – production, service and support will have
passed through four or five cycles of improvement. The demarcated
roles and responsibilities of departments and their employees will
start to blur. As waste continues to be stripped away, each employee's
responsibilities will grow in a loose structure of semi-autonomous
teams. All employees should be focused on the 'three zeros' challenge;
‘zero waiting, zero defects, and zero waste’.
 Phase 7 'Go farther' – the objective is to extend the approach beyond
the business’s boundaries; to improve the processes for upstream
supply and downstream consumption. Leaders should be willing to
make changes in the organisation to benefit suppliers and customers.
Once organisations work together harmoniously, the end product,
service, and value offered to the customer can be completely
redefined.
Graphical representation
 Set a strategy and targets for improvement
 Build a lean infrastructure, and design the future state operating
model
   
  Using Lean methodologies to improve performance
 
 
5 
 Build model cells for a single process = operational improvements
 Link model cells to create flow = process improvements
 Accelerate and expand the transformation to encompass the full
organisation, continuously increase the pace of change = plane
improvements
 Extend the transformation external to the organisation and into the
supply chain = cube improvements
Starting a new programme
Leading from the top
Successful lean transformations are always led from the top. Senior
executives must set the strategy, make a strong and visible commitment,
participate directly in implementing the system and instruct middle managers
to do likewise.
Responsibilities
The responsibilities of senior managers are:
 to build a full-time lean team
 to take part every year in an event - value stream analysis - and in
another to improve processes
 to review improvements at a value stream level once a month, and to
review improvements at a strategic level quarterly
 to tackle the ‘anti-bodies’ within the first few months.
Strategy, structure and governance
A single A3 sheet of paper provides a structured framework to define and
communicate the strategy and activities that flow from it. It is a consistent
and logical tool used to prepare, decide, implement, monitor and sustain
improvements. For example:
Operational
improvements
Process
improvements
Plane
improvements
Cube
improvements
   
 
 
6 
Title:_____________________ Team:____________________________
Date started:__________Current date:________ Review team: ______________________
1 Reasons for action 4 Gap analysis 6 Completion plans
2 Initial state 5 Solution approach 7 Confirmed state
3 Target state 8 Insight
The A3 format is used to record each level of activity. A programme covering
the whole organisation can be managed simply in a way that reflects lean
philosophies. The A3 structure provides an immediate visual
overview:
Once a strategy has been agreed and the governance system and structure put
in place, a core ‘Lean Team’ must be trained. Their priorities are:
 to learn and become internal lean specialists
 to train fellow employees in the tools and principles
   
  Using Lean methodologies to improve performance
 
 
7 
 to develop additional internal, lean specialists
 to follow up the events to ensure progress is sustained
 to build a lean improvement system and define standard work
 to work closely with Team Leaders and Sponsors to implement
improvements and to ensure that the benefits are fully realised.
Mapping and analysing the value stream
This is typically the first visible event and sets the tone for each subsequent
step. It concentrates on one, selected value stream, which is directly linked to
the organisation’s strategy. The mapping should reveal and quantify the
current sources of waste, unevenness and overburden. It develops a shared
vision of what might be achieved and offers a visual model of the future state
representing how value will flow once improvements have been implemented.
The map predicts the potential prize from adopting a new approach. The
route to an improved value stream is planned – through the implementation of
lean model cells. The team work together collaboratively, share ideas and
reinforce a collective commitment to change.
The basic features of a flow cell
To design and build a flow cell three concepts need to be adopted; 'the four
cornerstones', 'the two foundation stones', and 'the three challenges'
 Adoption of the four cornerstones are required to create the most
efficient and effective processes
 Adoption of the two foundation stones are required to sustain
improvements and prepare for more
 Adoption of the three challenges of 'zero delays', 'zero defects', and
'zero waste' are required to provide the momentum towards
continuous improvement.
   
 
 
8 
Traditional batch and queue process
Operational processes can be viewed as a ‘river’ flowing with inventory and, as
with all rivers, they can be prone to flood. The main reason for such flooding
is batch and queue processing: where inventory moves in clumps and it is
grouped together into batches for processing within separate departments.
Batches are retained within the department until all of the units within the
batch are completed. This tends to create long flow times.
For example:
Model cell – 1 item flow
By contrast, 1 piece flow processing means that each item is sent to the next
process for immediate processing. The flow continues until each unit is
completed as a finished product or service. By organizing an item’s flow
based upon 1 piece process flow as opposed to departmental batch and queue,
the flow time can be minimized. The time to react to any problems or
variation in customer demand is also minimized and flow processing is far
more flexible that batch and queue processing. For example:
Building model cells – zero defects
Errors can happen at any stage of a process, even when there is no history of
them occurring before. To err is to human. The typical responses are:
 to demand vigilance, exhort employees to be more careful
Flow cell
Op
6
Op
5
Op
4
Op
3
Op
2
Op
1
Out
In
Flow cell
Op
6
Op
5
Op
4
Op
3
Op
2
Op
1
Out
In
Department 1
Department 4
Department 3
Department 2
Traditional batch process Department 1
Department 4
Department 3
Department 2
Traditional batch process Department 1
Department 4
Department 3
Department 2
Traditional batch process
   
  Using Lean methodologies to improve performance
 
 
9 
 to introduce additional checks, consuming additional resources, or
 to eliminate the chance of making the mistake
Mistakes and errors are a result of incorrect actions, so
 prevent as far as possible the occurrence of incorrect actions.
Defects are the result of mistakes and errors, so
 detect mistakes and prevent them from generating defects.
Building model cells – Lowest cost
Standard work is used to define the most efficient and effect way of processing
an item, it's two main functions:
 to document the current best known way of doing something and use
this as the foundation for training and future improvements
 to recognise and analyse waste.
Standard operating procedures should be trialed, debugged, proven to work
every time, communicated and adhered to. It should contain:
 process steps
 process owners
 nominated people who are responsible for each step
 visual documentation of the sequence and quality of work.
Building model cells – Process control board
Process control boards (PCBs) display the status of a cell or process and
indicate any corrective actions required. They are also used to update the
confirmed state portion of the A3 document. The PCB is the nerve centre of
the cell and is used for day-to-day management, to review performance and to
manage improvement.
PCBs are located close to the working area and typically contain:
 management attendance review sheet
 standard work sheets
 flow cell assessment
 5S assessment sheet and tracker
 specified data collection – output, demand, resource, etc
 true north measures – quality, cost, delivery, human element
 issue resolution sheet, improvement suggestion sheets
   
 
 
10 
 skills matrix
 team cell and organisation chart.
Building model cells – 5S
5S is more than a shop floor cleaning campaign, it is a fundamental building
block of improvement which can be applied physically to a work place or
conceptually to a process or an organisational structure.
Building model cells – Summary
 Move the value-adding steps so close together that waste is
impossible
 Have the team members create their own layout to reflect the flow of
value
 Balance the work for good flow (standard work)
 Create several standard work scenarios for variations in demand
 Create the capability for quick changeovers to minimize batch sizes
and provide the flexibility to match variations in demand
 Have flow created only by flow from downstream
 Train the staff for flexibility
 Stop and fix problems right away
 Involve the team through process control boards and A3s
1
Sort
2
Set for flow
3
Shine to study
4
Standardise
5
Sustain
5S
Build the behaviors and
culture to sustain
improvement and minimize
the effort required to
maintain 5S condition
Sort by separating essential from
non-essential. Remove the non-
essential, retain only the essential
Set the essential in the correct
sequence to create flow. Use
visual management to clearly
indicate the item’s correct location
Shine (clean) to study the item /
process step to identify defects
before they affect performance
Create standard work procedures
to maintain the zero condition.
Monitor 5S status by including it
on the cell’s process control board
   
  Using Lean methodologies to improve performance
 
 
11 
Linking model cells
Synchronizing operations to create flow
In order to create flow throughout the full value stream the work within the
individual cells needs to balance and be synchronized. As the upstream cell
‘produces’ the downstream cell needs to be ready to accept the item ‘just in
time’, minimizing inventory and the waste created by idle time.
Perfect balance is not the objective as this will either cause over production or
operators to relax cycles times to meet customer demand. The aim is to
balance operations against the customer’s demand - shortening cycles within
cells downstream to create a pull effect and minimising stock throughout the
value stream.
Trigger and control flow to create pull
The primary function of a pull system is to trigger and control the flow of the
value stream. It is a visual process that connects customers to their suppliers
and:
 aligns flow processes that cannot be connected in ‘single piece flow’
cell
 conveys critical information to ensure control, so that the right item
is produced the necessary quantity and at the necessary time
 replenishes the consumption of items flowing in a process, allowing
close management of inventory
 becomes the autonomous nervous system of the value stream.
Key elements of a pull system
   
 
 
12 
How lean improves the 'bottom line'
Good service, high standards and committed employees are all very well. But
'Money makes the world go around'.
The cost of purchases is a vital part of the profit and loss statement. But this
is primarily determined by the price of commodities and by original equipment
manufacturers (OEMs). There is often not much scope for competitive
advantage there.
The second, and usually the largest, internal cost is people: their salaries; and
the facilities required. And that depends on their productivity. If that goes
up, the size – and cost – of the staff should go down.
Next, sales and revenue can be boosted by improvements in quality and lead
time. Reducing inventory is a start. But the real benefit comes from being a
responsive supplier. Cutting lead times by 75% can double or even quadruple
the rate of growth, say from 2% to 4% or even 8%.
Then there is quality. Few leaders recognise how closely quality and financial
performance are linked. But they are. Firms perceived as excellent generate
high returns on investment. But disappointed customers disappear, never to
return. Worse still, they tell others. Remember, it is cheaper to retain a
customer than to acquire one. To improve quality is one of the best - and
cheapest - marketing efforts that a firm can make.
A lean transformation prompts a virtuous cycle: processes speed up;
productivity rises; stock is turned over more often; lead times shorten;
customers pay faster; fixed and working capital are reduced and net margins
increased; debt declines; and marketable assets rise in value.
Summary
Lean transformations yield substantial and continuous business benefits. They
engage staff throughout the organisation, enrich jobs, reduce complexity and
streamline the structure. They can be summarised in a continuous cycle of
Plan – Do – Evaluate – Act.
   
  Using Lean methodologies to improve performance
 
 
13 
Costs People Organisation
Productivity Performance Restructuring
United
Kingdom
Mainland
Europe
United States
of America
Complexity, Direct costs, Employee relations,
Employment law, Implementing change, Integrating organisations, Lean,
Managerial controls, Organisational design, Overheads, Performance management,
Pricing, Process improvement, Procurement, Reward, Supply chain,
Transitional management, Value chain analysis, Workforce planning
collinsongrant.com
33 St James’s Square London SW1Y 4JS United Kingdom Telephone +44 20 7661 9382 Facsimile +44 20 7661 9400
Ryecroft Aviary Road Worsley Manchester M28 2WF United Kingdom Telephone +44 161 703 5600 Facsimile +44 161 790 9177
Web www.collinsongrant.com

Mais conteúdo relacionado

Mais procurados

Lean Culture Introduction
Lean Culture IntroductionLean Culture Introduction
Lean Culture IntroductionAnkit Patel
 
Kaizen Philosophy
Kaizen PhilosophyKaizen Philosophy
Kaizen Philosophypratik207
 
Lean Presentation
Lean PresentationLean Presentation
Lean PresentationPam Watkins
 
Lean Implementation Overview
Lean Implementation OverviewLean Implementation Overview
Lean Implementation Overviewbroper
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basicssarah bridge
 
Uhy Lean Core
Uhy Lean CoreUhy Lean Core
Uhy Lean Corealanlund
 
Applying lean thinking in the food supply chain presentation
Applying lean thinking in the food supply chain presentationApplying lean thinking in the food supply chain presentation
Applying lean thinking in the food supply chain presentationFayssal AL-KILANI
 
Alternate Hourly Lean Introduction
Alternate Hourly Lean IntroductionAlternate Hourly Lean Introduction
Alternate Hourly Lean IntroductionHarold Philbrick
 
Lean management new_frontiers_for_financial_institutions
Lean management new_frontiers_for_financial_institutionsLean management new_frontiers_for_financial_institutions
Lean management new_frontiers_for_financial_institutionsMario Charlin
 
Kaizen in manufacturing industry
Kaizen in manufacturing industryKaizen in manufacturing industry
Kaizen in manufacturing industryAmberSaleem8
 
Continuous Improvement using the Toyota Way
Continuous Improvement using the Toyota WayContinuous Improvement using the Toyota Way
Continuous Improvement using the Toyota WayAnita Rao
 

Mais procurados (20)

Lean management
Lean managementLean management
Lean management
 
Lean management
Lean managementLean management
Lean management
 
Lean Culture Introduction
Lean Culture IntroductionLean Culture Introduction
Lean Culture Introduction
 
Kaizen Philosophy
Kaizen PhilosophyKaizen Philosophy
Kaizen Philosophy
 
Lean Presentation
Lean PresentationLean Presentation
Lean Presentation
 
Lean Implementation Overview
Lean Implementation OverviewLean Implementation Overview
Lean Implementation Overview
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Uhy Lean Core
Uhy Lean CoreUhy Lean Core
Uhy Lean Core
 
Applying lean thinking in the food supply chain presentation
Applying lean thinking in the food supply chain presentationApplying lean thinking in the food supply chain presentation
Applying lean thinking in the food supply chain presentation
 
Lean management
Lean management Lean management
Lean management
 
This is lean
This is lean This is lean
This is lean
 
Identifying Waste
Identifying WasteIdentifying Waste
Identifying Waste
 
Driving Continuous Improvement
Driving Continuous ImprovementDriving Continuous Improvement
Driving Continuous Improvement
 
Alternate Hourly Lean Introduction
Alternate Hourly Lean IntroductionAlternate Hourly Lean Introduction
Alternate Hourly Lean Introduction
 
Lean management new_frontiers_for_financial_institutions
Lean management new_frontiers_for_financial_institutionsLean management new_frontiers_for_financial_institutions
Lean management new_frontiers_for_financial_institutions
 
Kaizen in manufacturing industry
Kaizen in manufacturing industryKaizen in manufacturing industry
Kaizen in manufacturing industry
 
KAIZEN Updated 030507
KAIZEN Updated 030507KAIZEN Updated 030507
KAIZEN Updated 030507
 
Lean Management
Lean ManagementLean Management
Lean Management
 
Continuous Improvement using the Toyota Way
Continuous Improvement using the Toyota WayContinuous Improvement using the Toyota Way
Continuous Improvement using the Toyota Way
 
Building a Lean Management System
Building a Lean Management System Building a Lean Management System
Building a Lean Management System
 

Semelhante a Lean transformation

Undersstanding of lean mananagement & processes course content sign
Undersstanding of lean mananagement & processes course content signUndersstanding of lean mananagement & processes course content sign
Undersstanding of lean mananagement & processes course content signTeh Chin Weng
 
Powerpoint created for Holland Management Consultant
Powerpoint created for Holland Management ConsultantPowerpoint created for Holland Management Consultant
Powerpoint created for Holland Management ConsultantBarbara Smith
 
Integrated Improvement Model
Integrated Improvement ModelIntegrated Improvement Model
Integrated Improvement ModelGareth Stone
 
Agile 2013 - Lean Change for Enabling Agile Transformations
Agile 2013 - Lean Change for Enabling Agile TransformationsAgile 2013 - Lean Change for Enabling Agile Transformations
Agile 2013 - Lean Change for Enabling Agile TransformationsAlexis Hui
 
Lean Mfg Takeawayssharing
Lean Mfg TakeawayssharingLean Mfg Takeawayssharing
Lean Mfg TakeawayssharingFNian
 
Business Process Re-Engineering
Business Process Re-Engineering Business Process Re-Engineering
Business Process Re-Engineering Dilawar Abbas
 
TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)SANJAY KUMAR JOGAR
 
production and operations management
production and operations managementproduction and operations management
production and operations managementEbe Nezer G
 
Agile Transformation Strategy
Agile Transformation StrategyAgile Transformation Strategy
Agile Transformation StrategySemen Arslan
 
Continous process improvement
Continous process improvementContinous process improvement
Continous process improvementSarfraz Ashraf
 
Agile And Lean Transformation: Creating a Foundation for Success
Agile And Lean Transformation: Creating a Foundation for SuccessAgile And Lean Transformation: Creating a Foundation for Success
Agile And Lean Transformation: Creating a Foundation for SuccessCognizant
 
Chapter3 demingjurancrosbyphilosophy
Chapter3 demingjurancrosbyphilosophyChapter3 demingjurancrosbyphilosophy
Chapter3 demingjurancrosbyphilosophyhwilson14889
 
CxO Lean StepUp ACT NOW model and canvas Macrow Lean Services Melbourne +61 4...
CxO Lean StepUp ACT NOW model and canvas Macrow Lean Services Melbourne +61 4...CxO Lean StepUp ACT NOW model and canvas Macrow Lean Services Melbourne +61 4...
CxO Lean StepUp ACT NOW model and canvas Macrow Lean Services Melbourne +61 4...John Macrow
 
Managing business change projects with Agile
Managing business change projects with AgileManaging business change projects with Agile
Managing business change projects with AgileAdam Humphrey
 

Semelhante a Lean transformation (20)

Undersstanding of lean mananagement & processes course content sign
Undersstanding of lean mananagement & processes course content signUndersstanding of lean mananagement & processes course content sign
Undersstanding of lean mananagement & processes course content sign
 
Powerpoint created for Holland Management Consultant
Powerpoint created for Holland Management ConsultantPowerpoint created for Holland Management Consultant
Powerpoint created for Holland Management Consultant
 
Tqm
Tqm Tqm
Tqm
 
Lean notes
Lean notesLean notes
Lean notes
 
Integrated Improvement Model
Integrated Improvement ModelIntegrated Improvement Model
Integrated Improvement Model
 
Agile 2013 - Lean Change for Enabling Agile Transformations
Agile 2013 - Lean Change for Enabling Agile TransformationsAgile 2013 - Lean Change for Enabling Agile Transformations
Agile 2013 - Lean Change for Enabling Agile Transformations
 
Lean management
Lean managementLean management
Lean management
 
Lean Mfg Takeawayssharing
Lean Mfg TakeawayssharingLean Mfg Takeawayssharing
Lean Mfg Takeawayssharing
 
Business Process Re-Engineering
Business Process Re-Engineering Business Process Re-Engineering
Business Process Re-Engineering
 
TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)
 
production and operations management
production and operations managementproduction and operations management
production and operations management
 
Agile Transformation Strategy
Agile Transformation StrategyAgile Transformation Strategy
Agile Transformation Strategy
 
QWL ppt
QWL pptQWL ppt
QWL ppt
 
Continous process improvement
Continous process improvementContinous process improvement
Continous process improvement
 
Agile And Lean Transformation: Creating a Foundation for Success
Agile And Lean Transformation: Creating a Foundation for SuccessAgile And Lean Transformation: Creating a Foundation for Success
Agile And Lean Transformation: Creating a Foundation for Success
 
Chapter3 demingjurancrosbyphilosophy
Chapter3 demingjurancrosbyphilosophyChapter3 demingjurancrosbyphilosophy
Chapter3 demingjurancrosbyphilosophy
 
CxO Lean StepUp ACT NOW model and canvas Macrow Lean Services Melbourne +61 4...
CxO Lean StepUp ACT NOW model and canvas Macrow Lean Services Melbourne +61 4...CxO Lean StepUp ACT NOW model and canvas Macrow Lean Services Melbourne +61 4...
CxO Lean StepUp ACT NOW model and canvas Macrow Lean Services Melbourne +61 4...
 
Managing business change projects with Agile
Managing business change projects with AgileManaging business change projects with Agile
Managing business change projects with Agile
 
Lesson6
Lesson6Lesson6
Lesson6
 
GEMBAKAIZEN
GEMBAKAIZENGEMBAKAIZEN
GEMBAKAIZEN
 

Mais de Cheshire East Council (17)

Restructuring in Germany
Restructuring in GermanyRestructuring in Germany
Restructuring in Germany
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Financial colleges in companies
Financial colleges in companiesFinancial colleges in companies
Financial colleges in companies
 
Managing branch networks successfully
Managing branch networks successfullyManaging branch networks successfully
Managing branch networks successfully
 
Best practice in pricing processes
Best practice in pricing processesBest practice in pricing processes
Best practice in pricing processes
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
Planning, initiating, and managing change
Planning, initiating, and managing changePlanning, initiating, and managing change
Planning, initiating, and managing change
 
Managing complexity
Managing complexityManaging complexity
Managing complexity
 
Assessing the value of the supply chain
Assessing the value of the supply chainAssessing the value of the supply chain
Assessing the value of the supply chain
 
How Collinson Grant helps retailers to maximise operational excellence
How Collinson Grant helps retailers to maximise operational excellenceHow Collinson Grant helps retailers to maximise operational excellence
How Collinson Grant helps retailers to maximise operational excellence
 
Psychometric assessments
Psychometric assessmentsPsychometric assessments
Psychometric assessments
 
Performance management
Performance managementPerformance management
Performance management
 
Managing organisational design
Managing organisational design Managing organisational design
Managing organisational design
 
Managing indirect costs
Managing indirect costsManaging indirect costs
Managing indirect costs
 
Managing Restructuring
Managing RestructuringManaging Restructuring
Managing Restructuring
 
Managing productivity
Managing productivityManaging productivity
Managing productivity
 
Employment law for line managers
Employment law for line managersEmployment law for line managers
Employment law for line managers
 

Último

Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 

Último (20)

Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 

Lean transformation

  • 1. Using lean methodologies to improve performance
  • 2. Contents Introduction 1 Lean principles 2 A transformation to lean  3 Graphical representation  4 Starting a new programme 5 Leading from the top  5 Mapping and analysing the value stream  7 The basic features of a flow cell  7 Model cell – 1 item flow  8 Building model cells – Lowest cost  9 Building model cells – Process control board  9 Building model cells – 5S  10 Linking model cells  11 Evaluation and organisational transformationError! Bookmark not defined. Accelerating the lean transformation  Error! Bookmark not defined. Expanding the lean transformation  Error! Bookmark not defined. Extending the lean transformation  Error! Bookmark not defined. Summary 12
  • 3.
  • 4.       Using Lean methodologies to improve performance     1  Introduction Lean thinking has developed rapidly in the last twenty years from its traditional roots in manufacturing, particularly in automotive production. It has been extended successfully to back-office, administrative functions the health service and many other sectors. A number of organisations have now successfully applied lean principles across its full operating structure and throughout its supply chain. Lean is the name for a set of tools, techniques and values, initially involving specialists who work with other managers and the staff to take diverse measurements and integrate them into a broad assessment of the whole business. The aim is to make it self-sufficient in continuous improvement. Lean is the heir of Method Study, Work Measurement, and Value Chain Analysis; of manufacturing engineering and of workplace design; and of some behavioural techniques developed continuously since the 1930s. These tools have had three aims  Economy – to reduce the cost of inputs to processes  Efficiency – to reduce the time and cost per unit from processes  Effectiveness – to increase the value added to the output - its utility and quality from the customer's perspective. Lean, the latest and most focused of all efforts to boost productivity, places a distinctive emphasis on defining waste and wastefulness, aiming also to reduce inputs and increase outputs to match customers' demands. Adopting a lean approach is unlike most other traditional improvement activities. It demands active involvement by senior executives, commitment of full-time resources and a significant re-thinking of current ways of doing things. And, at the outset an ‘Education’ phase is essential to introduce lean ideas and demonstrate how they will improve performance. A full transformation to lean has these characteristics:  it is based on established and proven methods  there is a high degree of engagement with employees (consultants facilitate and coach, rather than lead)  substantial improvements in performance are achievable – much faster processing time, reduced waste, increased capacity and lower costs  the initial focus on one set of activities (a value stream) can be scaled up later to embrace the whole organisation  continuous improvement is an integral part of the programme.
  • 5.         2  Lean principles Since the 1990s lean thinking has been distilled into five key principles: Lean always defines value or output from the perspective of the customer. An activity that adds value is any operation that directly and positively changes what is done to meet customers’ demands. Conversely, any activity that does not add value is deemed wasteful. Practitioners in Lean learn how to distinguish between activities that do and do not add value for the customer. Waste is a key concept in Lean. It takes many forms. People and processes waste time, space, buildings, products, services, and so on. In any business that is failing, the waste may get so dense that it 'strangles' the organisation. Once employees and managers absorb and act on the notion that waste is 'everything and anything that does not add value' all kinds of waste can be revealed. People who could see no waste before begin to see excess in the way most operations are performed. Waste is broken down into three types: 'Muri' or Overburden waste occurs when  people or machines are pushed beyond their capacity  excessive demands are placed on people or machines 'Mura' or Waste arising from unevenness or inconsistency occurs when  the use of a person or a machine is irregular or inconsistent
  • 6.       Using Lean methodologies to improve performance     3   there are imbalances or fluctuations in the pace of production 'Muda' or Operational waste occurs when  activities take place that do not add value to the product or service  overburden and unevenness inevitably create different types of operational waste. A transformation to lean Leaders should realise that change is not an event but a process. Progress is in phases that take time to work through and complete. But skipping stages Seven categories of 'operational provision' waste  over-production - producing goods too soon, or when they have not been ordered  inventory – all aspects of the business: buildings, services, unnecessary raw materials, work in progress, finished stocks etc  transportation – Moving things in and between facilities, picking them up, shifting them around, setting them down and stacking them  overly complex processing - unnecessary processing, procedures or steps (work done that adds no value)  idle time - People or equipment that are waiting to work cannot be adding value: idle time disrupts the flow of effort and slows productivity  re-working - of defective units that should have been right first time  motion - the movement of people that adds no value to the product Five categories of 'consumption' waste  don't waste my time - customers needing to queue and wait to be serviced  deliver where I want – providers not delivering a product or service at a convenient location  deliver when I want – providers not delivering a product or service at a time convenient for the customer.  reduce the number of decisions I must make - unnecessary processing, procedures or decision required to be performed by the customer (work done that adds no value)  solve my problem completely - the service or product does not fulfil the full requirements of the customer
  • 7.         4  creates only the illusion of speed, rarely a satisfying result. And if victory is declared too soon, momentum and hard-won gains can be lost and the desired change thwarted. There are seven primary phases within the transformation to lean.  Phase 1 'Get ready'– managers seek possible ways to improve and to give the employees at least an inkling that the status quo is not acceptable.  Phase 2 'Steady' – leaders set a programme and a method of improvement and encourage employees to contribute to any analysis and to question and test the proposed solutions.  Phase 3 'Go' – improvement is made in fits and starts as employees learn how best to do it. Emphasis is on raising the performance of one product or service rather than them all. Leaders, accepting that mistakes can be made, demand worthwhile results - ‘half the bad, double the good’ - and that benefits are reflected in the bottom line.  Phase 4 'Go quicker' – after the first improvements, the same products or services are given a tougher challenge – to improve as much again, but faster. Only once the staff has become proficient and learned the lessons can it move on to other products or services.  Phase 5 'Go broader' – now there is sufficient competence and confidence, it is time to spread new skills throughout the firm - to improve all products and services in all departments and functions. Leaders should clearly enunciate a new ETHOS: there is no going back! Increased productivity and service are noticed by customers and can speed up growth.  Phase 6 'Go deeper' – production, service and support will have passed through four or five cycles of improvement. The demarcated roles and responsibilities of departments and their employees will start to blur. As waste continues to be stripped away, each employee's responsibilities will grow in a loose structure of semi-autonomous teams. All employees should be focused on the 'three zeros' challenge; ‘zero waiting, zero defects, and zero waste’.  Phase 7 'Go farther' – the objective is to extend the approach beyond the business’s boundaries; to improve the processes for upstream supply and downstream consumption. Leaders should be willing to make changes in the organisation to benefit suppliers and customers. Once organisations work together harmoniously, the end product, service, and value offered to the customer can be completely redefined. Graphical representation  Set a strategy and targets for improvement  Build a lean infrastructure, and design the future state operating model
  • 8.       Using Lean methodologies to improve performance     5   Build model cells for a single process = operational improvements  Link model cells to create flow = process improvements  Accelerate and expand the transformation to encompass the full organisation, continuously increase the pace of change = plane improvements  Extend the transformation external to the organisation and into the supply chain = cube improvements Starting a new programme Leading from the top Successful lean transformations are always led from the top. Senior executives must set the strategy, make a strong and visible commitment, participate directly in implementing the system and instruct middle managers to do likewise. Responsibilities The responsibilities of senior managers are:  to build a full-time lean team  to take part every year in an event - value stream analysis - and in another to improve processes  to review improvements at a value stream level once a month, and to review improvements at a strategic level quarterly  to tackle the ‘anti-bodies’ within the first few months. Strategy, structure and governance A single A3 sheet of paper provides a structured framework to define and communicate the strategy and activities that flow from it. It is a consistent and logical tool used to prepare, decide, implement, monitor and sustain improvements. For example: Operational improvements Process improvements Plane improvements Cube improvements
  • 9.         6  Title:_____________________ Team:____________________________ Date started:__________Current date:________ Review team: ______________________ 1 Reasons for action 4 Gap analysis 6 Completion plans 2 Initial state 5 Solution approach 7 Confirmed state 3 Target state 8 Insight The A3 format is used to record each level of activity. A programme covering the whole organisation can be managed simply in a way that reflects lean philosophies. The A3 structure provides an immediate visual overview: Once a strategy has been agreed and the governance system and structure put in place, a core ‘Lean Team’ must be trained. Their priorities are:  to learn and become internal lean specialists  to train fellow employees in the tools and principles
  • 10.       Using Lean methodologies to improve performance     7   to develop additional internal, lean specialists  to follow up the events to ensure progress is sustained  to build a lean improvement system and define standard work  to work closely with Team Leaders and Sponsors to implement improvements and to ensure that the benefits are fully realised. Mapping and analysing the value stream This is typically the first visible event and sets the tone for each subsequent step. It concentrates on one, selected value stream, which is directly linked to the organisation’s strategy. The mapping should reveal and quantify the current sources of waste, unevenness and overburden. It develops a shared vision of what might be achieved and offers a visual model of the future state representing how value will flow once improvements have been implemented. The map predicts the potential prize from adopting a new approach. The route to an improved value stream is planned – through the implementation of lean model cells. The team work together collaboratively, share ideas and reinforce a collective commitment to change. The basic features of a flow cell To design and build a flow cell three concepts need to be adopted; 'the four cornerstones', 'the two foundation stones', and 'the three challenges'  Adoption of the four cornerstones are required to create the most efficient and effective processes  Adoption of the two foundation stones are required to sustain improvements and prepare for more  Adoption of the three challenges of 'zero delays', 'zero defects', and 'zero waste' are required to provide the momentum towards continuous improvement.
  • 11.         8  Traditional batch and queue process Operational processes can be viewed as a ‘river’ flowing with inventory and, as with all rivers, they can be prone to flood. The main reason for such flooding is batch and queue processing: where inventory moves in clumps and it is grouped together into batches for processing within separate departments. Batches are retained within the department until all of the units within the batch are completed. This tends to create long flow times. For example: Model cell – 1 item flow By contrast, 1 piece flow processing means that each item is sent to the next process for immediate processing. The flow continues until each unit is completed as a finished product or service. By organizing an item’s flow based upon 1 piece process flow as opposed to departmental batch and queue, the flow time can be minimized. The time to react to any problems or variation in customer demand is also minimized and flow processing is far more flexible that batch and queue processing. For example: Building model cells – zero defects Errors can happen at any stage of a process, even when there is no history of them occurring before. To err is to human. The typical responses are:  to demand vigilance, exhort employees to be more careful Flow cell Op 6 Op 5 Op 4 Op 3 Op 2 Op 1 Out In Flow cell Op 6 Op 5 Op 4 Op 3 Op 2 Op 1 Out In Department 1 Department 4 Department 3 Department 2 Traditional batch process Department 1 Department 4 Department 3 Department 2 Traditional batch process Department 1 Department 4 Department 3 Department 2 Traditional batch process
  • 12.       Using Lean methodologies to improve performance     9   to introduce additional checks, consuming additional resources, or  to eliminate the chance of making the mistake Mistakes and errors are a result of incorrect actions, so  prevent as far as possible the occurrence of incorrect actions. Defects are the result of mistakes and errors, so  detect mistakes and prevent them from generating defects. Building model cells – Lowest cost Standard work is used to define the most efficient and effect way of processing an item, it's two main functions:  to document the current best known way of doing something and use this as the foundation for training and future improvements  to recognise and analyse waste. Standard operating procedures should be trialed, debugged, proven to work every time, communicated and adhered to. It should contain:  process steps  process owners  nominated people who are responsible for each step  visual documentation of the sequence and quality of work. Building model cells – Process control board Process control boards (PCBs) display the status of a cell or process and indicate any corrective actions required. They are also used to update the confirmed state portion of the A3 document. The PCB is the nerve centre of the cell and is used for day-to-day management, to review performance and to manage improvement. PCBs are located close to the working area and typically contain:  management attendance review sheet  standard work sheets  flow cell assessment  5S assessment sheet and tracker  specified data collection – output, demand, resource, etc  true north measures – quality, cost, delivery, human element  issue resolution sheet, improvement suggestion sheets
  • 13.         10   skills matrix  team cell and organisation chart. Building model cells – 5S 5S is more than a shop floor cleaning campaign, it is a fundamental building block of improvement which can be applied physically to a work place or conceptually to a process or an organisational structure. Building model cells – Summary  Move the value-adding steps so close together that waste is impossible  Have the team members create their own layout to reflect the flow of value  Balance the work for good flow (standard work)  Create several standard work scenarios for variations in demand  Create the capability for quick changeovers to minimize batch sizes and provide the flexibility to match variations in demand  Have flow created only by flow from downstream  Train the staff for flexibility  Stop and fix problems right away  Involve the team through process control boards and A3s 1 Sort 2 Set for flow 3 Shine to study 4 Standardise 5 Sustain 5S Build the behaviors and culture to sustain improvement and minimize the effort required to maintain 5S condition Sort by separating essential from non-essential. Remove the non- essential, retain only the essential Set the essential in the correct sequence to create flow. Use visual management to clearly indicate the item’s correct location Shine (clean) to study the item / process step to identify defects before they affect performance Create standard work procedures to maintain the zero condition. Monitor 5S status by including it on the cell’s process control board
  • 14.       Using Lean methodologies to improve performance     11  Linking model cells Synchronizing operations to create flow In order to create flow throughout the full value stream the work within the individual cells needs to balance and be synchronized. As the upstream cell ‘produces’ the downstream cell needs to be ready to accept the item ‘just in time’, minimizing inventory and the waste created by idle time. Perfect balance is not the objective as this will either cause over production or operators to relax cycles times to meet customer demand. The aim is to balance operations against the customer’s demand - shortening cycles within cells downstream to create a pull effect and minimising stock throughout the value stream. Trigger and control flow to create pull The primary function of a pull system is to trigger and control the flow of the value stream. It is a visual process that connects customers to their suppliers and:  aligns flow processes that cannot be connected in ‘single piece flow’ cell  conveys critical information to ensure control, so that the right item is produced the necessary quantity and at the necessary time  replenishes the consumption of items flowing in a process, allowing close management of inventory  becomes the autonomous nervous system of the value stream. Key elements of a pull system
  • 15.         12  How lean improves the 'bottom line' Good service, high standards and committed employees are all very well. But 'Money makes the world go around'. The cost of purchases is a vital part of the profit and loss statement. But this is primarily determined by the price of commodities and by original equipment manufacturers (OEMs). There is often not much scope for competitive advantage there. The second, and usually the largest, internal cost is people: their salaries; and the facilities required. And that depends on their productivity. If that goes up, the size – and cost – of the staff should go down. Next, sales and revenue can be boosted by improvements in quality and lead time. Reducing inventory is a start. But the real benefit comes from being a responsive supplier. Cutting lead times by 75% can double or even quadruple the rate of growth, say from 2% to 4% or even 8%. Then there is quality. Few leaders recognise how closely quality and financial performance are linked. But they are. Firms perceived as excellent generate high returns on investment. But disappointed customers disappear, never to return. Worse still, they tell others. Remember, it is cheaper to retain a customer than to acquire one. To improve quality is one of the best - and cheapest - marketing efforts that a firm can make. A lean transformation prompts a virtuous cycle: processes speed up; productivity rises; stock is turned over more often; lead times shorten; customers pay faster; fixed and working capital are reduced and net margins increased; debt declines; and marketable assets rise in value. Summary Lean transformations yield substantial and continuous business benefits. They engage staff throughout the organisation, enrich jobs, reduce complexity and streamline the structure. They can be summarised in a continuous cycle of Plan – Do – Evaluate – Act.
  • 16.       Using Lean methodologies to improve performance     13 
  • 17. Costs People Organisation Productivity Performance Restructuring United Kingdom Mainland Europe United States of America Complexity, Direct costs, Employee relations, Employment law, Implementing change, Integrating organisations, Lean, Managerial controls, Organisational design, Overheads, Performance management, Pricing, Process improvement, Procurement, Reward, Supply chain, Transitional management, Value chain analysis, Workforce planning collinsongrant.com
  • 18. 33 St James’s Square London SW1Y 4JS United Kingdom Telephone +44 20 7661 9382 Facsimile +44 20 7661 9400 Ryecroft Aviary Road Worsley Manchester M28 2WF United Kingdom Telephone +44 161 703 5600 Facsimile +44 161 790 9177 Web www.collinsongrant.com