SlideShare uma empresa Scribd logo
1 de 7
Baixar para ler offline
CURRICULUM VITAE
Current Position : Welding Superintendent
PT. NIPPON STEEL BATAM OFFSHORE SERVICE 1 of 7
Name : BATARA SIREGAR
Place / Date of Birth : Aek-Bargot, October 10, 1969
Nationality : Indonesia
Status : Married
Sex : Male
Education : Tecknical High School
Address : Kav.SAGUBA Blok B2.No.21
RT 008/005.Sei-Binti.Sagulung
BATAM
Cell, +62-813 7272 4852
E-Mail , batarasiregar69@gmail.com
LANGUAGE : Indonesian, Malaysian, English,Japanese.
SPECIALTIES :
I have total (19) years plus experience in fabrication,maintenanance,construction,installation,hook-
up,Completion, Onshore-Offshore Oil & Gas, MarineIndustries.
SUMMARY OF
EXPERIENCE :
Nineteen (19) years experience in designing Structural system mostly within oil and gas industry.
Having extensive experience in all Structural preparation of specification, data sheets, drawing
preparation, requisition and selection of materials and equipment for projects, both onshore and
offshore, supports procurement and bidding activities, field engineering and commissioning. The
experience includes the following duties:
1. Preparation and setup yard for facility and project
Jacket structur, Profiling and Splicing Leg, Pile and Braces. Block assembly Conductor
guide, X- Brace, Pipe Riser Splicing, Riser Clamp, Caisson, Boat Landing, Panel assembly
and Erection, Function test and Hydro test, Preparation of offshore Installation.
2. Deck structur, fabrication, Block assembly and installation structure, Primary & Secondary
Steel, Plates, Tubular, Shapes and spools piping. Daily Progress Report. Weekly Progress
Report.
Read and interpret Piping Plan Lay Out design drawing, Read and interpret Isometric design
drawing,
Piping fabrication shop production knowledge, Piping installation production knowledge,
Piping line walk production knowledge, Produce Piping as-built drawing.
3. Review and Study for transportation to moving, load out and Seafasttening, etc.
4. Preparation lifting plan for heavy lifting activity
5. Preparation of engineering deliverables includes study report, specification, design basis, data
sheets, materials take off, purchase requisition, etc.
6. Supervision of structural drawings preparation, area classification, layout drawings,
schematic, detailed installation drawings, etc.
7. Familiar with the following Codes and standards API, DNV, AISC, Lloyd’s Register, NACE,
etc.
CURRICULUM VITAE
Current Position : Welding Superintendent
PT. NIPPON STEEL BATAM OFFSHORE SERVICE 2 of 7
PERFORMED WORK USING THE FOLLOWING SOFTWARE :
1. PDMS Review
2. MICROSOFT PROJECT
3. MICROSOFT OFFICE
4. MICROSOFT EXEL
EXPERIENCE DETAIL
Jan 2013 – March 2015 : Nippon Steel & Sumikin Batam .
Involved in Project : Tun Burrup Project
Client :Yara Pilbarra Nitrates PTY LTD
Position : Welder Superintendent
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
March. 2013 – Aug 2013 : Thai Nippon Steel .
Involved in Project : Salamander Project.
Client : C-Hess Project
Position : Production Control/Enginering
Work Location : Thai Nippon Steel,Banpakong,Thailand.
Apr. 2010 – Dec 2011 : Nippon Steel Batam Offshore Service.
Involved in Project : South Mahakam
Client : Total Indonesie
Involved in Project : Gajah Baru Wellhead Platform and CPP Jacket Project
Client : Premier Oil
Involved in Project : Yetagun-C Booster Compression Platform
Client : PC Myanmar (HONG KONG)
Position : Welder Superintendent
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
Mar. 2007 - Sep. 2010 : Nippon Steel Batam Offshore Service.
Involved in Project : Nort Belut WHP-Cand WHP-D Project
Client : Conocophillips Indonesia Inc. Ltd.
Position : Welder Supervisor
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
Feb. 2007 - Sep. 2008 : Nippon Steel Batam Offshore Service.
Involved in Project : EPSCI Wellhead Platform SWP- F Project
Client : Total Indonesie
Position : Welder Supervisor
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
CURRICULUM VITAE
Current Position : Welding Superintendent
PT. NIPPON STEEL BATAM OFFSHORE SERVICE 3 of 7
Jan. 2006 - Apr. 2007 : Nippon Steel Batam Offshore Service.
Involved in Project : Sisi Nubi Field Development Project phase I
Client : Total Indonesie
Position : Welder Supervisor
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
May. 2005 - Apr. 2006 : Nippon Steel Batam Offshore Service.
Involved in Project : West Lobe Wellhead Platform
Client : PremierOil
Position : Welder Supervisor
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
Jun. 2005 - Nov. 2005 : Nippon Steel Batam Offshore Service.
Involved in Project : ONGC 9 Well Platform Project Phase 2
Client : L&T and ONGC
Position : Welder Asst. Supervisor
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
Oct. 2004 - Apr. 2005 : Nippon Steel Batam Offshore Service.
Involved in Project : Total Myanmar Yadana WP3 Project
Client : Total Myanmar
Position : Welder Asst. Supervisor
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
Oct. 2004 - Mar. 2005 : Nippon Steel Batam Offshore Service
Involved in Project : Monopod APN Development Project
Client : Petrosea and Clough
Position : Welder Asst. Supervisor
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
Jul. 2004 - Jan. 2005 : Nippon Steel Batam Offshore Service
Involved in Project : ONGC 9 Wellhead Project Phase I
Client : L& T and ONGC
Position : Welder Asst. Supervisor
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
Jul. 2004 – Jul. 2005 : Nippon Steel Batam Offshore Service
Involved in Project : TLU Sakhalin II Phase 2 Project
Client : Sakhalin Energy Investment Co. Ltd.
Position : Welder Asst. Supervisor
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
Jun. 2003 - Jul. 2003 : Nippon Steel Batam Offshore Service
Involved in Project : Wellhead Protection Structure
Client : Technip Indonesia / Conoco Phillips
Position : Welder Asst. Supervisor
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
CURRICULUM VITAE
Current Position : Welding Superintendent
PT. NIPPON STEEL BATAM OFFSHORE SERVICE 4 of 7
Feb. 2003 – Sep. 2003 : Nippon Steel Batam Offshore Service
Involved in Project : 8 Jacket Fabrication MNW Project
Client : EIL / ONGC
Position : Welder Asst. Supervisor
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
Feb. 2003 - Feb. 2004 : Nippon Steel Batam Offshore Service
Involved in Project : Yolla Bass Gas Platform Fabrication
Client : CLOUGH / Origin Energy
Position : Welder Asst. Supervisor
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
Jan. 2003 - Apr. 2003 : Nippon Steel Batam Offshore Service
Ivolved in Project : Mid Water Buoyancy Arch and Gravity Base
Client : Techip Coflexip / SBM.
Position : Welder Asst. Supervisor
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Jan. 2003 - Mar. 2003 : Nippon Steel Batam Offshore Service
Involved in Project : Gauri A Jacket and Pile Fabrication
Client : Caim Energy India
Position : Welder Foreman
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Aug. 2002 - Nov. 2002 : Nippon Steel Batam Offshore Service
Involved in Project : 32 Units of Tendon Support Buoy and Conductor Guide
Client : UNOCAL / CLOUGH
Position : Welder Foreman
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
May. 2002 - Jul. 2002 : Nippon Steel Batam Offshore Service
Involved in Project : Wellhead Protection Frame
Client : CONOCO / TECHNIP
Position : Welder Foreman
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Jan. 2002 - Jul. 2002 : Nippon Steel Batam Offshore Service
Involved in Project : UNOCAL West Seno Living Quarter Project
Client : UNOCAL / EMTUNGA
Position : Welder Foreman
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Dec. 2001 - May. 2002 : Nippon Steel Batam Offshore Service
Involved in Project : CONOCO ADGF Project
Client : CONOCO / SAIPEM
CURRICULUM VITAE
Current Position : Welding Superintendent
PT. NIPPON STEEL BATAM OFFSHORE SERVICE 5 of 7
Position : Welder Foreman
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Oct. 2001 - Apr. 2002 : Nippon Steel Batam Offshore Service
Involved in Project : Deck Lakshmi A and B Project
Client : CAIRN / HHI
Position : Welder Foreman
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Feb. 2001 - Oct. 2001 : Nippon Steel Batam Offshore Service
Involved in Project : Top Side, Jacket and Pile UNOCAL Thailand Pase 22
Client : CLOUGH / Unithai
Position ` : Welder Foreman
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Oct. 2000 - Feb. 2001 : Nippon Steel Batam Offshore Service
Involved in Project : Wellhead D Platform Tripord, Pile and Conductors
Client : Caim Energy / CLOUGH
Position : Welder Foreman
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Jun. 2000 - Feb. 2001 : Nippon Steel Batam Offshore Service
Involved in Project : Peciko Field Development Phase II
Client : Total Indonesie
Position : Welder Foreman
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Mar. 2000 - Sep. 2001 : Nippon Steel Batam Offshore Service
Involved in Project : Anoa Gas Export Platform
Client : Premier Oil
Position : Welder Foreman
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Jun. 2000 - Oct. 2000: Nippon Steel Batam Offshore Service
Involved in Project : Chevron Waterflood Project
Client : Chevron
Position : Welder Foreman
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Dec. 1999 - Mar. 2000 : Nippon Steel Batam Offshore Service
Involved in Project : Topsides GS 15-4 and GS-23-1 ONGC Platform Project
Client : CLOUGH
Position : Welder Foreman
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Oct. 1998 - Jsn. 1999 : Nippon Steel Batam Offshore Service
Involved in Project : Sub-Sea Structure Benchamas
Client : POGO
CURRICULUM VITAE
Current Position : Welding Superintendent
PT. NIPPON STEEL BATAM OFFSHORE SERVICE 6 of 7
Position : Welder Group Leader
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Sep. 1998 - Feb. 1999 : Nippon Steel Batam Offshore Service
Involved in Project : POGO Tantawan E (Jacket, Deck, Piles and Coductors)
Client : POGO
Position : Welder Group Leader
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Sep. 1998 - Jun. 1999 : Nippon Steel Batam Offshore Service
Involved in Project : POGO Benchamas C (Jacket, Deck, Piles and Coductors)
Client : POGO
Position : Welder Group Leader
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Apr. 1998 - Oct. 1998 : Nippon Steel Batam Offshore Service
Involved in Project : POGO Benchamas B (Jacket, Deck, Piles and Coductors)
Client : POGO
Position : Welder Group Leader
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Apr. 1998 - Sep. 1998 : Nippon Steel Batam Offshore Service
Involved in Project : POGO Benchamas A (Jacket, Deck, Piles and Coductors)
Client : POGO
Position : Welder Group Leader
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Jun. 1998 – Sep. 1998 : Nippon Steel Batam Offshore Service
Involved in Project : POGO Benchamas (Tie-in Skid, FSO Plem and Piles)
Client : POGO
Position : Welder Group Leader
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Nov. 1997 - Jul. 1998 : Nippon Steel Batam Offshore Service
Involved in Project : Peciko Field Development (Jacket & Deck MWP - A & B)
Client : Total Indonesie
Position : Welder Group Leader
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Aug. 1997 - Mar. 1998 : Nippon Steel Batam Offshore Service
Involved in Project : Jacket and Deck Yetagun
Client : TEXACO
Position : Welder Group Leader
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
Aug. 1995 - Mar. 1996 : Nippon Steel Batam Offshore Service
Involved in Project : Jacket and Deck (AVB & ZUK)
Client : ARII
CURRICULUM VITAE
Current Position : Welding Superintendent
PT. NIPPON STEEL BATAM OFFSHORE SERVICE 7 of 7
Position : Welder Piping
Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia
May. 1993 - Jul. 1995 : Nisconi Balongan Base
Involved in Project : Jacket and Deck
Client : ARCO
Position : Welder Structure
Work Location : Nisconi Balongan Yard, Java, Indonesia
Mar. 1992 - Apr. 1993 : Nippon Steel Corporation
Involved in Project : Pipe Line
Client : EJGP
Position : Welder Pipe Line
Work Location : Off-Shore East Java,Indonesia.

Mais conteúdo relacionado

Mais procurados

Mais procurados (15)

CV D Schroeder 2016
CV D Schroeder 2016CV D Schroeder 2016
CV D Schroeder 2016
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer
 
My CV
My CVMy CV
My CV
 
Industrial Training On Construction At Simplex Infrastructures Ltd
Industrial Training On Construction At Simplex Infrastructures LtdIndustrial Training On Construction At Simplex Infrastructures Ltd
Industrial Training On Construction At Simplex Infrastructures Ltd
 
Engr._Fahad_CV[1]
Engr._Fahad_CV[1]Engr._Fahad_CV[1]
Engr._Fahad_CV[1]
 
HOW CV 20161129
HOW CV 20161129HOW CV 20161129
HOW CV 20161129
 
cv Syukur Anton Nugroho
cv  Syukur Anton Nugrohocv  Syukur Anton Nugroho
cv Syukur Anton Nugroho
 
CV
CVCV
CV
 
CV - RAMADAN 2016
CV - RAMADAN 2016CV - RAMADAN 2016
CV - RAMADAN 2016
 
pipeline foreman
pipeline foremanpipeline foreman
pipeline foreman
 
CV Hendra mai muklis
CV Hendra mai muklisCV Hendra mai muklis
CV Hendra mai muklis
 
CV-PM
CV-PMCV-PM
CV-PM
 
Mohammad Azman Bin Salleh Cv 2016
Mohammad Azman Bin Salleh Cv 2016Mohammad Azman Bin Salleh Cv 2016
Mohammad Azman Bin Salleh Cv 2016
 
susanta
susanta  susanta
susanta
 
CV-Pon
CV-PonCV-Pon
CV-Pon
 

Semelhante a Welding Expert CV (20)

CV Dwiyanto
CV DwiyantoCV Dwiyanto
CV Dwiyanto
 
subhash__cv
subhash__cvsubhash__cv
subhash__cv
 
Resume - Andika RZ
Resume - Andika RZResume - Andika RZ
Resume - Andika RZ
 
Update CV-Junaidi_Juni 2016
Update CV-Junaidi_Juni 2016Update CV-Junaidi_Juni 2016
Update CV-Junaidi_Juni 2016
 
CV. Syech Rieffan MB
CV. Syech Rieffan MBCV. Syech Rieffan MB
CV. Syech Rieffan MB
 
CV Bambang Eko Hermawan
CV Bambang Eko HermawanCV Bambang Eko Hermawan
CV Bambang Eko Hermawan
 
CV-Gusryan Zari Khamsya
CV-Gusryan Zari KhamsyaCV-Gusryan Zari Khamsya
CV-Gusryan Zari Khamsya
 
CV Hasrul Maswandy
CV Hasrul MaswandyCV Hasrul Maswandy
CV Hasrul Maswandy
 
CV Inesh
CV IneshCV Inesh
CV Inesh
 
New CV of VRB
New CV of VRBNew CV of VRB
New CV of VRB
 
Thomas vincent cv
Thomas vincent cvThomas vincent cv
Thomas vincent cv
 
cv andriyansysh
cv andriyansyshcv andriyansysh
cv andriyansysh
 
Andryanto - CV
Andryanto - CVAndryanto - CV
Andryanto - CV
 
FORE_PEAK_CLOSE_OUT_REPORT
FORE_PEAK_CLOSE_OUT_REPORTFORE_PEAK_CLOSE_OUT_REPORT
FORE_PEAK_CLOSE_OUT_REPORT
 
CV Kitjuk Harijanto
CV Kitjuk HarijantoCV Kitjuk Harijanto
CV Kitjuk Harijanto
 
Aditia Wardana-CV
Aditia Wardana-CVAditia Wardana-CV
Aditia Wardana-CV
 
CURICULUM VITAE (CV)
CURICULUM VITAE (CV)CURICULUM VITAE (CV)
CURICULUM VITAE (CV)
 
C.V. Aug 2015
C.V. Aug 2015 C.V. Aug 2015
C.V. Aug 2015
 
CV. Syech Rieffan MB
CV. Syech Rieffan MBCV. Syech Rieffan MB
CV. Syech Rieffan MB
 
CV Komar Eduar Irfanudin.pdf
CV Komar Eduar Irfanudin.pdfCV Komar Eduar Irfanudin.pdf
CV Komar Eduar Irfanudin.pdf
 

Mais de Siregar Batara

Safety Leadership For Supervisor Training
Safety Leadership For Supervisor TrainingSafety Leadership For Supervisor Training
Safety Leadership For Supervisor TrainingSiregar Batara
 
Leaders toward Safety and Certificates
Leaders toward Safety and CertificatesLeaders toward Safety and Certificates
Leaders toward Safety and CertificatesSiregar Batara
 
Certificate apreciation
Certificate apreciationCertificate apreciation
Certificate apreciationSiregar Batara
 

Mais de Siregar Batara (7)

2.Batara Certificate
2.Batara Certificate2.Batara Certificate
2.Batara Certificate
 
Safety Leadership For Supervisor Training
Safety Leadership For Supervisor TrainingSafety Leadership For Supervisor Training
Safety Leadership For Supervisor Training
 
Leaders toward Safety and Certificates
Leaders toward Safety and CertificatesLeaders toward Safety and Certificates
Leaders toward Safety and Certificates
 
Certificate apreciation
Certificate apreciationCertificate apreciation
Certificate apreciation
 
Basic Couse Tree
Basic Couse TreeBasic Couse Tree
Basic Couse Tree
 
AK3 Umum
AK3 UmumAK3 Umum
AK3 Umum
 
2.Batara Certificate
2.Batara Certificate2.Batara Certificate
2.Batara Certificate
 

Welding Expert CV

  • 1. CURRICULUM VITAE Current Position : Welding Superintendent PT. NIPPON STEEL BATAM OFFSHORE SERVICE 1 of 7 Name : BATARA SIREGAR Place / Date of Birth : Aek-Bargot, October 10, 1969 Nationality : Indonesia Status : Married Sex : Male Education : Tecknical High School Address : Kav.SAGUBA Blok B2.No.21 RT 008/005.Sei-Binti.Sagulung BATAM Cell, +62-813 7272 4852 E-Mail , batarasiregar69@gmail.com LANGUAGE : Indonesian, Malaysian, English,Japanese. SPECIALTIES : I have total (19) years plus experience in fabrication,maintenanance,construction,installation,hook- up,Completion, Onshore-Offshore Oil & Gas, MarineIndustries. SUMMARY OF EXPERIENCE : Nineteen (19) years experience in designing Structural system mostly within oil and gas industry. Having extensive experience in all Structural preparation of specification, data sheets, drawing preparation, requisition and selection of materials and equipment for projects, both onshore and offshore, supports procurement and bidding activities, field engineering and commissioning. The experience includes the following duties: 1. Preparation and setup yard for facility and project Jacket structur, Profiling and Splicing Leg, Pile and Braces. Block assembly Conductor guide, X- Brace, Pipe Riser Splicing, Riser Clamp, Caisson, Boat Landing, Panel assembly and Erection, Function test and Hydro test, Preparation of offshore Installation. 2. Deck structur, fabrication, Block assembly and installation structure, Primary & Secondary Steel, Plates, Tubular, Shapes and spools piping. Daily Progress Report. Weekly Progress Report. Read and interpret Piping Plan Lay Out design drawing, Read and interpret Isometric design drawing, Piping fabrication shop production knowledge, Piping installation production knowledge, Piping line walk production knowledge, Produce Piping as-built drawing. 3. Review and Study for transportation to moving, load out and Seafasttening, etc. 4. Preparation lifting plan for heavy lifting activity 5. Preparation of engineering deliverables includes study report, specification, design basis, data sheets, materials take off, purchase requisition, etc. 6. Supervision of structural drawings preparation, area classification, layout drawings, schematic, detailed installation drawings, etc. 7. Familiar with the following Codes and standards API, DNV, AISC, Lloyd’s Register, NACE, etc.
  • 2. CURRICULUM VITAE Current Position : Welding Superintendent PT. NIPPON STEEL BATAM OFFSHORE SERVICE 2 of 7 PERFORMED WORK USING THE FOLLOWING SOFTWARE : 1. PDMS Review 2. MICROSOFT PROJECT 3. MICROSOFT OFFICE 4. MICROSOFT EXEL EXPERIENCE DETAIL Jan 2013 – March 2015 : Nippon Steel & Sumikin Batam . Involved in Project : Tun Burrup Project Client :Yara Pilbarra Nitrates PTY LTD Position : Welder Superintendent Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia. March. 2013 – Aug 2013 : Thai Nippon Steel . Involved in Project : Salamander Project. Client : C-Hess Project Position : Production Control/Enginering Work Location : Thai Nippon Steel,Banpakong,Thailand. Apr. 2010 – Dec 2011 : Nippon Steel Batam Offshore Service. Involved in Project : South Mahakam Client : Total Indonesie Involved in Project : Gajah Baru Wellhead Platform and CPP Jacket Project Client : Premier Oil Involved in Project : Yetagun-C Booster Compression Platform Client : PC Myanmar (HONG KONG) Position : Welder Superintendent Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia. Mar. 2007 - Sep. 2010 : Nippon Steel Batam Offshore Service. Involved in Project : Nort Belut WHP-Cand WHP-D Project Client : Conocophillips Indonesia Inc. Ltd. Position : Welder Supervisor Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia. Feb. 2007 - Sep. 2008 : Nippon Steel Batam Offshore Service. Involved in Project : EPSCI Wellhead Platform SWP- F Project Client : Total Indonesie Position : Welder Supervisor Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
  • 3. CURRICULUM VITAE Current Position : Welding Superintendent PT. NIPPON STEEL BATAM OFFSHORE SERVICE 3 of 7 Jan. 2006 - Apr. 2007 : Nippon Steel Batam Offshore Service. Involved in Project : Sisi Nubi Field Development Project phase I Client : Total Indonesie Position : Welder Supervisor Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia. May. 2005 - Apr. 2006 : Nippon Steel Batam Offshore Service. Involved in Project : West Lobe Wellhead Platform Client : PremierOil Position : Welder Supervisor Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia. Jun. 2005 - Nov. 2005 : Nippon Steel Batam Offshore Service. Involved in Project : ONGC 9 Well Platform Project Phase 2 Client : L&T and ONGC Position : Welder Asst. Supervisor Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia. Oct. 2004 - Apr. 2005 : Nippon Steel Batam Offshore Service. Involved in Project : Total Myanmar Yadana WP3 Project Client : Total Myanmar Position : Welder Asst. Supervisor Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia. Oct. 2004 - Mar. 2005 : Nippon Steel Batam Offshore Service Involved in Project : Monopod APN Development Project Client : Petrosea and Clough Position : Welder Asst. Supervisor Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia. Jul. 2004 - Jan. 2005 : Nippon Steel Batam Offshore Service Involved in Project : ONGC 9 Wellhead Project Phase I Client : L& T and ONGC Position : Welder Asst. Supervisor Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia. Jul. 2004 – Jul. 2005 : Nippon Steel Batam Offshore Service Involved in Project : TLU Sakhalin II Phase 2 Project Client : Sakhalin Energy Investment Co. Ltd. Position : Welder Asst. Supervisor Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia. Jun. 2003 - Jul. 2003 : Nippon Steel Batam Offshore Service Involved in Project : Wellhead Protection Structure Client : Technip Indonesia / Conoco Phillips Position : Welder Asst. Supervisor Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia.
  • 4. CURRICULUM VITAE Current Position : Welding Superintendent PT. NIPPON STEEL BATAM OFFSHORE SERVICE 4 of 7 Feb. 2003 – Sep. 2003 : Nippon Steel Batam Offshore Service Involved in Project : 8 Jacket Fabrication MNW Project Client : EIL / ONGC Position : Welder Asst. Supervisor Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia. Feb. 2003 - Feb. 2004 : Nippon Steel Batam Offshore Service Involved in Project : Yolla Bass Gas Platform Fabrication Client : CLOUGH / Origin Energy Position : Welder Asst. Supervisor Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia. Jan. 2003 - Apr. 2003 : Nippon Steel Batam Offshore Service Ivolved in Project : Mid Water Buoyancy Arch and Gravity Base Client : Techip Coflexip / SBM. Position : Welder Asst. Supervisor Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Jan. 2003 - Mar. 2003 : Nippon Steel Batam Offshore Service Involved in Project : Gauri A Jacket and Pile Fabrication Client : Caim Energy India Position : Welder Foreman Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Aug. 2002 - Nov. 2002 : Nippon Steel Batam Offshore Service Involved in Project : 32 Units of Tendon Support Buoy and Conductor Guide Client : UNOCAL / CLOUGH Position : Welder Foreman Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia May. 2002 - Jul. 2002 : Nippon Steel Batam Offshore Service Involved in Project : Wellhead Protection Frame Client : CONOCO / TECHNIP Position : Welder Foreman Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Jan. 2002 - Jul. 2002 : Nippon Steel Batam Offshore Service Involved in Project : UNOCAL West Seno Living Quarter Project Client : UNOCAL / EMTUNGA Position : Welder Foreman Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Dec. 2001 - May. 2002 : Nippon Steel Batam Offshore Service Involved in Project : CONOCO ADGF Project Client : CONOCO / SAIPEM
  • 5. CURRICULUM VITAE Current Position : Welding Superintendent PT. NIPPON STEEL BATAM OFFSHORE SERVICE 5 of 7 Position : Welder Foreman Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Oct. 2001 - Apr. 2002 : Nippon Steel Batam Offshore Service Involved in Project : Deck Lakshmi A and B Project Client : CAIRN / HHI Position : Welder Foreman Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Feb. 2001 - Oct. 2001 : Nippon Steel Batam Offshore Service Involved in Project : Top Side, Jacket and Pile UNOCAL Thailand Pase 22 Client : CLOUGH / Unithai Position ` : Welder Foreman Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Oct. 2000 - Feb. 2001 : Nippon Steel Batam Offshore Service Involved in Project : Wellhead D Platform Tripord, Pile and Conductors Client : Caim Energy / CLOUGH Position : Welder Foreman Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Jun. 2000 - Feb. 2001 : Nippon Steel Batam Offshore Service Involved in Project : Peciko Field Development Phase II Client : Total Indonesie Position : Welder Foreman Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Mar. 2000 - Sep. 2001 : Nippon Steel Batam Offshore Service Involved in Project : Anoa Gas Export Platform Client : Premier Oil Position : Welder Foreman Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Jun. 2000 - Oct. 2000: Nippon Steel Batam Offshore Service Involved in Project : Chevron Waterflood Project Client : Chevron Position : Welder Foreman Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Dec. 1999 - Mar. 2000 : Nippon Steel Batam Offshore Service Involved in Project : Topsides GS 15-4 and GS-23-1 ONGC Platform Project Client : CLOUGH Position : Welder Foreman Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Oct. 1998 - Jsn. 1999 : Nippon Steel Batam Offshore Service Involved in Project : Sub-Sea Structure Benchamas Client : POGO
  • 6. CURRICULUM VITAE Current Position : Welding Superintendent PT. NIPPON STEEL BATAM OFFSHORE SERVICE 6 of 7 Position : Welder Group Leader Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Sep. 1998 - Feb. 1999 : Nippon Steel Batam Offshore Service Involved in Project : POGO Tantawan E (Jacket, Deck, Piles and Coductors) Client : POGO Position : Welder Group Leader Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Sep. 1998 - Jun. 1999 : Nippon Steel Batam Offshore Service Involved in Project : POGO Benchamas C (Jacket, Deck, Piles and Coductors) Client : POGO Position : Welder Group Leader Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Apr. 1998 - Oct. 1998 : Nippon Steel Batam Offshore Service Involved in Project : POGO Benchamas B (Jacket, Deck, Piles and Coductors) Client : POGO Position : Welder Group Leader Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Apr. 1998 - Sep. 1998 : Nippon Steel Batam Offshore Service Involved in Project : POGO Benchamas A (Jacket, Deck, Piles and Coductors) Client : POGO Position : Welder Group Leader Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Jun. 1998 – Sep. 1998 : Nippon Steel Batam Offshore Service Involved in Project : POGO Benchamas (Tie-in Skid, FSO Plem and Piles) Client : POGO Position : Welder Group Leader Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Nov. 1997 - Jul. 1998 : Nippon Steel Batam Offshore Service Involved in Project : Peciko Field Development (Jacket & Deck MWP - A & B) Client : Total Indonesie Position : Welder Group Leader Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Aug. 1997 - Mar. 1998 : Nippon Steel Batam Offshore Service Involved in Project : Jacket and Deck Yetagun Client : TEXACO Position : Welder Group Leader Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia Aug. 1995 - Mar. 1996 : Nippon Steel Batam Offshore Service Involved in Project : Jacket and Deck (AVB & ZUK) Client : ARII
  • 7. CURRICULUM VITAE Current Position : Welding Superintendent PT. NIPPON STEEL BATAM OFFSHORE SERVICE 7 of 7 Position : Welder Piping Work Location : Nippon Steel Batam Yard, Batam Island, Indonesia May. 1993 - Jul. 1995 : Nisconi Balongan Base Involved in Project : Jacket and Deck Client : ARCO Position : Welder Structure Work Location : Nisconi Balongan Yard, Java, Indonesia Mar. 1992 - Apr. 1993 : Nippon Steel Corporation Involved in Project : Pipe Line Client : EJGP Position : Welder Pipe Line Work Location : Off-Shore East Java,Indonesia.