CITY OF NEW SMYRNA BEACH – DEVELOPMENT SERVICES
Flagler Avenue Retail-Residential Project #SP-6-05
July 11, 2005
Summary
1. Applicant: Will Miller, 100 South Riverside Drive, New Smyrna Beach
2. Property Owner: Phyllis May Et. Al., 257 Minorca Beach Way, New Smyrna
Beach
3. Request: site plan approval to allow construction of a mixed-use building
consisting of 8,850 square feet of retail, seven residential units and seven
garages in three buildings.
4. Subject Area: The subject area consists of approximately .56 acres, is zoned
MU, Mixed Use and is located on the southeast corner of South Pine Street and
Flagler Avenue.
5. Recommendation: Staff recommends the Planning and Zoning Board approve
the site plan with conditions (see below).
6. Findings
K-1
Subject
Parcel
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
2
LPA/PLANNING AND ZONING BOARD
JULY 11, 2005
SP-6-05 FLAGLER AVENUE RETAIL-RESIDENTIAL PROJECT (CLASS III)
(1) The applicant’s stated purpose of this development is to provide a vertically
mixed-use development. The applicant must have a site plan approved by
the Plan Review Committee and the Planning and Zoning Board before the
City will issue a permit for development.
(2) This approval would constitute an approval of a site plan that received Plan
Review comments on May 13, 2005. To date, the site plan does not have all
the signatures of the Plan Review Committee members, indicating the plans
meet the technical requirements of the City. Addressing these issues and
receiving approval from all PRC members should be a condition of approval.
(3) One concern of many within the community is to replace buildings,
particularly in high visibility areas such as Flagler Avenue, with architectural
styles that fit the character of the area. Although the existing building on the
site is over 50-years old, it doesn’t necessarily seem to have an overall
redeeming architectural style. The owner of the property would like to
remove the building and construct a nice piece of architecture that will add
to the community. This is a laudable goal and should be encouraged by the
community.
(4) As indicated above there is a concern that new buildings on Flagler Avenue
fit the character of the area. It is difficult to determine exactly what the
character of the area is now that many of the smaller single-family home-like
buildings have been removed and replaced with newer buildings that have
little in common with the historic buildings remaining. Recently some
buildings have been constructed on Flagler Avenue that many consider not
conforming to the neighborhood character. This should not be construed as
a negative reflection on the owners but more of a lack of knowledge of
appropriate architectural style. To address the problem of future
inappropriate construction on Flagler Avenue, as well as other areas, the
City is in the process of trying to determine what is appropriate for the areas
and will hopefully soon adopt architectural standards that all new
construction must meet. In the mean time staff is working with local
architects and developers to try to design architecturally appropriate
buildings.
(5) Determining the appropriateness of a building can be fairly complicated and
takes experience. Items to look for include the massing and height of
buildings, building setbacks, building frontage on a street, construction
material and particular styles. The City has design guidelines that illustrate
these concepts. See Exhibit A. For example, if all the buildings in a
neighborhood are constructed in the craftsman or bungalow style, it may not
be appropriate to construct a building in the neighborhood having a
Mediterranean Revival style. Another example is if most buildings in the
neighborhood have a setback from the street between five- and ten-feet, it is
not appropriate to construct a new building with a setback of 25-feet.
(6) The proposed building associated with the subject site plan has several
features that City staff feels is appropriate for the Flagler Avenue area.
These items include the setback of the building, the massing and height of
K-2
1
2
3
4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
5
LPA/PLANNING AND ZONING BOARD
JULY 11, 2005
SP-6-05 FLAGLER AVENUE RETAIL-RESIDENTIAL PROJECT (CLASS III)
the building, the use of the building awnings and the vertical mixed use
having non-residential uses on the first floor and residential used on the
second floor. However, staff has a few concerns with the subject building in
that it is to be constructed with possibly inappropriate materials. From the
elevation drawings it appears that the exterior is constructed with glass and
keystone and most buildings along Flagler Avenue do not have an
overwhelming amount of glass and none have keystone. Also, there are
curves in the building whereas there are no curved buildings elsewhere on
the street. The applicant has indicated he is willing to work with City staff to
address some of the concerns.
(7) The proposal includes the demolition of a historic structure. That will require
approval from the Historic Preservation Commission, which should be a
condition of approval.
7. Recommendation
Approve the site plan with the condition that:
1. All Plan Review Committee comments are addressed and all members sign-
off on the plans.
2. The applicant obtains permission from the Historic Preservation Commission
to demolish the historic structure onsite.
K-3
1
2
3
4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
5

More Related Content

What's hot

Foxhall w street community meeting-flyer
Foxhall w street  community meeting-flyerFoxhall w street  community meeting-flyer
Foxhall w street community meeting-flyer
RamaChilamkurthy
 
Eastern market metro park meeting 06 24-2020
Eastern market metro park meeting 06 24-2020Eastern market metro park meeting 06 24-2020
Eastern market metro park meeting 06 24-2020
RamaChilamkurthy
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020
RamaChilamkurthy
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
RamaChilamkurthy
 

What's hot (20)

Foxhall w street community meeting-flyer
Foxhall w street  community meeting-flyerFoxhall w street  community meeting-flyer
Foxhall w street community meeting-flyer
 
Eastern market metro park meeting 06 24-2020
Eastern market metro park meeting 06 24-2020Eastern market metro park meeting 06 24-2020
Eastern market metro park meeting 06 24-2020
 
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meeting
 
Stamm
StammStamm
Stamm
 
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
 
Shaggy Dog
Shaggy DogShaggy Dog
Shaggy Dog
 
2021 Streets Survey
2021 Streets Survey2021 Streets Survey
2021 Streets Survey
 
Street Survey
Street SurveyStreet Survey
Street Survey
 
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020
 
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020
 
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
 
Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15
 
Commercial: Kensington Hotel Basement extension and Change of Use
Commercial: Kensington Hotel Basement extension and Change of UseCommercial: Kensington Hotel Basement extension and Change of Use
Commercial: Kensington Hotel Basement extension and Change of Use
 
South Lakes Drive Sidewalk
South Lakes Drive Sidewalk South Lakes Drive Sidewalk
South Lakes Drive Sidewalk
 
VCS Resume_May 2015
VCS Resume_May 2015VCS Resume_May 2015
VCS Resume_May 2015
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
 
AH City Council Meeting 12.14.15 - Item #10 - 6116 Broadway & 213 Henderson
AH City Council Meeting 12.14.15 - Item #10  - 6116 Broadway & 213 HendersonAH City Council Meeting 12.14.15 - Item #10  - 6116 Broadway & 213 Henderson
AH City Council Meeting 12.14.15 - Item #10 - 6116 Broadway & 213 Henderson
 
Hearst community meeting 04.05.2018
Hearst community meeting   04.05.2018Hearst community meeting   04.05.2018
Hearst community meeting 04.05.2018
 

Viewers also liked (14)

Banner tto aguas
Banner tto aguasBanner tto aguas
Banner tto aguas
 
Page0134
Page0134Page0134
Page0134
 
Calendari ANEM AL RIU!!
Calendari ANEM AL RIU!!Calendari ANEM AL RIU!!
Calendari ANEM AL RIU!!
 
Logo del cooperativismo y mutualismo escolar
Logo del cooperativismo y mutualismo escolarLogo del cooperativismo y mutualismo escolar
Logo del cooperativismo y mutualismo escolar
 
6
66
6
 
Page0158
Page0158Page0158
Page0158
 
Plan de alimentación 1500
Plan de alimentación 1500Plan de alimentación 1500
Plan de alimentación 1500
 
SociologyExchange.co.uk Shared Resource
SociologyExchange.co.uk Shared ResourceSociologyExchange.co.uk Shared Resource
SociologyExchange.co.uk Shared Resource
 
Actividad 3 146655
Actividad 3 146655Actividad 3 146655
Actividad 3 146655
 
Agenda nbl tract
Agenda nbl tractAgenda nbl tract
Agenda nbl tract
 
Regulamnto impressao
Regulamnto impressaoRegulamnto impressao
Regulamnto impressao
 
Of060 oferta hoteles de ciudad 2012
Of060 oferta hoteles de ciudad 2012Of060 oferta hoteles de ciudad 2012
Of060 oferta hoteles de ciudad 2012
 
Rl5000 eng&span0511
Rl5000 eng&span0511Rl5000 eng&span0511
Rl5000 eng&span0511
 
Presentacion
PresentacionPresentacion
Presentacion
 

Similar to SP-6-05 Flagler Avenue Retail-Residential Project

Construction technology and services 1[98]
Construction technology and services 1[98]Construction technology and services 1[98]
Construction technology and services 1[98]
Sara Saeid
 
Final Report
Final Report Final Report
Final Report
Jack Ng
 
Document Finished
Document FinishedDocument Finished
Document Finished
Gregg Boyd
 
My Architectural Portfilio
My Architectural PortfilioMy Architectural Portfilio
My Architectural Portfilio
ahmed nagy
 

Similar to SP-6-05 Flagler Avenue Retail-Residential Project (20)

Ricky Mason Portfolio 20155
Ricky Mason Portfolio 20155Ricky Mason Portfolio 20155
Ricky Mason Portfolio 20155
 
Construction solutions
Construction solutionsConstruction solutions
Construction solutions
 
Item # 5 - 117 Claywell (Significance & Compatibility Review)
Item # 5 - 117 Claywell (Significance & Compatibility Review)Item # 5 - 117 Claywell (Significance & Compatibility Review)
Item # 5 - 117 Claywell (Significance & Compatibility Review)
 
Property Acquistion Report_FINAL
Property Acquistion Report_FINALProperty Acquistion Report_FINAL
Property Acquistion Report_FINAL
 
final report draft.pdf
final report draft.pdffinal report draft.pdf
final report draft.pdf
 
Item # 4 - 240 Corona (Significance & Compatibility Review)
Item # 4 - 240 Corona (Significance & Compatibility Review)Item # 4 - 240 Corona (Significance & Compatibility Review)
Item # 4 - 240 Corona (Significance & Compatibility Review)
 
portfolio 2016
portfolio 2016portfolio 2016
portfolio 2016
 
Construction technology and services 1[98]
Construction technology and services 1[98]Construction technology and services 1[98]
Construction technology and services 1[98]
 
Final Report
Final Report Final Report
Final Report
 
f7
f7f7
f7
 
RFP
RFPRFP
RFP
 
WORK SAMPLE TFT
WORK SAMPLE TFTWORK SAMPLE TFT
WORK SAMPLE TFT
 
Snehansu 10110029 training
Snehansu 10110029 trainingSnehansu 10110029 training
Snehansu 10110029 training
 
Document Finished
Document FinishedDocument Finished
Document Finished
 
The Destruction and Reconstruction of a City Street: The Cork Street Corridor
The Destruction and Reconstruction of a City Street: The Cork Street CorridorThe Destruction and Reconstruction of a City Street: The Cork Street Corridor
The Destruction and Reconstruction of a City Street: The Cork Street Corridor
 
My Architectural Portfilio
My Architectural PortfilioMy Architectural Portfilio
My Architectural Portfilio
 
Miguel Yon Architecture Portfolio
Miguel Yon Architecture PortfolioMiguel Yon Architecture Portfolio
Miguel Yon Architecture Portfolio
 
Item # 3 - 321 Argo
Item # 3 - 321 ArgoItem # 3 - 321 Argo
Item # 3 - 321 Argo
 
25 years of Projects in a Nutshell
25 years of Projects in a Nutshell25 years of Projects in a Nutshell
25 years of Projects in a Nutshell
 
AH CC Meeting 06.12.17 Item #4 ppt 333 normandy
AH CC Meeting  06.12.17 Item #4   ppt 333 normandyAH CC Meeting  06.12.17 Item #4   ppt 333 normandy
AH CC Meeting 06.12.17 Item #4 ppt 333 normandy
 

More from Seann Smith, AICP (8)

Babcock work-samplev5
Babcock work-samplev5Babcock work-samplev5
Babcock work-samplev5
 
PA-06-07-52 The Loop Staff Report to BCC - Plan Amendment
PA-06-07-52 The Loop Staff Report to BCC - Plan AmendmentPA-06-07-52 The Loop Staff Report to BCC - Plan Amendment
PA-06-07-52 The Loop Staff Report to BCC - Plan Amendment
 
Carbon Tax V Trade - When Forests Burn
Carbon Tax V Trade - When Forests BurnCarbon Tax V Trade - When Forests Burn
Carbon Tax V Trade - When Forests Burn
 
A-7-05 Gardens 207 LLC-Pioneer Trails - staff report
A-7-05 Gardens 207 LLC-Pioneer Trails - staff reportA-7-05 Gardens 207 LLC-Pioneer Trails - staff report
A-7-05 Gardens 207 LLC-Pioneer Trails - staff report
 
CPA-2-03 West Canal
CPA-2-03 West CanalCPA-2-03 West Canal
CPA-2-03 West Canal
 
Renderings
RenderingsRenderings
Renderings
 
ZON2006-00040 Princeton-Smith
ZON2006-00040 Princeton-SmithZON2006-00040 Princeton-Smith
ZON2006-00040 Princeton-Smith
 
Babcock Work Sample.v3
Babcock Work Sample.v3Babcock Work Sample.v3
Babcock Work Sample.v3
 

SP-6-05 Flagler Avenue Retail-Residential Project

  • 1. CITY OF NEW SMYRNA BEACH – DEVELOPMENT SERVICES Flagler Avenue Retail-Residential Project #SP-6-05 July 11, 2005 Summary 1. Applicant: Will Miller, 100 South Riverside Drive, New Smyrna Beach 2. Property Owner: Phyllis May Et. Al., 257 Minorca Beach Way, New Smyrna Beach 3. Request: site plan approval to allow construction of a mixed-use building consisting of 8,850 square feet of retail, seven residential units and seven garages in three buildings. 4. Subject Area: The subject area consists of approximately .56 acres, is zoned MU, Mixed Use and is located on the southeast corner of South Pine Street and Flagler Avenue. 5. Recommendation: Staff recommends the Planning and Zoning Board approve the site plan with conditions (see below). 6. Findings K-1 Subject Parcel 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 2
  • 2. LPA/PLANNING AND ZONING BOARD JULY 11, 2005 SP-6-05 FLAGLER AVENUE RETAIL-RESIDENTIAL PROJECT (CLASS III) (1) The applicant’s stated purpose of this development is to provide a vertically mixed-use development. The applicant must have a site plan approved by the Plan Review Committee and the Planning and Zoning Board before the City will issue a permit for development. (2) This approval would constitute an approval of a site plan that received Plan Review comments on May 13, 2005. To date, the site plan does not have all the signatures of the Plan Review Committee members, indicating the plans meet the technical requirements of the City. Addressing these issues and receiving approval from all PRC members should be a condition of approval. (3) One concern of many within the community is to replace buildings, particularly in high visibility areas such as Flagler Avenue, with architectural styles that fit the character of the area. Although the existing building on the site is over 50-years old, it doesn’t necessarily seem to have an overall redeeming architectural style. The owner of the property would like to remove the building and construct a nice piece of architecture that will add to the community. This is a laudable goal and should be encouraged by the community. (4) As indicated above there is a concern that new buildings on Flagler Avenue fit the character of the area. It is difficult to determine exactly what the character of the area is now that many of the smaller single-family home-like buildings have been removed and replaced with newer buildings that have little in common with the historic buildings remaining. Recently some buildings have been constructed on Flagler Avenue that many consider not conforming to the neighborhood character. This should not be construed as a negative reflection on the owners but more of a lack of knowledge of appropriate architectural style. To address the problem of future inappropriate construction on Flagler Avenue, as well as other areas, the City is in the process of trying to determine what is appropriate for the areas and will hopefully soon adopt architectural standards that all new construction must meet. In the mean time staff is working with local architects and developers to try to design architecturally appropriate buildings. (5) Determining the appropriateness of a building can be fairly complicated and takes experience. Items to look for include the massing and height of buildings, building setbacks, building frontage on a street, construction material and particular styles. The City has design guidelines that illustrate these concepts. See Exhibit A. For example, if all the buildings in a neighborhood are constructed in the craftsman or bungalow style, it may not be appropriate to construct a building in the neighborhood having a Mediterranean Revival style. Another example is if most buildings in the neighborhood have a setback from the street between five- and ten-feet, it is not appropriate to construct a new building with a setback of 25-feet. (6) The proposed building associated with the subject site plan has several features that City staff feels is appropriate for the Flagler Avenue area. These items include the setback of the building, the massing and height of K-2 1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 5
  • 3. LPA/PLANNING AND ZONING BOARD JULY 11, 2005 SP-6-05 FLAGLER AVENUE RETAIL-RESIDENTIAL PROJECT (CLASS III) the building, the use of the building awnings and the vertical mixed use having non-residential uses on the first floor and residential used on the second floor. However, staff has a few concerns with the subject building in that it is to be constructed with possibly inappropriate materials. From the elevation drawings it appears that the exterior is constructed with glass and keystone and most buildings along Flagler Avenue do not have an overwhelming amount of glass and none have keystone. Also, there are curves in the building whereas there are no curved buildings elsewhere on the street. The applicant has indicated he is willing to work with City staff to address some of the concerns. (7) The proposal includes the demolition of a historic structure. That will require approval from the Historic Preservation Commission, which should be a condition of approval. 7. Recommendation Approve the site plan with the condition that: 1. All Plan Review Committee comments are addressed and all members sign- off on the plans. 2. The applicant obtains permission from the Historic Preservation Commission to demolish the historic structure onsite. K-3 1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 5