UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS
GCE Advanced Level




MARK SCHEME for the May/June 2009 question paper
for the guidance of teachers



                                9691 COMPUTING
        9691/03              Paper 3 (Written Paper 3), maximum raw mark 90



This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of
the examination. It shows the basis on which Examiners were instructed to award marks. It does not
indicate the details of the discussions that took place at an Examiners’ meeting before marking began,
which would have considered the acceptability of alternative answers.

Mark schemes must be read in conjunction with the question papers and the report on the
examination.



•   CIE will not enter into discussions or correspondence in connection with these mark schemes.



CIE is publishing the mark schemes for the May/June 2009 question papers for most IGCSE, GCE
Advanced Level and Advanced Subsidiary Level syllabuses and some Ordinary Level syllabuses.




                            www.xtremepapers.net
Page 2                 Mark Scheme: Teachers’ version                 Syllabus       Paper
                           GCE A LEVEL – May/June 2009                     9691           03

1   -File/Storage
         -Save to another folder/create folders for different types of message.
    -Replying
         -Can send a reply with address automatically put in
    -Copying/Forwarding/multiple forwarding
         -Make a copy of the message forward it to another/many person
         (using their address/book)/No need to retype the message
    -(Automatic) deletion
         -Remove message from box (after reading it to free up space)/to make space
    -Blocking
         -If message is unsolicited or unwelcome then arrange for provider to block future messages
         from that address.
    -Mark as Read/Unread
         -To ensure message remains in box/for future reference
    -Mark as important/high priority
         -To ensure message does not get ignored.
    -Sorting/Grouping
         -According to time received/sender/subject/…
    (Up to 2 per type, max 4 types, max 8)                                                       [8]


2   (a)   (i) -Data and methods are kept together/Data can only be accessed using the methods
              attached to it.                                                              [1]

          (ii) -Computer told facts and rules and then manipulates them to provide answers to
               queries.                                                                    [1]


    (b)   (i) -Also known as top-down design
              -Split original problem into smaller parts
              -Continue splitting into smaller and smaller parts until…
              -Each part can be considered to be a single process.
              (1 per -, max 2)                                                                   [2]

          (ii) -A procedure/small section of code…
               -which returns a specific value
               -The value is returned whenever the function name appears/acting just like a variable
               name.
               (1 per -, max 2)                                                                  [2]


    (c) Repeat
        Compare new value with root value
        -If > root value then follow right subtree
        -Else follow left subtree
        -Until no subtree
        -Insert new value as root of new subtree.
        (1 per -, max 4) (Allow symmetric algorithm)                                             [4]




                                             © UCLES 2009


                               www.xtremepapers.net
Page 3                    Mark Scheme: Teachers’ version                Syllabus   Paper
                              GCE A LEVEL – May/June 2009                    9691       03

    (d)   (i) -Used to combine already compiled procedures
              -with compiled program…
              -to create an executable file.
              -Deals with external references.

          (ii) -Copies object code into…
               -(primary) memory ready for execution.
               -Deals with addressing anomalies,
               -particularly relocatable addressing
               (1 per -, max 2 per dotty, max 4)                                               [4]


3   (a) -Goods offered for sale on electronic communication medium/Internet
        -Buyer orders goods by providing personal information on Internet..
        -including bank account/credit card/other payment details.
        -data transfer must be secure
        -that firm offering goods is genuine
        -that buyer is genuine
        -Goods dispatched to purchaser after payment checked.
        (1 per -, max 3)                                                                       [3]


    (b) -Enlarges market…
        -now worldwide rather than just local base.
        -Opens up richer markets where higher prices can be charged.
        -Sells 24/7
        -No need for expensive overheads
        -No need to employ large number of sales staff
        (1 per -, max 4)                                                                       [4]


4   (a)
                  CUSTOMER                         ACCOUNT                                     [1]


    (b)   (i) Many to many.                                                                    [1]

          (ii)
                       ACCOUNT                   LINK               STOCK


                 Marks:
                 -Use of Link table with sensible and descriptive name
                 -ACCOUNT to LINK is One to Many
                 -LINK to STOCK is Many to ONE.
                 (1 per -, max 2)                                                              [2]




                                               © UCLES 2009


                                  www.xtremepapers.net
Page 4                     Mark Scheme: Teachers’ version                  Syllabus          Paper
                               GCE A LEVEL – May/June 2009                      9691              03

    (c)    (i) -A unique identifier for a record
               -e.g. Customer ID.                                                                        [2]

          (ii) A field/item, not the primary key, offering an alternative identification for the record (not
               necessarily unique.)
               -e.g. Postal area (to arrange delivery schedules).                                        [2]

          (iii) -A field/item in one table which is a primary key in another table/acts as a link between
                tables.
                -Account number in customer table links records to relevant account in account table. [2]


    (d) -Confidential/Personal data of a sensitive type.
        -Will have guaranteed privacy of data to customers.
        -Must comply with legislation protecting data.
        -Do not want to lose any data or have data maliciously altered/used
        Important to maintain data integrity.
        -Passwords to get onto system…
        -and into different tables…
        -in hierarchical fashion…
        -giving different access rights/RO or RW…
        -and providing different views of the data
        -Physical protection by (e.g.) locking system terminals away/iris recognition/fingerprints/….
        -Protecting system with firewalls etc.
        (1 per -, max 6)                                                                              [6]


5   (a) -Concept of a stored program
        -Instructions and data use the same (primary) memory
        -Use of a single processor
        -Follows a sequential set of instructions.
        (1 per -, max 3)                                                                                 [3]


    (b)    (i) -201/202 (Sensible value)
               -because, once sent to MAR the value in the PC is incremented                             [2]

          (ii) -The result of a jump instruction which…
               -requires that the next instruction is not to be handled in sequence/specifically, that held
               in 180.                                                                                  [2]


6   (a)    (i) 11011010

          (ii) 10100110
               (1 per dotty)                                                                             [2]


    (b)    (i) -The fractional part of the representation
               -Place value of MSB is –1…
               -remainder of bits are ½, ¼…
               -Holds the magnitude of the data.
               (1 per -, max 2)                                                                          [2]




                                               © UCLES 2009


                                 www.xtremepapers.net
Page 5                 Mark Scheme: Teachers’ version                    Syllabus     Paper
                           GCE A LEVEL – May/June 2009                        9691         03

        (ii) -Is a two’s complement integer which…
             -holds the power of 2…
             -by which the mantissa must be multiplied...
             -to give the original value.
             (1 per -, max 2)                                                                      [2]

        (iii) 0.0101011 * 10 ^ 0101
              = 1010.11
              =8+2+½+¼
              Alternative:
              10 = 1010 and .75 = .11
              10.75 = 00101011 x 10^101

                   Point moves 5 places
             (1 per line, max 3)                                                                   [3]

        (iv) 01010110       0100
             (1 for mantissa, 1 for exponent)                                                      [2]


7   (a) -A series of bars representing time to be taken on…
        -the different tasks which are needed to produce the system…
        -and relative timings of tasks.
        -Shows when different resources are going to be required/when they should be booked.
        -Also shows reliance of one task on the completion of another.
        -Will show how long the whole system should take to complete.
        (1 per -, max 4)                                                                           [4]


    (b) -A series of manuals to explain the software…
        -in printed form and/or on screen.
        -Overview of package/contents page/index/glossary/…
        -Sample inputs/outputs.
        -Explanation of error messages.
        -Installation of software/hardware.
        -Quick reference guide.
        -How to carry out simple maintenance (like reloading a till roll).
        (1 per -, max 6)                                                                           [6]


8   (a) -Cheaper than waiting until real thing is built
        -May be impossible to alter things after building
        -Safer than testing in real life, e.g. evacuation procedures, using real people.
        -Impossible to carry out some tests, e.g. burning building down, when building complete.
        (1 per -, max 3)                                                                           [3]




                                             © UCLES 2009


                               www.xtremepapers.net
Page 6                 Mark Scheme: Teachers’ version                    Syllabus         Paper
                           GCE A LEVEL – May/June 2009                        9691             03

    (b)   (i) -Width of aisles..
                  -to be able to assess the number of people who can use the aisle at once.
              -Number of people in store…
                  -evacuation times will depend on number of people.
              -Position of exits…
                  -relative to groupings of people.
              -Number of exits…
                  -should be kept as low as is safe, for security reasons.
              -Position of fire/spread of fire…
                  -different positions will dictate flow of people/speed of spread.
              -Positions of different areas in store (e.g. bakery)…
                  -some areas will attract crowds of shoppers.
              -Time taken for emergency services to arrive
                  -expert help will alleviate the situation
              (1 per -, max 3 variables, max 6)                                                       [6]

          (ii) -Large quantities of data …
               -all interrelating with each other…
               -because some outcomes rely on outcomes of others.
               -Large quantities of processing required
               (1 per -, max 2)                                                                       [2]


9   -Interrupt given a priority
    -Placed in queue with other interrupts to be done…
    -according to priority.
    -When it becomes the highest priority interrupt it is dealt with
    -Contents of special registers are placed on a stack/saved
    -Interrupt (and others) dealt with
    -values read from stack into special registers.
    -Check for interrupt(s) at end of each cycle before fetching next instruction
    -Vectored interrupts
    (1 per -, max 6)                                                                                  [6]




                                             © UCLES 2009


                              www.xtremepapers.net

Mais conteúdo relacionado

Mais procurados

Nov 08 MS3
Nov 08 MS3Nov 08 MS3
Nov 08 MS3Samimvez
 
Nov 07 MS3
Nov 07 MS3Nov 07 MS3
Nov 07 MS3Samimvez
 
Nov 06 MS3
Nov 06 MS3Nov 06 MS3
Nov 06 MS3Samimvez
 
June 06 MS1
June 06 MS1June 06 MS1
June 06 MS1Samimvez
 
Nov 09 P11
Nov 09 P11Nov 09 P11
Nov 09 P11Samimvez
 
June 10 MS13
June 10 MS13June 10 MS13
June 10 MS13Samimvez
 
June 10 MS32
June 10 MS32June 10 MS32
June 10 MS32Samimvez
 
June 08 P1
June 08 P1June 08 P1
June 08 P1Samimvez
 
June 10 MS33
June 10 MS33June 10 MS33
June 10 MS33Samimvez
 
June 07 P1
June 07 P1June 07 P1
June 07 P1Samimvez
 

Mais procurados (11)

Nov 03 MS
Nov 03 MSNov 03 MS
Nov 03 MS
 
Nov 08 MS3
Nov 08 MS3Nov 08 MS3
Nov 08 MS3
 
Nov 07 MS3
Nov 07 MS3Nov 07 MS3
Nov 07 MS3
 
Nov 06 MS3
Nov 06 MS3Nov 06 MS3
Nov 06 MS3
 
June 06 MS1
June 06 MS1June 06 MS1
June 06 MS1
 
Nov 09 P11
Nov 09 P11Nov 09 P11
Nov 09 P11
 
June 10 MS13
June 10 MS13June 10 MS13
June 10 MS13
 
June 10 MS32
June 10 MS32June 10 MS32
June 10 MS32
 
June 08 P1
June 08 P1June 08 P1
June 08 P1
 
June 10 MS33
June 10 MS33June 10 MS33
June 10 MS33
 
June 07 P1
June 07 P1June 07 P1
June 07 P1
 

Destaque

June 03 P2
June 03 P2June 03 P2
June 03 P2Samimvez
 
Research into media Institutions
Research into media InstitutionsResearch into media Institutions
Research into media InstitutionsAlanyaodonnell
 
Cam's Totem Pole
Cam's Totem PoleCam's Totem Pole
Cam's Totem Polenathanr07
 
Premipera la convivència def
Premipera la convivència defPremipera la convivència def
Premipera la convivència defCelia Premat
 
Location recce
Location recceLocation recce
Location reccebeccacobb
 
Coms1010 exam paper - may 08
Coms1010   exam paper - may 08Coms1010   exam paper - may 08
Coms1010 exam paper - may 08Samimvez
 
Coms1010 exam paper - nov10
Coms1010   exam paper - nov10Coms1010   exam paper - nov10
Coms1010 exam paper - nov10Samimvez
 
Media Evaluation
Media EvaluationMedia Evaluation
Media Evaluationbrogan0135
 

Destaque (12)

June 03 P2
June 03 P2June 03 P2
June 03 P2
 
Research into media Institutions
Research into media InstitutionsResearch into media Institutions
Research into media Institutions
 
Kittens
KittensKittens
Kittens
 
Visual influences
Visual influencesVisual influences
Visual influences
 
Nov 05 P3
Nov 05 P3Nov 05 P3
Nov 05 P3
 
Cam's Totem Pole
Cam's Totem PoleCam's Totem Pole
Cam's Totem Pole
 
Premipera la convivència def
Premipera la convivència defPremipera la convivència def
Premipera la convivència def
 
Location recce
Location recceLocation recce
Location recce
 
Example3
Example3Example3
Example3
 
Coms1010 exam paper - may 08
Coms1010   exam paper - may 08Coms1010   exam paper - may 08
Coms1010 exam paper - may 08
 
Coms1010 exam paper - nov10
Coms1010   exam paper - nov10Coms1010   exam paper - nov10
Coms1010 exam paper - nov10
 
Media Evaluation
Media EvaluationMedia Evaluation
Media Evaluation
 

Semelhante a June 09 MS3

Nov 09 MS12
Nov 09 MS12Nov 09 MS12
Nov 09 MS12Samimvez
 
Nov 09 MS11
Nov 09 MS11Nov 09 MS11
Nov 09 MS11Samimvez
 
June 07 MS1
June 07 MS1June 07 MS1
June 07 MS1Samimvez
 
June 07 MS3
June 07 MS3June 07 MS3
June 07 MS3Samimvez
 
June 09 MS1
June 09 MS1June 09 MS1
June 09 MS1Samimvez
 
June 08 MS3
June 08 MS3June 08 MS3
June 08 MS3Samimvez
 
June 05 MS3
June 05 MS3June 05 MS3
June 05 MS3Samimvez
 
Nov 08 MS1
Nov 08 MS1Nov 08 MS1
Nov 08 MS1Samimvez
 
Nov 07 MS1
Nov 07 MS1Nov 07 MS1
Nov 07 MS1Samimvez
 
Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 1
Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 1Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 1
Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 1Alpro
 
Computing 9691 Mark Scheme for May / June 2007 Cambridge
Computing 9691 Mark Scheme for May / June 2007 CambridgeComputing 9691 Mark Scheme for May / June 2007 Cambridge
Computing 9691 Mark Scheme for May / June 2007 CambridgeAlpro
 
Mark Scheme for May June 2008 Question Paper Computing 9691 Computers Zimbabwe
Mark Scheme for May June 2008 Question Paper Computing 9691 Computers ZimbabweMark Scheme for May June 2008 Question Paper Computing 9691 Computers Zimbabwe
Mark Scheme for May June 2008 Question Paper Computing 9691 Computers ZimbabweAlpro
 
June 08 MS1
June 08 MS1June 08 MS1
June 08 MS1Samimvez
 
Nov 06 MS1
Nov 06 MS1Nov 06 MS1
Nov 06 MS1Samimvez
 
Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 3
Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 3Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 3
Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 3Alpro
 
June 04 MS
June 04 MSJune 04 MS
June 04 MSSamimvez
 
Nov 04 MS1
Nov 04 MS1Nov 04 MS1
Nov 04 MS1Samimvez
 
Nov 04 MS3
Nov 04 MS3Nov 04 MS3
Nov 04 MS3Samimvez
 
June 03 MS1
June 03 MS1June 03 MS1
June 03 MS1Samimvez
 
Computing 9691 Test Paper Question Paper Paper 3 (Written paper 3) for May / ...
Computing 9691 Test Paper Question Paper Paper 3 (Written paper 3) for May / ...Computing 9691 Test Paper Question Paper Paper 3 (Written paper 3) for May / ...
Computing 9691 Test Paper Question Paper Paper 3 (Written paper 3) for May / ...Alpro
 

Semelhante a June 09 MS3 (20)

Nov 09 MS12
Nov 09 MS12Nov 09 MS12
Nov 09 MS12
 
Nov 09 MS11
Nov 09 MS11Nov 09 MS11
Nov 09 MS11
 
June 07 MS1
June 07 MS1June 07 MS1
June 07 MS1
 
June 07 MS3
June 07 MS3June 07 MS3
June 07 MS3
 
June 09 MS1
June 09 MS1June 09 MS1
June 09 MS1
 
June 08 MS3
June 08 MS3June 08 MS3
June 08 MS3
 
June 05 MS3
June 05 MS3June 05 MS3
June 05 MS3
 
Nov 08 MS1
Nov 08 MS1Nov 08 MS1
Nov 08 MS1
 
Nov 07 MS1
Nov 07 MS1Nov 07 MS1
Nov 07 MS1
 
Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 1
Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 1Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 1
Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 1
 
Computing 9691 Mark Scheme for May / June 2007 Cambridge
Computing 9691 Mark Scheme for May / June 2007 CambridgeComputing 9691 Mark Scheme for May / June 2007 Cambridge
Computing 9691 Mark Scheme for May / June 2007 Cambridge
 
Mark Scheme for May June 2008 Question Paper Computing 9691 Computers Zimbabwe
Mark Scheme for May June 2008 Question Paper Computing 9691 Computers ZimbabweMark Scheme for May June 2008 Question Paper Computing 9691 Computers Zimbabwe
Mark Scheme for May June 2008 Question Paper Computing 9691 Computers Zimbabwe
 
June 08 MS1
June 08 MS1June 08 MS1
June 08 MS1
 
Nov 06 MS1
Nov 06 MS1Nov 06 MS1
Nov 06 MS1
 
Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 3
Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 3Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 3
Computing 9691 Mark Scheme for May / June 2007 Cambridge Paper 3
 
June 04 MS
June 04 MSJune 04 MS
June 04 MS
 
Nov 04 MS1
Nov 04 MS1Nov 04 MS1
Nov 04 MS1
 
Nov 04 MS3
Nov 04 MS3Nov 04 MS3
Nov 04 MS3
 
June 03 MS1
June 03 MS1June 03 MS1
June 03 MS1
 
Computing 9691 Test Paper Question Paper Paper 3 (Written paper 3) for May / ...
Computing 9691 Test Paper Question Paper Paper 3 (Written paper 3) for May / ...Computing 9691 Test Paper Question Paper Paper 3 (Written paper 3) for May / ...
Computing 9691 Test Paper Question Paper Paper 3 (Written paper 3) for May / ...
 

Mais de Samimvez (20)

Sql installation tutorial
Sql installation tutorialSql installation tutorial
Sql installation tutorial
 
Example2
Example2Example2
Example2
 
Labsheet 3
Labsheet 3Labsheet 3
Labsheet 3
 
Labsheet 3,5
Labsheet 3,5Labsheet 3,5
Labsheet 3,5
 
EQ V3x
EQ V3xEQ V3x
EQ V3x
 
Eq v2
Eq v2Eq v2
Eq v2
 
3.6
3.63.6
3.6
 
3.2
3.23.2
3.2
 
3.10
3.103.10
3.10
 
3.1
3.13.1
3.1
 
3.3
3.33.3
3.3
 
3.8
3.83.8
3.8
 
3.4
3.43.4
3.4
 
3.7
3.73.7
3.7
 
3.5
3.53.5
3.5
 
3.9
3.93.9
3.9
 
June 02 MS2
June 02 MS2June 02 MS2
June 02 MS2
 
June 05 MS2
June 05 MS2June 05 MS2
June 05 MS2
 
June 09 P1
June 09 P1June 09 P1
June 09 P1
 
Nov 05 P2
Nov 05 P2Nov 05 P2
Nov 05 P2
 

Último

Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 

Último (20)

Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 

June 09 MS3

  • 1. UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS GCE Advanced Level MARK SCHEME for the May/June 2009 question paper for the guidance of teachers 9691 COMPUTING 9691/03 Paper 3 (Written Paper 3), maximum raw mark 90 This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the details of the discussions that took place at an Examiners’ meeting before marking began, which would have considered the acceptability of alternative answers. Mark schemes must be read in conjunction with the question papers and the report on the examination. • CIE will not enter into discussions or correspondence in connection with these mark schemes. CIE is publishing the mark schemes for the May/June 2009 question papers for most IGCSE, GCE Advanced Level and Advanced Subsidiary Level syllabuses and some Ordinary Level syllabuses. www.xtremepapers.net
  • 2. Page 2 Mark Scheme: Teachers’ version Syllabus Paper GCE A LEVEL – May/June 2009 9691 03 1 -File/Storage -Save to another folder/create folders for different types of message. -Replying -Can send a reply with address automatically put in -Copying/Forwarding/multiple forwarding -Make a copy of the message forward it to another/many person (using their address/book)/No need to retype the message -(Automatic) deletion -Remove message from box (after reading it to free up space)/to make space -Blocking -If message is unsolicited or unwelcome then arrange for provider to block future messages from that address. -Mark as Read/Unread -To ensure message remains in box/for future reference -Mark as important/high priority -To ensure message does not get ignored. -Sorting/Grouping -According to time received/sender/subject/… (Up to 2 per type, max 4 types, max 8) [8] 2 (a) (i) -Data and methods are kept together/Data can only be accessed using the methods attached to it. [1] (ii) -Computer told facts and rules and then manipulates them to provide answers to queries. [1] (b) (i) -Also known as top-down design -Split original problem into smaller parts -Continue splitting into smaller and smaller parts until… -Each part can be considered to be a single process. (1 per -, max 2) [2] (ii) -A procedure/small section of code… -which returns a specific value -The value is returned whenever the function name appears/acting just like a variable name. (1 per -, max 2) [2] (c) Repeat Compare new value with root value -If > root value then follow right subtree -Else follow left subtree -Until no subtree -Insert new value as root of new subtree. (1 per -, max 4) (Allow symmetric algorithm) [4] © UCLES 2009 www.xtremepapers.net
  • 3. Page 3 Mark Scheme: Teachers’ version Syllabus Paper GCE A LEVEL – May/June 2009 9691 03 (d) (i) -Used to combine already compiled procedures -with compiled program… -to create an executable file. -Deals with external references. (ii) -Copies object code into… -(primary) memory ready for execution. -Deals with addressing anomalies, -particularly relocatable addressing (1 per -, max 2 per dotty, max 4) [4] 3 (a) -Goods offered for sale on electronic communication medium/Internet -Buyer orders goods by providing personal information on Internet.. -including bank account/credit card/other payment details. -data transfer must be secure -that firm offering goods is genuine -that buyer is genuine -Goods dispatched to purchaser after payment checked. (1 per -, max 3) [3] (b) -Enlarges market… -now worldwide rather than just local base. -Opens up richer markets where higher prices can be charged. -Sells 24/7 -No need for expensive overheads -No need to employ large number of sales staff (1 per -, max 4) [4] 4 (a) CUSTOMER ACCOUNT [1] (b) (i) Many to many. [1] (ii) ACCOUNT LINK STOCK Marks: -Use of Link table with sensible and descriptive name -ACCOUNT to LINK is One to Many -LINK to STOCK is Many to ONE. (1 per -, max 2) [2] © UCLES 2009 www.xtremepapers.net
  • 4. Page 4 Mark Scheme: Teachers’ version Syllabus Paper GCE A LEVEL – May/June 2009 9691 03 (c) (i) -A unique identifier for a record -e.g. Customer ID. [2] (ii) A field/item, not the primary key, offering an alternative identification for the record (not necessarily unique.) -e.g. Postal area (to arrange delivery schedules). [2] (iii) -A field/item in one table which is a primary key in another table/acts as a link between tables. -Account number in customer table links records to relevant account in account table. [2] (d) -Confidential/Personal data of a sensitive type. -Will have guaranteed privacy of data to customers. -Must comply with legislation protecting data. -Do not want to lose any data or have data maliciously altered/used Important to maintain data integrity. -Passwords to get onto system… -and into different tables… -in hierarchical fashion… -giving different access rights/RO or RW… -and providing different views of the data -Physical protection by (e.g.) locking system terminals away/iris recognition/fingerprints/…. -Protecting system with firewalls etc. (1 per -, max 6) [6] 5 (a) -Concept of a stored program -Instructions and data use the same (primary) memory -Use of a single processor -Follows a sequential set of instructions. (1 per -, max 3) [3] (b) (i) -201/202 (Sensible value) -because, once sent to MAR the value in the PC is incremented [2] (ii) -The result of a jump instruction which… -requires that the next instruction is not to be handled in sequence/specifically, that held in 180. [2] 6 (a) (i) 11011010 (ii) 10100110 (1 per dotty) [2] (b) (i) -The fractional part of the representation -Place value of MSB is –1… -remainder of bits are ½, ¼… -Holds the magnitude of the data. (1 per -, max 2) [2] © UCLES 2009 www.xtremepapers.net
  • 5. Page 5 Mark Scheme: Teachers’ version Syllabus Paper GCE A LEVEL – May/June 2009 9691 03 (ii) -Is a two’s complement integer which… -holds the power of 2… -by which the mantissa must be multiplied... -to give the original value. (1 per -, max 2) [2] (iii) 0.0101011 * 10 ^ 0101 = 1010.11 =8+2+½+¼ Alternative: 10 = 1010 and .75 = .11 10.75 = 00101011 x 10^101 Point moves 5 places (1 per line, max 3) [3] (iv) 01010110 0100 (1 for mantissa, 1 for exponent) [2] 7 (a) -A series of bars representing time to be taken on… -the different tasks which are needed to produce the system… -and relative timings of tasks. -Shows when different resources are going to be required/when they should be booked. -Also shows reliance of one task on the completion of another. -Will show how long the whole system should take to complete. (1 per -, max 4) [4] (b) -A series of manuals to explain the software… -in printed form and/or on screen. -Overview of package/contents page/index/glossary/… -Sample inputs/outputs. -Explanation of error messages. -Installation of software/hardware. -Quick reference guide. -How to carry out simple maintenance (like reloading a till roll). (1 per -, max 6) [6] 8 (a) -Cheaper than waiting until real thing is built -May be impossible to alter things after building -Safer than testing in real life, e.g. evacuation procedures, using real people. -Impossible to carry out some tests, e.g. burning building down, when building complete. (1 per -, max 3) [3] © UCLES 2009 www.xtremepapers.net
  • 6. Page 6 Mark Scheme: Teachers’ version Syllabus Paper GCE A LEVEL – May/June 2009 9691 03 (b) (i) -Width of aisles.. -to be able to assess the number of people who can use the aisle at once. -Number of people in store… -evacuation times will depend on number of people. -Position of exits… -relative to groupings of people. -Number of exits… -should be kept as low as is safe, for security reasons. -Position of fire/spread of fire… -different positions will dictate flow of people/speed of spread. -Positions of different areas in store (e.g. bakery)… -some areas will attract crowds of shoppers. -Time taken for emergency services to arrive -expert help will alleviate the situation (1 per -, max 3 variables, max 6) [6] (ii) -Large quantities of data … -all interrelating with each other… -because some outcomes rely on outcomes of others. -Large quantities of processing required (1 per -, max 2) [2] 9 -Interrupt given a priority -Placed in queue with other interrupts to be done… -according to priority. -When it becomes the highest priority interrupt it is dealt with -Contents of special registers are placed on a stack/saved -Interrupt (and others) dealt with -values read from stack into special registers. -Check for interrupt(s) at end of each cycle before fetching next instruction -Vectored interrupts (1 per -, max 6) [6] © UCLES 2009 www.xtremepapers.net