Zagazig University, Faculty of Engineering, Mechanical Power Division ,1978.
Personal Data:
Certified Consultant Mechanical Engineer, Water Works specialist.
Job Title:
Saleh Abdulrahman Ahmed Curriculum Vitae
Name: Saleh Abdulrahman Ahmad Saleh.
Mobile: +966 50 323 5567 - Riyadh.
Email: engsaleh@ymail.com
Nationality: Egyptian.
Education:
In 1979, I joined the Egyptian military service as an officer Engineer at fuel Corps. I was a
leader of equipment maintenance workshop .
In 1982, I worked as a site engineer in the natural gas sector in Cairo at William Press
Group (was leading British engineering business which merged with Leonard Fairclough & Son
to become a FTSE 100 Company).
I work for thirty years in the water works sector at Saudi Arabia and participated in the
development and expansion of AlKharj city and its suburbs water infrastructure such as
artesian and Shallow wells, desalination and treatment plants, pumping and booster stations,
and all other Water infrastructure mechanical and electrical elements.
AlKharj Integrated Water project
The objective of the project is to Feeding AlKharj city and its suburbs with desalinated water
from one central project by reverse osmosis technology. The project is on two phases . The
total capacity of the project is 100,000 cubic meters per day. The first phase costs 400 million S.R..
Responsibilities:
1) Participated in the preparation Committee of the project
2) Member of supervising Committee that was following up the project implementation.
3) Preparing studies of water quality and developing of submersible pumps specs.
4) Introducing a proposal and required designs to linking existed shallow wells to the new
project and designing pumping stations required for this.
5) Introducing a proposal and required designs to develop and update the water tower to
link it to the project.
6) Member of the committee that is testing the use of Nanotech Ceramic membranes and
Following up the test project and making reports to use this technology in the integrated
Water project.
7) Supervising the implementation of the project , the digging of the project's deep wells,
the pipelines that linking them to the project.
8) Member of the project handover committee.
9) Supervising the operation of the project and its maintenance.
Membership
- Certified Consultant Mechanical Engineer by the Saudi Council Of Engineers .
- Membership of The Egyptian Syndicate of Engineers.
Career Achievements and Experiences:
2
Saleh Abdulrahman Ahmed Curriculum Vitae
AlKharj Western Suburbs Water Pumping Station
The objective of the project is to facing the urban expansion in the city western suburbs which
is on a higher level than the rest of the city. The capacity of the project is 24,000 cubic meters
per day. It took one year and half to complete the project.
Responsibilities:
1) Introducing a proposal and preparing studies.
2) Preparing required designs and writing specs for the station and the connecting pipelines.
3) managing the implementation process of the project and the installation of all equipments
and pipelines.
AlKharj Main Water Pumping Station Development
The objective of the development is to increase the pumping capacity from 40,000 to 75,000
cubic meters per day which enable the pumping to the water tower and covering AlKharj
southern neighborhoods. The project costs 8 million S. R..
Responsibilities:
1) Introducing a proposal and preparing studies.
2) Writing specs for all electrical and mechanical equipments.
3) Supervising the implementation process.
Facing The Risk of Effects and Dangers of Rains and Floods That Have Occurred AlKharj
Province in Late 2003
Member of the team who helped effectively in preventing effects and dangers of floods and
rains that have occurred AlKharj province in late 2003 and Maintain the continuation of pumping
water to the city.
AlKharj Water Tower Rehabilitation Project
After a flood in 2003, the basement of AlKharj water tower was Fully damaged including
installations and equipments. A committee was formed to determine the damages. The cost
of Rehabilitation was 10 million S.R..
Responsibilities:
1) Member of the Committee that was Responsible for determining the damage.
2) Writing specs for all electrical installations and mechanical equipments for the
rehabilitation.
3) Supervising the Rehabilitation process.
AlKharj Water Project Emergency Plan During The Liberation War of Kuwait 1991
Responsibilities:
1) A member of the team that was responsible for developing an emergency plan for
AlKharj water project.
2) A part of the emergency team work that was responsible for the Implementation of the
Emergency plan in AlKharj water project.
3
Saleh Abdulrahman Ahmed Curriculum Vitae
AlKharj Water Project Resources Expansion
The objective of the project was to facing the growing need of water.
Responsibilities:
1) Proposing new sites for wells and providing its Plans and designs.
2) Preparing required designs and writing specs for drilling, equipments and connecting
pipelines.
3) Leading the team to implement these expansions including wells digging, equipment
installing and connecting pipelines.
4) Leading the team to operate these expansions and its maintenance.
Development of AlHariq Province Water Project
The objective of the Development was to facing the urban expansion of the province.
Responsibilities:
1) Introducing a proposal and preparing studies.
2) Writing specs for equipments and installations.
3) Supervising the implementation process.
Resolving Alhayathem and Aldelam Project Problem of Pollution
Responsibilities:
1) Preparing required designs and studies to resolve the problem of pollution at Alhayathem
and Aldelam project.
2) Leading a team for maintenance and installation of equipments, electricity and pipelines.
AlHayathem and AlDelam Water Project Rehabilitation
Leading a team to make a comprehensive maintenance for pumps and equipments in Aldelam
and Alhayathem water project.
MiniProjects in Several Villages and Hamlets
Establish a set of mini-projects in several villages and Hamlets.
Responsibilities:
1) Introducing a proposals and preparing studies.
2) Writing specs for equipments and installations.
3) Supervising the implementation process.
4) Leading the team to operate these mini-projects and its maintenance.
Assigned to resolve problems of other water projects outside AlKharj
Responsibilities:
1) Introducing proposals, preparing studies and provide designs to resolve problems
of other water projects outside AlKharj .
2) Leading the team to implement these solutions.
4
Saleh Abdulrahman Ahmed Curriculum Vitae
Technical Consultancy
Providing technical consultancy and studies to resolve water problems for other
organizations, for example, AlKharj Military base and Military Factories.
Operating and Maintaining Plants and Wells
Responsibilities:
1) Leading a team over 28 years for the operation and maintenance of mechanical and
electrical equipments from wells, pumping stations and treatment plants.
2) Preparing studies to develop the project and to address problems and expansions.
3) Propose solutions to network problems and implementation of water and water delivery
to all areas of the city of AlKharj
4) Writing specs for equipments and installations of the network like pumping stations,
booster stations, wells etc..
5) Manufacture of some spare parts locally as an alternative to equipment spare parts for
modifications and upgrading.
6) Managing teams to implement these elements.
7) Designing an integrated software for following up, maintenance, reporting , writing specs
and spare parts request.

Mais conteúdo relacionado

Destaque (8)

Dr. Eng. Mohammed Darsi Abdulrahman Nedham
Dr. Eng. Mohammed Darsi Abdulrahman NedhamDr. Eng. Mohammed Darsi Abdulrahman Nedham
Dr. Eng. Mohammed Darsi Abdulrahman Nedham
 
cv ahmed farid
cv ahmed faridcv ahmed farid
cv ahmed farid
 
CV_ABDULRAHMAN_MANSOUR_ALSAYYAR
CV_ABDULRAHMAN_MANSOUR_ALSAYYARCV_ABDULRAHMAN_MANSOUR_ALSAYYAR
CV_ABDULRAHMAN_MANSOUR_ALSAYYAR
 
Cv kareim 2
Cv kareim 2Cv kareim 2
Cv kareim 2
 
Khalid CV
Khalid CVKhalid CV
Khalid CV
 
Maged Mohamed Amr Shehata CV - updated (2)-2
Maged Mohamed Amr Shehata CV - updated (2)-2Maged Mohamed Amr Shehata CV - updated (2)-2
Maged Mohamed Amr Shehata CV - updated (2)-2
 
CV 4 ME
CV 4 MECV 4 ME
CV 4 ME
 
CV Ghulam Farid 25.08.15
CV Ghulam Farid 25.08.15CV Ghulam Farid 25.08.15
CV Ghulam Farid 25.08.15
 

Semelhante a Saleh_Abdulrahman_Cv

Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al ObaidyAli Alobaidy
 
CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0Ibrahim Anwer
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L NBasavaraj L N
 
Hashim Majeed CV 280116
Hashim Majeed CV 280116Hashim Majeed CV 280116
Hashim Majeed CV 280116Majeed Hashim
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)Hassan Halhoul
 
Epw. Cv. Doc 2010 A1
Epw. Cv.  Doc  2010 A1Epw. Cv.  Doc  2010 A1
Epw. Cv. Doc 2010 A1Ted Warren
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)NABIL NASSAR
 
PPT Gurudev PU Clg_24-01-2023 (1).pptx
PPT Gurudev PU Clg_24-01-2023 (1).pptxPPT Gurudev PU Clg_24-01-2023 (1).pptx
PPT Gurudev PU Clg_24-01-2023 (1).pptxshrutik57
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHesham Fathy, PMP
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15Greg Clifford
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghalyaladin ghaly
 

Semelhante a Saleh_Abdulrahman_Cv (20)

Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0
 
Saeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer UtilitiesSaeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer Utilities
 
My Cv 05-2014
My Cv 05-2014My Cv 05-2014
My Cv 05-2014
 
En c.v
En c.v En c.v
En c.v
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L N
 
Hashim Majeed CV 280116
Hashim Majeed CV 280116Hashim Majeed CV 280116
Hashim Majeed CV 280116
 
CV
CVCV
CV
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
CVupdatedNF
CVupdatedNFCVupdatedNF
CVupdatedNF
 
Epw. Cv. Doc 2010 A1
Epw. Cv.  Doc  2010 A1Epw. Cv.  Doc  2010 A1
Epw. Cv. Doc 2010 A1
 
Mina Ezzat CV
Mina Ezzat CVMina Ezzat CV
Mina Ezzat CV
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)
 
PPT Gurudev PU Clg_24-01-2023 (1).pptx
PPT Gurudev PU Clg_24-01-2023 (1).pptxPPT Gurudev PU Clg_24-01-2023 (1).pptx
PPT Gurudev PU Clg_24-01-2023 (1).pptx
 
Leslie Lopena_CV
Leslie Lopena_CVLeslie Lopena_CV
Leslie Lopena_CV
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 

Saleh_Abdulrahman_Cv

  • 1. 1 Zagazig University, Faculty of Engineering, Mechanical Power Division ,1978. Personal Data: Certified Consultant Mechanical Engineer, Water Works specialist. Job Title: Saleh Abdulrahman Ahmed Curriculum Vitae Name: Saleh Abdulrahman Ahmad Saleh. Mobile: +966 50 323 5567 - Riyadh. Email: engsaleh@ymail.com Nationality: Egyptian. Education: In 1979, I joined the Egyptian military service as an officer Engineer at fuel Corps. I was a leader of equipment maintenance workshop . In 1982, I worked as a site engineer in the natural gas sector in Cairo at William Press Group (was leading British engineering business which merged with Leonard Fairclough & Son to become a FTSE 100 Company). I work for thirty years in the water works sector at Saudi Arabia and participated in the development and expansion of AlKharj city and its suburbs water infrastructure such as artesian and Shallow wells, desalination and treatment plants, pumping and booster stations, and all other Water infrastructure mechanical and electrical elements. AlKharj Integrated Water project The objective of the project is to Feeding AlKharj city and its suburbs with desalinated water from one central project by reverse osmosis technology. The project is on two phases . The total capacity of the project is 100,000 cubic meters per day. The first phase costs 400 million S.R.. Responsibilities: 1) Participated in the preparation Committee of the project 2) Member of supervising Committee that was following up the project implementation. 3) Preparing studies of water quality and developing of submersible pumps specs. 4) Introducing a proposal and required designs to linking existed shallow wells to the new project and designing pumping stations required for this. 5) Introducing a proposal and required designs to develop and update the water tower to link it to the project. 6) Member of the committee that is testing the use of Nanotech Ceramic membranes and Following up the test project and making reports to use this technology in the integrated Water project. 7) Supervising the implementation of the project , the digging of the project's deep wells, the pipelines that linking them to the project. 8) Member of the project handover committee. 9) Supervising the operation of the project and its maintenance. Membership - Certified Consultant Mechanical Engineer by the Saudi Council Of Engineers . - Membership of The Egyptian Syndicate of Engineers. Career Achievements and Experiences:
  • 2. 2 Saleh Abdulrahman Ahmed Curriculum Vitae AlKharj Western Suburbs Water Pumping Station The objective of the project is to facing the urban expansion in the city western suburbs which is on a higher level than the rest of the city. The capacity of the project is 24,000 cubic meters per day. It took one year and half to complete the project. Responsibilities: 1) Introducing a proposal and preparing studies. 2) Preparing required designs and writing specs for the station and the connecting pipelines. 3) managing the implementation process of the project and the installation of all equipments and pipelines. AlKharj Main Water Pumping Station Development The objective of the development is to increase the pumping capacity from 40,000 to 75,000 cubic meters per day which enable the pumping to the water tower and covering AlKharj southern neighborhoods. The project costs 8 million S. R.. Responsibilities: 1) Introducing a proposal and preparing studies. 2) Writing specs for all electrical and mechanical equipments. 3) Supervising the implementation process. Facing The Risk of Effects and Dangers of Rains and Floods That Have Occurred AlKharj Province in Late 2003 Member of the team who helped effectively in preventing effects and dangers of floods and rains that have occurred AlKharj province in late 2003 and Maintain the continuation of pumping water to the city. AlKharj Water Tower Rehabilitation Project After a flood in 2003, the basement of AlKharj water tower was Fully damaged including installations and equipments. A committee was formed to determine the damages. The cost of Rehabilitation was 10 million S.R.. Responsibilities: 1) Member of the Committee that was Responsible for determining the damage. 2) Writing specs for all electrical installations and mechanical equipments for the rehabilitation. 3) Supervising the Rehabilitation process. AlKharj Water Project Emergency Plan During The Liberation War of Kuwait 1991 Responsibilities: 1) A member of the team that was responsible for developing an emergency plan for AlKharj water project. 2) A part of the emergency team work that was responsible for the Implementation of the Emergency plan in AlKharj water project.
  • 3. 3 Saleh Abdulrahman Ahmed Curriculum Vitae AlKharj Water Project Resources Expansion The objective of the project was to facing the growing need of water. Responsibilities: 1) Proposing new sites for wells and providing its Plans and designs. 2) Preparing required designs and writing specs for drilling, equipments and connecting pipelines. 3) Leading the team to implement these expansions including wells digging, equipment installing and connecting pipelines. 4) Leading the team to operate these expansions and its maintenance. Development of AlHariq Province Water Project The objective of the Development was to facing the urban expansion of the province. Responsibilities: 1) Introducing a proposal and preparing studies. 2) Writing specs for equipments and installations. 3) Supervising the implementation process. Resolving Alhayathem and Aldelam Project Problem of Pollution Responsibilities: 1) Preparing required designs and studies to resolve the problem of pollution at Alhayathem and Aldelam project. 2) Leading a team for maintenance and installation of equipments, electricity and pipelines. AlHayathem and AlDelam Water Project Rehabilitation Leading a team to make a comprehensive maintenance for pumps and equipments in Aldelam and Alhayathem water project. MiniProjects in Several Villages and Hamlets Establish a set of mini-projects in several villages and Hamlets. Responsibilities: 1) Introducing a proposals and preparing studies. 2) Writing specs for equipments and installations. 3) Supervising the implementation process. 4) Leading the team to operate these mini-projects and its maintenance. Assigned to resolve problems of other water projects outside AlKharj Responsibilities: 1) Introducing proposals, preparing studies and provide designs to resolve problems of other water projects outside AlKharj . 2) Leading the team to implement these solutions.
  • 4. 4 Saleh Abdulrahman Ahmed Curriculum Vitae Technical Consultancy Providing technical consultancy and studies to resolve water problems for other organizations, for example, AlKharj Military base and Military Factories. Operating and Maintaining Plants and Wells Responsibilities: 1) Leading a team over 28 years for the operation and maintenance of mechanical and electrical equipments from wells, pumping stations and treatment plants. 2) Preparing studies to develop the project and to address problems and expansions. 3) Propose solutions to network problems and implementation of water and water delivery to all areas of the city of AlKharj 4) Writing specs for equipments and installations of the network like pumping stations, booster stations, wells etc.. 5) Manufacture of some spare parts locally as an alternative to equipment spare parts for modifications and upgrading. 6) Managing teams to implement these elements. 7) Designing an integrated software for following up, maintenance, reporting , writing specs and spare parts request.