Village of Mount Pleasant – Storm Water Utility
       Pike River Improvements Project
Pike River Improvements Project

• Project is divided into 9 phases
• Each Phase is approximately ½ mile in
  length, stretching over 5 miles through the
  Village of Mt. Pleasant
• Construction began in 2001
• Phases 1-5 are complete
• Phase 6 is currently being constructed
Pike River Improvements Phasing
                •   Municipal Boundary

                •   Phase Limits

                •   Watershed Boundary

                •   Major Roadways
Pike River: Pre-project Conditions
             Phase 8
Primary Goals
• Flood Control with Expansion of Flood
  Channel to Keep Flooding within Corridor.
• Restoration of Riverine Corridor with
  Buffer Strips.
• Restoration of Aquatic Habitat with In-
  Steam Habitat Structures and Improved
  Substrate.
• Recreational Corridor Development with
  Trails
• Water Quality/TSS Removal
Flood Control
• Each Phase involves expansion of the
  flood channel to control floodwaters.
• Three Phases (Phase 1, 4 & 9) also
  include large flood storage areas.
• Construction of Phases 1-3 resulted in
  complete or partial release of floodplain
  restriction on over 120 properties.
Phase 1 Before & After
Flooding on Willow Road
      August 2007
Residential Flooding
   August 2007
Phase 4a Construction – Aug. 2007
       Flood Storage Area
Phase 4a Construction – Aug 2007
  Flood Storage Area - Flooded
Habitat Restoration
• Village works closely with various biologists and
  DNR staff to restore habitat within the Pike River
  corridor.
• Native prairie and wetland plantings are typical
  throughout the corridor with annual monitoring
  and invasive species control.
• Reconstructed stream provides more natural
  habitat (meanders, fish habitat structures, etc.).
• Annual monitoring of stream conditions (UWM)
  conducted to monitor impact of to-date
  construction and plan for future Phases.
Prairie Restoration
Pike River Pathway
Recreational Corridor Development
                  • Over 4 miles of multi-
                    use, off-road bike trail
                    constructed to-date
                    throughout the corridor.
                  • Trails are open to the
                    public year-round.
                  • River corridor provides
                    wealth of additional
                    passive and active
                    recreation opportunities.
                  • Unlimited access to the
                    river.
Water Quality/TSS Removal
• Water quality ponds constructed throughout
  the corridor at points of in-flow of runoff.
• Newly constructed flood channel banks with
  gentle (4:1) slopes and upland vegetated
  buffers.
• New development and re-development
  must meet NR 151 requirements.
Phase 4 Water Quality Ponds
Typical New Channel Section
Phases 8 & 9
Prescribed Burn
Pike River
Fish Monitoring
Pike River Restoration:
                                          Fish Improvement
                            40
                             0                                                                                                80%
                                                                                                                                %
                                        Non-Restored
                                                   d                   Phase 1
                                        Restored
                                               d
                            35
                             5                                        Completed                                               70%
                                                                                                                                %
                                        Improvement t

                            30
                             0                                                                                                60%
                                                                                                                                %




                                                                                                                                    Rela ve Improvement (%)
                                                                                                                                                      t )
                            25
                             5                                                                                                50%
                                                                                                                                %
Fish Bio c Inegrity (IBI)
                        )




                            20
                             0                                                                                                40%
                                                                                                                                %
                  y




                                                                                                                                          e
                            15
                             5                                                                                                30%
                                                                                                                                %



                            10
                             0                                                                                                20%
                                                                                                                                %
   h




                            5                                                                                                 10%
                                                                                                                                %



                            0                                                                                                 0%
                                                                                                                               %
                                 1990
                                    0   1993
                                           3   1994
                                                  4     2000
                                                           0   2001
                                                                  1   2002
                                                                         2   2003
                                                                                3   2004
                                                                                       4   2005
                                                                                              5   2006
                                                                                                     6   2007
                                                                                                            7   2008
                                                                                                                   8   2009
                                                                                                                          9

                                                                             Year
                                                                                r
                                                                                r
2011 and Beyond
• Phases 6-9 are scheduled for completion
  within the next 5-6 years
• Over $3 million in grant monies have been
  received to date for construction, land
  acquisition, etc.
• Project costs to date are approximately
  $11 M with total projected cost about $18
  M.
• Currently 300 acres acquired, projected
  total corridor about 450 acres.
Pike River Contact Information
• Mount Pleasant Storm Water Utility: 3 Members
  Sonny Havn – Village Trustee & President,
  George Vanhaverbeke, Joe Mandala
• Storm Water Contact: Mr. Tony Beyer, Water
  Systems Engineer (262-664-7849 or
  tbeyer@mtpleasantwi.gov ).
• Engineering Department: Mr. Bill Sasse, P.E.,
  Director of Engineering (262-664-7833 or
  bsasse@mtpleasantwi.gov ).

Mais conteúdo relacionado

Mais de Sweet Water

Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert MonnatClean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert MonnatSweet Water
 
Clean Rivers, Clean Lake 8 -- Restorative Economics -- Matt Howard
Clean Rivers, Clean Lake 8 -- Restorative Economics -- Matt HowardClean Rivers, Clean Lake 8 -- Restorative Economics -- Matt Howard
Clean Rivers, Clean Lake 8 -- Restorative Economics -- Matt HowardSweet Water
 
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources --  Robert MonnatClean Rivers, Clean Lake 8 -- Leveraging Resources --  Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert MonnatSweet Water
 
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey MenglerClean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey MenglerSweet Water
 
Clean Rivers, Clean Lake 8 -- Water Quality Trading -- Dennis Frame
Clean Rivers, Clean Lake 8 -- Water Quality Trading -- Dennis FrameClean Rivers, Clean Lake 8 -- Water Quality Trading -- Dennis Frame
Clean Rivers, Clean Lake 8 -- Water Quality Trading -- Dennis FrameSweet Water
 
Clean Rivers, Clean Lake 8 -- Nutrients Discharging from Drain Tiles -- Eric ...
Clean Rivers, Clean Lake 8 -- Nutrients Discharging from Drain Tiles -- Eric ...Clean Rivers, Clean Lake 8 -- Nutrients Discharging from Drain Tiles -- Eric ...
Clean Rivers, Clean Lake 8 -- Nutrients Discharging from Drain Tiles -- Eric ...Sweet Water
 
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben GramlingClean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben GramlingSweet Water
 
Clean Rivers, Clean Lake 8 -- New Projects on KK and Menomonee Rivers -- Dave...
Clean Rivers, Clean Lake 8 -- New Projects on KK and Menomonee Rivers -- Dave...Clean Rivers, Clean Lake 8 -- New Projects on KK and Menomonee Rivers -- Dave...
Clean Rivers, Clean Lake 8 -- New Projects on KK and Menomonee Rivers -- Dave...Sweet Water
 
Clean Rivers, Clean Lake 8 -- Ozaukee County Fishway -- Andrew Struck
Clean Rivers, Clean Lake 8 -- Ozaukee County Fishway -- Andrew StruckClean Rivers, Clean Lake 8 -- Ozaukee County Fishway -- Andrew Struck
Clean Rivers, Clean Lake 8 -- Ozaukee County Fishway -- Andrew StruckSweet Water
 
Clean Rivers, Clean Lake 8 -- River Walk Investment -- Alyssa Remington
Clean Rivers, Clean Lake 8 -- River Walk Investment -- Alyssa RemingtonClean Rivers, Clean Lake 8 -- River Walk Investment -- Alyssa Remington
Clean Rivers, Clean Lake 8 -- River Walk Investment -- Alyssa RemingtonSweet Water
 
Clean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura Bray
Clean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura BrayClean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura Bray
Clean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura BraySweet Water
 
Clean Rivers, Clean Lake 8 -- Business Successes on the Lower KK River -- Dav...
Clean Rivers, Clean Lake 8 -- Business Successes on the Lower KK River -- Dav...Clean Rivers, Clean Lake 8 -- Business Successes on the Lower KK River -- Dav...
Clean Rivers, Clean Lake 8 -- Business Successes on the Lower KK River -- Dav...Sweet Water
 
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision-- Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision--  Jeffrey MenglerClean Rivers, Clean Lake 8 -- Green Infrastructure Vision--  Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision-- Jeffrey MenglerSweet Water
 
Clean Rivers, Clean Lake 8 -- Smart Snow and Ice Removal -- Connie Fortin
Clean Rivers, Clean Lake 8 -- Smart Snow and Ice Removal -- Connie FortinClean Rivers, Clean Lake 8 -- Smart Snow and Ice Removal -- Connie Fortin
Clean Rivers, Clean Lake 8 -- Smart Snow and Ice Removal -- Connie FortinSweet Water
 
Clean Rivers, Clean Lake 8 -- Milwaukee's New I and I Reduction Project/ Zafa...
Clean Rivers, Clean Lake 8 -- Milwaukee's New I and I Reduction Project/ Zafa...Clean Rivers, Clean Lake 8 -- Milwaukee's New I and I Reduction Project/ Zafa...
Clean Rivers, Clean Lake 8 -- Milwaukee's New I and I Reduction Project/ Zafa...Sweet Water
 
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...Sweet Water
 
Clean Rivers, Clean Lake 8 -- Rainwater Harvesting/Residential - Sharon Adams
Clean Rivers, Clean Lake 8 -- Rainwater Harvesting/Residential - Sharon AdamsClean Rivers, Clean Lake 8 -- Rainwater Harvesting/Residential - Sharon Adams
Clean Rivers, Clean Lake 8 -- Rainwater Harvesting/Residential - Sharon AdamsSweet Water
 
Clean Rivers, Clean Lake 8 Rainwater Harvesting/organization - Tim Vargo
Clean Rivers, Clean Lake 8 Rainwater Harvesting/organization - Tim VargoClean Rivers, Clean Lake 8 Rainwater Harvesting/organization - Tim Vargo
Clean Rivers, Clean Lake 8 Rainwater Harvesting/organization - Tim VargoSweet Water
 
Clean Rivers, Clean Lake 8 - Rainwater Harvesting/business - Michael Betker
Clean Rivers, Clean Lake 8 - Rainwater Harvesting/business -  Michael BetkerClean Rivers, Clean Lake 8 - Rainwater Harvesting/business -  Michael Betker
Clean Rivers, Clean Lake 8 - Rainwater Harvesting/business - Michael BetkerSweet Water
 
Clean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy Frank
Clean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy FrankClean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy Frank
Clean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy FrankSweet Water
 

Mais de Sweet Water (20)

Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert MonnatClean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
 
Clean Rivers, Clean Lake 8 -- Restorative Economics -- Matt Howard
Clean Rivers, Clean Lake 8 -- Restorative Economics -- Matt HowardClean Rivers, Clean Lake 8 -- Restorative Economics -- Matt Howard
Clean Rivers, Clean Lake 8 -- Restorative Economics -- Matt Howard
 
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources --  Robert MonnatClean Rivers, Clean Lake 8 -- Leveraging Resources --  Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
 
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey MenglerClean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey Mengler
 
Clean Rivers, Clean Lake 8 -- Water Quality Trading -- Dennis Frame
Clean Rivers, Clean Lake 8 -- Water Quality Trading -- Dennis FrameClean Rivers, Clean Lake 8 -- Water Quality Trading -- Dennis Frame
Clean Rivers, Clean Lake 8 -- Water Quality Trading -- Dennis Frame
 
Clean Rivers, Clean Lake 8 -- Nutrients Discharging from Drain Tiles -- Eric ...
Clean Rivers, Clean Lake 8 -- Nutrients Discharging from Drain Tiles -- Eric ...Clean Rivers, Clean Lake 8 -- Nutrients Discharging from Drain Tiles -- Eric ...
Clean Rivers, Clean Lake 8 -- Nutrients Discharging from Drain Tiles -- Eric ...
 
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben GramlingClean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
 
Clean Rivers, Clean Lake 8 -- New Projects on KK and Menomonee Rivers -- Dave...
Clean Rivers, Clean Lake 8 -- New Projects on KK and Menomonee Rivers -- Dave...Clean Rivers, Clean Lake 8 -- New Projects on KK and Menomonee Rivers -- Dave...
Clean Rivers, Clean Lake 8 -- New Projects on KK and Menomonee Rivers -- Dave...
 
Clean Rivers, Clean Lake 8 -- Ozaukee County Fishway -- Andrew Struck
Clean Rivers, Clean Lake 8 -- Ozaukee County Fishway -- Andrew StruckClean Rivers, Clean Lake 8 -- Ozaukee County Fishway -- Andrew Struck
Clean Rivers, Clean Lake 8 -- Ozaukee County Fishway -- Andrew Struck
 
Clean Rivers, Clean Lake 8 -- River Walk Investment -- Alyssa Remington
Clean Rivers, Clean Lake 8 -- River Walk Investment -- Alyssa RemingtonClean Rivers, Clean Lake 8 -- River Walk Investment -- Alyssa Remington
Clean Rivers, Clean Lake 8 -- River Walk Investment -- Alyssa Remington
 
Clean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura Bray
Clean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura BrayClean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura Bray
Clean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura Bray
 
Clean Rivers, Clean Lake 8 -- Business Successes on the Lower KK River -- Dav...
Clean Rivers, Clean Lake 8 -- Business Successes on the Lower KK River -- Dav...Clean Rivers, Clean Lake 8 -- Business Successes on the Lower KK River -- Dav...
Clean Rivers, Clean Lake 8 -- Business Successes on the Lower KK River -- Dav...
 
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision-- Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision--  Jeffrey MenglerClean Rivers, Clean Lake 8 -- Green Infrastructure Vision--  Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision-- Jeffrey Mengler
 
Clean Rivers, Clean Lake 8 -- Smart Snow and Ice Removal -- Connie Fortin
Clean Rivers, Clean Lake 8 -- Smart Snow and Ice Removal -- Connie FortinClean Rivers, Clean Lake 8 -- Smart Snow and Ice Removal -- Connie Fortin
Clean Rivers, Clean Lake 8 -- Smart Snow and Ice Removal -- Connie Fortin
 
Clean Rivers, Clean Lake 8 -- Milwaukee's New I and I Reduction Project/ Zafa...
Clean Rivers, Clean Lake 8 -- Milwaukee's New I and I Reduction Project/ Zafa...Clean Rivers, Clean Lake 8 -- Milwaukee's New I and I Reduction Project/ Zafa...
Clean Rivers, Clean Lake 8 -- Milwaukee's New I and I Reduction Project/ Zafa...
 
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
 
Clean Rivers, Clean Lake 8 -- Rainwater Harvesting/Residential - Sharon Adams
Clean Rivers, Clean Lake 8 -- Rainwater Harvesting/Residential - Sharon AdamsClean Rivers, Clean Lake 8 -- Rainwater Harvesting/Residential - Sharon Adams
Clean Rivers, Clean Lake 8 -- Rainwater Harvesting/Residential - Sharon Adams
 
Clean Rivers, Clean Lake 8 Rainwater Harvesting/organization - Tim Vargo
Clean Rivers, Clean Lake 8 Rainwater Harvesting/organization - Tim VargoClean Rivers, Clean Lake 8 Rainwater Harvesting/organization - Tim Vargo
Clean Rivers, Clean Lake 8 Rainwater Harvesting/organization - Tim Vargo
 
Clean Rivers, Clean Lake 8 - Rainwater Harvesting/business - Michael Betker
Clean Rivers, Clean Lake 8 - Rainwater Harvesting/business -  Michael BetkerClean Rivers, Clean Lake 8 - Rainwater Harvesting/business -  Michael Betker
Clean Rivers, Clean Lake 8 - Rainwater Harvesting/business - Michael Betker
 
Clean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy Frank
Clean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy FrankClean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy Frank
Clean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy Frank
 

Último

MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusZilliz
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024The Digital Insurer
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Zilliz
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbuapidays
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 

Último (20)

MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 

Clean Rivers, Clean Lake 8 -- Pike River Restoration Success -- Bill Sasse

  • 1. Village of Mount Pleasant – Storm Water Utility Pike River Improvements Project
  • 2. Pike River Improvements Project • Project is divided into 9 phases • Each Phase is approximately ½ mile in length, stretching over 5 miles through the Village of Mt. Pleasant • Construction began in 2001 • Phases 1-5 are complete • Phase 6 is currently being constructed
  • 3. Pike River Improvements Phasing • Municipal Boundary • Phase Limits • Watershed Boundary • Major Roadways
  • 4. Pike River: Pre-project Conditions Phase 8
  • 5. Primary Goals • Flood Control with Expansion of Flood Channel to Keep Flooding within Corridor. • Restoration of Riverine Corridor with Buffer Strips. • Restoration of Aquatic Habitat with In- Steam Habitat Structures and Improved Substrate. • Recreational Corridor Development with Trails • Water Quality/TSS Removal
  • 6. Flood Control • Each Phase involves expansion of the flood channel to control floodwaters. • Three Phases (Phase 1, 4 & 9) also include large flood storage areas. • Construction of Phases 1-3 resulted in complete or partial release of floodplain restriction on over 120 properties.
  • 7. Phase 1 Before & After
  • 8. Flooding on Willow Road August 2007
  • 9. Residential Flooding August 2007
  • 10. Phase 4a Construction – Aug. 2007 Flood Storage Area
  • 11. Phase 4a Construction – Aug 2007 Flood Storage Area - Flooded
  • 12. Habitat Restoration • Village works closely with various biologists and DNR staff to restore habitat within the Pike River corridor. • Native prairie and wetland plantings are typical throughout the corridor with annual monitoring and invasive species control. • Reconstructed stream provides more natural habitat (meanders, fish habitat structures, etc.). • Annual monitoring of stream conditions (UWM) conducted to monitor impact of to-date construction and plan for future Phases.
  • 14.
  • 15.
  • 16.
  • 17.
  • 19. Recreational Corridor Development • Over 4 miles of multi- use, off-road bike trail constructed to-date throughout the corridor. • Trails are open to the public year-round. • River corridor provides wealth of additional passive and active recreation opportunities. • Unlimited access to the river.
  • 20. Water Quality/TSS Removal • Water quality ponds constructed throughout the corridor at points of in-flow of runoff. • Newly constructed flood channel banks with gentle (4:1) slopes and upland vegetated buffers. • New development and re-development must meet NR 151 requirements.
  • 21. Phase 4 Water Quality Ponds
  • 26. Pike River Restoration: Fish Improvement 40 0 80% % Non-Restored d Phase 1 Restored d 35 5 Completed 70% % Improvement t 30 0 60% % Rela ve Improvement (%) t ) 25 5 50% % Fish Bio c Inegrity (IBI) ) 20 0 40% % y e 15 5 30% % 10 0 20% % h 5 10% % 0 0% % 1990 0 1993 3 1994 4 2000 0 2001 1 2002 2 2003 3 2004 4 2005 5 2006 6 2007 7 2008 8 2009 9 Year r r
  • 27.
  • 28.
  • 29.
  • 30. 2011 and Beyond • Phases 6-9 are scheduled for completion within the next 5-6 years • Over $3 million in grant monies have been received to date for construction, land acquisition, etc. • Project costs to date are approximately $11 M with total projected cost about $18 M. • Currently 300 acres acquired, projected total corridor about 450 acres.
  • 31.
  • 32. Pike River Contact Information • Mount Pleasant Storm Water Utility: 3 Members Sonny Havn – Village Trustee & President, George Vanhaverbeke, Joe Mandala • Storm Water Contact: Mr. Tony Beyer, Water Systems Engineer (262-664-7849 or tbeyer@mtpleasantwi.gov ). • Engineering Department: Mr. Bill Sasse, P.E., Director of Engineering (262-664-7833 or bsasse@mtpleasantwi.gov ).

Notas do Editor

  1. This graph displays the Fish Biotic Integrity (IBI) within areas of the Pike River that were Restored and compares it to areas that were Unrestored (between the years 1990-2009). The mean Fish Biotic Integrity observed within the Non-Restored areas of the stream  Red Line The mean Fish Biotic Integrity observed within the Restored areas of the stream  Green Line The marked difference between the Restored and Non-Restored is shown in the Relative Improvement  Purple Line This graph shows that the restoration applied to the Pike River was having a positive effect on the Fish Biotic Integrity.