HASSELL
That BIM definition… again…g
Building information modelling (BIM) is the process of generating andBuilding information modelling (BIM) is the process of generating and
managing building data during the life cycle of the built structure.
It uses three-dimensional, real-time, dynamic building modelling software to
increase productivity in building design, construction and occupation.
The process produces the building information model (also abbreviated
BIM) which encompasses building geometry spatial relationshipsBIM), which encompasses building geometry, spatial relationships,
geographic information, quantities and properties of building components
and spaces.
Many forms of analysis can then be performed on this digital prototype
before it is actually physically built in its environment at great cost.
Alternative BIM definition
• Building Information Management is an
alternative description of BIM focussed
• Identification
• Design criteria
• Fabric & finishes
• Schedule of Areas
• Functional brief
• Equipment schedule
alternative description of BIM, focussed
on the management of information and
process.
• Once the design principles and project• Once the design principles and project
aspirations are identified, they should
drive how the BIM is developed, it’s
content and final use - the project team
need to be aware of this!
Briefing Rooms
• Information should develop integrally
within the design and the whole team
understand the needs and deliverablesFF&EValidation
at each project milestone.
• What information do our clients require
and when?• Generic arrangements
• Specialist areas
• Internal QA checks
• Specialist areas
• Schedules for Tender /
BofQ
• Brief vs. Design
• Client management
Space Planning Technologyp g gy
...is a general term used to describe software packages that:
o enable the briefing of facilities
o integrate briefing data with BIM’s
o generate reportsg p
o analysis of brief vs. design
o some functionality beyond design
o or the ability to export data downstreamo or the ability to export data downstream
Typical inputs + outputsyp p p
SPT in BIM
Revit does many things...
Modelling...
Documentation...
B i f i li tiBasis for visualisation...
Object orientedj
No object = no informationj
Alan Johnston Drawing a Shadowg
Alan Johnston used white walls as a
blank sheet of paper on which to base
his drawing He divided Galleries 1 2his drawing. He divided Galleries 1, 2
and 3 up into unequal frames, drawing
directly with a pencil onto the walls in
strips covering an area of about 2
square cm Navigating the cornerssquare cm. Navigating the corners,
recesses and architraves; the space
which is left is equally as important as
the space that he fills in; constantly
i th h i hmeasuring the shape in space, he
makes sculpture out of architecture.
Brief developmentp
BriefReview
DesignDesign
Review
Client
input
Areas of Focus
DATA CAPTURE
_Spaces
Location_Location
_Functional
_Finishes
Furniture_Furniture
_Equipment
_Services
_Door
Object orientedj
DATA CAPTURE
_Economy strength
_BIM Capability
_BIM Management Plans
Standards (BIM)_Standards (BIM)
_SPT Capability
Revit + BIM Link + RDB Link …
Revit + BIM Link + RDB Link …
Both are great tools, but have limitations
o enable the briefing of facilities
o integrate briefing data with BIM’s
o generate reports
analysis of brief vs designo analysis of brief vs. design
o some functionality beyond design
o or the ability to export data downstream
SPT main playersp y
A – Affinity (Trelligence)
B – BuildingOne
C – CodeBookC CodeBook
D – dRofus
Noteworthy…y
_Project Size
I t ti l U_International Use
_Years of Operation
_BIM Interoperability
_Organizational Size
Common groundg
_Each do many similar things
A 75% l_Approx 75% overlap
_Each has a unique point of difference
_Each has a bi-directional link to BIM
F d th i t t_Focus on rooms and their content
_Drive brief information into BIM
_Analyse the design against the brief
Overview Process (dRofus)( )
The iterative process of client requirement managementp q g
Standardized Requirements model
Exchange and present requirements in design tool
Exchange and compare design to requirementsExchange and compare design to requirements
Deviations trigger one of the following actions:
> Update design
> Update requirements
> Present delta
At handover Requirement=Design=As Built
All data exchange using open buildingSMART standardsg g p g
Detailed Workflow - SD
Detailed Workflow - DD
Detailed Workflow - CD
Typical / traditional deliverablesyp /
buildingSMARTg
Standard Pack of Deliverables
> 1:200 Generic Room Keyplan
> 1:50 Generic Room Layout Sheets (relevant to dept)
> Generic Room Data Sheets (relevant to dept)> Generic Room Data Sheets (relevant to dept)
> 1:100 GA setout plans
> 1:50 FF&E plans (key rooms for user review)
> 1:50 RLS drawings (key room for user review)
> Schedule of Accommodation (department)
> Room Data Sheets (key rooms for review in meeting)
> RDS excel extract (update in meeting, rather than markup)
> FF&E S h d l> FF&E Schedule
Revit considerations
Data Author –
BIM or SPT?BIM or SPT?
Map it out and
make sure the
team know
Shared or Systemy
b lSystem parameters – built in, for specific uses
Shared parameters – user defined, do anything!
Categoriesg
You may also choose to
t i huse categories such as
Communication Devices,
Data Devices, Fire
Alarm available withinAlarm... available within
the Building Design Suite
Unique selling pointq g p
Affinity – planning module
BuildingOne FM solutionBuildingOne – FM solution
CodeBook – works with multiple
design tools
dRofus – accessibilityy
Roles
Deliverables & Programmeg
Issuing Processg
INTEGRAL PART OF DESIGN PROCESS
_UPDATING / SYNCHRONISATION
_QA CHECKING
PRODUCTION OF INFORMATION_PRODUCTION OF INFORMATION
_PDF’ing
_UPLOADING
Implementation challengesp g
_BRIEF CAPTURE
CONCEPTUAL PLANNING_CONCEPTUAL PLANNING
_EASE OF USE
_AREA ANALYSIS
BIM INTEGRATION_BIM INTEGRATION
_INFORMATION MANAGEMENT
_EQUIPMENT VALIDATION
_ADDITIONAL SERVICES / FEES
_EXPORT TO COBie / FM
_ACCESS FROM MOBILE DEVICES
Advice?
Get training or embed a specialist in your team_Get training, or embed a specialist in your team
_Shoot the content re-designers, re-namer, that over model, over complicate....
_Know your project delivery requirements, define the deliverables, their format etc...
_define roles and define the Data Author
_Design what is important
Technology doesn’t stop bad work_Technology doesn t stop bad work
RTC slides from the past…
RTC slides from the past…
Questions?Questions?
Chris Razzell HASSELL

More Related Content

What's hot

Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group reportSyafiq Zariful
 
Bim White Paper 11 9 09
Bim White Paper 11 9 09Bim White Paper 11 9 09
Bim White Paper 11 9 09rsalbin
 
Software Application
Software ApplicationSoftware Application
Software Applicationkohwenqi
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information ModellingFARO_Europe
 
Building Energy parametric optimization / collaboration
Building Energy parametric optimization / collaborationBuilding Energy parametric optimization / collaboration
Building Energy parametric optimization / collaborationTero Järvinen
 
Software app slides
Software app slidesSoftware app slides
Software app slidesahmong4
 
Software Application Report
Software Application ReportSoftware Application Report
Software Application ReportShze Hwa Lee
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation SlidesShze Hwa Lee
 
Building information modeling
Building information modelingBuilding information modeling
Building information modelingPradeepa M
 
Software Application presentation slides
Software Application presentation slidesSoftware Application presentation slides
Software Application presentation slidesDoreen Yeo
 
Software report-complete-final
Software report-complete-finalSoftware report-complete-final
Software report-complete-finalYong Sy
 
How to Easily Read and Write CityGML Data Using FME
How to Easily Read and Write CityGML Data Using FME How to Easily Read and Write CityGML Data Using FME
How to Easily Read and Write CityGML Data Using FME Safe Software
 
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 16120111142420161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424Anshad cp
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1Timun Loh
 

What's hot (19)

Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group report
 
Bim White Paper 11 9 09
Bim White Paper 11 9 09Bim White Paper 11 9 09
Bim White Paper 11 9 09
 
Software Application
Software ApplicationSoftware Application
Software Application
 
What is BIM?
What is BIM?What is BIM?
What is BIM?
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information Modelling
 
PP1 report
PP1 reportPP1 report
PP1 report
 
Building Energy parametric optimization / collaboration
Building Energy parametric optimization / collaborationBuilding Energy parametric optimization / collaboration
Building Energy parametric optimization / collaboration
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Software assignment
Software assignmentSoftware assignment
Software assignment
 
BIM
BIMBIM
BIM
 
Software Application Report
Software Application ReportSoftware Application Report
Software Application Report
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 
Building information modeling
Building information modelingBuilding information modeling
Building information modeling
 
Software Application presentation slides
Software Application presentation slidesSoftware Application presentation slides
Software Application presentation slides
 
Software report-complete-final
Software report-complete-finalSoftware report-complete-final
Software report-complete-final
 
How to Easily Read and Write CityGML Data Using FME
How to Easily Read and Write CityGML Data Using FME How to Easily Read and Write CityGML Data Using FME
How to Easily Read and Write CityGML Data Using FME
 
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 16120111142420161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1
 

Viewers also liked

Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...
Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...
Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...Aconex
 
BIMStorm Washington DC Presentation 5 Report
BIMStorm Washington DC Presentation 5 ReportBIMStorm Washington DC Presentation 5 Report
BIMStorm Washington DC Presentation 5 ReportMike Bordenaro
 
Using Web 2.0 to Become a Recognized Oracle Expert
Using Web 2.0 to Become a Recognized Oracle ExpertUsing Web 2.0 to Become a Recognized Oracle Expert
Using Web 2.0 to Become a Recognized Oracle ExpertMohan Dutt
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionReshma Philip
 
BIM to GIS Interoperability
BIM to GIS InteroperabilityBIM to GIS Interoperability
BIM to GIS InteroperabilitySafe Software
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015Aconex
 
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015Aconex
 
Entregando Exitosamente un Megaproyecto Internacional - Webinar, April 2016
Entregando Exitosamente un Megaproyecto Internacional - Webinar, April 2016Entregando Exitosamente un Megaproyecto Internacional - Webinar, April 2016
Entregando Exitosamente un Megaproyecto Internacional - Webinar, April 2016Aconex
 
How to Create GIS and BIM Interoperability
How to Create GIS and BIM InteroperabilityHow to Create GIS and BIM Interoperability
How to Create GIS and BIM InteroperabilitySafe Software
 
All your BIM are belong to us - Revit and FME for Enterprise Data Management
All your BIM are belong to us - Revit and FME for Enterprise Data ManagementAll your BIM are belong to us - Revit and FME for Enterprise Data Management
All your BIM are belong to us - Revit and FME for Enterprise Data ManagementSafe Software
 

Viewers also liked (10)

Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...
Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...
Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...
 
BIMStorm Washington DC Presentation 5 Report
BIMStorm Washington DC Presentation 5 ReportBIMStorm Washington DC Presentation 5 Report
BIMStorm Washington DC Presentation 5 Report
 
Using Web 2.0 to Become a Recognized Oracle Expert
Using Web 2.0 to Become a Recognized Oracle ExpertUsing Web 2.0 to Become a Recognized Oracle Expert
Using Web 2.0 to Become a Recognized Oracle Expert
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
BIM to GIS Interoperability
BIM to GIS InteroperabilityBIM to GIS Interoperability
BIM to GIS Interoperability
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
 
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
 
Entregando Exitosamente un Megaproyecto Internacional - Webinar, April 2016
Entregando Exitosamente un Megaproyecto Internacional - Webinar, April 2016Entregando Exitosamente un Megaproyecto Internacional - Webinar, April 2016
Entregando Exitosamente un Megaproyecto Internacional - Webinar, April 2016
 
How to Create GIS and BIM Interoperability
How to Create GIS and BIM InteroperabilityHow to Create GIS and BIM Interoperability
How to Create GIS and BIM Interoperability
 
All your BIM are belong to us - Revit and FME for Enterprise Data Management
All your BIM are belong to us - Revit and FME for Enterprise Data ManagementAll your BIM are belong to us - Revit and FME for Enterprise Data Management
All your BIM are belong to us - Revit and FME for Enterprise Data Management
 

Similar to Rtcaus13 abcd

Software Applications
Software ApplicationsSoftware Applications
Software ApplicationsXinYee Khoo
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwaresRuchy Lakhani
 
BIM project execution
BIM project executionBIM project execution
BIM project executionStephen Au
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionVeetil Digital Service
 
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfNZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfle canh
 
Chapter three.pptx
Chapter three.pptxChapter three.pptx
Chapter three.pptxBossGold
 
Software Application report
Software Application reportSoftware Application report
Software Application reportKailyn Lee
 
Building Information Modelling M.arch.pdf
Building Information Modelling M.arch.pdfBuilding Information Modelling M.arch.pdf
Building Information Modelling M.arch.pdfShaheRobinson
 
Extend the Value of Your BIM Data with FME: Part 1
Extend the Value of Your BIM Data with FME: Part 1Extend the Value of Your BIM Data with FME: Part 1
Extend the Value of Your BIM Data with FME: Part 1Safe Software
 
software assignment
software assignmentsoftware assignment
software assignmentseenyeeyong
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxcooperapleh
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxeubanksnefen
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxhelzerpatrina
 

Similar to Rtcaus13 abcd (20)

Software Applications
Software ApplicationsSoftware Applications
Software Applications
 
BIM training
BIM training BIM training
BIM training
 
BIM
BIMBIM
BIM
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
 
BIM project execution
BIM project executionBIM project execution
BIM project execution
 
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in Construction
 
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfNZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
 
Chapter three.pptx
Chapter three.pptxChapter three.pptx
Chapter three.pptx
 
3 d modeling using bim ppt
3 d modeling using bim ppt3 d modeling using bim ppt
3 d modeling using bim ppt
 
Software Application report
Software Application reportSoftware Application report
Software Application report
 
Building Information Modelling M.arch.pdf
Building Information Modelling M.arch.pdfBuilding Information Modelling M.arch.pdf
Building Information Modelling M.arch.pdf
 
Software
SoftwareSoftware
Software
 
Extend the Value of Your BIM Data with FME: Part 1
Extend the Value of Your BIM Data with FME: Part 1Extend the Value of Your BIM Data with FME: Part 1
Extend the Value of Your BIM Data with FME: Part 1
 
software assignment
software assignmentsoftware assignment
software assignment
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docx
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docx
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docx
 
Bim overview
Bim overviewBim overview
Bim overview
 
Software
Software Software
Software
 

Recently uploaded

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Zilliz
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusZilliz
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfOverkill Security
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 

Recently uploaded (20)

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 

Rtcaus13 abcd

  • 1. The A, B, C & D of Space Planning TechnologiesSpace Planning Technologies Chris Razzell HASSELL
  • 2. That BIM definition… again…g Building information modelling (BIM) is the process of generating andBuilding information modelling (BIM) is the process of generating and managing building data during the life cycle of the built structure. It uses three-dimensional, real-time, dynamic building modelling software to increase productivity in building design, construction and occupation. The process produces the building information model (also abbreviated BIM) which encompasses building geometry spatial relationshipsBIM), which encompasses building geometry, spatial relationships, geographic information, quantities and properties of building components and spaces. Many forms of analysis can then be performed on this digital prototype before it is actually physically built in its environment at great cost.
  • 3. Alternative BIM definition • Building Information Management is an alternative description of BIM focussed • Identification • Design criteria • Fabric & finishes • Schedule of Areas • Functional brief • Equipment schedule alternative description of BIM, focussed on the management of information and process. • Once the design principles and project• Once the design principles and project aspirations are identified, they should drive how the BIM is developed, it’s content and final use - the project team need to be aware of this! Briefing Rooms • Information should develop integrally within the design and the whole team understand the needs and deliverablesFF&EValidation at each project milestone. • What information do our clients require and when?• Generic arrangements • Specialist areas • Internal QA checks • Specialist areas • Schedules for Tender / BofQ • Brief vs. Design • Client management
  • 4. Space Planning Technologyp g gy ...is a general term used to describe software packages that: o enable the briefing of facilities o integrate briefing data with BIM’s o generate reportsg p o analysis of brief vs. design o some functionality beyond design o or the ability to export data downstreamo or the ability to export data downstream
  • 5. Typical inputs + outputsyp p p
  • 6. SPT in BIM Revit does many things... Modelling... Documentation... B i f i li tiBasis for visualisation...
  • 8. No object = no informationj Alan Johnston Drawing a Shadowg Alan Johnston used white walls as a blank sheet of paper on which to base his drawing He divided Galleries 1 2his drawing. He divided Galleries 1, 2 and 3 up into unequal frames, drawing directly with a pencil onto the walls in strips covering an area of about 2 square cm Navigating the cornerssquare cm. Navigating the corners, recesses and architraves; the space which is left is equally as important as the space that he fills in; constantly i th h i hmeasuring the shape in space, he makes sculpture out of architecture.
  • 10. Areas of Focus DATA CAPTURE _Spaces Location_Location _Functional _Finishes Furniture_Furniture _Equipment _Services _Door
  • 11. Object orientedj DATA CAPTURE _Economy strength _BIM Capability _BIM Management Plans Standards (BIM)_Standards (BIM) _SPT Capability
  • 12. Revit + BIM Link + RDB Link …
  • 13. Revit + BIM Link + RDB Link … Both are great tools, but have limitations o enable the briefing of facilities o integrate briefing data with BIM’s o generate reports analysis of brief vs designo analysis of brief vs. design o some functionality beyond design o or the ability to export data downstream
  • 14. SPT main playersp y A – Affinity (Trelligence) B – BuildingOne C – CodeBookC CodeBook D – dRofus
  • 15. Noteworthy…y _Project Size I t ti l U_International Use _Years of Operation _BIM Interoperability _Organizational Size
  • 16. Common groundg _Each do many similar things A 75% l_Approx 75% overlap _Each has a unique point of difference _Each has a bi-directional link to BIM F d th i t t_Focus on rooms and their content _Drive brief information into BIM _Analyse the design against the brief
  • 17. Overview Process (dRofus)( ) The iterative process of client requirement managementp q g Standardized Requirements model Exchange and present requirements in design tool Exchange and compare design to requirementsExchange and compare design to requirements Deviations trigger one of the following actions: > Update design > Update requirements > Present delta At handover Requirement=Design=As Built All data exchange using open buildingSMART standardsg g p g
  • 21. Typical / traditional deliverablesyp /
  • 23. Standard Pack of Deliverables > 1:200 Generic Room Keyplan > 1:50 Generic Room Layout Sheets (relevant to dept) > Generic Room Data Sheets (relevant to dept)> Generic Room Data Sheets (relevant to dept) > 1:100 GA setout plans > 1:50 FF&E plans (key rooms for user review) > 1:50 RLS drawings (key room for user review) > Schedule of Accommodation (department) > Room Data Sheets (key rooms for review in meeting) > RDS excel extract (update in meeting, rather than markup) > FF&E S h d l> FF&E Schedule
  • 24. Revit considerations Data Author – BIM or SPT?BIM or SPT? Map it out and make sure the team know
  • 25. Shared or Systemy b lSystem parameters – built in, for specific uses Shared parameters – user defined, do anything!
  • 26. Categoriesg You may also choose to t i huse categories such as Communication Devices, Data Devices, Fire Alarm available withinAlarm... available within the Building Design Suite
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39. Unique selling pointq g p Affinity – planning module BuildingOne FM solutionBuildingOne – FM solution CodeBook – works with multiple design tools dRofus – accessibilityy
  • 40. Roles
  • 42. Issuing Processg INTEGRAL PART OF DESIGN PROCESS _UPDATING / SYNCHRONISATION _QA CHECKING PRODUCTION OF INFORMATION_PRODUCTION OF INFORMATION _PDF’ing _UPLOADING
  • 44. _BRIEF CAPTURE CONCEPTUAL PLANNING_CONCEPTUAL PLANNING _EASE OF USE _AREA ANALYSIS BIM INTEGRATION_BIM INTEGRATION _INFORMATION MANAGEMENT _EQUIPMENT VALIDATION _ADDITIONAL SERVICES / FEES _EXPORT TO COBie / FM _ACCESS FROM MOBILE DEVICES
  • 45. Advice? Get training or embed a specialist in your team_Get training, or embed a specialist in your team _Shoot the content re-designers, re-namer, that over model, over complicate.... _Know your project delivery requirements, define the deliverables, their format etc... _define roles and define the Data Author _Design what is important Technology doesn’t stop bad work_Technology doesn t stop bad work
  • 46. RTC slides from the past…
  • 47. RTC slides from the past…