SlideShare uma empresa Scribd logo
1 de 12
Baixar para ler offline
KOSOVO Public procurement legislative experiences and need Plans for development of the legislative framework in short and medium term Dr. Sc. Ilaz DULI, Board Member of PPRC Kosovo Vlora, Albania 9-10 September 2014
Procurement Procedures 
 Open Procedures ( > 10.000 € ) 
 Negotiated procedures after the publication of a contract notice 
 Negotiated procedures without publication of a contract notice 
 Restricted procedures 
 Procedures for price quotations (1.000 € - 10.000 € ) 
 Procedures for minimum contracts ( 100 € - 1.000 € ) 
 Framework contracts (special form)
Innovations in PPL No. 02 / L - 042 
• Contract management activities 
 Contracting authorities after signing the contract are obliged to prepare 
• a detailed plan that foresees the implementation of the contract 
• (Contract Management Plan); 
 This plan should include all aspects of organizational, economic, 
• technical and legal contract management. 
 Contract Management Plan should be acceptable, and be signed by 
• both contracting parties, prior to start the execution of the contract; 
• 
 PPRC is obliged to prepare a separate regulation and guideline on 
• how the implementation of the contract by the Contracting authorities; 
• 
 PPRC is authorized to monitor and manage the contract by the 
• contracting authorities.
Procurement activities of the public services operators 
 This chapter provides a greater flexibility in the case when the public 
• companies carrying out procurement activities; 
 Qualification of economic operators will be based on Indicative notice, 
• or on the basis of contract notice; 
 Deadline for selected economic operator is a maximum of three years, and 
• Indicative notices must be published each year; 
 In order procurement process to be successful their interest in writing, must 
• express at least three economic operators; 
• 
 Economic operators who have applied for qualification should be informed 
• as soon as possible, and in normal cases within 15 days; 
 Operators which are rejected, have the right to appeal the PRB
Secondary legislation on Public procurement in Kosovo 
•Procurement secondary legislation, including 7 parts: 
•Part A: Regulation of Public Procurement (Regulation and Operational 
• guideline for PP); 
•Part B: Rules on Procurement Procedures (53 different forms: notices, tender 
• dossiers, evaluation reports, standard documents); 
•Part C: Contract Management (Contract Management Plan); 
•Part D: Procurement Code of Ethics (code of ethics and 3 statements); 
•Part E: Rules Governing Sale and Disposals of Assets(rules for sale 
• and 7 different forms; 
•Part F: Rules of Review Procedures (standard form); 
•Part G: Documents for Diplomatic and Consular Mission of Republic of Kosovo 
• (instruction and 9 different forms);
Plans for development of the legislative framework 
 In the work plan of Kosovo Government for 2014, has been 
• foreseen to start of the amendments to the PPL; 
 The amendment is expected to begin this year, while procedures for 
• approval to be completed in 2015; 
 During the amendment of the PPL, is expected to incorporate: 
• - Some of the provisions of the new EU Directive of 2014; 
• - Mandatory use of electronic procurement, by the contracting 
• authorities 
• - The elimination of some difficulties that are presented during 
• implementation of the PPL in practice in these last three years;
Implementation of the legislation 
• Although the procurement legislation in Kosovo is quite 
• advanced and complete, this cannot be concluded with respect 
• to the implementation of the legislation in practice.
Challenges of the public procurement system in Kosovo 
• Main challenges that accompany the public procurement system in Kosovo are: 
 The pressure made to procurement officers during the performance of 
• procurement activities, especially on the contract award; 
 Non-appropriate implementation of public procurement legislation; 
 Frequent replacing the procurement officers in Contract Authorities; 
• 
 Very small number of licensed procurement officers in Kosovo, 
• comparing with budget spent for procurement; 
 Lack of e-procurement (WB is assisting Kosovo to develop e-procurement); 
 Not enough training of procurement officers in the public sector and in 
• the private sector; 
•
Actions to be taken 
The strengthening and building of institutional capacities of human resources dealing with the implementation of the public procurement legislation; 
The fair and reasonable implementation and enforcement of the public procurement legislation; 
 Continuing training of procurement officers in public sector; 
Start training of procurement officers in the private sector
CONCLUSION 
 It can be concluded that, in general, the public procurement system in Kosovo has shown 
• significant results within a relatively short time (A decade and a half ); 
 If current achievements in PP are compared to the past time, from the introduction of the PP, it 
• can be concluded that considerable results have been achieved within a short time. 
 Factors that impacted in these results can be split into two groups: 
a)A large number of international procurement experts, who established the public procurement 
• system in Kosovo, were engaged immediately after the war in the field of public procurement in Kosovo; 
•b) Many different donors offered funds for training Kosovar procurement officers in Kosovo and 
• abroad; 
 From the introduction of the PP in Kosovo up to the end of 2013, the PPL has been changed 
• five times. All these changes aimed to further reform and improve the public procurement 
• system in general by approximating and harmonizing it with the EC procurement directives, 
• as well as with the best international practices. 
 The PPL No. 04/L-042, which is in force, is harmonized in the most part with the EU 
• Procurement Directives. 
 This law provides for the performance of public procurement activities in Kosovo in a 
• transparent, professional and non-discriminatory manner; 
 The secondary legislation is comprehensive, complete and contains all the necessary forms for 
• the successful implementation of procurement activities;
Faleminderit

Mais conteúdo relacionado

Destaque (7)

Laguna e Nartes
Laguna e NartesLaguna e Nartes
Laguna e Nartes
 
Kooperimi ne bujqesi
Kooperimi ne bujqesiKooperimi ne bujqesi
Kooperimi ne bujqesi
 
Analiza dhe hulumtimi i te dhenave ne biznes
Analiza dhe hulumtimi i te dhenave ne biznesAnaliza dhe hulumtimi i te dhenave ne biznes
Analiza dhe hulumtimi i te dhenave ne biznes
 
Tema e diplomes
Tema e diplomesTema e diplomes
Tema e diplomes
 
Projekt diplome
Projekt diplome Projekt diplome
Projekt diplome
 
Teme diplome Eduart Likollari.
Teme diplome Eduart Likollari. Teme diplome Eduart Likollari.
Teme diplome Eduart Likollari.
 
Bujqësia
BujqësiaBujqësia
Bujqësia
 

Semelhante a Kosovo Presentation, Ilaz Duli, PPRC, PP Legislative experience, 7th Regional Public Procurement Conference, Vlora, 9-10 Sept 2014_English

RA9184 GPPB Presentation
RA9184 GPPB PresentationRA9184 GPPB Presentation
RA9184 GPPB Presentation
Alain Pinsotes
 
European Spallation Source
European Spallation SourceEuropean Spallation Source
European Spallation Source
Scion DTU
 

Semelhante a Kosovo Presentation, Ilaz Duli, PPRC, PP Legislative experience, 7th Regional Public Procurement Conference, Vlora, 9-10 Sept 2014_English (20)

Serbia Presentation, PPO, Borisav Knezevic, Legislative Framework in Serbia, ...
Serbia Presentation, PPO, Borisav Knezevic, Legislative Framework in Serbia, ...Serbia Presentation, PPO, Borisav Knezevic, Legislative Framework in Serbia, ...
Serbia Presentation, PPO, Borisav Knezevic, Legislative Framework in Serbia, ...
 
Macedonia Presentation, PPB, Institutional set up of PP, 7th Regional Public ...
Macedonia Presentation, PPB, Institutional set up of PP, 7th Regional Public ...Macedonia Presentation, PPB, Institutional set up of PP, 7th Regional Public ...
Macedonia Presentation, PPB, Institutional set up of PP, 7th Regional Public ...
 
Presentation by Ruslan Malai, Moldova (ENG) Second SIGMA Regional ENP East Co...
Presentation by Ruslan Malai, Moldova (ENG) Second SIGMA Regional ENP East Co...Presentation by Ruslan Malai, Moldova (ENG) Second SIGMA Regional ENP East Co...
Presentation by Ruslan Malai, Moldova (ENG) Second SIGMA Regional ENP East Co...
 
Presentation on how to set up independent review body
Presentation on how to set up independent review bodyPresentation on how to set up independent review body
Presentation on how to set up independent review body
 
Presentation by S. Hoxha, Kosovo (ENG) Eighth SIGMA Regional IPA Conference o...
Presentation by S. Hoxha, Kosovo (ENG) Eighth SIGMA Regional IPA Conference o...Presentation by S. Hoxha, Kosovo (ENG) Eighth SIGMA Regional IPA Conference o...
Presentation by S. Hoxha, Kosovo (ENG) Eighth SIGMA Regional IPA Conference o...
 
Speaker presentation by Gunnar Wedde - Oslo StartUp Day: Make the City of Osl...
Speaker presentation by Gunnar Wedde - Oslo StartUp Day: Make the City of Osl...Speaker presentation by Gunnar Wedde - Oslo StartUp Day: Make the City of Osl...
Speaker presentation by Gunnar Wedde - Oslo StartUp Day: Make the City of Osl...
 
PROCUREMENT OVERSIGHT AND MONITORING – A MEANS FOR EFFECTIVE PROJECT IMPLEMEN...
PROCUREMENT OVERSIGHT AND MONITORING – A MEANS FOR EFFECTIVE PROJECT IMPLEMEN...PROCUREMENT OVERSIGHT AND MONITORING – A MEANS FOR EFFECTIVE PROJECT IMPLEMEN...
PROCUREMENT OVERSIGHT AND MONITORING – A MEANS FOR EFFECTIVE PROJECT IMPLEMEN...
 
Serbia Presentation, PPO, Svetlana Razic, Serbian Practical Experience in PP ...
Serbia Presentation, PPO, Svetlana Razic, Serbian Practical Experience in PP ...Serbia Presentation, PPO, Svetlana Razic, Serbian Practical Experience in PP ...
Serbia Presentation, PPO, Svetlana Razic, Serbian Practical Experience in PP ...
 
Presentation by Peter Bennett, Senior Policy Adviser, Cabinet Office, United ...
Presentation by Peter Bennett, Senior Policy Adviser, Cabinet Office, United ...Presentation by Peter Bennett, Senior Policy Adviser, Cabinet Office, United ...
Presentation by Peter Bennett, Senior Policy Adviser, Cabinet Office, United ...
 
Montenegro Presentation, Sandra Skataric, PPA, Legislative framework, 7th Reg...
Montenegro Presentation, Sandra Skataric, PPA, Legislative framework, 7th Reg...Montenegro Presentation, Sandra Skataric, PPA, Legislative framework, 7th Reg...
Montenegro Presentation, Sandra Skataric, PPA, Legislative framework, 7th Reg...
 
Tendering procedures
Tendering proceduresTendering procedures
Tendering procedures
 
3 The new European Public Procurement Directives_English
3 The new European Public Procurement Directives_English3 The new European Public Procurement Directives_English
3 The new European Public Procurement Directives_English
 
Presentation by Maria Stylianidou, Hellenic Open University, Greece (ENG) Sec...
Presentation by Maria Stylianidou, Hellenic Open University, Greece (ENG) Sec...Presentation by Maria Stylianidou, Hellenic Open University, Greece (ENG) Sec...
Presentation by Maria Stylianidou, Hellenic Open University, Greece (ENG) Sec...
 
RA9184 GPPB Presentation
RA9184 GPPB PresentationRA9184 GPPB Presentation
RA9184 GPPB Presentation
 
Procurement presentation Ace workshop - Cotonou
Procurement presentation Ace workshop - CotonouProcurement presentation Ace workshop - Cotonou
Procurement presentation Ace workshop - Cotonou
 
5_Procurement, conflict of interest and sub-granting
5_Procurement, conflict of interest and sub-granting5_Procurement, conflict of interest and sub-granting
5_Procurement, conflict of interest and sub-granting
 
European Spallation Source
European Spallation SourceEuropean Spallation Source
European Spallation Source
 
Centralised purchasing in a decentralised procurement environment, Ivana Fran...
Centralised purchasing in a decentralised procurement environment, Ivana Fran...Centralised purchasing in a decentralised procurement environment, Ivana Fran...
Centralised purchasing in a decentralised procurement environment, Ivana Fran...
 
Presentation on theme.docx
Presentation on theme.docxPresentation on theme.docx
Presentation on theme.docx
 
Overview-of-Ppr.pptx
Overview-of-Ppr.pptxOverview-of-Ppr.pptx
Overview-of-Ppr.pptx
 

Mais de Support for Improvement in Governance and Management SIGMA

Mais de Support for Improvement in Governance and Management SIGMA (20)

PPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdfPPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....
PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....
PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....
 
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdfPPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
 
Photo gallery - SIGMA-GIZ Academies on QM - Stage 1.pdf
Photo gallery - SIGMA-GIZ Academies on QM - Stage 1.pdfPhoto gallery - SIGMA-GIZ Academies on QM - Stage 1.pdf
Photo gallery - SIGMA-GIZ Academies on QM - Stage 1.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdfPPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2 and 3.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2  and 3.pdfPPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2  and 3.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2 and 3.pdf
 
Academies-QM_Stage1_Ministry of Higher Education CAF.pdf
Academies-QM_Stage1_Ministry of Higher Education CAF.pdfAcademies-QM_Stage1_Ministry of Higher Education CAF.pdf
Academies-QM_Stage1_Ministry of Higher Education CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdfPPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
 
Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...
Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...
Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...
 
eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...
eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...
eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...
 

Último

VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Último (20)

Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Government e Marketplace GeM Presentation
Government e Marketplace GeM PresentationGovernment e Marketplace GeM Presentation
Government e Marketplace GeM Presentation
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORSPPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 

Kosovo Presentation, Ilaz Duli, PPRC, PP Legislative experience, 7th Regional Public Procurement Conference, Vlora, 9-10 Sept 2014_English

  • 1. KOSOVO Public procurement legislative experiences and need Plans for development of the legislative framework in short and medium term Dr. Sc. Ilaz DULI, Board Member of PPRC Kosovo Vlora, Albania 9-10 September 2014
  • 2.
  • 3. Procurement Procedures  Open Procedures ( > 10.000 € )  Negotiated procedures after the publication of a contract notice  Negotiated procedures without publication of a contract notice  Restricted procedures  Procedures for price quotations (1.000 € - 10.000 € )  Procedures for minimum contracts ( 100 € - 1.000 € )  Framework contracts (special form)
  • 4. Innovations in PPL No. 02 / L - 042 • Contract management activities  Contracting authorities after signing the contract are obliged to prepare • a detailed plan that foresees the implementation of the contract • (Contract Management Plan);  This plan should include all aspects of organizational, economic, • technical and legal contract management.  Contract Management Plan should be acceptable, and be signed by • both contracting parties, prior to start the execution of the contract; •  PPRC is obliged to prepare a separate regulation and guideline on • how the implementation of the contract by the Contracting authorities; •  PPRC is authorized to monitor and manage the contract by the • contracting authorities.
  • 5. Procurement activities of the public services operators  This chapter provides a greater flexibility in the case when the public • companies carrying out procurement activities;  Qualification of economic operators will be based on Indicative notice, • or on the basis of contract notice;  Deadline for selected economic operator is a maximum of three years, and • Indicative notices must be published each year;  In order procurement process to be successful their interest in writing, must • express at least three economic operators; •  Economic operators who have applied for qualification should be informed • as soon as possible, and in normal cases within 15 days;  Operators which are rejected, have the right to appeal the PRB
  • 6. Secondary legislation on Public procurement in Kosovo •Procurement secondary legislation, including 7 parts: •Part A: Regulation of Public Procurement (Regulation and Operational • guideline for PP); •Part B: Rules on Procurement Procedures (53 different forms: notices, tender • dossiers, evaluation reports, standard documents); •Part C: Contract Management (Contract Management Plan); •Part D: Procurement Code of Ethics (code of ethics and 3 statements); •Part E: Rules Governing Sale and Disposals of Assets(rules for sale • and 7 different forms; •Part F: Rules of Review Procedures (standard form); •Part G: Documents for Diplomatic and Consular Mission of Republic of Kosovo • (instruction and 9 different forms);
  • 7. Plans for development of the legislative framework  In the work plan of Kosovo Government for 2014, has been • foreseen to start of the amendments to the PPL;  The amendment is expected to begin this year, while procedures for • approval to be completed in 2015;  During the amendment of the PPL, is expected to incorporate: • - Some of the provisions of the new EU Directive of 2014; • - Mandatory use of electronic procurement, by the contracting • authorities • - The elimination of some difficulties that are presented during • implementation of the PPL in practice in these last three years;
  • 8. Implementation of the legislation • Although the procurement legislation in Kosovo is quite • advanced and complete, this cannot be concluded with respect • to the implementation of the legislation in practice.
  • 9. Challenges of the public procurement system in Kosovo • Main challenges that accompany the public procurement system in Kosovo are:  The pressure made to procurement officers during the performance of • procurement activities, especially on the contract award;  Non-appropriate implementation of public procurement legislation;  Frequent replacing the procurement officers in Contract Authorities; •  Very small number of licensed procurement officers in Kosovo, • comparing with budget spent for procurement;  Lack of e-procurement (WB is assisting Kosovo to develop e-procurement);  Not enough training of procurement officers in the public sector and in • the private sector; •
  • 10. Actions to be taken The strengthening and building of institutional capacities of human resources dealing with the implementation of the public procurement legislation; The fair and reasonable implementation and enforcement of the public procurement legislation;  Continuing training of procurement officers in public sector; Start training of procurement officers in the private sector
  • 11. CONCLUSION  It can be concluded that, in general, the public procurement system in Kosovo has shown • significant results within a relatively short time (A decade and a half );  If current achievements in PP are compared to the past time, from the introduction of the PP, it • can be concluded that considerable results have been achieved within a short time.  Factors that impacted in these results can be split into two groups: a)A large number of international procurement experts, who established the public procurement • system in Kosovo, were engaged immediately after the war in the field of public procurement in Kosovo; •b) Many different donors offered funds for training Kosovar procurement officers in Kosovo and • abroad;  From the introduction of the PP in Kosovo up to the end of 2013, the PPL has been changed • five times. All these changes aimed to further reform and improve the public procurement • system in general by approximating and harmonizing it with the EC procurement directives, • as well as with the best international practices.  The PPL No. 04/L-042, which is in force, is harmonized in the most part with the EU • Procurement Directives.  This law provides for the performance of public procurement activities in Kosovo in a • transparent, professional and non-discriminatory manner;  The secondary legislation is comprehensive, complete and contains all the necessary forms for • the successful implementation of procurement activities;