SlideShare a Scribd company logo
1 of 93
Download to read offline
www.sfcta.org/MoveSmartSF
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
San Francisco
Transportation Plan
Overview and Introduction
May 30, 2013
Purpose of the San Francisco
Transportation Plan
2
What is it?
 San Francisco’s transportation investment
program for all modes, operators to year 2040
 Supporting policies and strategic initiatives
 Funding and implementation strategy
How will it be used?
 Informs local plans and investments
(Transportation Element Update, SFMTA and
CCSF capital plans)
 Guides SF’s input to regional planning efforts (BART Strategic Plan, 2017 RTP)
 Advocating together for San Francisco’s fair share
 Positions SF for future funding opportunities and policy discussions at
state, national level
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
Accomplishments of 2004 Countywide
Transportation Plan
New Capital Projects – Constructed or Underway
 T-Third, Central Freeway/Octavia Blvd
 Doyle Drive (Presidio Parkway)
 Central Subway, Transbay Terminal Phase 1
Development of a Network of Rapid Buses
 $45M FTA funds committed to Van Ness BRT
 EIRs for Geary BRT and SFMTA’s Transit Effectiveness
Project underway
Bicycle, Pedestrian, Traffic Calming, Streetscape Improvements
 Provided stable stream of funding for traffic calming
 Leland, Valencia and Broadway re-designs
Parking management and road pricing
 $20M USDOT grant for SFpark
 Mobility Access & Pricing Study, Treasure Island Program
3
Neighborhood Transportation Plans
 Outer Mission,
Mission/Valencia
 Tenderloin/Little Saigon
 Bayview
 W. SOMA
 Balboa, Cesar Chavez East
New transportation goals and city
development objectives
2013 Regional Transportation Plan: new projects
 Blended High Speed Rail/Caltrain
Electrification/Transbay/Downtown extension
 BART Metro, Transit Effectiveness Project, SF Pricing Program
SB375, SF Climate Action Strategy
 SF goal: reduce GHGs to 80% below 1990 levels by 2050
 Regional Transportation Plan Update includes a Sustainable
Communities Strategy
Bicycle and Pedestrian Safety Directives
 BoS: 20% Bicycle Mode Share by 2020
 Mayor’s Directive: 50% reduction in pedestrian injuries by 2020
Demand Management to Support Approved Plans
 Bayview Waterfront, Treasure Island, Park Merced Plans
 SFMTA Parking and Shuttle Management policies
4
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
The Challenge -101k households, 191k jobs in San
Francisco in Plan Bay Area Preferred Scenario
Source: ABAG, Jobs-Housing
Connection Scenario
Final Vision Scenario
FINAL ADOPTED
PLAN
Summer /Fall
2013
Draft Vision Scenario
Revenue Strategy
Developing the SFTP
6
Goals, Needs, &
Available
Funding
$64.3B
State of Good
Repair Needs
(O&M)
DRAFT
Financially
Constrained Plan
Spring 2013
Projects
Public
Feedback
Programs
Sector Policies
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
Public
Feedback
6
• 4 strategic initiatives
• 3 special market analyses
• 2 equity initiatives
• New revenue / legislative
advocacy platform
“What would it take” to achieve our goals?
Create a more
livable city
Ensure a healthy
environment
Provide
world-class
infrastructure
& service
Strengthen the
city’s regional
competitiveness
Non-auto mode
share >50%
No change in
commute travel
time to SF
~50% below
1990 GHG
emissions
State of
good repair
SFTP needs assessment
framework
Healthy
Environment
 Vehicle miles
traveled
 Greenhouse gas
emissions
 Active Transportation
(walking & biking)
Trips
Livability
 Travel safety
 Transfers/Transit trip
 Non-auto trip shares
 School trip needs
State of Good Repair
 Crowded Transit
Lines
 Pavement Condition
Index
 Transit Reliability
 Structural Sufficiency
Economic
Competitiveness
 Congested Streets,
Commute times
 Peak: Off-peak Drive
Travel Time
 Goods movement
needs and visitor
access
Equity
Public Input
Transportation System Performance
 Total trip-making
 Mode share
 Avg Occupancy (PMT/VMT)
 Transit: Auto Travel Time Ratio
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
8
Our growth and transportation challenge
Planned growth through 2040
 101,000 new households
 191,000 new workers
 603,000 more daily car trips (more than the combined daily
volume of Bay Bridge and Golden Gate Bridge crossings)
New Jobs
by Plan
Area
New
Housing by
Plan Area
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
> 5 Million trips to/from/within SF by 2040
33% more trips than today
10
Source: SF-CHAMP 4.3
2,025,000
765,000
72,000
932,000
603,000
279,000
40,000
329,000
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
Auto Transit Bike Ped
Total Trips To, From, and Within SF by Mode
2012: Total 2040: Additional Trips
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
• Projected growth in car trips is
40% MORE than current daily
Golden Gate and Bay Bridge
crossings
• Slightly over half of all daily
trips made by car
• Current 3.5% bike mode share
Pavley Law
11
Example: Healthy Environment Scenario
can only approach goal w/aggressive policy change
Bundle
Previous Trend
Expected Trend
Goal
San Francisco GHG Emissions Trend vs. Goal
(on-road mobile, weekday)
Source: SF CHAMP 4.1 Draft SCS, SFCTA, 2011
2
3
4
5
6
7
8
9
1990 1995 2000 2005 2010 2015 2020 2025 2030 2035
MetricTons/Day(1000s)
More aggressive!!
 $10B infrastructure
 Local road user pricing
 Up to 16% EV fleet
 $10B+ infrastructure
 Regional pricing at 2x
today’s operating costs
 Up to 25% EV fleet
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
Change in local auto trips:
2012-40
Source: SF-CHAMP 4.3
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
12
Change in regional auto trips:
2012-40
Source: SF-CHAMP 4.3
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
13
Congestion impacts transit speeds
 Transit trip takes 2-3 times longer than automobile trip in same market
 Muni average transit speed – 8 mph;
 Some Downtown streets between 5 and 10 mph
Transit Speeds, Spring 2009** Auto LOS, Spring 2009*
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 14
Muni crowding
Morning peak hour, 2012 and 2040
15
Source: SF-CHAMP 4.3
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
Crowding on regional transit
systems | Morning peak hour, 2012 and 2040
16
Source: SF-CHAMP 4.3
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
Pedestrian Injuries: Total number of injuries
17
Sources:
Tract Populations: American Community Survey, 2009
Ped Collisions (2007-11): Statewide Integrated Traffic Reporting System (SWITRS)
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
Deep and Broad Public Involvement
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 18
 4 Rounds of Outreach at various
stages (multi-lingual)
 Community and Technical Advisory
Committee - 13 meetings to date
 Website, Newsletters
 Social Media sites (facebook,
twitter)
 Dozens of presentations to Boards,
Commissions, neighborhood groups
 Tabling at community events and
presentations
Response to calls for projects:
public input
19
300 submittals from both agencies and
the public
Support for “Fix It First”
Support for projects to improve
transit reliability and provide
dedicated right-of-way
Demand for traffic calming,
pedestrian safety and
enhancement, and bicycle
improvements
Demand for more frequent transit
service (to alleviate crowding)
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
Desire for more investment in walking,
cycling, + Muni enhancements
20
Investment in Programs
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
Prioritizing discretionary
revenue
21
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
How should we prioritize $3.14 billion in
uncommitted funds?
State of Good Repair / Operations &
Maintenance (O&M)
 Improve transit reliability
 Pavement quality, state and local structures
Transportation enhancements and programs
 Pedestrian safety, traffic calming
 Bicycle facilities, Rapid Transit network
Expansion projects
 Relieve crowding; long range strategic rail
investments
 Develop freeway management strategies
(US101, HWY280)
Nearly 50 projects and programs were evaluated for cost
effective contribution to plan goals
Project performance evaluation
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
22
Final Vision Scenario
FINAL ADOPTED
PLAN
Summer /Fall
2013
Draft Vision Scenario
Revenue Strategy
Developing the SFTP
23
Goals, Needs, &
Available
Funding
$64.3B
State of Good
Repair Needs
(O&M)
DRAFT
Financially
Constrained Plan
Spring 2013
Projects
Public
Feedback
Programs
Sector Policies
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
Public
Feedback
www.sfcta.org/MoveSmartSF
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
Thank you!
For more information see:
www.movesmartsf.org
www.sfcta.org/MoveSmartSF
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
www.sfcta.org/MoveSmartSF
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
Draft San Francisco
Transportation Plan
May 30, 2013
Draft SFTP Financially
Constrained Investment Scenario
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
2
Total: $72.6Billion
What we heard from the
public:
• More investment in
operations and
maintenance of the
existing system
Committed projects
(Baseline) - $9.43B
What we heard from the
public:
• More investment in
operations and
maintenance of the
existing system
• Better transit
reliability, reduced
transit crowding
What we heard from the
public:
• More investment in
operations and
maintenance of the
existing system
• Better transit
reliability, reduced
transit crowding
• Investment in safety
projects, pedestrian
infrastructure, traffic
calming
What we heard from the
public:
• More investment in
operations and
maintenance of the
existing system
• Better transit
reliability, reduced
transit crowding
• Investment in safety
projects, pedestrian
infrastructure, traffic
calming
• Support for cost-
effective projects that
improve system
efficiency
Transit SOGR
$55.18
76%
Local Streets &
Roads SOGR
$7.78
11%
Programs and
Enhancements
$1.22
2%
Expansion
Projects
$8.27
11%
Transit Service
Expansion
$0.41
0%
Draft SFTP
Total plan summary by type
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
3
Total discretionary
revenue: $3.14Billion
$YOE Billions
Total $72.6
Knitting it all together
Investment Scenario Approach
Complementary choices among investment types (e.g.
replacement vehicles, rapid transit network
development can increase effective level of transit
service)
But also:
 Tradeoffs between and within investment types (e.g.
Operations, Maintenance, Programs, Expansion), modes,
geographic areas and
Plan development considered multiple factors: Need,
Performance, Cost-Effectiveness, Public Input , Policy/Plan
status, Equity
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
4
Transit SOGR
$0.28
9%
Local Streets &
Roads SOGR
$0.46
15%
Programs and
Enhancements
$1.11
35%
Expansion Projects
(excluding Baseline)
$0.88
28%
Transit Service
Expansion
$0.41
13%
Draft SFTP
Discretionary funds by type
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
5
Total discretionary
revenue: $3.14Billion
Findings & Recommendations
Transit Operations
Crowding, unreliability, and service reductions continue without more investment; moreover,
current Muni service is financially unsustainable, need to study alternatives
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
6
Plan recommendations:
Invest $410M (13% of discretionary revenues)
toward continued/new transit services (mostly
Muni, plus potentially, a small amount for new
contracted regional bus service)
Result: Slows the decline of service, cuts
would still be inevitable
Other policy recommendations:
• Advocate for new, dedicated transit
operating revenue
• Pursue Muni cost management strategies,
in concert with regional efforts
Source: MTC Transit Sustainability Project
Findings & Recommendations
Transit Operations
7
Source: SF-CHAMP 4.3
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
Other policy recommendations, continued:
• Enable regional operator inbound pick ups
• Study/pilot new models of service delivery
Findings & Recommendations
Transit Maintenance
Unreliability and cost trends will continue to worsen unless we act decisively to address SOGR.
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
8
Plan rec’s:
Increase transit SOGR investment by $10M/
year (9% of discretionary revenue) toward
capital asset maintenance (vehicles, facilities,
guideways) to fund 70% of most critical needs
Result: Replace all vehicles and 70% of other
mission critical assets on time
Other policy rec’s:
• Finish Muni Asset Mgmt System, C3 and
Radio Replacement projects
• Implement Muni Facilities Plan
• Develop pipeline of projects and funding
strategy Source: SFMTA Transit Effectiveness Project
Findings & Recommendations
Local Streets and Roads Maintenance
Without significant investment pavement degradation will impair safe travel by all modes.
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
9
Plan rec’s:
Increase LS&R investment by $460M (over
$16M/year, 15% of discretionary revs) for pavement
resurfacing and reconstruction
Result: Over time, worsens PCI about 15% to 50’s (vs.
64 today)
Other policy rec’s:
• Do “Smart SOGR” – follow the paving/sewer
project for complete streets, reduced costs
• Support full roll-out of Envista as a map-based
coordination platform for street/sewer
improvement projects
• Must advocate for additional resurfacing funding
Findings & Recommendations
Programmatic Enhancements
The city can deliver Complete Streets more efficiently and effectively than today.
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
10
Plan rec’s: Invest $640M (20% of
discretionary revenue) into multi-modal
(pedestrian, bicycling, traffic calming,
signal) projects.
Note: This investment level represents
aspirational delivery rates, based on past and
current indications; it could be delivered in ½
the Plan period with strong policy and political
support.
Result: Safer, more complete pedestrian,
bicycle and transit networks; calmer
streets, smoother traffic flows
Source: SFMTA Pedestrian Strategy
Findings & Recommendations
Programmatic Enhancements – complete streets
The city can deliver Complete Streets more efficiently and effectively than today.
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
11
Other policy rec’s:
• Increase transparency and public
involvement through “Citizen’s Guide to
Transportation Improvements in SF”
• Clarify city’s Complete Streets design
policies, processes and standards.
• Support MTA’s revised Traffic Calming
program, Pedestrian Strategy, and
creation of signals investment strategy
(e.g., for the “Sfgo” program).
Findings & Recommendations
Programmatic Enhancements - transit
Muni and Regional transit enhancements – a focus on “customer first” improvements
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
12
Plan recommendations:
Maintain existing levels at $330M or $11.8M/year (10.5% of
discretionary revs) toward transit enhancements, e.g. development of
regional and local transit hubs with real-time information and access
improvements, including integration of bike/car sharing, taxi and
pedestrian safety, e.g. at Balboa Station
Result: More consistent and convenient user experience
Other policy rec’s:
• Coordinate major capital projects e.g. Embarc./Montgomery BART
stations with Transbay Terminal, Better Market Street
• Coordinate transit investment with land use development plans, M-
Line, Bayview Waterfront Transit Center, Geneva BRT, Treasures Island
• Increase regional partnerships & advocacy to develop project pipeline
Findings & Recommendations
Programmatic Enhancements – Transportation Demand Mgmt
We must broaden our Transportation Demand Management (TDM) efforts to reach our goals.
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
13
Plan recommendations:
Increase TDM investment to $60M ($2.1M/year, or 2% of
discretionary revs) for strategies to encourage time and mode
shifts away from single-occupant automobile trips.
Other policy rec’s:
• Continue to develop pricing and other peak–spreading
strategies (Treasure Island, Cordon Pricing, parking pricing,
and Employer policies)
• Develop MTA regulatory programs to allow safe integration
of 3rd party providers (Muni Partners, taxi/ride-sharing)
• Encourage, grow community-based mobility solutions, e.g.
vehicle sharing, volunteer driver program
• Explore area-wide parking cap or employer trip reduction
programs for SoMA/MissionBay
Findings & Recommendations
Efficiency and expansion projects
We must improve system performance (reliability, travel times) to meet existing and future
demands.
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
14
Plan recommendations:
Investment $880M ($31M/year, or 28% of discretionary revs) in new projects and studies to raise
the operational efficiency of our system and meet the demands of growth.
Findings & Recommendations
Efficiency and expansion projects
We must improve system performance (reliability, travel times) to meet existing and future
demands.
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
15
In addition to the Committed Projects,
the Plan includes:
• Continued rapid transit network
development for travel times and
reliability (TEP, Geary, Geneva and
Potrero/Bayshore BRT
• Address rapid network
capacity and
performance
bottlenecks (Transit
Performance
Initiative, BART
Metro)
Findings & Recommendations
Efficiency and expansion projects
We must improve system performance (reliability, travel times) to meet existing and future
demands.
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
16
In addition to the Committed Projects, the Plan includes:
• Setting a vision for SF freeway management strategies
• Study of our long range BART/Muni/Caltrain transit
network development
Other Policy Rec’s:
• Seek the delivery of Caltrain Electrification by 2019
• Solidify the plan for delivering DTX
• Expansion of P3s, value capture to replace
Redevelopment mechanism, and pursue other innovative
project delivery approaches, with strong revenue
advocacy for our priorities.
Findings & Recommendations
Equity-focused Investments
The draft Plan responds to recent findings of Authority’s equity analysis identifying some
geographic and socio-economic disparities
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
17
Geographic equity support:
• Enhance regional transit system
access – new regional transit access
pilot, e.g. West side to Caltrain,
BART
• Improve reliability, especially in
outer parts of the city – SOGR,
transit enhancement (real time
information displays) and transit
priority network development
• Implement neighborhood
transportation improvements in
every district, e.g. through upcoming
5-year Prop K programs
Findings & Recommendations
Equity-focused Investments
The draft Plan responds to recent findings of Authority’s equity analysis identifying some
geographic and socio-economic disparities
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
18
Socio-Economic equity support:
• Pedestrian Safety funding, including SR2S, SR2T, traffic
calming , education, outreach, and enforcement funds
• Bicycle network development and implementation
• Mobility management support for CBOs (e.g. Bayview shuttle-
sharing)
• Bikeshare/carshare initiatives (address affordability)
• Increased planning funds to build neighborhood capacity and
a strong pipeline of projects
Plan Performance
19
Source: SF-CHAMP 4.3 and DPW
• Despite limited new
resources, the Plan
achieves modest
performance in all goal
areas
• However, underfunding
road and transit
maintenance
counteracts SOGR gains
from reduced crowding
• Specific corridors see
more dramatic
performance gains
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
Differentiating Between Scenarios: Environment
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 20
2000
2500
3000
3500
4000
4500
5000
5500
6000
6500
7000
1990 2000 2010 2015 2020 2025 2030 2035 2040
MetricTonsofGHGEmitted
Healthy Environment: Greenhouse Gas Emissions*
2040 Goal:
2,400
Plan With
Congestion Pricing:
3,915 to 4,100
Plan Without
Congestion Pricing:
4,215 to 4,400
Expected Trend:
4,440 to 4,500
*Average weekday on-road mobile emissions
Differentiating Between Scenarios: Livability
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 21
45%
47%
49%
51%
53%
55%
2010 2015 2020 2025 2030 2035 2040
ShareofAllTripsbyAutomobile
Livability: Percent of Weekday T rips Made by Auto
Plan With
Congestion Pricing:
47-50%
Plan Without
Congestion Pricing:
48% to 51%
2040 Goal: Below 50%
Expected Trend:
51% to 52%
Plan Investment vs. Need
0.41 0.28 0.46
1.03 0.88
0.99 0.75
0.56
0.51
0.72 0.63
2
4
1.53
1
2.9
0
1
2
3
4
5
6 "Priority 2" Need
"Priority 1" Need
Discretionary Revenue
(Financially Constrained
Investment Strategy)
22
S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
Billions
Thank ou!For For meeting schedule through July,
see:
www.movesmartsf.org
www.sfcta.org/MoveSmartSF
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA |
www.facebook.com/MoveSmartSF
San Francisco Transportation Plan
Making It Happen:
An Implementation Strategy for the SFTP
What’s working? What’s not?
 Looking Back – past studies, Prop K and E data,
public input
 Looking Around – reviewing how transportation is
done in other places, what can we learn?
 Looking Ahead – continue what works, address
areas that need improvement, pilot new
approaches
SFTP Implementation Strategies
2SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
Transportation in San Francisco is a complex machine:
Myriad of forces (too many to show here!) shape our transportation system
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA |
www.facebook.com/MoveSmartSF
3
Public Agencies
(i.e. SFMTA,
DPW, PUC,
SFCTA, BART,
MTC, Caltrans,
FTA, FHWA)
Funding
External
Forces
Transportation
network
Federal
StateRegional
Local
Public
CEQA/NEPA
Land use
Economy
Daily
challenges
Collisions
Legal issues
Shifting
political
priorities
Weather
Top concerns we hear from the public
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA |
www.facebook.com/MoveSmartSF
4
We should be
able to deliver
projects faster
We deserve a
better
transportation
system
We need better
coordination
between
agencies and
with the public
We need to get
the biggest
bang for our
transportation
buck
What we found:
 We are working on the right projects (pedestrian,
traffic calming) but they are taking too long, and
too often are uncoordinated.
 Pilots are effective– high demand for more pilots
and near-term improvements, but agencies can’t
keep up, e.g. traffic calming.
 Initial “complete streets” are popular, but
expensive e.g. Valencia. The public wants more,
but we lack strong policies and processes to
prioritize, design and build them cost-effectively.
Looking Back
5SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
 It’s not clear how transportation planning and funding processes work,
and outreach is inconsistent, leading to shifting priorities and uneven or
inadequate public involvement, with problematic outcomes.
Strategic Initiatives:
Complete Streets and Project Delivery
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 6
 Complete Streets: Provide more benefit
with each transportation investment by
creating a cost-effective complete
streets approach from planning to
implementation
 Project Delivery: Increase transparency,
shorten the timeline for project delivery
and increase “bang for the buck”
Complete Streets are wonderful, and in high
demand…
7www.sfcta.org | twitter.com/SanFranciscoTA | www.facebook.com/SFCTA
But they pose policy, funding and institutional
challenges
8www.sfcta.org | twitter.com/SanFranciscoTA | www.facebook.com/SFCTA
graphic: SFMTA
 Dispersed responsibility for streets is a common feature among cities
 Street management
and improvement
decisions require
strong policy
direction,
coordination
 Including multiple
features rapidly
increases a project’s
cost, with varying
implications for cost-
effectiveness
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY 9
Toward more Complete Streets:
Set realistic expectations, improve city practices
We recommend program designed to clarify complete streets expectations
by creating a culture and consistent practice of multi-modal design:
 Recognize trade-offs, prioritize our efforts: How many
multi-featured projects can/should we deliver per year?
 Design Standards – e.g. define standard bulb-out
designs and cost-estimates
 Design rules - establish “must,” “should,” “may”
practices) for incorporating complete street elements
 Design processes -mainstreaming practice of multi-
modal design, value engineering, alternatives analysis
 Funding practices - Set up “joint opportunities” funding
pots to facilitate and incentivize add-ons to a project
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 10
Looking Around
How can we improve project delivery in the city?
source: LA Metro
 Larger Project Delivery
► Review of SF experience
► Case Studies of Southern CA
experience
 Small Projects Delivery
► Review of past local studies,
reports, Prop K data
► Interviews with local elected and
civic, community leaders
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 11
SF Project Delivery Assessment
Preliminary Findings
 Project identification, prioritization
processes and status are not always
transparent
 Publish multi-agency “Citizen Guide to
Transportation Project Development”
 Expand monitoring and accountability tools
and websites (like MyStreetSF.com)
 Political champions and agency leadership
needs to be focused on/aid project delivery
 Support strong project designs, necessary
trade-offs
 Set clear expectations for project schedules,
organizational culture shifts
Source: SANDAG
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 12
SF Project Delivery Assessment
Preliminary Findings
 Coordination across and within agencies is a
challenge
 Multi-departmental leadership is required to
make existing organizations more effective;
Common tools, e.g. Envista GIS map, can help
 Alternatively, re-organizing to focus roles and
accountability is an option
 Project managers are not empowered, resourced to deliver projects efficiently
 Strong PMs, with integrated, co-located project teams are needed
 Agencies should be encouraged to use alternative delivery methods, streamlined
procurement processes
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 13
Looking Ahead - Proposed Early Action
Neighborhood Transportation Improvement Program
 This Early Delivery demonstration
program is designed to:
► Respond to SFTP equity analysis
findings
► Demonstrate new complete streets and
project delivery approaches
► Result in on-the-ground improvements
within 5 years
 If desired by Authority Board, could be
approved through Prop K 5-year
Program updates this fall.
 Would seek to leverage Prop K with
other funds
Sample NTI Program
District Project
1 Geary: near term Ped/Signal improvements
1 Anza Ped/Bike improvements
2 Lombard Street Pedestrian and Streetcape
2 Ped Safety Mini Program: Marina Boulevard, SR2S
3 Columbus Ave Phase 1 (coordinate with paving, TEP)
3 Broadway Neighborhood Transportation Plan, traffic calming
4 Ocean Beach Plan Phase 1 - Sloat (Bike, Ped, Traffic Calming)
4,7 19th Ave Bulbouts Phase 1 (coordinate with TEP)
5 Fillmore Fill - planning study and design
5 Ped Safety Mini Program: Octavia/Oak, re-open x-walks
6 Ped Safety Mini Program: 6th St (coordinate with BMS)+SR2S
6 Ellis/Eddy Traffic calming/pedestrian improvements
7 Ped Safety Mini Program: Traffic calming, bulbouts etc.
8 Glen Park Plan plaza/access improvements
8,9,11 SJ/Guerrero Re-design and multi-modal (Bike/Ped) improvements
9 Ped Safety Mini Program: SR2S/Ped or Mission Streetscape
10 Palou Streetscape and Paving
10
Ped Safety Mini Program: New sidewalks, SR2T (22nd
Street Station) SR2S
11 Mission Terrace planning and project
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 14
5-Year Prop K Prioritization Programs
How do you want to spend Prop K sales tax dollars?
 Check out MyStreetSF.com – anything
missing? If so, propose it this summer
 5-Year Program Updates: 21 categories of
transportation investment in Prop K Sales
Tax Program
► All modes, types of projects
► Local and regional agency sponsors
► Public outreach and involvement planned
for Summer to Fall 2013
 Stay tuned for updates at SFCTA website:
sfcta.org or movesmartsf.com
Prop
K
Questions?
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA |
www.facebook.com/MoveSmartSF
TheSanFrancisco TransportationPlan
SFCTA Board Workshop
May 30th, 2013
Land Use, Growth & Implementation
Express
Bus
Current
BART
Muni Metro
Caltrain
Muni TEP Rapid
Network
1 Dot = 100
Central Subway
High Speed Rail
Bus Rapid Transit
Households
Jobs
Express
Bus
Current
BART
Muni Metro
Caltrain
Muni TEP Rapid
Network
1 Dot = 100
Central Subway
High Speed Rail
Bus Rapid Transit
Households
Jobs
Land Use Today
Households Change Jobs Change
REGION 700,000 27% 1,120,000 33%
SAN FRANCISCO 92,410 25% 190,740 34%
Priority Development Areas 80,000 48% 145,000 30%
Rest of City 12,410 6% 45,740 18%
GROWTH
2010 - 2040
•	Region will grow
substantially; 	
San Francisco will
take large share.
•	PDA’s today can
accommodate 80%
of San Francisco’s
growth.
•	New development
guided to build new,
vibrant, mixed use
Potential Housing
80,000
UNITS
Potential Employment
145,000
JOBS
Priority
Development
Areas
Express
Bus
2040
BART
Muni Metro
Caltrain
Muni TEP Rapid
Network
1 Dot = 100
Central Subway
High Speed Rail
Bus Rapid Transit
Households
Jobs
Express
Bus
2040
BART
Muni Metro
Caltrain
Muni TEP Rapid
Network
1 Dot = 100
Central Subway
High Speed Rail
Bus Rapid Transit
Households
Jobs
Projected Growth to 2040
Photo by Josef Willems
Implementation
Transportation Element Update
Central Corridor Plan
SoMa Circulation Plan
Parking Supply Management Strategies
BiCounty: T-Third to Bayshore Station
19th Avenue Transit Study
Better Market Street
Invest In Neighborhoods
Projects Underway
Linking
Transportation
& Land Use
Transportation Vision
Initial Policy Analysis
05 | 30 | 2013
SAN FRANCISCO, CALIFORNIA
SFMTA | Municipal Transportation Agency Image: Market and Geary Streets, circa 1920s, Muni Centennial logo
SF Total Transportation Needs
• A well-functioning transportation system is
foundational to the City’s health and economic vitality
• >$4 billion already spent each year on transportation
– Over $1 billion public funds spent annually on transportation
– Approx. $3 billion private funds spent annually operating and
maintaining private transportation
• Almost $900 million a year needed to meet goals
– Operating, Maintenance, Repair and Expansion
2
Two-tiered strategy for the transport system
Transport
Strategy
Travel ChoicesDemand Pricing
Demand Management
Priority Transit Complete Streets Vehicle Sharing
Infrastructure Support
Smart Land-Use
4
Link land use
with
growing
travel
markets
Virtuous Cycle of Integrated
InvestmentsIntegration
Project Investment Mode Shift Effect
More comfortable bicycle
facilities = more transit
capacity
Car/bike/scooter
sharing, taxi demand
grows
investments in bicycling
infrastructure, facilities &
programs
More transit and bicycle
trips = more walking and
more economic
development
investments in walking
infrastructure, facilities &
programs
investments in transit
reliability and frequency
programs
investments in demand
management and vehicle
sharing programs
48th Ave to Market/Third:
35 min-45 min
Ocean Beach
to Embarcadero:
40-50 min
Third St., Bayshore
to Embarcadero:
40-50 min
Caltrain,
Bayshore
to Fourth/King:
15 min (+9 to
Embarcadero)
BART, Daly City
to Embarcadero:
17 min
19th/Holloway
to Embarcadero:
30-45 min
Network:
• Rail
• Rapid Transitways
• Local Service
• Historic Network
Transit
Network
Travel Time
Variability
Assessment
Network
Conditions
West Portal
Market & Van Ness
Embarcadero
Fourth/King
Church & Duboce
Balboa Park
Network:
• Rail
• Rapid Network
• Local Service
• Historic Network
Increasing growth &
congestion can lead to:
• Reliability & travel
time variability
• Slower operating
speeds
• Vehicle capacity/
crowding
• Network
vulnerability
• Hotspots &
bottlenecks
Core Capacity Needs &
Rail Pinch-Points
Transit
Strategy
Long-term
Transit
Vision
Upgrade the
core capacity
Lines
48th Ave to
Market/Third:
25 min
Ocean Beach
to Embarcadero :
25 min
Wharves
to Moscone:
10 min
Daly City
to Embarcadero:
25 min
Bayshore &
Hunters Point
to Market St.:
25 min
DRAFT
9
Emerging Bicycle Core AreaBicycle
Strategy
10
Travel experience of networkBicycle
Strategy
DRAFT
Focus on
45 miles
11
Primary bicycle corridors analysisBicycle
Strategy
DRAFT
12
12
12
12
Corridor AnalysisBicycle
Strategy
DRAFT
Source: SFMTA , US Census Data, Land-use & gradient analysis
Strategic Gap Closure High Stress Point in Network
13
Strategic Network Gap ClosuresBicycle
Strategy
DRAFT
Funding Needs Investment Scenarios
14
• “Bicycle Plan Plus” Scenario:
– $60 million through 2018
• Strategic Plan Scenario :
– $200 million through 2018
• System Build-out Scenario:
– $600 million
=
+
44 Miles of High Priority Segments (HPS) Need
Complete Street Type Treatments by 2021
15
High Priority Streets for focused investmentPedestrian
Strategy
• Core Projects and Programs $ 60 m
• Best Practices Projects $303 m
Total Need $363 m
1616
Core Investment NeedsPedestrian
Strategy
Vehicle &
Ride Sharing Increasing travel options
SF Private Auto Fleet Trends and Goals
1990 2000 2010 2020 2030 Goal
400
375
350
325
300
275
250
0%
PrivateAutoFleet(000s)
15- 25% fleet reduction potential with
significant vehicle sharing growth
Trend
Potential
Vehicle
Sharing
Opportunity
Vehicle &
Ride Sharing Vehicle sharing potential
Transportation System Needs Investment
• Today’s system is under-resourced for current and
future needs, despite ongoing efficiency improvements
• Tradeoffs have to be made in rights of way priority and
demand management tools to meet goals
• The key is to help reduce everyone’s transportation
budget, improve overall transportation efficiency and
increase our economic competitiveness.
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA |
www.facebook.com/MoveSmartSF
San Francisco Transportation Plan
Vision and Revenue Strategy
May 30, 2013
We need additional transportation revenues to bring our
system to a SOGR and to meet the public’s demand for
improvements, but must use existing revenues more efficiently
to build voter confidence
 New/improved approaches to project delivery
 Investing in projects that reduce ongoing
operations and maintenance costs (e.g. Transit
Effectiveness Project, staggered fleet replacements
to reduce average age of fleet)
 Findings ways to control cost escalation
SFTP Revenue Strategies
Use Existing Revenues More Efficiently
2SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
Potential New Funding Sources
Key policy considerations
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 3
The size of SF’s unfunded need is so large, that it demands a multi-pronged
approach:
 Use what we have more efficiently
Maximize capture of discretionary revenues and leverage private sector
Identify new sources of revenues
Continued uncertainty at the federal and state levels present opportunities (e.g.
Public-Private Partnerships), but also mean new revenues might need to be local
solutions in the near-term
Still, SF should proactively develop strong regional (e.g. future bridge toll), state
(e.g. cap and trade) and federal (next transportation act) advocacy platforms
Potential New Funding Sources
Local Sources Being Evaluated
Examples include:
Additional ½ cent sales tax (for a total of 1% of
SF local sales tax capacity dedicated to
transportation)
Parcel tax (flat rate or progressive)
Citywide community facilities district (Mello-
Roos)
Local & regional gas taxes
Vehicle license fee
Express lanes on US 101/I-280
General obligation bonds
Regional VMT fee
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 4
Each revenue source involves tradeoffs
Some sources present challenges from an equity standpoint – each
needs to be comprehensively evaluated
Other public priorities (education, health care, parks, etc.) are also
competing for public funding
Ongoing coordination with Mayor’s Transportation 2030 Task Force
“What If” scenarios let us
imagine what our transportation
system might look like if we
have additional transportation
revenues.
And, it helps to shape revenue
advocacy strategy by:
 Increase efficient use of
existing funds
 Demonstrating ability to
leverage other sources of
funding (public and private)
 Building consensus on our
federal, state, regional “Asks”
What if….we had more revenues?
Revenue Levels for Vision Scenarios
5SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
$6+ billion more might require a mixture
of big, medium and smaller sources
such as:
• $4.0 B - another half-cent sales tax
• $1.0 B - general obligation bonds
• $0.8 B - additional Federal funds
• $0.5 B - community benefits district
$10 billion more might require all of the
above, plus something like:
• $2.7 B - 1.35% SF vehicle license fee
• $1.0 B - even more Federal funds
• $0.2 B - 0.5% MUNI op’g cost savings
www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA |
www.facebook.com/MoveSmartSF
Thank You. Questions?

More Related Content

What's hot

Lessons Learned in Transit Efficiencies, Revenue Generation, and Cost Reductions
Lessons Learned in Transit Efficiencies, Revenue Generation, and Cost ReductionsLessons Learned in Transit Efficiencies, Revenue Generation, and Cost Reductions
Lessons Learned in Transit Efficiencies, Revenue Generation, and Cost ReductionsNew York Public Transit Association
 
Cost Cutting through Information Systems: Using Google Transit as a Model
Cost Cutting through Information Systems: Using Google Transit as a ModelCost Cutting through Information Systems: Using Google Transit as a Model
Cost Cutting through Information Systems: Using Google Transit as a ModelNew York Public Transit Association
 
Staff Report 15-069 2014 Ridership and Route Performance
Staff Report 15-069 2014 Ridership and Route PerformanceStaff Report 15-069 2014 Ridership and Route Performance
Staff Report 15-069 2014 Ridership and Route PerformanceHoward Der
 
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...Emmanuel Mongaya
 
Scarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation PlanScarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation PlanToronto Public Consultation Unit
 
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016Fairfax County
 

What's hot (20)

SAFETEA-LU Reauthorization Context & Issues
SAFETEA-LU ReauthorizationContext & IssuesSAFETEA-LU ReauthorizationContext & Issues
SAFETEA-LU Reauthorization Context & Issues
 
Lessons Learned in Transit Efficiencies, Revenue Generation, and Cost Reductions
Lessons Learned in Transit Efficiencies, Revenue Generation, and Cost ReductionsLessons Learned in Transit Efficiencies, Revenue Generation, and Cost Reductions
Lessons Learned in Transit Efficiencies, Revenue Generation, and Cost Reductions
 
Grid Un-Locked - Week 3
Grid Un-Locked - Week 3Grid Un-Locked - Week 3
Grid Un-Locked - Week 3
 
Grid Un-Locked - Week 1
Grid Un-Locked - Week 1Grid Un-Locked - Week 1
Grid Un-Locked - Week 1
 
SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015
 
Grid Un-Locked - Week 2
Grid Un-Locked - Week 2Grid Un-Locked - Week 2
Grid Un-Locked - Week 2
 
MTA Bus Customer Information Systems
MTA Bus Customer Information SystemsMTA Bus Customer Information Systems
MTA Bus Customer Information Systems
 
Cost Cutting through Information Systems: Using Google Transit as a Model
Cost Cutting through Information Systems: Using Google Transit as a ModelCost Cutting through Information Systems: Using Google Transit as a Model
Cost Cutting through Information Systems: Using Google Transit as a Model
 
Draft Relief Line Corridor Evaluation
Draft Relief Line Corridor EvaluationDraft Relief Line Corridor Evaluation
Draft Relief Line Corridor Evaluation
 
01.ENTRIPS
01.ENTRIPS01.ENTRIPS
01.ENTRIPS
 
Toronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting PresentationToronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting Presentation
 
June Relief Line Update
June Relief Line UpdateJune Relief Line Update
June Relief Line Update
 
AICPA GPAC presentation
AICPA GPAC presentationAICPA GPAC presentation
AICPA GPAC presentation
 
Staff Report 15-069 2014 Ridership and Route Performance
Staff Report 15-069 2014 Ridership and Route PerformanceStaff Report 15-069 2014 Ridership and Route Performance
Staff Report 15-069 2014 Ridership and Route Performance
 
DTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
DTPW's Rapid Transit Corridors Conceptual Financial Plan ProposalDTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
DTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
 
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
 
Scarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation PlanScarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation Plan
 
15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation
 
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 

Similar to San Francisco Transportation Plan - May 30, 2013 Board Workshop Presentations

San Francisco Mobility Access and Pricing Study: Study Findings and Public Fe...
San Francisco Mobility Access and Pricing Study: Study Findings and Public Fe...San Francisco Mobility Access and Pricing Study: Study Findings and Public Fe...
San Francisco Mobility Access and Pricing Study: Study Findings and Public Fe...SanFranciscoTA
 
2040 RTP Outcomes Summary
2040 RTP Outcomes Summary2040 RTP Outcomes Summary
2040 RTP Outcomes SummaryCHCRPA
 
Timothy Papandreou - Sustainable Mobility Strategy
Timothy Papandreou - Sustainable Mobility StrategyTimothy Papandreou - Sustainable Mobility Strategy
Timothy Papandreou - Sustainable Mobility StrategyINVERS Mobility Solutions
 
2040 RTP Highlights
2040 RTP Highlights2040 RTP Highlights
2040 RTP HighlightsCHCRPA
 
Visualize 2045: Highlights from the Draft Plan
Visualize 2045: Highlights from the Draft PlanVisualize 2045: Highlights from the Draft Plan
Visualize 2045: Highlights from the Draft PlanFairfax County
 
Transportation Summit08 Tom Prendergast
Transportation Summit08 Tom PrendergastTransportation Summit08 Tom Prendergast
Transportation Summit08 Tom PrendergastCrooky
 
2040 lrtp executive summary
2040 lrtp executive summary2040 lrtp executive summary
2040 lrtp executive summaryBrendan O'Connor
 
AICP Prep Course - Transportation Module
AICP Prep Course - Transportation ModuleAICP Prep Course - Transportation Module
AICP Prep Course - Transportation Modulealexbond68
 
AICP Prep Course - Transportation Planning
AICP Prep Course - Transportation PlanningAICP Prep Course - Transportation Planning
AICP Prep Course - Transportation Planningguestd509af
 
April 21 Complete Streets Open House Boards
April 21 Complete Streets Open House BoardsApril 21 Complete Streets Open House Boards
April 21 Complete Streets Open House BoardsCityofBoulder
 
Session 43: The Current State of Play on the Transportation Bill in Washingto...
Session 43: The Current State of Play on the Transportation Bill in Washingto...Session 43: The Current State of Play on the Transportation Bill in Washingto...
Session 43: The Current State of Play on the Transportation Bill in Washingto...Sharon Roerty
 
9/10 SAT 8:30 | Planning for Walkable Multimodal Neighborhoods
9/10 SAT 8:30 | Planning for Walkable Multimodal Neighborhoods9/10 SAT 8:30 | Planning for Walkable Multimodal Neighborhoods
9/10 SAT 8:30 | Planning for Walkable Multimodal NeighborhoodsAPA Florida
 
Partnering for Performance with State DOTs: North Carolina
Partnering for Performance with State DOTs: North CarolinaPartnering for Performance with State DOTs: North Carolina
Partnering for Performance with State DOTs: North CarolinaRPO America
 
Final_SierraClubLP_SSF_DSAP_CommentLetter
Final_SierraClubLP_SSF_DSAP_CommentLetterFinal_SierraClubLP_SSF_DSAP_CommentLetter
Final_SierraClubLP_SSF_DSAP_CommentLetterKenneth Rosales
 
Policy conundrums in urban transport
Policy conundrums in urban transportPolicy conundrums in urban transport
Policy conundrums in urban transportTristan Wiggill
 
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.OV Consulting
 
Smart Commute Initiative: Implementing a Regional Workplace-based TDM Program...
Smart Commute Initiative: Implementing a Regional Workplace-based TDM Program...Smart Commute Initiative: Implementing a Regional Workplace-based TDM Program...
Smart Commute Initiative: Implementing a Regional Workplace-based TDM Program...Smart Commute
 

Similar to San Francisco Transportation Plan - May 30, 2013 Board Workshop Presentations (20)

San Francisco Mobility Access and Pricing Study: Study Findings and Public Fe...
San Francisco Mobility Access and Pricing Study: Study Findings and Public Fe...San Francisco Mobility Access and Pricing Study: Study Findings and Public Fe...
San Francisco Mobility Access and Pricing Study: Study Findings and Public Fe...
 
2040 RTP Outcomes Summary
2040 RTP Outcomes Summary2040 RTP Outcomes Summary
2040 RTP Outcomes Summary
 
Timothy Papandreou - Sustainable Mobility Strategy
Timothy Papandreou - Sustainable Mobility StrategyTimothy Papandreou - Sustainable Mobility Strategy
Timothy Papandreou - Sustainable Mobility Strategy
 
2040 RTP Highlights
2040 RTP Highlights2040 RTP Highlights
2040 RTP Highlights
 
Visualize 2045: Highlights from the Draft Plan
Visualize 2045: Highlights from the Draft PlanVisualize 2045: Highlights from the Draft Plan
Visualize 2045: Highlights from the Draft Plan
 
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
 
Transportation Summit08 Tom Prendergast
Transportation Summit08 Tom PrendergastTransportation Summit08 Tom Prendergast
Transportation Summit08 Tom Prendergast
 
2040 lrtp executive summary
2040 lrtp executive summary2040 lrtp executive summary
2040 lrtp executive summary
 
AICP Prep Course - Transportation Module
AICP Prep Course - Transportation ModuleAICP Prep Course - Transportation Module
AICP Prep Course - Transportation Module
 
AICP Prep Course - Transportation Planning
AICP Prep Course - Transportation PlanningAICP Prep Course - Transportation Planning
AICP Prep Course - Transportation Planning
 
April 21 Complete Streets Open House Boards
April 21 Complete Streets Open House BoardsApril 21 Complete Streets Open House Boards
April 21 Complete Streets Open House Boards
 
Cleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National PerspectiveCleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National Perspective
 
Session 43: The Current State of Play on the Transportation Bill in Washingto...
Session 43: The Current State of Play on the Transportation Bill in Washingto...Session 43: The Current State of Play on the Transportation Bill in Washingto...
Session 43: The Current State of Play on the Transportation Bill in Washingto...
 
9/10 SAT 8:30 | Planning for Walkable Multimodal Neighborhoods
9/10 SAT 8:30 | Planning for Walkable Multimodal Neighborhoods9/10 SAT 8:30 | Planning for Walkable Multimodal Neighborhoods
9/10 SAT 8:30 | Planning for Walkable Multimodal Neighborhoods
 
Mobility Fees - An Overview
Mobility Fees - An OverviewMobility Fees - An Overview
Mobility Fees - An Overview
 
Partnering for Performance with State DOTs: North Carolina
Partnering for Performance with State DOTs: North CarolinaPartnering for Performance with State DOTs: North Carolina
Partnering for Performance with State DOTs: North Carolina
 
Final_SierraClubLP_SSF_DSAP_CommentLetter
Final_SierraClubLP_SSF_DSAP_CommentLetterFinal_SierraClubLP_SSF_DSAP_CommentLetter
Final_SierraClubLP_SSF_DSAP_CommentLetter
 
Policy conundrums in urban transport
Policy conundrums in urban transportPolicy conundrums in urban transport
Policy conundrums in urban transport
 
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.
 
Smart Commute Initiative: Implementing a Regional Workplace-based TDM Program...
Smart Commute Initiative: Implementing a Regional Workplace-based TDM Program...Smart Commute Initiative: Implementing a Regional Workplace-based TDM Program...
Smart Commute Initiative: Implementing a Regional Workplace-based TDM Program...
 

Recently uploaded

Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 

Recently uploaded (20)

Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 

San Francisco Transportation Plan - May 30, 2013 Board Workshop Presentations

  • 1. www.sfcta.org/MoveSmartSF SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY San Francisco Transportation Plan Overview and Introduction May 30, 2013
  • 2. Purpose of the San Francisco Transportation Plan 2 What is it?  San Francisco’s transportation investment program for all modes, operators to year 2040  Supporting policies and strategic initiatives  Funding and implementation strategy How will it be used?  Informs local plans and investments (Transportation Element Update, SFMTA and CCSF capital plans)  Guides SF’s input to regional planning efforts (BART Strategic Plan, 2017 RTP)  Advocating together for San Francisco’s fair share  Positions SF for future funding opportunities and policy discussions at state, national level S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
  • 3. Accomplishments of 2004 Countywide Transportation Plan New Capital Projects – Constructed or Underway  T-Third, Central Freeway/Octavia Blvd  Doyle Drive (Presidio Parkway)  Central Subway, Transbay Terminal Phase 1 Development of a Network of Rapid Buses  $45M FTA funds committed to Van Ness BRT  EIRs for Geary BRT and SFMTA’s Transit Effectiveness Project underway Bicycle, Pedestrian, Traffic Calming, Streetscape Improvements  Provided stable stream of funding for traffic calming  Leland, Valencia and Broadway re-designs Parking management and road pricing  $20M USDOT grant for SFpark  Mobility Access & Pricing Study, Treasure Island Program 3 Neighborhood Transportation Plans  Outer Mission, Mission/Valencia  Tenderloin/Little Saigon  Bayview  W. SOMA  Balboa, Cesar Chavez East
  • 4. New transportation goals and city development objectives 2013 Regional Transportation Plan: new projects  Blended High Speed Rail/Caltrain Electrification/Transbay/Downtown extension  BART Metro, Transit Effectiveness Project, SF Pricing Program SB375, SF Climate Action Strategy  SF goal: reduce GHGs to 80% below 1990 levels by 2050  Regional Transportation Plan Update includes a Sustainable Communities Strategy Bicycle and Pedestrian Safety Directives  BoS: 20% Bicycle Mode Share by 2020  Mayor’s Directive: 50% reduction in pedestrian injuries by 2020 Demand Management to Support Approved Plans  Bayview Waterfront, Treasure Island, Park Merced Plans  SFMTA Parking and Shuttle Management policies 4 S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
  • 5. The Challenge -101k households, 191k jobs in San Francisco in Plan Bay Area Preferred Scenario Source: ABAG, Jobs-Housing Connection Scenario
  • 6. Final Vision Scenario FINAL ADOPTED PLAN Summer /Fall 2013 Draft Vision Scenario Revenue Strategy Developing the SFTP 6 Goals, Needs, & Available Funding $64.3B State of Good Repair Needs (O&M) DRAFT Financially Constrained Plan Spring 2013 Projects Public Feedback Programs Sector Policies S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y Public Feedback 6 • 4 strategic initiatives • 3 special market analyses • 2 equity initiatives • New revenue / legislative advocacy platform
  • 7. “What would it take” to achieve our goals? Create a more livable city Ensure a healthy environment Provide world-class infrastructure & service Strengthen the city’s regional competitiveness Non-auto mode share >50% No change in commute travel time to SF ~50% below 1990 GHG emissions State of good repair
  • 8. SFTP needs assessment framework Healthy Environment  Vehicle miles traveled  Greenhouse gas emissions  Active Transportation (walking & biking) Trips Livability  Travel safety  Transfers/Transit trip  Non-auto trip shares  School trip needs State of Good Repair  Crowded Transit Lines  Pavement Condition Index  Transit Reliability  Structural Sufficiency Economic Competitiveness  Congested Streets, Commute times  Peak: Off-peak Drive Travel Time  Goods movement needs and visitor access Equity Public Input Transportation System Performance  Total trip-making  Mode share  Avg Occupancy (PMT/VMT)  Transit: Auto Travel Time Ratio S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 8
  • 9. Our growth and transportation challenge Planned growth through 2040  101,000 new households  191,000 new workers  603,000 more daily car trips (more than the combined daily volume of Bay Bridge and Golden Gate Bridge crossings) New Jobs by Plan Area New Housing by Plan Area S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
  • 10. > 5 Million trips to/from/within SF by 2040 33% more trips than today 10 Source: SF-CHAMP 4.3 2,025,000 765,000 72,000 932,000 603,000 279,000 40,000 329,000 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 Auto Transit Bike Ped Total Trips To, From, and Within SF by Mode 2012: Total 2040: Additional Trips S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y • Projected growth in car trips is 40% MORE than current daily Golden Gate and Bay Bridge crossings • Slightly over half of all daily trips made by car • Current 3.5% bike mode share
  • 11. Pavley Law 11 Example: Healthy Environment Scenario can only approach goal w/aggressive policy change Bundle Previous Trend Expected Trend Goal San Francisco GHG Emissions Trend vs. Goal (on-road mobile, weekday) Source: SF CHAMP 4.1 Draft SCS, SFCTA, 2011 2 3 4 5 6 7 8 9 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035 MetricTons/Day(1000s) More aggressive!!  $10B infrastructure  Local road user pricing  Up to 16% EV fleet  $10B+ infrastructure  Regional pricing at 2x today’s operating costs  Up to 25% EV fleet S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
  • 12. Change in local auto trips: 2012-40 Source: SF-CHAMP 4.3 S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 12
  • 13. Change in regional auto trips: 2012-40 Source: SF-CHAMP 4.3 S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 13
  • 14. Congestion impacts transit speeds  Transit trip takes 2-3 times longer than automobile trip in same market  Muni average transit speed – 8 mph;  Some Downtown streets between 5 and 10 mph Transit Speeds, Spring 2009** Auto LOS, Spring 2009* www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 14
  • 15. Muni crowding Morning peak hour, 2012 and 2040 15 Source: SF-CHAMP 4.3 S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
  • 16. Crowding on regional transit systems | Morning peak hour, 2012 and 2040 16 Source: SF-CHAMP 4.3 S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
  • 17. Pedestrian Injuries: Total number of injuries 17 Sources: Tract Populations: American Community Survey, 2009 Ped Collisions (2007-11): Statewide Integrated Traffic Reporting System (SWITRS) S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
  • 18. Deep and Broad Public Involvement www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 18  4 Rounds of Outreach at various stages (multi-lingual)  Community and Technical Advisory Committee - 13 meetings to date  Website, Newsletters  Social Media sites (facebook, twitter)  Dozens of presentations to Boards, Commissions, neighborhood groups  Tabling at community events and presentations
  • 19. Response to calls for projects: public input 19 300 submittals from both agencies and the public Support for “Fix It First” Support for projects to improve transit reliability and provide dedicated right-of-way Demand for traffic calming, pedestrian safety and enhancement, and bicycle improvements Demand for more frequent transit service (to alleviate crowding) S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
  • 20. Desire for more investment in walking, cycling, + Muni enhancements 20 Investment in Programs S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
  • 21. Prioritizing discretionary revenue 21 S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y How should we prioritize $3.14 billion in uncommitted funds? State of Good Repair / Operations & Maintenance (O&M)  Improve transit reliability  Pavement quality, state and local structures Transportation enhancements and programs  Pedestrian safety, traffic calming  Bicycle facilities, Rapid Transit network Expansion projects  Relieve crowding; long range strategic rail investments  Develop freeway management strategies (US101, HWY280)
  • 22. Nearly 50 projects and programs were evaluated for cost effective contribution to plan goals Project performance evaluation S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 22
  • 23. Final Vision Scenario FINAL ADOPTED PLAN Summer /Fall 2013 Draft Vision Scenario Revenue Strategy Developing the SFTP 23 Goals, Needs, & Available Funding $64.3B State of Good Repair Needs (O&M) DRAFT Financially Constrained Plan Spring 2013 Projects Public Feedback Programs Sector Policies SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY Public Feedback
  • 24. www.sfcta.org/MoveSmartSF SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY Thank you! For more information see: www.movesmartsf.org www.sfcta.org/MoveSmartSF SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
  • 25. www.sfcta.org/MoveSmartSF SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY Draft San Francisco Transportation Plan May 30, 2013
  • 26. Draft SFTP Financially Constrained Investment Scenario S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 2 Total: $72.6Billion What we heard from the public: • More investment in operations and maintenance of the existing system Committed projects (Baseline) - $9.43B What we heard from the public: • More investment in operations and maintenance of the existing system • Better transit reliability, reduced transit crowding What we heard from the public: • More investment in operations and maintenance of the existing system • Better transit reliability, reduced transit crowding • Investment in safety projects, pedestrian infrastructure, traffic calming What we heard from the public: • More investment in operations and maintenance of the existing system • Better transit reliability, reduced transit crowding • Investment in safety projects, pedestrian infrastructure, traffic calming • Support for cost- effective projects that improve system efficiency
  • 27. Transit SOGR $55.18 76% Local Streets & Roads SOGR $7.78 11% Programs and Enhancements $1.22 2% Expansion Projects $8.27 11% Transit Service Expansion $0.41 0% Draft SFTP Total plan summary by type S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 3 Total discretionary revenue: $3.14Billion $YOE Billions Total $72.6
  • 28. Knitting it all together Investment Scenario Approach Complementary choices among investment types (e.g. replacement vehicles, rapid transit network development can increase effective level of transit service) But also:  Tradeoffs between and within investment types (e.g. Operations, Maintenance, Programs, Expansion), modes, geographic areas and Plan development considered multiple factors: Need, Performance, Cost-Effectiveness, Public Input , Policy/Plan status, Equity S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 4
  • 29. Transit SOGR $0.28 9% Local Streets & Roads SOGR $0.46 15% Programs and Enhancements $1.11 35% Expansion Projects (excluding Baseline) $0.88 28% Transit Service Expansion $0.41 13% Draft SFTP Discretionary funds by type S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 5 Total discretionary revenue: $3.14Billion
  • 30. Findings & Recommendations Transit Operations Crowding, unreliability, and service reductions continue without more investment; moreover, current Muni service is financially unsustainable, need to study alternatives S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 6 Plan recommendations: Invest $410M (13% of discretionary revenues) toward continued/new transit services (mostly Muni, plus potentially, a small amount for new contracted regional bus service) Result: Slows the decline of service, cuts would still be inevitable Other policy recommendations: • Advocate for new, dedicated transit operating revenue • Pursue Muni cost management strategies, in concert with regional efforts Source: MTC Transit Sustainability Project
  • 31. Findings & Recommendations Transit Operations 7 Source: SF-CHAMP 4.3 S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y Other policy recommendations, continued: • Enable regional operator inbound pick ups • Study/pilot new models of service delivery
  • 32. Findings & Recommendations Transit Maintenance Unreliability and cost trends will continue to worsen unless we act decisively to address SOGR. S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 8 Plan rec’s: Increase transit SOGR investment by $10M/ year (9% of discretionary revenue) toward capital asset maintenance (vehicles, facilities, guideways) to fund 70% of most critical needs Result: Replace all vehicles and 70% of other mission critical assets on time Other policy rec’s: • Finish Muni Asset Mgmt System, C3 and Radio Replacement projects • Implement Muni Facilities Plan • Develop pipeline of projects and funding strategy Source: SFMTA Transit Effectiveness Project
  • 33. Findings & Recommendations Local Streets and Roads Maintenance Without significant investment pavement degradation will impair safe travel by all modes. S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 9 Plan rec’s: Increase LS&R investment by $460M (over $16M/year, 15% of discretionary revs) for pavement resurfacing and reconstruction Result: Over time, worsens PCI about 15% to 50’s (vs. 64 today) Other policy rec’s: • Do “Smart SOGR” – follow the paving/sewer project for complete streets, reduced costs • Support full roll-out of Envista as a map-based coordination platform for street/sewer improvement projects • Must advocate for additional resurfacing funding
  • 34. Findings & Recommendations Programmatic Enhancements The city can deliver Complete Streets more efficiently and effectively than today. S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 10 Plan rec’s: Invest $640M (20% of discretionary revenue) into multi-modal (pedestrian, bicycling, traffic calming, signal) projects. Note: This investment level represents aspirational delivery rates, based on past and current indications; it could be delivered in ½ the Plan period with strong policy and political support. Result: Safer, more complete pedestrian, bicycle and transit networks; calmer streets, smoother traffic flows Source: SFMTA Pedestrian Strategy
  • 35. Findings & Recommendations Programmatic Enhancements – complete streets The city can deliver Complete Streets more efficiently and effectively than today. S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 11 Other policy rec’s: • Increase transparency and public involvement through “Citizen’s Guide to Transportation Improvements in SF” • Clarify city’s Complete Streets design policies, processes and standards. • Support MTA’s revised Traffic Calming program, Pedestrian Strategy, and creation of signals investment strategy (e.g., for the “Sfgo” program).
  • 36. Findings & Recommendations Programmatic Enhancements - transit Muni and Regional transit enhancements – a focus on “customer first” improvements S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 12 Plan recommendations: Maintain existing levels at $330M or $11.8M/year (10.5% of discretionary revs) toward transit enhancements, e.g. development of regional and local transit hubs with real-time information and access improvements, including integration of bike/car sharing, taxi and pedestrian safety, e.g. at Balboa Station Result: More consistent and convenient user experience Other policy rec’s: • Coordinate major capital projects e.g. Embarc./Montgomery BART stations with Transbay Terminal, Better Market Street • Coordinate transit investment with land use development plans, M- Line, Bayview Waterfront Transit Center, Geneva BRT, Treasures Island • Increase regional partnerships & advocacy to develop project pipeline
  • 37. Findings & Recommendations Programmatic Enhancements – Transportation Demand Mgmt We must broaden our Transportation Demand Management (TDM) efforts to reach our goals. S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 13 Plan recommendations: Increase TDM investment to $60M ($2.1M/year, or 2% of discretionary revs) for strategies to encourage time and mode shifts away from single-occupant automobile trips. Other policy rec’s: • Continue to develop pricing and other peak–spreading strategies (Treasure Island, Cordon Pricing, parking pricing, and Employer policies) • Develop MTA regulatory programs to allow safe integration of 3rd party providers (Muni Partners, taxi/ride-sharing) • Encourage, grow community-based mobility solutions, e.g. vehicle sharing, volunteer driver program • Explore area-wide parking cap or employer trip reduction programs for SoMA/MissionBay
  • 38. Findings & Recommendations Efficiency and expansion projects We must improve system performance (reliability, travel times) to meet existing and future demands. S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 14 Plan recommendations: Investment $880M ($31M/year, or 28% of discretionary revs) in new projects and studies to raise the operational efficiency of our system and meet the demands of growth.
  • 39. Findings & Recommendations Efficiency and expansion projects We must improve system performance (reliability, travel times) to meet existing and future demands. S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 15 In addition to the Committed Projects, the Plan includes: • Continued rapid transit network development for travel times and reliability (TEP, Geary, Geneva and Potrero/Bayshore BRT • Address rapid network capacity and performance bottlenecks (Transit Performance Initiative, BART Metro)
  • 40. Findings & Recommendations Efficiency and expansion projects We must improve system performance (reliability, travel times) to meet existing and future demands. S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 16 In addition to the Committed Projects, the Plan includes: • Setting a vision for SF freeway management strategies • Study of our long range BART/Muni/Caltrain transit network development Other Policy Rec’s: • Seek the delivery of Caltrain Electrification by 2019 • Solidify the plan for delivering DTX • Expansion of P3s, value capture to replace Redevelopment mechanism, and pursue other innovative project delivery approaches, with strong revenue advocacy for our priorities.
  • 41. Findings & Recommendations Equity-focused Investments The draft Plan responds to recent findings of Authority’s equity analysis identifying some geographic and socio-economic disparities S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 17 Geographic equity support: • Enhance regional transit system access – new regional transit access pilot, e.g. West side to Caltrain, BART • Improve reliability, especially in outer parts of the city – SOGR, transit enhancement (real time information displays) and transit priority network development • Implement neighborhood transportation improvements in every district, e.g. through upcoming 5-year Prop K programs
  • 42. Findings & Recommendations Equity-focused Investments The draft Plan responds to recent findings of Authority’s equity analysis identifying some geographic and socio-economic disparities S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y 18 Socio-Economic equity support: • Pedestrian Safety funding, including SR2S, SR2T, traffic calming , education, outreach, and enforcement funds • Bicycle network development and implementation • Mobility management support for CBOs (e.g. Bayview shuttle- sharing) • Bikeshare/carshare initiatives (address affordability) • Increased planning funds to build neighborhood capacity and a strong pipeline of projects
  • 43. Plan Performance 19 Source: SF-CHAMP 4.3 and DPW • Despite limited new resources, the Plan achieves modest performance in all goal areas • However, underfunding road and transit maintenance counteracts SOGR gains from reduced crowding • Specific corridors see more dramatic performance gains S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y
  • 44. Differentiating Between Scenarios: Environment www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 20 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 1990 2000 2010 2015 2020 2025 2030 2035 2040 MetricTonsofGHGEmitted Healthy Environment: Greenhouse Gas Emissions* 2040 Goal: 2,400 Plan With Congestion Pricing: 3,915 to 4,100 Plan Without Congestion Pricing: 4,215 to 4,400 Expected Trend: 4,440 to 4,500 *Average weekday on-road mobile emissions
  • 45. Differentiating Between Scenarios: Livability www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 21 45% 47% 49% 51% 53% 55% 2010 2015 2020 2025 2030 2035 2040 ShareofAllTripsbyAutomobile Livability: Percent of Weekday T rips Made by Auto Plan With Congestion Pricing: 47-50% Plan Without Congestion Pricing: 48% to 51% 2040 Goal: Below 50% Expected Trend: 51% to 52%
  • 46. Plan Investment vs. Need 0.41 0.28 0.46 1.03 0.88 0.99 0.75 0.56 0.51 0.72 0.63 2 4 1.53 1 2.9 0 1 2 3 4 5 6 "Priority 2" Need "Priority 1" Need Discretionary Revenue (Financially Constrained Investment Strategy) 22 S A N F R A N C I S C O C O U N T Y T R A N S P O R T A T I O N A U T H O R I T Y Billions
  • 47. Thank ou!For For meeting schedule through July, see: www.movesmartsf.org www.sfcta.org/MoveSmartSF SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
  • 48. www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF San Francisco Transportation Plan Making It Happen: An Implementation Strategy for the SFTP
  • 49. What’s working? What’s not?  Looking Back – past studies, Prop K and E data, public input  Looking Around – reviewing how transportation is done in other places, what can we learn?  Looking Ahead – continue what works, address areas that need improvement, pilot new approaches SFTP Implementation Strategies 2SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
  • 50. Transportation in San Francisco is a complex machine: Myriad of forces (too many to show here!) shape our transportation system www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 3 Public Agencies (i.e. SFMTA, DPW, PUC, SFCTA, BART, MTC, Caltrans, FTA, FHWA) Funding External Forces Transportation network Federal StateRegional Local Public CEQA/NEPA Land use Economy Daily challenges Collisions Legal issues Shifting political priorities Weather
  • 51. Top concerns we hear from the public www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 4 We should be able to deliver projects faster We deserve a better transportation system We need better coordination between agencies and with the public We need to get the biggest bang for our transportation buck
  • 52. What we found:  We are working on the right projects (pedestrian, traffic calming) but they are taking too long, and too often are uncoordinated.  Pilots are effective– high demand for more pilots and near-term improvements, but agencies can’t keep up, e.g. traffic calming.  Initial “complete streets” are popular, but expensive e.g. Valencia. The public wants more, but we lack strong policies and processes to prioritize, design and build them cost-effectively. Looking Back 5SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY  It’s not clear how transportation planning and funding processes work, and outreach is inconsistent, leading to shifting priorities and uneven or inadequate public involvement, with problematic outcomes.
  • 53. Strategic Initiatives: Complete Streets and Project Delivery www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 6  Complete Streets: Provide more benefit with each transportation investment by creating a cost-effective complete streets approach from planning to implementation  Project Delivery: Increase transparency, shorten the timeline for project delivery and increase “bang for the buck”
  • 54. Complete Streets are wonderful, and in high demand… 7www.sfcta.org | twitter.com/SanFranciscoTA | www.facebook.com/SFCTA
  • 55. But they pose policy, funding and institutional challenges 8www.sfcta.org | twitter.com/SanFranciscoTA | www.facebook.com/SFCTA graphic: SFMTA  Dispersed responsibility for streets is a common feature among cities  Street management and improvement decisions require strong policy direction, coordination  Including multiple features rapidly increases a project’s cost, with varying implications for cost- effectiveness
  • 56. SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY 9 Toward more Complete Streets: Set realistic expectations, improve city practices We recommend program designed to clarify complete streets expectations by creating a culture and consistent practice of multi-modal design:  Recognize trade-offs, prioritize our efforts: How many multi-featured projects can/should we deliver per year?  Design Standards – e.g. define standard bulb-out designs and cost-estimates  Design rules - establish “must,” “should,” “may” practices) for incorporating complete street elements  Design processes -mainstreaming practice of multi- modal design, value engineering, alternatives analysis  Funding practices - Set up “joint opportunities” funding pots to facilitate and incentivize add-ons to a project
  • 57. www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 10 Looking Around How can we improve project delivery in the city? source: LA Metro  Larger Project Delivery ► Review of SF experience ► Case Studies of Southern CA experience  Small Projects Delivery ► Review of past local studies, reports, Prop K data ► Interviews with local elected and civic, community leaders
  • 58. www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 11 SF Project Delivery Assessment Preliminary Findings  Project identification, prioritization processes and status are not always transparent  Publish multi-agency “Citizen Guide to Transportation Project Development”  Expand monitoring and accountability tools and websites (like MyStreetSF.com)  Political champions and agency leadership needs to be focused on/aid project delivery  Support strong project designs, necessary trade-offs  Set clear expectations for project schedules, organizational culture shifts Source: SANDAG
  • 59. www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 12 SF Project Delivery Assessment Preliminary Findings  Coordination across and within agencies is a challenge  Multi-departmental leadership is required to make existing organizations more effective; Common tools, e.g. Envista GIS map, can help  Alternatively, re-organizing to focus roles and accountability is an option  Project managers are not empowered, resourced to deliver projects efficiently  Strong PMs, with integrated, co-located project teams are needed  Agencies should be encouraged to use alternative delivery methods, streamlined procurement processes
  • 60. www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 13 Looking Ahead - Proposed Early Action Neighborhood Transportation Improvement Program  This Early Delivery demonstration program is designed to: ► Respond to SFTP equity analysis findings ► Demonstrate new complete streets and project delivery approaches ► Result in on-the-ground improvements within 5 years  If desired by Authority Board, could be approved through Prop K 5-year Program updates this fall.  Would seek to leverage Prop K with other funds Sample NTI Program District Project 1 Geary: near term Ped/Signal improvements 1 Anza Ped/Bike improvements 2 Lombard Street Pedestrian and Streetcape 2 Ped Safety Mini Program: Marina Boulevard, SR2S 3 Columbus Ave Phase 1 (coordinate with paving, TEP) 3 Broadway Neighborhood Transportation Plan, traffic calming 4 Ocean Beach Plan Phase 1 - Sloat (Bike, Ped, Traffic Calming) 4,7 19th Ave Bulbouts Phase 1 (coordinate with TEP) 5 Fillmore Fill - planning study and design 5 Ped Safety Mini Program: Octavia/Oak, re-open x-walks 6 Ped Safety Mini Program: 6th St (coordinate with BMS)+SR2S 6 Ellis/Eddy Traffic calming/pedestrian improvements 7 Ped Safety Mini Program: Traffic calming, bulbouts etc. 8 Glen Park Plan plaza/access improvements 8,9,11 SJ/Guerrero Re-design and multi-modal (Bike/Ped) improvements 9 Ped Safety Mini Program: SR2S/Ped or Mission Streetscape 10 Palou Streetscape and Paving 10 Ped Safety Mini Program: New sidewalks, SR2T (22nd Street Station) SR2S 11 Mission Terrace planning and project
  • 61. www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 14 5-Year Prop K Prioritization Programs How do you want to spend Prop K sales tax dollars?  Check out MyStreetSF.com – anything missing? If so, propose it this summer  5-Year Program Updates: 21 categories of transportation investment in Prop K Sales Tax Program ► All modes, types of projects ► Local and regional agency sponsors ► Public outreach and involvement planned for Summer to Fall 2013  Stay tuned for updates at SFCTA website: sfcta.org or movesmartsf.com Prop K
  • 63. TheSanFrancisco TransportationPlan SFCTA Board Workshop May 30th, 2013 Land Use, Growth & Implementation
  • 64. Express Bus Current BART Muni Metro Caltrain Muni TEP Rapid Network 1 Dot = 100 Central Subway High Speed Rail Bus Rapid Transit Households Jobs Express Bus Current BART Muni Metro Caltrain Muni TEP Rapid Network 1 Dot = 100 Central Subway High Speed Rail Bus Rapid Transit Households Jobs Land Use Today
  • 65. Households Change Jobs Change REGION 700,000 27% 1,120,000 33% SAN FRANCISCO 92,410 25% 190,740 34% Priority Development Areas 80,000 48% 145,000 30% Rest of City 12,410 6% 45,740 18% GROWTH 2010 - 2040 • Region will grow substantially; San Francisco will take large share. • PDA’s today can accommodate 80% of San Francisco’s growth. • New development guided to build new, vibrant, mixed use
  • 67. Express Bus 2040 BART Muni Metro Caltrain Muni TEP Rapid Network 1 Dot = 100 Central Subway High Speed Rail Bus Rapid Transit Households Jobs Express Bus 2040 BART Muni Metro Caltrain Muni TEP Rapid Network 1 Dot = 100 Central Subway High Speed Rail Bus Rapid Transit Households Jobs Projected Growth to 2040
  • 68. Photo by Josef Willems Implementation Transportation Element Update Central Corridor Plan SoMa Circulation Plan Parking Supply Management Strategies BiCounty: T-Third to Bayshore Station 19th Avenue Transit Study Better Market Street Invest In Neighborhoods Projects Underway Linking Transportation & Land Use
  • 69. Transportation Vision Initial Policy Analysis 05 | 30 | 2013 SAN FRANCISCO, CALIFORNIA SFMTA | Municipal Transportation Agency Image: Market and Geary Streets, circa 1920s, Muni Centennial logo
  • 70. SF Total Transportation Needs • A well-functioning transportation system is foundational to the City’s health and economic vitality • >$4 billion already spent each year on transportation – Over $1 billion public funds spent annually on transportation – Approx. $3 billion private funds spent annually operating and maintaining private transportation • Almost $900 million a year needed to meet goals – Operating, Maintenance, Repair and Expansion 2
  • 71. Two-tiered strategy for the transport system Transport Strategy Travel ChoicesDemand Pricing Demand Management Priority Transit Complete Streets Vehicle Sharing Infrastructure Support Smart Land-Use
  • 73. Virtuous Cycle of Integrated InvestmentsIntegration Project Investment Mode Shift Effect More comfortable bicycle facilities = more transit capacity Car/bike/scooter sharing, taxi demand grows investments in bicycling infrastructure, facilities & programs More transit and bicycle trips = more walking and more economic development investments in walking infrastructure, facilities & programs investments in transit reliability and frequency programs investments in demand management and vehicle sharing programs
  • 74. 48th Ave to Market/Third: 35 min-45 min Ocean Beach to Embarcadero: 40-50 min Third St., Bayshore to Embarcadero: 40-50 min Caltrain, Bayshore to Fourth/King: 15 min (+9 to Embarcadero) BART, Daly City to Embarcadero: 17 min 19th/Holloway to Embarcadero: 30-45 min Network: • Rail • Rapid Transitways • Local Service • Historic Network Transit Network Travel Time Variability Assessment
  • 75. Network Conditions West Portal Market & Van Ness Embarcadero Fourth/King Church & Duboce Balboa Park Network: • Rail • Rapid Network • Local Service • Historic Network Increasing growth & congestion can lead to: • Reliability & travel time variability • Slower operating speeds • Vehicle capacity/ crowding • Network vulnerability • Hotspots & bottlenecks Core Capacity Needs & Rail Pinch-Points Transit Strategy
  • 76. Long-term Transit Vision Upgrade the core capacity Lines 48th Ave to Market/Third: 25 min Ocean Beach to Embarcadero : 25 min Wharves to Moscone: 10 min Daly City to Embarcadero: 25 min Bayshore & Hunters Point to Market St.: 25 min DRAFT
  • 77. 9 Emerging Bicycle Core AreaBicycle Strategy
  • 78. 10 Travel experience of networkBicycle Strategy DRAFT
  • 79. Focus on 45 miles 11 Primary bicycle corridors analysisBicycle Strategy DRAFT
  • 81. Source: SFMTA , US Census Data, Land-use & gradient analysis Strategic Gap Closure High Stress Point in Network 13 Strategic Network Gap ClosuresBicycle Strategy DRAFT
  • 82. Funding Needs Investment Scenarios 14 • “Bicycle Plan Plus” Scenario: – $60 million through 2018 • Strategic Plan Scenario : – $200 million through 2018 • System Build-out Scenario: – $600 million
  • 83. = + 44 Miles of High Priority Segments (HPS) Need Complete Street Type Treatments by 2021 15 High Priority Streets for focused investmentPedestrian Strategy
  • 84. • Core Projects and Programs $ 60 m • Best Practices Projects $303 m Total Need $363 m 1616 Core Investment NeedsPedestrian Strategy
  • 85. Vehicle & Ride Sharing Increasing travel options
  • 86. SF Private Auto Fleet Trends and Goals 1990 2000 2010 2020 2030 Goal 400 375 350 325 300 275 250 0% PrivateAutoFleet(000s) 15- 25% fleet reduction potential with significant vehicle sharing growth Trend Potential Vehicle Sharing Opportunity Vehicle & Ride Sharing Vehicle sharing potential
  • 87. Transportation System Needs Investment • Today’s system is under-resourced for current and future needs, despite ongoing efficiency improvements • Tradeoffs have to be made in rights of way priority and demand management tools to meet goals • The key is to help reduce everyone’s transportation budget, improve overall transportation efficiency and increase our economic competitiveness.
  • 88. www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF San Francisco Transportation Plan Vision and Revenue Strategy May 30, 2013
  • 89. We need additional transportation revenues to bring our system to a SOGR and to meet the public’s demand for improvements, but must use existing revenues more efficiently to build voter confidence  New/improved approaches to project delivery  Investing in projects that reduce ongoing operations and maintenance costs (e.g. Transit Effectiveness Project, staggered fleet replacements to reduce average age of fleet)  Findings ways to control cost escalation SFTP Revenue Strategies Use Existing Revenues More Efficiently 2SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
  • 90. Potential New Funding Sources Key policy considerations www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 3 The size of SF’s unfunded need is so large, that it demands a multi-pronged approach:  Use what we have more efficiently Maximize capture of discretionary revenues and leverage private sector Identify new sources of revenues Continued uncertainty at the federal and state levels present opportunities (e.g. Public-Private Partnerships), but also mean new revenues might need to be local solutions in the near-term Still, SF should proactively develop strong regional (e.g. future bridge toll), state (e.g. cap and trade) and federal (next transportation act) advocacy platforms
  • 91. Potential New Funding Sources Local Sources Being Evaluated Examples include: Additional ½ cent sales tax (for a total of 1% of SF local sales tax capacity dedicated to transportation) Parcel tax (flat rate or progressive) Citywide community facilities district (Mello- Roos) Local & regional gas taxes Vehicle license fee Express lanes on US 101/I-280 General obligation bonds Regional VMT fee www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF 4 Each revenue source involves tradeoffs Some sources present challenges from an equity standpoint – each needs to be comprehensively evaluated Other public priorities (education, health care, parks, etc.) are also competing for public funding Ongoing coordination with Mayor’s Transportation 2030 Task Force
  • 92. “What If” scenarios let us imagine what our transportation system might look like if we have additional transportation revenues. And, it helps to shape revenue advocacy strategy by:  Increase efficient use of existing funds  Demonstrating ability to leverage other sources of funding (public and private)  Building consensus on our federal, state, regional “Asks” What if….we had more revenues? Revenue Levels for Vision Scenarios 5SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY $6+ billion more might require a mixture of big, medium and smaller sources such as: • $4.0 B - another half-cent sales tax • $1.0 B - general obligation bonds • $0.8 B - additional Federal funds • $0.5 B - community benefits district $10 billion more might require all of the above, plus something like: • $2.7 B - 1.35% SF vehicle license fee • $1.0 B - even more Federal funds • $0.2 B - 0.5% MUNI op’g cost savings
  • 93. www.sfcta.org/MoveSmartSF | twitter.com/SanFranciscoTA | www.facebook.com/MoveSmartSF Thank You. Questions?