SlideShare uma empresa Scribd logo
1 de 42
Baixar para ler offline
Edgar Road Community
                         Simon Lapinski
     Centre Proposals.
Contents
        ZONE A                                             ZONE B
  1     Aims & Ambitions.                          25      Base plan
  2     Site survey.                               26      Images of site.
  3     Images of site.                            27      Shadow analysis.
  4     Base plan of site with proposed            28      Site analysis.
  5     extension.                                 29      Aims & ambitions.
  6     Sketch model of site.                              Schematics:
  7     Shadow analysis.                           30      Ideal with notes.
  8     Concept development and notes.             31      Connectivity, desire lines
  9     Concept proposal plan.                             & access points.
  10    Schematic of proposal.                     32      Concept proposal: Home zone phase 1.
        Concept elements:                          33      Schematic of proposal.
  11    Infants (0-2 years).                       34      Sketch models.
  12    Toddlers (2-4years).                       35-38   Sketch visualisations.
  13    Pre-schoolers (3-5years).
  14    Parents.
  15    Sectional elevation.                               ZONE C
        Construction details:                      39      Perspective of site.
  16    Section A.                                 40      Proposal.
  17    Section B.
  18    Section C.
  19    Planting plan & description.
  20    Concept proposal models.
  21-22 Occupation.
  22-23 Outdoor musical, sensory and interactive
        installations.
  24    Visualisation of concept.
Aims and ambitions: Under fives play area; Zone A.



Elements of design
Natural planting, engaging with envi-
  Elements of design
ronment, wildlife, creating a sense of
mystery and experience of change.
  Natural planting, engage with
  environment, wildlife, create a
  sense of mystery and experience
  change.                                   Seating, story telling and shade.



                                            Seating, story telling, and shade.




                                          Vertical climbers, the activty of gardening and utility space.
 Slopes, mounds and flat surfaces.

                                          Climbers, gardening and storage.

 Slopes, mounds and flat surfaces

P1
Aims and ambitions: Under fives play area; Zone A.
Words and precedent images considered when conceptualising play space.
A. Bespoke - play space designed for                                                            L. Sources of delight, surprise,
location.                                          Invermead close, Fulham, London.
                                                                                                experiance and exploration.
B. Use of natural materials.                                                                    M. Planting - Light, shade, direc-
C. Range of play opportunities.                                                                 tional, boundery, interactive and
D. Meet community needs.                                                                        wildlife.
E. Children of all ages.                                                                        N. Water.                            Inexspensive material, Baerum.
F. Change & evolution/seasons/                                                                  O. Allow children to create own
openendedness.                                                                                  play.
                                                                                                P. Educate, develope knowl-
                                                                                                edge, appreciation of natural
                                                                                                environment and self-discovery.
                                                                                                Q. Participatory interventions.
                                                                                                U. Event qualities - occupation.
                                                                                                R. Budget.
                                                                                                S. Sustainability.
                                                   Barrel Wharehouse Park, Waterloo, Canada.


                                                                                                                                     Friburg City Council.

Helle Nebelong, Environmentally ordred childrens
playground, Gentofte, Denmark.
                                                                                                                                     The Natural Playground. Valbyparken, Denmark.
G. Imaginary worlds.
H. Test bounderies.
I. Acceptable risk.
J. Stimulate senses.
K. Natural environment
Trefusus playing fieild, Kerrier.                  Waverly Park, Stirling.                     Bisalski, Berlin.




 P2
Survey of site dimensions & existing features




P3
Images of site
                                                                                 A. View from existing
                                                                                 partitioning brick wall,
                                                                                 illustraing rear perim-
                                                                                 eter fenceline onto main
                                                                                 line railway tracks and
                                                                                 exiisting vegetation.

                                       E




                                A                 C

                            B



                                                                                 B. View from brick parti-
                                                                                 tion wall showing extent
                                                                                 of existing hardland-
                                                                                 scaping features and
                                                                                 scale of brick surface
                                                                                 provided by neighbour-
                                                                                 ing residence.


                                                                D




E. View of gated entrance from Edgar Road and   D. View of existing vegetation   C. Image of brick parti-
accessibility from 4 x 900mm doors at rear of   from gated access on Edgar       tion wall and site of pro-
community centre main hall.                     Road.                                   posed extension.




P4
Base plan: Edgar Road Community Centre; Proposed building extension & under fives
           play space.




     N

     0m   2.5m   5m


P5
Existing site features with proposed extension




P6
Shadow analysis: Proposed extension and Under-fives playspace




January 12pm                  March 12pm                        May 12pm




July 12pm                      September 12pm                   November 12pm


P7
Concept development sketch & notes




P8
Concept proposal plan




     N
         0m       5m    10m




P9
Schematic of Proposal
Zone A; Under fives play area

Legend

      Storage
      space


      Canopy
      shade


      Resin Bound
      gravel surface


      450mm x 450mm
      Stone monolith

      Grass
      surface


      Planted
      area

      Sand



      Existing
      trees

      Timber fence
      line



P10
Concept Proposal: Infant features (0-2 years)
Require modulated sensory stimulation and
increasing physical opportunities.

1. Things to look at from horizontal and vertical
position.

2. Protection from excessive sun, wind and rain.

3. Places to crawl.

4. Items to pull themselves up on.

5. Ability to watch and not be knocked over.

6. Waving grasses and plants.

7. Clombers on vertical surfaces to attract birds and but-
terflies.

8. Soft surfaces to creep on.

9. Sloped surfaces instead of steps for safe crawling.

10. pleasant colours and sounds.


Legend



Shade & shelter       Planted           Sloped               Soft grass   Stone monolith     Vertical
from canopy           elements          surfaces             surfaces     for pulling onto   climbers


P11
Concept Proposal: Toddler features (2-4 years)
Require places and spaces for acting out
prepositions - over, under, on top off,
up and down, because physical
development is paramount and fuels cognitive
advancement.

1. Safe appropriatley sized structures, mounds and slpoes
to clamber up and down.

2. Walkways and soft surfaces for practicing walking, then
running and pushing wheeled toys.

3. Protection from excessive wind, rain and effects of the
sun.

4. Sand to aid cognitive development.

5. Trees to provide shade and elements of interest, such as
pinecombs.




Legend



Flat surfaces for     Sheltered space     Sand                Structures for         Existing
walking and running                                           crawling, clambering   trees
                                                              and climbing.



P12
Concept Proposal: Pre-schooler features (3-5 years)
Rapid physical development, increas-
ing social and languagage skills require a
space with many opportunitis.



1. Running, climbing, hopping, jumping, sliding,
 dancing and spinning.

2. Areas, paths and slopes for tricycles, wagons,
wheelbarrorws etc.

3. Storage space for equipment (props, art supplies,
mobile play equipment etc).

4. Gardening, advance cognitve understanding and
appreciation of nature.

5. Sand and water. Increase knowledge of physical
world, creative expression. Provides entry point to
social play with others.




Legend




potential       Planted         Structures for     Sand   Level Surfaces    Informal          Storage
gardening       elements        physical                  for mobile play   auditorium for    area
sites                           development               equipment         play acting and
                                                                            story telling
P13
Concept Proposal: Parents
Provision to be provided for comfort and
enjoyment for parents and child carers.


1. Places to sit, supervise and talk with other parents.

2. Relax and enjoy childrens company.

3. Provision for pushchairs.




Legend




Areas to              Stone monolith
relax                 to provide seating




P14
Sectional elevation: Under-fives play area
                               A

                                            Plan of concept                                                                        7. Existing trees.
                                            illustrating location of                                                               2 x Common Beech.
                                            sectional elevation.                                                                   1 x pine (Unknown species.)




               A
                                                          3. Proposed building extension.




           1. Edgar Road
           Community Centre
           main hall.




      0m       1.2m     2.4m
                               2. Storage                4. Boulders placed in              5. 450mm high grass mound with 450mm   6. Planting with 2.4m
                               area.                     sand pit and bordering             wide stone monolith retaining soil     high timber
      Scale                                              grass.                             and providing seating.                 boundery fencing.




P15
Construction details:
Section A
Section showing Resin bound
pathway, sand pit and                                                                                                              Boulders installed within sand and grass
                                                                                                                                   to be sunken a third of their size into
boulder.                                                                                                                           surrounding medium to ensure stabilsed
                                                                                                                                   by own weight.



                                                                                     1.5m grass border



 Resin bound pathway layers.
 A. 20mm aggregate and resin.
 B. 50mm bindong course.                                                                                                                                      350mm deep
 C. 100mm MOT type 1 subase.                                                                                                                                  sand pit.

                                                                                                                                                               100mm compacted
                                200mm x 200mm x 200mm stone blocks laid on 50mm mortar base                                                                    MOT Type 1 subase
                                to separate and retain soil and sand. 250mm x 200mm concrete footing                                                           with lining of goe-
                                to support blockwork above and retain MOT Type 1 subase.                                                                       textile membrane
                                                                                                                                                               separating sand
                                                                                                                     Soil layer.                               from subase.




                                                                 A. Plan of concept
                                                                 illustrating location
                                               C                 of construction
                                                                 cross-sections.


                                          B


                                    A


                                                                              B. Sectional elevation
                                                                              showing position of
                                                                              construction detail
                                                                              drawn above.               Section A

P16
Construction details: Section B
Section of grass mound
with retaining stone
monolith.


                                      Grass mound.                                                                                 170mm x 20mm flexible edging and
                                                                                                                                   spike fixings retaining soil of mound
                                                                                                                                   and aggregates of Resin Bound
                                                                                                                                   pathway.



                                                                                                                                                     Resin bound pathway layers.
  350mm deep                         900mm x 450mm stone monolith stabilised by own weight and                                                       A. 20mm aggregate and resin.
  sand pit.                          surrounding material, retaining soil of grass mound. 8m length                                                  B. 50mm bindong course.
                                     of stone monolith divided into two sections of 4m and secured together                                          C. 100mm MOT type 1 subase.
                                     via metals dowels and corresponding holes within end sections.
  100mm compacted                                                                                             Soil layer.
  MOT Type 1 subase
  with lining of goe-
  textile membrane.
                                                          2.35m                                                1.5m




                                         A. Plan of concept
                                         illustrating location
                                 C       of construction
                                         cross-sections.


                             B


                         A


                                                      B. Sectional elevation
                                                      showing position of
                                                      construction detail
                                                      drawn above.                                                          Section B

P17
Construction details:
                                                                                                                          Existing Common
Section C                                                                                                                 Beech.



Section showing Resin bound                                                                                               2.4m high timber fence line.
pathway, border planting                                                                                                  8 x 300mm x 40mm timber planks
and timber boundery                                                                                                       fixed between timber posts to
                                                                                                                          establish panelling. Along sections
fence work.                                                                                                               of fencework bordered by resin
                                                                                                                          bound path, several timber planks to be
                                                                                                                          replaced with toughened glass to
                                                                                                                          allow viewing of passing trains.



                                                                                                                          Border planting.



                                                                                                                          Grass embankment leading to
      Resin bound pathway layers.                                                                                         main line railway tracks.
      A. 20mm aggregate and resin.
      B. 50mm bindong course.
      C. 100mm MOT type 1 subase.


                                                                                                                           100mm x 100m timber post sunk in
      Containerised plants of different litreages placed in excavated holes which                                          concrete footing 600mm x 300mm
      allow for a minimum of 50mm mix of organic compost/topsoil for root establishment                                    x 300mm.
      and nutrient intake.                                                                           3.5m   Soil layer.




                                                           A. Plan of concept
                                                           illustrating location
                                         C                 of construction
                                                           cross-sections.


                                     B


                              A

                                                                            B. Sectional elevation
                                                                            showing position of
                                                                            construction detail
                                                                            drawn above.                                                 Section C

P18
Planting plan and details




                                                                                                                                                              Attract wildlife




                                                                                                                                                                                                           Excite senses
                                                                                                                                                                                            Connect with
                                                                                                               Plant name            Description




                                                                                                                                                                                 maintain


                                                                                                                                                                                            seasons
                                                                                                                                                                                 Easy to
      Planting plan: Under-fives play area.


                                                                                                                                                               • •
                                                                                                               Eleaagnus x ebbingei Fast growing ever-
                                                                                                                                    green shrub, white
                                                                                                                                    flower in autumn.


                                                                                                                                                               • • • •
                                                                                                               Cotinus coggyria     Red leaves in autumn
                                                                                                               flame                followed featered
                                                                                                                                    flower stalks

                                                                                                                                                                                    • •
                                                                                                               Cornus alba Siberica Deciduous shrub,
                                                                                                                                    Show of bright red
                                                                                                                                    stems during winter.


                                                                                                                                                                                    • •
                                                                                                               Cornus stolonifera   As above but green.
                                                                                                               Flaviramea



                                                                                                                                                                                   •                         •
        20Lt plants                              10Lt plants                     7.5Lt plants                  Polypodium vulgare   Evergreen fern with
                                                                                                                                    dark green herring-
                Eleaagnus x ebbingei                  Polypodium vulgare              Osmanthus x burkwoodii                        bone leaf structure.


                                                                                                                                                                                    •                       •
                                                                                                               Stachy’s byzantina   Evergreen woolly
                                                      Stachys byzantina                                        Siver carpet         silver-leaved shrub.
                                                      Lambs tonque                    Stipa arundinacea
                Cotinus coggyria


                                                                                                                                                                                   •
                                                 3Lt plants                      7.5Lt climbers                Vinca major          Hardy evergreen
                                                     Vinca major                       Lonicera japonica       ‘gertrude Jekyll     ground cover shrub
                                                                                       halliana                                     with white flowers.


                                                                                                                                                                                    •                       •
                                                      Festuca glauca                                           Festuca glauca       Evergreen blue-grey
        15 Lt plants
                                                      Lamium maculatum                                                              ornamental tufted
                                                                                                                                    grass.
                Cornus alba Siberica                  Liriope muscari

                                                                                                                                                                • •
                                                                                                               Lamium maculatum     Evergreen ground
                                                      Hebe peniguifolia Pegei                                                       ground cover with
                Cornus stolonifera                                                                                                  silver leaves.


                                                                                                                                                                                   •                          •
                Flaviramea                            Stachys byzantina                                        Liriope muscari      Dark arching grass-like
                                                                                                                                    grass like leaves with
                                                                                                                                    white flower autumn.


                                                                                                                                                                                   •                         •
      Notes                                                                                                    Hebe peniguifolia    Evergreen groundcover
      Following list of perenials to be planted in drifts around scheme above.                                 Pegei                with greyish-blue
                                                                                                                                    leaves.
      - Achillea filipendula ‘goldplate’         - Aster x frikartii

                                                                                                                                                               • • • •
      - Echinacea purperea ‘white swan’          - Helianthium benledi                                         Osmanthus x          Dark green leaves
      - Knophobia ‘royal standard’               - Rudbeckia ‘goldstream’                                      burkwoodii           with fragrent white
      - Sedum spectabile ‘brilliant’             - Digitalis purpurea                                                               flowers in spring.


                                                                                                                                                              •                     •                       •
      - Hellianthus annus                                                                                      Stipa arundinacea    Evergreen golden
                                                                                                                                    leaved grass with
                                                                                                                                    purple hints in summer


                                                                                                                                                              •                      • • •
                                                                                                               Lonicera japonica    Evergreen climber with
                                                                                                               halliana             fragrent cream flowers
                                                                                                                                    summer-autumn.
P19
Visualisations: Concept proposal




P20
Occupation: Under fives play area.




                                                            B. View of proposal from side gate on Edgar Road.




A. Aerial View of Proposal at Edgar Road Community Centre




P21
D. Aerial view of proposal of Edgar Road Community Centre.




C. View towards existing side gate on Edgar Road.




P22
Visualisation: Edgar Road Community Centre Under Fives Play Space




P23
Outdoor musical, sensory and interactive installations & possible site
placement.
As part of the brief, the inclusion of hearing and sensory elements were one of the core considerations when resolving the Under-fives play space to aid the development of their cognitive
knowledge. The items i’ve selected i believe provide a range of experiances and introductions to different sounds and activities. The installations were also chosen for their robust construction
which could stand the vigours of boundless energy.

                                                                                        A. Mounted and free standing Chimes.
                                                                                        Eight x 50mm diameter chimes tuned to the notes of ABCDEFGABC
                                                                                                                                                                                Outdoor instruments
                                                                                        mounted on a timber frame standing 1.5m in height.




                                                                                                                     B. Spiral Chimes.
Outdoor instruments                                                                                                  Eight individual chimes mounted on timber frames which increase in height (1.2-2m), with the chimes
                                                                                                                     placed along circular path.

                                                                                                                                                                                                            D. Drum set.
                                                                                         C. Crash n Bang and                   Three drums of various sizes made from heavy duty plastic mounted on plastic coated metal
                                                                                         Rainmaker.                  Outdoor instruments, Spiral chimes.                                                         frames.
                                                                                         Bell tower. Four diferent
                                                                                         sized bells fixed to tim-
                                                                                         ber post. Each produc-
                                                                                         ing a different pitch.
                                                                                         Rainmaker. Stainless
                                                                                         steel stick contain-
                                                                                         ing hundreds of plastic
                                                                                         beads. When rotated
                                                                                         simunlates the sound of
                                                                                         fallling rain.
                                                                                         Crash. Three different
                                                                                         sized cymbels attached
                                                                                         to timber frame.


 P24
Sensory installations




F. Talking Bob.                                                                                  E. Talking flowers.
By spinning Bob’s nose to generate energy, chidren can      Pair of talking flowers are linked underground by 10m
talk to Bob and hes talks back in a funny voice repeating    of pipework which translates the voices and sounds
what they say.                                                                         from one flower to the other.




Interactive solutions                                                                                                  Sensory installation, Talking flowers.




G. Waterplay, Splash.
Stainless steel watertrays structured on timber posts.



                                                                                                         H. Blackboard.                                    I. Mirror.
                                                                                                         A1 sized blackboard mounted                       A1 sized shatter proof acyrlic mirror whose imperfect
                                                                                                         between timber posts, providing                   reflection provides fun seeing what you and your
                                                                                                         children space to express their                   friends look like.
                                                                                                         drawing abilities




P25
Base plan: Edgar Road Community Centre; Zone B.




      N
           0m     20m    40m



P26
Images of site
                                                                             A. View of pedestrian
                                                                             access to A314
                                                                             Hanworth Road. Ex-
                                                                             isting pathway cut out
                                                                             and muddy path por-
                                                                             trays prefered route.
                                                                             Over use of tarmac.

                                              D

                                                        C


                                  E
                       B




                                                                         A   B. Image of area
                                                                             adjoining
                                                                             Hounslow Heath.
                                                                             Photograph illustrates
                                                                             potential of
                                                                             setting amongst openly
                                                                             spaced trees Existing
                                                                             lawn areas worn,
                                                                             looking tired and
                                                                             uninviting




E. Four story residential blocks with dull        D. Image of Edgar Road     C. View of play area,
arrangment of                                     Community Centre and Car   road structure and
Tarmac, utility paving units, unimaginative       park. Sea of grey pavers   rented 3/4 bedroom
planting and plane of mowed grass.                and tarmac                 terraced properties.




P27
Shadow Analysis: Zone B.
                           A. January
                           12pm




                                             D. July
                                              12pm
                           B. March
                           12pm




                                        E. September
                                                12pm
                           C. May
                           12pm




                                        D. November
                                               12pm
P28
Site analysis: Zone B
A. Built Structures                                                                              B. Pedestrian, vehicular and parking
                                                                                                 infrastructure




    Legend
                                                                                                   Pavement      Road        Parking         Car    Pedestrian      A314
    3 Bed        4Bed         Community     4Storey         Entrance &   Residents
                                                                                                                             bays            park   exit/entrance   Hanworth Rd
    properties   properties   centre        blocks of flats stairs       sheds




                                                                            C. Open spaces       D. Vegetation




   Residents     Common                                                                                            Lawn/         Tree
                                                                                                   Residents
   gardens       land                                                                                              grass         positions
                                                                                                   gardens


                                                                                                      Worn grass     Enclosed       Utility shrub
  Railway    Communal         Enclosed com- Private         Recreation   Children’s   Planting        bare soil      community      planting
  embankment space            munity space land             area         play area                                   gardens
P29
Aims and ambitions: Edgar Road community Centre; Zone B.
Ambition for Zone B is to apply the principles of Homezones as part of a phasing that could be gradually
employed to other sections of the estate.

Homezones term is used to describe a site containing an infrustructure of roads or streets, where
pedestrians and vehicles share the whole road space on equal terms and quality of life takes precedance
over ease of traffic movement. Based on the notion that motorists entering Homezone know they have left
the normal highway and entered an area where they can expect pedestrians to be using the whole street.
Benefits                                                              Elements

1. Promote quality of life for residents and remove                   1. 10mph speed limit within homezones.
traffic barriers to promote community relations.
                                                                      2. Lifting of street surface to pedestrian kerb level.
2. Attractive and interesting spaces that reflect local               Removes feature which motorists link to having pri-
needs and encourage activities in the street.                         ority over pedestrians. Denotes change in status of
                                                                      street.
3. Marriage of functional and aesthetic considrations.
                                                                      3. Play areas have no bounderies or fencing from
4. Community involvement and participation                            vehicular use - people have right to whole of space.
essential within design process if results to be valued
by residents. Create a sense of pride and                             4. Physical items such as bollards, planting or trees
ownership.                                                            creat and define communal space.

5. Transforms area into valued public space,                          5. Use of materials that will enhance and reflect
catering for safe play, excersise and relaxation,                     character of estate.
creating a sense of identity and community.
                                                                      6. Opportunities for indisciminate parking should be
6. Provide focus for physical and social regeneration                 removed through design location of street furniture
of araea, empowering                                                  and planting.
residents to shape their neighbourhood.
                                                                      7. Wildflower meadow alternative to cut grass,
P30                                                                   thrive on poor quality soils, only two cuts per year.
Schematic: Ideal with notes




P31
Schematic: Connectivity, desire lines, access points and road lines




P32
Concept Proposal: Homezone phase1.




      N
          0m     20m    40m



P33
Schematic of Proposal : Zone B; phase1 Homezone.




Legend



Proposed   Grass   Wild     Meadow   Existing   Resin bound   Planted   Pedestrian   Vehicular   Parking
trees              meadow   path     trees      gravel        borders   walkway      passage     bays      P34
Sketch Models: Zone B; Phase1 Homezone.




P35
Sketch Visualisations: Zone B; Phase1 Homezone.   A. Aerial view of proposed wild meadows and access to neighbouring
                                                  Common.




P36
B. Aerial view of proposed scheme for Edgar Road Community Centre car park.




P37
Sketch Visualisation: Pocket Park connecting Community Centre and Common.




P38
Isometric perspective: Edgar Estate; Zone C.




P39
Proposal: Edgar Estate; Zone C.
Concept of Home zone apllied to Zone B extended in
phases to remainder of Edgar Road Estate.

                      Existing rear car organised into blocks of three to reclaim space for recreational use.
                      Trees planted with informal paths running Wild grass meadow running along border with
                      Common. Rear space designed to visually merge Common with estate’s open areas.

                                                                Additional access to Common via
                                                                central gate.




                                                                                                                                                         Outline of proposal illustrates interventions to
                                                                                                                                                                                Zome C of Edgar Estate.
                                                                                                                    Edgar Road off Han-
  Central Edgar                                                                                                     worth Road reduced
  Road                                                                                                              in width to generate
  reduced in width                                                                                                  greater social domain
  with vertical                                                                                                     by reducing motorist
  3m deflections                                                                                                    speeds. Trees planted
  to reduce vehicle                                                                                                 either sid to create ap-
                                                                                                                    pealing avenue.            PRECEDENT: Invermead Court, Hammersmith. New resi-
  speeds and flow.                                                                                                                               dential development illustrates configuration of parking
  Reclaimed space                                                                                                                                                      proposed for Edgar Road Estate.
  used to increase
  size of gardens
  between
  residential
  blocks.




                  Estate on Hanworth Road made accessible with removal of existing fenceline. Avenue of trees di-
                  vided by pathway to run along length of space to attract greater usage.




P40

Mais conteúdo relacionado

Mais procurados

Selected Portfolio Work
Selected Portfolio WorkSelected Portfolio Work
Selected Portfolio WorkButler Evers
 
CA: Bay-Friendly Landscapes Case Studies - Willow Park
CA: Bay-Friendly Landscapes Case Studies - Willow ParkCA: Bay-Friendly Landscapes Case Studies - Willow Park
CA: Bay-Friendly Landscapes Case Studies - Willow ParkSotirakou964
 
Kanchana bhatia work
Kanchana  bhatia workKanchana  bhatia work
Kanchana bhatia workdezyneecole
 
Total1peridovocabulario 130113070134-phpapp02
Total1peridovocabulario 130113070134-phpapp02Total1peridovocabulario 130113070134-phpapp02
Total1peridovocabulario 130113070134-phpapp02Luciana M. M. Gomes
 
My Space Pod Brochure
My Space Pod BrochureMy Space Pod Brochure
My Space Pod Brochuremyspacepod
 

Mais procurados (10)

Mip milestone 1
Mip milestone 1Mip milestone 1
Mip milestone 1
 
Selected Portfolio Work
Selected Portfolio WorkSelected Portfolio Work
Selected Portfolio Work
 
Portfolio
PortfolioPortfolio
Portfolio
 
CA: Bay-Friendly Landscapes Case Studies - Willow Park
CA: Bay-Friendly Landscapes Case Studies - Willow ParkCA: Bay-Friendly Landscapes Case Studies - Willow Park
CA: Bay-Friendly Landscapes Case Studies - Willow Park
 
Kanchana bhatia work
Kanchana  bhatia workKanchana  bhatia work
Kanchana bhatia work
 
Sustainable Architecture Without Architects
Sustainable Architecture Without ArchitectsSustainable Architecture Without Architects
Sustainable Architecture Without Architects
 
Total1peridovocabulario 130113070134-phpapp02
Total1peridovocabulario 130113070134-phpapp02Total1peridovocabulario 130113070134-phpapp02
Total1peridovocabulario 130113070134-phpapp02
 
My Space Pod Brochure
My Space Pod BrochureMy Space Pod Brochure
My Space Pod Brochure
 
Adrienne Rosenblatt Portfolio
Adrienne Rosenblatt PortfolioAdrienne Rosenblatt Portfolio
Adrienne Rosenblatt Portfolio
 
Pylon Design Competition Shortlist booklet
Pylon Design Competition Shortlist bookletPylon Design Competition Shortlist booklet
Pylon Design Competition Shortlist booklet
 

Mais de Simon Lapinski

Management plan: Tanyard Basin, Shalford.
Management plan: Tanyard Basin, Shalford.Management plan: Tanyard Basin, Shalford.
Management plan: Tanyard Basin, Shalford.Simon Lapinski
 
Extended essay: Home zones in the U.K.
Extended essay: Home zones in the U.K.Extended essay: Home zones in the U.K.
Extended essay: Home zones in the U.K.Simon Lapinski
 
Italian And French Renaissance
Italian And French RenaissanceItalian And French Renaissance
Italian And French RenaissanceSimon Lapinski
 
Essay 1500 W Evaluation Rept
Essay 1500 W   Evaluation ReptEssay 1500 W   Evaluation Rept
Essay 1500 W Evaluation ReptSimon Lapinski
 
Greyshott square project
Greyshott square projectGreyshott square project
Greyshott square projectSimon Lapinski
 
A Comparable Study Of Station Bridge, Steel
A Comparable Study Of Station Bridge, SteelA Comparable Study Of Station Bridge, Steel
A Comparable Study Of Station Bridge, SteelSimon Lapinski
 
Streetlifepresentation
StreetlifepresentationStreetlifepresentation
StreetlifepresentationSimon Lapinski
 

Mais de Simon Lapinski (12)

9
99
9
 
19
1919
19
 
Management plan: Tanyard Basin, Shalford.
Management plan: Tanyard Basin, Shalford.Management plan: Tanyard Basin, Shalford.
Management plan: Tanyard Basin, Shalford.
 
Extended essay: Home zones in the U.K.
Extended essay: Home zones in the U.K.Extended essay: Home zones in the U.K.
Extended essay: Home zones in the U.K.
 
Cigarette Isle
Cigarette IsleCigarette Isle
Cigarette Isle
 
Bodies
BodiesBodies
Bodies
 
Eatin&Relationship
Eatin&RelationshipEatin&Relationship
Eatin&Relationship
 
Italian And French Renaissance
Italian And French RenaissanceItalian And French Renaissance
Italian And French Renaissance
 
Essay 1500 W Evaluation Rept
Essay 1500 W   Evaluation ReptEssay 1500 W   Evaluation Rept
Essay 1500 W Evaluation Rept
 
Greyshott square project
Greyshott square projectGreyshott square project
Greyshott square project
 
A Comparable Study Of Station Bridge, Steel
A Comparable Study Of Station Bridge, SteelA Comparable Study Of Station Bridge, Steel
A Comparable Study Of Station Bridge, Steel
 
Streetlifepresentation
StreetlifepresentationStreetlifepresentation
Streetlifepresentation
 

Último

Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 

Último (20)

Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 

Playnow: Edgar Road Community Centre

  • 1. Edgar Road Community Simon Lapinski Centre Proposals.
  • 2. Contents ZONE A ZONE B 1 Aims & Ambitions. 25 Base plan 2 Site survey. 26 Images of site. 3 Images of site. 27 Shadow analysis. 4 Base plan of site with proposed 28 Site analysis. 5 extension. 29 Aims & ambitions. 6 Sketch model of site. Schematics: 7 Shadow analysis. 30 Ideal with notes. 8 Concept development and notes. 31 Connectivity, desire lines 9 Concept proposal plan. & access points. 10 Schematic of proposal. 32 Concept proposal: Home zone phase 1. Concept elements: 33 Schematic of proposal. 11 Infants (0-2 years). 34 Sketch models. 12 Toddlers (2-4years). 35-38 Sketch visualisations. 13 Pre-schoolers (3-5years). 14 Parents. 15 Sectional elevation. ZONE C Construction details: 39 Perspective of site. 16 Section A. 40 Proposal. 17 Section B. 18 Section C. 19 Planting plan & description. 20 Concept proposal models. 21-22 Occupation. 22-23 Outdoor musical, sensory and interactive installations. 24 Visualisation of concept.
  • 3. Aims and ambitions: Under fives play area; Zone A. Elements of design Natural planting, engaging with envi- Elements of design ronment, wildlife, creating a sense of mystery and experience of change. Natural planting, engage with environment, wildlife, create a sense of mystery and experience change. Seating, story telling and shade. Seating, story telling, and shade. Vertical climbers, the activty of gardening and utility space. Slopes, mounds and flat surfaces. Climbers, gardening and storage. Slopes, mounds and flat surfaces P1
  • 4. Aims and ambitions: Under fives play area; Zone A. Words and precedent images considered when conceptualising play space. A. Bespoke - play space designed for L. Sources of delight, surprise, location. Invermead close, Fulham, London. experiance and exploration. B. Use of natural materials. M. Planting - Light, shade, direc- C. Range of play opportunities. tional, boundery, interactive and D. Meet community needs. wildlife. E. Children of all ages. N. Water. Inexspensive material, Baerum. F. Change & evolution/seasons/ O. Allow children to create own openendedness. play. P. Educate, develope knowl- edge, appreciation of natural environment and self-discovery. Q. Participatory interventions. U. Event qualities - occupation. R. Budget. S. Sustainability. Barrel Wharehouse Park, Waterloo, Canada. Friburg City Council. Helle Nebelong, Environmentally ordred childrens playground, Gentofte, Denmark. The Natural Playground. Valbyparken, Denmark. G. Imaginary worlds. H. Test bounderies. I. Acceptable risk. J. Stimulate senses. K. Natural environment Trefusus playing fieild, Kerrier. Waverly Park, Stirling. Bisalski, Berlin. P2
  • 5. Survey of site dimensions & existing features P3
  • 6. Images of site A. View from existing partitioning brick wall, illustraing rear perim- eter fenceline onto main line railway tracks and exiisting vegetation. E A C B B. View from brick parti- tion wall showing extent of existing hardland- scaping features and scale of brick surface provided by neighbour- ing residence. D E. View of gated entrance from Edgar Road and D. View of existing vegetation C. Image of brick parti- accessibility from 4 x 900mm doors at rear of from gated access on Edgar tion wall and site of pro- community centre main hall. Road. posed extension. P4
  • 7. Base plan: Edgar Road Community Centre; Proposed building extension & under fives play space. N 0m 2.5m 5m P5
  • 8. Existing site features with proposed extension P6
  • 9. Shadow analysis: Proposed extension and Under-fives playspace January 12pm March 12pm May 12pm July 12pm September 12pm November 12pm P7
  • 11. Concept proposal plan N 0m 5m 10m P9
  • 12. Schematic of Proposal Zone A; Under fives play area Legend Storage space Canopy shade Resin Bound gravel surface 450mm x 450mm Stone monolith Grass surface Planted area Sand Existing trees Timber fence line P10
  • 13. Concept Proposal: Infant features (0-2 years) Require modulated sensory stimulation and increasing physical opportunities. 1. Things to look at from horizontal and vertical position. 2. Protection from excessive sun, wind and rain. 3. Places to crawl. 4. Items to pull themselves up on. 5. Ability to watch and not be knocked over. 6. Waving grasses and plants. 7. Clombers on vertical surfaces to attract birds and but- terflies. 8. Soft surfaces to creep on. 9. Sloped surfaces instead of steps for safe crawling. 10. pleasant colours and sounds. Legend Shade & shelter Planted Sloped Soft grass Stone monolith Vertical from canopy elements surfaces surfaces for pulling onto climbers P11
  • 14. Concept Proposal: Toddler features (2-4 years) Require places and spaces for acting out prepositions - over, under, on top off, up and down, because physical development is paramount and fuels cognitive advancement. 1. Safe appropriatley sized structures, mounds and slpoes to clamber up and down. 2. Walkways and soft surfaces for practicing walking, then running and pushing wheeled toys. 3. Protection from excessive wind, rain and effects of the sun. 4. Sand to aid cognitive development. 5. Trees to provide shade and elements of interest, such as pinecombs. Legend Flat surfaces for Sheltered space Sand Structures for Existing walking and running crawling, clambering trees and climbing. P12
  • 15. Concept Proposal: Pre-schooler features (3-5 years) Rapid physical development, increas- ing social and languagage skills require a space with many opportunitis. 1. Running, climbing, hopping, jumping, sliding, dancing and spinning. 2. Areas, paths and slopes for tricycles, wagons, wheelbarrorws etc. 3. Storage space for equipment (props, art supplies, mobile play equipment etc). 4. Gardening, advance cognitve understanding and appreciation of nature. 5. Sand and water. Increase knowledge of physical world, creative expression. Provides entry point to social play with others. Legend potential Planted Structures for Sand Level Surfaces Informal Storage gardening elements physical for mobile play auditorium for area sites development equipment play acting and story telling P13
  • 16. Concept Proposal: Parents Provision to be provided for comfort and enjoyment for parents and child carers. 1. Places to sit, supervise and talk with other parents. 2. Relax and enjoy childrens company. 3. Provision for pushchairs. Legend Areas to Stone monolith relax to provide seating P14
  • 17. Sectional elevation: Under-fives play area A Plan of concept 7. Existing trees. illustrating location of 2 x Common Beech. sectional elevation. 1 x pine (Unknown species.) A 3. Proposed building extension. 1. Edgar Road Community Centre main hall. 0m 1.2m 2.4m 2. Storage 4. Boulders placed in 5. 450mm high grass mound with 450mm 6. Planting with 2.4m area. sand pit and bordering wide stone monolith retaining soil high timber Scale grass. and providing seating. boundery fencing. P15
  • 18. Construction details: Section A Section showing Resin bound pathway, sand pit and Boulders installed within sand and grass to be sunken a third of their size into boulder. surrounding medium to ensure stabilsed by own weight. 1.5m grass border Resin bound pathway layers. A. 20mm aggregate and resin. B. 50mm bindong course. 350mm deep C. 100mm MOT type 1 subase. sand pit. 100mm compacted 200mm x 200mm x 200mm stone blocks laid on 50mm mortar base MOT Type 1 subase to separate and retain soil and sand. 250mm x 200mm concrete footing with lining of goe- to support blockwork above and retain MOT Type 1 subase. textile membrane separating sand Soil layer. from subase. A. Plan of concept illustrating location C of construction cross-sections. B A B. Sectional elevation showing position of construction detail drawn above. Section A P16
  • 19. Construction details: Section B Section of grass mound with retaining stone monolith. Grass mound. 170mm x 20mm flexible edging and spike fixings retaining soil of mound and aggregates of Resin Bound pathway. Resin bound pathway layers. 350mm deep 900mm x 450mm stone monolith stabilised by own weight and A. 20mm aggregate and resin. sand pit. surrounding material, retaining soil of grass mound. 8m length B. 50mm bindong course. of stone monolith divided into two sections of 4m and secured together C. 100mm MOT type 1 subase. via metals dowels and corresponding holes within end sections. 100mm compacted Soil layer. MOT Type 1 subase with lining of goe- textile membrane. 2.35m 1.5m A. Plan of concept illustrating location C of construction cross-sections. B A B. Sectional elevation showing position of construction detail drawn above. Section B P17
  • 20. Construction details: Existing Common Section C Beech. Section showing Resin bound 2.4m high timber fence line. pathway, border planting 8 x 300mm x 40mm timber planks and timber boundery fixed between timber posts to establish panelling. Along sections fence work. of fencework bordered by resin bound path, several timber planks to be replaced with toughened glass to allow viewing of passing trains. Border planting. Grass embankment leading to Resin bound pathway layers. main line railway tracks. A. 20mm aggregate and resin. B. 50mm bindong course. C. 100mm MOT type 1 subase. 100mm x 100m timber post sunk in Containerised plants of different litreages placed in excavated holes which concrete footing 600mm x 300mm allow for a minimum of 50mm mix of organic compost/topsoil for root establishment x 300mm. and nutrient intake. 3.5m Soil layer. A. Plan of concept illustrating location C of construction cross-sections. B A B. Sectional elevation showing position of construction detail drawn above. Section C P18
  • 21. Planting plan and details Attract wildlife Excite senses Connect with Plant name Description maintain seasons Easy to Planting plan: Under-fives play area. • • Eleaagnus x ebbingei Fast growing ever- green shrub, white flower in autumn. • • • • Cotinus coggyria Red leaves in autumn flame followed featered flower stalks • • Cornus alba Siberica Deciduous shrub, Show of bright red stems during winter. • • Cornus stolonifera As above but green. Flaviramea • • 20Lt plants 10Lt plants 7.5Lt plants Polypodium vulgare Evergreen fern with dark green herring- Eleaagnus x ebbingei Polypodium vulgare Osmanthus x burkwoodii bone leaf structure. • • Stachy’s byzantina Evergreen woolly Stachys byzantina Siver carpet silver-leaved shrub. Lambs tonque Stipa arundinacea Cotinus coggyria • 3Lt plants 7.5Lt climbers Vinca major Hardy evergreen Vinca major Lonicera japonica ‘gertrude Jekyll ground cover shrub halliana with white flowers. • • Festuca glauca Festuca glauca Evergreen blue-grey 15 Lt plants Lamium maculatum ornamental tufted grass. Cornus alba Siberica Liriope muscari • • Lamium maculatum Evergreen ground Hebe peniguifolia Pegei ground cover with Cornus stolonifera silver leaves. • • Flaviramea Stachys byzantina Liriope muscari Dark arching grass-like grass like leaves with white flower autumn. • • Notes Hebe peniguifolia Evergreen groundcover Following list of perenials to be planted in drifts around scheme above. Pegei with greyish-blue leaves. - Achillea filipendula ‘goldplate’ - Aster x frikartii • • • • - Echinacea purperea ‘white swan’ - Helianthium benledi Osmanthus x Dark green leaves - Knophobia ‘royal standard’ - Rudbeckia ‘goldstream’ burkwoodii with fragrent white - Sedum spectabile ‘brilliant’ - Digitalis purpurea flowers in spring. • • • - Hellianthus annus Stipa arundinacea Evergreen golden leaved grass with purple hints in summer • • • • Lonicera japonica Evergreen climber with halliana fragrent cream flowers summer-autumn. P19
  • 23. Occupation: Under fives play area. B. View of proposal from side gate on Edgar Road. A. Aerial View of Proposal at Edgar Road Community Centre P21
  • 24. D. Aerial view of proposal of Edgar Road Community Centre. C. View towards existing side gate on Edgar Road. P22
  • 25. Visualisation: Edgar Road Community Centre Under Fives Play Space P23
  • 26. Outdoor musical, sensory and interactive installations & possible site placement. As part of the brief, the inclusion of hearing and sensory elements were one of the core considerations when resolving the Under-fives play space to aid the development of their cognitive knowledge. The items i’ve selected i believe provide a range of experiances and introductions to different sounds and activities. The installations were also chosen for their robust construction which could stand the vigours of boundless energy. A. Mounted and free standing Chimes. Eight x 50mm diameter chimes tuned to the notes of ABCDEFGABC Outdoor instruments mounted on a timber frame standing 1.5m in height. B. Spiral Chimes. Outdoor instruments Eight individual chimes mounted on timber frames which increase in height (1.2-2m), with the chimes placed along circular path. D. Drum set. C. Crash n Bang and Three drums of various sizes made from heavy duty plastic mounted on plastic coated metal Rainmaker. Outdoor instruments, Spiral chimes. frames. Bell tower. Four diferent sized bells fixed to tim- ber post. Each produc- ing a different pitch. Rainmaker. Stainless steel stick contain- ing hundreds of plastic beads. When rotated simunlates the sound of fallling rain. Crash. Three different sized cymbels attached to timber frame. P24
  • 27. Sensory installations F. Talking Bob. E. Talking flowers. By spinning Bob’s nose to generate energy, chidren can Pair of talking flowers are linked underground by 10m talk to Bob and hes talks back in a funny voice repeating of pipework which translates the voices and sounds what they say. from one flower to the other. Interactive solutions Sensory installation, Talking flowers. G. Waterplay, Splash. Stainless steel watertrays structured on timber posts. H. Blackboard. I. Mirror. A1 sized blackboard mounted A1 sized shatter proof acyrlic mirror whose imperfect between timber posts, providing reflection provides fun seeing what you and your children space to express their friends look like. drawing abilities P25
  • 28. Base plan: Edgar Road Community Centre; Zone B. N 0m 20m 40m P26
  • 29. Images of site A. View of pedestrian access to A314 Hanworth Road. Ex- isting pathway cut out and muddy path por- trays prefered route. Over use of tarmac. D C E B A B. Image of area adjoining Hounslow Heath. Photograph illustrates potential of setting amongst openly spaced trees Existing lawn areas worn, looking tired and uninviting E. Four story residential blocks with dull D. Image of Edgar Road C. View of play area, arrangment of Community Centre and Car road structure and Tarmac, utility paving units, unimaginative park. Sea of grey pavers rented 3/4 bedroom planting and plane of mowed grass. and tarmac terraced properties. P27
  • 30. Shadow Analysis: Zone B. A. January 12pm D. July 12pm B. March 12pm E. September 12pm C. May 12pm D. November 12pm P28
  • 31. Site analysis: Zone B A. Built Structures B. Pedestrian, vehicular and parking infrastructure Legend Pavement Road Parking Car Pedestrian A314 3 Bed 4Bed Community 4Storey Entrance & Residents bays park exit/entrance Hanworth Rd properties properties centre blocks of flats stairs sheds C. Open spaces D. Vegetation Residents Common Lawn/ Tree Residents gardens land grass positions gardens Worn grass Enclosed Utility shrub Railway Communal Enclosed com- Private Recreation Children’s Planting bare soil community planting embankment space munity space land area play area gardens P29
  • 32. Aims and ambitions: Edgar Road community Centre; Zone B. Ambition for Zone B is to apply the principles of Homezones as part of a phasing that could be gradually employed to other sections of the estate. Homezones term is used to describe a site containing an infrustructure of roads or streets, where pedestrians and vehicles share the whole road space on equal terms and quality of life takes precedance over ease of traffic movement. Based on the notion that motorists entering Homezone know they have left the normal highway and entered an area where they can expect pedestrians to be using the whole street. Benefits Elements 1. Promote quality of life for residents and remove 1. 10mph speed limit within homezones. traffic barriers to promote community relations. 2. Lifting of street surface to pedestrian kerb level. 2. Attractive and interesting spaces that reflect local Removes feature which motorists link to having pri- needs and encourage activities in the street. ority over pedestrians. Denotes change in status of street. 3. Marriage of functional and aesthetic considrations. 3. Play areas have no bounderies or fencing from 4. Community involvement and participation vehicular use - people have right to whole of space. essential within design process if results to be valued by residents. Create a sense of pride and 4. Physical items such as bollards, planting or trees ownership. creat and define communal space. 5. Transforms area into valued public space, 5. Use of materials that will enhance and reflect catering for safe play, excersise and relaxation, character of estate. creating a sense of identity and community. 6. Opportunities for indisciminate parking should be 6. Provide focus for physical and social regeneration removed through design location of street furniture of araea, empowering and planting. residents to shape their neighbourhood. 7. Wildflower meadow alternative to cut grass, P30 thrive on poor quality soils, only two cuts per year.
  • 34. Schematic: Connectivity, desire lines, access points and road lines P32
  • 35. Concept Proposal: Homezone phase1. N 0m 20m 40m P33
  • 36. Schematic of Proposal : Zone B; phase1 Homezone. Legend Proposed Grass Wild Meadow Existing Resin bound Planted Pedestrian Vehicular Parking trees meadow path trees gravel borders walkway passage bays P34
  • 37. Sketch Models: Zone B; Phase1 Homezone. P35
  • 38. Sketch Visualisations: Zone B; Phase1 Homezone. A. Aerial view of proposed wild meadows and access to neighbouring Common. P36
  • 39. B. Aerial view of proposed scheme for Edgar Road Community Centre car park. P37
  • 40. Sketch Visualisation: Pocket Park connecting Community Centre and Common. P38
  • 41. Isometric perspective: Edgar Estate; Zone C. P39
  • 42. Proposal: Edgar Estate; Zone C. Concept of Home zone apllied to Zone B extended in phases to remainder of Edgar Road Estate. Existing rear car organised into blocks of three to reclaim space for recreational use. Trees planted with informal paths running Wild grass meadow running along border with Common. Rear space designed to visually merge Common with estate’s open areas. Additional access to Common via central gate. Outline of proposal illustrates interventions to Zome C of Edgar Estate. Edgar Road off Han- Central Edgar worth Road reduced Road in width to generate reduced in width greater social domain with vertical by reducing motorist 3m deflections speeds. Trees planted to reduce vehicle either sid to create ap- pealing avenue. PRECEDENT: Invermead Court, Hammersmith. New resi- speeds and flow. dential development illustrates configuration of parking Reclaimed space proposed for Edgar Road Estate. used to increase size of gardens between residential blocks. Estate on Hanworth Road made accessible with removal of existing fenceline. Avenue of trees di- vided by pathway to run along length of space to attract greater usage. P40