Facilities Engineering
    Presentation

  M3 Engineering &
Technology Corporation
Overall Site Plan
Facilities Engineering Scope of Work

 §  Process Facilities
 §  Ancillary Facilities
 §  Civil Infrastructure
 §  Power Supply
 §  Fresh Water Supply & Distribution
Facilities Plan
Process Facilities
§  Sulfide Processing Plant
     §  75,000 DSTPD of Sulfide Ore
     §  1,350 DSTPD of Copper Concentrate
     §      15 DSTPD of Molybdenite Concentrate

§  Sulfide Circuit
     §  Primary Gyratory Crusher, Overland Conveyor, Stockpile
     §  SAG Mill & 2 Parallel Ball Mill Circuits
     §  Copper Flotation with Molybdenum Separation Circuit
     §  Concentrate Dewatering / Filtration
     §  Flotation Tailing dewatering, filtration, convey.
     §  Dry Stack Tailing Area
     §  Reagent Area
Process Facilities
§  Oxide Facility
     §  17,000 DSTPD of Oxide Ore by Leach
     §  Approx. 76,800 Pounds Per Day High Purity Cathode Copper

§  Oxide Circuit
     §  Leach Pad for Run of Mine Ore
     §  Raffinate and PLS Ponds
     §  Storm Water Pond
     §  Two Extraction and One Stripper Solvent Extraction Circuit
     §  Electro-winning Facility
     §  Reagent Area
Ancillary Facilities
            (Support Process & Mine)
§    Warehouse Facilities
§    Administration Building
§    Change Room
§    Analytical Laboratory
§    Mine Truck Shop with Tire Shop
§    Mine Truck Wash and Lubrication Facility
§    Gasoline & Diesel Fuel Storage & Dispensing Facilities
§    Ammonium Nitrate Silos and Explosives Magazines
§    Guard Facility with Truck Scale
Civil Infrastructure
§  Modifications to State Route 83 at Intersection with Mine East
       Access Road
§    East Access Road
§    Upgrades to USFS roads and private roads
§    New USFS connecting roads around Plant
§    Perimeter Road around Waste Rock & Dry Stack Tailing
       Facility
§  Overall Site Grading and Drainage
§  In-plant Roads
§  Initial Mine Haul Roads
Civil Infrastructure
§  North Storm Water Diversion Structure
§  Storm Water Diversion to Process Water Temporary Storage
   (PWTS)
§  Storm Water Diversions around Open Pit
§  Dry Stack Tailing Facility water management
§  Compliance – Point Water Management Structure
Power Supply and Distribution
§  Coordination with Tucson Electric Power (TEP)
§  Substation at TEP connection to step down voltage for Fresh
    Water System
§  Rosemont Substation (138 KV to 34.5 KV)
§  Distribution to Process Motor Control Rooms and other
    Facilities
Fresh Water Supply and Distribution
§    Well field
§    20 inch Water Delivery Line with Booster Stations
§    Fresh Water and Fire Water Tank at Process Facilities
§    Potable Water System with Water Treatment Package
§    Fresh Water System
§    Process Water System
§    Fire Water System
§    Pit Dewatering System
M3 EPCM Scope of Work
§  Project Management
§  Basic Engineering
§  Detail Engineering
§  Procurement
§  Construction Management
§  Commissioning
§  Start-Up Assistance
EPCM Status
§  Currently in Basic Engineering Phase
§  Started in May 2008, finish in April 2009
§  Basic Engineering Effort
    §  Update Deliverables with Better Scope Delineation
    §  Improve Quality of Information for update of Capital
        Estimate and Operating Estimate
    §  Finalize Criteria for Detailed Design Effort
§  Effort Currently Supported by Other Consultants:
    §    Geotechnical Services                 Tetra Tech
    §    Geotechnical Drilling Contract        Tetra Tech
    §    Dry Stack Tailings Facility           AMEC
    §    Heap Leach Facility                   Tetra Tech
Basic Engineering Deliverables
§    Project Procedures
§    Drawing, Specification, and Equipment Lists
§    Discipline Design Criteria
§    Major Equipment and Material Specifications
§    Flowsheets
§    General Arrangement Drawings
§    P&IDs
§    Electrical One-Lines
§    Civil Site Plan and Rough Grading Drawings
§    Architectural Drawings
§    Major Concrete Foundation Drawings (Mills)
§    Updated Capital Estimate and Operating Estimate
§    EPCM Schedule
Detail Engineering Phase
§  Planned start in February 2009
§  Engineering effort linked to forecasted availability of vendor
   information
§  Substantial Complete in July 2010
§  Engineering support will continue through construction

More Related Content

What's hot

Fall prevention prog
Fall prevention progFall prevention prog
Fall prevention progasia1parveen
 
Vulnerable patient policy
Vulnerable patient policyVulnerable patient policy
Vulnerable patient policydeeparani38
 
Common emergency drugs in medicine
Common emergency drugs in medicineCommon emergency drugs in medicine
Common emergency drugs in medicineOluwatobi Olusiyan
 
Central Venous Catheter - Reg Lagaac (Cambridge)
Central Venous Catheter - Reg Lagaac (Cambridge)Central Venous Catheter - Reg Lagaac (Cambridge)
Central Venous Catheter - Reg Lagaac (Cambridge)Cambridge University
 
Crash Cart Medications
Crash Cart MedicationsCrash Cart Medications
Crash Cart MedicationsWaelAbuAlfahem
 
Indications of renal replacement therapy
Indications of renal   replacement therapyIndications of renal   replacement therapy
Indications of renal replacement therapyBimal khadka
 
JCI Internal Audit Checklist By-Dr.Mahboob Khan Phd
JCI Internal Audit Checklist  By-Dr.Mahboob Khan Phd JCI Internal Audit Checklist  By-Dr.Mahboob Khan Phd
JCI Internal Audit Checklist By-Dr.Mahboob Khan Phd Healthcare consultant
 
Inter hospital transfer of the critically ill patients
Inter hospital transfer of the critically ill patientsInter hospital transfer of the critically ill patients
Inter hospital transfer of the critically ill patientsdrdani18
 
Introduction to the Visual Infusion Phlebitis (VIP) score
Introduction to the Visual Infusion Phlebitis (VIP) scoreIntroduction to the Visual Infusion Phlebitis (VIP) score
Introduction to the Visual Infusion Phlebitis (VIP) scoreivteam
 
INTRAVENOUS CANNULATION PROCEDURE.pptx
INTRAVENOUS CANNULATION PROCEDURE.pptxINTRAVENOUS CANNULATION PROCEDURE.pptx
INTRAVENOUS CANNULATION PROCEDURE.pptxNehaPandey199
 
patient identification.pptx
patient identification.pptxpatient identification.pptx
patient identification.pptxssuser002e70
 
Medication Error as per 5th Edition Standard of NABH
Medication Error as per 5th Edition Standard of NABHMedication Error as per 5th Edition Standard of NABH
Medication Error as per 5th Edition Standard of NABHAbhishek Srivastava
 
Disaster management
Disaster managementDisaster management
Disaster managementSCGH ED CME
 
Ward assistant performance appraisal
Ward assistant performance appraisalWard assistant performance appraisal
Ward assistant performance appraisalmartinbilly11
 
Product water and hemodialysis dialysis solution
Product water and hemodialysis dialysis solutionProduct water and hemodialysis dialysis solution
Product water and hemodialysis dialysis solutionIPMS- KMU KPK PAKISTAN
 

What's hot (20)

Fall prevention prog
Fall prevention progFall prevention prog
Fall prevention prog
 
Vulnerable patient policy
Vulnerable patient policyVulnerable patient policy
Vulnerable patient policy
 
Common emergency drugs in medicine
Common emergency drugs in medicineCommon emergency drugs in medicine
Common emergency drugs in medicine
 
Central Venous Catheter - Reg Lagaac (Cambridge)
Central Venous Catheter - Reg Lagaac (Cambridge)Central Venous Catheter - Reg Lagaac (Cambridge)
Central Venous Catheter - Reg Lagaac (Cambridge)
 
9. drugs used in critical
9. drugs used in critical9. drugs used in critical
9. drugs used in critical
 
Crash Cart Medications
Crash Cart MedicationsCrash Cart Medications
Crash Cart Medications
 
Indications of renal replacement therapy
Indications of renal   replacement therapyIndications of renal   replacement therapy
Indications of renal replacement therapy
 
JCI Internal Audit Checklist By-Dr.Mahboob Khan Phd
JCI Internal Audit Checklist  By-Dr.Mahboob Khan Phd JCI Internal Audit Checklist  By-Dr.Mahboob Khan Phd
JCI Internal Audit Checklist By-Dr.Mahboob Khan Phd
 
Inter hospital transfer of the critically ill patients
Inter hospital transfer of the critically ill patientsInter hospital transfer of the critically ill patients
Inter hospital transfer of the critically ill patients
 
Introduction to the Visual Infusion Phlebitis (VIP) score
Introduction to the Visual Infusion Phlebitis (VIP) scoreIntroduction to the Visual Infusion Phlebitis (VIP) score
Introduction to the Visual Infusion Phlebitis (VIP) score
 
High Alert Medication
 High Alert Medication  High Alert Medication
High Alert Medication
 
INTRAVENOUS CANNULATION PROCEDURE.pptx
INTRAVENOUS CANNULATION PROCEDURE.pptxINTRAVENOUS CANNULATION PROCEDURE.pptx
INTRAVENOUS CANNULATION PROCEDURE.pptx
 
patient identification.pptx
patient identification.pptxpatient identification.pptx
patient identification.pptx
 
Medication Error as per 5th Edition Standard of NABH
Medication Error as per 5th Edition Standard of NABHMedication Error as per 5th Edition Standard of NABH
Medication Error as per 5th Edition Standard of NABH
 
Crash Cart Medication
Crash Cart Medication Crash Cart Medication
Crash Cart Medication
 
Rapid response team
Rapid response teamRapid response team
Rapid response team
 
Disaster management
Disaster managementDisaster management
Disaster management
 
QUALITY NURSE job description
QUALITY NURSE job descriptionQUALITY NURSE job description
QUALITY NURSE job description
 
Ward assistant performance appraisal
Ward assistant performance appraisalWard assistant performance appraisal
Ward assistant performance appraisal
 
Product water and hemodialysis dialysis solution
Product water and hemodialysis dialysis solutionProduct water and hemodialysis dialysis solution
Product water and hemodialysis dialysis solution
 

Similar to Facilities Engineering Presentation

4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.144.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14Kristipoom R-khubut
 
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zachary Maddox
 
Capabilities and resources
Capabilities and resourcesCapabilities and resources
Capabilities and resourcesMartin de Beer
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillDeanGarratt
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Association for Project Management
 
Introduction to power plant
Introduction to power plantIntroduction to power plant
Introduction to power plantRahul Rathod
 
Ground Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional DrillingGround Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional DrillingTim Leung
 
Tabnak Drilling Management
Tabnak Drilling ManagementTabnak Drilling Management
Tabnak Drilling ManagementMojrian Web
 
Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14James M. Bright, P.E.
 
Basics of Hydro power plant
Basics of  Hydro power plant Basics of  Hydro power plant
Basics of Hydro power plant Prasad Vejendla
 
Permitting and Hydraulic Fracturing, Leslie Savage
Permitting and Hydraulic Fracturing, Leslie SavagePermitting and Hydraulic Fracturing, Leslie Savage
Permitting and Hydraulic Fracturing, Leslie SavageTXGroundwaterSummit
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description detailsAonghus Murray
 

Similar to Facilities Engineering Presentation (20)

Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Dariush.resume
Dariush.resumeDariush.resume
Dariush.resume
 
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.144.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
 
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01
 
The GBHE Project Experience
The GBHE Project ExperienceThe GBHE Project Experience
The GBHE Project Experience
 
Capabilities and resources
Capabilities and resourcesCapabilities and resources
Capabilities and resources
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drill
 
Tushar resume
Tushar resumeTushar resume
Tushar resume
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
Introduction to power plant
Introduction to power plantIntroduction to power plant
Introduction to power plant
 
Ground Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional DrillingGround Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional Drilling
 
Tabnak Drilling Management
Tabnak Drilling ManagementTabnak Drilling Management
Tabnak Drilling Management
 
Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14
 
Basics of Hydro power plant
Basics of  Hydro power plant Basics of  Hydro power plant
Basics of Hydro power plant
 
Permitting and Hydraulic Fracturing, Leslie Savage
Permitting and Hydraulic Fracturing, Leslie SavagePermitting and Hydraulic Fracturing, Leslie Savage
Permitting and Hydraulic Fracturing, Leslie Savage
 
Small Hydro Training Module
Small Hydro Training ModuleSmall Hydro Training Module
Small Hydro Training Module
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 
Cv english
Cv englishCv english
Cv english
 
 

More from Hudbay Minerals Inc.

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationHudbay Minerals Inc.
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Hudbay Minerals Inc.
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Hudbay Minerals Inc.
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockHudbay Minerals Inc.
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Hudbay Minerals Inc.
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Hudbay Minerals Inc.
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and AfterHudbay Minerals Inc.
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelHudbay Minerals Inc.
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Hudbay Minerals Inc.
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyHudbay Minerals Inc.
 
Aquifer Protection Permitting: Rosemont Mine
Aquifer Protection Permitting:  Rosemont MineAquifer Protection Permitting:  Rosemont Mine
Aquifer Protection Permitting: Rosemont MineHudbay Minerals Inc.
 

More from Hudbay Minerals Inc. (20)

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling Presentation
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine Rock
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009
 
Dry Stack Tailings Overview
Dry Stack Tailings OverviewDry Stack Tailings Overview
Dry Stack Tailings Overview
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007
 
Reclamation Requirements
Reclamation RequirementsReclamation Requirements
Reclamation Requirements
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and After
 
Partial Pit Backfill Alternative
Partial Pit Backfill AlternativePartial Pit Backfill Alternative
Partial Pit Backfill Alternative
 
Regional Groundwater Flow Models
Regional Groundwater Flow ModelsRegional Groundwater Flow Models
Regional Groundwater Flow Models
 
Baseline Traffic Study
Baseline Traffic StudyBaseline Traffic Study
Baseline Traffic Study
 
Baseline Noise Study
Baseline Noise StudyBaseline Noise Study
Baseline Noise Study
 
Heap Leach Facilities
Heap Leach FacilitiesHeap Leach Facilities
Heap Leach Facilities
 
Geotechnical Study
Geotechnical StudyGeotechnical Study
Geotechnical Study
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake Model
 
Rosemont Project Orientation
Rosemont Project OrientationRosemont Project Orientation
Rosemont Project Orientation
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
 
Aquifer Protection Permitting: Rosemont Mine
Aquifer Protection Permitting:  Rosemont MineAquifer Protection Permitting:  Rosemont Mine
Aquifer Protection Permitting: Rosemont Mine
 

Recently uploaded

Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 

Recently uploaded (20)

Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 

Facilities Engineering Presentation

  • 1. Facilities Engineering Presentation M3 Engineering & Technology Corporation
  • 3. Facilities Engineering Scope of Work §  Process Facilities §  Ancillary Facilities §  Civil Infrastructure §  Power Supply §  Fresh Water Supply & Distribution
  • 5. Process Facilities §  Sulfide Processing Plant §  75,000 DSTPD of Sulfide Ore §  1,350 DSTPD of Copper Concentrate §  15 DSTPD of Molybdenite Concentrate §  Sulfide Circuit §  Primary Gyratory Crusher, Overland Conveyor, Stockpile §  SAG Mill & 2 Parallel Ball Mill Circuits §  Copper Flotation with Molybdenum Separation Circuit §  Concentrate Dewatering / Filtration §  Flotation Tailing dewatering, filtration, convey. §  Dry Stack Tailing Area §  Reagent Area
  • 6. Process Facilities §  Oxide Facility §  17,000 DSTPD of Oxide Ore by Leach §  Approx. 76,800 Pounds Per Day High Purity Cathode Copper §  Oxide Circuit §  Leach Pad for Run of Mine Ore §  Raffinate and PLS Ponds §  Storm Water Pond §  Two Extraction and One Stripper Solvent Extraction Circuit §  Electro-winning Facility §  Reagent Area
  • 7. Ancillary Facilities (Support Process & Mine) §  Warehouse Facilities §  Administration Building §  Change Room §  Analytical Laboratory §  Mine Truck Shop with Tire Shop §  Mine Truck Wash and Lubrication Facility §  Gasoline & Diesel Fuel Storage & Dispensing Facilities §  Ammonium Nitrate Silos and Explosives Magazines §  Guard Facility with Truck Scale
  • 8. Civil Infrastructure §  Modifications to State Route 83 at Intersection with Mine East Access Road §  East Access Road §  Upgrades to USFS roads and private roads §  New USFS connecting roads around Plant §  Perimeter Road around Waste Rock & Dry Stack Tailing Facility §  Overall Site Grading and Drainage §  In-plant Roads §  Initial Mine Haul Roads
  • 9. Civil Infrastructure §  North Storm Water Diversion Structure §  Storm Water Diversion to Process Water Temporary Storage (PWTS) §  Storm Water Diversions around Open Pit §  Dry Stack Tailing Facility water management §  Compliance – Point Water Management Structure
  • 10. Power Supply and Distribution §  Coordination with Tucson Electric Power (TEP) §  Substation at TEP connection to step down voltage for Fresh Water System §  Rosemont Substation (138 KV to 34.5 KV) §  Distribution to Process Motor Control Rooms and other Facilities
  • 11. Fresh Water Supply and Distribution §  Well field §  20 inch Water Delivery Line with Booster Stations §  Fresh Water and Fire Water Tank at Process Facilities §  Potable Water System with Water Treatment Package §  Fresh Water System §  Process Water System §  Fire Water System §  Pit Dewatering System
  • 12. M3 EPCM Scope of Work §  Project Management §  Basic Engineering §  Detail Engineering §  Procurement §  Construction Management §  Commissioning §  Start-Up Assistance
  • 13. EPCM Status §  Currently in Basic Engineering Phase §  Started in May 2008, finish in April 2009 §  Basic Engineering Effort §  Update Deliverables with Better Scope Delineation §  Improve Quality of Information for update of Capital Estimate and Operating Estimate §  Finalize Criteria for Detailed Design Effort §  Effort Currently Supported by Other Consultants: §  Geotechnical Services Tetra Tech §  Geotechnical Drilling Contract Tetra Tech §  Dry Stack Tailings Facility AMEC §  Heap Leach Facility Tetra Tech
  • 14. Basic Engineering Deliverables §  Project Procedures §  Drawing, Specification, and Equipment Lists §  Discipline Design Criteria §  Major Equipment and Material Specifications §  Flowsheets §  General Arrangement Drawings §  P&IDs §  Electrical One-Lines §  Civil Site Plan and Rough Grading Drawings §  Architectural Drawings §  Major Concrete Foundation Drawings (Mills) §  Updated Capital Estimate and Operating Estimate §  EPCM Schedule
  • 15. Detail Engineering Phase §  Planned start in February 2009 §  Engineering effort linked to forecasted availability of vendor information §  Substantial Complete in July 2010 §  Engineering support will continue through construction