Types of projects that I have estimated:
Currently (CH2M Hill) working on a $600M energy conservation and Wind Turbine
project for Kwajalein Atoll
Design Build Transmission and Distribution – High voltage power grid in
Afghanistan
Communication infrastructure – Afghanistan
MATOC – Central African Republic
SOF Concrete structure in Qatar
Command and Control structure in Kabul Headquarters Project
Port of entty project – Iraq – Design Build
Fiber optic utilities – Afghanistan
Design Build 4 story Command and Control project – Kabul
Variety of special projects for special clients in un-named areas
Design Build bid preparation
o MATOC, SATOC, WERC, HERC, FRR, GSA Programs
o Afghanistan and Iraq programs – Specialist in LOGISTICS operations
o Bid Review team member
Fairchild Air Force Base, Runway Replacement - $60 Mil
Andrews AFB, Munitions Storage Facilities - $26 Mil
Ft Benning VMIF - $24 Mil
Lajes Housing Renovations - $24 Mil
Saipan Airport Renovations – TSA,CBP $ 17 Mil
Camp Bastion Runway Replacement - $155 Mil
Dubai Global Hawk Hangars
Minister of Defense Headquarters – Afghanistan - $48 Mil
Land Ports of Entry Facilities, North Dakota - $24 Mil
SOCOM Language Facility – MacDill AFB - $15 Mil
Renovations to DFAC Facility – Youngstown Ohio - $ 6 Mil
HRSOC – NAVFAC Project in Hawaii - $320Mil
AAFES Guam Facility – Guam - $38 Mil
LOGCAP – US Army Material Command - $5 Billion/yr
Army Reserve Centers – California, Nevada
U S Forrest Rangers Station – $7 Mil EA – New Mexico and Arizona (Both Wins)
DTRA Program – Biologic Threat Reduction Program – Northrop Grumman
FT Sill – Battalion/Brigade Headquarters - $ 25 Mil Design Build
NCETR - Redstone Alabama - $30 Mil Design/Build
RAFB – Randolph AFB Brac Administrative Office - $9.7 Mil (CCL) Design Build
Conceptual Estimating: City Redevelopment projects, Bio Tech Facilities, National
Art Facility Buildings, Prisons, Potable Water Treatment plants, Correctional
Facilities, Residential subdivisions, Interstate highway renovation I-95 Baltimore
Managed Lane Project, VA Hospital Renovations
Special Transportation Projects:
o Dulles Airport Expansion (HNTB)
o New Haven Catenaries (Washington Group)
o Claims analysis on Baltimore Metro Rail Yard Expansion
o Schedule preparation and Cost estimate for I95 Managed Lane Project
o Various Large Scale Parking Garages
2. 2
Estimating methodology:
Most of the projects that I have worked on have been firm fixed priced RFP’s. Bidding firm
fixed price projects requires that you bid to the specs and with only those positions that are
required field positions. A careful risk analysis may be required to quantify those areas of
work that may not be specified but may be required to execute the work, as such inclusion of
some contingency is included to mitigate the risk. Discussion with senior level management
will provide direction and guidance on the level of that mitigating contingency included in
the bid.
Estimating software and tools:
HCSS – Heavy Bid – Advanced/Expert user
Win Est Estimating systems,– Subject Matter Expert (SME)
Timberline – (SME), HCSS Implementation (SME)
On Center Excavation modeling
Estimation Inc – Maxwell Systems for MEP estimating
Primavera P6 and Pertmaster Risk analysis module (average working knowledge, acceptable
analysis knowledge)
Excel – Support spreadsheet (better than average knowledge – (SME)
R S Means – Pricing support databases (SME)
EVMS – SME