SlideShare uma empresa Scribd logo
1 de 48
School District of Beloit
REFERENDUM PRESENTATION




      IMAGINE BELOIT
1.   History/Challenge and Opportunity
2.   The cost
3.   The physical plants
4.   Educational Advantages
5.   Fiscal Responsibility and Savings
6.   Economic Development
7.   April 3, 2012
Board of Education:

• Facility study 1998
• Architectural drawings 2008
Board of Education challenge:

  •   8 buildings built before 1928
  •   Newest building built: 1965
  •   Last major improvements: 1994
  •   Non-functional pool: 1968
  •   Deteriorating facilities
Board of Education Opportunity:

    • 1994 bonds maturing in 2012
    • Lowest interest rates in history
    • Extremely competitive
      construction industry driving costs
      down
    • Perfect storm
2012-2013 Tax Impact
              On a $70 Million Dollar Referendum
              Under Current Funding Aid Formula
                  Estimated Interest at 3.5%
Home Value                Annual Cost          Monthly Cost

$75,000*                  $ 67.50                   $5.63

• State reimburses District $45 million or 64% of the bond issue
• Increased 12 of the last 14 years
• Beloit tax payers pay only $25 million
• Business 46%
• Residential 54%
*Average home value in the city of Beloit
Success Breeds Success

•   National AP Honor Roll, 1 of 367
•   National Blue Ribbon, Gaston, 1 of 305
•   National GPA award, Girls Swim, 20th
•   National GPA award, Boys Swim, 6th
•   National Jazz Competition, top 15
•   RTI program receiving state and national
    attention
Referendum Plan: Physical Plants
Renovate six elementary schools to PK-3
1. More and larger classrooms for consolidation/team
   teaching
2. Create intervention rooms
3. More gym space
4. Needed repairs
    •Roofing               •Security Upgrade
    •Boiler Systems/HVAC   •Parking/Drop off
    •Building Envelope     •Playgrounds
    •Needed Furnishings    •Technology


5. Food prep and serving areas
Primary Schools
  Cost Approximately $31 million
Approximately 440 Students/Building

East              West
  Todd    $6.0M    Converse $5.6M
  Merrill 4.4M     Hackett   5.1M
  Robinson 5.6M    Gaston    4.2M
Todd
Merrill
Robinson
Converse
Hackett
Gaston
Aldrich and McNeel


$10M to be allocated from maintenance
    savings over the next 5 years

 Fewer students after reconfiguration
Middle School Demographics
Free Lunch by Middle School



Aldrich:                85.89%
Cunningham:             79.83%
McNeel:                 80.34%
Southeast School:       70.51%


Diversity by Middle School


Aldrich:   Black - 34.6% White - 32.0% Hispanic - 32.3% AmerIndian - .1% Asian - 1%
Cunningham:Black - 21.7% White - 46.6% Hispanic - 31.5% AmerIndian - .2% Asian - 0%
McNeel:    Black - 28.3% White - 44.5% Hispanic - 26.7% AmerIndian - .1% Asian - .4%
Southeast: Black - 25.3% White - 38.4% Hispanic - 32.6% AmerIndian - .9% Asian - 2.8%
McNeel
Aldrich
New Cunningham 4-8
 Cost Approximately $16 million

• Cunningham 60% increase in square
  footage
• Land area sufficient for expansion
• Large amount of green space remaining
  after expansion
New Cunningham
New SE Intermediate School 4-8
 Cost Approximately $16 million

• Corner of Lee Lane and Milwaukee Rd
• Collaborative partnership with Beloit
  Health Systems
New SE Intermediate
New SE Intermediate
Intermediate School Design
1. Separate wings for 4,5,6 and 7,8
2. Separate entrances/pickup and drop off areas
3. Shared spaces for:
  –   Music
  –   Art
  –   Phy Ed
  –   ELL
  –   Special Education
  –   Library Media
Beloit Memorial High School

•   New Swimming Pool – 8 lane
•   Conference and Sectional meets
•   Locker rooms male and female
•   Community Changing Room
•   Bleachers for 500 + people at pool level
•   All mechanical-Electrical-Plumbing
•   Pool Room Heating and Ventilation
•   Used daily from 6AM to 8PM
Tennis Courts

•   Tear up existing Tennis Courts
•   Relocate west of student parking
•   8 tennis courts complex
•   Tournaments
Life Center
• New equipment relocated from class rooms
• Level playing field for Big 8 athletics
• Relocate to existing pool area
• Current weight room transformed to
  wrestling and/or dance or yoga studio
• Fight childhood obesity
• Lower health care costs of district
  employees
High School
High School
Future Use of District-Owned Buildings
• Buildings Available for    • Possible Uses
  Retirement or Repurposing:    – District Office
   –   Royce                       – Charter School (RCAA)
   –   McLenegan                   – Learning Academy
   –   Kolak                       – Sale to outside party
   –   Morgan
   –   Wright
   –   Burdge
Educational Advantages
PK-3 Grade Alignment
       Educational Advantages

• Six PK-3 Schools
• Alignment of resources for learning to read
• Collaborative opportunities
• Intense focus on developmental needs of the
  young child
• Dedicated Art and Music areas
PK-3 Grade Alignment
       Educational Advantages
Higher Parent Involvement

  – More years in the same building
  – Sustained Relationships
  – Fewer transitions
4-8 Grade Alignment
         Educational Advantages
• “Elemiddle” approach
  – Makes smaller grades 6-8, approx 150 per grade
• Alignment of resources for reading to learn
• Use of other resources and shared classrooms
 (e.g. Gym, Tech Ed, Music, Art)
4-8 Grade Alignment
         Educational Advantages
• Collaborative opportunities for
• 4-6 and 7-8 wings
• Culture change in a building with younger and
  older students
• More opportunities to be involved in sports and
  extracurricular activities with smaller classes.
4-8 Grade Alignment
       Educational Advantages
Higher Parent Involvement

  – More years in the same building
  – Sustained Relationships
  – Fewer transitions
The Cost
Primary schools =        $31 million
Intermediate schools =   $32 million
Secondary School =       $ 7 million
                Total=   $70 million

$45 million reimbursed by the State
These are estimated permanent reductions that would assist
   us with our budget challenges in each year going forward.
Cost Savings Area                                          Estimated Annual Cost Savings If
                                                                 Referendum Passes

Rent                                                   $             128,007.00
Utilities (Gas, Electric, Water, Sewer, Storm Water)   $              66,232.00
Reduction of Personnel                                 $           1,019,582.00
Facility and Building Maintenance                      $             978,780.00
Property Services                                      $              28,334.00
Technology Savings-Fiber Lease /Phone
Lines                                                  $              10,446.00
Transportation                                         $              35,730.00
Staff Travel                                           $              30,000.00
   Grand Total                                         $           2,297,111.00
Referendum versus Operating Cost
 • Referendum is a stand-alone loan fund
   – Must be for capital improvements only
   – Not used for operating budget or salaries

 • Yearly Operating budget is effected only by
   the savings incurred by improvements
   – Helps offset the budget challenges we will
     continue to face due to decreasing funding
Fiscal Responsibility
25


20


15
                                           Actual Levy collected
10                                         1995 Levy adjusted for inflation


 5


 0
 1990   1995   2000   2005   2010   2015
2012-2013 Tax Impact
              On a $70 Million Dollar Referendum
              Under Current Funding Aid Formula
                  Estimated Interest at 3.5%
Home Value                Annual Cost          Monthly Cost

$75,000*                  $ 67.50                   $5.63

• State reimburses District $45 million or 64% of the bond issue
• Increased 12 of the last 14 years
• Beloit tax payers pay only $25 million
• Business 46%
• Residential 54%
*Average home value in the city of Beloit
Economic Development
• Schools are one of the most
  important reasons for business
  start-ups and expansion
• More new employees stay in Beloit
• Higher property values
• Increased community pride
• Local construction jobs
• $45 million in outside investment
•   Chamber of Commerce: ENDORSED
•   GBEDC: ENDORSED
•   City Council: ENDORSED
•   Beloit 2020: ENDORSED
•   Outside tourism revenue $50/$140
•   Improved image to non-Beloiters
•   Continue Beloit improvements
•   $45MM in outside investment
Discussion
VOTE

April 3, 2012

Mais conteúdo relacionado

Semelhante a Imagine power point.3 (1)

School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30Rick McGrath
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013SchoolDude
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposalyestoinvest
 
Funding our future community information session nov 2013
Funding our future community information session nov 2013Funding our future community information session nov 2013
Funding our future community information session nov 2013maitlandyoursay
 
Iced Eggs And Issues Presentations
Iced Eggs And Issues PresentationsIced Eggs And Issues Presentations
Iced Eggs And Issues PresentationsIndependence EDC
 
Facilities Master Plan OUSD
Facilities Master Plan OUSDFacilities Master Plan OUSD
Facilities Master Plan OUSDaaronjacoby
 
Referendum presentation 2012
Referendum presentation 2012Referendum presentation 2012
Referendum presentation 2012rcox726
 
Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012Michael McDermott
 
School Funding and Property Taxes
School Funding and Property TaxesSchool Funding and Property Taxes
School Funding and Property TaxesJeffMcLynch1
 
Manitowoc Public School District Referendum Presentaiton 10-6-2014
Manitowoc Public School District Referendum Presentaiton 10-6-2014Manitowoc Public School District Referendum Presentaiton 10-6-2014
Manitowoc Public School District Referendum Presentaiton 10-6-2014TheChamber
 
Dana Dykhouse presentation
Dana Dykhouse presentationDana Dykhouse presentation
Dana Dykhouse presentationJeff Zahn
 
Power4Schools and SchoolDude
Power4Schools and SchoolDude Power4Schools and SchoolDude
Power4Schools and SchoolDude SchoolDude
 
Budget Presentation 08 09
Budget Presentation 08 09Budget Presentation 08 09
Budget Presentation 08 09guest08a3ab
 
Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014KEPHART
 
MnSCU Bonding Request
MnSCU Bonding RequestMnSCU Bonding Request
MnSCU Bonding RequestMSCSA
 
Diverse Perspectives on Managing Facilities Demands
Diverse Perspectives on Managing Facilities DemandsDiverse Perspectives on Managing Facilities Demands
Diverse Perspectives on Managing Facilities DemandsSightlines
 
Presentations, MPO Policy Committee, May 28, 2015
Presentations, MPO Policy Committee, May 28, 2015Presentations, MPO Policy Committee, May 28, 2015
Presentations, MPO Policy Committee, May 28, 2015dmampo
 

Semelhante a Imagine power point.3 (1) (20)

School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013
 
Levy presentation2
Levy presentation2Levy presentation2
Levy presentation2
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposal
 
levy2
levy2levy2
levy2
 
Funding our future community information session nov 2013
Funding our future community information session nov 2013Funding our future community information session nov 2013
Funding our future community information session nov 2013
 
2012 usd263 bond
2012 usd263 bond2012 usd263 bond
2012 usd263 bond
 
Iced Eggs And Issues Presentations
Iced Eggs And Issues PresentationsIced Eggs And Issues Presentations
Iced Eggs And Issues Presentations
 
Facilities Master Plan OUSD
Facilities Master Plan OUSDFacilities Master Plan OUSD
Facilities Master Plan OUSD
 
Referendum presentation 2012
Referendum presentation 2012Referendum presentation 2012
Referendum presentation 2012
 
Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012
 
School Funding and Property Taxes
School Funding and Property TaxesSchool Funding and Property Taxes
School Funding and Property Taxes
 
Manitowoc Public School District Referendum Presentaiton 10-6-2014
Manitowoc Public School District Referendum Presentaiton 10-6-2014Manitowoc Public School District Referendum Presentaiton 10-6-2014
Manitowoc Public School District Referendum Presentaiton 10-6-2014
 
Dana Dykhouse presentation
Dana Dykhouse presentationDana Dykhouse presentation
Dana Dykhouse presentation
 
Power4Schools and SchoolDude
Power4Schools and SchoolDude Power4Schools and SchoolDude
Power4Schools and SchoolDude
 
Budget Presentation 08 09
Budget Presentation 08 09Budget Presentation 08 09
Budget Presentation 08 09
 
Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014
 
MnSCU Bonding Request
MnSCU Bonding RequestMnSCU Bonding Request
MnSCU Bonding Request
 
Diverse Perspectives on Managing Facilities Demands
Diverse Perspectives on Managing Facilities DemandsDiverse Perspectives on Managing Facilities Demands
Diverse Perspectives on Managing Facilities Demands
 
Presentations, MPO Policy Committee, May 28, 2015
Presentations, MPO Policy Committee, May 28, 2015Presentations, MPO Policy Committee, May 28, 2015
Presentations, MPO Policy Committee, May 28, 2015
 

Último

Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 

Último (20)

Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 

Imagine power point.3 (1)

  • 1. School District of Beloit REFERENDUM PRESENTATION IMAGINE BELOIT
  • 2. 1. History/Challenge and Opportunity 2. The cost 3. The physical plants 4. Educational Advantages 5. Fiscal Responsibility and Savings 6. Economic Development 7. April 3, 2012
  • 3. Board of Education: • Facility study 1998 • Architectural drawings 2008
  • 4. Board of Education challenge: • 8 buildings built before 1928 • Newest building built: 1965 • Last major improvements: 1994 • Non-functional pool: 1968 • Deteriorating facilities
  • 5. Board of Education Opportunity: • 1994 bonds maturing in 2012 • Lowest interest rates in history • Extremely competitive construction industry driving costs down • Perfect storm
  • 6. 2012-2013 Tax Impact On a $70 Million Dollar Referendum Under Current Funding Aid Formula Estimated Interest at 3.5% Home Value Annual Cost Monthly Cost $75,000* $ 67.50 $5.63 • State reimburses District $45 million or 64% of the bond issue • Increased 12 of the last 14 years • Beloit tax payers pay only $25 million • Business 46% • Residential 54% *Average home value in the city of Beloit
  • 7. Success Breeds Success • National AP Honor Roll, 1 of 367 • National Blue Ribbon, Gaston, 1 of 305 • National GPA award, Girls Swim, 20th • National GPA award, Boys Swim, 6th • National Jazz Competition, top 15 • RTI program receiving state and national attention
  • 9. Renovate six elementary schools to PK-3 1. More and larger classrooms for consolidation/team teaching 2. Create intervention rooms 3. More gym space 4. Needed repairs •Roofing •Security Upgrade •Boiler Systems/HVAC •Parking/Drop off •Building Envelope •Playgrounds •Needed Furnishings •Technology 5. Food prep and serving areas
  • 10. Primary Schools Cost Approximately $31 million Approximately 440 Students/Building East West Todd $6.0M Converse $5.6M Merrill 4.4M Hackett 5.1M Robinson 5.6M Gaston 4.2M
  • 11. Todd
  • 17. Aldrich and McNeel $10M to be allocated from maintenance savings over the next 5 years Fewer students after reconfiguration
  • 18. Middle School Demographics Free Lunch by Middle School Aldrich: 85.89% Cunningham: 79.83% McNeel: 80.34% Southeast School: 70.51% Diversity by Middle School Aldrich: Black - 34.6% White - 32.0% Hispanic - 32.3% AmerIndian - .1% Asian - 1% Cunningham:Black - 21.7% White - 46.6% Hispanic - 31.5% AmerIndian - .2% Asian - 0% McNeel: Black - 28.3% White - 44.5% Hispanic - 26.7% AmerIndian - .1% Asian - .4% Southeast: Black - 25.3% White - 38.4% Hispanic - 32.6% AmerIndian - .9% Asian - 2.8%
  • 21. New Cunningham 4-8 Cost Approximately $16 million • Cunningham 60% increase in square footage • Land area sufficient for expansion • Large amount of green space remaining after expansion
  • 23. New SE Intermediate School 4-8 Cost Approximately $16 million • Corner of Lee Lane and Milwaukee Rd • Collaborative partnership with Beloit Health Systems
  • 26. Intermediate School Design 1. Separate wings for 4,5,6 and 7,8 2. Separate entrances/pickup and drop off areas 3. Shared spaces for: – Music – Art – Phy Ed – ELL – Special Education – Library Media
  • 27. Beloit Memorial High School • New Swimming Pool – 8 lane • Conference and Sectional meets • Locker rooms male and female • Community Changing Room • Bleachers for 500 + people at pool level • All mechanical-Electrical-Plumbing • Pool Room Heating and Ventilation • Used daily from 6AM to 8PM
  • 28. Tennis Courts • Tear up existing Tennis Courts • Relocate west of student parking • 8 tennis courts complex • Tournaments
  • 29. Life Center • New equipment relocated from class rooms • Level playing field for Big 8 athletics • Relocate to existing pool area • Current weight room transformed to wrestling and/or dance or yoga studio • Fight childhood obesity • Lower health care costs of district employees
  • 32. Future Use of District-Owned Buildings • Buildings Available for • Possible Uses Retirement or Repurposing: – District Office – Royce – Charter School (RCAA) – McLenegan – Learning Academy – Kolak – Sale to outside party – Morgan – Wright – Burdge
  • 34. PK-3 Grade Alignment Educational Advantages • Six PK-3 Schools • Alignment of resources for learning to read • Collaborative opportunities • Intense focus on developmental needs of the young child • Dedicated Art and Music areas
  • 35. PK-3 Grade Alignment Educational Advantages Higher Parent Involvement – More years in the same building – Sustained Relationships – Fewer transitions
  • 36. 4-8 Grade Alignment Educational Advantages • “Elemiddle” approach – Makes smaller grades 6-8, approx 150 per grade • Alignment of resources for reading to learn • Use of other resources and shared classrooms (e.g. Gym, Tech Ed, Music, Art)
  • 37. 4-8 Grade Alignment Educational Advantages • Collaborative opportunities for • 4-6 and 7-8 wings • Culture change in a building with younger and older students • More opportunities to be involved in sports and extracurricular activities with smaller classes.
  • 38. 4-8 Grade Alignment Educational Advantages Higher Parent Involvement – More years in the same building – Sustained Relationships – Fewer transitions
  • 39. The Cost Primary schools = $31 million Intermediate schools = $32 million Secondary School = $ 7 million Total= $70 million $45 million reimbursed by the State
  • 40. These are estimated permanent reductions that would assist us with our budget challenges in each year going forward. Cost Savings Area Estimated Annual Cost Savings If Referendum Passes Rent $ 128,007.00 Utilities (Gas, Electric, Water, Sewer, Storm Water) $ 66,232.00 Reduction of Personnel $ 1,019,582.00 Facility and Building Maintenance $ 978,780.00 Property Services $ 28,334.00 Technology Savings-Fiber Lease /Phone Lines $ 10,446.00 Transportation $ 35,730.00 Staff Travel $ 30,000.00 Grand Total $ 2,297,111.00
  • 41. Referendum versus Operating Cost • Referendum is a stand-alone loan fund – Must be for capital improvements only – Not used for operating budget or salaries • Yearly Operating budget is effected only by the savings incurred by improvements – Helps offset the budget challenges we will continue to face due to decreasing funding
  • 42. Fiscal Responsibility 25 20 15 Actual Levy collected 10 1995 Levy adjusted for inflation 5 0 1990 1995 2000 2005 2010 2015
  • 43. 2012-2013 Tax Impact On a $70 Million Dollar Referendum Under Current Funding Aid Formula Estimated Interest at 3.5% Home Value Annual Cost Monthly Cost $75,000* $ 67.50 $5.63 • State reimburses District $45 million or 64% of the bond issue • Increased 12 of the last 14 years • Beloit tax payers pay only $25 million • Business 46% • Residential 54% *Average home value in the city of Beloit
  • 45. • Schools are one of the most important reasons for business start-ups and expansion • More new employees stay in Beloit • Higher property values • Increased community pride • Local construction jobs • $45 million in outside investment
  • 46. Chamber of Commerce: ENDORSED • GBEDC: ENDORSED • City Council: ENDORSED • Beloit 2020: ENDORSED • Outside tourism revenue $50/$140 • Improved image to non-Beloiters • Continue Beloit improvements • $45MM in outside investment

Notas do Editor

  1. Welcome. Thank the community for their support of our programs.