1. intro
introduction planning process pilot project monitoring
restoration measures at the
lowland river Morava
oberhofer riocom
2. introduction planning process pilot project monitoring
restoration measures at the
lowland river Morava
pilot project “MUF km 15 –25” river bank
and river profile improvements and
restoration as well as measures for
meander reconnection for the Morava
River km 15-25 (Marchegg).
oberhofer riocom
3. introduction pilot
planning process pilot project monitoring
1.step - general scheme with
following goals:
development of various types of
measures, related to different
objectives in the context of river
ecology
2 – phase plan
phase A – short term goals
phase B – long term “ideal”
objectives
2. step – application of types of
measures for the river section km
15 - 25
oberhofer riocom
4. 1st phase 2nd phase
introduction planning process pilot project monitoring
2 phase plan
oberhofer riocom
5. introduction planning process pilot project monitoring
typology of measures
A. improvement of river
course development
B. variability of cross section
morphology
C. lateral connectivity
D. meander reconnection
E. improvements of low water
structures in river course
F. new types of river bank
stabilization
G. design of river banks in urban
areas
oberhofer riocom
6. introduction planning process pilot project monitoring
A improvement of river course development
set back training structure
during
construction, 2002
steep bank,
current situation,
low water 2004
oberhofer riocom
7. introduction planning process pilot project monitoring
set back training structure
Profile (rkm 24.41): steep bank, survey
oberhofer riocom
8. introduction planning process pilot project monitoring
set back training structure
steep bank: low water 2004-07 steep bank: low water 2004-07
oberhofer riocom
9. introduction planning process pilot project monitoring
set back training structure
steep bank: low water 2004-07 steep bank: low water 2004-07
oberhofer riocom
10. introduction planning process pilot project monitoring
set back training structure
left: change detection
erosion (yellow),
accumulation (red)
right: digital elevation model,
mean water and low water 2004
oberhofer riocom
11. introduction planning process pilot project monitoring
C lateral connectivity
secondary river channel
2003-01
> mean water
2005-03
flood (HQ 20?)
oberhofer riocom
12. introduction planning process pilot project monitoring
secondary river channel
> mean water 2004-02 > mean water 2003-01
oberhofer riocom
13. introduction planning process pilot project monitoring
F new types of river bank stabilization
short groyne
low water 2004-03
low water 2004-07
oberhofer riocom
14. introduction planning process pilot project monitoring
short groyne
low water 2004 low water 2003
oberhofer riocom
15. introduction planning process pilot project monitoring
short groyne
left: change
detection
erosion (yellow),
accumulation (red)
right: digital
elevation model,
low water and
mean water 2004
oberhofer riocom
16. introduction planning process pilot project monitoring
D meander reconnection
meander VI, outflow reconnection
meander VI,
during construction,
low water 2002
meander VI,
mean water 2003
oberhofer riocom
17. introduction planning process pilot project monitoring
meander VI, outflow reconnection
mean water 2002-12 mean water 2003-03
oberhofer riocom
18. introduction planning process pilot project monitoring
meander VI, outflow reconnection
change detection, erosion (yellow),
accumulation (red)
digital elevation
model,
low water, 2003
digital elevation
model,
low water, 2004
oberhofer riocom
19. introduction planning process pilot project monitoring
meander VI, outflow reconnection
digital elevation model – 2004, low water
oberhofer riocom
20. introduction planning process pilot project monitoring
D meander reconnection
triangular guiding structure
during construction 2002, Austrian side during construction 2003, Slovakian side
oberhofer riocom
21. introduction planning process pilot project monitoring
triangular guiding structure
after construction 2003, Austrian side after construction 2003, Austrian side
oberhofer riocom
22. introduction planning process pilot project monitoring
B variability of cross section morphology
sediment benches
overview of
sediment bench
and the meander
outflow (M IV) on
the Austrian side
and the triangular
guiding structure
on the Slovakian
side,
digital elevation
model, mean water
and low water
oberhofer riocom
23. introduction planning process pilot project monitoring
sediment benches
Sediment benches made from meander-outflow material, low water (2002)
oberhofer riocom