PEARL COMMUNITY
• FOR LARGE COMMUNITIES
• ADEQUATE FOR DEVELOPMENTS OF MORE
THAN 75,000 m2
PEARL BUILDING
• FOR BUILDINGS
• ADEQUATE FOR ONE OR MORE BUILDING
WITH A TOTAL AREA OF LESS THAN 75,000 m2
PEARLVILLA
• FORVILLAS
• ADEQUATE FOR INDIVIDUAL HOMES AND
VILLAS
DESIGN RATING
CONSTRUCTION
RATING
OPERATIONAL
RATING ??
Design rating
ensures all the
credits submitted at
the design stage are
achievable
Construction rating
ensures that all credits
submitted in design stage
are achieved at the end of
construction
Design rating
ensures all the
credits submitted at
the design stage are
achievable
Operational rating ensures building
continue to achieve the intent of design
throughout its life
(this rating is not yet implemented)
Construction rating
ensures that all credits
submitted in design stage
are achieved at the end of
construction
Design rating
ensures all the
credits submitted at
the design stage are
achievable
Consideration
for local
weather
Consideration for
the precious water
Consideration
for the
particular
nature
Consideration for
the cultural
heritage
Consideration
for the
Emirate urban
development
Integration
within Abu
Dhabi’s
vision 2030
Lower energy demand
means lower energy cost
Better
maintenance
plan means
lower running
cost
Healthier environment
means higher
productivity
Leadership in
environmental
friendliness
Promotion of
environmental
awareness
WINDOWS
SHADES
TRANSPARENT SPACES
(OUTSIDEVUE)
NATURAL LIGHTING
RE-R1 MINIMUM ENERGY
REQUIRMENTS
RE-1 IMPROVED ENERGY
PERFORMANCE
RE-2 COOL BUILDING
STRATEGY
MANDATORY – RE-R1 #B-8:
• COMPLY WITH ABU DHABI IECC 502, 503, 505 AND AN OPTION
OF 506
• ACHIEVE ENERGY PERFORMANCE 12 % BETTERTHAN ASHRAE
90.1:2007 REQUIREMENTS
MUNICIPALITY MINIMUM PROGRAM:
• ACHIEVE GLASS PANEL UVALUE OF 1.8 W/m2K AND AN
ASSEMBLY UVALUE OF 2.2W/m2K
ENERGY PERFORMANCE CREDIT POINTS – RE-1:
• DEMONSTRATE ENERGY PERFORMANCE 14% TO 60% BETTER
THAN ASHRAE 90.1:2007 REQUIREMENTS TO ACHIEVE CREDIT
POINTS 1 TO 15
COOL BUILDING STRATEGIS CREDIT POINTS – RE-2:
• DEMONSTRATE PASSIVE DESIGN MEASURTES LEADTO HEAT
REDUCTION OF 10%TO 50% COMPARED TO BASELINETO
ACHIEVE CREDIT POINTS 1 TO 5 THROUGH:
1. ORIENTATION
2. GLAZING RATIO
3. SHGC
4. SHADING
5. AIRTIGHTNESS
6. INSULATION
7. ANY OTHER PASSIVE METHOD
• USE COOL ROOF TO ACHIEVE AN ADDITION CREDIT POINT
LBi-7 / LV-8
DAYLIGHT & GLARE
Lbi-8VIEWS
DAYLIGHT CREDIT POINTS – LBi-7 AND LV-8:
• DEMONSTRATE AT 10AM, 12PM, 2PM ON THE EQUINOX AND
THE SUMMER SOLSTICE:
• OFFICES: 250 Lux ON WORK PLANE: 1CREDIT 50%, 2
CREDITS 75%
• RESIDENTIAL: 200 Lux ON LIVING AREAS FLOOR: 1CREDIT
50%, 2 CREDITS 75%
• SCHOOLS: 300 Lux ON WORK PLANE: 1CREDIT 75%, 2
CREDITS 90%
• PROVIDE OCCUPANCY SENSORS AS REQUIRED
GLARE (REQUIRED FORTHIS CREDIT)– LBi-7:
• DEMONSTRATE GLARE CONTROL DEVICES ARE INSTALLED, IF
AUTOMATED, IT MUST BE CONNECTED TO THE BMS.
NOTE: RETAIL IS NOT ELIGIBLE FOR THIS CREDIT
SM-4 (BUILDING) DESIGN FOR
DISASSEMBLY
SM-6 (BUILDING) & SM-2 (VILLA) DESIGN
FOR DURABILITY
SM-8 (BUILDING) MATERIAL REUSE
SM-9 (BUILDING) & SM-4 (VILLA) & IB#11
REGIONAL MATERIALS
SM-10 (BUILDING) & SM-5 (VILLA)
RECYCLED MATERIALS
SM-4 (BUILDING) DESIGN FOR DISASSEMBLY
• 1 CREDIT: DEMONSTRATE 75% OF FAÇADE AREA CAN BE
DISASSEMBLED
SM-6 (BUILDING) & SM-2 (VILLA) DESIGN FOR DURABILITY
• 1 CREDIT: PROVIDE A DURABILITY PLAN DEMONSTRATING
IMPROVED DURABILITY FOR FAÇADE ELEMENTS AMONG OTHER
ELEMENTS AND ENSURE MAINTENANCE IS EASY.
SM-8 (BUILDING) MATERIAL REUSE
• 1 CREDIT: DEMONSTRATETHAT THE TOTAL MATERIAL COST OF
REUSED AND SALVAGED MATERIALS REPRESENTS 3% OF THE
TOTAL MATERIAL COST, INCLUDING GLASS PANELS.
SM-9 (BUILDING) & SM-4 (VILLA) & IB#11 REGIONAL
MATERIALS
• 1 CREDIT: COST OF REGIONAL MATERIALS IS 5% OF TOTAL COST
• 2 CREDITS: COST OF REGIONAL MATERIALS IS 10% OF TOTAL
COST
REGIONAL MATERIAL IS DEFINEDTO BE ORIGINATINGWITHING 500
KM OR MANUFACTURED WITHINTHE UAE BOUNDARIES. SIMPLE
ASSEMBLY DOES NOT QUALIFY.
SM-10 (BUILDING) & SM-5 (VILLA) RECYCLED MATERIALS
• 1 CREDIT: COST OF RECYCLED MATERIALS IS 10% OF TOTAL COST.
ACCEPTED COMBINATIONS OF THE FOLLOWING:
• MINIMUM 30% POST-CONSUMER RECYCLED CONTENT
• MINIMUM OF 80% POST-INDUSTRIAL CONTENT
• 50% AGRICULTURALWASTE BY-PRODUCT
3RD PARTY
TESTING
ENVELOPE U-
VALUE
U-VALUETHIRD PARTY
TESTING
• THIRD-PARTYTEST
CERTIFICATE
DEMONSTRATING
THERMAL PROPERTIES OF
ELEMENTS
ENVELOPE U-VALUE
• SHOP DRAWINGS HIGHLIGHTING ENVELOPE ELEMENTSWITH
DIFFERENT U-VALUES
FERTIL NON-PROCESS BUILDINGS
6 3-PEARL RATED BUILDINGS
1ST EVER 3 PEARL RATED MOSQUE
1ST EVER 3 PEARL RATED
WAREHOUSE
a
a
a
a
FERTIL NON-PROCESS BUILDINGS
GLASS USED:
SHGC: 28%
SC: 0.22
UVALUE: 1.09W/M2k
ARGON FILLED
ASSEMBLY:6mm / 20 mm / 6mm
FRAMES USED:
THERMALLY BROKEN POWDER
COATED ALUMINIUM SECTION
ACHIEVEMENT:
ACHIEVEDVIEWS POINT
14% ENERGY REDUCTION
FULLY ACHIEVED COOL
BUILDING STRATEGY (5
POINTS)
Designing with glass to achieve estidama pearl ratings

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
ALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTIONALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTION
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
 
Green Building in India with Case Study
Green Building in India with Case StudyGreen Building in India with Case Study
Green Building in India with Case Study
 
LEED certified building case study
LEED certified building case studyLEED certified building case study
LEED certified building case study
 
Green/sustainable buildings
Green/sustainable buildingsGreen/sustainable buildings
Green/sustainable buildings
 
Glazing
GlazingGlazing
Glazing
 
Sustainable Architecture PPT
Sustainable Architecture PPTSustainable Architecture PPT
Sustainable Architecture PPT
 
Embodied Energy In Building Construction
Embodied Energy In Building ConstructionEmbodied Energy In Building Construction
Embodied Energy In Building Construction
 
ZERO ENERGY BUILDING (senthil)
ZERO ENERGY BUILDING (senthil)ZERO ENERGY BUILDING (senthil)
ZERO ENERGY BUILDING (senthil)
 
Green Buildings
Green BuildingsGreen Buildings
Green Buildings
 
STUDY NET ZERO ENERGY BUILDING
STUDY NET ZERO ENERGY BUILDINGSTUDY NET ZERO ENERGY BUILDING
STUDY NET ZERO ENERGY BUILDING
 
Green building rating system
Green building rating systemGreen building rating system
Green building rating system
 
Zero Energy Building.
Zero Energy Building.Zero Energy Building.
Zero Energy Building.
 
Non Ferrous Metals (BUILDING MATERIALS AND CONSTRUCTION)
Non Ferrous Metals (BUILDING MATERIALS AND CONSTRUCTION)Non Ferrous Metals (BUILDING MATERIALS AND CONSTRUCTION)
Non Ferrous Metals (BUILDING MATERIALS AND CONSTRUCTION)
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architecture
 
LEED Certification
LEED CertificationLEED Certification
LEED Certification
 
Embodied energy
Embodied energyEmbodied energy
Embodied energy
 
Solar building design
Solar building designSolar building design
Solar building design
 
Leed Green Associate Study Slides
Leed Green Associate Study SlidesLeed Green Associate Study Slides
Leed Green Associate Study Slides
 
GRIHA
GRIHAGRIHA
GRIHA
 
Zero Energy Building
Zero Energy BuildingZero Energy Building
Zero Energy Building
 

Destaque

Destaque (20)

Architype - Adopting BIM - An Architect's Perspective
Architype - Adopting BIM - An Architect's PerspectiveArchitype - Adopting BIM - An Architect's Perspective
Architype - Adopting BIM - An Architect's Perspective
 
Architype - Delivering Radical Low Energy Performance with BIM
Architype - Delivering Radical Low Energy Performance with BIMArchitype - Delivering Radical Low Energy Performance with BIM
Architype - Delivering Radical Low Energy Performance with BIM
 
M Simpson coursework
M Simpson courseworkM Simpson coursework
M Simpson coursework
 
Passivhaus primary schools and how architects can drive their adoption
Passivhaus primary schools and how architects can drive their adoptionPassivhaus primary schools and how architects can drive their adoption
Passivhaus primary schools and how architects can drive their adoption
 
HPR Integrated Design - BIM/IPD Proposal Presentation
HPR Integrated Design - BIM/IPD Proposal PresentationHPR Integrated Design - BIM/IPD Proposal Presentation
HPR Integrated Design - BIM/IPD Proposal Presentation
 
PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.
PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.
PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.
 
Designing & Learning from Passivhaus Education Buildings
Designing & Learning from Passivhaus Education BuildingsDesigning & Learning from Passivhaus Education Buildings
Designing & Learning from Passivhaus Education Buildings
 
Bim and integrated design
Bim and integrated designBim and integrated design
Bim and integrated design
 
5 things to know about Passivhaus
5 things to know about Passivhaus5 things to know about Passivhaus
5 things to know about Passivhaus
 
Passivhaus: Sacrificing Natural Materials for Energy Efficiency?
Passivhaus: Sacrificing Natural Materials for Energy Efficiency?Passivhaus: Sacrificing Natural Materials for Energy Efficiency?
Passivhaus: Sacrificing Natural Materials for Energy Efficiency?
 
Architype - Passive Beyond The House
Architype - Passive Beyond The HouseArchitype - Passive Beyond The House
Architype - Passive Beyond The House
 
Designing with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsDesigning with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratings
 
Mind the Gap - What can Passive House Design teach us about closing the build...
Mind the Gap - What can Passive House Design teach us about closing the build...Mind the Gap - What can Passive House Design teach us about closing the build...
Mind the Gap - What can Passive House Design teach us about closing the build...
 
Architype - Standardised Passivhaus Schools, Ecobuild UK 2014
Architype - Standardised Passivhaus Schools, Ecobuild UK 2014Architype - Standardised Passivhaus Schools, Ecobuild UK 2014
Architype - Standardised Passivhaus Schools, Ecobuild UK 2014
 
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
 
Designign fully glazed buildings that can be easily cleaned and maintained
Designign fully glazed buildings that can be easily cleaned and maintainedDesignign fully glazed buildings that can be easily cleaned and maintained
Designign fully glazed buildings that can be easily cleaned and maintained
 
International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5
 
RIBA Part 3 Course: BIM Overview + Application
RIBA Part 3 Course: BIM Overview + ApplicationRIBA Part 3 Course: BIM Overview + Application
RIBA Part 3 Course: BIM Overview + Application
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
Sustainable Passivhaus School Design
Sustainable Passivhaus School DesignSustainable Passivhaus School Design
Sustainable Passivhaus School Design
 

Semelhante a Designing with glass to achieve estidama pearl ratings

Presentation_LeedCD_245
Presentation_LeedCD_245Presentation_LeedCD_245
Presentation_LeedCD_245
Adam Carducci
 
CURRICULUM____VITAE CIVIL ENGIMEER
CURRICULUM____VITAE CIVIL ENGIMEERCURRICULUM____VITAE CIVIL ENGIMEER
CURRICULUM____VITAE CIVIL ENGIMEER
Riaz Mohammad
 
Development Proposal Shanghai Group 2
Development Proposal Shanghai Group 2Development Proposal Shanghai Group 2
Development Proposal Shanghai Group 2
Ernesto Correa
 

Semelhante a Designing with glass to achieve estidama pearl ratings (20)

LEED Introduction & Naked Stables
LEED Introduction & Naked StablesLEED Introduction & Naked Stables
LEED Introduction & Naked Stables
 
Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"
 
Moving to High Performance Design
Moving to High Performance DesignMoving to High Performance Design
Moving to High Performance Design
 
Green buildings
Green buildings  Green buildings
Green buildings
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429
 
Presentation_LeedCD_245
Presentation_LeedCD_245Presentation_LeedCD_245
Presentation_LeedCD_245
 
Integrate Early; Integrate Often
Integrate Early; Integrate OftenIntegrate Early; Integrate Often
Integrate Early; Integrate Often
 
Achieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFAchieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSF
 
Griha - green rating for integrated habitat assesment
Griha - green rating for integrated habitat assesmentGriha - green rating for integrated habitat assesment
Griha - green rating for integrated habitat assesment
 
Ghassan al otaibi cv
Ghassan al otaibi cvGhassan al otaibi cv
Ghassan al otaibi cv
 
greenbuildingppt-161123093000.pdf
greenbuildingppt-161123093000.pdfgreenbuildingppt-161123093000.pdf
greenbuildingppt-161123093000.pdf
 
Green building ppt
Green building pptGreen building ppt
Green building ppt
 
TRAINING PROGRAM FOR SITE MANAGERS.ppt
TRAINING PROGRAM FOR SITE MANAGERS.pptTRAINING PROGRAM FOR SITE MANAGERS.ppt
TRAINING PROGRAM FOR SITE MANAGERS.ppt
 
03 USGBC 090816
03 USGBC 09081603 USGBC 090816
03 USGBC 090816
 
CURRICULUM____VITAE CIVIL ENGIMEER
CURRICULUM____VITAE CIVIL ENGIMEERCURRICULUM____VITAE CIVIL ENGIMEER
CURRICULUM____VITAE CIVIL ENGIMEER
 
Development Proposal Shanghai Group 2
Development Proposal Shanghai Group 2Development Proposal Shanghai Group 2
Development Proposal Shanghai Group 2
 
Hussein Khalil CV
Hussein Khalil CVHussein Khalil CV
Hussein Khalil CV
 
Regulatory Requisites & Development Cost Analysis in Bangalore
Regulatory Requisites & Development Cost Analysis in BangaloreRegulatory Requisites & Development Cost Analysis in Bangalore
Regulatory Requisites & Development Cost Analysis in Bangalore
 
Rak precast vs sustainability
Rak precast vs sustainability   Rak precast vs sustainability
Rak precast vs sustainability
 
Leed
LeedLeed
Leed
 

Último

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Último (20)

Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

Designing with glass to achieve estidama pearl ratings

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6. PEARL COMMUNITY • FOR LARGE COMMUNITIES • ADEQUATE FOR DEVELOPMENTS OF MORE THAN 75,000 m2 PEARL BUILDING • FOR BUILDINGS • ADEQUATE FOR ONE OR MORE BUILDING WITH A TOTAL AREA OF LESS THAN 75,000 m2 PEARLVILLA • FORVILLAS • ADEQUATE FOR INDIVIDUAL HOMES AND VILLAS
  • 8. Design rating ensures all the credits submitted at the design stage are achievable
  • 9. Construction rating ensures that all credits submitted in design stage are achieved at the end of construction Design rating ensures all the credits submitted at the design stage are achievable
  • 10. Operational rating ensures building continue to achieve the intent of design throughout its life (this rating is not yet implemented) Construction rating ensures that all credits submitted in design stage are achieved at the end of construction Design rating ensures all the credits submitted at the design stage are achievable
  • 11.
  • 12.
  • 13. Consideration for local weather Consideration for the precious water Consideration for the particular nature Consideration for the cultural heritage Consideration for the Emirate urban development
  • 14. Integration within Abu Dhabi’s vision 2030 Lower energy demand means lower energy cost Better maintenance plan means lower running cost Healthier environment means higher productivity Leadership in environmental friendliness Promotion of environmental awareness
  • 15.
  • 16.
  • 19. RE-R1 MINIMUM ENERGY REQUIRMENTS RE-1 IMPROVED ENERGY PERFORMANCE RE-2 COOL BUILDING STRATEGY
  • 20. MANDATORY – RE-R1 #B-8: • COMPLY WITH ABU DHABI IECC 502, 503, 505 AND AN OPTION OF 506 • ACHIEVE ENERGY PERFORMANCE 12 % BETTERTHAN ASHRAE 90.1:2007 REQUIREMENTS MUNICIPALITY MINIMUM PROGRAM: • ACHIEVE GLASS PANEL UVALUE OF 1.8 W/m2K AND AN ASSEMBLY UVALUE OF 2.2W/m2K ENERGY PERFORMANCE CREDIT POINTS – RE-1: • DEMONSTRATE ENERGY PERFORMANCE 14% TO 60% BETTER THAN ASHRAE 90.1:2007 REQUIREMENTS TO ACHIEVE CREDIT POINTS 1 TO 15
  • 21. COOL BUILDING STRATEGIS CREDIT POINTS – RE-2: • DEMONSTRATE PASSIVE DESIGN MEASURTES LEADTO HEAT REDUCTION OF 10%TO 50% COMPARED TO BASELINETO ACHIEVE CREDIT POINTS 1 TO 5 THROUGH: 1. ORIENTATION 2. GLAZING RATIO 3. SHGC 4. SHADING 5. AIRTIGHTNESS 6. INSULATION 7. ANY OTHER PASSIVE METHOD • USE COOL ROOF TO ACHIEVE AN ADDITION CREDIT POINT
  • 22. LBi-7 / LV-8 DAYLIGHT & GLARE Lbi-8VIEWS
  • 23. DAYLIGHT CREDIT POINTS – LBi-7 AND LV-8: • DEMONSTRATE AT 10AM, 12PM, 2PM ON THE EQUINOX AND THE SUMMER SOLSTICE: • OFFICES: 250 Lux ON WORK PLANE: 1CREDIT 50%, 2 CREDITS 75% • RESIDENTIAL: 200 Lux ON LIVING AREAS FLOOR: 1CREDIT 50%, 2 CREDITS 75% • SCHOOLS: 300 Lux ON WORK PLANE: 1CREDIT 75%, 2 CREDITS 90% • PROVIDE OCCUPANCY SENSORS AS REQUIRED GLARE (REQUIRED FORTHIS CREDIT)– LBi-7: • DEMONSTRATE GLARE CONTROL DEVICES ARE INSTALLED, IF AUTOMATED, IT MUST BE CONNECTED TO THE BMS. NOTE: RETAIL IS NOT ELIGIBLE FOR THIS CREDIT
  • 24. SM-4 (BUILDING) DESIGN FOR DISASSEMBLY SM-6 (BUILDING) & SM-2 (VILLA) DESIGN FOR DURABILITY SM-8 (BUILDING) MATERIAL REUSE SM-9 (BUILDING) & SM-4 (VILLA) & IB#11 REGIONAL MATERIALS SM-10 (BUILDING) & SM-5 (VILLA) RECYCLED MATERIALS
  • 25. SM-4 (BUILDING) DESIGN FOR DISASSEMBLY • 1 CREDIT: DEMONSTRATE 75% OF FAÇADE AREA CAN BE DISASSEMBLED SM-6 (BUILDING) & SM-2 (VILLA) DESIGN FOR DURABILITY • 1 CREDIT: PROVIDE A DURABILITY PLAN DEMONSTRATING IMPROVED DURABILITY FOR FAÇADE ELEMENTS AMONG OTHER ELEMENTS AND ENSURE MAINTENANCE IS EASY. SM-8 (BUILDING) MATERIAL REUSE • 1 CREDIT: DEMONSTRATETHAT THE TOTAL MATERIAL COST OF REUSED AND SALVAGED MATERIALS REPRESENTS 3% OF THE TOTAL MATERIAL COST, INCLUDING GLASS PANELS.
  • 26. SM-9 (BUILDING) & SM-4 (VILLA) & IB#11 REGIONAL MATERIALS • 1 CREDIT: COST OF REGIONAL MATERIALS IS 5% OF TOTAL COST • 2 CREDITS: COST OF REGIONAL MATERIALS IS 10% OF TOTAL COST REGIONAL MATERIAL IS DEFINEDTO BE ORIGINATINGWITHING 500 KM OR MANUFACTURED WITHINTHE UAE BOUNDARIES. SIMPLE ASSEMBLY DOES NOT QUALIFY. SM-10 (BUILDING) & SM-5 (VILLA) RECYCLED MATERIALS • 1 CREDIT: COST OF RECYCLED MATERIALS IS 10% OF TOTAL COST. ACCEPTED COMBINATIONS OF THE FOLLOWING: • MINIMUM 30% POST-CONSUMER RECYCLED CONTENT • MINIMUM OF 80% POST-INDUSTRIAL CONTENT • 50% AGRICULTURALWASTE BY-PRODUCT
  • 29. ENVELOPE U-VALUE • SHOP DRAWINGS HIGHLIGHTING ENVELOPE ELEMENTSWITH DIFFERENT U-VALUES
  • 30. FERTIL NON-PROCESS BUILDINGS 6 3-PEARL RATED BUILDINGS 1ST EVER 3 PEARL RATED MOSQUE 1ST EVER 3 PEARL RATED WAREHOUSE a a a a
  • 31. FERTIL NON-PROCESS BUILDINGS GLASS USED: SHGC: 28% SC: 0.22 UVALUE: 1.09W/M2k ARGON FILLED ASSEMBLY:6mm / 20 mm / 6mm FRAMES USED: THERMALLY BROKEN POWDER COATED ALUMINIUM SECTION ACHIEVEMENT: ACHIEVEDVIEWS POINT 14% ENERGY REDUCTION FULLY ACHIEVED COOL BUILDING STRATEGY (5 POINTS)