[object Object],[object Object],Aviation Committee Illuminating Engineering Society  Memphis 2008
Outline ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1-Introduction ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
2-Airfield Lighting Circuit Equipments ,[object Object],[object Object],[object Object],[object Object]
2-Airfield Lighting Circuit Reliability of cables and cable joints ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],or  11 places 3 cable joints Field  Factory 0.006130 Cable (failure / 1000’) 0.001728 Cable joint – secondary* 3   (site) 0.000864 Cable joint – secondary* 2,3  (factory) 0.000864 Cable joint – primary (site) 0.000432 Cable joint – primary* 2  (factory) Failure unit/year* 1 Equipment
2-Airfield Lighting Circuit Reliability of cables and cable joints
2-Airfield Lighting Circuit Reliability of cables and cable joints ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
2-Airfield Lighting Circuit Reliability of cables and cable joints ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
3-Basic Component Details ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
3-Cable Description ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
3-Cable Characteristics ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Brand 12 192 .600’’ 15.1 mm 0.080’’ 2.03 mm 0.125’’ 3.18 mm B Jacket thickness 8 862 0.405’’ 10.3 mm 0.110’’ 2.79 mm 0.015’’ 0.38 mm 0.146’’ 3.71 mm .0486’’ A 8 193 0.375’’ 0.110’’ 0.146’’ C IR M Ω  for  1000’ Cable O.D. Dia (D) Insulation thickness Shield thickness AWG 8 dia. (d) Strand dia
3-Cable Construction ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],From BETAlux 5 kV Airfield Lighting Cables
3-Cable Preparation-Installation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Ripley  WS-49
[object Object],[object Object],3-Cable Preparation-Installation Figure 23 AC 150/5340-30C
3-Cable Preparation-Installation ,[object Object]
3-Transformer Description ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],5`0 1000 5.0 Hot/Cold  Secondary   over  150W 5.0 3000 15.0 Hot/Cold  Primary   over  150 W 2.0 2500 5.0 Hot/Cold  Secondary   up to  150 W 2.0 7500 15.0 Hot/Cold  Primary   up to   150 W Maximum Leakage Current (Micro amps) Minimum Insulation Resistance (Megohms) Voltage Applied (kV DC) Winding under Test
3-Connector At Cable and Transformer ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
3-Connector Standards and Approvals ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
3-Connector Other Standards ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
3-Connector Characteristics ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],25 000 25 000 Min. insulation resistance M Ω   (Dielectric test) 23 500 4.7 6.0 II 75 000** 15 7.5 I Min. insulation resistance M Ω (Production test)   Test Voltage (kV) Voltage drop max.  (mV) Type of connector
3-Connector Characteristics ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Timron Scientific Consulting
3-Connector Installation ,[object Object],[object Object],[object Object]
3-Connector Installation ,[object Object],[object Object],[object Object],[object Object]
3-Connector Installation with crimping tool ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
3-Connector Installation with crimping tool ,[object Object],[object Object],[object Object],R = 81  μΩ R= 2150  μΩ From Fixed-position electric heaters report - R. Butturini January 2002
3-Other Types of Connector For cable and CCR ,[object Object]
3-Other Types of Connector For cable and CCR ,[object Object],Water protection or drained?
3-Other Types of Connector For cable and CCR ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Solon Manufacturing
3-Other Types of Connector For cable and CCR ,[object Object],[object Object],[object Object],[object Object],Solon Manufacturing
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],3-Shrink Properties
[object Object],[object Object],[object Object],4-Experimentation   Planning
4-Experimentation   Planning ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
4-Experimentation  Infrared measurement ,[object Object],[object Object],[object Object]
4-Experimentation  Theory of infrared measurement ,[object Object],[object Object],[object Object]
4-Experimentation  Theory of infrared measurement ,[object Object],[object Object],2 1 3
4-Experimentation   Theory of infrared measurement ,[object Object],[object Object],Image from R&C instrumentation
4-Experimentation  Findings ,[object Object],[object Object],[object Object],[object Object]
4-Experimentation   Findings ,[object Object],[object Object],T 29.9  o C T 35.5.9  o C T 39.1  o C
4-Experimentation   Findings ,[object Object],[object Object]
4-Experimentation   Findings ,[object Object],[object Object],[object Object]
4-Experimentation   Findings ,[object Object],[object Object]
4-Experimentation   Future test By passed 6.6 amps regulator 20 amps regulator (raised heating) Transformer out of circuit  Load bank
5-Conclusion  General ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Current leakage
5-Conclusion General ,[object Object],[object Object],[object Object],[object Object],[object Object]
5-Conclusion  Reliability ,[object Object],[object Object],Based on:  Hartford Steam Boiler Claims Data 8.1 10- All others causes 2.2 9- Accumulation of dust, dirt and oil 2.4 8- Overloading / inadequate capacity  3.9 7- Collision 7.3 6- Foreign objects / short circuiting 8.1 5- Lightning 9.9 4- Defective / inadequate insulation 10.4 3- Line disturbance (other than lightning) 17.4 2- Moisture 30.3 1- Loose connections / parts % Component
5-Conclusion Installation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
5-Conclusion Special thanks ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
QUESTIONS?
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
n ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
n ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Lukisan Elektrik
Lukisan ElektrikLukisan Elektrik
Lukisan Elektrik
 
CYCLO CONVERTER USING THYRISTORS
CYCLO CONVERTER USING THYRISTORSCYCLO CONVERTER USING THYRISTORS
CYCLO CONVERTER USING THYRISTORS
 
UPS AND BATERY CHARGER INSTALLATION AND MAINTENANCE
UPS AND BATERY CHARGER INSTALLATION AND MAINTENANCEUPS AND BATERY CHARGER INSTALLATION AND MAINTENANCE
UPS AND BATERY CHARGER INSTALLATION AND MAINTENANCE
 
Under ground cables presention
Under ground cables presentionUnder ground cables presention
Under ground cables presention
 
Catalog busbar ls 06. busduct presentation e series rev 2
Catalog busbar ls 06. busduct presentation e series rev 2Catalog busbar ls 06. busduct presentation e series rev 2
Catalog busbar ls 06. busduct presentation e series rev 2
 
Installation & maintenance of power cable
Installation & maintenance of power cableInstallation & maintenance of power cable
Installation & maintenance of power cable
 
Introduction to mv switchgear
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgear
 
Nexans Airfield Ground Lighting Cables (Primary Secondary)
Nexans Airfield Ground Lighting Cables (Primary  Secondary)Nexans Airfield Ground Lighting Cables (Primary  Secondary)
Nexans Airfield Ground Lighting Cables (Primary Secondary)
 
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCELOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
 
SISTEM PEMBUMIAN
SISTEM PEMBUMIANSISTEM PEMBUMIAN
SISTEM PEMBUMIAN
 
A1 PPT ASAS PEMASANGAN SELONGSONG PVC FASA TUNGGAL
A1 PPT ASAS PEMASANGAN SELONGSONG PVC FASA TUNGGALA1 PPT ASAS PEMASANGAN SELONGSONG PVC FASA TUNGGAL
A1 PPT ASAS PEMASANGAN SELONGSONG PVC FASA TUNGGAL
 
Copper Cable Lugs and Terminals Catalogue
Copper Cable Lugs and Terminals CatalogueCopper Cable Lugs and Terminals Catalogue
Copper Cable Lugs and Terminals Catalogue
 
Busduct
BusductBusduct
Busduct
 
Power cables
Power cablesPower cables
Power cables
 
Joints and terminations
Joints and terminationsJoints and terminations
Joints and terminations
 
Distribution boards and Protection devices ppt
Distribution boards and Protection devices  pptDistribution boards and Protection devices  ppt
Distribution boards and Protection devices ppt
 
PTV PENGENALAN(1).ppt
 PTV PENGENALAN(1).ppt PTV PENGENALAN(1).ppt
PTV PENGENALAN(1).ppt
 
Nota abc kabel 1
Nota abc kabel 1Nota abc kabel 1
Nota abc kabel 1
 
ESD protection
ESD protection ESD protection
ESD protection
 
Electrical Installation Design Project_DUBAI STANDARD_ by Mohnad Ibrahim
Electrical Installation Design Project_DUBAI STANDARD_ by Mohnad IbrahimElectrical Installation Design Project_DUBAI STANDARD_ by Mohnad Ibrahim
Electrical Installation Design Project_DUBAI STANDARD_ by Mohnad Ibrahim
 

Destaque

Airport security 2013 la gs panel discussion
Airport security 2013   la gs panel discussionAirport security 2013   la gs panel discussion
Airport security 2013 la gs panel discussion
Russell Publishing
 
ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1
dashdeepak33
 
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-102015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10
Carl S. Johnson II - ACE
 
Avlite System_White Paper_Runway_Closures_FINAL
Avlite System_White Paper_Runway_Closures_FINALAvlite System_White Paper_Runway_Closures_FINAL
Avlite System_White Paper_Runway_Closures_FINAL
Lucas Bracken
 

Destaque (20)

Airfield Ground Lighting Cables - 5kV Single Core 6sqmm (Primary & Secondary)
Airfield Ground Lighting Cables - 5kV Single Core 6sqmm (Primary & Secondary)Airfield Ground Lighting Cables - 5kV Single Core 6sqmm (Primary & Secondary)
Airfield Ground Lighting Cables - 5kV Single Core 6sqmm (Primary & Secondary)
 
Airport lighting
Airport lightingAirport lighting
Airport lighting
 
Airfield Lighting Introductory
Airfield Lighting IntroductoryAirfield Lighting Introductory
Airfield Lighting Introductory
 
Electrical Hazards on Airport
Electrical Hazards on AirportElectrical Hazards on Airport
Electrical Hazards on Airport
 
Airport marking
Airport markingAirport marking
Airport marking
 
Airfield ground lighting (AGL)
Airfield ground lighting (AGL)Airfield ground lighting (AGL)
Airfield ground lighting (AGL)
 
Airport planning and Design
Airport planning and DesignAirport planning and Design
Airport planning and Design
 
Airport Layout
Airport LayoutAirport Layout
Airport Layout
 
Airfield Ground Lighting (AGL) Heat Shrink Cable Joint Kits
Airfield Ground Lighting (AGL) Heat Shrink Cable Joint KitsAirfield Ground Lighting (AGL) Heat Shrink Cable Joint Kits
Airfield Ground Lighting (AGL) Heat Shrink Cable Joint Kits
 
Dubai Airport Show Movie
Dubai Airport Show MovieDubai Airport Show Movie
Dubai Airport Show Movie
 
Airport security 2013 la gs panel discussion
Airport security 2013   la gs panel discussionAirport security 2013   la gs panel discussion
Airport security 2013 la gs panel discussion
 
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
 
ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1
 
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-102015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10
 
Avlite System_White Paper_Runway_Closures_FINAL
Avlite System_White Paper_Runway_Closures_FINALAvlite System_White Paper_Runway_Closures_FINAL
Avlite System_White Paper_Runway_Closures_FINAL
 
Scotchcast 82-A1 Airfield Lighting Joint Kits, 6-16sqmm
Scotchcast 82-A1 Airfield Lighting Joint Kits, 6-16sqmmScotchcast 82-A1 Airfield Lighting Joint Kits, 6-16sqmm
Scotchcast 82-A1 Airfield Lighting Joint Kits, 6-16sqmm
 
PLS 2014: Lighting for Pilots
PLS 2014: Lighting for PilotsPLS 2014: Lighting for Pilots
PLS 2014: Lighting for Pilots
 
FAA Guide to Operations - A Comprehensive Guide to Safe Driving on the Airpor...
FAA Guide to Operations - A Comprehensive Guide to Safe Driving on the Airpor...FAA Guide to Operations - A Comprehensive Guide to Safe Driving on the Airpor...
FAA Guide to Operations - A Comprehensive Guide to Safe Driving on the Airpor...
 
Project on PLC (SILO)
Project on PLC (SILO)Project on PLC (SILO)
Project on PLC (SILO)
 
Programmable Logic Controller(PLC)
Programmable Logic Controller(PLC)Programmable Logic Controller(PLC)
Programmable Logic Controller(PLC)
 

Semelhante a Electrical component at airport for airfield lighting circuit

cable ampacity calculations- IEC
cable ampacity calculations- IECcable ampacity calculations- IEC
cable ampacity calculations- IEC
Joe Khan
 
Electromagnetic and-electronic-circuitbreaker-[technolead]
Electromagnetic and-electronic-circuitbreaker-[technolead]Electromagnetic and-electronic-circuitbreaker-[technolead]
Electromagnetic and-electronic-circuitbreaker-[technolead]
Neha Bandhu
 

Semelhante a Electrical component at airport for airfield lighting circuit (20)

Cable ampacity calculations iec
Cable ampacity calculations  iecCable ampacity calculations  iec
Cable ampacity calculations iec
 
cable ampacity calculations- IEC
cable ampacity calculations- IECcable ampacity calculations- IEC
cable ampacity calculations- IEC
 
Jmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTDJmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTD
 
presentation defence and police and JMV LPS LTD
 presentation  defence and police  and JMV LPS LTD presentation  defence and police  and JMV LPS LTD
presentation defence and police and JMV LPS LTD
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
presentation national desaster management and JMV LPS Ltd
 presentation  national desaster management  and JMV LPS Ltd presentation  national desaster management  and JMV LPS Ltd
presentation national desaster management and JMV LPS Ltd
 
cable sizing.ppt
cable sizing.pptcable sizing.ppt
cable sizing.ppt
 
Airfield Ground Lighting Cables - 2-3kV Single Core 6sqmm (Primary & Secondary)
Airfield Ground Lighting Cables - 2-3kV Single Core 6sqmm (Primary & Secondary)Airfield Ground Lighting Cables - 2-3kV Single Core 6sqmm (Primary & Secondary)
Airfield Ground Lighting Cables - 2-3kV Single Core 6sqmm (Primary & Secondary)
 
Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...
 
360786862-Indice-de-Normas.pdf
360786862-Indice-de-Normas.pdf360786862-Indice-de-Normas.pdf
360786862-Indice-de-Normas.pdf
 
Lightning and surge transfer to systems presentation by jmv lps
Lightning and surge  transfer to systems presentation by jmv lpsLightning and surge  transfer to systems presentation by jmv lps
Lightning and surge transfer to systems presentation by jmv lps
 
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptxCHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
 
Presentation indian railway electrical and s&t by jmv
Presentation indian railway electrical and s&t by jmvPresentation indian railway electrical and s&t by jmv
Presentation indian railway electrical and s&t by jmv
 
Earthing and bonding - Power cables
Earthing and bonding - Power cablesEarthing and bonding - Power cables
Earthing and bonding - Power cables
 
Electromagnetic and-electronic-circuitbreaker-[technolead]
Electromagnetic and-electronic-circuitbreaker-[technolead]Electromagnetic and-electronic-circuitbreaker-[technolead]
Electromagnetic and-electronic-circuitbreaker-[technolead]
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS Ltd
 
Jmv presentation smart hospital projects india-1
Jmv  presentation  smart hospital projects india-1Jmv  presentation  smart hospital projects india-1
Jmv presentation smart hospital projects india-1
 
Dfcc project and jmv lps earthing and protection
Dfcc project and jmv lps earthing and protectionDfcc project and jmv lps earthing and protection
Dfcc project and jmv lps earthing and protection
 
Jmv presentation smart power transmission projects cea
Jmv  presentation  smart power transmission projects  ceaJmv  presentation  smart power transmission projects  cea
Jmv presentation smart power transmission projects cea
 

Electrical component at airport for airfield lighting circuit

  • 1.  
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7. 2-Airfield Lighting Circuit Reliability of cables and cable joints
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43. 4-Experimentation Future test By passed 6.6 amps regulator 20 amps regulator (raised heating) Transformer out of circuit Load bank
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 50.