SlideShare uma empresa Scribd logo
1 de 33
-:A SUMMER TRAINIG
EXPERIENCE:
IN
-:NATIONAL THERMAL POWER PLANT{DADRI}:-

 PRESENTED

BY:

EMAM RAZA



ROLL.NO-1002940032



M.E STUDENT OF
KIET(GZB)

UNDER THE GUIDANCE OF:-

MR. R.K SHINHA
DGM, EE Department of power plant
(DADRI)
-:About NTPC:•
•
•
•
•
•
•
•
•

NTPC, the largest power Company in India, was setup in 1975 to accelerate
power development in the country.
Dr.Arup Roy choudhary is chairman & MD since 1/09/2010.
NTPC has installed capacity of 41,684 MW.
NTPC ranked 300th in the ‘2013, Forbes Global 2000’ ranking of the World’s
biggest companies.
NTPC plans to become a 128,000 MW company by 2032.
It has 16 coal based power stations (23,395 MW)
7 gas based power stations (3,955 MW)
4 power stations in Joint Ventures (1,794 MW).
NTPC has been awarded NO-1,best workplace in india among large
organization and the best psu for the year 2010.
-:NTPC, DADRI:TOTAL CAPACITY OF DADRI POWER PLANT :(A) THERMAL
I:- 04X210 MW = 840 MW
II:- 02X490 MW = 980 MW
TOTAL
= 1820 MW
B)

GAS

(C) SOLAR

= 817 MW
= 05MW

GRAND TOTAL = 2642 MW
PMI Revision 00

October 14, 2013

5
Diagram of a typical coal-fired thermal power station
-:Generation of Electricity:•
•

•
•
•

Prime mover coupled to
Alternator
Prime mover is driven by energy
obtained from various sources
such as
burning of fuel
pressure of water
Force of wind etc.
Fig. Fundamental of generation of Electricity
-:Thermal Power Plant:•

A generating station which converts heat energy of coal combustion
into electrical energy is known as a steam power station.

•

Steam is produced in the boiler by utilizing the heat of coal
combustion. The steam is then expanded in the steam turbine and is
condensed in a condenser to be fed into the boiler again. The steam
turbine drives the alternator which converts mechanical energy of the
turbine into electrical energy.
-:Basic Power Plant Cycle:-
-:WORKING OF STEAM POWER PLANT:Coal is burnt in a boiler ,which converts water into
steam.
• The steam is expanded in a turbine used to drive
alternator.
• The steam expanded is condensed in a condenser to
be feed into the boiler again.
• The entire arrangement of steam power plant can be
divided into.
•

a. fuel and ash plant.
b. air and fuel gas plant.
c. feed water and steam plant.
d. cooling water plant.
-:Main and Auxiliary Equipments:1. Coal handling plant
2. Stoker
3. Pulverizer
4.Boiler
5.Superheater
6.Eonomiser & Air preheater
7.Reheater
8.Deaerator
9.Condenser
10.Primary air fan
11.Turbine(prime mover)
12.Draft fan & chimney
13.Electo-static precipitator
14.Cooling tower
15.Ash handling plant
16.Electrical equipment
a. Generator
b. Transformers
c. Switch yard
-:Coal handling plant:-

•The

function of coal handling plant is automatic feeding of coal to the boiler
furnace.
• A thermal power plant burns enormous amounts of coal.
•A 200MW plant may require around 2000 tons of coal daily
Coal conveyor : This is a belt type of arrangement. With this coal is transported from
coal storage place in power plant to the place near by boiler.  

Stoker : The coal which is brought near by boiler has to put in boiler furnace for
combustion. This stoker is a mechanical device for feeding coal to a furnace.

Pulverizer : The coal is put in the boiler after pulverization. For this pulverizer is used. A
pulverizer is a device for grinding coal for combustion in a furnace in a power plant. A
pulverizer is a device for grinding coal for combustion in a furnace in a power plant.
Pulverizing mills are further classified as:
1.Contact mill
2.Ball mill
3.Impact mill
-:Boiler:A boiler is closed vessel in which water is converted into steam by
utilising the heat of coal combustion.
Steam boilers are broadly classified into following two types:base on the
relative position of water and gases.
(a) Water tube boilers (b) Fire tube boilers
In a water tube boiler, water flows
through the tubes and the hot gases of
combustion flow over these tubes.
Water-tube boilers are used for highpressure boilers
Examples: cochron, Lancashire,
locomotive boiler.
In a fire tube boiler, the hot products of combustion pass through the
tubes surrounded by water.

• The heated water then rises into the steam drum. Here, saturated steam is
drawn off the top of the drum. The steam will reenter the furnace in
through a superheater in order to become superheated. Superheated
steam is used in driving turbines. Since water droplets can severely
damage turbine blades, steam is superheated to 730°F (390°C) or higher
in order to ensure that there is no water entrained in the steam.
-:Super heater:•

A device which removes last traces of moisture.

•
•

It helps in reduction in requirement of steam quantity.
steam being dry reduces the mechanical resistance of
turbine.
No corrosion at the turbine blades.

•
-:Economizer and Air Pre-heater:•

An economizer is a heat transfer device used for heating the feed water with
the help of hot flue gases before leaving the chimney.

•

It helps in improving the efficiency of the power plant.

•

Air preheater is a device which utilizes the waste heat of the flue gases leaving
the economizer to heat the air to be supplied to the boiler.
-:Reheater :Some of the heat of superheated
steam is used to rotate the turbine
where it loses some of its energy.
The steam after reheating is used
to rotate the second steam turbine
where the heat is converted to
mechanical
energy.
This
mechanical energy is used to run
the alternator, which is coupled to
turbine , there by generating
electrical energy.
-:DEAERATOR:•A steam generating boiler requires that the boiler feed water should be devoid
of air and other dissolved gases, particularly corrosive ones.
• In order to avoid corrosion of the metal, power station uses a Deaerator, for
the removal of air and other dissolved gases from the boiler feed water.
•A deaerator has a vertical, domed deaeration section mounted on top of a
horizontal cylindrical vessel which serves as a deaerated boiler feed water
storage tank.
-:Condenser:Which condenses the steam at the exhaust of turbine.
•It

creates a very low pressure at the exhaust of turbine, this
helps in converting heat energy of steam into mechanical
energy in the prime mover.
•The

condensed steam can be used as feed water to the
boiler.
•Classification of condenser
1.Jet condensers or contact condensers,
2. Surface condensers
Primary Air Fan:•

Air to blow the coal from the mill
to the boiler, called the primary
air, is supplied by a large fan
driven by a variable speed motor

•

When mixed with a stream of air
the powdered coal behaves more
like a gas than a solid

•

Primary air does two jobs –
heating the coal powder and
secondly lifting it into the furnace
through pipelines
-:Prime Mover (i.e. Turbine):A steam turbine is a mechanical device that extracts thermal energy from
pressurized steam, and converts it into mechanical energy.
The steam turbine is a form of heat engine that derives much of its
improvement in thermodynamic efficiency from the use of multiple stages in
the expansion of the steam, which results in a closer approach to the ideal
reversible expansion process.
About 86% of all electric generation in the world is by use of steam turbines.

BOILER

GENERATOR
STEAM TURBINE
-:Cooling Towers:Remove heat from the
water discharged from the
condenser so that the water
can be discharged to the
river or re circulated and
reused.
• Air can be circulated in the
cooling towers through
natural draft and
mechanical draft.
• Type of cooling tower
1. Wet cooling tower
2. Dry cooling tower
•
Induced Draught (ID) Fan

Chimney
•

•

Two induced draught fans draw
gases out of the boiler

•

The gas has already passed
through the air heaters and
precipitators before it has
reached these fans

•

The heat from the flue gases or
smoke is used in the air heaters
to heat up the primary and
secondary air

The chimney is 275 meters' high
and 50,000 tonnes of reinforced
concrete were used to make it

•

It consists of flues each of which
serve typically two or three boilers
(two units)
-:Electro-Static Precipitator:-

Top View of ESP Schematic Diagram



Side view of ESP Schematic Diagram

It is a device which removes dust or other finely divided particles from flue gases by
charging the particles inductively with an electric field, then attracting them to highly
charged collector plates. Also known as precipitator. The process depends on two
steps. In the first step the suspension passes through an electric discharge (corona
discharge) area where ionization of the gas occurs. The ions produced collide with
the suspended particles and confer on them an electric charge. The charged particles
drift toward an electrode of opposite sign and are deposited on the electrode where
their electric charge is neutralized. The phenomenon would be more correctly
designated as electrode position from the gas phase
-:COAL TRANSPORTATION SYATEM:



Source of coal = Piparwar Mines North Karanpur (Jharkhand)
Location = Near Ranchi
Means of transportation-Railway



Rout of ply=kalari-gawaroad,seonnogarmughalsarai,Allahabad,Kanpur,Aligarh,dadri-plant unloading area.



Distance = 1124 Km from kholori to dadri with electrified trak from
seonnogar.



Type of coal = F-grade (Washed),E grade(Raw)



C.V(calorific value)=3600-3800 kcal/kg.



Coal requirement = 13,000 MT/Day(04 rakes)



Type of wagon= 1.BOBR(bogy open rapid discharge)
= 2.Box-N(min 2 door on each said)
ASH HANDLING PLANT
The percentage of ash in coal is 5% in good quality coal & about 40% in poor
quality coal.
• Power plants generally use poor quality of coal , thus amount of ash produced
by it is quite large.
• A modern 1000MW plant produces about 4800 tons of ash daily.
• The stations use some conveyor arrangement to carry ash to dump sites.
•
-:Electrical Equipments:Alternator
An alternator is coupled to a steam turbine and converts mechanical
energy of the turbine into electrical energy.
It may be hydrogen or air cooled.
The necessary excitation is provided by means of main and pilot exciters
directly coupled to the alternator shaft.
Transformers
(a) main step-transformers, which steps-up generated voltage transmission
of power
(b) station transformers, general purpose
(c) auxiliary transformers, which supply to individual unit-auxiliaries.
Control Room and Switchyard :
The control room monitors the overall operation of the plant. It is
provided with controls for real and reactive power flow. It is provided
with safety relays and switchgears.
-:Coal Ash can be used in:•
•
•
•
•
•

Construction of embankments and fills
Construction of road in sub-base
Manufacture of cement
Manufacture of bricks/blocks
Filling as flowable fill material
Agriculture as soil amendment/source of
essential plant nutrients
-:TRIPICAL DIAGRAM OP THERMAL POWER PLANT:-
Efficiency of Thermal Power Station or Plant
The overall efficiency of a thermal power station or plant varies from 20% to 26% and
it depends upon plant capacity.
ppt of ntpc dadri by emam raza khan

Mais conteúdo relacionado

Mais procurados

VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALMilind Punj
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadriVirat Shishodia
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training ReportShani Kumar Singh
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plantsagar20jain
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipatpratikguptateddy
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardI.E.T. lucknow
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training reportravi kant
 
Ntpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILENtpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILERanjan kumar
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPPAmit Bansal
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plantRama Charan
 
Lanco training
Lanco trainingLanco training
Lanco trainingKSOM
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC Shivam Singh
 
Sagar mehta summer training thermal power station full report
Sagar mehta summer training thermal power station full reportSagar mehta summer training thermal power station full report
Sagar mehta summer training thermal power station full reportSagar Mehta
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)Baibhav Saha
 
Vocational training report
Vocational training reportVocational training report
Vocational training reportATUL RAJ
 

Mais procurados (20)

VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadri
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 
Ntpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILENtpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILE
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
 
Lanco training
Lanco trainingLanco training
Lanco training
 
Training Report, Thermal Power Plant Report, KSTPS Report
Training Report, Thermal Power Plant Report, KSTPS ReportTraining Report, Thermal Power Plant Report, KSTPS Report
Training Report, Thermal Power Plant Report, KSTPS Report
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC
 
Sagar mehta summer training thermal power station full report
Sagar mehta summer training thermal power station full reportSagar mehta summer training thermal power station full report
Sagar mehta summer training thermal power station full report
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
 

Semelhante a ppt of ntpc dadri by emam raza khan

Semelhante a ppt of ntpc dadri by emam raza khan (20)

Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
Mtps ppt
Mtps pptMtps ppt
Mtps ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ntpc2
Ntpc2Ntpc2
Ntpc2
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
 
thermal and nuclear power plant
 thermal and nuclear power plant thermal and nuclear power plant
thermal and nuclear power plant
 
compalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docxcompalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docx
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt complete
 
Bandel training
Bandel trainingBandel training
Bandel training
 
Ntpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharmaNtpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharma
 
KTPS
KTPSKTPS
KTPS
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 

Mais de Dubai Electricity and Water Authority | DEWA | Official-Page (6)

Delivery challan.
Delivery challan.Delivery challan.
Delivery challan.
 
Fabrication and determination of critical thickness of spherical objects
Fabrication and determination of critical      thickness of spherical objectsFabrication and determination of critical      thickness of spherical objects
Fabrication and determination of critical thickness of spherical objects
 
Application for refund of security
Application for refund of securityApplication for refund of security
Application for refund of security
 
bhushan steel ppt
bhushan steel pptbhushan steel ppt
bhushan steel ppt
 
Alttc report
Alttc report Alttc report
Alttc report
 
Emam training
Emam training Emam training
Emam training
 

Último

Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesShubhangi Sonawane
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 

Último (20)

Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 

ppt of ntpc dadri by emam raza khan

  • 1. -:A SUMMER TRAINIG EXPERIENCE: IN -:NATIONAL THERMAL POWER PLANT{DADRI}:-  PRESENTED BY: EMAM RAZA  ROLL.NO-1002940032  M.E STUDENT OF KIET(GZB) UNDER THE GUIDANCE OF:- MR. R.K SHINHA DGM, EE Department of power plant (DADRI)
  • 2. -:About NTPC:• • • • • • • • • NTPC, the largest power Company in India, was setup in 1975 to accelerate power development in the country. Dr.Arup Roy choudhary is chairman & MD since 1/09/2010. NTPC has installed capacity of 41,684 MW. NTPC ranked 300th in the ‘2013, Forbes Global 2000’ ranking of the World’s biggest companies. NTPC plans to become a 128,000 MW company by 2032. It has 16 coal based power stations (23,395 MW) 7 gas based power stations (3,955 MW) 4 power stations in Joint Ventures (1,794 MW). NTPC has been awarded NO-1,best workplace in india among large organization and the best psu for the year 2010.
  • 3.
  • 4. -:NTPC, DADRI:TOTAL CAPACITY OF DADRI POWER PLANT :(A) THERMAL I:- 04X210 MW = 840 MW II:- 02X490 MW = 980 MW TOTAL = 1820 MW B) GAS (C) SOLAR = 817 MW = 05MW GRAND TOTAL = 2642 MW
  • 6. Diagram of a typical coal-fired thermal power station
  • 7. -:Generation of Electricity:• • • • • Prime mover coupled to Alternator Prime mover is driven by energy obtained from various sources such as burning of fuel pressure of water Force of wind etc. Fig. Fundamental of generation of Electricity
  • 8. -:Thermal Power Plant:• A generating station which converts heat energy of coal combustion into electrical energy is known as a steam power station. • Steam is produced in the boiler by utilizing the heat of coal combustion. The steam is then expanded in the steam turbine and is condensed in a condenser to be fed into the boiler again. The steam turbine drives the alternator which converts mechanical energy of the turbine into electrical energy.
  • 10. -:WORKING OF STEAM POWER PLANT:Coal is burnt in a boiler ,which converts water into steam. • The steam is expanded in a turbine used to drive alternator. • The steam expanded is condensed in a condenser to be feed into the boiler again. • The entire arrangement of steam power plant can be divided into. • a. fuel and ash plant. b. air and fuel gas plant. c. feed water and steam plant. d. cooling water plant.
  • 11. -:Main and Auxiliary Equipments:1. Coal handling plant 2. Stoker 3. Pulverizer 4.Boiler 5.Superheater 6.Eonomiser & Air preheater 7.Reheater 8.Deaerator 9.Condenser 10.Primary air fan 11.Turbine(prime mover) 12.Draft fan & chimney 13.Electo-static precipitator 14.Cooling tower 15.Ash handling plant 16.Electrical equipment a. Generator b. Transformers c. Switch yard
  • 12. -:Coal handling plant:- •The function of coal handling plant is automatic feeding of coal to the boiler furnace. • A thermal power plant burns enormous amounts of coal. •A 200MW plant may require around 2000 tons of coal daily
  • 13. Coal conveyor : This is a belt type of arrangement. With this coal is transported from coal storage place in power plant to the place near by boiler.   Stoker : The coal which is brought near by boiler has to put in boiler furnace for combustion. This stoker is a mechanical device for feeding coal to a furnace. Pulverizer : The coal is put in the boiler after pulverization. For this pulverizer is used. A pulverizer is a device for grinding coal for combustion in a furnace in a power plant. A pulverizer is a device for grinding coal for combustion in a furnace in a power plant. Pulverizing mills are further classified as: 1.Contact mill 2.Ball mill 3.Impact mill
  • 14. -:Boiler:A boiler is closed vessel in which water is converted into steam by utilising the heat of coal combustion. Steam boilers are broadly classified into following two types:base on the relative position of water and gases. (a) Water tube boilers (b) Fire tube boilers In a water tube boiler, water flows through the tubes and the hot gases of combustion flow over these tubes. Water-tube boilers are used for highpressure boilers Examples: cochron, Lancashire, locomotive boiler.
  • 15. In a fire tube boiler, the hot products of combustion pass through the tubes surrounded by water. • The heated water then rises into the steam drum. Here, saturated steam is drawn off the top of the drum. The steam will reenter the furnace in through a superheater in order to become superheated. Superheated steam is used in driving turbines. Since water droplets can severely damage turbine blades, steam is superheated to 730°F (390°C) or higher in order to ensure that there is no water entrained in the steam.
  • 16. -:Super heater:• A device which removes last traces of moisture. • • It helps in reduction in requirement of steam quantity. steam being dry reduces the mechanical resistance of turbine. No corrosion at the turbine blades. •
  • 17. -:Economizer and Air Pre-heater:• An economizer is a heat transfer device used for heating the feed water with the help of hot flue gases before leaving the chimney. • It helps in improving the efficiency of the power plant. • Air preheater is a device which utilizes the waste heat of the flue gases leaving the economizer to heat the air to be supplied to the boiler.
  • 18. -:Reheater :Some of the heat of superheated steam is used to rotate the turbine where it loses some of its energy. The steam after reheating is used to rotate the second steam turbine where the heat is converted to mechanical energy. This mechanical energy is used to run the alternator, which is coupled to turbine , there by generating electrical energy.
  • 19. -:DEAERATOR:•A steam generating boiler requires that the boiler feed water should be devoid of air and other dissolved gases, particularly corrosive ones. • In order to avoid corrosion of the metal, power station uses a Deaerator, for the removal of air and other dissolved gases from the boiler feed water. •A deaerator has a vertical, domed deaeration section mounted on top of a horizontal cylindrical vessel which serves as a deaerated boiler feed water storage tank.
  • 20. -:Condenser:Which condenses the steam at the exhaust of turbine. •It creates a very low pressure at the exhaust of turbine, this helps in converting heat energy of steam into mechanical energy in the prime mover. •The condensed steam can be used as feed water to the boiler. •Classification of condenser 1.Jet condensers or contact condensers, 2. Surface condensers
  • 21. Primary Air Fan:• Air to blow the coal from the mill to the boiler, called the primary air, is supplied by a large fan driven by a variable speed motor • When mixed with a stream of air the powdered coal behaves more like a gas than a solid • Primary air does two jobs – heating the coal powder and secondly lifting it into the furnace through pipelines
  • 22. -:Prime Mover (i.e. Turbine):A steam turbine is a mechanical device that extracts thermal energy from pressurized steam, and converts it into mechanical energy. The steam turbine is a form of heat engine that derives much of its improvement in thermodynamic efficiency from the use of multiple stages in the expansion of the steam, which results in a closer approach to the ideal reversible expansion process. About 86% of all electric generation in the world is by use of steam turbines. BOILER GENERATOR STEAM TURBINE
  • 23. -:Cooling Towers:Remove heat from the water discharged from the condenser so that the water can be discharged to the river or re circulated and reused. • Air can be circulated in the cooling towers through natural draft and mechanical draft. • Type of cooling tower 1. Wet cooling tower 2. Dry cooling tower •
  • 24. Induced Draught (ID) Fan Chimney • • Two induced draught fans draw gases out of the boiler • The gas has already passed through the air heaters and precipitators before it has reached these fans • The heat from the flue gases or smoke is used in the air heaters to heat up the primary and secondary air The chimney is 275 meters' high and 50,000 tonnes of reinforced concrete were used to make it • It consists of flues each of which serve typically two or three boilers (two units)
  • 25. -:Electro-Static Precipitator:- Top View of ESP Schematic Diagram  Side view of ESP Schematic Diagram It is a device which removes dust or other finely divided particles from flue gases by charging the particles inductively with an electric field, then attracting them to highly charged collector plates. Also known as precipitator. The process depends on two steps. In the first step the suspension passes through an electric discharge (corona discharge) area where ionization of the gas occurs. The ions produced collide with the suspended particles and confer on them an electric charge. The charged particles drift toward an electrode of opposite sign and are deposited on the electrode where their electric charge is neutralized. The phenomenon would be more correctly designated as electrode position from the gas phase
  • 26.
  • 27. -:COAL TRANSPORTATION SYATEM:   Source of coal = Piparwar Mines North Karanpur (Jharkhand) Location = Near Ranchi Means of transportation-Railway  Rout of ply=kalari-gawaroad,seonnogarmughalsarai,Allahabad,Kanpur,Aligarh,dadri-plant unloading area.  Distance = 1124 Km from kholori to dadri with electrified trak from seonnogar.  Type of coal = F-grade (Washed),E grade(Raw)  C.V(calorific value)=3600-3800 kcal/kg.  Coal requirement = 13,000 MT/Day(04 rakes)  Type of wagon= 1.BOBR(bogy open rapid discharge) = 2.Box-N(min 2 door on each said)
  • 28. ASH HANDLING PLANT The percentage of ash in coal is 5% in good quality coal & about 40% in poor quality coal. • Power plants generally use poor quality of coal , thus amount of ash produced by it is quite large. • A modern 1000MW plant produces about 4800 tons of ash daily. • The stations use some conveyor arrangement to carry ash to dump sites. •
  • 29. -:Electrical Equipments:Alternator An alternator is coupled to a steam turbine and converts mechanical energy of the turbine into electrical energy. It may be hydrogen or air cooled. The necessary excitation is provided by means of main and pilot exciters directly coupled to the alternator shaft. Transformers (a) main step-transformers, which steps-up generated voltage transmission of power (b) station transformers, general purpose (c) auxiliary transformers, which supply to individual unit-auxiliaries. Control Room and Switchyard : The control room monitors the overall operation of the plant. It is provided with controls for real and reactive power flow. It is provided with safety relays and switchgears.
  • 30. -:Coal Ash can be used in:• • • • • • Construction of embankments and fills Construction of road in sub-base Manufacture of cement Manufacture of bricks/blocks Filling as flowable fill material Agriculture as soil amendment/source of essential plant nutrients
  • 31. -:TRIPICAL DIAGRAM OP THERMAL POWER PLANT:-
  • 32. Efficiency of Thermal Power Station or Plant The overall efficiency of a thermal power station or plant varies from 20% to 26% and it depends upon plant capacity.