3rd Street Sewer Repair
  February 16, 2012 Update




    Chestnut Street to Market Street
Timeline Of Events
October 2011: Sewer failed under
3rd Street.
October 2011: PWD began work to
repair the broken section of sewer.
During these repairs, two more
broken sections of sewer were
identified.
November 2011: PWD began
excavation to see the extent of the
damage and found that the Sewer
needed full replacement from
Elbow Lane to Market Street.
December 2011: PWD began
working with PECO and PGW to
discuss moving of critical
infrastructure so that repairs can
be made to the broken sewer.
Why is this so Challenging?
         It’s crowded down there




3rd Street Looking Towards Chestnut Street
Excavation
        Challenges
Many Utilities

Active infrastructure

Narrow Street

Maintain Local access
What Needs to Be Done?
Replacement of 1850s sewer on 3rd Street
from Market Street to Elbow Lane
Lining of existing sewer on 3rd Street from
Elbow Lane to Chestnut Street (cutting
four months from construction schedule).
This section is in good shape
To Do This
PGW needs to relocate its 6 inch gas main
located directly above the sewer
PECO needs to maintain existing service
while relocating ducts & cables above new
sewer. Impacted lines feed both
secondary & primary customers in this
area of Old City
What Work is PGW
   Planning ?
           Excavate and install
           new pipeline along
           east curb

           Tie-in/energize new
           pipeline at Elbow
           Lane and Market
           Street

            Install customer
           laterals /make
           service line
           connections
What Work is PECO Planning?

                   Build New
                   Duct Bank
                   Pull new
                   cable and
                   rework
                   electrical
                   circuits
                   Coordinate
                   customer
                   outages
Construction Sequence
PGW must go first – expected construction
timeline – 6 to 8 weeks
PWD follows – will excavate for sewer while
supporting ductbanks. Excavation, sheeting and
shoring, new sewer construction and existing
sewer relining expected construction timeline – 8
weeks
PECO last– expected construction timeline – 8
weeks – but cannot take place during hot
weather
Road Closures
PGW – loss of parking
lane on east side of the
street. No road closures
PWD - will be keeping
one lane of traffic open as
much as possible for local
traffic as it works on the
west side of the street.
Loss of parking lane and
road closure during
daytime construction
PECO – loss of parking
lane to maintain two
lanes of traffic;
occasional loss of one
traffic lane during
manhole reconstruction
Property Owner Concerns
Understand property owners/business
concerns
Deliveries and trash pick up
Pedestrian safety
Signage for road closures
Open for business signage
Communications with contractor and PWD
Concerns Voiced by Businesses on
          December 15, 2011
PWD will reach out to the Parking Authority to see if it is possible to
work with them to eliminate ticketing on the block for the duration of
the work.
Make certain that our contract requires consistent clean up (dust,
materials, etc.)
Investigate making the contract call for 12 hour work days instead of
8 hour work days.
Make certain that proper signage with all business names is posted
at the entrance of the streets alerting customers that these
businesses are open during construction.
Make certain that all deliveries can be made to businesses that need
them with as little hassle as possible during construction.
Look into which properties have vaults in the sidewalk so we are
aware when we are going to be doing any work in the sidewalk for
reconnections.
Work with the properties who have upcoming construction projects
to allow them site access and room to do the work they need to
accomplish.
Work on promotion for the businesses on this Street to let people
know they can still shop, eat, and walk down this block.
SIGNAGE/PUBLICITY
           Road close during
           working hours

           Street reopens
           nightly and
           weekends
SIGNAGE   For NB traffic-locate
          construction signs
  PLAN    at Chestnut, Walnut
          and Locust Streets
          For EB traffic-
          locate signs at 5th
          and Chestnut.
Sign up for Updates
www.phillywatersheds.org/alerts

Mais conteúdo relacionado

Mais procurados

Eglinton Crosstown Update
Eglinton Crosstown UpdateEglinton Crosstown Update
Eglinton Crosstown UpdateCrosstown TO
 
Fall Real Estate Conference 2013 - Driskell
Fall Real Estate Conference 2013 - DriskellFall Real Estate Conference 2013 - Driskell
Fall Real Estate Conference 2013 - DriskellWRONG PERSON
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15Ron O'Connor
 
Leaside - Laird Construction Liaison Committee - July 2018
Leaside - Laird Construction Liaison Committee - July 2018Leaside - Laird Construction Liaison Committee - July 2018
Leaside - Laird Construction Liaison Committee - July 2018Crosstown TO
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copydon rawson
 
Chaplin Grout Plant and Headwall Construction
Chaplin Grout Plant and Headwall ConstructionChaplin Grout Plant and Headwall Construction
Chaplin Grout Plant and Headwall ConstructionCrosstown TO
 
East Virtual Open House
East Virtual Open HouseEast Virtual Open House
East Virtual Open HouseCrosstown TO
 
Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Crosstown TO
 
Self Storage Face Lift: A Case Study
Self Storage Face Lift: A Case StudySelf Storage Face Lift: A Case Study
Self Storage Face Lift: A Case Studyclelam
 
O’Connell Street presentation 17th November 2010
O’Connell Street presentation 17th November 2010O’Connell Street presentation 17th November 2010
O’Connell Street presentation 17th November 2010RailwayProcurementAgency
 
CV Suhail Sharma - II
CV Suhail Sharma - IICV Suhail Sharma - II
CV Suhail Sharma - IISuhail Sharma
 
Wincobank Presentation
Wincobank PresentationWincobank Presentation
Wincobank Presentationbridgetingle
 
CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)leslie Lavender
 

Mais procurados (20)

Eglinton Crosstown Update
Eglinton Crosstown UpdateEglinton Crosstown Update
Eglinton Crosstown Update
 
Redlands-Alabama Intersection
Redlands-Alabama IntersectionRedlands-Alabama Intersection
Redlands-Alabama Intersection
 
Fall Real Estate Conference 2013 - Driskell
Fall Real Estate Conference 2013 - DriskellFall Real Estate Conference 2013 - Driskell
Fall Real Estate Conference 2013 - Driskell
 
DVCV060715
DVCV060715DVCV060715
DVCV060715
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15
 
Bottino's shoprite
Bottino's shopriteBottino's shoprite
Bottino's shoprite
 
Leaside - Laird Construction Liaison Committee - July 2018
Leaside - Laird Construction Liaison Committee - July 2018Leaside - Laird Construction Liaison Committee - July 2018
Leaside - Laird Construction Liaison Committee - July 2018
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copy
 
Chaplin Grout Plant and Headwall Construction
Chaplin Grout Plant and Headwall ConstructionChaplin Grout Plant and Headwall Construction
Chaplin Grout Plant and Headwall Construction
 
East Virtual Open House
East Virtual Open HouseEast Virtual Open House
East Virtual Open House
 
Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019
 
Self Storage Face Lift: A Case Study
Self Storage Face Lift: A Case StudySelf Storage Face Lift: A Case Study
Self Storage Face Lift: A Case Study
 
O’Connell Street presentation 17th November 2010
O’Connell Street presentation 17th November 2010O’Connell Street presentation 17th November 2010
O’Connell Street presentation 17th November 2010
 
ES-2015 Canyon Resume
ES-2015 Canyon ResumeES-2015 Canyon Resume
ES-2015 Canyon Resume
 
CV Suhail Sharma - II
CV Suhail Sharma - IICV Suhail Sharma - II
CV Suhail Sharma - II
 
Holspl station
Holspl stationHolspl station
Holspl station
 
CrackGuard
CrackGuardCrackGuard
CrackGuard
 
Wincobank Presentation
Wincobank PresentationWincobank Presentation
Wincobank Presentation
 
CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)
 
Simon Murphy CV
Simon Murphy CVSimon Murphy CV
Simon Murphy CV
 

Destaque

Sachin gupta summer training in pwd
Sachin gupta summer training in pwdSachin gupta summer training in pwd
Sachin gupta summer training in pwdSachin gupta
 
project report on pwd work.....
project report on pwd work.....project report on pwd work.....
project report on pwd work.....Thakur Sankhyan
 
ROCKS AS A CONSTRUCTION MATERIAL
ROCKS AS A CONSTRUCTION MATERIALROCKS AS A CONSTRUCTION MATERIAL
ROCKS AS A CONSTRUCTION MATERIALRandhir Kumar
 
Pwd department of chhattisgarh
Pwd department of chhattisgarhPwd department of chhattisgarh
Pwd department of chhattisgarhAdarshKirmani
 
PWD department of chhattisgarh
PWD department of chhattisgarhPWD department of chhattisgarh
PWD department of chhattisgarhvinayakkumar04
 
Costing_Actual spendings & pricing
Costing_Actual spendings & pricingCosting_Actual spendings & pricing
Costing_Actual spendings & pricingAjinkya Deshpande
 
Road networks in india
Road networks in indiaRoad networks in india
Road networks in indiaRenosh R
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential buildingSumit Singh
 
building construction,ppt
building construction,pptbuilding construction,ppt
building construction,pptPawankumarm65
 
J.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycleJ.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycleJ.S. Daniel
 
Estimation and costing
Estimation and costingEstimation and costing
Estimation and costingGanesh Murugan
 
Shareslide presentation
Shareslide presentationShareslide presentation
Shareslide presentationksross
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
road construction project
road construction projectroad construction project
road construction projectnishant singh
 

Destaque (20)

East Park Reservoir Improvements
East Park Reservoir Improvements East Park Reservoir Improvements
East Park Reservoir Improvements
 
Sachin gupta summer training in pwd
Sachin gupta summer training in pwdSachin gupta summer training in pwd
Sachin gupta summer training in pwd
 
project report on pwd work.....
project report on pwd work.....project report on pwd work.....
project report on pwd work.....
 
ROCKS AS A CONSTRUCTION MATERIAL
ROCKS AS A CONSTRUCTION MATERIALROCKS AS A CONSTRUCTION MATERIAL
ROCKS AS A CONSTRUCTION MATERIAL
 
Pwd department of chhattisgarh
Pwd department of chhattisgarhPwd department of chhattisgarh
Pwd department of chhattisgarh
 
PWD department of chhattisgarh
PWD department of chhattisgarhPWD department of chhattisgarh
PWD department of chhattisgarh
 
Costing_Actual spendings & pricing
Costing_Actual spendings & pricingCosting_Actual spendings & pricing
Costing_Actual spendings & pricing
 
Road networks in india
Road networks in indiaRoad networks in india
Road networks in india
 
Contract costing
Contract costingContract costing
Contract costing
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential building
 
Rupsha
RupshaRupsha
Rupsha
 
Under Ground water tank design including estimation and costing
Under Ground  water tank design including estimation and costingUnder Ground  water tank design including estimation and costing
Under Ground water tank design including estimation and costing
 
building construction,ppt
building construction,pptbuilding construction,ppt
building construction,ppt
 
J.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycleJ.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycle
 
Estimation and costing
Estimation and costingEstimation and costing
Estimation and costing
 
Shareslide presentation
Shareslide presentationShareslide presentation
Shareslide presentation
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
road construction project
road construction projectroad construction project
road construction project
 
Project proposal
Project proposalProject proposal
Project proposal
 

Semelhante a 3rd Street Project Overview

My Current resume 2016
My Current resume 2016My Current resume 2016
My Current resume 2016Michael Duffy
 
Practical Work Report - Fletcher
Practical Work Report - FletcherPractical Work Report - Fletcher
Practical Work Report - FletcherJade Keswick
 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Crosstown TO
 
Why Do The Consulting Engineers Stress On Maintaining Pipe Casing Integrity?
Why Do The Consulting Engineers Stress On Maintaining Pipe Casing Integrity?Why Do The Consulting Engineers Stress On Maintaining Pipe Casing Integrity?
Why Do The Consulting Engineers Stress On Maintaining Pipe Casing Integrity?Fernandes & Associates Pty Ltd
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingCrosstown TO
 
Eglinton & Mt pleasant CLC - November
Eglinton & Mt pleasant CLC - November Eglinton & Mt pleasant CLC - November
Eglinton & Mt pleasant CLC - November Crosstown TO
 
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowTA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowMark Oberschmidt
 
216631544 Ntuli S.I EXP I.docx
216631544 Ntuli S.I EXP I.docx216631544 Ntuli S.I EXP I.docx
216631544 Ntuli S.I EXP I.docxSbusisoNtuli1
 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdfCLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdfCrosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingCrosstown TO
 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Crosstown TO
 
Eglinton Crosstown Leaside Open House Presentation
Eglinton Crosstown Leaside Open House PresentationEglinton Crosstown Leaside Open House Presentation
Eglinton Crosstown Leaside Open House PresentationCrosstown TO
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Crosstown TO
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASHRavi Prakash
 
CLC Eglinton and Mount Pleasant
CLC Eglinton and Mount PleasantCLC Eglinton and Mount Pleasant
CLC Eglinton and Mount PleasantCrosstown TO
 

Semelhante a 3rd Street Project Overview (20)

My Current resume 2016
My Current resume 2016My Current resume 2016
My Current resume 2016
 
Practical Work Report - Fletcher
Practical Work Report - FletcherPractical Work Report - Fletcher
Practical Work Report - Fletcher
 
Nick Kennedy cv
Nick Kennedy cvNick Kennedy cv
Nick Kennedy cv
 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020
 
Why Do The Consulting Engineers Stress On Maintaining Pipe Casing Integrity?
Why Do The Consulting Engineers Stress On Maintaining Pipe Casing Integrity?Why Do The Consulting Engineers Stress On Maintaining Pipe Casing Integrity?
Why Do The Consulting Engineers Stress On Maintaining Pipe Casing Integrity?
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
Eglinton & Mt pleasant CLC - November
Eglinton & Mt pleasant CLC - November Eglinton & Mt pleasant CLC - November
Eglinton & Mt pleasant CLC - November
 
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowTA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
216631544 Ntuli S.I EXP I.docx
216631544 Ntuli S.I EXP I.docx216631544 Ntuli S.I EXP I.docx
216631544 Ntuli S.I EXP I.docx
 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
 
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdfCLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
 
PARSENEAU resume
PARSENEAU resumePARSENEAU resume
PARSENEAU resume
 
CV - AGK LinkedIn
CV - AGK LinkedInCV - AGK LinkedIn
CV - AGK LinkedIn
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee Meeting
 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
 
Eglinton Crosstown Leaside Open House Presentation
Eglinton Crosstown Leaside Open House PresentationEglinton Crosstown Leaside Open House Presentation
Eglinton Crosstown Leaside Open House Presentation
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASH
 
CLC Eglinton and Mount Pleasant
CLC Eglinton and Mount PleasantCLC Eglinton and Mount Pleasant
CLC Eglinton and Mount Pleasant
 

Mais de Philadelphia Water Department

Mais de Philadelphia Water Department (10)

Hendren/Spring Lane Public Meeting: June 26, 2014
Hendren/Spring Lane Public Meeting: June 26, 2014Hendren/Spring Lane Public Meeting: June 26, 2014
Hendren/Spring Lane Public Meeting: June 26, 2014
 
Hendren/Spring Lane Public Meeting: February 20, 2014
Hendren/Spring Lane Public Meeting: February 20, 2014Hendren/Spring Lane Public Meeting: February 20, 2014
Hendren/Spring Lane Public Meeting: February 20, 2014
 
Main Break: Baker's Centre, Fox Street
Main Break: Baker's Centre, Fox StreetMain Break: Baker's Centre, Fox Street
Main Break: Baker's Centre, Fox Street
 
Frankford Avenue Main Break 1.8.13 Update Photos
Frankford Avenue Main Break 1.8.13 Update PhotosFrankford Avenue Main Break 1.8.13 Update Photos
Frankford Avenue Main Break 1.8.13 Update Photos
 
Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer
Proposed Project: Spring Lane and Hendren Street Storm and Sanitary SewerProposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer
Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer
 
Turbines to Tanks
Turbines to TanksTurbines to Tanks
Turbines to Tanks
 
PWD Rain Barrel Wrap Designs
PWD Rain Barrel Wrap DesignsPWD Rain Barrel Wrap Designs
PWD Rain Barrel Wrap Designs
 
Community Meeting: 21st & Bainbridge
Community Meeting: 21st & BainbridgeCommunity Meeting: 21st & Bainbridge
Community Meeting: 21st & Bainbridge
 
21st and Bainbridge: Removal of Damaged Pipe Sections
21st and Bainbridge: Removal of Damaged Pipe Sections21st and Bainbridge: Removal of Damaged Pipe Sections
21st and Bainbridge: Removal of Damaged Pipe Sections
 
PWD 2012 Rate Hearing
PWD 2012 Rate HearingPWD 2012 Rate Hearing
PWD 2012 Rate Hearing
 

Último

Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 

Último (20)

Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 

3rd Street Project Overview

  • 1. 3rd Street Sewer Repair February 16, 2012 Update Chestnut Street to Market Street
  • 2. Timeline Of Events October 2011: Sewer failed under 3rd Street. October 2011: PWD began work to repair the broken section of sewer. During these repairs, two more broken sections of sewer were identified. November 2011: PWD began excavation to see the extent of the damage and found that the Sewer needed full replacement from Elbow Lane to Market Street. December 2011: PWD began working with PECO and PGW to discuss moving of critical infrastructure so that repairs can be made to the broken sewer.
  • 3. Why is this so Challenging? It’s crowded down there 3rd Street Looking Towards Chestnut Street
  • 4. Excavation Challenges Many Utilities Active infrastructure Narrow Street Maintain Local access
  • 5. What Needs to Be Done? Replacement of 1850s sewer on 3rd Street from Market Street to Elbow Lane Lining of existing sewer on 3rd Street from Elbow Lane to Chestnut Street (cutting four months from construction schedule). This section is in good shape
  • 6. To Do This PGW needs to relocate its 6 inch gas main located directly above the sewer PECO needs to maintain existing service while relocating ducts & cables above new sewer. Impacted lines feed both secondary & primary customers in this area of Old City
  • 7. What Work is PGW Planning ? Excavate and install new pipeline along east curb Tie-in/energize new pipeline at Elbow Lane and Market Street Install customer laterals /make service line connections
  • 8. What Work is PECO Planning? Build New Duct Bank Pull new cable and rework electrical circuits Coordinate customer outages
  • 9. Construction Sequence PGW must go first – expected construction timeline – 6 to 8 weeks PWD follows – will excavate for sewer while supporting ductbanks. Excavation, sheeting and shoring, new sewer construction and existing sewer relining expected construction timeline – 8 weeks PECO last– expected construction timeline – 8 weeks – but cannot take place during hot weather
  • 10. Road Closures PGW – loss of parking lane on east side of the street. No road closures PWD - will be keeping one lane of traffic open as much as possible for local traffic as it works on the west side of the street. Loss of parking lane and road closure during daytime construction PECO – loss of parking lane to maintain two lanes of traffic; occasional loss of one traffic lane during manhole reconstruction
  • 11. Property Owner Concerns Understand property owners/business concerns Deliveries and trash pick up Pedestrian safety Signage for road closures Open for business signage Communications with contractor and PWD
  • 12. Concerns Voiced by Businesses on December 15, 2011 PWD will reach out to the Parking Authority to see if it is possible to work with them to eliminate ticketing on the block for the duration of the work. Make certain that our contract requires consistent clean up (dust, materials, etc.) Investigate making the contract call for 12 hour work days instead of 8 hour work days. Make certain that proper signage with all business names is posted at the entrance of the streets alerting customers that these businesses are open during construction. Make certain that all deliveries can be made to businesses that need them with as little hassle as possible during construction. Look into which properties have vaults in the sidewalk so we are aware when we are going to be doing any work in the sidewalk for reconnections. Work with the properties who have upcoming construction projects to allow them site access and room to do the work they need to accomplish. Work on promotion for the businesses on this Street to let people know they can still shop, eat, and walk down this block.
  • 13. SIGNAGE/PUBLICITY Road close during working hours Street reopens nightly and weekends
  • 14.
  • 15. SIGNAGE For NB traffic-locate construction signs PLAN at Chestnut, Walnut and Locust Streets For EB traffic- locate signs at 5th and Chestnut.
  • 16.
  • 17. Sign up for Updates www.phillywatersheds.org/alerts