SlideShare uma empresa Scribd logo
1 de 114
Nunce
    Deck operating manual

        Accommodation barge NUNCE




1
Nunce
         Deck operating manual

                        Deck operating manual

    1.         Principal particulars
          1.         Barge characteristics
          2.         General arrangement
    2.         Ballast system
          1.         Capacity plan
          2.         Ballast valve remote control system
          3.         Ballast level remote gauge system
          4.         Ballast arrangement and equipment
          5.         Ballast operations
    3.         Helicopter operations
          1.         Helideck
          2.         Helideck routine operations
          3.         Helicopter refueling
    4.         Bunkering management
          1.         Bunkering stations
          2.         Bunkering hoses and connections
          3.         Oil pollution prevention and SOPEP plan
          4.         Bunkering operations
    5.         Anchoring systems
          1.         Anchoring arrangement
          2.         Anchoring equipment description
          3.         Anchoring winches
          4.         Anchoring winch operating procedures
    6.         Lifting equipment
          1.         Deck cargo crane
          2.         Palfinger crane
          3.         Cargo lift
          4.         Medic crane




2
Nunce
    Deck operating manual

            Principal particulars




                                    3
3
Nunce
          Deck operating manual

                            Barge characteristics


                            PRINCIPAL PARTICULARS
    Length Overall                 122,00 m
    Breadth                        42,00 m
    Depth Moulded                  8.40 m
    Draft                          5.00 m
    Built                          2008
    GRT/NRT                        21.160 / 6349 T
    Class/Notation                 ABS/ABS + A1 Accom. / Work Barge E, M,
                                   AMCCU, CRC, UWILD
    Flag                           LIBERIA
    Port of registry               Monrovia

                               CARGO CAPACITIES
    Deadweight                     5000 t
    Deck Strength                  10 t/m2
    Clear Deck Area                900 m² (hard wood cladding)
    Fuel Oil                       2 x 1360 m3
    Fresh Water                    2 x 1500 m3
    Ballast Water                  6300 m3
    Industrial Water               equal to FW quantity minus 1000 m³

                               PROVISION STORES
    Cold rooms                     1 x 50 m³ + 1 x 25 m³ Each @ -20°c
    Vegetable Room                 1 x 50 m³ + 1 x 25 m³ Each @ + 5°c
    Dry Store                      60 m2
    Bottle store                   30 m³
    Dropping zone on deck          Yes 2x 20 feet container dedicated area on
                                   deck (beside frigo rooms)

                                   PUMPS
    SURF refueling                 6 m³/h
    Catamaran/Seacor Cheetah       15 m³/h
    Fuel Oil                       2 x 50m³/hr. @ 35 m head
    Fresh Water                    2 x Press set 40m³/hr. @ 40m head
    Ballast Water                  2 x 200 m³/hr. @ 30m head
    Industrial Water               50 m³/h @ 40 m head
    Separators                     Yes (L.O & MGO)


4
Nunce
            Deck operating manual

                            Barge characteristics


                                     MACHINERY
    Main Generator                    3 x 1260 kw @ 450V / 3 Phase / 60 Hz
                                      MAN 6 x 28 / 32 H
    Emergency Gen Set                 1 x 592 kW @ 450V / 3 Phase / 60 Hz
    Air Compressors                   3 x electric 10 bar
    HVAC                              Yes in Accomodations / Engines areas /
                                      Workshops
    Water Maker                       2 x 140 ton/day
    Sewage Treatment                  2 x 450 men minimum IMO/USCG Standard
    Oil Water Separator 15 PPm        Yes

                            PROTECTION / TREATMENT
    Hull                                ICCP (impressed current cathodic protection)
    Seawater seachests, filters & lines Anti-fouling system

                              WORKSHOPS (on deck)
    Barge                 85 m²        1 c/w lathe, pneumatic and mechanical tools,
                                       grinding machines, 1 x radial drill, hacksaw
                                       machine,
                                       1 x Arc welding & 1 Portable Arc welding sets
    Electric workshop      45 m²       Yes equipped for control and repairs
    Client workshop        80 m²       1 lathe machine (4 mt between center)
                                       mechanical tools,
                                       hacksaw machine, 1 x Arc welding & 1
                                       Portable Arc welding sets
    Safety workshop       45 m²
    Elect & instrum       20 m²        In engine room




5
Nunce
          Deck operating manual

                             Barge characteristics


                                   DECK EQUIPMENTS
    8 Point Mooring                        8 x single drum Electro hydraulic c/w tension
                                           sensor & length paid out
                                           indicators / 16 Fairleads x 360° - dubble
                                           sheaves
    Winches control                        Local or remote control from barge control
                                           room with CCTV
    Rated Pull                             85t x 10m / min. @ 1st Layer (1st speed)
                                           45t x 30m / min. @ 1st Layer (2nd speed)
    Brake Capacity                         200 ton (Static) @ 1st Layer
    Anchor Wire                            8 x 2000 m (L) x 76mm Diameter
    Anchors                                8 x 12 ton
    Capstan (bridle winch)                 Yes
    Provision crane                        None
    Main crane                             Electric / Hydraulic
    Main Crane Hook                        25 t x 32m Radius
    Whip Hoist                             8 t x 32m Radius

                                            STORES
    Barge store    75 m³ & 75 m³           Forward & Aft
    Spare store    25 m³ & 30 m³           Forward & Aft
    Rope store     10 m³ & 10 m³           Forward & Aft
    General store       50 m³              Aft
    Engine spare parts lift (2 levels)     Yes

                                           HELIDECK
                                         Suitable for S- 61
    Refueling station                      Yes w/ 2 x 4000 lt




6
Nunce
         Deck operating manual

                          Barge characteristics


                               ACCOMMODATION
    Cabin                             min. 11,8 m² floor area (incl. bathroom)
    Double Berth                      178 x 2 berth
    TOTAL                             356 Berth (expandable to 450)
    Facilities                        All rooms equipped with Radio, TV & internet
                                      connections
    Automatic telephone               Every accommodation room, office, public
                                      space, engine area

                      RADIO & NAVIGATION EQUIPMENT
    Radio control room                Yes 20 m²    H24 manned x 2men
    GMDSS                             Yes
    SSB                               Yes
    INMARSAT C + Telex / SSAS         Yes
    INMARSAT F                        Yes
    Faxsimile receiver                Yes
    VHF/DSC Radio Tel                 Yes
    Navtec Receiver                   Yes
    SART                              Yes
    EPIRB                             Yes
    Portable VHF Marine Radio (with   Yes
    DSC)
    VHF Air Band Receiver             Yes
    Beacon                            Yes
    Radar ARPA                        Yes
    AIS                               Yes
    Gyro compass                      Yes
    Echo Sounder                      No
    Meteo display station             Yes
    GPS                               Yes
    Fog horn                          Yes Audio beam system (2 miles)
    Sound Powered Tel.                Yes
    PA System                         Yes
    International call                Yes 4 cabins




7
Nunce
          Deck operating manual

                          Barge characteristics

                    FIRE FIGHTING & SURVIVAL EQUIPMENT
    Fire Pump                             2 x 180 m³/ 120m head
    Fire Monitors                         2 x Foam monitors (helideck)
                                          2 x water monitors
    Emergency Fire Pump                   1 x 75 m³/hr. @ 80 m head
    Life Raft                             42 x 25 p
    Fast Rescue Boat                      1 x 35 Kts - 3 men    elect / hydraulic
                                          launching davit
    Fire Detection System in all enclosed Yes
    spaces.
    Gas Detection System in all enclosed Yes
    spaces
    Hi-Fog system                         Machinery store Rooms, generators rooms,
                                          utility rooms, winches room & Paint locker
    Hi- Fog system                        Yes in whole accommodation spaces

                                        GALLEY
    GALLEY            270 m²            Services 450 people over 2 hours max
    Bakery             35 m²            2 x man @ 24h
    Mess room          500 m² 240       Services 450 people over 2 hours max
    seats

                                       MEDICAL
    MEDICAL          total 108 m²       Hospital 1 x 4 berth + examination room +
                                        transit (beside Helideck)

                                       OFFICES
    OFFICES           20 m² 2 desks     26 x Client & 8 x Barge
    Client Archives     40 m³            2 Rooms
    Telecom eqpt room 10 m²             Yes
    Conference Room 110 / 70 / 65       Client Meeting room / Barge meeting room
    m²                                  / Training room
    Administration office 20 m²         Yes w/ 2 desk




8
Nunce
        Deck operating manual

                       Barge characteristics


                                ENTERTAINMENT
    TV Room           180 / 95 / All equipped w/ 110 cm Plasma screen & 20
    60 m³                        satellite channels + inner.
    Recreation Room     45 m²     1 x room

    Library                       Yes
    Internet room                 Yes Equipped w/ 12 PC
    Fitness room        60 m²     Full equipped & Air cond.

                                OTHER FACILITIES
                                  2 x 140m2 Luggage Rooms + 2 x 140m2 Muster
                                  Rooms (convertible)
                                  1 x 70 m² deck changing / toilet room
                                  1 x 30 m² deck transit lounge
                                  1 x 10 m² deck dirty coffee room




9
Nunce
     Deck operating manual

          General arrangement plan




10
Nunce
     Deck operating manual

               Ballast system




11
Nunce
     Deck operating manual

                    Ballast Tanks




                      Inside a ballast tank (4ps)




        Suction and filling
       at the bottom of the
12             tank
Nunce
     Deck operating manual

       Ballast valve remote control system




13
Nunce
        Deck operating manual

            Ballast level remote gauge system

     Confer to “associated plans and drawings to Nunce deck
     operating manual folio”
                 Ballast level remote gauge system




                    Air pipe for remote gauging system
                            inside ballast tanks

14
Nunce
         Deck operating manual

           Ballast arrangement and equipment

     •   Two main longitudinal symmetrical ballast lines of 7 side
         ballasts
     •   There is no double bottom tank
     •   Two ballast centrifugal pumps (300m3/h) taken suction from
         main sea water chest
     •   Crossover line allows cross feeding from suctions valves
     •   Crossover line allows cross feeding from a ballast line to the
         other
     •   Pumps are used either for ballasting and deballasting
     •   Emergency suctions from bilge system and flooding




15
Nunce
     Deck operating manual

             Ballast system plan




16
Nunce
           Deck operating manual

                         Ballast operations

                            General guidance
     A responsible officer must be always on duty and in charge of the
     follow up of the ballast condition at all time and report to the
     barge master when ballast operations are completed.
     For accurate measure of quantity of water in ballast, refer to the
     sounding table.




      Precautions to take prior filling or emptying of a ballast
                                tank

           Ballast operations will not jeopardize the stability and sea
            behavior of the barge.
           There is no works in progress in relation with ballast
            system (inspection, maintenance…).
           HPU for remote control valve is available and ready
            (working pressure at 150bar).
           Ballast pumps (1 and/or 2) are available and ready and
            that starting will not overload the busbar.
           Level gauges are readable (not inhibited or shut off).




17
Nunce
          Deck operating manual

                     Ballast filling procedure


     1.   Select the ballast to fill by operating the corresponding
          remote valves on the ballast synoptic.
     2.   Set the ballast pump remote control valves for ballasting.
     3.   Open manual suction valve corresponding to the ballast
          pump.
     4.   Close the manual overboard valve.
     5.   Start the ballast pump
     6.   Check for pressure gauge
     7.   Check for level gauge

                               General guidance
     a.   Operate the valves one by one on the synoptic to avoid big
          drop of pressure of the HPU
     b.   Operate only the necessary hydraulic valves to reach the
          ballast tank
     c.   Do not fill two or more tank at the same time on the same line
     d.   When ballasting, make sure to avoid to overflow the tank,
          high level alarm are set to 90% of full capacity.




18
Nunce
          Deck operating manual

                  Ballast emptying procedure

     1.   Select the ballast to empty by operating the corresponding
          remote valves on the ballast synoptic.
     2.   Set the ballast pump remote control valves for emptying.
     3.   Open manual suction valve corresponding to the ballast
          pump.
     4.   Close the manual overboard valve.
     5.   Start the ballast pump
     6.   Check for pressure gauge
     7.   Check for level gauge

                               General guidance
     a.   Operate the valves one by one on the synoptic to avoid big
          drop of pressure of the HPU
     b.   Operate only the necessary hydraulic valves to reach the
          ballast tank
     c.   Do not empty two or more tank at the same time on the same
          line
     d.   During ballast emptying, be careful to not loose suction from
          the pump while capacity get at very low level: check pressure
          gauge on pump.




19
Nunce
        Deck operating manual

                   Helicopter operations




     Aerospatiale Dolphin approaching NUNCE




20   NUNCE Helideck at night
Nunce
        Deck operating manual

                               Helideck

     The accommodation barge Nunce is fitted with an helideck on the
     upper end of D deck at the aft of the barge:
     The helideck structures were designed according to landing areas
     – Guidance on standards, CAP 437, Rev 5 Offshore Helicopter and
     reviewed for helicopter type Sikorsky S61N (MTOW of 9300 Kg)




     NUNCE Helideck




21
Nunce
       Deck operating manual

                         Helideck




     NUNCE Helideck Marking

22
Nunce
        Deck operating manual

                Helicopter routine operations

     SCOPE:
     This procedure applies to all employees engaged in helideck
     operations on board Accommodation Barge NUNCE.


     PURPOSE:
     This procedure describes the roles and responsibilities of
     personnel involved, to ensure the safety and security of persons
     transferred by helicopter and the efficiency of the operations.


     FORMS:
     HLO helideck daily inspection


     REFERENCE:
     CAP 437 – Offshore Helicopter Landing Areas – Guidance on
     Standards




23   Dolphin landing on NUNCE
Nunce
        Deck operating manual

                           Responsibilities
     Barge Master:
     Check that HLO team carry out their job according to prevailing
     standards and site procedures.
     Have authority over the HLO team.
     Ensure that the validity of the certificates of the helideck personnel
     concerned.
     Ensure that the standards of certification, inspection, equipment,
     maintenance and any corrective action on the helideck and the
     refueling station.
     Ensure of the presence and correct operation of the means of
     telecommunication, weather stations and the movement
     measuring instruments of the floating support.
     Hold the site’s “helicopter” emergency procedures and coordinates
     any implementation.

     Safety officer:
     Ensure that all safety equipment related to the helideck are fully
     operational and correctly maintained.
     Ensure that HLO teams are fully aware and informed about their
     duties in an emergency situations such as crash on deck, ditching
     or medical evacuation.
     Is the intervention leader concerning all emergency situations may
     arise on board
     HLO:
     Ensure at all times the safe sequence of helicopter operations,
     while landing, taking off nor refueling.
     To ensure the safe embarkation and disembarkation of passengers
     The HLO has perfect knowledge of the standard CAP 437 ("Offshore
     Helicopter Landing Areas – Guidance on Standards") and shall have
     a current copy on site.
     Responsible for the safety aspect of the refueling operations

     HDA:
     Assisting HLO during helicopter operations
     One HAD must always act as fireman, fireman outfit worn, and be
24   at the foam monitor during all movement of helicopters.
Nunce
        Deck operating manual

                           Responsibilities

     Radio Operator:
     They monitor flight safety between the various land and offshore
     sites, in coordination with the operators of Echo Charlie and the
     Head of Helicopter Operations in Luanda and on the sites.
     They record the radio messages transmitted by the pilot on the
     helicopter operations log.
     They give the pilot any useful information concerning flight safety.

     Administrator:
     Summoning the passengers to the departure lounge, weighs them
     and records the weights on the manifest.
     searching baggage in the presence of the passengers to make sure
     that they do not transport any prohibited or dangerous objects.
     He weighs baggage and records on the passenger manifest.
     He shows the passengers the video of the safety instructions

     Site Coordinating Logistic Officer:
     He works in permanent liaison with the radio operator and the
     HLO teams of the installation and, as required, the radio operators
     of the other offshore sites at which the helicopter needs to reach.
     He prints the final manifest and gives it with 3 copies to the
     landing officer (HLO)
     He makes sure that the total weight of baggage and freight in the
     compartment remains within the limit allowed by the air operator
     and pilot.




25
Nunce
         Deck operating manual

                           Safety highlights

     The Client Logistic coordinator, via the helicopter Company will
     inform Nunce personnel of the helicopter arrival with sufficient
     notice to allow mobilization of the stand-by/work boat and
     helideck crew.
     During helicopter operations crane boom will be positioned so
     that there is no possibility of interference with the helicopter and
     the crane operator will not be in the crane cab.
     During landing or takeoff, the HLO remains visible at all times to
     the pilot by being necessary at the top of the access stairs. His
     presence shall only be allowed outside the helideck during
     landing & take-off, maintaining the greatest possible distance
     from the limits of the helicopter's landing gear contact surface.
     The HLO and the HDA must be equipped with lightweight fire-
     resistant suits and safety goggles.
     The HLO will also be equipped with hands-free VHF earphones
     enabling him to communicate with the pilot.
     NOTA 1 : the international (in English language) radio phraseology
     must be followed at all times to avoid any confusion or
     misunderstanding
     NOTA 2: the words “clear” or “clearance” must be avoided as only
     air traffic controllers (ATC licensee) are allowed to use these
     words.




26
Nunce
        Deck operating manual

             Helicopter routine works sequence


                         30 min before landing
     Radio Operator
     Informs the landing officer (HLO) so that he may ensure safety on
           the helideck, and awaits confirmation.
     Telling HLO the ETA and the number of passengers and parcels to
           unload/load, and notifies any fuel requirements.
     Inform the ships operating in the transfer zone alongside barge.
     Administrator:
     He summons the passengers to the departure lounge by PA for a
         reminder of the safety instructions, weighs them and their
         baggage and records the weights on the passenger manifest
     He prints the final manifest and gives it with 3 copies to the
         landing officer (HLO)
     HLO
     Verify the Helideck is available and ready:
     • No obstruction, in 210 Obstacle Free Sector (OFS) up to a
          distance of 1000metres from the helideck.
     • Helideck area clear of any loose material.
     • Safety net tightness , hammock effect.
     • The net is stretched and the hooking points in place..
     • No explosive atmosphere, no flammable liquids or gas
     • No hot air or hot gas above the helideck
     • No strong wind (> 45 knots) and no gust or eddy, such to
          enable free movements of crew, in safe conditions.
     • Availability of the safety equipments for firefighting and crash
     • The foam monitors are directed laterally and not facing the
          helicopter (in the event of unexpected release) and a portable
          CO2 extinguisher is available if a fire starts in the engine
          casing.
     • Good overall condition of the wind sock
     • Good lighting within the helideck zone, good lighting of masts,
          obstruction, and wind sock
     • Inform the radio operator of the helideck readiness
27
Nunce
        Deck operating manual

             Helicopter routine works sequence

                       15 minutes before Landing
     Radio Operator
     Summons the technical team (HLO, HDA, firemen) onto the
     helideck.
     Summons the passengers onto the helideck or in front of the
     departure lounge depending on the site, and makes a roll call
     according to the manifest.
     Passengers visiting for the day, are generally exempted from the
     safety briefing, must join the group at this moment after returning
     their t-card. Any passenger not answering the call will be refused
     embarkation.

     HLO
     Inform to stop all cranes operations and set the jibs of cranes at
     the normal not working positions
     Verify firefighting equipment and the PPE worn by the helideck
     crew.
     Places HDA in position: one HDA at the foam monitor upwind. The
     second one will act as the first attack firefighter.
     Cancel the access to the helideck to people not being member of
     the HLO team.
     In case of refueling, verify the equipment are in good operational
     conditions and that documents are available.
     Confirm the stop of cranes operations and that the jibs of cranes
     are down.
     Verify the good working and functioning of the portable vhf by
     testing the transmission.
     Collect manifest from radio room.




28
Nunce
        Deck operating manual

             Helicopter routine works sequence

                          5 minutes before Landing
     HLO
     Ensure that all passengers, baggage and freight is ready for
     departure and awaiting on the special dedicated area.
     Check that luggage and freight comply with the manifest.
     All luggage not declared or considered not complying with the
     manifest or for safety nor security reason will be refused.

                            Just before Landing
     HLO
     Inform the helicopter that the helideck is available for landing and
     that fire fighting equipment is ready.
     Message is “NUNCE helideck available for landing”. Or “NUNCE
     green deck”.




29
Nunce
        Deck operating manual

            Helicopter routine works sequence

                  Disembarking and embarking passengers

     • Disembarking and embarking passengers may be carried out
       with the rotor turning or motor and blades stopped
     • In the case of a complete stop, it is important not to approach
       the helicopter before the rotor completely stops because the
       blades of some helicopters (especially with the S76), at low
       speed, may "drop" and pass at a height lower than the head of
       a man.
     • Under no circumstances may passengers go round the
       helicopter, whether by the front or the back. Only the HLO and
       the HDA are allowed to do it, by the front only, to collect or
       bring back baggage, and only when access to the
       compartment, stairs side, is impossible (see Annex 2:
       Circulation around Helicopter).
     • After landing, the pilot gives the HLO permission to approach
       with a thumb-up and by switching off his rotating navigation
       lights.




30
Nunce
         Deck operating manual

             Helicopter routine works sequence


         The HLO then has to carry out the following actions

     •    Advance to the helicopter by its side safety area according
          type of helicopter, see drawing in Annex 1
     •    Take receipt of the manifest of disembarking passengers from
          the pilot.
     •    Check on the action of the HDA, who collects the baggage of
          the disembarking passengers and brings it close to the stairs.
              • During this time, the passengers wait in the helicopter.
              •   Long items will be carried horizontally to prevent
                  contact with rotor blades.
     •    Open the doors descent stairs side, and this side only, for
          disembarking passengers, and leads them out of the helideck
          by the side of the helicopter facing these stairs.
              •   Passengers descend with their life jackets on.
     •    Check on the collecting of life jackets from disembarking
          passengers by the HDA outside the helideck and distribution
          of them to embarking passengers
              •   If embarkation is done with the rotor turning, all
                  passengers must put on their life jackets before going
                  up on the helideck.
     •    Check on loading of embarking passengers' baggage in the
          helicopter's baggage compartment by the HDA.
     •    Guide embarking passengers to the doors of the helicopter,
          stairs side, (and this side only), and checks on the correct
          buckling of safety belts.
     •    Close all helicopter doors.
     •    Deliver to the pilot, four copies of the manifest of embarking
          passengers, freight and retains receipt of a signed
     •    Ask the pilot for confirmation of the door closing lights, and
          returns to the station at the access to the helideck.
     •    If the helicopter motor and blades are stopped, the HLO and
          HDAs have to lash the helicopter to the pilot’s
          recommendations
31
Nunce
         Deck operating manual

             Helicopter routine works sequence

                         Before helicopter take off
     HLO
     Verify with the pilot the locking of doors
     Push aside in safe area all people remaining on the helideck zone
     Verify no leak of jet fuel or oil, no obstruction in the take-off area
     Verify helideck is ready, and the wheels or skid is clear from the
     safety net
     Give to the helicopter pilot the manual signal “All is clear””, with
     pus turned up, and confirm by radio he may take-off.

                       Once helicopter has departed
     HLO
     Inform the crane operator and the supply boat the end of
     helicopter operations
     The HLO team remains in place for 5 minutes after takeoff.
     Radio Operator
     Record all times
     Perform the radio watch




32
Nunce
        Deck operating manual

            Helicopter routine works sequence

                      Periodical Checks and Tests

     Each day and before any landing or take-off, the HLO shall perform
     a thorough examination of the helideck area and the safety
     equipment.
     He has to follow a check list to do this and will recordt any
     observations or remarks in the HLO workbook.
     Findings, if any, will have to be dealt with immediately.
     Filled checklist will be kept in dedicated file.




33
Nunce
         Deck operating manual

                    HLO daily checklist of helideck
     Items                                                  M   Tu   W   Th   F   Sa   Su

     Helideck Surface
     Colour condition - NonSlip characteristic – Drainage

     Helideck Marking
     Perimeter line – Aiming circle – Chevron

     Surface Net
     Condition – Tension – Tie down points

     Perimeter Safety Net
     Condition…

     Perimeter Lighting
     All working – Brightness – Condition of lens

     Flood Lighting
     All working – Effective Dazzle protection

     Fire Protection
     Foam Monitors: condition - Foam tank Full
     Dry Powder extinguishers: Condition – (2*50kg)
     CO2 extinguishers: Condition – (2*5kg)
     CO2 extinguihsers: Condition- (2*9kg)
     Hose reels
     Water Hydrants – Hoses - Nozzles

     Rescue Equipment
     Crash rescue box – Inventory (as per box checklist)
     SCABA: Condition – Nominal Pressure

     Protective Clothing
     Quantity - General Condition

     Additional Equipment
     Helicopter “do not land” flag available
     Alarm push buttons
     Sandbags – Tiedown ropes

     Radio Equipment
     Portable VHF w/Headset

     Weather Equipment
     Anemometer – AirTemp – Barometer – Windsock…

     Access Points
34   Hand rails – Safety Notices
Nunce
        Deck operating manual

               Safe areas around helicopters




     Annex 1




35
Nunce
       Deck operating manual

               Safe areas around helicopters




     Annex 1




36
Nunce
       Deck operating manual

               Safe areas around helicopters




     Annex 1


37
Nunce
       Deck operating manual

               Safe areas around helicopters




     Annex 1




38
Nunce
        Deck operating manual

                       Helicopter refueling




                     Refueling station


     SCOPE:
     This procedure applies to Helideck affected on board the
     Accommodation Barge NUNCE.


     PURPOSE:
     This procedure provides guidelines to refuel the helicopters,
     describing checks and duties of the personnel involved for a safe
     operation.


     REFERENCES:
     CAP437
     Manufacturer’s manual “WILMAX engineering



39
Nunce
         Deck operating manual

                           Responsibilities

     RESPONSIBILITY
     The HLO is in overall charge of all helideck refueling operations.

     PROCEDURE
     General
     Jet A1 is classified as IMDG class 3 (flammable liquids).
     Before arrival, the Pilot must inform the Radio of any need in
     refueling, stating the requested volume.
     The HLO positions himself so that he can see and be seen by the
     Pilot and the HDAs involved in this operation.
     Helicopter must shutdown for refueling and have passengers
     disembarked.
     Should occur any strong rain, thunderstorm in the vicinity, turning
     machine or source of sparks, refueling can’t be continued.
     Equipment and specific items
     Helicopter refueling station is on the D-deck Portside Aft
     Jet A1 fuel tanks and pumps are on Main deck Starboard side
     Forward.




40
Nunce
          Deck operating manual

                    Refueling operation sequence

                                       Initial State
     The initial state considered in this procedure start when helicopter
     is landed, rotor stopped.


                                       INITIAL STATE
                      HELICOPTER LANDED – ROTOR STOPPED
       PASSENGERS DISEMBARKED – HELICOPTER CREW ON STATION


                                   Before refueling

     Connect the line between tank and pump                               HDA

     Check that there is no leak                                          HDA
     Check the filter (air jet fuel)                                      HLO
     Check the counter                                                    HLO

     Check the grounding cable                                            HLO

     Check the Emergency stop                                             HLO

     Perform a general check of the system by flushing                    HLO

     Check that the inlet of the pump corresponds to the selected         HLO
     tank
     Drain tank, the filter of the pump and take a sample in a sampling   HDA
     bottle
     Perform the water detection test                                     HLO

     Drain the tank and the filter of the pump until there is no more     HDA
     water
     Make labelling of sample with sampling date                          HDA
41
Nunce
         Deck operating manual

                   Refueling operation sequence

                                      Refueling

     Inform the Radio Room for hot works suspension                      HLO

     Check that all passengers have left the helicopter and stand in     HLO
     safe area
     Reset the counter                                                   HLO
     Exhibit the fuel quantity control records to the Pilot              HLO


     Take a sample from the refuelling nozzle.                           HLO
     Show the sample to the Pilot and perform the water detection        HLO
     test in front of him.
     Make labelling of sample with sampling date and keep it until the   HLO
     next day
     Ground the helicopter                                               HLO
     Unwind the refuelling hose                                          HLO
     Open the plug of the helicopter tank and insert the nozzle          HDA
     Check that the firemen and HDA are ready to their station           HLO
     Check the counter figure                                            HLO
     Start the pump on Pilot request only and after both Pilot and       HDA
     HLO
     agreed on the volume to be delivered
     Check the working order of the flicker light                        HDA
     Record the differential pressure during the transfer                HDA
     Stop transferring on Pilot request, or when reaching the            HDA
     agreed volume to deliver, or in case of nay trouble




42
Nunce
        Deck operating manual

                 Refueling operation sequence

                                After refueling


     Remove the nozzle and its grounding cable.                          HDA

     Check that the plug of the tank is locked                           HLO

     Disconnect the grounding cable and show the free end to the         HDA
     Pilot
     Carefully stow the equipment.                                       HDA

     Record the delivered quantity as stated by the counter.             HLO

     Take a sample from the refuelling nozzle and show it to the         HLO
     Pilot.
     Make labelling of sample with sampling date and keep it.            HLO

     Fill the Jet A1 Delivery Coupon and makes it signed by the Pilot.   HLO

     Check that the helideck is free, stuff stowed and helideck team     HLO
     away
     Inform the Pilot, inform the CCR for resuming hot works             HLO




43
Nunce
        Deck operating manual

                Refueling operation sequence

                             Final Status

     •Helicopter on helideck, rotor stopped
     •Passenger disembarked, crew on board
     •Helicopter tanks refueled
     •Helideck available



                              FINAL STATE
                         HELICOPTER REFUELED




44
Nunce
        Deck operating manual

                    Bunkering management

     SCOPE:
     This procedure applies to Accommodation Barge NUNCE.

     PURPOSE:
     To ensure a safe and very low environmental impact transfer of
     hydrocarbons (mainly constituted by light MDO) between the
     barge and other vessels either receiving nor supplying.

     RESPONSIBILITIES:
     The chief engineer is responsible for all transfer of hydrocarbons
     on board the barge.
     The safety officer is in charge of the deck operations and the
     implementation of the safety measures during bunkering
     operations.
     The 2nd engineer is in charge of the availability and the
     preparation of the engine room for bunkering operations. He is in
     charge of the follow up of bunkering operations

     REFERENCES
     MARPOL 73/78 convention
     ISGOTT manual
     Environmental company policy




45
Nunce
     Deck operating manual

             Bunkering stations




46
Nunce
         Deck operating manual

              Bunkering hoses and connections

                           Starboardside bunkering station

     Hose           Type       Coupling   Number      Max rate   Use for

     Black/ brown   15m/3”     TODO           2       50m3/h     Supply’s DO
     marked                    type                              bunkering
     Black/brown    25m/2”     Manual         1        6m3/h     Surfers DO
     marked                    handle                            bunkering
                               ZVA 25
                     Portside bunkering stations (mid and fwd)

     Hose           Type       Coupling   Quantity    Max rate   Use for

     HD             25m/2”     cam lock       1       15m3/h     Cheetah DO
     50L/brown                                                   bunkering
     marked
     Black/brown    25m/2”     Manual         1        6m3/h     Surfers DO
     marked                    handle                            bunkering
                               ZVA 25




     ToDo connection                        ToDo principle




47
Nunce
        Deck operating manual

                 Oil pollution prevention and
                          SOPEP plan
     SCOPE:
     This procedure applies to all personnel on board the
     Accommodation Barge NUNCE and covers oil pollution prevention
     on board the Accommodation Barge.

     AIM:
     To give guidance in implementing Company guidelines on the
     subject of preventing contamination of the environment.

     Emergency Plan:
     Accommodation Barge NUNCE is in possession of a SOPEP (Ship Oil
     Pollution Emergency Plan) (MARPOL 73/78).
     This plan defines and describes actions required to address spills
     due to breach or loss of containment.
     This plan provides the following but non limitative actions:
            1.    Response designed to ensure that any on board spill is
                  contained onboard and not discharged into the sea.
            2.    Control the spill and minimize hazard to human life
                  and the environment by means of cleaning up,
                  temporary containment and/or isolation.
            3.    Reporting procedures.




48
Nunce
           Deck operating manual

                       Bunkering operations

     Surfers (fast crew boats transferring personnel between the barge
     and the platforms within the field) are regularly refueling by the
     barge crew.


              Refueling surfer general and safety guidance
      1.    No smoking/no naked flames policy in force
      2.    Refueling is performed one vessel at a time
      3.    Check of equipment condition (fuel hose, pistol, coupling)
            have to be done each time before refueling.
      4.    Surfer pilot is in charge of follow up quantity delivered and
            must inform on time the pumpman for stopping the pump.


                            Refueling sequence
     1.    Surfer pilot request for refueling
     2.    Surfer proceed to the boat landing
     3.    The deck hand in charge (pumpman) bring the fuel hose fitted
           with a gasoil pistol to the surfer crew
     4.    When the surfer is ready to receive fuel, the pumpman will
           start the pump and be on stand by until the completion of the
           refueling
     5.    When the surfer received the requested quantity, surfer pilot
           inform the pumpman to stop the pump
     6.    The pumpman pick up back the hose and confirm by reading
           the counter the quantity given to the surfer.




                         GO pistol ZVA25

49
Nunce
          Deck operating manual

                       Bunkering operations

         Supply vessels bunkering general and safety guidance

     •      Bunker management application plan in force including
            safety measures prior bunkering (see following check-list)
     •      No smoking/no naked flames policy in force
     •      Bunkering is performed one vessel at a time
     •      Check of equipment condition (fuel hose, couplings, piping)
            and correct settings of valves have to be done each time
            before refueling.




50
Nunce
           Deck operating manual

                     Supply vessels bunkering

               Bunker requisition must be done at least 8h before
                                          .
     1.    Supply vessel request for approaching bunkering station.
     2.    Bunkering safety measures have to be implemented before
           the connection.
     3.    When connection is completed, exchange of safety check-lists
           is done to ensure each other is ready for the bunkering
           operation: barge safety officer and supply vessel captain have
           to fill and sign.
     4.    Bunker ticket has to be checked and signed by both chief
           engineers.
     5.    When confirmation is done on each side, pump is started at a
           slow rate to check tightness of connections and leaking if any:
           this is the integrity check.
     6.    Then a pump emergency stop is performed to ensure that it is
           working normally.
     7.    If all safety checks are performed without any fault, pump rate
           is increased until the maximum admissible rate by the
           installation.
     8.    One engineer is on stand-by at the manifold during the whole
           bunkering operation.
     9.    Soundings have to be regularly checked to avoid any overflow.
     10.   Safety officer will remain fully available and maintain radio
           watch.
     11.   If topping of tanks is necessary, pump rate will be decreased
           accordingly until the completion of tanks.
     12.   When transfer is completed, pump is stopped and bunker
           confirm receipt will send to the receiving installation.
     13.   In normal conditions there is no need to flush the line as the
           connection are ToDo type coupling and will remain fully tight
           when they are disconnected.
     14.   The hose is picked up back and secured to the barge.




51
Nunce
     Deck operating manual

          Bunkering safety checklist




52
Nunce
     Deck operating manual

          Bunkering safety checklist




53
Nunce
       Deck operating manual

                Anchoring systems




     Sheave                Mooring Anchor




                           anchoring arrangement
                           starboard aft station
                           wire cables 5 and 6




              wire cable
54
Nunce
     Deck operating manual

           Anchoring arrangement




55
Nunce
     Deck operating manual

         Anchor Winch Arrangement




56
Nunce
        Deck operating manual

                          Anchor winches
     REFERENCE:
     •Manufacturer’s   manual NORCRANE




     Description
     The Nor Crane & Winch‘s Hydraulic Mooring Winch model type
     NCW MW-85-200-H is designed for safe and reliable personnel
     handling operation.
     This hydraulic mooring winch consists of a single hauling drum
     mounted on a high tensile steel main shaft, supported on the
     fabricated winch base-plate by heavy duty roller type bearings.
     The bearings are mounted in steel housings, fitted with external
     grease lubrication points, bolted to the winch base-plate.
     The drum is fitted with a spring loaded, hydraulic released band
     brake, giving a fail-safe to “ON” mode during operation. This brake
     is a wrap-up design consisting of two halves warp around the race
     of the drum flange. The brake would operate through a hydraulic
     cylinder and spring loaded system, through mechanical linkages
     to provide the required holding load. All brake straps are lined
     with a high grade non-asbestos marine lining that is bolted to
     position. A spanner is provided to manually override onto the
     cylinder in a case of emergency. Also a hydraulically operated
     ratchet assembly is provided for stopping the
     drum at full braking load in as standby of drum brake.
     The drum can engaged or disengaged by means of a hydraulically
57   operated dog clutch, which is installed at the intermediate shaft
     to allow the engagement of drum to drive unit.
Nunce
        Deck operating manual

                          Anchor winches

     A mechanical fresh water cooled disc tension drag brake is installed
     on another pinion shaft to ensure the drum is under controlled
     payout dynamically for operation of anchor deployment.
     Transmission would be from two low speed high torque medium
     pressure hydraulic motors.
     The motors would be positioned at one side of the winch, driving
     through a guarded doubled stage spur reduction gearing.
     An automatic spooling device is provided for the wire spool
     smoothly on drum. This device comprises a lead-screw and drive
     tongue, guide bar, side support frames, fabricated bushed carriage
     completed with vertical rollers, manually operated clutch and
     chain drive mechanism driver and driven sprockets, chain and
     fabricated steel guard.




58
Nunce
           Deck operating manual

                               Machinery data


     Subject                                Specifications
                                   Working Drum:
     Drum Capacity                          2000m x Ø76mm S.W.R (11 Layers)
                                            85Tonne x 0~10m/min (1st Speed)
     Duty Pull (1st layer)                  42.5Tonne x 0~20m/min (2nd Speed)
                                            56Tonne x 0~15m/min (1st Speed)
     Duty Pull (5th Layer)                  28Tonne x 0~30m/min (2nd Speed)
                                            38Tonne x 0~22.5m/min (1st Speed)
     Duty Pull (Top Layer)                  19Tonne x 0~45m/min (2nd Speed)

     Brake Holding                           200Tonne (Static @ 1st layer)
                                             Spring Loaded, Hydraulic Released
     Brake Assembly                         Fail-Safe Band Break
     Ratchet Holding                         200Tonne (Static @ 1st layer)
     Ratchet Assembly                        Hydraulic Operated
                                            0~16Tonne x 100m/min (1st Layer)
     Drag Brake Tension                     0~10.5Tonne x 150m/min (5th Layer)
                                            Air Loaded, Spring Released, Fresh-
                                            Water Cooled Disc Tension Brake for
     Drag Brake Assembly                    Anchor Deployment


                                Hydraulic Motor #1:
     Brand / Model                          SAI S7-4300-9-H-D250
     Component bulletin, Chapter 3, Section
     3,6,1                                  see manufacturer’s manual
                                Hydraulic Motor #2:
     Brand / Model                          SAI S7-4300-9-H-D250-L
     Component bulletin, Chapter 3, Section
     3,6,1                                   see manufacturer’s manual


                                       Control:
     • Local control box near the winch.
     • Remote control panel at barge control room.



59
Nunce
         Deck operating manual

                  Winch general overview




     Drum Capacity     2000m x Ø76mm S.W.R (11 Layers)
                           85Tonne x 0~10m/min (1st Speed)
     Duty Pull (1st layer) 42.5Tonne x 0~20m/min (2nd Speed)
                           56Tonne x 0~15m/min (1st Speed)
     Duty Pull (5th Layer) 28Tonne x 0~30m/min (2nd Speed)
                           38Tonne x 0~22.5m/min (1st Speed)
     Duty Pull (Top Layer) 19Tonne x 0~45m/min (2nd Speed)




60
Nunce
        Deck operating manual

                           Band brake

     Brake holding
     •200t (Static on 1st layer)
     Brake Assembly
     •Spring loaded, hydraulic
     released
     •Fail-Safe band break




                                   Band brake




                   Fail-safe system
61
Nunce
        Deck operating manual

                       Hydraulic motors




     Fore detailed information, please refer to Winch manual,
     Component bulletin: Chapter 3, Section 3.6.1, creer hyperlien




62
Nunce
     Deck operating manual

            Hydraulic jaw-clutch




63
Nunce
        Deck operating manual

                 Hydraulic activated ratchet




     Ratchet holding
     •200t (Static @ 1st layer)
     •Ratchet assembly
     •Hydraulic operated




64
Nunce
        Deck operating manual

                           Drag brake

     A mechanical fresh water cooled disc tension drag brake is
     installed on another pinion shaft to ensure the drum is
     under controlled payout dynamically for operation of
     anchor deployment.
     Drag Brake Tension
     0~16Tonne x 100m/min (1st Layer)
     0~10.5Tonne x 150m/min (5th Layer)
     Drag Brake Assembly
     Air Loaded, Spring Released, Fresh-
     Water Cooled Disc Tension Brake for
     Anchor Deployment




65
Nunce
        Deck operating manual

                       Spooling device

     An automatic spooling device is provided for the wire
     spool smoothly on drum. This device
     comprises a lead-screw and drive tongue, guide bar, side
     support frames, fabricated
     bushed carriage completed with vertical rollers, manually
     operated clutch and chain drive
     mechanism driver and driven sprockets, chain and
     fabricated steel guard.




66
Nunce
        Deck operating manual

                     Hydraulic power pack

                              Description
     The Electro-Hydraulic Power Pack would comprise of 2 x 110kW + 1
     x 7.5kW electric motor, 440V / 3pH / 60Hz supply, Class ‘F’
     insulation, IP55, TEFC.
     The motor are flexibly coupled to the hydraulic pressure
     compensated pump and are mounted on a fabricated skid base
     plate all suitable for below deck mounting.
     All components are mounted on the power pack and internally
     piped to a bulkhead tray.
     3 x 110kW softstarter & 1 x 7.5kW Direct-On-Line are supplied
     along with the power pack.




67
Nunce
     Deck operating manual

              Wire passageway
            and directional pulley




68
Nunce
     Deck operating manual

           Winches control station
            Barge control room




69
Nunce
      Deck operating manual

     Remote control panel on barge control room




70
Nunce
     Deck operating manual

        Remote control starting console




71
Nunce
     Deck operating manual

      Hydraulic power pack remote control
      Top panel on remote control station




72
Nunce
     Deck operating manual

        Winch remote control console
                Lower panel




73
Nunce
            Deck operating manual

            Remote control panel features description

     Item      Features                     Functions
                                            In the “PAY OUT” mode it controls the drum and allows the rope to
               Directional Control Winch
     01.                                   release, while in the “HEAVE” mode it controls the drum to coil the
              “PAY OUT” / “HEAVE”
                                           rope.
                                            It opens the drum brake and disengages the clutch from the drum so
               “EMERGENCY RELEASE”
     04.                                   that the drum is free to rotate. After the emergency release button is
              push button
                                           re-set, the brake remains closed.
                                            To engage the clutch to the drum, turn the selector to “IN” position.
               Clutch selector “IN” /
     09.                                   To disengage the clutch from the drum, turn the selector to “OUT”
              “OUT”
                                           position.
               “CLUTCH IN” indicating
     10.                                    It indicates the clutch is engaged to the upper or lower drum.
              light.
               “CLUTCH OUT” indicating
     11.                                    It indicates the clutch is disengaged to the drum.
              light
               Station selector “LC” /      To allow control from either the remote control in the wheel house
     12.
              “WH”                         or local control near the
                                            To set the drum to High speed, turn the selector to “HI”. To set the
     14.       Speed selector “HI / LO” drum to low speed, turn the selector to “LO”. Turning of the selector
                                           must be done only when the winch is not rotating /moving.
                                            A three positions brake control. When turn to “ON” mode, the brake
                                           is always closed. Turn to “AUTO” mode, and the brake band shall
               Brake selector “ON” /
     15.                                   open once the winch rotates, and it automatically closes when the
              “AUTO” / “OFF”
                                           winch stops. It works together with the main valve. When turn to
                                           “OFF” the brake band is open.
                                            This indicates the brake band is closed. The brake is holding the
     16.       Brake “ON” indicating light
                                           drum.
               Brake “OFF” indicating       This indicates the brake band is open. The brake is not holding the
     17.
              Light                        drum
                                            To engage the ratchet to hold the drum, turn the selector to “IN”
                                           position. The ratchet will hold the drum in conjunction with the
               Ratchet selector “IN /      brake or when the brake slip. To disengage the ratchet from the
              OUT”                         drum, turn the selector to “OUT” position. < Warning: The ratchet to
                                           be used only when the brake slips. It must not be used
     20.
                                           independently.
               Ratchet “OUT” indicating
                                            It indicates the ratchet is not fully engaged to the drum.
              light
               Ratchet “IN” indicating
                                            It indicates the ratchet is fully engaged to the drum.
              light
                                            An audio alarm that activates once the system has a fault. Check the
     21.       “BUZZER”
                                           actual fault with the indicating light.
                                            To check the bulb is working. Push the button and all the bulbs shall
     22.       “LAMP TEST” push button.
                                           be lighted, otherwise, bulb is faulty.
               “POWER FAILURE”
     23.                                    It indicates that the AC system power is not available.
              indication light
               “POWER ON” indication        It indicates the system power is switched on, and ready for
     24.
              light                        operation.


74
Nunce
     Deck operating manual

          Winch local control console




75
Nunce
            Deck operating manual

                       Winch local control features

     Item   Features                     Functions
                                        In the “PAY OUT” mode it controls the drum and allows the rope to
             Directional Control Winch
     01.                               release, while in the “HEAVE” mode it controls the drum to coil the
            “PAY OUT” / “HEAVE”
                                       rope.

     02.     “MAIN PRESSURE” Display It indicates the main hydraulic system pressure in bar.

     03.     “PILOT PRESSURE” display It indicates the control hydraulic system pressure in bar.

                                         It opens the drum brake and disengages the clutch from the drum so
            “EMERGENCY RELEASE”
     04.                                that the drum is free to rotate. After the emergency release button is
            push button
                                        re-set, the brake remains closed.
            “EMERGENCY STOP” push Push the button to stop the hydraulic pump station in the HPU. The
     05.    button for Hydraulic Power button must be reset once it is activated, otherwise, the pump
            Unit (HPU)                 station would not start.

                                        To set the drum to High speed, turn the selector to “HI”. To set the
     06.     Speed selector “HI / LO”   drum to low speed, turn the selector to “LO”. Turning of the selector
                                        must be done only when the winch is not rotating /moving.

                                        To engage the clutch to the drum, turn the selector to “IN” position.
             Clutch selector “IN” /
     07.                                To disengage the clutch from the drum, turn the selector to “OUT”
            “OUT”
                                        position.

                                         A three positions brake control. When turn to “ON” mode, the brake
                                        is always closed. Turn to “AUTO” mode, and the brake band shall
             Brake selector “ON” /
     08.                                open once the winch rotates, and it automatically closes when the
            “AUTO” / “OFF”
                                        winch stops. It works together with the main valve. When turn to
                                        “OFF” the brake band is open.

             “STATION ON” Indicator     It indicates the system power is switched on and ready for
     09.
            Light                       operation.

                                         To engage the ratchet to hold the drum, turn the selector to “IN”
                                        position. The ratchet will hold the drum in conjunction with the
            Ratchet selector “IN /      brake or when the brake slip. To disengage the ratchet from the
     10.
            OUT”                        drum, turn the selector to “OUT” position. < Warning: The ratchet to
                                        be used only when the brake slips. It must not be used
                                        independently.

             Lock selector “WO” /       For maintenance purpose. Switch to “MA” when doing maintenance
     11.
            “MA”                        on the equipment & select to “WO” for normal operation.



76
Nunce
     Deck operating manual

     Local control for main and pilot pumps




             See Procedure 04.19




77
Nunce
         Deck operating manual

                Winches operating instructions

                          Operation instructions

     1. Start-up of power pack
     Prior to every start up of power pack, ensure the following checks:
     • Suction valves to the hydraulic pump are opened.
     • Check oil level in reservoir to be at least 3/4 full at level gauge.
     • There is incoming electrical supply to starter.
     • Cooling circuit is lined up and valves are open.
     • Press motor “START” button on the control to start the pump
     station

     2. Heave / Payout of Wire Rope
     i) Clutch Engagement
     • Switch brake control to “ON”
     • Switch speed control to “ LOW”
     • Turn clutch control to “IN” and check whether the clutch “IN”
     indicating light is on.
     • When the clutch control light indicates out, then slowly turn the
     directional control in
     the “PAYOUT” position until the clutch control “IN” indicating light
     is on. Stop the
     control once the clutch is engaged.
     ii) Heave / Payout
     • Ensure brake selector is switched to “ AUTO”.
     • Turn to the required speed mode.
     • Turn the directional control to “HEAVE” or “PAYOUT” position.
     • Varies the speed by turning the direction control to the required
     direction.
     • Apply the band brake and disengage the clutch after every
     operation.




78
Nunce
        Deck operating manual

              Dragging system for wire release

     Note concerning the dragging system for release wire for
     deployment of anchors

     3 Drag Brake Application
     • This brake is used in the wire pull out during deployment of
     anchors.
     • Switch brake control to “ON”.
     • Switch speed control to “LOW”.
     • Turn clutch control to “OUT” and check whether the clutch
     “OUT” indicating light is lightened.
     • Whenever the clutch is lightened at “IN”, turn the control lever
     slightly in both directions to loosen the clutch.
     • Turn the drag brake to “ON” position for a constant brake
     application.

     4. Shut-Down Operation
     • Band brake is applied.
     • Jaw clutch is disengaged from the drive mechanism.
     • Switch-off electrical starter at the power pack.
     • Do a visual inspection of the components associated with the
     equipment and check for any components that may be loose.
     Ensure cable/rope is properly secured. Any leaks within the
     hydraulic system must be rectified.
     • Complete the shut down operation then lubricate the exposed
     areas and greasing points where necessary.




79
Nunce
          Deck operating manual

                       Lifting equipment




     1.   Deck cargo crane
     2.   Palfinger crane
     3.   Cargo lift
     4.   Medic crane


80
Nunce
        Deck operating manual

                         Deck cargo crane

     REFERENCE:
     Manufacturer’s manual (PELLEGRINI)


                       GENERAL INFORMATION

     SCOPE OF WORK
     This Specification covers the minimum technical requirements for
     the design,
     materials, manufacture, inspection, testing and assembly of ONE
     pedestal crane Type A suitable to be installed the accommodation
     barge Nunce.




81
Nunce
        Deck operating manual

                          Deck cargo crane

     Third Party and Certifying Authority is ABS.
     In the event of conflict between the above standards and the
     regulations of the Certifying Authority, the latter shall prevail.
     Marine Equipment Pellegrini certifies that the design and
     construction of the furnished crane are authenticated in
     accordance with API 2C Spec (without monogram).




82
Nunce
         Deck operating manual

                          Deck cargo crane

                   CODES AND STANDARDS
      REFERENCES CODES
      The crane is designed and constructed tested and certified
      according to the latest edition of following:


      ORDER OF PREFERENCE
      Any Government Regulations or Construction Code, listed in the
      Project
      Specifications, in the Requisition or in the Purchase Order, have
      precedence except where this Specification is more stringent.


                     specification for offshore cranes 6th edition,
     API Spec. 2C   September 2004
     API Spec. 9A    specification for wire ropes
                     recommended practice for planning, designing,
                    fabrication and erection of structural steel for
     API RP 2A      building
                     lifting gear - instruction for calculation,
     CRN UNI 7670 manufacture and maintenance
                     steel structure for calculation, manufacture and
     CRN B.U. N. 73 maintenance
     AWS D 1.1       structural welding code
                     specification for welding earthmoving and
     AWS D 14.3     construction equipment
     ASTM or
     Equivalent      materials
     IEC STANDARD
     ISO             mechanical equipment standards




83
Nunce
         Deck operating manual

                              Deck cargo crane

                                 REQUIREMENTS
     GENERAL
     The design philosophy for the offshore pedestal crane is of stand-
     alone/independent operation.
     The crane is designed for the life, duty and service conditions as stated in the
     technical data and in the Shipyard’s Technical Specification.
     The electro-hydraulic pedestal crane is Type A as shown in figure 1 crane
     assembly of API Spec. 2C 6th Edition, September 2004.
     The crane is capable of lifting, swinging, luffing and lowering loads at
     capacities, radii and speeds in conditions as specified in the technical data,
     specifications and drawings.
     Safe Working Load (SWL) is the actual loads that can be lifted and are not
     include the hook, block and hoist rope weights.
     The crane is self-contained, electro-hydraulic driven, hydraulically operated,
     ram luffing, stiff boom box type, pedestal mounted and fully revolving;
     furnished with a pedestal adaptor, an enclosed cabin and all auxiliary
     equipment suitable for duties associated with an offshore vessel.
     The function of the crane includes but not necessarily be limited to the
     following:
     A) Offloading item such as wire line equipment and coil tubing package, the
     heaviest maintenance item materials (drilling tubular goods) from supply boat.
     B) Transportation of personnel to/ from a supply boat.
     C) Handling materials on platform deck.
     D) Removing heavy components with various characteristics for their
     installation on the deck at permanent locations (lay down areas).
     The crane is provided with lifting lugs on all major assemblies to facilitate
     erection or disassembly of the complete crane package.
     The crane is equipped with a main hoist and auxiliary hoist.
     The main hoist is capable of reeving various multi-falls of rope to achieve a
     range of lifts for heavy loads.
     The auxiliary hoist is of single fall, used for lifting light loads.
     The crane’s flood-lights and electric equipment installed on the boom are
     certified for safe area (unless otherwise specified).
     The crane is continuous rotary type, rotating in both direction through 400°
     limited.
     The crane's power is sufficient to ensure that the one movement under full
     load, full speed and under worst conditions.
     Simultaneous operation is possible at reduced speed.
     All areas of the crane are accessible for inspection, maintenance and repairs.
     No feature on the crane presents or creates a safety hazard to personnel.
84
Nunce
        Deck operating manual

                          Deck cargo crane

                                  DESIGN
     The crane is designed and constructed in accordance with API SPEC
     2C,
     Specification for Offshore Cranes, 6th edition, September 2004.
     The crane is designed to provide the SWL capacities at the required
     load, radii and speeds.
     These SWL capacities are used to determine the Category 1 (static)
     and Category 2 (dynamic) design loads as defined in API SPEC 2C.
     For the purpose of evaluating the dynamic ratings for lifts from
     boats, off-lead and side-lead angles are used as stated in the
     technical data for the sea states indicated.
     Also the maximum operating wind speed is included in the
     evaluation of side forces.
     The out-of-service wind speed is considered with the boom in the
     horizontal position restrained in a rest.
     Detailed calculations are prepared for all primary loaded members
     of the crane, such as:
     • Pedestal adaptor.
     • Swing Circle bearing.
     • Revolving Base structure.
     • Frame.
     • Boom.
     • Running ropes.
     • Boom foot pins and sheave pins, etc.
     • Hoist winches drums and shafts.




85
Nunce
        Deck operating manual

                          Deck cargo crane

     MEP's standard specifications and procedures are reviewed by the
     Shipyard.
     Bearings supporting rotation are sleeve or antifriction types.
     All antifriction bearings are selected in accordance with AFBMA or
     equivalent and have an L-10 life exceeding the equivalent of 5,000
     hours and are of suitable size for the loads and speeds specified.
     Slew bearing is selected in order to stand about 25.000 hours prior
     to any replacement.
     Gears are designed for sufficient strength and surface durability
     using service factors in accordance with AGMA or equivalent.
     All hoist gearing is enclosed and provided with positive means of
     lubrication.
     Adequate lubrication is provided for all moving contact points of
     the hoist and drives.
     Where lifetime lubricated bearings are used, means of external
     lubrication are not required.
     Stainless steel grease fittings are provided for all sheave pins and
     hinge pins.
     The selection of materials is suitable for the crane application,
     offering adequate corrosion protection for the proper function of
     the crane and its component parts.
     Crane is provided with self-maintenance devices for
     removing/installing sheaves, winches, drums and hydraulic motors.




86
Nunce
          Deck operating manual

                              Deck cargo crane

                                  GENERAL DATA

     PROJECT                                ACCOMMODATION BARGE

     CLIENT                                 COSCO SHIPYARD

     MACHINERY                              ONE PEDESTAL OFFSHORE CRANE

     MANUFACTURER                           MARINE EQUIPMENTS PELLEGRINI

     MANUFACTURER'S TYPE                    CHCD 25/32 EH
                                            ABS Certified and in COMPLIANCE
     DESIGN AND PROJECT                     WITH A.P.I. 2C (6th EDITION)


                       ENVIRONMENTAL CONDITIONS
      The pedestal offshore crane is suitable to withstand and correctly
      operate at following conditions:

                                      WIND DATA


     Wind speed m/sec.                      30 (steady state conditions) 40 (gust)
     The above reported values are defined
     at 45 m above Chart Datum
                                   AIR TEMPERATURE


     Minimum                                                  0 °C

     Maximum                                                 +35 °C
                                AIR RELATIVE HUMIDITY


     Minimum                                                 64%

     Maximum                                                 99%

87
Nunce
        Deck operating manual

                          Deck cargo crane

                          AREA CLASSIFICATION
     As per the available specifications it does not appear any
     mentioning to hazardous areas. For this reason the supplied crane
     is suitable to be installed in safe area.
                                   LOAD
     The supplied crane is designed to hoist the nominal SWL up to sea
     condition with SWH=2,5m.
     For higher SWH, the crane capacity is reduced in full accordance
     with API 2C.
     Maximum mounting misalignment of the crane pedestal from the
     vertical is 0,5°.


                  TRANSPORTATION OF PERSONNEL
     The transportation of personnel crane rated load in according with
     Standard API-2C as per par 4.1.2. is the least of the following:
     • Max 33% of the calculated SWL for non-personnel load ratting of
     the whip hoist.
     • Maximum load based on load line reeving and wire rope design
     factor per Section 7.2.4.3.
     • Maximum load based on load hoist line pull available,
     considering line reeving losses with MEP’s design reeving for a load
     at the boom head, calculated in accordance with paragraph 8.1.7
     of API 2C.
     MEP fulfil load tables, listing the net loads to be hoisted, hence,
     according to API standard, the weights of the crane components
     (such as tackle, weights, hooks, slings) are added thereto.




88
Nunce
          Deck operating manual

                                Deck cargo crane

                                   PERFORMANCES


     Full load Main Hoist                       25 ton at 0 - 20 m/min

     Empty hook                                 0 - 40 m/min

     Full load Whip Hoist                       8 ton at 60 m/min

     Empty hook Whip Hoist                      0 - 60 m/min

     Min. Boom Angle operating                  15°

     Stowage/inspection                         0°

     Slewing Range                              400° limited

     Slewing Speed                              0 – 0,8 rpm

     Max. Hook Travel Main Hoist                60m (4 rope falls)

     Max. Hook Travel Whip Hoist                 65m (single rope fall)
                                                 160kW based on one operation at full
     Main Driver Capacity                       load and speed (as per data table)

     Diameter of Pedestal Adaptor               2830 mm

     Height of Pedestal Adaptor                 1600 mm

     Electrical feeding from plant              440V-60Hz AC 3Ph

     Electrical feeding for aerial signalling   220V-60Hz- AC 1Ph


                                         DESIGN
     Life 20 Years
     Duty 8 Hours/Day continuous

89
Nunce
            Deck operating manual

                                     Deck cargo crane

     TECHNICAL DATA               CHCD 25/32 EH                NOTE
                                                             Please refer to annexed sketch n°
     Crane type                   Offshore Stiff Boom Crane HD1520CA
     Quantity                                              1

     Total lift weight main        25 ton at all radius up to Up to SWH=2,5m de-rating in
     winch (Maximum)              32m                          accordance with API 2C for higher SWH
                                   8 ton at all radius up to
                                  35,5m. Rated for man
      Total lifting weight for    riding (4 persons + basket =
     auxiliary winch              700kg)
      Installation area            Crane in safe area
      Main Hook speed (full
     load)                        0-20 m/min
      Main Hook speed (no load)   0-40 m/min
      Aux Hook speed              0-60 m/min
      Slewing speed               0-0,8 rpm
      Slewing angle               400° limited
                                                                Minimum working radius please check
     Max. working radius          32m/35,5m                    the annexed sketch
                                  About 60m for main hook
     Hook stroke                  and 65m for aux hook    TBC
                                 Nominal SWL up to
      Operative sea condition SWH=2,5m                         Cb in accordance with API 2C
      Design temperature
     (min/Max)                   0°C/+35°C
      Number of falls (main/aux) 4/1
      Design Certification/third
     party                       ABS                           Without Class Notation
                                 Integrated on the auxiliary   Performances and characteristics in
      Man riding winch           winch.                        accordance with ABS Rules
      Working hydraulic
     pressure                    160 -250 bar
      Available feeding from
     board                       440V 3Ph 60Hz                 TBC
                                                               Suitable for one manoeuvre at full load
     Electric motors total                                     and speed. Simultaneous manoeuvres
     output power S2-30min        160kW                        are possible at reduced speed
                                                               In accordance with API 2C for the
     List/trim                    Up to 5°/2°                  operative sea conditions




90
Nunce
     Deck operating manual

          Deck cargo crane manual




91
Nunce
     Deck operating manual

          Deck cargo crane manual




92
Nunce
     Deck operating manual

          Deck cargo crane manual




93
Nunce
     Deck operating manual

           Deck cargo crane manual

             Crane command cabin




94
Nunce
     Deck operating manual

          Deck cargo crane manual

            1) Cabin control console




95
Nunce
     Deck operating manual

          Deck cargo crane manual




96
Nunce
     Deck operating manual

          Deck cargo crane manual




97
Nunce
     Deck operating manual

          Deck cargo crane manual

            2) Proportional joysticks




98
Nunce
     Deck operating manual

          Deck cargo crane manual




99
Nunce
      Deck operating manual

           Deck cargo crane manual




100
Nunce
      Deck operating manual

           Deck cargo crane manual




101
Nunce
      Deck operating manual

       Emergency releasecrane manual GOPS
           Deck cargo of wire system




102
Nunce
      Deck operating manual

           Deck cargo crane manual




103
Nunce
      Deck operating manual

           Deck cargo crane manual




104
Nunce
      Deck operating manual

           Deck cargo crane manual




105
Nunce
      Deck operating manual

           Deck cargo crane manual




106
Nunce
      Deck operating manual

      Crane control system operator’s manual

               3) Crane control system
                     Chcd 25-32




107
Nunce
         Deck operating manual

          Crane control system operator’s manual

                       3) Crane control system
                             Chcd 25-32

      Feature overview
      1.1 - Real-time display
      All the monitored data are displayed on the instrument's screen,
      as well as the following:
      Actual load expressed graphically as a percentage of the maximum
      acceptable load
      Actual Boom Inclination and working radius
      Several possible alarm conditions (see “Alarming” below)




108
Nunce
         Deck operating manual

          Crane control system operator’s manual

      1.2 - Alarming
      Possible alarm conditions which may be displayed by means of a
      flashing red text (alarm) or blue text (warning) in the middle of the
      screen include:
      !!!EMERGENCY !!!
      This indicates that the emergency button has been pushed
      By pass Overload
      This one appears while the alarm by-pass switch is activated, to
      remind the operator that the instrument cannot signal some
      potentially harming conditions.
      By-pass Collision
      This one appears (where present) while the anti-collision by-pass
      switch is activated, to remind the operator that the instrument
      cannot signal some potentially harming conditions.
      GOPS
      This one appears when crane is in GOPS Working condition
      (current load > 120% than SWL).
      !!! GOPS: Turn the lever to ACTIVATE it!!! These BLUE words
      means that GOPS can be activated by turning the lever
      !!! GOPS ACTIVATED !!! These RED words means that GOPS has
      been activated




109
Nunce
          Deck operating manual

          Crane control system operator’s manual

      Alarms signaled by the instrument are:
      Overload pre-alarm
      This means that the current load, expressed as a percentage of the
      load limit, is greater than a configured threshold value (see the
      “Setup” section for details). This condition is signaled visually by a
      yellow area in the current load bar graph.
      Overload
      This means that the current load, expressed as a percentage of the
      load limit, is greater than a configured threshold value (see the
      “Setup” section for details). This condition is signaled visually by a
      red area in the current load bar graph.
      Communications fault
      A red, blinking circle indicates a wrong communication between
      screen and the CPU. This should never happen, as long as the
      instrument has not been damaged; if the indication appears during
      operation, please contact the manufacturer for assistance.
      NOTE: A green blinking circle appears in normal communication.
      Service messages
      Appears when machine needs service maintenance.
      Collision Information
      Screen displays possible actions for crane operator, in collision
      conditions (see the “Anticollision” section for details.)




110
Nunce
         Deck operating manual

          Crane control system operator’s manual

      1.3 - Data logging
      A list of the recorded data and their format, in the order in which
      they appear on each record, follows:
      •Current date and time, in the form yyyy-mm-dd hh.mm.ss
      •Actual load, expressed in kilograms
      •Load limit, expressed in kilograms
      •Actual load, expressed as a percentage of the load limit
      •Actual boom inclination expressed in degrees minutes
      •(degrees *10)
      •Actual jib aperture expressed in degrees minutes
      •Actual unthread length expressed in millimeters
      •Actual crane rotation expressed in degrees minutes
      •Work radius, expressed in millimeters for MAIN winch
      •Work radius, expressed in millimeters for AUX winch
      •Boom height expressed in millimeters
      •Sea state, as selected by the operator




111
Nunce
         Deck operating manual

          Crane control system operator’s manual

      •A boolean value (1 or 0) indicating whether Aux or Main winch is
      selected
      •A boolean value (1 or 0) indicating whether the crane is
      considered to be in boom rest position;
      •A boolean value (1 or 0) indicating whether personnel mode
      selection is active
      •A boolean value (1 or 0) indicating whether wave mode selection
      is active
      •A boolean value (1 or 0) indicating whether a gross overload
      condition exists
      •A boolean value (1 or 0) indicating whether a gross overload
      button was pushed but there is not a GOPS condition (load in not
      bigger than 150% than SWL)
      •A boolean value (1 or 0) indicating whether a By pass OVERLOAD
      button is active
      •A boolean value (1 or 0) indicating whether a By pass COLLISION
      button is active
      •A boolean value (1 or 0) indicating whether the EMERGENCY
      button is active 5
      •A boolean value (1 or 0) indicating whether a collision condition
      is active.
      •A boolean value (1 or 0) indicating whether maintenance is
      needed.
      •Raw boom inclinometer input value (for assistance and
      troubleshooting purposes)
      •Raw unthread sensor input value (for assistance and
      troubleshooting purposes)
      •Raw load cell input value (for assistance and troubleshooting
      purposes)
      •Raw jib inclinometer input value (for assistance and
      troubleshooting purposes)




112
Nunce
          Deck operating manual

        Main screen: During normal operation, the
         instrument screen appears as follows:




      2.1 - Load bar graph
      The colored bar shows the current load applied to the hoist, in terms of
      percentage of the acceptable load. The instruments computes the
      acceptable load in real time, based on the sea state and current luffing value.
      A yellow area in the bar indicates that the current load is greater than the
      pre-alarm threshold.
      A red area in the bar indicates that the current load is greater than the alarm
      threshold.
      2.2 - Current load
      To the right of the bar graph, the load currently applied to the hoist is shown,
      expressed in ton.
      2.3 - Load limit (SWL)
      The load limit (Safe Working Load), depending upon the sea state, selected
      hoist (when available) and working radius, is displayed immediately below
      the current load value.
      2.4 - Radius
      Working radius is expressed in meters.
      2.5 - Luffing
      The luffing value is expressed in degrees.
      2.6 - Communication icon
113   A green circle indicates a right communication. A red circle indicates a wrong
      communication
Nunce
         Deck operating manual

                           Palfinger crane

      REFERENCE:
      Manufacturer’s manual (PALFINGER)


                        GENERAL INFORMATION

      SCOPE OF WORK
      This Specification covers the minimum technical requirements for
      the design, materials, manufacture, inspection, testing and
      assembly of ONE pedestal crane Type A suitable to be installed
      the accommodation barge Nunce.




114

Mais conteúdo relacionado

Semelhante a Nunce deck operating manual project

Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Anatolijs Krjucenkovs
 
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]Gerald Patrick Soriano
 
Specification Sheet - 59m MPOSV (H1077)
Specification Sheet - 59m MPOSV (H1077)Specification Sheet - 59m MPOSV (H1077)
Specification Sheet - 59m MPOSV (H1077)Gerald Patrick Soriano
 
CSC Nelson AHTS ETV ERV
CSC Nelson AHTS ETV ERVCSC Nelson AHTS ETV ERV
CSC Nelson AHTS ETV ERVStoyan Dimov
 
Altus optimus-specification
Altus optimus-specificationAltus optimus-specification
Altus optimus-specificationpatel170591
 
135 nedship baia mare 2011 yacht for sale neff yacht sales
135 nedship baia mare 2011 yacht for sale   neff yacht sales135 nedship baia mare 2011 yacht for sale   neff yacht sales
135 nedship baia mare 2011 yacht for sale neff yacht salesNeff Yacht Sales
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformerKapil Singh
 
Sp1656 1324 kw uk perkins generator data sheet
Sp1656 1324 kw uk perkins generator data sheetSp1656 1324 kw uk perkins generator data sheet
Sp1656 1324 kw uk perkins generator data sheetSUNSHINE MACHINERY
 
Ed1 r4 product specification
Ed1 r4 product specificationEd1 r4 product specification
Ed1 r4 product specificationPrabhakar Tiwari
 
Seven borealis
Seven borealisSeven borealis
Seven borealisBarry Gray
 
Seven Borealis
Seven BorealisSeven Borealis
Seven BorealisBarry Gray
 

Semelhante a Nunce deck operating manual project (20)

Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014
 
MEO Guardian
MEO GuardianMEO Guardian
MEO Guardian
 
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
 
H1102 Technical Specification Summary
H1102 Technical Specification SummaryH1102 Technical Specification Summary
H1102 Technical Specification Summary
 
Specification Sheet - 59m MPOSV (H1077)
Specification Sheet - 59m MPOSV (H1077)Specification Sheet - 59m MPOSV (H1077)
Specification Sheet - 59m MPOSV (H1077)
 
CSC Nelson AHTS ETV ERV
CSC Nelson AHTS ETV ERVCSC Nelson AHTS ETV ERV
CSC Nelson AHTS ETV ERV
 
Altus optimus-specification
Altus optimus-specificationAltus optimus-specification
Altus optimus-specification
 
135 nedship baia mare 2011 yacht for sale neff yacht sales
135 nedship baia mare 2011 yacht for sale   neff yacht sales135 nedship baia mare 2011 yacht for sale   neff yacht sales
135 nedship baia mare 2011 yacht for sale neff yacht sales
 
emi/emc
emi/emcemi/emc
emi/emc
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
 
General Presentation Uf
General Presentation   UfGeneral Presentation   Uf
General Presentation Uf
 
Sp1656 1324 kw uk perkins generator data sheet
Sp1656 1324 kw uk perkins generator data sheetSp1656 1324 kw uk perkins generator data sheet
Sp1656 1324 kw uk perkins generator data sheet
 
Road Header and Bolter Miner
Road Header and Bolter MinerRoad Header and Bolter Miner
Road Header and Bolter Miner
 
Raptor AHTS
Raptor AHTSRaptor AHTS
Raptor AHTS
 
Sp1100 perkins
Sp1100 perkinsSp1100 perkins
Sp1100 perkins
 
Lone_Star
Lone_StarLone_Star
Lone_Star
 
Ed1 r4 product specification
Ed1 r4 product specificationEd1 r4 product specification
Ed1 r4 product specification
 
Surface miner
Surface minerSurface miner
Surface miner
 
Seven borealis
Seven borealisSeven borealis
Seven borealis
 
Seven Borealis
Seven BorealisSeven Borealis
Seven Borealis
 

Último

Abanoub Ghobrial, Planning Team Leader.pdf
Abanoub Ghobrial, Planning Team Leader.pdfAbanoub Ghobrial, Planning Team Leader.pdf
Abanoub Ghobrial, Planning Team Leader.pdfAbanoubGhobrial1
 
Transportation and Trade Part 5 (1) (1).pptx
Transportation and Trade Part 5 (1) (1).pptxTransportation and Trade Part 5 (1) (1).pptx
Transportation and Trade Part 5 (1) (1).pptxSheldon Byron
 
Complete Benefits of career counseling in India
Complete Benefits of career counseling in IndiaComplete Benefits of career counseling in India
Complete Benefits of career counseling in IndiaMere Mentor
 
Human Rights are notes and helping material
Human Rights are notes and helping materialHuman Rights are notes and helping material
Human Rights are notes and helping materialnadeemcollege26
 
Spanish Classes Online In India With Tutor At Affordable Price
Spanish Classes Online In India With Tutor At Affordable PriceSpanish Classes Online In India With Tutor At Affordable Price
Spanish Classes Online In India With Tutor At Affordable PriceFluent Fast Academy
 
Senior IT Professional with Master’s Degree with 21+ years of experience is...
Senior IT Professional with Master’s Degree with 21+ years of experience   is...Senior IT Professional with Master’s Degree with 21+ years of experience   is...
Senior IT Professional with Master’s Degree with 21+ years of experience is...Anas Acharath Parakat
 
加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作
加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作
加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作rpb5qxou
 
Chapter 4 - Promoting Inclusive Culture.ppt
Chapter 4 - Promoting   Inclusive Culture.pptChapter 4 - Promoting   Inclusive Culture.ppt
Chapter 4 - Promoting Inclusive Culture.pptmoytopo
 
Thomas Calculus 12th Edition Textbook and helping material
Thomas Calculus 12th Edition Textbook and helping materialThomas Calculus 12th Edition Textbook and helping material
Thomas Calculus 12th Edition Textbook and helping materialsafdarhussainbhutta4
 
What is the career path of a VFX artist?
What is the career path of a VFX artist?What is the career path of a VFX artist?
What is the career path of a VFX artist?santoshjadhav126
 
Abanoub Ghobrial, Planning Team Leader.pdf
Abanoub Ghobrial, Planning Team Leader.pdfAbanoub Ghobrial, Planning Team Leader.pdf
Abanoub Ghobrial, Planning Team Leader.pdfAbanoubGhobrial1
 
Soviet pilot Yuri Gagarin was the first person to ever orbit the Earth
Soviet pilot Yuri Gagarin was the first person to ever orbit the EarthSoviet pilot Yuri Gagarin was the first person to ever orbit the Earth
Soviet pilot Yuri Gagarin was the first person to ever orbit the EarthChristina Parmionova
 
Banged Dubai Call Girls O525547819 Call Girls Dubai
Banged Dubai Call Girls O525547819 Call Girls DubaiBanged Dubai Call Girls O525547819 Call Girls Dubai
Banged Dubai Call Girls O525547819 Call Girls Dubaikojalkojal131
 
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024Hector Del Castillo, CPM, CPMM
 
Network to Success - Using Social Media in Job Search
Network to Success - Using Social Media in Job SearchNetwork to Success - Using Social Media in Job Search
Network to Success - Using Social Media in Job SearchBruce Bennett
 
Crack JAG. Guidance program for entry to JAG Dept. & SSB interview
Crack JAG. Guidance program for entry to JAG Dept. & SSB interviewCrack JAG. Guidance program for entry to JAG Dept. & SSB interview
Crack JAG. Guidance program for entry to JAG Dept. & SSB interviewNilendra Kumar
 
401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx
401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx
401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptxwaghmare9860lavin
 
LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024Bruce Bennett
 
How to make career in advance 3d animation
How to make career in advance 3d animationHow to make career in advance 3d animation
How to make career in advance 3d animationsantoshjadhav126
 
Back on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental LeaveBack on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental LeaveMarharyta Nedzelska
 

Último (20)

Abanoub Ghobrial, Planning Team Leader.pdf
Abanoub Ghobrial, Planning Team Leader.pdfAbanoub Ghobrial, Planning Team Leader.pdf
Abanoub Ghobrial, Planning Team Leader.pdf
 
Transportation and Trade Part 5 (1) (1).pptx
Transportation and Trade Part 5 (1) (1).pptxTransportation and Trade Part 5 (1) (1).pptx
Transportation and Trade Part 5 (1) (1).pptx
 
Complete Benefits of career counseling in India
Complete Benefits of career counseling in IndiaComplete Benefits of career counseling in India
Complete Benefits of career counseling in India
 
Human Rights are notes and helping material
Human Rights are notes and helping materialHuman Rights are notes and helping material
Human Rights are notes and helping material
 
Spanish Classes Online In India With Tutor At Affordable Price
Spanish Classes Online In India With Tutor At Affordable PriceSpanish Classes Online In India With Tutor At Affordable Price
Spanish Classes Online In India With Tutor At Affordable Price
 
Senior IT Professional with Master’s Degree with 21+ years of experience is...
Senior IT Professional with Master’s Degree with 21+ years of experience   is...Senior IT Professional with Master’s Degree with 21+ years of experience   is...
Senior IT Professional with Master’s Degree with 21+ years of experience is...
 
加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作
加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作
加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作
 
Chapter 4 - Promoting Inclusive Culture.ppt
Chapter 4 - Promoting   Inclusive Culture.pptChapter 4 - Promoting   Inclusive Culture.ppt
Chapter 4 - Promoting Inclusive Culture.ppt
 
Thomas Calculus 12th Edition Textbook and helping material
Thomas Calculus 12th Edition Textbook and helping materialThomas Calculus 12th Edition Textbook and helping material
Thomas Calculus 12th Edition Textbook and helping material
 
What is the career path of a VFX artist?
What is the career path of a VFX artist?What is the career path of a VFX artist?
What is the career path of a VFX artist?
 
Abanoub Ghobrial, Planning Team Leader.pdf
Abanoub Ghobrial, Planning Team Leader.pdfAbanoub Ghobrial, Planning Team Leader.pdf
Abanoub Ghobrial, Planning Team Leader.pdf
 
Soviet pilot Yuri Gagarin was the first person to ever orbit the Earth
Soviet pilot Yuri Gagarin was the first person to ever orbit the EarthSoviet pilot Yuri Gagarin was the first person to ever orbit the Earth
Soviet pilot Yuri Gagarin was the first person to ever orbit the Earth
 
Banged Dubai Call Girls O525547819 Call Girls Dubai
Banged Dubai Call Girls O525547819 Call Girls DubaiBanged Dubai Call Girls O525547819 Call Girls Dubai
Banged Dubai Call Girls O525547819 Call Girls Dubai
 
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
 
Network to Success - Using Social Media in Job Search
Network to Success - Using Social Media in Job SearchNetwork to Success - Using Social Media in Job Search
Network to Success - Using Social Media in Job Search
 
Crack JAG. Guidance program for entry to JAG Dept. & SSB interview
Crack JAG. Guidance program for entry to JAG Dept. & SSB interviewCrack JAG. Guidance program for entry to JAG Dept. & SSB interview
Crack JAG. Guidance program for entry to JAG Dept. & SSB interview
 
401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx
401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx
401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx
 
LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024
 
How to make career in advance 3d animation
How to make career in advance 3d animationHow to make career in advance 3d animation
How to make career in advance 3d animation
 
Back on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental LeaveBack on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental Leave
 

Nunce deck operating manual project

  • 1. Nunce Deck operating manual Accommodation barge NUNCE 1
  • 2. Nunce Deck operating manual Deck operating manual 1. Principal particulars 1. Barge characteristics 2. General arrangement 2. Ballast system 1. Capacity plan 2. Ballast valve remote control system 3. Ballast level remote gauge system 4. Ballast arrangement and equipment 5. Ballast operations 3. Helicopter operations 1. Helideck 2. Helideck routine operations 3. Helicopter refueling 4. Bunkering management 1. Bunkering stations 2. Bunkering hoses and connections 3. Oil pollution prevention and SOPEP plan 4. Bunkering operations 5. Anchoring systems 1. Anchoring arrangement 2. Anchoring equipment description 3. Anchoring winches 4. Anchoring winch operating procedures 6. Lifting equipment 1. Deck cargo crane 2. Palfinger crane 3. Cargo lift 4. Medic crane 2
  • 3. Nunce Deck operating manual Principal particulars 3 3
  • 4. Nunce Deck operating manual Barge characteristics PRINCIPAL PARTICULARS Length Overall 122,00 m Breadth 42,00 m Depth Moulded 8.40 m Draft 5.00 m Built 2008 GRT/NRT 21.160 / 6349 T Class/Notation ABS/ABS + A1 Accom. / Work Barge E, M, AMCCU, CRC, UWILD Flag LIBERIA Port of registry Monrovia CARGO CAPACITIES Deadweight 5000 t Deck Strength 10 t/m2 Clear Deck Area 900 m² (hard wood cladding) Fuel Oil 2 x 1360 m3 Fresh Water 2 x 1500 m3 Ballast Water 6300 m3 Industrial Water equal to FW quantity minus 1000 m³ PROVISION STORES Cold rooms 1 x 50 m³ + 1 x 25 m³ Each @ -20°c Vegetable Room 1 x 50 m³ + 1 x 25 m³ Each @ + 5°c Dry Store 60 m2 Bottle store 30 m³ Dropping zone on deck Yes 2x 20 feet container dedicated area on deck (beside frigo rooms) PUMPS SURF refueling 6 m³/h Catamaran/Seacor Cheetah 15 m³/h Fuel Oil 2 x 50m³/hr. @ 35 m head Fresh Water 2 x Press set 40m³/hr. @ 40m head Ballast Water 2 x 200 m³/hr. @ 30m head Industrial Water 50 m³/h @ 40 m head Separators Yes (L.O & MGO) 4
  • 5. Nunce Deck operating manual Barge characteristics MACHINERY Main Generator 3 x 1260 kw @ 450V / 3 Phase / 60 Hz MAN 6 x 28 / 32 H Emergency Gen Set 1 x 592 kW @ 450V / 3 Phase / 60 Hz Air Compressors 3 x electric 10 bar HVAC Yes in Accomodations / Engines areas / Workshops Water Maker 2 x 140 ton/day Sewage Treatment 2 x 450 men minimum IMO/USCG Standard Oil Water Separator 15 PPm Yes PROTECTION / TREATMENT Hull ICCP (impressed current cathodic protection) Seawater seachests, filters & lines Anti-fouling system WORKSHOPS (on deck) Barge 85 m² 1 c/w lathe, pneumatic and mechanical tools, grinding machines, 1 x radial drill, hacksaw machine, 1 x Arc welding & 1 Portable Arc welding sets Electric workshop 45 m² Yes equipped for control and repairs Client workshop 80 m² 1 lathe machine (4 mt between center) mechanical tools, hacksaw machine, 1 x Arc welding & 1 Portable Arc welding sets Safety workshop 45 m² Elect & instrum 20 m² In engine room 5
  • 6. Nunce Deck operating manual Barge characteristics DECK EQUIPMENTS 8 Point Mooring 8 x single drum Electro hydraulic c/w tension sensor & length paid out indicators / 16 Fairleads x 360° - dubble sheaves Winches control Local or remote control from barge control room with CCTV Rated Pull 85t x 10m / min. @ 1st Layer (1st speed) 45t x 30m / min. @ 1st Layer (2nd speed) Brake Capacity 200 ton (Static) @ 1st Layer Anchor Wire 8 x 2000 m (L) x 76mm Diameter Anchors 8 x 12 ton Capstan (bridle winch) Yes Provision crane None Main crane Electric / Hydraulic Main Crane Hook 25 t x 32m Radius Whip Hoist 8 t x 32m Radius STORES Barge store 75 m³ & 75 m³ Forward & Aft Spare store 25 m³ & 30 m³ Forward & Aft Rope store 10 m³ & 10 m³ Forward & Aft General store 50 m³ Aft Engine spare parts lift (2 levels) Yes HELIDECK Suitable for S- 61 Refueling station Yes w/ 2 x 4000 lt 6
  • 7. Nunce Deck operating manual Barge characteristics ACCOMMODATION Cabin min. 11,8 m² floor area (incl. bathroom) Double Berth 178 x 2 berth TOTAL 356 Berth (expandable to 450) Facilities All rooms equipped with Radio, TV & internet connections Automatic telephone Every accommodation room, office, public space, engine area RADIO & NAVIGATION EQUIPMENT Radio control room Yes 20 m² H24 manned x 2men GMDSS Yes SSB Yes INMARSAT C + Telex / SSAS Yes INMARSAT F Yes Faxsimile receiver Yes VHF/DSC Radio Tel Yes Navtec Receiver Yes SART Yes EPIRB Yes Portable VHF Marine Radio (with Yes DSC) VHF Air Band Receiver Yes Beacon Yes Radar ARPA Yes AIS Yes Gyro compass Yes Echo Sounder No Meteo display station Yes GPS Yes Fog horn Yes Audio beam system (2 miles) Sound Powered Tel. Yes PA System Yes International call Yes 4 cabins 7
  • 8. Nunce Deck operating manual Barge characteristics FIRE FIGHTING & SURVIVAL EQUIPMENT Fire Pump 2 x 180 m³/ 120m head Fire Monitors 2 x Foam monitors (helideck) 2 x water monitors Emergency Fire Pump 1 x 75 m³/hr. @ 80 m head Life Raft 42 x 25 p Fast Rescue Boat 1 x 35 Kts - 3 men elect / hydraulic launching davit Fire Detection System in all enclosed Yes spaces. Gas Detection System in all enclosed Yes spaces Hi-Fog system Machinery store Rooms, generators rooms, utility rooms, winches room & Paint locker Hi- Fog system Yes in whole accommodation spaces GALLEY GALLEY 270 m² Services 450 people over 2 hours max Bakery 35 m² 2 x man @ 24h Mess room 500 m² 240 Services 450 people over 2 hours max seats MEDICAL MEDICAL total 108 m² Hospital 1 x 4 berth + examination room + transit (beside Helideck) OFFICES OFFICES 20 m² 2 desks 26 x Client & 8 x Barge Client Archives 40 m³ 2 Rooms Telecom eqpt room 10 m² Yes Conference Room 110 / 70 / 65 Client Meeting room / Barge meeting room m² / Training room Administration office 20 m² Yes w/ 2 desk 8
  • 9. Nunce Deck operating manual Barge characteristics ENTERTAINMENT TV Room 180 / 95 / All equipped w/ 110 cm Plasma screen & 20 60 m³ satellite channels + inner. Recreation Room 45 m² 1 x room Library Yes Internet room Yes Equipped w/ 12 PC Fitness room 60 m² Full equipped & Air cond. OTHER FACILITIES 2 x 140m2 Luggage Rooms + 2 x 140m2 Muster Rooms (convertible) 1 x 70 m² deck changing / toilet room 1 x 30 m² deck transit lounge 1 x 10 m² deck dirty coffee room 9
  • 10. Nunce Deck operating manual General arrangement plan 10
  • 11. Nunce Deck operating manual Ballast system 11
  • 12. Nunce Deck operating manual Ballast Tanks Inside a ballast tank (4ps) Suction and filling at the bottom of the 12 tank
  • 13. Nunce Deck operating manual Ballast valve remote control system 13
  • 14. Nunce Deck operating manual Ballast level remote gauge system Confer to “associated plans and drawings to Nunce deck operating manual folio” Ballast level remote gauge system Air pipe for remote gauging system inside ballast tanks 14
  • 15. Nunce Deck operating manual Ballast arrangement and equipment • Two main longitudinal symmetrical ballast lines of 7 side ballasts • There is no double bottom tank • Two ballast centrifugal pumps (300m3/h) taken suction from main sea water chest • Crossover line allows cross feeding from suctions valves • Crossover line allows cross feeding from a ballast line to the other • Pumps are used either for ballasting and deballasting • Emergency suctions from bilge system and flooding 15
  • 16. Nunce Deck operating manual Ballast system plan 16
  • 17. Nunce Deck operating manual Ballast operations General guidance A responsible officer must be always on duty and in charge of the follow up of the ballast condition at all time and report to the barge master when ballast operations are completed. For accurate measure of quantity of water in ballast, refer to the sounding table. Precautions to take prior filling or emptying of a ballast tank  Ballast operations will not jeopardize the stability and sea behavior of the barge.  There is no works in progress in relation with ballast system (inspection, maintenance…).  HPU for remote control valve is available and ready (working pressure at 150bar).  Ballast pumps (1 and/or 2) are available and ready and that starting will not overload the busbar.  Level gauges are readable (not inhibited or shut off). 17
  • 18. Nunce Deck operating manual Ballast filling procedure 1. Select the ballast to fill by operating the corresponding remote valves on the ballast synoptic. 2. Set the ballast pump remote control valves for ballasting. 3. Open manual suction valve corresponding to the ballast pump. 4. Close the manual overboard valve. 5. Start the ballast pump 6. Check for pressure gauge 7. Check for level gauge General guidance a. Operate the valves one by one on the synoptic to avoid big drop of pressure of the HPU b. Operate only the necessary hydraulic valves to reach the ballast tank c. Do not fill two or more tank at the same time on the same line d. When ballasting, make sure to avoid to overflow the tank, high level alarm are set to 90% of full capacity. 18
  • 19. Nunce Deck operating manual Ballast emptying procedure 1. Select the ballast to empty by operating the corresponding remote valves on the ballast synoptic. 2. Set the ballast pump remote control valves for emptying. 3. Open manual suction valve corresponding to the ballast pump. 4. Close the manual overboard valve. 5. Start the ballast pump 6. Check for pressure gauge 7. Check for level gauge General guidance a. Operate the valves one by one on the synoptic to avoid big drop of pressure of the HPU b. Operate only the necessary hydraulic valves to reach the ballast tank c. Do not empty two or more tank at the same time on the same line d. During ballast emptying, be careful to not loose suction from the pump while capacity get at very low level: check pressure gauge on pump. 19
  • 20. Nunce Deck operating manual Helicopter operations Aerospatiale Dolphin approaching NUNCE 20 NUNCE Helideck at night
  • 21. Nunce Deck operating manual Helideck The accommodation barge Nunce is fitted with an helideck on the upper end of D deck at the aft of the barge: The helideck structures were designed according to landing areas – Guidance on standards, CAP 437, Rev 5 Offshore Helicopter and reviewed for helicopter type Sikorsky S61N (MTOW of 9300 Kg) NUNCE Helideck 21
  • 22. Nunce Deck operating manual Helideck NUNCE Helideck Marking 22
  • 23. Nunce Deck operating manual Helicopter routine operations SCOPE: This procedure applies to all employees engaged in helideck operations on board Accommodation Barge NUNCE. PURPOSE: This procedure describes the roles and responsibilities of personnel involved, to ensure the safety and security of persons transferred by helicopter and the efficiency of the operations. FORMS: HLO helideck daily inspection REFERENCE: CAP 437 – Offshore Helicopter Landing Areas – Guidance on Standards 23 Dolphin landing on NUNCE
  • 24. Nunce Deck operating manual Responsibilities Barge Master: Check that HLO team carry out their job according to prevailing standards and site procedures. Have authority over the HLO team. Ensure that the validity of the certificates of the helideck personnel concerned. Ensure that the standards of certification, inspection, equipment, maintenance and any corrective action on the helideck and the refueling station. Ensure of the presence and correct operation of the means of telecommunication, weather stations and the movement measuring instruments of the floating support. Hold the site’s “helicopter” emergency procedures and coordinates any implementation. Safety officer: Ensure that all safety equipment related to the helideck are fully operational and correctly maintained. Ensure that HLO teams are fully aware and informed about their duties in an emergency situations such as crash on deck, ditching or medical evacuation. Is the intervention leader concerning all emergency situations may arise on board HLO: Ensure at all times the safe sequence of helicopter operations, while landing, taking off nor refueling. To ensure the safe embarkation and disembarkation of passengers The HLO has perfect knowledge of the standard CAP 437 ("Offshore Helicopter Landing Areas – Guidance on Standards") and shall have a current copy on site. Responsible for the safety aspect of the refueling operations HDA: Assisting HLO during helicopter operations One HAD must always act as fireman, fireman outfit worn, and be 24 at the foam monitor during all movement of helicopters.
  • 25. Nunce Deck operating manual Responsibilities Radio Operator: They monitor flight safety between the various land and offshore sites, in coordination with the operators of Echo Charlie and the Head of Helicopter Operations in Luanda and on the sites. They record the radio messages transmitted by the pilot on the helicopter operations log. They give the pilot any useful information concerning flight safety. Administrator: Summoning the passengers to the departure lounge, weighs them and records the weights on the manifest. searching baggage in the presence of the passengers to make sure that they do not transport any prohibited or dangerous objects. He weighs baggage and records on the passenger manifest. He shows the passengers the video of the safety instructions Site Coordinating Logistic Officer: He works in permanent liaison with the radio operator and the HLO teams of the installation and, as required, the radio operators of the other offshore sites at which the helicopter needs to reach. He prints the final manifest and gives it with 3 copies to the landing officer (HLO) He makes sure that the total weight of baggage and freight in the compartment remains within the limit allowed by the air operator and pilot. 25
  • 26. Nunce Deck operating manual Safety highlights The Client Logistic coordinator, via the helicopter Company will inform Nunce personnel of the helicopter arrival with sufficient notice to allow mobilization of the stand-by/work boat and helideck crew. During helicopter operations crane boom will be positioned so that there is no possibility of interference with the helicopter and the crane operator will not be in the crane cab. During landing or takeoff, the HLO remains visible at all times to the pilot by being necessary at the top of the access stairs. His presence shall only be allowed outside the helideck during landing & take-off, maintaining the greatest possible distance from the limits of the helicopter's landing gear contact surface. The HLO and the HDA must be equipped with lightweight fire- resistant suits and safety goggles. The HLO will also be equipped with hands-free VHF earphones enabling him to communicate with the pilot. NOTA 1 : the international (in English language) radio phraseology must be followed at all times to avoid any confusion or misunderstanding NOTA 2: the words “clear” or “clearance” must be avoided as only air traffic controllers (ATC licensee) are allowed to use these words. 26
  • 27. Nunce Deck operating manual Helicopter routine works sequence 30 min before landing Radio Operator Informs the landing officer (HLO) so that he may ensure safety on the helideck, and awaits confirmation. Telling HLO the ETA and the number of passengers and parcels to unload/load, and notifies any fuel requirements. Inform the ships operating in the transfer zone alongside barge. Administrator: He summons the passengers to the departure lounge by PA for a reminder of the safety instructions, weighs them and their baggage and records the weights on the passenger manifest He prints the final manifest and gives it with 3 copies to the landing officer (HLO) HLO Verify the Helideck is available and ready: • No obstruction, in 210 Obstacle Free Sector (OFS) up to a distance of 1000metres from the helideck. • Helideck area clear of any loose material. • Safety net tightness , hammock effect. • The net is stretched and the hooking points in place.. • No explosive atmosphere, no flammable liquids or gas • No hot air or hot gas above the helideck • No strong wind (> 45 knots) and no gust or eddy, such to enable free movements of crew, in safe conditions. • Availability of the safety equipments for firefighting and crash • The foam monitors are directed laterally and not facing the helicopter (in the event of unexpected release) and a portable CO2 extinguisher is available if a fire starts in the engine casing. • Good overall condition of the wind sock • Good lighting within the helideck zone, good lighting of masts, obstruction, and wind sock • Inform the radio operator of the helideck readiness 27
  • 28. Nunce Deck operating manual Helicopter routine works sequence 15 minutes before Landing Radio Operator Summons the technical team (HLO, HDA, firemen) onto the helideck. Summons the passengers onto the helideck or in front of the departure lounge depending on the site, and makes a roll call according to the manifest. Passengers visiting for the day, are generally exempted from the safety briefing, must join the group at this moment after returning their t-card. Any passenger not answering the call will be refused embarkation. HLO Inform to stop all cranes operations and set the jibs of cranes at the normal not working positions Verify firefighting equipment and the PPE worn by the helideck crew. Places HDA in position: one HDA at the foam monitor upwind. The second one will act as the first attack firefighter. Cancel the access to the helideck to people not being member of the HLO team. In case of refueling, verify the equipment are in good operational conditions and that documents are available. Confirm the stop of cranes operations and that the jibs of cranes are down. Verify the good working and functioning of the portable vhf by testing the transmission. Collect manifest from radio room. 28
  • 29. Nunce Deck operating manual Helicopter routine works sequence 5 minutes before Landing HLO Ensure that all passengers, baggage and freight is ready for departure and awaiting on the special dedicated area. Check that luggage and freight comply with the manifest. All luggage not declared or considered not complying with the manifest or for safety nor security reason will be refused. Just before Landing HLO Inform the helicopter that the helideck is available for landing and that fire fighting equipment is ready. Message is “NUNCE helideck available for landing”. Or “NUNCE green deck”. 29
  • 30. Nunce Deck operating manual Helicopter routine works sequence Disembarking and embarking passengers • Disembarking and embarking passengers may be carried out with the rotor turning or motor and blades stopped • In the case of a complete stop, it is important not to approach the helicopter before the rotor completely stops because the blades of some helicopters (especially with the S76), at low speed, may "drop" and pass at a height lower than the head of a man. • Under no circumstances may passengers go round the helicopter, whether by the front or the back. Only the HLO and the HDA are allowed to do it, by the front only, to collect or bring back baggage, and only when access to the compartment, stairs side, is impossible (see Annex 2: Circulation around Helicopter). • After landing, the pilot gives the HLO permission to approach with a thumb-up and by switching off his rotating navigation lights. 30
  • 31. Nunce Deck operating manual Helicopter routine works sequence The HLO then has to carry out the following actions • Advance to the helicopter by its side safety area according type of helicopter, see drawing in Annex 1 • Take receipt of the manifest of disembarking passengers from the pilot. • Check on the action of the HDA, who collects the baggage of the disembarking passengers and brings it close to the stairs. • During this time, the passengers wait in the helicopter. • Long items will be carried horizontally to prevent contact with rotor blades. • Open the doors descent stairs side, and this side only, for disembarking passengers, and leads them out of the helideck by the side of the helicopter facing these stairs. • Passengers descend with their life jackets on. • Check on the collecting of life jackets from disembarking passengers by the HDA outside the helideck and distribution of them to embarking passengers • If embarkation is done with the rotor turning, all passengers must put on their life jackets before going up on the helideck. • Check on loading of embarking passengers' baggage in the helicopter's baggage compartment by the HDA. • Guide embarking passengers to the doors of the helicopter, stairs side, (and this side only), and checks on the correct buckling of safety belts. • Close all helicopter doors. • Deliver to the pilot, four copies of the manifest of embarking passengers, freight and retains receipt of a signed • Ask the pilot for confirmation of the door closing lights, and returns to the station at the access to the helideck. • If the helicopter motor and blades are stopped, the HLO and HDAs have to lash the helicopter to the pilot’s recommendations 31
  • 32. Nunce Deck operating manual Helicopter routine works sequence Before helicopter take off HLO Verify with the pilot the locking of doors Push aside in safe area all people remaining on the helideck zone Verify no leak of jet fuel or oil, no obstruction in the take-off area Verify helideck is ready, and the wheels or skid is clear from the safety net Give to the helicopter pilot the manual signal “All is clear””, with pus turned up, and confirm by radio he may take-off. Once helicopter has departed HLO Inform the crane operator and the supply boat the end of helicopter operations The HLO team remains in place for 5 minutes after takeoff. Radio Operator Record all times Perform the radio watch 32
  • 33. Nunce Deck operating manual Helicopter routine works sequence Periodical Checks and Tests Each day and before any landing or take-off, the HLO shall perform a thorough examination of the helideck area and the safety equipment. He has to follow a check list to do this and will recordt any observations or remarks in the HLO workbook. Findings, if any, will have to be dealt with immediately. Filled checklist will be kept in dedicated file. 33
  • 34. Nunce Deck operating manual HLO daily checklist of helideck Items M Tu W Th F Sa Su Helideck Surface Colour condition - NonSlip characteristic – Drainage Helideck Marking Perimeter line – Aiming circle – Chevron Surface Net Condition – Tension – Tie down points Perimeter Safety Net Condition… Perimeter Lighting All working – Brightness – Condition of lens Flood Lighting All working – Effective Dazzle protection Fire Protection Foam Monitors: condition - Foam tank Full Dry Powder extinguishers: Condition – (2*50kg) CO2 extinguishers: Condition – (2*5kg) CO2 extinguihsers: Condition- (2*9kg) Hose reels Water Hydrants – Hoses - Nozzles Rescue Equipment Crash rescue box – Inventory (as per box checklist) SCABA: Condition – Nominal Pressure Protective Clothing Quantity - General Condition Additional Equipment Helicopter “do not land” flag available Alarm push buttons Sandbags – Tiedown ropes Radio Equipment Portable VHF w/Headset Weather Equipment Anemometer – AirTemp – Barometer – Windsock… Access Points 34 Hand rails – Safety Notices
  • 35. Nunce Deck operating manual Safe areas around helicopters Annex 1 35
  • 36. Nunce Deck operating manual Safe areas around helicopters Annex 1 36
  • 37. Nunce Deck operating manual Safe areas around helicopters Annex 1 37
  • 38. Nunce Deck operating manual Safe areas around helicopters Annex 1 38
  • 39. Nunce Deck operating manual Helicopter refueling Refueling station SCOPE: This procedure applies to Helideck affected on board the Accommodation Barge NUNCE. PURPOSE: This procedure provides guidelines to refuel the helicopters, describing checks and duties of the personnel involved for a safe operation. REFERENCES: CAP437 Manufacturer’s manual “WILMAX engineering 39
  • 40. Nunce Deck operating manual Responsibilities RESPONSIBILITY The HLO is in overall charge of all helideck refueling operations. PROCEDURE General Jet A1 is classified as IMDG class 3 (flammable liquids). Before arrival, the Pilot must inform the Radio of any need in refueling, stating the requested volume. The HLO positions himself so that he can see and be seen by the Pilot and the HDAs involved in this operation. Helicopter must shutdown for refueling and have passengers disembarked. Should occur any strong rain, thunderstorm in the vicinity, turning machine or source of sparks, refueling can’t be continued. Equipment and specific items Helicopter refueling station is on the D-deck Portside Aft Jet A1 fuel tanks and pumps are on Main deck Starboard side Forward. 40
  • 41. Nunce Deck operating manual Refueling operation sequence Initial State The initial state considered in this procedure start when helicopter is landed, rotor stopped. INITIAL STATE HELICOPTER LANDED – ROTOR STOPPED PASSENGERS DISEMBARKED – HELICOPTER CREW ON STATION Before refueling Connect the line between tank and pump HDA Check that there is no leak HDA Check the filter (air jet fuel) HLO Check the counter HLO Check the grounding cable HLO Check the Emergency stop HLO Perform a general check of the system by flushing HLO Check that the inlet of the pump corresponds to the selected HLO tank Drain tank, the filter of the pump and take a sample in a sampling HDA bottle Perform the water detection test HLO Drain the tank and the filter of the pump until there is no more HDA water Make labelling of sample with sampling date HDA 41
  • 42. Nunce Deck operating manual Refueling operation sequence Refueling Inform the Radio Room for hot works suspension HLO Check that all passengers have left the helicopter and stand in HLO safe area Reset the counter HLO Exhibit the fuel quantity control records to the Pilot HLO Take a sample from the refuelling nozzle. HLO Show the sample to the Pilot and perform the water detection HLO test in front of him. Make labelling of sample with sampling date and keep it until the HLO next day Ground the helicopter HLO Unwind the refuelling hose HLO Open the plug of the helicopter tank and insert the nozzle HDA Check that the firemen and HDA are ready to their station HLO Check the counter figure HLO Start the pump on Pilot request only and after both Pilot and HDA HLO agreed on the volume to be delivered Check the working order of the flicker light HDA Record the differential pressure during the transfer HDA Stop transferring on Pilot request, or when reaching the HDA agreed volume to deliver, or in case of nay trouble 42
  • 43. Nunce Deck operating manual Refueling operation sequence After refueling Remove the nozzle and its grounding cable. HDA Check that the plug of the tank is locked HLO Disconnect the grounding cable and show the free end to the HDA Pilot Carefully stow the equipment. HDA Record the delivered quantity as stated by the counter. HLO Take a sample from the refuelling nozzle and show it to the HLO Pilot. Make labelling of sample with sampling date and keep it. HLO Fill the Jet A1 Delivery Coupon and makes it signed by the Pilot. HLO Check that the helideck is free, stuff stowed and helideck team HLO away Inform the Pilot, inform the CCR for resuming hot works HLO 43
  • 44. Nunce Deck operating manual Refueling operation sequence Final Status •Helicopter on helideck, rotor stopped •Passenger disembarked, crew on board •Helicopter tanks refueled •Helideck available FINAL STATE HELICOPTER REFUELED 44
  • 45. Nunce Deck operating manual Bunkering management SCOPE: This procedure applies to Accommodation Barge NUNCE. PURPOSE: To ensure a safe and very low environmental impact transfer of hydrocarbons (mainly constituted by light MDO) between the barge and other vessels either receiving nor supplying. RESPONSIBILITIES: The chief engineer is responsible for all transfer of hydrocarbons on board the barge. The safety officer is in charge of the deck operations and the implementation of the safety measures during bunkering operations. The 2nd engineer is in charge of the availability and the preparation of the engine room for bunkering operations. He is in charge of the follow up of bunkering operations REFERENCES MARPOL 73/78 convention ISGOTT manual Environmental company policy 45
  • 46. Nunce Deck operating manual Bunkering stations 46
  • 47. Nunce Deck operating manual Bunkering hoses and connections Starboardside bunkering station Hose Type Coupling Number Max rate Use for Black/ brown 15m/3” TODO 2 50m3/h Supply’s DO marked type bunkering Black/brown 25m/2” Manual 1 6m3/h Surfers DO marked handle bunkering ZVA 25 Portside bunkering stations (mid and fwd) Hose Type Coupling Quantity Max rate Use for HD 25m/2” cam lock 1 15m3/h Cheetah DO 50L/brown bunkering marked Black/brown 25m/2” Manual 1 6m3/h Surfers DO marked handle bunkering ZVA 25 ToDo connection ToDo principle 47
  • 48. Nunce Deck operating manual Oil pollution prevention and SOPEP plan SCOPE: This procedure applies to all personnel on board the Accommodation Barge NUNCE and covers oil pollution prevention on board the Accommodation Barge. AIM: To give guidance in implementing Company guidelines on the subject of preventing contamination of the environment. Emergency Plan: Accommodation Barge NUNCE is in possession of a SOPEP (Ship Oil Pollution Emergency Plan) (MARPOL 73/78). This plan defines and describes actions required to address spills due to breach or loss of containment. This plan provides the following but non limitative actions: 1. Response designed to ensure that any on board spill is contained onboard and not discharged into the sea. 2. Control the spill and minimize hazard to human life and the environment by means of cleaning up, temporary containment and/or isolation. 3. Reporting procedures. 48
  • 49. Nunce Deck operating manual Bunkering operations Surfers (fast crew boats transferring personnel between the barge and the platforms within the field) are regularly refueling by the barge crew. Refueling surfer general and safety guidance 1. No smoking/no naked flames policy in force 2. Refueling is performed one vessel at a time 3. Check of equipment condition (fuel hose, pistol, coupling) have to be done each time before refueling. 4. Surfer pilot is in charge of follow up quantity delivered and must inform on time the pumpman for stopping the pump. Refueling sequence 1. Surfer pilot request for refueling 2. Surfer proceed to the boat landing 3. The deck hand in charge (pumpman) bring the fuel hose fitted with a gasoil pistol to the surfer crew 4. When the surfer is ready to receive fuel, the pumpman will start the pump and be on stand by until the completion of the refueling 5. When the surfer received the requested quantity, surfer pilot inform the pumpman to stop the pump 6. The pumpman pick up back the hose and confirm by reading the counter the quantity given to the surfer. GO pistol ZVA25 49
  • 50. Nunce Deck operating manual Bunkering operations Supply vessels bunkering general and safety guidance • Bunker management application plan in force including safety measures prior bunkering (see following check-list) • No smoking/no naked flames policy in force • Bunkering is performed one vessel at a time • Check of equipment condition (fuel hose, couplings, piping) and correct settings of valves have to be done each time before refueling. 50
  • 51. Nunce Deck operating manual Supply vessels bunkering Bunker requisition must be done at least 8h before . 1. Supply vessel request for approaching bunkering station. 2. Bunkering safety measures have to be implemented before the connection. 3. When connection is completed, exchange of safety check-lists is done to ensure each other is ready for the bunkering operation: barge safety officer and supply vessel captain have to fill and sign. 4. Bunker ticket has to be checked and signed by both chief engineers. 5. When confirmation is done on each side, pump is started at a slow rate to check tightness of connections and leaking if any: this is the integrity check. 6. Then a pump emergency stop is performed to ensure that it is working normally. 7. If all safety checks are performed without any fault, pump rate is increased until the maximum admissible rate by the installation. 8. One engineer is on stand-by at the manifold during the whole bunkering operation. 9. Soundings have to be regularly checked to avoid any overflow. 10. Safety officer will remain fully available and maintain radio watch. 11. If topping of tanks is necessary, pump rate will be decreased accordingly until the completion of tanks. 12. When transfer is completed, pump is stopped and bunker confirm receipt will send to the receiving installation. 13. In normal conditions there is no need to flush the line as the connection are ToDo type coupling and will remain fully tight when they are disconnected. 14. The hose is picked up back and secured to the barge. 51
  • 52. Nunce Deck operating manual Bunkering safety checklist 52
  • 53. Nunce Deck operating manual Bunkering safety checklist 53
  • 54. Nunce Deck operating manual Anchoring systems Sheave Mooring Anchor anchoring arrangement starboard aft station wire cables 5 and 6 wire cable 54
  • 55. Nunce Deck operating manual Anchoring arrangement 55
  • 56. Nunce Deck operating manual Anchor Winch Arrangement 56
  • 57. Nunce Deck operating manual Anchor winches REFERENCE: •Manufacturer’s manual NORCRANE Description The Nor Crane & Winch‘s Hydraulic Mooring Winch model type NCW MW-85-200-H is designed for safe and reliable personnel handling operation. This hydraulic mooring winch consists of a single hauling drum mounted on a high tensile steel main shaft, supported on the fabricated winch base-plate by heavy duty roller type bearings. The bearings are mounted in steel housings, fitted with external grease lubrication points, bolted to the winch base-plate. The drum is fitted with a spring loaded, hydraulic released band brake, giving a fail-safe to “ON” mode during operation. This brake is a wrap-up design consisting of two halves warp around the race of the drum flange. The brake would operate through a hydraulic cylinder and spring loaded system, through mechanical linkages to provide the required holding load. All brake straps are lined with a high grade non-asbestos marine lining that is bolted to position. A spanner is provided to manually override onto the cylinder in a case of emergency. Also a hydraulically operated ratchet assembly is provided for stopping the drum at full braking load in as standby of drum brake. The drum can engaged or disengaged by means of a hydraulically 57 operated dog clutch, which is installed at the intermediate shaft to allow the engagement of drum to drive unit.
  • 58. Nunce Deck operating manual Anchor winches A mechanical fresh water cooled disc tension drag brake is installed on another pinion shaft to ensure the drum is under controlled payout dynamically for operation of anchor deployment. Transmission would be from two low speed high torque medium pressure hydraulic motors. The motors would be positioned at one side of the winch, driving through a guarded doubled stage spur reduction gearing. An automatic spooling device is provided for the wire spool smoothly on drum. This device comprises a lead-screw and drive tongue, guide bar, side support frames, fabricated bushed carriage completed with vertical rollers, manually operated clutch and chain drive mechanism driver and driven sprockets, chain and fabricated steel guard. 58
  • 59. Nunce Deck operating manual Machinery data Subject Specifications Working Drum: Drum Capacity 2000m x Ø76mm S.W.R (11 Layers) 85Tonne x 0~10m/min (1st Speed) Duty Pull (1st layer) 42.5Tonne x 0~20m/min (2nd Speed) 56Tonne x 0~15m/min (1st Speed) Duty Pull (5th Layer) 28Tonne x 0~30m/min (2nd Speed) 38Tonne x 0~22.5m/min (1st Speed) Duty Pull (Top Layer) 19Tonne x 0~45m/min (2nd Speed) Brake Holding 200Tonne (Static @ 1st layer) Spring Loaded, Hydraulic Released Brake Assembly Fail-Safe Band Break Ratchet Holding 200Tonne (Static @ 1st layer) Ratchet Assembly Hydraulic Operated 0~16Tonne x 100m/min (1st Layer) Drag Brake Tension 0~10.5Tonne x 150m/min (5th Layer) Air Loaded, Spring Released, Fresh- Water Cooled Disc Tension Brake for Drag Brake Assembly Anchor Deployment Hydraulic Motor #1: Brand / Model SAI S7-4300-9-H-D250 Component bulletin, Chapter 3, Section 3,6,1 see manufacturer’s manual Hydraulic Motor #2: Brand / Model SAI S7-4300-9-H-D250-L Component bulletin, Chapter 3, Section 3,6,1 see manufacturer’s manual Control: • Local control box near the winch. • Remote control panel at barge control room. 59
  • 60. Nunce Deck operating manual Winch general overview Drum Capacity 2000m x Ø76mm S.W.R (11 Layers) 85Tonne x 0~10m/min (1st Speed) Duty Pull (1st layer) 42.5Tonne x 0~20m/min (2nd Speed) 56Tonne x 0~15m/min (1st Speed) Duty Pull (5th Layer) 28Tonne x 0~30m/min (2nd Speed) 38Tonne x 0~22.5m/min (1st Speed) Duty Pull (Top Layer) 19Tonne x 0~45m/min (2nd Speed) 60
  • 61. Nunce Deck operating manual Band brake Brake holding •200t (Static on 1st layer) Brake Assembly •Spring loaded, hydraulic released •Fail-Safe band break Band brake Fail-safe system 61
  • 62. Nunce Deck operating manual Hydraulic motors Fore detailed information, please refer to Winch manual, Component bulletin: Chapter 3, Section 3.6.1, creer hyperlien 62
  • 63. Nunce Deck operating manual Hydraulic jaw-clutch 63
  • 64. Nunce Deck operating manual Hydraulic activated ratchet Ratchet holding •200t (Static @ 1st layer) •Ratchet assembly •Hydraulic operated 64
  • 65. Nunce Deck operating manual Drag brake A mechanical fresh water cooled disc tension drag brake is installed on another pinion shaft to ensure the drum is under controlled payout dynamically for operation of anchor deployment. Drag Brake Tension 0~16Tonne x 100m/min (1st Layer) 0~10.5Tonne x 150m/min (5th Layer) Drag Brake Assembly Air Loaded, Spring Released, Fresh- Water Cooled Disc Tension Brake for Anchor Deployment 65
  • 66. Nunce Deck operating manual Spooling device An automatic spooling device is provided for the wire spool smoothly on drum. This device comprises a lead-screw and drive tongue, guide bar, side support frames, fabricated bushed carriage completed with vertical rollers, manually operated clutch and chain drive mechanism driver and driven sprockets, chain and fabricated steel guard. 66
  • 67. Nunce Deck operating manual Hydraulic power pack Description The Electro-Hydraulic Power Pack would comprise of 2 x 110kW + 1 x 7.5kW electric motor, 440V / 3pH / 60Hz supply, Class ‘F’ insulation, IP55, TEFC. The motor are flexibly coupled to the hydraulic pressure compensated pump and are mounted on a fabricated skid base plate all suitable for below deck mounting. All components are mounted on the power pack and internally piped to a bulkhead tray. 3 x 110kW softstarter & 1 x 7.5kW Direct-On-Line are supplied along with the power pack. 67
  • 68. Nunce Deck operating manual Wire passageway and directional pulley 68
  • 69. Nunce Deck operating manual Winches control station Barge control room 69
  • 70. Nunce Deck operating manual Remote control panel on barge control room 70
  • 71. Nunce Deck operating manual Remote control starting console 71
  • 72. Nunce Deck operating manual Hydraulic power pack remote control Top panel on remote control station 72
  • 73. Nunce Deck operating manual Winch remote control console Lower panel 73
  • 74. Nunce Deck operating manual Remote control panel features description Item Features Functions In the “PAY OUT” mode it controls the drum and allows the rope to Directional Control Winch 01. release, while in the “HEAVE” mode it controls the drum to coil the “PAY OUT” / “HEAVE” rope. It opens the drum brake and disengages the clutch from the drum so “EMERGENCY RELEASE” 04. that the drum is free to rotate. After the emergency release button is push button re-set, the brake remains closed. To engage the clutch to the drum, turn the selector to “IN” position. Clutch selector “IN” / 09. To disengage the clutch from the drum, turn the selector to “OUT” “OUT” position. “CLUTCH IN” indicating 10. It indicates the clutch is engaged to the upper or lower drum. light. “CLUTCH OUT” indicating 11. It indicates the clutch is disengaged to the drum. light Station selector “LC” / To allow control from either the remote control in the wheel house 12. “WH” or local control near the To set the drum to High speed, turn the selector to “HI”. To set the 14. Speed selector “HI / LO” drum to low speed, turn the selector to “LO”. Turning of the selector must be done only when the winch is not rotating /moving. A three positions brake control. When turn to “ON” mode, the brake is always closed. Turn to “AUTO” mode, and the brake band shall Brake selector “ON” / 15. open once the winch rotates, and it automatically closes when the “AUTO” / “OFF” winch stops. It works together with the main valve. When turn to “OFF” the brake band is open. This indicates the brake band is closed. The brake is holding the 16. Brake “ON” indicating light drum. Brake “OFF” indicating This indicates the brake band is open. The brake is not holding the 17. Light drum To engage the ratchet to hold the drum, turn the selector to “IN” position. The ratchet will hold the drum in conjunction with the Ratchet selector “IN / brake or when the brake slip. To disengage the ratchet from the OUT” drum, turn the selector to “OUT” position. < Warning: The ratchet to be used only when the brake slips. It must not be used 20. independently. Ratchet “OUT” indicating It indicates the ratchet is not fully engaged to the drum. light Ratchet “IN” indicating It indicates the ratchet is fully engaged to the drum. light An audio alarm that activates once the system has a fault. Check the 21. “BUZZER” actual fault with the indicating light. To check the bulb is working. Push the button and all the bulbs shall 22. “LAMP TEST” push button. be lighted, otherwise, bulb is faulty. “POWER FAILURE” 23. It indicates that the AC system power is not available. indication light “POWER ON” indication It indicates the system power is switched on, and ready for 24. light operation. 74
  • 75. Nunce Deck operating manual Winch local control console 75
  • 76. Nunce Deck operating manual Winch local control features Item Features Functions In the “PAY OUT” mode it controls the drum and allows the rope to Directional Control Winch 01. release, while in the “HEAVE” mode it controls the drum to coil the “PAY OUT” / “HEAVE” rope. 02. “MAIN PRESSURE” Display It indicates the main hydraulic system pressure in bar. 03. “PILOT PRESSURE” display It indicates the control hydraulic system pressure in bar. It opens the drum brake and disengages the clutch from the drum so “EMERGENCY RELEASE” 04. that the drum is free to rotate. After the emergency release button is push button re-set, the brake remains closed. “EMERGENCY STOP” push Push the button to stop the hydraulic pump station in the HPU. The 05. button for Hydraulic Power button must be reset once it is activated, otherwise, the pump Unit (HPU) station would not start. To set the drum to High speed, turn the selector to “HI”. To set the 06. Speed selector “HI / LO” drum to low speed, turn the selector to “LO”. Turning of the selector must be done only when the winch is not rotating /moving. To engage the clutch to the drum, turn the selector to “IN” position. Clutch selector “IN” / 07. To disengage the clutch from the drum, turn the selector to “OUT” “OUT” position. A three positions brake control. When turn to “ON” mode, the brake is always closed. Turn to “AUTO” mode, and the brake band shall Brake selector “ON” / 08. open once the winch rotates, and it automatically closes when the “AUTO” / “OFF” winch stops. It works together with the main valve. When turn to “OFF” the brake band is open. “STATION ON” Indicator It indicates the system power is switched on and ready for 09. Light operation. To engage the ratchet to hold the drum, turn the selector to “IN” position. The ratchet will hold the drum in conjunction with the Ratchet selector “IN / brake or when the brake slip. To disengage the ratchet from the 10. OUT” drum, turn the selector to “OUT” position. < Warning: The ratchet to be used only when the brake slips. It must not be used independently. Lock selector “WO” / For maintenance purpose. Switch to “MA” when doing maintenance 11. “MA” on the equipment & select to “WO” for normal operation. 76
  • 77. Nunce Deck operating manual Local control for main and pilot pumps See Procedure 04.19 77
  • 78. Nunce Deck operating manual Winches operating instructions Operation instructions 1. Start-up of power pack Prior to every start up of power pack, ensure the following checks: • Suction valves to the hydraulic pump are opened. • Check oil level in reservoir to be at least 3/4 full at level gauge. • There is incoming electrical supply to starter. • Cooling circuit is lined up and valves are open. • Press motor “START” button on the control to start the pump station 2. Heave / Payout of Wire Rope i) Clutch Engagement • Switch brake control to “ON” • Switch speed control to “ LOW” • Turn clutch control to “IN” and check whether the clutch “IN” indicating light is on. • When the clutch control light indicates out, then slowly turn the directional control in the “PAYOUT” position until the clutch control “IN” indicating light is on. Stop the control once the clutch is engaged. ii) Heave / Payout • Ensure brake selector is switched to “ AUTO”. • Turn to the required speed mode. • Turn the directional control to “HEAVE” or “PAYOUT” position. • Varies the speed by turning the direction control to the required direction. • Apply the band brake and disengage the clutch after every operation. 78
  • 79. Nunce Deck operating manual Dragging system for wire release Note concerning the dragging system for release wire for deployment of anchors 3 Drag Brake Application • This brake is used in the wire pull out during deployment of anchors. • Switch brake control to “ON”. • Switch speed control to “LOW”. • Turn clutch control to “OUT” and check whether the clutch “OUT” indicating light is lightened. • Whenever the clutch is lightened at “IN”, turn the control lever slightly in both directions to loosen the clutch. • Turn the drag brake to “ON” position for a constant brake application. 4. Shut-Down Operation • Band brake is applied. • Jaw clutch is disengaged from the drive mechanism. • Switch-off electrical starter at the power pack. • Do a visual inspection of the components associated with the equipment and check for any components that may be loose. Ensure cable/rope is properly secured. Any leaks within the hydraulic system must be rectified. • Complete the shut down operation then lubricate the exposed areas and greasing points where necessary. 79
  • 80. Nunce Deck operating manual Lifting equipment 1. Deck cargo crane 2. Palfinger crane 3. Cargo lift 4. Medic crane 80
  • 81. Nunce Deck operating manual Deck cargo crane REFERENCE: Manufacturer’s manual (PELLEGRINI) GENERAL INFORMATION SCOPE OF WORK This Specification covers the minimum technical requirements for the design, materials, manufacture, inspection, testing and assembly of ONE pedestal crane Type A suitable to be installed the accommodation barge Nunce. 81
  • 82. Nunce Deck operating manual Deck cargo crane Third Party and Certifying Authority is ABS. In the event of conflict between the above standards and the regulations of the Certifying Authority, the latter shall prevail. Marine Equipment Pellegrini certifies that the design and construction of the furnished crane are authenticated in accordance with API 2C Spec (without monogram). 82
  • 83. Nunce Deck operating manual Deck cargo crane CODES AND STANDARDS REFERENCES CODES The crane is designed and constructed tested and certified according to the latest edition of following: ORDER OF PREFERENCE Any Government Regulations or Construction Code, listed in the Project Specifications, in the Requisition or in the Purchase Order, have precedence except where this Specification is more stringent. specification for offshore cranes 6th edition, API Spec. 2C September 2004 API Spec. 9A specification for wire ropes recommended practice for planning, designing, fabrication and erection of structural steel for API RP 2A building lifting gear - instruction for calculation, CRN UNI 7670 manufacture and maintenance steel structure for calculation, manufacture and CRN B.U. N. 73 maintenance AWS D 1.1 structural welding code specification for welding earthmoving and AWS D 14.3 construction equipment ASTM or Equivalent materials IEC STANDARD ISO mechanical equipment standards 83
  • 84. Nunce Deck operating manual Deck cargo crane REQUIREMENTS GENERAL The design philosophy for the offshore pedestal crane is of stand- alone/independent operation. The crane is designed for the life, duty and service conditions as stated in the technical data and in the Shipyard’s Technical Specification. The electro-hydraulic pedestal crane is Type A as shown in figure 1 crane assembly of API Spec. 2C 6th Edition, September 2004. The crane is capable of lifting, swinging, luffing and lowering loads at capacities, radii and speeds in conditions as specified in the technical data, specifications and drawings. Safe Working Load (SWL) is the actual loads that can be lifted and are not include the hook, block and hoist rope weights. The crane is self-contained, electro-hydraulic driven, hydraulically operated, ram luffing, stiff boom box type, pedestal mounted and fully revolving; furnished with a pedestal adaptor, an enclosed cabin and all auxiliary equipment suitable for duties associated with an offshore vessel. The function of the crane includes but not necessarily be limited to the following: A) Offloading item such as wire line equipment and coil tubing package, the heaviest maintenance item materials (drilling tubular goods) from supply boat. B) Transportation of personnel to/ from a supply boat. C) Handling materials on platform deck. D) Removing heavy components with various characteristics for their installation on the deck at permanent locations (lay down areas). The crane is provided with lifting lugs on all major assemblies to facilitate erection or disassembly of the complete crane package. The crane is equipped with a main hoist and auxiliary hoist. The main hoist is capable of reeving various multi-falls of rope to achieve a range of lifts for heavy loads. The auxiliary hoist is of single fall, used for lifting light loads. The crane’s flood-lights and electric equipment installed on the boom are certified for safe area (unless otherwise specified). The crane is continuous rotary type, rotating in both direction through 400° limited. The crane's power is sufficient to ensure that the one movement under full load, full speed and under worst conditions. Simultaneous operation is possible at reduced speed. All areas of the crane are accessible for inspection, maintenance and repairs. No feature on the crane presents or creates a safety hazard to personnel. 84
  • 85. Nunce Deck operating manual Deck cargo crane DESIGN The crane is designed and constructed in accordance with API SPEC 2C, Specification for Offshore Cranes, 6th edition, September 2004. The crane is designed to provide the SWL capacities at the required load, radii and speeds. These SWL capacities are used to determine the Category 1 (static) and Category 2 (dynamic) design loads as defined in API SPEC 2C. For the purpose of evaluating the dynamic ratings for lifts from boats, off-lead and side-lead angles are used as stated in the technical data for the sea states indicated. Also the maximum operating wind speed is included in the evaluation of side forces. The out-of-service wind speed is considered with the boom in the horizontal position restrained in a rest. Detailed calculations are prepared for all primary loaded members of the crane, such as: • Pedestal adaptor. • Swing Circle bearing. • Revolving Base structure. • Frame. • Boom. • Running ropes. • Boom foot pins and sheave pins, etc. • Hoist winches drums and shafts. 85
  • 86. Nunce Deck operating manual Deck cargo crane MEP's standard specifications and procedures are reviewed by the Shipyard. Bearings supporting rotation are sleeve or antifriction types. All antifriction bearings are selected in accordance with AFBMA or equivalent and have an L-10 life exceeding the equivalent of 5,000 hours and are of suitable size for the loads and speeds specified. Slew bearing is selected in order to stand about 25.000 hours prior to any replacement. Gears are designed for sufficient strength and surface durability using service factors in accordance with AGMA or equivalent. All hoist gearing is enclosed and provided with positive means of lubrication. Adequate lubrication is provided for all moving contact points of the hoist and drives. Where lifetime lubricated bearings are used, means of external lubrication are not required. Stainless steel grease fittings are provided for all sheave pins and hinge pins. The selection of materials is suitable for the crane application, offering adequate corrosion protection for the proper function of the crane and its component parts. Crane is provided with self-maintenance devices for removing/installing sheaves, winches, drums and hydraulic motors. 86
  • 87. Nunce Deck operating manual Deck cargo crane GENERAL DATA PROJECT ACCOMMODATION BARGE CLIENT COSCO SHIPYARD MACHINERY ONE PEDESTAL OFFSHORE CRANE MANUFACTURER MARINE EQUIPMENTS PELLEGRINI MANUFACTURER'S TYPE CHCD 25/32 EH ABS Certified and in COMPLIANCE DESIGN AND PROJECT WITH A.P.I. 2C (6th EDITION) ENVIRONMENTAL CONDITIONS The pedestal offshore crane is suitable to withstand and correctly operate at following conditions: WIND DATA Wind speed m/sec. 30 (steady state conditions) 40 (gust) The above reported values are defined at 45 m above Chart Datum AIR TEMPERATURE Minimum 0 °C Maximum +35 °C AIR RELATIVE HUMIDITY Minimum 64% Maximum 99% 87
  • 88. Nunce Deck operating manual Deck cargo crane AREA CLASSIFICATION As per the available specifications it does not appear any mentioning to hazardous areas. For this reason the supplied crane is suitable to be installed in safe area. LOAD The supplied crane is designed to hoist the nominal SWL up to sea condition with SWH=2,5m. For higher SWH, the crane capacity is reduced in full accordance with API 2C. Maximum mounting misalignment of the crane pedestal from the vertical is 0,5°. TRANSPORTATION OF PERSONNEL The transportation of personnel crane rated load in according with Standard API-2C as per par 4.1.2. is the least of the following: • Max 33% of the calculated SWL for non-personnel load ratting of the whip hoist. • Maximum load based on load line reeving and wire rope design factor per Section 7.2.4.3. • Maximum load based on load hoist line pull available, considering line reeving losses with MEP’s design reeving for a load at the boom head, calculated in accordance with paragraph 8.1.7 of API 2C. MEP fulfil load tables, listing the net loads to be hoisted, hence, according to API standard, the weights of the crane components (such as tackle, weights, hooks, slings) are added thereto. 88
  • 89. Nunce Deck operating manual Deck cargo crane PERFORMANCES Full load Main Hoist 25 ton at 0 - 20 m/min Empty hook 0 - 40 m/min Full load Whip Hoist 8 ton at 60 m/min Empty hook Whip Hoist 0 - 60 m/min Min. Boom Angle operating 15° Stowage/inspection 0° Slewing Range 400° limited Slewing Speed 0 – 0,8 rpm Max. Hook Travel Main Hoist 60m (4 rope falls) Max. Hook Travel Whip Hoist 65m (single rope fall) 160kW based on one operation at full Main Driver Capacity load and speed (as per data table) Diameter of Pedestal Adaptor 2830 mm Height of Pedestal Adaptor 1600 mm Electrical feeding from plant 440V-60Hz AC 3Ph Electrical feeding for aerial signalling 220V-60Hz- AC 1Ph DESIGN Life 20 Years Duty 8 Hours/Day continuous 89
  • 90. Nunce Deck operating manual Deck cargo crane TECHNICAL DATA CHCD 25/32 EH NOTE Please refer to annexed sketch n° Crane type Offshore Stiff Boom Crane HD1520CA Quantity 1 Total lift weight main 25 ton at all radius up to Up to SWH=2,5m de-rating in winch (Maximum) 32m accordance with API 2C for higher SWH 8 ton at all radius up to 35,5m. Rated for man Total lifting weight for riding (4 persons + basket = auxiliary winch 700kg) Installation area Crane in safe area Main Hook speed (full load) 0-20 m/min Main Hook speed (no load) 0-40 m/min Aux Hook speed 0-60 m/min Slewing speed 0-0,8 rpm Slewing angle 400° limited Minimum working radius please check Max. working radius 32m/35,5m the annexed sketch About 60m for main hook Hook stroke and 65m for aux hook TBC Nominal SWL up to Operative sea condition SWH=2,5m Cb in accordance with API 2C Design temperature (min/Max) 0°C/+35°C Number of falls (main/aux) 4/1 Design Certification/third party ABS Without Class Notation Integrated on the auxiliary Performances and characteristics in Man riding winch winch. accordance with ABS Rules Working hydraulic pressure 160 -250 bar Available feeding from board 440V 3Ph 60Hz TBC Suitable for one manoeuvre at full load Electric motors total and speed. Simultaneous manoeuvres output power S2-30min 160kW are possible at reduced speed In accordance with API 2C for the List/trim Up to 5°/2° operative sea conditions 90
  • 91. Nunce Deck operating manual Deck cargo crane manual 91
  • 92. Nunce Deck operating manual Deck cargo crane manual 92
  • 93. Nunce Deck operating manual Deck cargo crane manual 93
  • 94. Nunce Deck operating manual Deck cargo crane manual Crane command cabin 94
  • 95. Nunce Deck operating manual Deck cargo crane manual 1) Cabin control console 95
  • 96. Nunce Deck operating manual Deck cargo crane manual 96
  • 97. Nunce Deck operating manual Deck cargo crane manual 97
  • 98. Nunce Deck operating manual Deck cargo crane manual 2) Proportional joysticks 98
  • 99. Nunce Deck operating manual Deck cargo crane manual 99
  • 100. Nunce Deck operating manual Deck cargo crane manual 100
  • 101. Nunce Deck operating manual Deck cargo crane manual 101
  • 102. Nunce Deck operating manual Emergency releasecrane manual GOPS Deck cargo of wire system 102
  • 103. Nunce Deck operating manual Deck cargo crane manual 103
  • 104. Nunce Deck operating manual Deck cargo crane manual 104
  • 105. Nunce Deck operating manual Deck cargo crane manual 105
  • 106. Nunce Deck operating manual Deck cargo crane manual 106
  • 107. Nunce Deck operating manual Crane control system operator’s manual 3) Crane control system Chcd 25-32 107
  • 108. Nunce Deck operating manual Crane control system operator’s manual 3) Crane control system Chcd 25-32 Feature overview 1.1 - Real-time display All the monitored data are displayed on the instrument's screen, as well as the following: Actual load expressed graphically as a percentage of the maximum acceptable load Actual Boom Inclination and working radius Several possible alarm conditions (see “Alarming” below) 108
  • 109. Nunce Deck operating manual Crane control system operator’s manual 1.2 - Alarming Possible alarm conditions which may be displayed by means of a flashing red text (alarm) or blue text (warning) in the middle of the screen include: !!!EMERGENCY !!! This indicates that the emergency button has been pushed By pass Overload This one appears while the alarm by-pass switch is activated, to remind the operator that the instrument cannot signal some potentially harming conditions. By-pass Collision This one appears (where present) while the anti-collision by-pass switch is activated, to remind the operator that the instrument cannot signal some potentially harming conditions. GOPS This one appears when crane is in GOPS Working condition (current load > 120% than SWL). !!! GOPS: Turn the lever to ACTIVATE it!!! These BLUE words means that GOPS can be activated by turning the lever !!! GOPS ACTIVATED !!! These RED words means that GOPS has been activated 109
  • 110. Nunce Deck operating manual Crane control system operator’s manual Alarms signaled by the instrument are: Overload pre-alarm This means that the current load, expressed as a percentage of the load limit, is greater than a configured threshold value (see the “Setup” section for details). This condition is signaled visually by a yellow area in the current load bar graph. Overload This means that the current load, expressed as a percentage of the load limit, is greater than a configured threshold value (see the “Setup” section for details). This condition is signaled visually by a red area in the current load bar graph. Communications fault A red, blinking circle indicates a wrong communication between screen and the CPU. This should never happen, as long as the instrument has not been damaged; if the indication appears during operation, please contact the manufacturer for assistance. NOTE: A green blinking circle appears in normal communication. Service messages Appears when machine needs service maintenance. Collision Information Screen displays possible actions for crane operator, in collision conditions (see the “Anticollision” section for details.) 110
  • 111. Nunce Deck operating manual Crane control system operator’s manual 1.3 - Data logging A list of the recorded data and their format, in the order in which they appear on each record, follows: •Current date and time, in the form yyyy-mm-dd hh.mm.ss •Actual load, expressed in kilograms •Load limit, expressed in kilograms •Actual load, expressed as a percentage of the load limit •Actual boom inclination expressed in degrees minutes •(degrees *10) •Actual jib aperture expressed in degrees minutes •Actual unthread length expressed in millimeters •Actual crane rotation expressed in degrees minutes •Work radius, expressed in millimeters for MAIN winch •Work radius, expressed in millimeters for AUX winch •Boom height expressed in millimeters •Sea state, as selected by the operator 111
  • 112. Nunce Deck operating manual Crane control system operator’s manual •A boolean value (1 or 0) indicating whether Aux or Main winch is selected •A boolean value (1 or 0) indicating whether the crane is considered to be in boom rest position; •A boolean value (1 or 0) indicating whether personnel mode selection is active •A boolean value (1 or 0) indicating whether wave mode selection is active •A boolean value (1 or 0) indicating whether a gross overload condition exists •A boolean value (1 or 0) indicating whether a gross overload button was pushed but there is not a GOPS condition (load in not bigger than 150% than SWL) •A boolean value (1 or 0) indicating whether a By pass OVERLOAD button is active •A boolean value (1 or 0) indicating whether a By pass COLLISION button is active •A boolean value (1 or 0) indicating whether the EMERGENCY button is active 5 •A boolean value (1 or 0) indicating whether a collision condition is active. •A boolean value (1 or 0) indicating whether maintenance is needed. •Raw boom inclinometer input value (for assistance and troubleshooting purposes) •Raw unthread sensor input value (for assistance and troubleshooting purposes) •Raw load cell input value (for assistance and troubleshooting purposes) •Raw jib inclinometer input value (for assistance and troubleshooting purposes) 112
  • 113. Nunce Deck operating manual Main screen: During normal operation, the instrument screen appears as follows: 2.1 - Load bar graph The colored bar shows the current load applied to the hoist, in terms of percentage of the acceptable load. The instruments computes the acceptable load in real time, based on the sea state and current luffing value. A yellow area in the bar indicates that the current load is greater than the pre-alarm threshold. A red area in the bar indicates that the current load is greater than the alarm threshold. 2.2 - Current load To the right of the bar graph, the load currently applied to the hoist is shown, expressed in ton. 2.3 - Load limit (SWL) The load limit (Safe Working Load), depending upon the sea state, selected hoist (when available) and working radius, is displayed immediately below the current load value. 2.4 - Radius Working radius is expressed in meters. 2.5 - Luffing The luffing value is expressed in degrees. 2.6 - Communication icon 113 A green circle indicates a right communication. A red circle indicates a wrong communication
  • 114. Nunce Deck operating manual Palfinger crane REFERENCE: Manufacturer’s manual (PALFINGER) GENERAL INFORMATION SCOPE OF WORK This Specification covers the minimum technical requirements for the design, materials, manufacture, inspection, testing and assembly of ONE pedestal crane Type A suitable to be installed the accommodation barge Nunce. 114