PHOLAPATRA INTHALOHIT
Address: 10 Soi Streevidhaya 2(sub-14) Chockchai 4(sub-72) Road,
Ladprao, Bangkok 10230
Contact No.: Home Tel: +662 931 1655, Mobile: +668 3003 4777
E-mail Address: pholapatra@gmail.com and pholapatra.inthalohit@tractebel.engie.com
OBJECTIVE
PROJECT MANAGER or SITE MANAGER
CONSTRUCTION MANAGER or LEAD DISCIPLINE ENGINEER
“Infrastructures, Oil & Gas and Power Sector with more than 20 years of
practice”
CAREER SUMMARY
Over 20 years of experience in positions with national and international companies specifically related to oil & gas plants,
power plants and mega projects of infrastructures which include; Lead Civil Engineer at GUT Power Plant Project, Project/Asst.
Project manager at various PTT’s projects, Project Engineer at GASGO’s project in Abu Dhabi UAE, Senior Civil Engineer at Dubai
Metro in Dubai UAE, Tendering Engineer at VSL in Thailand’s mega projects and QA/QC Engineer at Second Stage Expressway,
etc. Skilled in all aspect of civil engineering on project management, international high standard site supervision, budgetary
management and cost control, estimating, recruiting and purchasing of vender, equipment and materials, and co-ordination with
technical of engineering staff. Communication skill of speaking and writing in Thai and English.
AREAS OF EXPERTISE
♦ Project Tendering, Budgeting and Cost Control ♦ Project Scheduling & Tracking
♦ Construction Progress and Productivity ♦ Contract Administration & Change
Management
♦ Construction Procurement and Purchasing ♦ Supplier and Vendor Outsourcing
♦ Project Instruction Manual ♦ Construction Procedure and Method
Statement
♦ Technical & Engineering Scheme ♦ Quality Assurance & Control and HSE Plan
♦ Project Evaluation
VARIOUS RESPONSIBILITES
Construction management role (I)
• Schedule the project in logical steps and budget time required to meet deadlines.
• Determine labor requirements and dispatch workers to construction sites.
• Oversee construction works of projects in accordance with contract specifications, client’s instructions and work
procedures.
• Control project’s cost, time, scope and quality.
• Monitors master program, tracks critical paths and milestone for identifying them to contractor.
• Monitor all productivity related activities of contractors’ staff, labor and plant on site.
• Handle all changes as instructed by the owner and coordinates with concerned parties for required implementation.
• Monitor project resources and highlights deficiencies.
• Reports to the Head of Department of any changes which may have time and cost implications on the project.
• Monitor work is carried out in accordance with contract documents and highlight any problems to the concerned parties.
• Ensure minutes of meetings are taken down for follow-up actions.
• Follow-up of material submission, approval and procurement schedules.
• Direct Quantity Surveyors and prepare monthly reports.
• Approves controls and monitors safety plans.
• Conduct on-going review of contract requirements as new instructions or documents are received from Client and
identifies appropriate staff to carry out detailed reviews.
• Liaise with sub-consultants, if any, to ensure all progressive works are well coordinated.
• Liaison with sub-contractor for special work (Erection work, Heavy lifting).
• Ensure appropriate documents distribution among site team and follow-up for the required actions by each site staff.
• Upgrade the site team skills and prepare them for higher levels of responsibilities.
• Ensure acceptable performance of site team and report to the head of department.
Technical of engineering role (II)
• Monitor and direct the quality assurance and quality control for work to be carried out as per project’s contract quality
requirement.
• Provide technical support including method statement for construction and maintenance of all facilities to ensure the
safety, reliability and integrity of all civil works and structures.
• Prepare appropriate inspection and testing procedures for inclusion in work method statement.
• Ensure agreed inspection and testing procedures, the project quality plan and project quality control plan are satisfactory
carried out.
• Prepare all work plans for repairing works (FRP Strengthening). This would require getting drawings from the system and
or customers, vendors, researching acceptable work methods and procedures and testing procedures.
• Conduct technical studies for civil structures which are dilapidated or have deteriorated in order to develop
recommendations for corrective action.
• Ensure deliveries to site are as per schedule of all drawings, procedures and manuals “Approved for Construction” and
Project Equipment in full co-operation with all discipline leaders, specialists, construction and company staff.
Site supervision role (III)
• Review all incoming inspections to be proper statement, including any testing documents making sure the information he
is receiving from the shop floor is signed off and correct.
• Interface and coordinate with clients for production and QC matters and coordinate with third party inspection agencies for
all related inspection activities.
• Undertake QC functions in the workplace for daily QC activities.
• Ensure all specified standards are available for reference and their requirements observed.
• Conduct inspection of raw materials, bought out items and review of Material Test Certificates (MTC) and the specification
requirements.
• Inspect the incoming materials from suppliers and main store.
• Supervise staff for reporting, recording and inspection activities.
Proposals Feasibility, Procurement & Quotation (IV)
• Prepare contracts and negotiate revisions, changes and additions to contractual agreements with consultants, clients,
suppliers and subcontractors.
• Interpret and explain plans and contract terms to administrative staff, workers, and clients, representing the owner or
developer.
• Conduct site surveys, evaluate existing structures and prepare scope of work for submission to contract department to
invite contract bids, review all contract bids received for capital/operational for civil maintenance jobs and evaluate these
bids based on criterion points covering the scope of work.
• Completing Tenders and Quotations within the due time.
• Review all reports in order to be sure they are complete with all forms and attachments before submitting to the
commercial team for customer transmittal, also reviewing all folders to ensure document integrity before submitting to
finance.
• Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as
work procedures, complaints, and construction problems.
• Coordinate with all parties (Client VSL Design Department, VSL Technical Center) to define preliminary design concept.
• Follow up tendered project and advance payment.
• Visit customer and organize event quarterly to keep relationship with customer.
• Forecast and plan to reach sales budget quarterly.
PROFESSIONAL EXPERIENCE
 Tractebel Engineering GDF SUEZ
: Sep 14, 2015 – Present
Site Manager, Renewable Energy Section
Project: 1) Chaiyaphum Wind Farm Project (Owner: EGCO PCL)
Value: 167 Million USD
The Chaiyaphum Wind Farm is a 90 MW wind power plant under development by the Chaiyaphum Wind Farm
Company Limited (CWF) located at Sub-Yai District Chaiyaphum Province. The project sponsors are The Electricity
Generating Public Company Limited (EGCO), Pro Ventum International GmbH and other affiliated companies. The CWF
project will be implemented under a 5-years automatically renewable power purchase agreement with EGAT as the Small
Power Producer (SPP). The wind farm is composed of 32 wind turbines (generated of 2.5 MW per WTG) and will be
supplied under one full EPC contract.
Job description:
• Organize and supervise team (Civil, WTG Erection and E&IC inspector) to provide site inspections on behalf of
client regarding QA/QC plan and method statement provided by EPC consortium.
• Organize regular site meetings and general coordination with the client and the EPC consortium to cover all key
organization, staffing, quality assurance, design & engineering and construction control issues.
• Review the construction method statements and other project control document including Project Quality Control
Plan and Inspection and Test Plan.
• Oversee and ensure that the EPC consortium provides an appropriate project master schedule, structural design,
site execution plan, quality assurance & control and other relevant necessary mitigation measure.
• Supervise team to participate in the site inspections on construction, erection and commissioning phases
regarding the following activities;
− Civil Construction of WTG foundation pad & pedestal, sub-station & switchyard, road work & site
drainage, hardstand & crane pad, underground cables and utilities.
− WTG Erection with the installation sequences of tower section, nacelle, generator and rotor.
− E & IC installation and site test.
− WTG and BOP Pre-commissioning/commissioning carried out after the MCC final walk-down,
verification and developing of punch list.
− AC Withstanding under PEA and EGAT inspection prior to receiving the grid power.
− Power Synchronizing from WTG to grid.
− Power Quality and Reliability test.
• Supervise team to ensure conformity of site works in accordance with the approved design.
• Supervise team to issue document and report any non-conformity.
• Supervise team to participate in all field and lab testing for Civil & Erection and E & IC.
• Supervise team to monitor and instruct EPC consortium to carry out the material and equipment storage to be
done in accordance with the material and equipment storage procedure.
• Ensure the condition for the Mechanical Completion Certificate of the site works to be satisfied in accordance with
the contract requirement.
• Supervise team to establish and develop the registration of master punch list and maintain registering punched
items to be resolved in due time according to EPC Contract requirement.
• Verify and confirm that the payment milestone declared by EPC consortium complied of quality and quantity in
accordance with the milestone achievement procedure.
• Supervise team to review the daily site log and weekly & monthly report made by EPC consortium.
• Issue weekly & monthly MOM based on site inspections and consortium’s progress reports.
• Review and verify the construction milestone achievement submitted by EPC consortium, and confirm for further
approval in order to release the milestone payment certificate respected to EPC contract.
• Attend on a weekly and monthly basis, a project progress meeting.
• Provide support documents and information to TE Bangkok office to incorporate in monthly progress report.
• Monitor the project consortium planning and interfacing activities to determine and limit the impact of any
schedule deviation.
• Ensure compliance of the consortium’s activities with the quality and quantity requirement (including deadline)
under their respective contract.
 Power Engineer Asia Ltd. (former name; Burns and Roe Asia, Ltd.)
: Sep 5, 2012 – Aug 31, 2015
Lead Site Civil and Structural Engineer
Project: Gulf U-Thai (GUT) Power Plant
Value: 1.3 Billion USD
Gulf U-Thai Power Plant is an Independent Power Producer (IPP) of 1,600 MW (megawatt) gas turbine combined
cycle (GTCC) power generation plant (two blocks of a 800MW power generation unit and it is currently constructed by
Mitsubishi Heavy Industries, Ltd (MHI). The GUT power plant will have dual fuel specifications enabling both natural gas
and diesel oil combustion, and will consist mainly of four M701F4 gas turbines, two steam turbines and six generators.
Job description:
1. Monitor EPC Construction Contract Work for:
• Compliance with Contract Documents.
• Compliance with procedures and method statements.
• Work progress against the Project Master Schedule.
• Contractor’s staffing plans for acceptable use of personnel.
• Material and equipment receipt inspections.
• Conformance to the Contractor’s QA/QC programs.
• Contractor performance with new employee indoctrination programs. Observe that all
employees receive training.
2. Review site generated information, including:
• Detailed drawings, documentation, method statement and procedures.
• EHS Plan and Procedures.
3. Monthly, provide two-month look-ahead projections for office supplies.
4. Record and log all site correspondence, incoming and outgoing.
5. Record all site drawing and document submittals in the Contractor Drawing Management System
(“CDMS”).
6. Coordinate reviews of root cause analyses and remedial plans.
7. Review Contractor’s Construction Contract Monthly Progress Reports and PMS updates.
8. Issue non-conformance notices (“NCN”) for work not conforming to the Supply or Construction Contract
according to GUT-SP-001 and review Contractor’s replies and accept or reject the Contractor’s
resolutions, as applicable.
9. Issue requests for information and technical queries (“RITQ”) for lacking, incomplete or ambiguous
information in the project drawings and documents according to GUT-SP-002. Review Contractor’s
replies and accept or reject the Contractor’s responses, as applicable.
10. Record all Design and Field Change Notices (“DCN” and “FCN”) and attach a copy to the drawings and
documents in the working print file.
 Kharafi National L.L.C
: Jan 5, 2011 – Feb 1, 2012, Abu Dhabi U.A.E
Project Engineer (Senior Technical Engineer, Civil Works (Phase I))
Project: Habshan 5 Process Plant (Oil & Gas)
Value: 8 Billion USD
Habshan 5 process plant is a sulfur granulation plant, locates at Habshan province Abu Dhabi U.A.E, capacitates
receiving, processing and granulating capacity of 11,000 tons/day of sulfur from the Habshan gas plants, and includes
also “storage of liquid sulfur and granulated sulfur, blocking, rail car loading and generation of required utilities.
These projects had employed a workforce of around 20,000 at the peak of construction activities, of which around
15,000 were in Habshan and 5,000 were stationed in other line of entire project. The front end engineering design (FEED)
for the project was completed in mid-2010 and will be commissioning by end of the year 2014.
Job description:
1. Managed and direct a team of 4 site engineer and 6 supervisors with around 600 skilled workers,
successfully completing the project on time and under budget.
2. Controlled sub-contractors for pre-cast concrete pits and manholes.
3. Managed all schedules for civil work to be without any delay.
4. Prepared technical queries for all civil works to technical division.
5. Directed issuing safety plans and submitted them to GASGO via main contractor (Technimont).
6. Maintained the quality of work to ensure strict adherence to GASGO Regulation.
Scope of works: Civil works include 40,000 m
3
from 180,000 m
3
of total concrete and 6,500 ton from 28,000 ton of
total reinforcing steel of following concrete structures;
• Equipment Foundations, Pipe-rack Foundations, AOC Pits, Sump Pits and Manholes
• Electrical Dummy Trenches, Electrical Buried Trenches, Piping Trenches and instrument Trenches
• Earth Works and Concrete Paving
 IETL Co., Ltd.
: Nov 1, 2008 – Dec 2010, Bangkok Thailand
Assistant Project Manager
Project:
1) PPCL BPA Project, PTT Phenol
Value: 10 million USD
PPCL BPA is Bisphenol-A (BPA) plant with a capacity of 150,000 tons per year from PTT Phenol Company
Limited. This BPA plant based on Mitsubishi Chemical process technology is a down-stream project of PPCL Phenol
Plant. When the BPA Plant is brought on-line, PPCL has put in place of one of the largest Phenol & BPA Complex in Asia.
Bisphenol-A is used for epoxy resin and main raw material for Polycarbonate (PC) resins, which is used for compact discs
(CDs), automotive parts and transparent sheets for roofing applications.
Job description:
1. Managed and directed a team of 2 site engineers, 2 office engineers and 4 supervisors with around 400
skilled workers and other sub-contractors.
2. Managed all schedules for civil work to be without any delay.
3. Managed preparing budget of project to implement the cost center.
4. Controlled cost of construction to be according to cost center and budget.
5. Managed issuing complete shop drawings in accordance with PPT Phenol drawings.
Scope of work: Civil works include Central Control Building, Main BPA Sub-station, BPA Warehouse and following
items;
• AOC Pits, Sump Pits and Value Pits
• Electrical Dummy Trenches
• Earth Works, Concrete and asphalt Paving
2) Renovation of 10 BKK Intersection Flyovers
Value: 20.31 million USD
The Renovation of 10 BKK Intersection Flyovers was the first big project of maintenance to ten flyovers which are
located in the most traffic area in Bangkok. The key concept to which challenges BMA (Bangkok Metropolitan Authority) is
to carry out the parallel works along three bridges to be on schedule without any delay due to avoid blocking traffic.
Job description:
1 Managed and directed a team of 3 site engineers, 2 office engineers and 4 supervisors with around 500
skilled workers and other sub-contractors.
2 Cooperated with BMA and RTP (Royal Thai Police) regarding to plan for Traffic Diversion.
3 Managed all schedules for execution of project to be without any delay.
4 Controlled cost of construction to be according to cost center and budget.
5 Managed issuing complete shop drawings in accordance with BMA Regulation.
Scope of work: Renovation work for 10 bridges include: Ratchayotin Flyover, Kaset Flyover, Din-daeng Flyover,
Pong-pet Flyover, Rama IV Flyover, Klongton Flyover, Tha-pla Flyover, Bangplat Flyover, Wongsawang Flyover,
Prachanukul Flyover with following items;
• Provide criteria design, modified design, technical and engineering
• Replacing of pre-cast concrete planks, pot bearings, bearing pads and handrail
• Strengthening of concrete planks, steel girders and steel columns
• Removing and repaving
• Replaced Flowable Fill Concrete to base-course layer and re-constructed the transition and approach
slabs
• Removing existing color and re-painting works
 Obayashi Corporation (Dubai Rapid Link Consortium)
: Sep30, 2007 - Sep 30, 2008, Dubai U.A.E
Senior Civil Engineer, Sub Structure, Green line, North1 Section
Project: Dubai Metro Project, Dubai, U.A.E
Value : 7.5 Billion USD
The Dubai Metro is a “Mega driverless, fully automated metro rail network in the United Arab
Emirates”, city of Dubai began with two lines, The Red Line and Green Line are operational, with three further lines are
planned. These first two lines run underground in the city centre and on elevated viaducts with 50 of elevated and
underground stations.
Job description:
1. Managed and direct a team of 4 site engineers, 4 supervisors with around 400 skilled workers and 2
local sub-contractors.
2. Produced method statement and shop drawings of piling and pier works to support sub-contractors.
3. Prepared action plan for road closure downtown due to road diversion.
4. Prepared Bar Bending Schedule (BBS) in accordance with BS Code and proceeded it to steel factory.
5. Prepared three weeks ahead schedule for forecasting of construction material consumption.
6. Ordered and follow up construction materials concerns to assigned works.
Scope of work: Road & Utilities Diversion, Utilities Verification, Piling Works, Ramp and Pier Works include: Columns,
Pier Heads, Bearing Plinths.
 VSL (Thailand) Co.,Ltd.
: Apr 2006- June 2007, Bangkok Thailand
Tendering Engineer, working as Asst. Tendering Manager
(Post-tensioning work, Heavy lifting, Special project)
Job description: Carried out entire tasks of tendering stage to be awarded on major projects such as Suvarnabhumi
Airport, Airport Rail Link Project, SOBRR, Roofing Truss lifting at Central World Plaza, etc.
 Pylon Co.,Ltd.
: Nov 2002-Apr 2006, Bangkok Thailand
Project manager
Project: 1) The Third State Expressway System (S1), 1.72 Million USD
2) BTS (Extension), 1.09 Million USD
3) MWA (SAMLAE), 1.0 Million USD
4) Bangkuntian, Suksawat Fly Over, 1.0 Million USD
Job description: Managed and directed piling work and diaphragm wall.
 Thai Master Builders Co.,Ltd. (degussa. Construction Chemicals)
: Sep 2001-Sep 2002, Bangkok Thailand
Technical Engineer – Proposals & Feasibility
Job description: as per item IV
 Sakol Equipment Co., Ltd.
: April 2000- August 2000, Hua Hin Prachuap khiri karn
Project Engineer
Project: Hyatt Regency Hotel Project
Value: 1.56 million USD
Scope of work: Concrete structural works: 5 Nos. of large swimming pool: 5,000 m3 (Curve designed), Waste water
treatment reinforced concrete tank sizes 15 X 30 X 2.5m. , 5 Nos. of Surge tanks, 5 Nos. of Pump Rooms and 4-Storeies
building (Staff dormitory)
 Joint Venture BBCT
: August 1997- August 1999, Bangkok Thailand
Construction Engineer
Project: Second Stage Expressway System Project (Sector D)
Value: 234.38 million USD
Job description: as per item III
 Kohsang Sahapun Co.,Ltd.
: July 1996 - June 1997, Bangkok Thailand
Site Engineer
Project: Laksi Underpass Project
Value : 23.44 million USD
 Power P (Public) Ltd.
: August 1994 - June 1996, Bangkok Thailand
Site Engineer
Project: 1) 50 years Chalermprabaramee Building
2) Hope Well Project, Donmuang City (Building & Depot), Aue Chu Leange Building
EDUCATION BACKGROUND
KHONKAEN UNIVERSITY
Bachelor Degree of Engineering (Civil Engineering)
TRAINING EXPERIENCE
• Sep 3- October 3, 200: Concrete technology and construction chemical (structural repair system)
Engineering Institute of Thailand.
• June 1 - October 31, 1994: Training of Construction Engineering, Krung Thep Anothai Co.,Ltd.
• March 20 - May 31, 1993: Training of Highway Engineering, the department of Highways.
SPECIAL SKILLS
Language: Good command of written and spoken English
Computer Programming: Microsoft Office & Microsoft Project
REFERENCES
References will further be furnished on request.

Mais conteúdo relacionado

Mais procurados (20)

CV
CVCV
CV
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
Giridhar
GiridharGiridhar
Giridhar
 
Hariprasad K V R
Hariprasad K V RHariprasad K V R
Hariprasad K V R
 
Waji Ul Hassan_original
Waji Ul Hassan_originalWaji Ul Hassan_original
Waji Ul Hassan_original
 
MUHAMMAD ZEESHAN
MUHAMMAD ZEESHANMUHAMMAD ZEESHAN
MUHAMMAD ZEESHAN
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
 
Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Resume
ResumeResume
Resume
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
 
Bilal updated cv
Bilal updated cvBilal updated cv
Bilal updated cv
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain Project
 

Destaque (11)

Cv of shamim weca
Cv of shamim wecaCv of shamim weca
Cv of shamim weca
 
2015 03-17 cv-stefan-grabe_en_e-signed
2015 03-17 cv-stefan-grabe_en_e-signed2015 03-17 cv-stefan-grabe_en_e-signed
2015 03-17 cv-stefan-grabe_en_e-signed
 
Expect.cv.Gary comprehensive
Expect.cv.Gary comprehensiveExpect.cv.Gary comprehensive
Expect.cv.Gary comprehensive
 
BNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC InspectorBNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC Inspector
 
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
 
Resume 30 may12
Resume 30 may12Resume 30 may12
Resume 30 may12
 
Tamil_Updated_Resume
Tamil_Updated_ResumeTamil_Updated_Resume
Tamil_Updated_Resume
 
Cv senior qc manager mk-bencharif - english
Cv senior qc manager  mk-bencharif - englishCv senior qc manager  mk-bencharif - english
Cv senior qc manager mk-bencharif - english
 
Chetana Charoenbibhop CV July 2015
Chetana Charoenbibhop CV July 2015Chetana Charoenbibhop CV July 2015
Chetana Charoenbibhop CV July 2015
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Curriculum vitae kamonrat edit
Curriculum vitae kamonrat editCurriculum vitae kamonrat edit
Curriculum vitae kamonrat edit
 

Semelhante a CV Pholapatra Latest Rev 05

Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerSidharth Sunny
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015Teddy Fernando
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)Sunkara Gsk
 
Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementEdwinJacob5
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Elsahen
 

Semelhante a CV Pholapatra Latest Rev 05 (20)

Amir QC
Amir QCAmir QC
Amir QC
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
Qc
QcQc
Qc
 
Naim CV
Naim CVNaim CV
Naim CV
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
 
Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract management
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
C V
C VC V
C V
 
Raguram palnichamy jun 2019
Raguram palnichamy jun 2019Raguram palnichamy jun 2019
Raguram palnichamy jun 2019
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
SANPPT
SANPPTSANPPT
SANPPT
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
Engr. Bode CV corrted-Road
Engr. Bode CV corrted-RoadEngr. Bode CV corrted-Road
Engr. Bode CV corrted-Road
 

CV Pholapatra Latest Rev 05

  • 1. PHOLAPATRA INTHALOHIT Address: 10 Soi Streevidhaya 2(sub-14) Chockchai 4(sub-72) Road, Ladprao, Bangkok 10230 Contact No.: Home Tel: +662 931 1655, Mobile: +668 3003 4777 E-mail Address: pholapatra@gmail.com and pholapatra.inthalohit@tractebel.engie.com OBJECTIVE PROJECT MANAGER or SITE MANAGER CONSTRUCTION MANAGER or LEAD DISCIPLINE ENGINEER “Infrastructures, Oil & Gas and Power Sector with more than 20 years of practice” CAREER SUMMARY Over 20 years of experience in positions with national and international companies specifically related to oil & gas plants, power plants and mega projects of infrastructures which include; Lead Civil Engineer at GUT Power Plant Project, Project/Asst. Project manager at various PTT’s projects, Project Engineer at GASGO’s project in Abu Dhabi UAE, Senior Civil Engineer at Dubai Metro in Dubai UAE, Tendering Engineer at VSL in Thailand’s mega projects and QA/QC Engineer at Second Stage Expressway, etc. Skilled in all aspect of civil engineering on project management, international high standard site supervision, budgetary management and cost control, estimating, recruiting and purchasing of vender, equipment and materials, and co-ordination with technical of engineering staff. Communication skill of speaking and writing in Thai and English. AREAS OF EXPERTISE
  • 2. ♦ Project Tendering, Budgeting and Cost Control ♦ Project Scheduling & Tracking ♦ Construction Progress and Productivity ♦ Contract Administration & Change Management ♦ Construction Procurement and Purchasing ♦ Supplier and Vendor Outsourcing ♦ Project Instruction Manual ♦ Construction Procedure and Method Statement ♦ Technical & Engineering Scheme ♦ Quality Assurance & Control and HSE Plan ♦ Project Evaluation VARIOUS RESPONSIBILITES Construction management role (I) • Schedule the project in logical steps and budget time required to meet deadlines. • Determine labor requirements and dispatch workers to construction sites. • Oversee construction works of projects in accordance with contract specifications, client’s instructions and work procedures. • Control project’s cost, time, scope and quality. • Monitors master program, tracks critical paths and milestone for identifying them to contractor. • Monitor all productivity related activities of contractors’ staff, labor and plant on site. • Handle all changes as instructed by the owner and coordinates with concerned parties for required implementation. • Monitor project resources and highlights deficiencies. • Reports to the Head of Department of any changes which may have time and cost implications on the project. • Monitor work is carried out in accordance with contract documents and highlight any problems to the concerned parties. • Ensure minutes of meetings are taken down for follow-up actions. • Follow-up of material submission, approval and procurement schedules. • Direct Quantity Surveyors and prepare monthly reports. • Approves controls and monitors safety plans. • Conduct on-going review of contract requirements as new instructions or documents are received from Client and identifies appropriate staff to carry out detailed reviews. • Liaise with sub-consultants, if any, to ensure all progressive works are well coordinated. • Liaison with sub-contractor for special work (Erection work, Heavy lifting). • Ensure appropriate documents distribution among site team and follow-up for the required actions by each site staff. • Upgrade the site team skills and prepare them for higher levels of responsibilities. • Ensure acceptable performance of site team and report to the head of department. Technical of engineering role (II)
  • 3. • Monitor and direct the quality assurance and quality control for work to be carried out as per project’s contract quality requirement. • Provide technical support including method statement for construction and maintenance of all facilities to ensure the safety, reliability and integrity of all civil works and structures. • Prepare appropriate inspection and testing procedures for inclusion in work method statement. • Ensure agreed inspection and testing procedures, the project quality plan and project quality control plan are satisfactory carried out. • Prepare all work plans for repairing works (FRP Strengthening). This would require getting drawings from the system and or customers, vendors, researching acceptable work methods and procedures and testing procedures. • Conduct technical studies for civil structures which are dilapidated or have deteriorated in order to develop recommendations for corrective action. • Ensure deliveries to site are as per schedule of all drawings, procedures and manuals “Approved for Construction” and Project Equipment in full co-operation with all discipline leaders, specialists, construction and company staff. Site supervision role (III) • Review all incoming inspections to be proper statement, including any testing documents making sure the information he is receiving from the shop floor is signed off and correct. • Interface and coordinate with clients for production and QC matters and coordinate with third party inspection agencies for all related inspection activities. • Undertake QC functions in the workplace for daily QC activities. • Ensure all specified standards are available for reference and their requirements observed. • Conduct inspection of raw materials, bought out items and review of Material Test Certificates (MTC) and the specification requirements. • Inspect the incoming materials from suppliers and main store. • Supervise staff for reporting, recording and inspection activities. Proposals Feasibility, Procurement & Quotation (IV) • Prepare contracts and negotiate revisions, changes and additions to contractual agreements with consultants, clients, suppliers and subcontractors. • Interpret and explain plans and contract terms to administrative staff, workers, and clients, representing the owner or developer. • Conduct site surveys, evaluate existing structures and prepare scope of work for submission to contract department to invite contract bids, review all contract bids received for capital/operational for civil maintenance jobs and evaluate these bids based on criterion points covering the scope of work. • Completing Tenders and Quotations within the due time. • Review all reports in order to be sure they are complete with all forms and attachments before submitting to the commercial team for customer transmittal, also reviewing all folders to ensure document integrity before submitting to finance. • Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems. • Coordinate with all parties (Client VSL Design Department, VSL Technical Center) to define preliminary design concept.
  • 4. • Follow up tendered project and advance payment. • Visit customer and organize event quarterly to keep relationship with customer. • Forecast and plan to reach sales budget quarterly. PROFESSIONAL EXPERIENCE  Tractebel Engineering GDF SUEZ : Sep 14, 2015 – Present Site Manager, Renewable Energy Section Project: 1) Chaiyaphum Wind Farm Project (Owner: EGCO PCL) Value: 167 Million USD The Chaiyaphum Wind Farm is a 90 MW wind power plant under development by the Chaiyaphum Wind Farm Company Limited (CWF) located at Sub-Yai District Chaiyaphum Province. The project sponsors are The Electricity Generating Public Company Limited (EGCO), Pro Ventum International GmbH and other affiliated companies. The CWF project will be implemented under a 5-years automatically renewable power purchase agreement with EGAT as the Small Power Producer (SPP). The wind farm is composed of 32 wind turbines (generated of 2.5 MW per WTG) and will be supplied under one full EPC contract. Job description: • Organize and supervise team (Civil, WTG Erection and E&IC inspector) to provide site inspections on behalf of client regarding QA/QC plan and method statement provided by EPC consortium. • Organize regular site meetings and general coordination with the client and the EPC consortium to cover all key organization, staffing, quality assurance, design & engineering and construction control issues. • Review the construction method statements and other project control document including Project Quality Control Plan and Inspection and Test Plan. • Oversee and ensure that the EPC consortium provides an appropriate project master schedule, structural design, site execution plan, quality assurance & control and other relevant necessary mitigation measure. • Supervise team to participate in the site inspections on construction, erection and commissioning phases regarding the following activities; − Civil Construction of WTG foundation pad & pedestal, sub-station & switchyard, road work & site drainage, hardstand & crane pad, underground cables and utilities. − WTG Erection with the installation sequences of tower section, nacelle, generator and rotor. − E & IC installation and site test.
  • 5. − WTG and BOP Pre-commissioning/commissioning carried out after the MCC final walk-down, verification and developing of punch list. − AC Withstanding under PEA and EGAT inspection prior to receiving the grid power. − Power Synchronizing from WTG to grid. − Power Quality and Reliability test. • Supervise team to ensure conformity of site works in accordance with the approved design. • Supervise team to issue document and report any non-conformity. • Supervise team to participate in all field and lab testing for Civil & Erection and E & IC. • Supervise team to monitor and instruct EPC consortium to carry out the material and equipment storage to be done in accordance with the material and equipment storage procedure. • Ensure the condition for the Mechanical Completion Certificate of the site works to be satisfied in accordance with the contract requirement. • Supervise team to establish and develop the registration of master punch list and maintain registering punched items to be resolved in due time according to EPC Contract requirement. • Verify and confirm that the payment milestone declared by EPC consortium complied of quality and quantity in accordance with the milestone achievement procedure. • Supervise team to review the daily site log and weekly & monthly report made by EPC consortium. • Issue weekly & monthly MOM based on site inspections and consortium’s progress reports. • Review and verify the construction milestone achievement submitted by EPC consortium, and confirm for further approval in order to release the milestone payment certificate respected to EPC contract. • Attend on a weekly and monthly basis, a project progress meeting. • Provide support documents and information to TE Bangkok office to incorporate in monthly progress report. • Monitor the project consortium planning and interfacing activities to determine and limit the impact of any schedule deviation. • Ensure compliance of the consortium’s activities with the quality and quantity requirement (including deadline) under their respective contract.  Power Engineer Asia Ltd. (former name; Burns and Roe Asia, Ltd.) : Sep 5, 2012 – Aug 31, 2015
  • 6. Lead Site Civil and Structural Engineer Project: Gulf U-Thai (GUT) Power Plant Value: 1.3 Billion USD Gulf U-Thai Power Plant is an Independent Power Producer (IPP) of 1,600 MW (megawatt) gas turbine combined cycle (GTCC) power generation plant (two blocks of a 800MW power generation unit and it is currently constructed by Mitsubishi Heavy Industries, Ltd (MHI). The GUT power plant will have dual fuel specifications enabling both natural gas and diesel oil combustion, and will consist mainly of four M701F4 gas turbines, two steam turbines and six generators. Job description: 1. Monitor EPC Construction Contract Work for: • Compliance with Contract Documents. • Compliance with procedures and method statements. • Work progress against the Project Master Schedule. • Contractor’s staffing plans for acceptable use of personnel. • Material and equipment receipt inspections. • Conformance to the Contractor’s QA/QC programs. • Contractor performance with new employee indoctrination programs. Observe that all employees receive training. 2. Review site generated information, including: • Detailed drawings, documentation, method statement and procedures. • EHS Plan and Procedures. 3. Monthly, provide two-month look-ahead projections for office supplies. 4. Record and log all site correspondence, incoming and outgoing. 5. Record all site drawing and document submittals in the Contractor Drawing Management System (“CDMS”). 6. Coordinate reviews of root cause analyses and remedial plans. 7. Review Contractor’s Construction Contract Monthly Progress Reports and PMS updates. 8. Issue non-conformance notices (“NCN”) for work not conforming to the Supply or Construction Contract according to GUT-SP-001 and review Contractor’s replies and accept or reject the Contractor’s resolutions, as applicable. 9. Issue requests for information and technical queries (“RITQ”) for lacking, incomplete or ambiguous information in the project drawings and documents according to GUT-SP-002. Review Contractor’s replies and accept or reject the Contractor’s responses, as applicable. 10. Record all Design and Field Change Notices (“DCN” and “FCN”) and attach a copy to the drawings and documents in the working print file.  Kharafi National L.L.C : Jan 5, 2011 – Feb 1, 2012, Abu Dhabi U.A.E Project Engineer (Senior Technical Engineer, Civil Works (Phase I)) Project: Habshan 5 Process Plant (Oil & Gas) Value: 8 Billion USD
  • 7. Habshan 5 process plant is a sulfur granulation plant, locates at Habshan province Abu Dhabi U.A.E, capacitates receiving, processing and granulating capacity of 11,000 tons/day of sulfur from the Habshan gas plants, and includes also “storage of liquid sulfur and granulated sulfur, blocking, rail car loading and generation of required utilities. These projects had employed a workforce of around 20,000 at the peak of construction activities, of which around 15,000 were in Habshan and 5,000 were stationed in other line of entire project. The front end engineering design (FEED) for the project was completed in mid-2010 and will be commissioning by end of the year 2014. Job description: 1. Managed and direct a team of 4 site engineer and 6 supervisors with around 600 skilled workers, successfully completing the project on time and under budget. 2. Controlled sub-contractors for pre-cast concrete pits and manholes. 3. Managed all schedules for civil work to be without any delay. 4. Prepared technical queries for all civil works to technical division. 5. Directed issuing safety plans and submitted them to GASGO via main contractor (Technimont). 6. Maintained the quality of work to ensure strict adherence to GASGO Regulation. Scope of works: Civil works include 40,000 m 3 from 180,000 m 3 of total concrete and 6,500 ton from 28,000 ton of total reinforcing steel of following concrete structures; • Equipment Foundations, Pipe-rack Foundations, AOC Pits, Sump Pits and Manholes • Electrical Dummy Trenches, Electrical Buried Trenches, Piping Trenches and instrument Trenches • Earth Works and Concrete Paving  IETL Co., Ltd. : Nov 1, 2008 – Dec 2010, Bangkok Thailand Assistant Project Manager Project: 1) PPCL BPA Project, PTT Phenol Value: 10 million USD PPCL BPA is Bisphenol-A (BPA) plant with a capacity of 150,000 tons per year from PTT Phenol Company Limited. This BPA plant based on Mitsubishi Chemical process technology is a down-stream project of PPCL Phenol Plant. When the BPA Plant is brought on-line, PPCL has put in place of one of the largest Phenol & BPA Complex in Asia. Bisphenol-A is used for epoxy resin and main raw material for Polycarbonate (PC) resins, which is used for compact discs (CDs), automotive parts and transparent sheets for roofing applications. Job description: 1. Managed and directed a team of 2 site engineers, 2 office engineers and 4 supervisors with around 400 skilled workers and other sub-contractors. 2. Managed all schedules for civil work to be without any delay. 3. Managed preparing budget of project to implement the cost center.
  • 8. 4. Controlled cost of construction to be according to cost center and budget. 5. Managed issuing complete shop drawings in accordance with PPT Phenol drawings. Scope of work: Civil works include Central Control Building, Main BPA Sub-station, BPA Warehouse and following items; • AOC Pits, Sump Pits and Value Pits • Electrical Dummy Trenches • Earth Works, Concrete and asphalt Paving 2) Renovation of 10 BKK Intersection Flyovers Value: 20.31 million USD The Renovation of 10 BKK Intersection Flyovers was the first big project of maintenance to ten flyovers which are located in the most traffic area in Bangkok. The key concept to which challenges BMA (Bangkok Metropolitan Authority) is to carry out the parallel works along three bridges to be on schedule without any delay due to avoid blocking traffic. Job description: 1 Managed and directed a team of 3 site engineers, 2 office engineers and 4 supervisors with around 500 skilled workers and other sub-contractors. 2 Cooperated with BMA and RTP (Royal Thai Police) regarding to plan for Traffic Diversion. 3 Managed all schedules for execution of project to be without any delay. 4 Controlled cost of construction to be according to cost center and budget. 5 Managed issuing complete shop drawings in accordance with BMA Regulation. Scope of work: Renovation work for 10 bridges include: Ratchayotin Flyover, Kaset Flyover, Din-daeng Flyover, Pong-pet Flyover, Rama IV Flyover, Klongton Flyover, Tha-pla Flyover, Bangplat Flyover, Wongsawang Flyover, Prachanukul Flyover with following items; • Provide criteria design, modified design, technical and engineering • Replacing of pre-cast concrete planks, pot bearings, bearing pads and handrail • Strengthening of concrete planks, steel girders and steel columns • Removing and repaving • Replaced Flowable Fill Concrete to base-course layer and re-constructed the transition and approach slabs • Removing existing color and re-painting works  Obayashi Corporation (Dubai Rapid Link Consortium) : Sep30, 2007 - Sep 30, 2008, Dubai U.A.E Senior Civil Engineer, Sub Structure, Green line, North1 Section Project: Dubai Metro Project, Dubai, U.A.E Value : 7.5 Billion USD
  • 9. The Dubai Metro is a “Mega driverless, fully automated metro rail network in the United Arab Emirates”, city of Dubai began with two lines, The Red Line and Green Line are operational, with three further lines are planned. These first two lines run underground in the city centre and on elevated viaducts with 50 of elevated and underground stations. Job description: 1. Managed and direct a team of 4 site engineers, 4 supervisors with around 400 skilled workers and 2 local sub-contractors. 2. Produced method statement and shop drawings of piling and pier works to support sub-contractors. 3. Prepared action plan for road closure downtown due to road diversion. 4. Prepared Bar Bending Schedule (BBS) in accordance with BS Code and proceeded it to steel factory. 5. Prepared three weeks ahead schedule for forecasting of construction material consumption. 6. Ordered and follow up construction materials concerns to assigned works. Scope of work: Road & Utilities Diversion, Utilities Verification, Piling Works, Ramp and Pier Works include: Columns, Pier Heads, Bearing Plinths.  VSL (Thailand) Co.,Ltd. : Apr 2006- June 2007, Bangkok Thailand Tendering Engineer, working as Asst. Tendering Manager (Post-tensioning work, Heavy lifting, Special project) Job description: Carried out entire tasks of tendering stage to be awarded on major projects such as Suvarnabhumi Airport, Airport Rail Link Project, SOBRR, Roofing Truss lifting at Central World Plaza, etc.  Pylon Co.,Ltd. : Nov 2002-Apr 2006, Bangkok Thailand Project manager Project: 1) The Third State Expressway System (S1), 1.72 Million USD 2) BTS (Extension), 1.09 Million USD 3) MWA (SAMLAE), 1.0 Million USD 4) Bangkuntian, Suksawat Fly Over, 1.0 Million USD Job description: Managed and directed piling work and diaphragm wall.  Thai Master Builders Co.,Ltd. (degussa. Construction Chemicals) : Sep 2001-Sep 2002, Bangkok Thailand Technical Engineer – Proposals & Feasibility
  • 10. Job description: as per item IV  Sakol Equipment Co., Ltd. : April 2000- August 2000, Hua Hin Prachuap khiri karn Project Engineer Project: Hyatt Regency Hotel Project Value: 1.56 million USD Scope of work: Concrete structural works: 5 Nos. of large swimming pool: 5,000 m3 (Curve designed), Waste water treatment reinforced concrete tank sizes 15 X 30 X 2.5m. , 5 Nos. of Surge tanks, 5 Nos. of Pump Rooms and 4-Storeies building (Staff dormitory)  Joint Venture BBCT : August 1997- August 1999, Bangkok Thailand Construction Engineer Project: Second Stage Expressway System Project (Sector D) Value: 234.38 million USD Job description: as per item III  Kohsang Sahapun Co.,Ltd. : July 1996 - June 1997, Bangkok Thailand Site Engineer Project: Laksi Underpass Project Value : 23.44 million USD  Power P (Public) Ltd. : August 1994 - June 1996, Bangkok Thailand Site Engineer Project: 1) 50 years Chalermprabaramee Building 2) Hope Well Project, Donmuang City (Building & Depot), Aue Chu Leange Building EDUCATION BACKGROUND KHONKAEN UNIVERSITY Bachelor Degree of Engineering (Civil Engineering)
  • 11. TRAINING EXPERIENCE • Sep 3- October 3, 200: Concrete technology and construction chemical (structural repair system) Engineering Institute of Thailand. • June 1 - October 31, 1994: Training of Construction Engineering, Krung Thep Anothai Co.,Ltd. • March 20 - May 31, 1993: Training of Highway Engineering, the department of Highways. SPECIAL SKILLS Language: Good command of written and spoken English Computer Programming: Microsoft Office & Microsoft Project REFERENCES References will further be furnished on request.