SlideShare uma empresa Scribd logo
1 de 5
Baixar para ler offline
Project Teaser 
Romanian 4 MW Wind Farm 
Published October 2014 
Copyright © 2012-2014
Project Description 
The Project co-founders (2) are proposing to upgrade an existing wind-powered generating 
facility of 3 old turbines of 600 kW each (the first Wind farm ever constructed in Romania in 
the early 90’s) with 2 new turbines of 2.000 kW each with a capacity of approximately 4 MW. 
In addition to the wind turbines, the Project will involve digging of windmill foundations 
because of lack of knowledge and suitable technology at that time, construction of a 
permanent meteorological tower, a system of gravel access roads, an operation and 
maintenance building. 
The Wind farm is localized on a small non-agricultural private village land of 2 hectares at 
1382 m above sea level (well known area as best wind location in Romania) that makes part 
of an entire beautiful undeveloped touristic area in South-Banat region in western Romania 
which will have to be purchased by the new SPV to be founded yet, no construction 
modifications will be made in this existent Wind farm but upgrading its turbines by more 
powerful ones thus, reviving tourism and the economy of this area. The Project renewal is 
currently anticipated to commence in autumn 2014 and to finish in autumn 2015. 
Once upgraded, the wind turbines and associated components operate in almost completely 
automated fashion. The Project will, however, employ administrative personnel. The wind 
turbine anticipated for the project (Enercon E-82 E2) begins to generate electricity at wind 
speed as low as 3 m/s. This turbine’s rotational speed varies between 6 and 15 rpm 
depending on the wind velocity. High-speed shutdown occurs when constant wind velocity 
exceeds roughly 28 m/s to avoid excessive wear and tear that may shorten the turbine’s 
useful life. Each wind turbine has a computer to control critical functions, monitor wind 
conditions, and report data. 
Page 2
Wind Performance 
In 2009, a 60m Tubular Wind Mast had been installed. Unfortunately, the Wind Mast had 
broken up few months after its installation date because of the powerful wind and the 
unusual winter conditions on top of the mount at an altitude of 1382m (11 cm of ice had been 
stuck on the Wind Mast cables). The respective zone has considerable strong winds 
amongst the windiest places in Romania. 
The total of 5.574 hours of fully functional wind indicates that the operational wind is about 7 
months per year which exhibits significant seasonal characteristics being repetitive. 
Page 3
Business Opportunity 
In terms of RES of gross electricity consumption, Romania is on target. The potential of 
Romania in wind energy is considered the highest in SEE. Even if the wind is free, wind 
energy producers receive incentives (Green Certificates) from the state besides the 
electricity retail price, because the investments are very high. Through its progressive 
legislation, the government is creating one of Europe’s friendliest environments for RE 
developers and is encouraging future investments in the wind sector and not only. So, since 
2004 green energy producers receive 1 Green Certificate for each MWh of energy delivered 
into the system. In July 2010, the Romanian Parliament amended the law 139/2010 giving 
more incentives to RE producers. Finally, in July 2011, the European Commission had 
approved the law 139/2010. For instance, those in the wind sector get 2 Green Certificates 
for 1 MWh until 2017 after that just single. However, in December 2013, the Romanian 
Parliament amended the law GD 994/2013 reducing this time incentives to RE producers. 
For instance, those in the wind sector, starting from January 1, 2014 get 1,5 instead of 2 
TGCs for 1 MWh until January 1, 2018 after that 1,75. 
The Project Scenario 
· The Project is to manufacture and build (upgrade) a 4 MWp Wind farm in a highly 
desirable location in Romania with proven wind velocity conditions (MAWS of 7,2 m/s 
in West-Banat Mountains). 
· The amount of the deal is estimated to be in the region of €6,5 Million advanced over 
a 1-yr period to cover manufacturing and management costs and could be paid off in 
period of less than 10-yrs based on revenues. 
Page 4
Page 5 
 €5.200.000 – total cost of 2 wind turbines 
 €200.000 – turbines transportation 
 €200.000 – foundations  pedestals 
 €25.000 – turbines installing using a crane 
 €15.000 – guarantee for putting Wind farm in operation 
 €70.000 – land + OM building purchasing 
 €6.000 – land + OM building development 
 €414.000 – operational expenses 
 €370.000 – contingency 
· Operational activity is at the end of the 1st year with current estimates showing yearly 
revenues (including incentives) of approx. €1,2 Million. 
· AEP = 12,634 GWh, ROI = 12%, NPV = €5,1 Million, IRR = 19,2%. 
· From that point on this would be a very profitable venture for all concerned. 
· Opportunities to blue print this process and do more deals throughout Romania as 
demand continues to increase for alternative energy. 
Action Plan 
· Site Location – The proposed Wind farm will be upgraded on a private land of 2 
hectares (co-founders will make a purchase contract with the land owner). The 
proposed Wind farm would be located 480 km West to Bucharest city (Capital of 
Romania). No agriculture is made in this zone. The plot location is nearby a County 
road and a very close unloaded existing substation and national grid line connection 
point. 
· Company Formation – We as a Managing team are willing to incorporate the 
appropriate corporate structure that will best benefit both the project proponents and 
the investor. Considerations will include the need for a Romanian based entity that 
satisfies the requirements of the governing body. 
· Administrative Process – The administrative process necessary for upgrading this 
special Wind farm is very fast, with a suggested time-frame of 5 to 6 months. 
Moreover, the co-founders have the Mayor’s commitment to support all official efforts 
in order to obtain all necessary permits establishing  operating of the Wind farm. 
· Collateral – The group has neither liquidity nor collateral to offer.

Mais conteúdo relacionado

Mais procurados

summer training report ntpc anta
summer training report ntpc antasummer training report ntpc anta
summer training report ntpc antanishant pareek
 
NTPC Barh ppt by Shivank
NTPC Barh ppt by ShivankNTPC Barh ppt by Shivank
NTPC Barh ppt by Shivankshivank Kumar
 
medupi-kusile-south-africa-editorial
medupi-kusile-south-africa-editorialmedupi-kusile-south-africa-editorial
medupi-kusile-south-africa-editorialRiaan Barwise
 
layoutofkodermathermalpowerstationbyshreya-151013090702-lva1-app6891
layoutofkodermathermalpowerstationbyshreya-151013090702-lva1-app6891layoutofkodermathermalpowerstationbyshreya-151013090702-lva1-app6891
layoutofkodermathermalpowerstationbyshreya-151013090702-lva1-app6891shreya sankrityayan
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Udbhav's presentation on ntpc
Udbhav's presentation on ntpcUdbhav's presentation on ntpc
Udbhav's presentation on ntpcUdbhav garg
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportAditya Shekhar
 
Tarbela Hydro Power Plant
Tarbela Hydro Power PlantTarbela Hydro Power Plant
Tarbela Hydro Power PlantSaQib MuGhal
 
Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt nilesh choubey
 
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
POWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNISTPOWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNIST
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNISTS.Vijaya Bhaskar
 
Ntpc badarpur summer training
Ntpc badarpur summer trainingNtpc badarpur summer training
Ntpc badarpur summer trainingAnubhav Ghosh
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training reportravi kant
 
Ghazi Barotha Hydro power Projec
Ghazi Barotha Hydro power ProjecGhazi Barotha Hydro power Projec
Ghazi Barotha Hydro power ProjecAbdul Majid
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 

Mais procurados (20)

summer training report ntpc anta
summer training report ntpc antasummer training report ntpc anta
summer training report ntpc anta
 
NTPC Barh ppt by Shivank
NTPC Barh ppt by ShivankNTPC Barh ppt by Shivank
NTPC Barh ppt by Shivank
 
medupi-kusile-south-africa-editorial
medupi-kusile-south-africa-editorialmedupi-kusile-south-africa-editorial
medupi-kusile-south-africa-editorial
 
layoutofkodermathermalpowerstationbyshreya-151013090702-lva1-app6891
layoutofkodermathermalpowerstationbyshreya-151013090702-lva1-app6891layoutofkodermathermalpowerstationbyshreya-151013090702-lva1-app6891
layoutofkodermathermalpowerstationbyshreya-151013090702-lva1-app6891
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
NTPC training
NTPC trainingNTPC training
NTPC training
 
Udbhav's presentation on ntpc
Udbhav's presentation on ntpcUdbhav's presentation on ntpc
Udbhav's presentation on ntpc
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 
Tarbela dam project
Tarbela dam projectTarbela dam project
Tarbela dam project
 
Tarbela Hydro Power Plant
Tarbela Hydro Power PlantTarbela Hydro Power Plant
Tarbela Hydro Power Plant
 
Power Plant Scheme
Power Plant SchemePower Plant Scheme
Power Plant Scheme
 
Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt
 
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
POWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNISTPOWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNIST
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
 
Training NTPC
Training NTPCTraining NTPC
Training NTPC
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
Ntpc barh (bstpp)
Ntpc barh (bstpp)Ntpc barh (bstpp)
Ntpc barh (bstpp)
 
Ntpc badarpur summer training
Ntpc badarpur summer trainingNtpc badarpur summer training
Ntpc badarpur summer training
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 
Ghazi Barotha Hydro power Projec
Ghazi Barotha Hydro power ProjecGhazi Barotha Hydro power Projec
Ghazi Barotha Hydro power Projec
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 

Semelhante a SRWF PR4

Power Sector Analysis Report 2017_Sultanate of Oman
Power Sector Analysis Report 2017_Sultanate of Oman Power Sector Analysis Report 2017_Sultanate of Oman
Power Sector Analysis Report 2017_Sultanate of Oman Shoby P.Jacob
 
New base special 13 october 2014
New base special  13 october  2014New base special  13 october  2014
New base special 13 october 2014Khaled Al Awadi
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE
 
MPX Corporate Presentation
MPX Corporate PresentationMPX Corporate Presentation
MPX Corporate PresentationMPX_RI
 
Presentation Innowind AS
Presentation Innowind ASPresentation Innowind AS
Presentation Innowind ASkjetil55
 
Presentation Innowind AS
Presentation Innowind ASPresentation Innowind AS
Presentation Innowind ASkjetil55
 
North sea offshore wind - Developments in Belgium and The Netherlands
North sea offshore wind  - Developments in Belgium and The NetherlandsNorth sea offshore wind  - Developments in Belgium and The Netherlands
North sea offshore wind - Developments in Belgium and The NetherlandsLoyens & Loeff
 
A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.Saurabh Biswas
 
Mpx corp presentation eng
Mpx corp presentation engMpx corp presentation eng
Mpx corp presentation engMPX_RI
 
Bankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseBankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseLeonardo ENERGY
 
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWBankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWLeonardo ENERGY
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 

Semelhante a SRWF PR4 (20)

RWF PR90
RWF PR90RWF PR90
RWF PR90
 
report
reportreport
report
 
Integrated systems design project
Integrated systems design projectIntegrated systems design project
Integrated systems design project
 
Romania
RomaniaRomania
Romania
 
Power Sector Analysis Report 2017_Sultanate of Oman
Power Sector Analysis Report 2017_Sultanate of Oman Power Sector Analysis Report 2017_Sultanate of Oman
Power Sector Analysis Report 2017_Sultanate of Oman
 
New base special 13 october 2014
New base special  13 october  2014New base special  13 october  2014
New base special 13 october 2014
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
 
MPX Corporate Presentation
MPX Corporate PresentationMPX Corporate Presentation
MPX Corporate Presentation
 
Presentation Innowind AS
Presentation Innowind ASPresentation Innowind AS
Presentation Innowind AS
 
Presentation Innowind AS
Presentation Innowind ASPresentation Innowind AS
Presentation Innowind AS
 
North sea offshore wind - Developments in Belgium and The Netherlands
North sea offshore wind  - Developments in Belgium and The NetherlandsNorth sea offshore wind  - Developments in Belgium and The Netherlands
North sea offshore wind - Developments in Belgium and The Netherlands
 
A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.
 
Mpx corp presentation eng
Mpx corp presentation engMpx corp presentation eng
Mpx corp presentation eng
 
Quality Energy Investment Opportunities 100mw letonia
Quality Energy  Investment Opportunities 100mw letoniaQuality Energy  Investment Opportunities 100mw letonia
Quality Energy Investment Opportunities 100mw letonia
 
Bankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseBankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa case
 
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWBankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
 
Wind sector brief
Wind sector briefWind sector brief
Wind sector brief
 
Power stations
Power stationsPower stations
Power stations
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
Carrington
CarringtonCarrington
Carrington
 

Mais de Paul Keisch

Timisoara overview 2013
Timisoara overview 2013Timisoara overview 2013
Timisoara overview 2013Paul Keisch
 
Romania investment grade 2014
Romania investment grade 2014Romania investment grade 2014
Romania investment grade 2014Paul Keisch
 
Rezumat strategie lugoj
Rezumat strategie lugojRezumat strategie lugoj
Rezumat strategie lugojPaul Keisch
 
Why small businesses fail
Why small businesses failWhy small businesses fail
Why small businesses failPaul Keisch
 
Weo redrawing energyclimatemap
Weo redrawing energyclimatemapWeo redrawing energyclimatemap
Weo redrawing energyclimatemapPaul Keisch
 
Unique business opportunity in eu
Unique business opportunity in euUnique business opportunity in eu
Unique business opportunity in euPaul Keisch
 
Contractual risks in pe invsts dr[1]. kishore - prmia
Contractual risks in pe invsts   dr[1]. kishore  - prmiaContractual risks in pe invsts   dr[1]. kishore  - prmia
Contractual risks in pe invsts dr[1]. kishore - prmiaPaul Keisch
 
Ied fellows lecture 5
Ied fellows lecture 5Ied fellows lecture 5
Ied fellows lecture 5Paul Keisch
 
Wp1 before negotiations-031307
Wp1 before negotiations-031307Wp1 before negotiations-031307
Wp1 before negotiations-031307Paul Keisch
 
Fairshare model-high-level-concept
Fairshare model-high-level-conceptFairshare model-high-level-concept
Fairshare model-high-level-conceptPaul Keisch
 
Wind rotor blade - invention promotion
Wind rotor blade - invention promotionWind rotor blade - invention promotion
Wind rotor blade - invention promotionPaul Keisch
 
News 20120107 storm
News 20120107 stormNews 20120107 storm
News 20120107 stormPaul Keisch
 
News 20111229 cernavoda
News 20111229 cernavodaNews 20111229 cernavoda
News 20111229 cernavodaPaul Keisch
 
News 20111220 rwe
News 20111220 rweNews 20111220 rwe
News 20111220 rwePaul Keisch
 
News 20111228 windmills
News 20111228 windmillsNews 20111228 windmills
News 20111228 windmillsPaul Keisch
 
Overview renewable energy_in_romania
Overview renewable energy_in_romaniaOverview renewable energy_in_romania
Overview renewable energy_in_romaniaPaul Keisch
 

Mais de Paul Keisch (20)

LOI 90 MW
LOI 90 MWLOI 90 MW
LOI 90 MW
 
LOI 10 MWp
LOI 10 MWpLOI 10 MWp
LOI 10 MWp
 
LOI 4 MW
LOI 4 MWLOI 4 MW
LOI 4 MW
 
Timisoara overview 2013
Timisoara overview 2013Timisoara overview 2013
Timisoara overview 2013
 
Romania investment grade 2014
Romania investment grade 2014Romania investment grade 2014
Romania investment grade 2014
 
Rezumat strategie lugoj
Rezumat strategie lugojRezumat strategie lugoj
Rezumat strategie lugoj
 
Why small businesses fail
Why small businesses failWhy small businesses fail
Why small businesses fail
 
Weo redrawing energyclimatemap
Weo redrawing energyclimatemapWeo redrawing energyclimatemap
Weo redrawing energyclimatemap
 
Unique business opportunity in eu
Unique business opportunity in euUnique business opportunity in eu
Unique business opportunity in eu
 
Contractual risks in pe invsts dr[1]. kishore - prmia
Contractual risks in pe invsts   dr[1]. kishore  - prmiaContractual risks in pe invsts   dr[1]. kishore  - prmia
Contractual risks in pe invsts dr[1]. kishore - prmia
 
Ied fellows lecture 5
Ied fellows lecture 5Ied fellows lecture 5
Ied fellows lecture 5
 
Wp1 before negotiations-031307
Wp1 before negotiations-031307Wp1 before negotiations-031307
Wp1 before negotiations-031307
 
Fairshare model-high-level-concept
Fairshare model-high-level-conceptFairshare model-high-level-concept
Fairshare model-high-level-concept
 
Raisecapital
RaisecapitalRaisecapital
Raisecapital
 
Wind rotor blade - invention promotion
Wind rotor blade - invention promotionWind rotor blade - invention promotion
Wind rotor blade - invention promotion
 
News 20120107 storm
News 20120107 stormNews 20120107 storm
News 20120107 storm
 
News 20111229 cernavoda
News 20111229 cernavodaNews 20111229 cernavoda
News 20111229 cernavoda
 
News 20111220 rwe
News 20111220 rweNews 20111220 rwe
News 20111220 rwe
 
News 20111228 windmills
News 20111228 windmillsNews 20111228 windmills
News 20111228 windmills
 
Overview renewable energy_in_romania
Overview renewable energy_in_romaniaOverview renewable energy_in_romania
Overview renewable energy_in_romania
 

Último

MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 

Último (20)

Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 

SRWF PR4

  • 1. Project Teaser Romanian 4 MW Wind Farm Published October 2014 Copyright © 2012-2014
  • 2. Project Description The Project co-founders (2) are proposing to upgrade an existing wind-powered generating facility of 3 old turbines of 600 kW each (the first Wind farm ever constructed in Romania in the early 90’s) with 2 new turbines of 2.000 kW each with a capacity of approximately 4 MW. In addition to the wind turbines, the Project will involve digging of windmill foundations because of lack of knowledge and suitable technology at that time, construction of a permanent meteorological tower, a system of gravel access roads, an operation and maintenance building. The Wind farm is localized on a small non-agricultural private village land of 2 hectares at 1382 m above sea level (well known area as best wind location in Romania) that makes part of an entire beautiful undeveloped touristic area in South-Banat region in western Romania which will have to be purchased by the new SPV to be founded yet, no construction modifications will be made in this existent Wind farm but upgrading its turbines by more powerful ones thus, reviving tourism and the economy of this area. The Project renewal is currently anticipated to commence in autumn 2014 and to finish in autumn 2015. Once upgraded, the wind turbines and associated components operate in almost completely automated fashion. The Project will, however, employ administrative personnel. The wind turbine anticipated for the project (Enercon E-82 E2) begins to generate electricity at wind speed as low as 3 m/s. This turbine’s rotational speed varies between 6 and 15 rpm depending on the wind velocity. High-speed shutdown occurs when constant wind velocity exceeds roughly 28 m/s to avoid excessive wear and tear that may shorten the turbine’s useful life. Each wind turbine has a computer to control critical functions, monitor wind conditions, and report data. Page 2
  • 3. Wind Performance In 2009, a 60m Tubular Wind Mast had been installed. Unfortunately, the Wind Mast had broken up few months after its installation date because of the powerful wind and the unusual winter conditions on top of the mount at an altitude of 1382m (11 cm of ice had been stuck on the Wind Mast cables). The respective zone has considerable strong winds amongst the windiest places in Romania. The total of 5.574 hours of fully functional wind indicates that the operational wind is about 7 months per year which exhibits significant seasonal characteristics being repetitive. Page 3
  • 4. Business Opportunity In terms of RES of gross electricity consumption, Romania is on target. The potential of Romania in wind energy is considered the highest in SEE. Even if the wind is free, wind energy producers receive incentives (Green Certificates) from the state besides the electricity retail price, because the investments are very high. Through its progressive legislation, the government is creating one of Europe’s friendliest environments for RE developers and is encouraging future investments in the wind sector and not only. So, since 2004 green energy producers receive 1 Green Certificate for each MWh of energy delivered into the system. In July 2010, the Romanian Parliament amended the law 139/2010 giving more incentives to RE producers. Finally, in July 2011, the European Commission had approved the law 139/2010. For instance, those in the wind sector get 2 Green Certificates for 1 MWh until 2017 after that just single. However, in December 2013, the Romanian Parliament amended the law GD 994/2013 reducing this time incentives to RE producers. For instance, those in the wind sector, starting from January 1, 2014 get 1,5 instead of 2 TGCs for 1 MWh until January 1, 2018 after that 1,75. The Project Scenario · The Project is to manufacture and build (upgrade) a 4 MWp Wind farm in a highly desirable location in Romania with proven wind velocity conditions (MAWS of 7,2 m/s in West-Banat Mountains). · The amount of the deal is estimated to be in the region of €6,5 Million advanced over a 1-yr period to cover manufacturing and management costs and could be paid off in period of less than 10-yrs based on revenues. Page 4
  • 5. Page 5 €5.200.000 – total cost of 2 wind turbines €200.000 – turbines transportation €200.000 – foundations pedestals €25.000 – turbines installing using a crane €15.000 – guarantee for putting Wind farm in operation €70.000 – land + OM building purchasing €6.000 – land + OM building development €414.000 – operational expenses €370.000 – contingency · Operational activity is at the end of the 1st year with current estimates showing yearly revenues (including incentives) of approx. €1,2 Million. · AEP = 12,634 GWh, ROI = 12%, NPV = €5,1 Million, IRR = 19,2%. · From that point on this would be a very profitable venture for all concerned. · Opportunities to blue print this process and do more deals throughout Romania as demand continues to increase for alternative energy. Action Plan · Site Location – The proposed Wind farm will be upgraded on a private land of 2 hectares (co-founders will make a purchase contract with the land owner). The proposed Wind farm would be located 480 km West to Bucharest city (Capital of Romania). No agriculture is made in this zone. The plot location is nearby a County road and a very close unloaded existing substation and national grid line connection point. · Company Formation – We as a Managing team are willing to incorporate the appropriate corporate structure that will best benefit both the project proponents and the investor. Considerations will include the need for a Romanian based entity that satisfies the requirements of the governing body. · Administrative Process – The administrative process necessary for upgrading this special Wind farm is very fast, with a suggested time-frame of 5 to 6 months. Moreover, the co-founders have the Mayor’s commitment to support all official efforts in order to obtain all necessary permits establishing operating of the Wind farm. · Collateral – The group has neither liquidity nor collateral to offer.