SlideShare uma empresa Scribd logo
1 de 2
1. A1 M cameras Newcastle 2007
Sent up to supervise the initial mast installation of A1M masts.
To carry out a site survey the A66 sign sites around Snowgates.
Installed the first six cameras at Gateshead on the A1M as a two man team.
Additional camera install on MS3 at Eastern end of the A66 on A1M.
2. Sign refurbishment and security cameras A66 Cumbria 2007
Follow on job on signs around Snow Gates.
3. Design and build of Mains distribution panel for all 19” Racking systems to be built at SSL, for Isolation and
electrical safety.
4. Fault finding, repair and test of Lantern Controllers and MS3 & MS4 LED Lamps.
Including Replacement of surface mount components
5. Rationalisation of earth wiring and continuity in all SSL rack based systems to meet TR1100 requirements and
replace unworkable system devised by ‘senior’ staff.
6. MS3 & MS4 works on the M40 Oxford and M42, reprogramming and testing.
Follow up job - replacing faulty display boards and fault finding with Colas Engineer, currently with Costain at
Yatton.
7. Rework of Unit 10 electrical circuitry to improve Diversity Factor and cut down mains failures due to
overload tripping.
8. Cabinet building & installations, creating a very high standard for ease of servicing.
For RCCs at Kent/Northampton/Birmingham/Leicester/Manchester/North East/Avonmouth.
Senior manager at North West RCC commended our work, described our cabinets as ‘the benchmark’ to be
matched from that time.
9. OIF rescue mission East Midlands, working with to repair SSL reputation in several control centres.
10. Help Design, build, test and install Mobile Camera system, linked to Mobile network at Dobwalls in Cornwall.
To monitor traffic through long term roadworks on busy holiday route.
11. MAD (Magnetic Anomaly Detectors) system installation & emergency redesign Kent and Birmingham, running
a site team. 2010 to 2011.
Through initial testing at Berkshire test centre to a first install on the A2 – M25 interchange proved a non
viable design. I personally redesigned the carrier and built a prototype in 10 working days, the design was
approved and we fitted a working system at Oldbury, J2 M5 (made PTM for some time).
12. Became involved in CCTV, on site installations on the M4.
Then a key player in the production in Unit 4 building cameras, programming and setting up through testing
to Production Acceptance Testing including observed with Consultant.
Organised two technicians as a team to salvage a production run where Cameras were failing and taking
out the associated Base Units, looking at a 6+ week delay I reduced this to about 2 weeks.
Cable acceptance testing was also required so with a colleague designed and built a Unit to speed testing,
commended by the Consultant as we reduced testing from 2 days to a half day. I have been a key player in
keeping things going for 3 or 4 years now, keeping records and tabs on all production, keeping Managers fully
informed of the status of build and testing. Just before the takeover by Costain Project Manager asked me to
be her Co-ordinator on CCTV.
13. Repair and testing of cameras, pan-tilts and base-units.
14. Works on Cameras, Plymouth, Bodmin, Newquay, Exeter, Portsmouth, Reading.
15. First Production of EAV Cameras.
Built part time as I was busy with building and testing existing CCTV systems.
16. Southwick Tunnel, electrician on site.
17. Saltash Tunnel, Sign controllers pulling in cables and connecting to system.
18. Tamar Bridge, sign controllers, servicing fibre optic system.
19. Additional Pan-tilt Cameras at Bowes Incline, Testoes Roundabout Newcastle.
20. Further cameras at Washington on MS3 gantrys.
With my wide ranging skills I have often been required to carry out Emergency building repairs around the
Yatton premises.
MORE TO BE ADDED.

Mais conteúdo relacionado

Mais procurados

Mais procurados (8)

cv
cvcv
cv
 
loai_Resume
loai_Resumeloai_Resume
loai_Resume
 
Omer_CV
Omer_CVOmer_CV
Omer_CV
 
Nstark 2015
Nstark 2015Nstark 2015
Nstark 2015
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
 
CV - James Ayrton - November 2014
CV - James Ayrton - November 2014CV - James Ayrton - November 2014
CV - James Ayrton - November 2014
 
CV
CVCV
CV
 
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
 

Destaque

কর্মসংস্থান ব্যাংক আইন,১৯৯৮
কর্মসংস্থান ব্যাংক আইন,১৯৯৮কর্মসংস্থান ব্যাংক আইন,১৯৯৮
কর্মসংস্থান ব্যাংক আইন,১৯৯৮Ashique Iqbal
 
Propuesta De ModificacióNs á RegulacióN De Humedais Protexidos De Galicia Sghn
Propuesta De ModificacióNs á RegulacióN De Humedais Protexidos De Galicia   SghnPropuesta De ModificacióNs á RegulacióN De Humedais Protexidos De Galicia   Sghn
Propuesta De ModificacióNs á RegulacióN De Humedais Protexidos De Galicia Sghnguestd00645
 
Midias virtuais e educação on line diferenças e convergências entre ead e eol...
Midias virtuais e educação on line diferenças e convergências entre ead e eol...Midias virtuais e educação on line diferenças e convergências entre ead e eol...
Midias virtuais e educação on line diferenças e convergências entre ead e eol...vmdamasceno
 
April 2008 St. Charles Housing Policy Summary
April 2008 St. Charles Housing Policy SummaryApril 2008 St. Charles Housing Policy Summary
April 2008 St. Charles Housing Policy Summarybobhupp
 
Mfl magic with qr codes
Mfl magic with qr codesMfl magic with qr codes
Mfl magic with qr codesmrsadam
 
Reading and Listening in MFL
Reading and Listening in MFLReading and Listening in MFL
Reading and Listening in MFLmrsadam
 

Destaque (10)

Perfil edwin
Perfil edwinPerfil edwin
Perfil edwin
 
কর্মসংস্থান ব্যাংক আইন,১৯৯৮
কর্মসংস্থান ব্যাংক আইন,১৯৯৮কর্মসংস্থান ব্যাংক আইন,১৯৯৮
কর্মসংস্থান ব্যাংক আইন,১৯৯৮
 
Propuesta De ModificacióNs á RegulacióN De Humedais Protexidos De Galicia Sghn
Propuesta De ModificacióNs á RegulacióN De Humedais Protexidos De Galicia   SghnPropuesta De ModificacióNs á RegulacióN De Humedais Protexidos De Galicia   Sghn
Propuesta De ModificacióNs á RegulacióN De Humedais Protexidos De Galicia Sghn
 
Midias virtuais e educação on line diferenças e convergências entre ead e eol...
Midias virtuais e educação on line diferenças e convergências entre ead e eol...Midias virtuais e educação on line diferenças e convergências entre ead e eol...
Midias virtuais e educação on line diferenças e convergências entre ead e eol...
 
Pais Europeu
Pais EuropeuPais Europeu
Pais Europeu
 
April 2008 St. Charles Housing Policy Summary
April 2008 St. Charles Housing Policy SummaryApril 2008 St. Charles Housing Policy Summary
April 2008 St. Charles Housing Policy Summary
 
Coulant de chocolate
Coulant de chocolateCoulant de chocolate
Coulant de chocolate
 
Curriculum Vitae Español Alvaro
Curriculum Vitae Español AlvaroCurriculum Vitae Español Alvaro
Curriculum Vitae Español Alvaro
 
Mfl magic with qr codes
Mfl magic with qr codesMfl magic with qr codes
Mfl magic with qr codes
 
Reading and Listening in MFL
Reading and Listening in MFLReading and Listening in MFL
Reading and Listening in MFL
 

Semelhante a Safe Resume expanded

Semelhante a Safe Resume expanded (20)

Fred CV2
Fred CV2Fred CV2
Fred CV2
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
cv2016
cv2016cv2016
cv2016
 
Ir. Unggang CV latest
Ir. Unggang CV latestIr. Unggang CV latest
Ir. Unggang CV latest
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017
 
Arqiva 2008 Ops Conference - TWM Update by GHarris
Arqiva 2008 Ops Conference - TWM Update by GHarrisArqiva 2008 Ops Conference - TWM Update by GHarris
Arqiva 2008 Ops Conference - TWM Update by GHarris
 
WHO final
WHO  finalWHO  final
WHO final
 
Kazunda Simon CV1
Kazunda Simon CV1Kazunda Simon CV1
Kazunda Simon CV1
 
John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 
Resume 25.09.15
Resume 25.09.15Resume 25.09.15
Resume 25.09.15
 
Cv sivam oct.doc 1
Cv sivam oct.doc 1Cv sivam oct.doc 1
Cv sivam oct.doc 1
 
Cv sivam oct.doc 1
Cv sivam oct.doc 1Cv sivam oct.doc 1
Cv sivam oct.doc 1
 
Case study_Walney_rev1
Case study_Walney_rev1Case study_Walney_rev1
Case study_Walney_rev1
 
CV - Chris Gibbins
CV - Chris GibbinsCV - Chris Gibbins
CV - Chris Gibbins
 
final CV
final CVfinal CV
final CV
 
Mr johann van der westhuizen full cv.docx
Mr johann van der westhuizen full cv.docxMr johann van der westhuizen full cv.docx
Mr johann van der westhuizen full cv.docx
 
REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013
 
Mr johann van der westhuizen new cv 2
Mr johann van der westhuizen new cv 2Mr johann van der westhuizen new cv 2
Mr johann van der westhuizen new cv 2
 

Safe Resume expanded

  • 1. 1. A1 M cameras Newcastle 2007 Sent up to supervise the initial mast installation of A1M masts. To carry out a site survey the A66 sign sites around Snowgates. Installed the first six cameras at Gateshead on the A1M as a two man team. Additional camera install on MS3 at Eastern end of the A66 on A1M. 2. Sign refurbishment and security cameras A66 Cumbria 2007 Follow on job on signs around Snow Gates. 3. Design and build of Mains distribution panel for all 19” Racking systems to be built at SSL, for Isolation and electrical safety. 4. Fault finding, repair and test of Lantern Controllers and MS3 & MS4 LED Lamps. Including Replacement of surface mount components 5. Rationalisation of earth wiring and continuity in all SSL rack based systems to meet TR1100 requirements and replace unworkable system devised by ‘senior’ staff. 6. MS3 & MS4 works on the M40 Oxford and M42, reprogramming and testing. Follow up job - replacing faulty display boards and fault finding with Colas Engineer, currently with Costain at Yatton. 7. Rework of Unit 10 electrical circuitry to improve Diversity Factor and cut down mains failures due to overload tripping. 8. Cabinet building & installations, creating a very high standard for ease of servicing. For RCCs at Kent/Northampton/Birmingham/Leicester/Manchester/North East/Avonmouth. Senior manager at North West RCC commended our work, described our cabinets as ‘the benchmark’ to be matched from that time. 9. OIF rescue mission East Midlands, working with to repair SSL reputation in several control centres. 10. Help Design, build, test and install Mobile Camera system, linked to Mobile network at Dobwalls in Cornwall. To monitor traffic through long term roadworks on busy holiday route. 11. MAD (Magnetic Anomaly Detectors) system installation & emergency redesign Kent and Birmingham, running a site team. 2010 to 2011. Through initial testing at Berkshire test centre to a first install on the A2 – M25 interchange proved a non viable design. I personally redesigned the carrier and built a prototype in 10 working days, the design was approved and we fitted a working system at Oldbury, J2 M5 (made PTM for some time). 12. Became involved in CCTV, on site installations on the M4. Then a key player in the production in Unit 4 building cameras, programming and setting up through testing to Production Acceptance Testing including observed with Consultant. Organised two technicians as a team to salvage a production run where Cameras were failing and taking out the associated Base Units, looking at a 6+ week delay I reduced this to about 2 weeks. Cable acceptance testing was also required so with a colleague designed and built a Unit to speed testing, commended by the Consultant as we reduced testing from 2 days to a half day. I have been a key player in keeping things going for 3 or 4 years now, keeping records and tabs on all production, keeping Managers fully informed of the status of build and testing. Just before the takeover by Costain Project Manager asked me to be her Co-ordinator on CCTV. 13. Repair and testing of cameras, pan-tilts and base-units.
  • 2. 14. Works on Cameras, Plymouth, Bodmin, Newquay, Exeter, Portsmouth, Reading. 15. First Production of EAV Cameras. Built part time as I was busy with building and testing existing CCTV systems. 16. Southwick Tunnel, electrician on site. 17. Saltash Tunnel, Sign controllers pulling in cables and connecting to system. 18. Tamar Bridge, sign controllers, servicing fibre optic system. 19. Additional Pan-tilt Cameras at Bowes Incline, Testoes Roundabout Newcastle. 20. Further cameras at Washington on MS3 gantrys. With my wide ranging skills I have often been required to carry out Emergency building repairs around the Yatton premises. MORE TO BE ADDED.