2. Corporate Vision
To be a professional Engineering, Procurement and Construction business
Vision
Totality support
Focus support
Effective & efficient support
Mission
3 “ON”- 2” NO”
1. ON Specification
2. ON Time.
3. ON Budget.
4. NO Accident
5. NO Complain
Values
3. 17 Years Experience
Oil and Gas, Energy, Steel Services Business
Established in 1999
Pipeline : Pipeline Design and Installation
Piping : Piping Design and Installation
Tank : Tank Design, Fabrication and
Installation
Structure : Structure Design and
Installation, Pipe Support Design and
Installation
4. Strong Track Record Across Various
Sectors For High Quality Clients
Pipeline
Piping
Tank
Structure
Capabilitiesacrossindustries
9. PROJECT
On Going Project Project Client
Contract Value
US/Rp
Period Scope
Piping SPBG Installation
PT. Wijaya Karya
Persero
Rp 268 million 2016 S
10. PROJECTS EXPERIENCE
Complete Project
Project Client
Contract
Value (Rp)
Period Scope
Pipeline Installation 8” from
Kampung Melayu – Pulo
Gebang (Pipa Pendukung
SPBG Paket 2)
PT. Rekaya
Industri
(subsidiary of
PSD)
Rp 10,1 Billion 2016 S
Structure on RS. Delima Asih
Sisma Medika
PT. PP (Persero) Rp 300 Million 2012 S
Generator on Depkes RI
Building Project
PT. PP (Persero) Rp 300 Million 2012 S
Penguatan D-Wall Basement
RSCM Gedung Ibu dan Anak
PT. PP (Persero) Rp 500 Million 2011 S
Maintenance Generator PT. EPI Rp 170 Million 2011 S
Platform Maintenance Ruang
Genset PLN The Wave
PT. PP (Persero)
Rp 25 Million
2011 S
Tangga Servis Ground Water
Tank The Wave
PT. PP (Persero) Rp 20 Million 2011 S
Tutup Manhole Ground Water
Tank
PT. PP (Persero) Rp 50 Million 2011 S
Grill Gutter The Wave PT. PP (Persero) Rp 10 Million 2011 S
Pagar BRC The Wave PT. PP (Persero) Rp 20 Million 2011 S
Penangkal Petir PEMKAB JEPARA Rp 25 Million 2011 S
11. Experience List
NO PROJECT DESCRIPTION CLIENT LOCATION YEAR
1 Machining Flange & Blind Flange (UD
Power Baja)
Fa. Tugas Pulogadung 1998
2 Machining Shaft Srew Conveyor (UD
Power Baja)
Fa. Tugas Pulogadung 1999
3 Machining Shaft Bucket Elevator (UD
Power Baja)
Fa. Tugas Pulogadung 2000
4 Machining Shaft Srew Conveyor (UD
Power Baja)
Fa. Tugas Pulogadung 2001
5 Maching Bushing & Sprocket (UD
Power Baja)
Fa. Tugas Pulogadung 2002
6 Machining Otomotif (UD Power Baja) All Owner Jaktim 1999
7 Suppli dan Fabrikasi plat bordes PT. Multi Prima Konstruksi Cilegon 2007
8 Repair Pipa Steam PT. Aica Indonesia Tambun 2007
9 Repair Blower Dust Colector PT. Aica Indonesia Tambun 2007
10 Repair Stoper Press Machine PT. Aica Indonesia Tambun 2007
11 Repair Pompa Air Baku Jasa Tirta II Cawang 2007
12 Repair Pompa Air Centrifugal PT. Herinoko Jakarta 2007
13 Repair Pompa Air Centrifugal PT. Supralima Jakarta 2007
14 Machining Moulding Press Ban PT. Bridgestone Indonesia Karawang 2007
12. Experience List
NO PROJECT DESCRIPTION CLIENT LOCATION YEAR
15 Machining Houshing, Junction,
Casting, Grinding Screw
PT. Metal Castindo Bekasi 2007
16 Perbaikan Dryer System Refrigerasi PT. BATAN - PUSPITEK Serpong 2007
17 Fabrikasi Rumah Genset
TELKOMSEL
PT. Trimeka Hutama Jakarta 2007
18 Fabrikasi Skid Compressor Type
XATS 156
PT. Atlas Copco Indonesia Jakarta 2007
19 Fabrikasi & Erection Belt Conveyor
8.5 M 60 Ton/Jam
PT. Siamindo Gypsum
Industry
Cibitung 2007
20 Pabrikasi silencer genset 250 KVA
dan repair sound proof
PT. Sumber Daya
Sewatama
Jakarta 2008
21 Pembuatan vacum tank SUS 316 PT. Aica Indonesia bekasi 2008
22 Fuel tank kapasitas 5000L dan
8000L Indosat
Cv sarana sejahtera & PT.
Hansulindo
Jakarta 2008
23 Rekondisi dan balancing impeller &
stuffing box
PT. Sumber Daya
Sewatama
Jakarta 2008
24 Fabrikasi Housing Air cleaner &
Machinning Part SDC
PT. Sumber Daya
Sewatama
Jakarta 2008
25 Machinning Shaft Crane & Part
Lathe 5
PT. MMC Metal Fabrication Jababeka 2008
13. Experience List
NO PROJECT DESCRIPTION CLIENT LOCATION YEAR
26 Machinning Pisau potong plastic,
Bolt Join & claim
PT. Yakin Maju Sentosa Jakarta 2008
27 Repair Machinning gear pinion &
Lifting Bar
PT. Titan Persada Indonesia Jakarta 2008
28 Repair Servis Break system &
Electrical XQ Carier
PT. Sumber Daya Sewatama Jakarta 2008
29 Repair Tanki 100L 10 bar dan
Instal Compressor XAS-97
PT. Atlas Copco Indonesia Jakarta 2008
30 Install PLTD Bitung 3 & 4 Manado
10 MW
PT. Sumber Daya Sewatama Manado 2009
31 Relokasi PLTD bitung 2 ke
Gorontalo 7 MW
PT. Sumber Daya Sewatama Gorontalo 2009
32 Crobong & Y connection 15 bar PT. Atlas Copco Indonesia Jakarta 2009
33 Tanki solar 16000L dengan Skid
Container
PT. Sumber Daya Sewatama Jakarta 2009
34 Machining Rol penggilling tebu,
pabrik biodisel
BPPT Jakarta 2009
35 Fuel Tank 16 Kl With Containerize PT. Sumber Daya Sewatama Kalsel 2011
36 Fuel Tank 54 Kl PT. Sumber Daya Sewatama Kalsel 2011
37 PLTD 20 Mw Installtion PT. Sumber Daya Sewatama Kalsel 2011
38 Canopy Entrance Menara 165 PT. Pembangunan Perumahan Jakarta 2011
15. Tool Available
NO NAMA PERALATAN BRAND KONDISI JUMLAH
1 Welding machine Miller® Big Blue®
600X CC
USA OK 6
2 Welding Habitat INA OK 4
3 Airman Compressor PDS 185 S Japan OK 1
4 Flange Manajenent / bolt tightening Japan OK 1
5 Cold cutter Japan-Taiwan- China OK 1
16. List Tool
NO NAMA PERALATAN BRAND KONDISI JUMLAH
1 HOUNING MACHINE Japan OK 1
2 FRAIS MACHINE Japan-Taiwan- China OK 4
3 LATHE MACHINE Ø300 x 2000mm Japan OK 3
4 BORING FRAIS MACHINE Japan OK 2
5 MILLLING MACHINE Japan-Taiwan- China OK 4
6 BORING MACHINE Japan-Taiwan OK 2
7 MAGNETIC BORING MACHINE Japan_taiwan OK 2
8 CUTING WHEEL MACHINE Bosh, Makita, Matek OK 4
9 GRINDING MACHINE Ø400 x 1500mm Bosh, Makita, Matek OK 1
10 WATER PUMP Honda OK 1
11 STAND GRINDING MACHINE Japan-Taiwan OK 1
12 CUTTING GAS MACHINE Japan-Taiwan OK 3
13 WELDING MACHINE KA-402A Kobewel OK 2
14 WELDING MACHINE KA-402A Kobewel OK 2
17. List Tool
NO NAMA PERALATAN BRAND KONDISI JUMLAH
15 WELDING MACHINE S160i Kobewel OK 4
16 WELDING MACHINE TIG200 Porto Italy OK 2
17 WELDING MACHINE MPH-120 Prado OK 3
18 CHAIN BLOCK 5,3 TON Condo OK 2
19 LEVELING BLOCK Japan OK 2
20 PRESS MACHINE CAP 30 Ton Japan OK 1
21 WELDING DIESEL Japan OK 2
22 PRESS MACHINE CAP 14 Ton Japan OK 1
23 CHAIN BLOCK 3 TON Japan OK 2
24 FORK LIFT 5 TON Japan OK 1
25 KOMPRESSOR Japan 0K 2
26 HYDRO TEST Japan OK 1
27 Gantry 5 Ton Japan 0K 1
28 HYDRO TEST Japan OK 1
21. Direktur Utama
Sukron M
Direktur Keuangan
Nurina Manggi Asih
Project Control
Mulyadi
Project Support
Puji Ono
Account Manager
Yudi
Project PIC
Ferdi Hermawan
Project PIC
Abdullah
Project PIC
Eko
Direktur Operasi
Radityo
Organization Chart
Komisaris
Satrio A. P
22. Office and Workshop
Office Address :
Phone /Fax : 021 8515577
Email : sukron@gmail.com
Contact Person : Sukron M (081381189329)
Jl.Pondok Bambu Batas No. 2, RT 009 Rw 004
Duren Sawit, Jakarta Timur – 13430 Indonesia
mustika.aneka.mitra@gmail.com
sukron@gmail.com - 0813-8118-9329
Warehouse and Work Shop :
Jl. Bintara Jaya II No. 50,
Bekasi Barat, Kota Bekasi, Jawa Barat