Disclaimer This presentation uses the terms “potential petroleum quantities”, “prospective resources” and “contingent resources” to describe those quantities of petroleum that are potentially recoverable from accumulations yet to be discovered. Because of the uncertainty of commerciality and lack of sufficient exploration drilling, and the lack of identified prospects, leads, or future development and exploration projects, the potential petroleum quantities estimated herein cannot be classified as prospective resources, contingent resources or reserves, and the prospective resources and contingent resources cannot be classified as reserves. Investors are advised that the U.S. Securities and Exchange Commission (SEC) and other international securities regulators do not recognize potential petroleum quantities and prospective and contingent resources.  There is no certainty that any portion of the potential petroleum quantities or prospective resources will be discovered and, if discovered, whether they could be developed economically. Therefore, investors are cautioned not to assume that all or any part of OGX’s potential petroleum quantities or prospective resources exist, or that they can be developed economically. Accordingly, information concerning potential petroleum quantities and prospective and contingent resources contained in this presentation are not comparable to information permitted to be made public by U.S. or other international companies subject to SEC reporting and disclosure requirements, especially Regulation S-K under the Securities Act. Certain of the information and conclusions set forth herein are based on projections. These projections were prepared for the limited purpose of analyzing the potential risks and benefits of an investment in the securities by illustrating under certain limited assumptions projected capital and operating expenditures, installed production capacity, expected production, and number of wells drilled. In addition, because of the subjective judgments and inherent uncertainties of projections and because the projections are based on a number of assumptions, which are subject to significant uncertainties and contingencies that are beyond the control of OGX, there can be no assurance that the projections or conclusions derived therefrom will be realized. Under no circumstances should the projections set forth herein be regarded as a representation, warranty or prediction that OGX will achieve or is likely to achieve any particular future result. There can be no assurance that OGX’s future results or projections will not vary significantly from those set forth herein. Accordingly, investors may lose all of their investment to the extent the projections or conclusions included herein are not ultimately realized. This presentation also contains forward-looking statements, which may be identified by such words as "may", "plans", "expects", "believes" and similar expressions, or by their context. These statements are made on the basis of current knowledge and, by their nature, involve numerous assumptions and uncertainties.  This presentation does not constitute an offer, or invitation, or solicitation of an offer, to subscribe for or purchase any securities. Neither this presentation nor anything contained herein shall form the basis of any contract or commitment whatsoever.  Recipients of this presentation are not to construe the contents of this summary as legal, tax or investment advice and recipients should consult their own advisors in this regard. Various factors could cause OGX's actual future results, performance or events to differ materially from those described in this presentation. In no event shall OGX or the members of its board, directors, assigns or employees be liable to any third party (including investors) for investment decisions or acts or business carried out based on the information and statements that appear in this presentation, or for indirect damage, lost profit or related issues. OGX does not intend to provide to potential shareholders with a revision of the statements or an analysis of the differences between the statements and the actual results. You are urged to carefully review OGX's offering circular, including the risk factors included therein. This presentation does not purport to be all-inclusive or to contain all the information that a prospective investor may desire in evaluating OGX. Each investor must conduct and rely on its own evaluation, including of the associated risks, in making an investment decision.11 2
Agenda ,[object Object]
OGX Portfolio
OGX Operations
Path to Production
Financial Overview
AppendixLastupdate: 09/16/11 3
OGX Overview
OGX Overview OGX is among the 15 largest pure E&P companies globally with a market cap of approximately US$25 billion, and is the 3rd most traded stock in Latin America World class E&P portfolio with 10.8 billion boe of potential resources, mostly in shallow waters and onshore (low cost and off-the-shelf technology) Multi-billion barrel discoveries and overall success rate exceeding 90% with high productivity reservoirs amongst the best in Brazil Solid cash position allows OGX to conclude the largest and most successful private sector exploratory campaign in Brazil and to support production development (more than 60 wells spud since the beginning of its exploratory campaign in Aug. 2009) Highly successful and experienced management team, combining unique intellectual capital and superior execution skills Proven execution capability (from concept to oil in an unprecedented timing) with fully established operations comprising more than 5,000 people Brazil’s historical under-exploration underpins massive growth opportunities for OGX 5
OGX Main Accomplishments OSX-1 and initial production 1 block acquired in Parnaíba (50% stake) OGX Main Accomplishments Updated OGX portfolio to 10.8 bn(1)boe of potential resources 5 onshore blocks acquired in Colombia Bond: US$ 2.6bn raised Nov/ 11 High productivity horizontal well FPSO secured for  20 years Sep/11 OGX included in the Ibovespa Index US$1.3 bnraised through an equity Private Placement 21 blocks acquired during the 9th Bidding Round Beginning of thedrilling campaign May/11 Apr/11 Acquisition of 70% stake in the Parnaíba Assets ,[object Object]
Total equity raised to date: US$8.0 bnFeb/11 Jun/10 IPO: US$4.1 bn raised  Jan/10 OGX Creation Survey and interpretation of the 3D seismic data Sep/09 Aug/09 Procurement of all equipment and services necessary to initiate the drilling campaign Jun/08 Nov/07 Jul/07 Proven execution capability (from concept to first oil in unprecedented timing) with fully established operations comprising more than 5,000 people (1) Calculated by OGX based on potential, prospective and contingent volumes contained in the DeGolyer and MacNaughton Reports 6
(1) Free Float Free Float 39% 61% Petróleo e Gás Participações S.A.(Market Capitalization (3): ~ US$25 Billion) 99.99% 66.67% (4) Petróleo e Gás Ltda.  Maranhão Petróleo e Gás Ltda. 70% 100% OGX Ownership and Corporate Structure ,[object Object]
 ~33 thousand investors
 3rdmost representative  stock in Ibovespa index 4.1%
 Most liquid common share99.99% OGX Campos Petróleo e Gás S.A.  30% 100% 8 Blocks  7 Blocks  20 Blocks  ,[object Object]
1 – Parnaíba (50%) (2)
5 - Campos (100%) (2)
2 - Campos (50%)
5 - Santos (100%) (2)
5 - Espirito Santo (50%)
5 - PAMA (100%) (2)
5 - Colombia (100%) (2)(1) EBX represented through Centennial Asset Mining Fund LLC (Nevada, USA) (“CAMF”) (2) OGX as operator (3) Market data as of  June 30, 2011 (4) MPX S.A. holds 33.33% 7
CEO Eike Batista Gen. Exec. Officer Paulo Mendonça (38) Oil & Gas Commercialization Joaquim Dib Cohen (32) Exploration Officer Paulo Mendonça (38) General Counsel  José Roberto Faveret CFO Marcelo Torres Production Officer Reinaldo Belotti(34) ExplorationCampos-ES Paulo Ricardo (28) Procurement Olavo Foerch (32) Production Development José Brito (42) Exploration Santos and Eq. Margin Edmundo Marques (24) Reservoir & Reserves Roberto Toledo  (31) Drilling Ricardo Juiniti (27) E&P Laboratory Dolores Carvalho (35) Onshore Basin Celso Martins (34) Logistics Billy Pinheiro (30) Strategic Alliances Luiz Reis (45) International Ernani Posrche (33) Production Ricardo Abiramia (24) New Areas Executive Manager Paulo de Tarso Guimarães (34) GeologicalOperations Moacir Santos (38) Applied Technology Marcos Amaral (28) HSE Leandro Leme (31) Highly successful and committed management team,  Combining unique intellectual capital and superior execution skills  Management Organization Structure (1) (1) 	Parentheses represent years experience in the E&P industry 8
PBR success index Exploratory Team ,[object Object]
Success index in excess of 60% on average offshore Brazil from 2002-2007 whilst at Petrobras
Over 10 billion boe and more than 50 new fields discoveredProven track record having opened several new oil frontiers, including the pre-salt, and discovering over 50 new oil fields Highly Qualified Exploration Team 9
Brazil: Vast Untapped Oil & Gas Potential Brazil: Vast Untapped Oil & Gas Potential Largest oil and gas discoveries in the world New provinces could propel Brazil into top reserves holders Still significantly under-explored % of sedimentary basins under concession + 35 bn boe SaudiArabia Venezuela Iran Iraq Kuwait Brazil post Tupi UAE Russia Libya Kazakhstan Nigeria Canada US Qatar China Angola Brazil Licensed  4% BrazilTurkmenistan Iran  Kazakhstan China  Russia Australia Kuwait  Israel  SaudiArabiaIndia Indonesia Venezuela Papua  NewGuineaGhana Unlicensed 96% Source: ANP Oil & gas in the world Oil and Gas Discovered Volumes 2000 – 2010 (Bn boe) Oil  Resources- December 2009  (Bn bbl) Source: EIA-DOE, BP Statistical Review of World Energy 2010, Saudi Aramco, UPPSALA University, Petrobras, ANP and OGX analysis Source: IHS Source: BP Statistical Review of World Energy 2010 & analyst estimates Brazil’s historical under-exploration underpins massive growth opportunities for OGX 10
OGX Portfolio
[object Object]
Unique portfolio with 10.8 billion potential recoverable barrels of oil equivalent (boer)
OGX’s business plan is based on 4.1 billion barrels already discovered in the shallow waters of the Campos BasinPortfolio Shallowwater ~120m Shallowwater ~150m Shallowwater ~60m Deepwater ~1,000m 12 OGX Portfolio
Campos Basin ,[object Object]
5 blocks operated by OGX (100% owned) and 2  operated by Maersk Oil (50% owned)
Total area of 1,177 km2
Average water depth of ~120m
46 wells drilled
100% success rateOGX’s discovered accumulations confirm a new hydrocarbon province in the southern Campos Basin Campos Basin: Low Risk, Shallow Water and Large 13
Santos Basin: High Potential Santos Basin ,[object Object]
5 blocks operated by OGX (100% owned)
Total area of 820 km²
Average water depth of ~150 m
9 wells drilled
~ 65% success rateSantos basin is oneofthemostpromisingexploratoryareas in brazil, withsignificantpotential for gasand light oil 14
Parnaíba basin Newfrontierbasinwithhighpotential for gasproduction Parnaíba Basin: Major Gas Province ,[object Object]
8 blocks operated by OGX Maranhão
Total area of 24,500 km²
Monetization of gas through thermoelectric plants to be developed by MPX/Petra (3,722 MW already licensed)
>75% success rate  (9 wells drilled)

More Related Content

What's hot

OGX Management Presentation
OGX Management PresentationOGX Management Presentation
OGX Management PresentationOgx2011
 
Petro River Oil Corp - Petro Spring
Petro River Oil Corp - Petro SpringPetro River Oil Corp - Petro Spring
Petro River Oil Corp - Petro SpringBRS Resources Ltd.
 
2019.06.05 probe metals presentation
2019.06.05 probe metals presentation 2019.06.05 probe metals presentation
2019.06.05 probe metals presentation Probe Gold
 
2018 07-09 prb corporate presentation (3) (1)
2018 07-09 prb corporate presentation (3) (1)2018 07-09 prb corporate presentation (3) (1)
2018 07-09 prb corporate presentation (3) (1)Probe Gold
 
2019.05.07 probe metals presentation
2019.05.07 probe metals presentation 2019.05.07 probe metals presentation
2019.05.07 probe metals presentation Probe Gold
 
2019.04.23 probe metals presentation
2019.04.23 probe metals presentation 2019.04.23 probe metals presentation
2019.04.23 probe metals presentation Probe Gold
 
2018 04-10 prb corporate presentation
2018 04-10 prb corporate presentation2018 04-10 prb corporate presentation
2018 04-10 prb corporate presentationProbe Gold
 
2019.04.23 probe metals presentation
2019.04.23 probe metals presentation 2019.04.23 probe metals presentation
2019.04.23 probe metals presentation Probe Gold
 
2018 07-09 prb corporate presentation (3)
2018 07-09 prb corporate presentation (3)2018 07-09 prb corporate presentation (3)
2018 07-09 prb corporate presentation (3)Probe Gold
 
2019.03.28 probe metals presentation final
2019.03.28 probe metals presentation final2019.03.28 probe metals presentation final
2019.03.28 probe metals presentation finalProbe Gold
 
2018 07-09 prb corporate presentation (3)
2018 07-09 prb corporate presentation (3)2018 07-09 prb corporate presentation (3)
2018 07-09 prb corporate presentation (3)Probe Gold
 
2019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 92019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 9Probe Gold
 
2019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 92019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 9Probe Gold
 

What's hot (14)

OGX Management Presentation
OGX Management PresentationOGX Management Presentation
OGX Management Presentation
 
Petro River Oil Corp - Petro Spring
Petro River Oil Corp - Petro SpringPetro River Oil Corp - Petro Spring
Petro River Oil Corp - Petro Spring
 
2019.06.05 probe metals presentation
2019.06.05 probe metals presentation 2019.06.05 probe metals presentation
2019.06.05 probe metals presentation
 
2018 07-09 prb corporate presentation (3) (1)
2018 07-09 prb corporate presentation (3) (1)2018 07-09 prb corporate presentation (3) (1)
2018 07-09 prb corporate presentation (3) (1)
 
2019.05.07 probe metals presentation
2019.05.07 probe metals presentation 2019.05.07 probe metals presentation
2019.05.07 probe metals presentation
 
2019.04.23 probe metals presentation
2019.04.23 probe metals presentation 2019.04.23 probe metals presentation
2019.04.23 probe metals presentation
 
2018 04-10 prb corporate presentation
2018 04-10 prb corporate presentation2018 04-10 prb corporate presentation
2018 04-10 prb corporate presentation
 
2019.04.23 probe metals presentation
2019.04.23 probe metals presentation 2019.04.23 probe metals presentation
2019.04.23 probe metals presentation
 
2018 07-09 prb corporate presentation (3)
2018 07-09 prb corporate presentation (3)2018 07-09 prb corporate presentation (3)
2018 07-09 prb corporate presentation (3)
 
2019.03.28 probe metals presentation final
2019.03.28 probe metals presentation final2019.03.28 probe metals presentation final
2019.03.28 probe metals presentation final
 
2018 07-09 prb corporate presentation (3)
2018 07-09 prb corporate presentation (3)2018 07-09 prb corporate presentation (3)
2018 07-09 prb corporate presentation (3)
 
2019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 92019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 9
 
2019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 92019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 9
 
Probe Metals
Probe MetalsProbe Metals
Probe Metals
 

Viewers also liked

2Q11 Presentation final
2Q11 Presentation final2Q11 Presentation final
2Q11 Presentation finalOgx2011
 
9 contingent camposandparnaiba-dez_2010
9   contingent camposandparnaiba-dez_20109   contingent camposandparnaiba-dez_2010
9 contingent camposandparnaiba-dez_2010Ogx2011
 
7 unconventional parnaiba-dez_2010
7   unconventional parnaiba-dez_20107   unconventional parnaiba-dez_2010
7 unconventional parnaiba-dez_2010Ogx2011
 
Ogx public presentationv8
Ogx public presentationv8Ogx public presentationv8
Ogx public presentationv8Ogx2011
 
12 glossrioleo gsvfinal-ing
12   glossrioleo gsvfinal-ing12   glossrioleo gsvfinal-ing
12 glossrioleo gsvfinal-ingOgx2011
 
OGX Management Presentation
OGX Management PresentationOGX Management Presentation
OGX Management PresentationOgx2011
 
1Q13 Earnings Presentation
1Q13 Earnings Presentation1Q13 Earnings Presentation
1Q13 Earnings PresentationOgx2011
 
OGX 4Q12 Earnings Presentation
OGX 4Q12 Earnings PresentationOGX 4Q12 Earnings Presentation
OGX 4Q12 Earnings PresentationOgx2011
 
Ogx management presentation v27
Ogx management presentation v27Ogx management presentation v27
Ogx management presentation v27Ogx2011
 
5 potential volumescolombia-cesarrancheria_mar_2011
5   potential volumescolombia-cesarrancheria_mar_20115   potential volumescolombia-cesarrancheria_mar_2011
5 potential volumescolombia-cesarrancheria_mar_2011Ogx2011
 
Conference call presentation 2 q10 results
Conference call presentation 2 q10 resultsConference call presentation 2 q10 results
Conference call presentation 2 q10 resultsOgx2011
 
11 apresentao4 t10ing
11   apresentao4 t10ing11   apresentao4 t10ing
11 apresentao4 t10ingOgx2011
 
Presentation Earnings Release 2011
Presentation Earnings Release 2011Presentation Earnings Release 2011
Presentation Earnings Release 2011Ogx2011
 
2Q11 Presentation final
2Q11 Presentation final2Q11 Presentation final
2Q11 Presentation finalOgx2011
 
Ogx management presentation v5
Ogx management presentation v5Ogx management presentation v5
Ogx management presentation v5Ogx2011
 
Ogx management presentation v1
Ogx management presentation v1Ogx management presentation v1
Ogx management presentation v1Ogx2011
 

Viewers also liked (16)

2Q11 Presentation final
2Q11 Presentation final2Q11 Presentation final
2Q11 Presentation final
 
9 contingent camposandparnaiba-dez_2010
9   contingent camposandparnaiba-dez_20109   contingent camposandparnaiba-dez_2010
9 contingent camposandparnaiba-dez_2010
 
7 unconventional parnaiba-dez_2010
7   unconventional parnaiba-dez_20107   unconventional parnaiba-dez_2010
7 unconventional parnaiba-dez_2010
 
Ogx public presentationv8
Ogx public presentationv8Ogx public presentationv8
Ogx public presentationv8
 
12 glossrioleo gsvfinal-ing
12   glossrioleo gsvfinal-ing12   glossrioleo gsvfinal-ing
12 glossrioleo gsvfinal-ing
 
OGX Management Presentation
OGX Management PresentationOGX Management Presentation
OGX Management Presentation
 
1Q13 Earnings Presentation
1Q13 Earnings Presentation1Q13 Earnings Presentation
1Q13 Earnings Presentation
 
OGX 4Q12 Earnings Presentation
OGX 4Q12 Earnings PresentationOGX 4Q12 Earnings Presentation
OGX 4Q12 Earnings Presentation
 
Ogx management presentation v27
Ogx management presentation v27Ogx management presentation v27
Ogx management presentation v27
 
5 potential volumescolombia-cesarrancheria_mar_2011
5   potential volumescolombia-cesarrancheria_mar_20115   potential volumescolombia-cesarrancheria_mar_2011
5 potential volumescolombia-cesarrancheria_mar_2011
 
Conference call presentation 2 q10 results
Conference call presentation 2 q10 resultsConference call presentation 2 q10 results
Conference call presentation 2 q10 results
 
11 apresentao4 t10ing
11   apresentao4 t10ing11   apresentao4 t10ing
11 apresentao4 t10ing
 
Presentation Earnings Release 2011
Presentation Earnings Release 2011Presentation Earnings Release 2011
Presentation Earnings Release 2011
 
2Q11 Presentation final
2Q11 Presentation final2Q11 Presentation final
2Q11 Presentation final
 
Ogx management presentation v5
Ogx management presentation v5Ogx management presentation v5
Ogx management presentation v5
 
Ogx management presentation v1
Ogx management presentation v1Ogx management presentation v1
Ogx management presentation v1
 

Similar to Ogx management presentation v8

ISES 2013 - Day 2 - Mitchell Winkler (Director Arctic, Shell) - Arctic Drilling
ISES 2013  - Day 2 - Mitchell Winkler (Director Arctic, Shell) - Arctic DrillingISES 2013  - Day 2 - Mitchell Winkler (Director Arctic, Shell) - Arctic Drilling
ISES 2013 - Day 2 - Mitchell Winkler (Director Arctic, Shell) - Arctic DrillingStudent Energy
 
Gulfport Energy Investor Presentation May 2015
Gulfport Energy Investor Presentation May 2015Gulfport Energy Investor Presentation May 2015
Gulfport Energy Investor Presentation May 2015Marcellus Drilling News
 
Using Deformable Shapes to Build a Plate Model by Malcom Ross, Shell: 2013/Th...
Using Deformable Shapes to Build a Plate Model by Malcom Ross, Shell: 2013/Th...Using Deformable Shapes to Build a Plate Model by Malcom Ross, Shell: 2013/Th...
Using Deformable Shapes to Build a Plate Model by Malcom Ross, Shell: 2013/Th...The Rothwell Group, L.P.
 
2018 Deepwater Energy Conference (DEC) plenary session highlights
2018 Deepwater Energy Conference (DEC) plenary session highlights 2018 Deepwater Energy Conference (DEC) plenary session highlights
2018 Deepwater Energy Conference (DEC) plenary session highlights Deepwater Conference Committee
 
Llg corporate presentation february 2018
Llg   corporate presentation february 2018Llg   corporate presentation february 2018
Llg corporate presentation february 2018masongraphite
 
Progress energy resources corp. cibc new york mini conference no-appendix
Progress energy resources corp. cibc new york mini conference no-appendixProgress energy resources corp. cibc new york mini conference no-appendix
Progress energy resources corp. cibc new york mini conference no-appendixProgressEnergy
 
Llg corporate presentation march 2018
Llg   corporate presentation march 2018Llg   corporate presentation march 2018
Llg corporate presentation march 2018masongraphite
 
Llg corporate presentation march 2018
Llg   corporate presentation march 2018Llg   corporate presentation march 2018
Llg corporate presentation march 2018masongraphite
 
Investor Presentation - Allana Potash
Investor Presentation - Allana PotashInvestor Presentation - Allana Potash
Investor Presentation - Allana PotashMining On Top
 
1510-Shearwater-Well-Reservoir-and-Facilities-Management-Optimisation-1-Hwei-...
1510-Shearwater-Well-Reservoir-and-Facilities-Management-Optimisation-1-Hwei-...1510-Shearwater-Well-Reservoir-and-Facilities-Management-Optimisation-1-Hwei-...
1510-Shearwater-Well-Reservoir-and-Facilities-Management-Optimisation-1-Hwei-...MohanadHussien2
 
Largo corporate presentation july 2017
Largo corporate presentation july 2017Largo corporate presentation july 2017
Largo corporate presentation july 2017Alex Guthrie
 
Q4 2013 financial results webcast presentation final
Q4 2013 financial results webcast presentation finalQ4 2013 financial results webcast presentation final
Q4 2013 financial results webcast presentation finalAuRico Gold
 
Primero 2015-cambridge-house-final v001-f69ux4
Primero 2015-cambridge-house-final v001-f69ux4Primero 2015-cambridge-house-final v001-f69ux4
Primero 2015-cambridge-house-final v001-f69ux4primero_mining
 
Lgo corporate presentation august 2017
Lgo corporate presentation   august 2017Lgo corporate presentation   august 2017
Lgo corporate presentation august 2017Alex Guthrie
 
Llg corporate presentation october 2017
Llg   corporate presentation october 2017Llg   corporate presentation october 2017
Llg corporate presentation october 2017masongraphite
 
Llg corporate presentation january 2018
Llg   corporate presentation january 2018Llg   corporate presentation january 2018
Llg corporate presentation january 2018masongraphite
 
Llg corporate presentation november 2017
Llg   corporate presentation november 2017Llg   corporate presentation november 2017
Llg corporate presentation november 2017masongraphite
 
Llg corporate presentation november 2017
Llg   corporate presentation november 2017Llg   corporate presentation november 2017
Llg corporate presentation november 2017masongraphite
 

Similar to Ogx management presentation v8 (20)

ISES 2013 - Day 2 - Mitchell Winkler (Director Arctic, Shell) - Arctic Drilling
ISES 2013  - Day 2 - Mitchell Winkler (Director Arctic, Shell) - Arctic DrillingISES 2013  - Day 2 - Mitchell Winkler (Director Arctic, Shell) - Arctic Drilling
ISES 2013 - Day 2 - Mitchell Winkler (Director Arctic, Shell) - Arctic Drilling
 
Gulfport Energy Investor Presentation May 2015
Gulfport Energy Investor Presentation May 2015Gulfport Energy Investor Presentation May 2015
Gulfport Energy Investor Presentation May 2015
 
Using Deformable Shapes to Build a Plate Model by Malcom Ross, Shell: 2013/Th...
Using Deformable Shapes to Build a Plate Model by Malcom Ross, Shell: 2013/Th...Using Deformable Shapes to Build a Plate Model by Malcom Ross, Shell: 2013/Th...
Using Deformable Shapes to Build a Plate Model by Malcom Ross, Shell: 2013/Th...
 
2018 Deepwater Energy Conference (DEC) plenary session highlights
2018 Deepwater Energy Conference (DEC) plenary session highlights 2018 Deepwater Energy Conference (DEC) plenary session highlights
2018 Deepwater Energy Conference (DEC) plenary session highlights
 
Llg corporate presentation february 2018
Llg   corporate presentation february 2018Llg   corporate presentation february 2018
Llg corporate presentation february 2018
 
Progress energy resources corp. cibc new york mini conference no-appendix
Progress energy resources corp. cibc new york mini conference no-appendixProgress energy resources corp. cibc new york mini conference no-appendix
Progress energy resources corp. cibc new york mini conference no-appendix
 
Llg corporate presentation march 2018
Llg   corporate presentation march 2018Llg   corporate presentation march 2018
Llg corporate presentation march 2018
 
Llg corporate presentation march 2018
Llg   corporate presentation march 2018Llg   corporate presentation march 2018
Llg corporate presentation march 2018
 
Investor Presentation - Allana Potash
Investor Presentation - Allana PotashInvestor Presentation - Allana Potash
Investor Presentation - Allana Potash
 
1510-Shearwater-Well-Reservoir-and-Facilities-Management-Optimisation-1-Hwei-...
1510-Shearwater-Well-Reservoir-and-Facilities-Management-Optimisation-1-Hwei-...1510-Shearwater-Well-Reservoir-and-Facilities-Management-Optimisation-1-Hwei-...
1510-Shearwater-Well-Reservoir-and-Facilities-Management-Optimisation-1-Hwei-...
 
Largo corporate presentation july 2017
Largo corporate presentation july 2017Largo corporate presentation july 2017
Largo corporate presentation july 2017
 
Q4 2013 financial results webcast presentation final
Q4 2013 financial results webcast presentation finalQ4 2013 financial results webcast presentation final
Q4 2013 financial results webcast presentation final
 
Primero 2015-cambridge-house-final v001-f69ux4
Primero 2015-cambridge-house-final v001-f69ux4Primero 2015-cambridge-house-final v001-f69ux4
Primero 2015-cambridge-house-final v001-f69ux4
 
Lgo corporate presentation august 2017
Lgo corporate presentation   august 2017Lgo corporate presentation   august 2017
Lgo corporate presentation august 2017
 
Llg corporate presentation october 2017
Llg   corporate presentation october 2017Llg   corporate presentation october 2017
Llg corporate presentation october 2017
 
International Standard for Maritime Pilot Organisations
International Standard for Maritime Pilot OrganisationsInternational Standard for Maritime Pilot Organisations
International Standard for Maritime Pilot Organisations
 
Llg corporate presentation january 2018
Llg   corporate presentation january 2018Llg   corporate presentation january 2018
Llg corporate presentation january 2018
 
Llg corporate presentation november 2017
Llg   corporate presentation november 2017Llg   corporate presentation november 2017
Llg corporate presentation november 2017
 
Llg corporate presentation november 2017
Llg   corporate presentation november 2017Llg   corporate presentation november 2017
Llg corporate presentation november 2017
 
Energy Consumption - Scenario Planning
Energy Consumption - Scenario PlanningEnergy Consumption - Scenario Planning
Energy Consumption - Scenario Planning
 

More from Ogx2011

Anexo xiv metodologia do cálculo do índice de custo benefício - icb
Anexo xiv   metodologia do cálculo do índice de custo benefício - icbAnexo xiv   metodologia do cálculo do índice de custo benefício - icb
Anexo xiv metodologia do cálculo do índice de custo benefício - icbOgx2011
 
Apresentação Institucional OGX
Apresentação Institucional OGXApresentação Institucional OGX
Apresentação Institucional OGXOgx2011
 
Ogx management presentation port
Ogx management presentation portOgx management presentation port
Ogx management presentation portOgx2011
 
Apresentação Institucional OGX
Apresentação Institucional OGXApresentação Institucional OGX
Apresentação Institucional OGXOgx2011
 
OGX Management Presentation
OGX Management PresentationOGX Management Presentation
OGX Management PresentationOgx2011
 
Apresentação Resultados 1T13
Apresentação Resultados 1T13Apresentação Resultados 1T13
Apresentação Resultados 1T13Ogx2011
 
Apresentação Resultados 1T13
Apresentação Resultados 1T13Apresentação Resultados 1T13
Apresentação Resultados 1T13Ogx2011
 
1Q13 Earnings Presentation
1Q13 Earnings Presentation1Q13 Earnings Presentation
1Q13 Earnings PresentationOgx2011
 
OGX Apresentação Institucional
OGX Apresentação InstitucionalOGX Apresentação Institucional
OGX Apresentação InstitucionalOgx2011
 
OGX 2012 Earnings Presentation
OGX 2012 Earnings PresentationOGX 2012 Earnings Presentation
OGX 2012 Earnings PresentationOgx2011
 
OGX 2012 Apresentação Resultados
OGX 2012 Apresentação ResultadosOGX 2012 Apresentação Resultados
OGX 2012 Apresentação ResultadosOgx2011
 
OGX 4T12 Apresentação Resultados
OGX 4T12 Apresentação ResultadosOGX 4T12 Apresentação Resultados
OGX 4T12 Apresentação ResultadosOgx2011
 
Apresentação Institucional OGX
Apresentação Institucional OGXApresentação Institucional OGX
Apresentação Institucional OGXOgx2011
 
OGX Management Presentation
OGX Management PresentationOGX Management Presentation
OGX Management PresentationOgx2011
 
OGX Management Presentation
OGX Management PresentationOGX Management Presentation
OGX Management PresentationOgx2011
 
Apresentação Institucional OGX
Apresentação Institucional OGXApresentação Institucional OGX
Apresentação Institucional OGXOgx2011
 
Apresentação Institucional OGX
Apresentação Institucional OGXApresentação Institucional OGX
Apresentação Institucional OGXOgx2011
 
OGX Management Presentation
OGX Management PresentationOGX Management Presentation
OGX Management PresentationOgx2011
 
Ogx management presentation v2
Ogx management presentation v2Ogx management presentation v2
Ogx management presentation v2Ogx2011
 
Branding book ebx_final
Branding book ebx_finalBranding book ebx_final
Branding book ebx_finalOgx2011
 

More from Ogx2011 (20)

Anexo xiv metodologia do cálculo do índice de custo benefício - icb
Anexo xiv   metodologia do cálculo do índice de custo benefício - icbAnexo xiv   metodologia do cálculo do índice de custo benefício - icb
Anexo xiv metodologia do cálculo do índice de custo benefício - icb
 
Apresentação Institucional OGX
Apresentação Institucional OGXApresentação Institucional OGX
Apresentação Institucional OGX
 
Ogx management presentation port
Ogx management presentation portOgx management presentation port
Ogx management presentation port
 
Apresentação Institucional OGX
Apresentação Institucional OGXApresentação Institucional OGX
Apresentação Institucional OGX
 
OGX Management Presentation
OGX Management PresentationOGX Management Presentation
OGX Management Presentation
 
Apresentação Resultados 1T13
Apresentação Resultados 1T13Apresentação Resultados 1T13
Apresentação Resultados 1T13
 
Apresentação Resultados 1T13
Apresentação Resultados 1T13Apresentação Resultados 1T13
Apresentação Resultados 1T13
 
1Q13 Earnings Presentation
1Q13 Earnings Presentation1Q13 Earnings Presentation
1Q13 Earnings Presentation
 
OGX Apresentação Institucional
OGX Apresentação InstitucionalOGX Apresentação Institucional
OGX Apresentação Institucional
 
OGX 2012 Earnings Presentation
OGX 2012 Earnings PresentationOGX 2012 Earnings Presentation
OGX 2012 Earnings Presentation
 
OGX 2012 Apresentação Resultados
OGX 2012 Apresentação ResultadosOGX 2012 Apresentação Resultados
OGX 2012 Apresentação Resultados
 
OGX 4T12 Apresentação Resultados
OGX 4T12 Apresentação ResultadosOGX 4T12 Apresentação Resultados
OGX 4T12 Apresentação Resultados
 
Apresentação Institucional OGX
Apresentação Institucional OGXApresentação Institucional OGX
Apresentação Institucional OGX
 
OGX Management Presentation
OGX Management PresentationOGX Management Presentation
OGX Management Presentation
 
OGX Management Presentation
OGX Management PresentationOGX Management Presentation
OGX Management Presentation
 
Apresentação Institucional OGX
Apresentação Institucional OGXApresentação Institucional OGX
Apresentação Institucional OGX
 
Apresentação Institucional OGX
Apresentação Institucional OGXApresentação Institucional OGX
Apresentação Institucional OGX
 
OGX Management Presentation
OGX Management PresentationOGX Management Presentation
OGX Management Presentation
 
Ogx management presentation v2
Ogx management presentation v2Ogx management presentation v2
Ogx management presentation v2
 
Branding book ebx_final
Branding book ebx_finalBranding book ebx_final
Branding book ebx_final
 

Recently uploaded

Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524najka9823
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 

Recently uploaded (20)

Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 

Ogx management presentation v8

  • 2. Disclaimer This presentation uses the terms “potential petroleum quantities”, “prospective resources” and “contingent resources” to describe those quantities of petroleum that are potentially recoverable from accumulations yet to be discovered. Because of the uncertainty of commerciality and lack of sufficient exploration drilling, and the lack of identified prospects, leads, or future development and exploration projects, the potential petroleum quantities estimated herein cannot be classified as prospective resources, contingent resources or reserves, and the prospective resources and contingent resources cannot be classified as reserves. Investors are advised that the U.S. Securities and Exchange Commission (SEC) and other international securities regulators do not recognize potential petroleum quantities and prospective and contingent resources. There is no certainty that any portion of the potential petroleum quantities or prospective resources will be discovered and, if discovered, whether they could be developed economically. Therefore, investors are cautioned not to assume that all or any part of OGX’s potential petroleum quantities or prospective resources exist, or that they can be developed economically. Accordingly, information concerning potential petroleum quantities and prospective and contingent resources contained in this presentation are not comparable to information permitted to be made public by U.S. or other international companies subject to SEC reporting and disclosure requirements, especially Regulation S-K under the Securities Act. Certain of the information and conclusions set forth herein are based on projections. These projections were prepared for the limited purpose of analyzing the potential risks and benefits of an investment in the securities by illustrating under certain limited assumptions projected capital and operating expenditures, installed production capacity, expected production, and number of wells drilled. In addition, because of the subjective judgments and inherent uncertainties of projections and because the projections are based on a number of assumptions, which are subject to significant uncertainties and contingencies that are beyond the control of OGX, there can be no assurance that the projections or conclusions derived therefrom will be realized. Under no circumstances should the projections set forth herein be regarded as a representation, warranty or prediction that OGX will achieve or is likely to achieve any particular future result. There can be no assurance that OGX’s future results or projections will not vary significantly from those set forth herein. Accordingly, investors may lose all of their investment to the extent the projections or conclusions included herein are not ultimately realized. This presentation also contains forward-looking statements, which may be identified by such words as "may", "plans", "expects", "believes" and similar expressions, or by their context. These statements are made on the basis of current knowledge and, by their nature, involve numerous assumptions and uncertainties. This presentation does not constitute an offer, or invitation, or solicitation of an offer, to subscribe for or purchase any securities. Neither this presentation nor anything contained herein shall form the basis of any contract or commitment whatsoever. Recipients of this presentation are not to construe the contents of this summary as legal, tax or investment advice and recipients should consult their own advisors in this regard. Various factors could cause OGX's actual future results, performance or events to differ materially from those described in this presentation. In no event shall OGX or the members of its board, directors, assigns or employees be liable to any third party (including investors) for investment decisions or acts or business carried out based on the information and statements that appear in this presentation, or for indirect damage, lost profit or related issues. OGX does not intend to provide to potential shareholders with a revision of the statements or an analysis of the differences between the statements and the actual results. You are urged to carefully review OGX's offering circular, including the risk factors included therein. This presentation does not purport to be all-inclusive or to contain all the information that a prospective investor may desire in evaluating OGX. Each investor must conduct and rely on its own evaluation, including of the associated risks, in making an investment decision.11 2
  • 3.
  • 10. OGX Overview OGX is among the 15 largest pure E&P companies globally with a market cap of approximately US$25 billion, and is the 3rd most traded stock in Latin America World class E&P portfolio with 10.8 billion boe of potential resources, mostly in shallow waters and onshore (low cost and off-the-shelf technology) Multi-billion barrel discoveries and overall success rate exceeding 90% with high productivity reservoirs amongst the best in Brazil Solid cash position allows OGX to conclude the largest and most successful private sector exploratory campaign in Brazil and to support production development (more than 60 wells spud since the beginning of its exploratory campaign in Aug. 2009) Highly successful and experienced management team, combining unique intellectual capital and superior execution skills Proven execution capability (from concept to oil in an unprecedented timing) with fully established operations comprising more than 5,000 people Brazil’s historical under-exploration underpins massive growth opportunities for OGX 5
  • 11.
  • 12. Total equity raised to date: US$8.0 bnFeb/11 Jun/10 IPO: US$4.1 bn raised Jan/10 OGX Creation Survey and interpretation of the 3D seismic data Sep/09 Aug/09 Procurement of all equipment and services necessary to initiate the drilling campaign Jun/08 Nov/07 Jul/07 Proven execution capability (from concept to first oil in unprecedented timing) with fully established operations comprising more than 5,000 people (1) Calculated by OGX based on potential, prospective and contingent volumes contained in the DeGolyer and MacNaughton Reports 6
  • 13.
  • 14. ~33 thousand investors
  • 15. 3rdmost representative stock in Ibovespa index 4.1%
  • 16.
  • 17. 1 – Parnaíba (50%) (2)
  • 18. 5 - Campos (100%) (2)
  • 19. 2 - Campos (50%)
  • 20. 5 - Santos (100%) (2)
  • 21. 5 - Espirito Santo (50%)
  • 22. 5 - PAMA (100%) (2)
  • 23. 5 - Colombia (100%) (2)(1) EBX represented through Centennial Asset Mining Fund LLC (Nevada, USA) (“CAMF”) (2) OGX as operator (3) Market data as of June 30, 2011 (4) MPX S.A. holds 33.33% 7
  • 24. CEO Eike Batista Gen. Exec. Officer Paulo Mendonça (38) Oil & Gas Commercialization Joaquim Dib Cohen (32) Exploration Officer Paulo Mendonça (38) General Counsel José Roberto Faveret CFO Marcelo Torres Production Officer Reinaldo Belotti(34) ExplorationCampos-ES Paulo Ricardo (28) Procurement Olavo Foerch (32) Production Development José Brito (42) Exploration Santos and Eq. Margin Edmundo Marques (24) Reservoir & Reserves Roberto Toledo (31) Drilling Ricardo Juiniti (27) E&P Laboratory Dolores Carvalho (35) Onshore Basin Celso Martins (34) Logistics Billy Pinheiro (30) Strategic Alliances Luiz Reis (45) International Ernani Posrche (33) Production Ricardo Abiramia (24) New Areas Executive Manager Paulo de Tarso Guimarães (34) GeologicalOperations Moacir Santos (38) Applied Technology Marcos Amaral (28) HSE Leandro Leme (31) Highly successful and committed management team, Combining unique intellectual capital and superior execution skills Management Organization Structure (1) (1) Parentheses represent years experience in the E&P industry 8
  • 25.
  • 26. Success index in excess of 60% on average offshore Brazil from 2002-2007 whilst at Petrobras
  • 27. Over 10 billion boe and more than 50 new fields discoveredProven track record having opened several new oil frontiers, including the pre-salt, and discovering over 50 new oil fields Highly Qualified Exploration Team 9
  • 28. Brazil: Vast Untapped Oil & Gas Potential Brazil: Vast Untapped Oil & Gas Potential Largest oil and gas discoveries in the world New provinces could propel Brazil into top reserves holders Still significantly under-explored % of sedimentary basins under concession + 35 bn boe SaudiArabia Venezuela Iran Iraq Kuwait Brazil post Tupi UAE Russia Libya Kazakhstan Nigeria Canada US Qatar China Angola Brazil Licensed 4% BrazilTurkmenistan Iran Kazakhstan China Russia Australia Kuwait Israel SaudiArabiaIndia Indonesia Venezuela Papua NewGuineaGhana Unlicensed 96% Source: ANP Oil & gas in the world Oil and Gas Discovered Volumes 2000 – 2010 (Bn boe) Oil Resources- December 2009 (Bn bbl) Source: EIA-DOE, BP Statistical Review of World Energy 2010, Saudi Aramco, UPPSALA University, Petrobras, ANP and OGX analysis Source: IHS Source: BP Statistical Review of World Energy 2010 & analyst estimates Brazil’s historical under-exploration underpins massive growth opportunities for OGX 10
  • 30.
  • 31. Unique portfolio with 10.8 billion potential recoverable barrels of oil equivalent (boer)
  • 32. OGX’s business plan is based on 4.1 billion barrels already discovered in the shallow waters of the Campos BasinPortfolio Shallowwater ~120m Shallowwater ~150m Shallowwater ~60m Deepwater ~1,000m 12 OGX Portfolio
  • 33.
  • 34. 5 blocks operated by OGX (100% owned) and 2 operated by Maersk Oil (50% owned)
  • 35. Total area of 1,177 km2
  • 38. 100% success rateOGX’s discovered accumulations confirm a new hydrocarbon province in the southern Campos Basin Campos Basin: Low Risk, Shallow Water and Large 13
  • 39.
  • 40. 5 blocks operated by OGX (100% owned)
  • 41. Total area of 820 km²
  • 44. ~ 65% success rateSantos basin is oneofthemostpromisingexploratoryareas in brazil, withsignificantpotential for gasand light oil 14
  • 45.
  • 46. 8 blocks operated by OGX Maranhão
  • 47. Total area of 24,500 km²
  • 48. Monetization of gas through thermoelectric plants to be developed by MPX/Petra (3,722 MW already licensed)
  • 49. >75% success rate (9 wells drilled)
  • 50. Commerciality declared for 2 accumulations15
  • 51.
  • 52. 5 blocks operated by OGX (100% owned)
  • 53. Total area of 960 km²
  • 55. 1st well to be drilled in 2H11Newfrontierwithgeologicalmodel similar to westAfrica, wheresignificantdiscoveriesweremaderecently 16
  • 56.
  • 57. 5 blocks operated by Perenco (50% owned)
  • 58. Total area of 3,620 km²
  • 59. Average water depth of ~1,000 m
  • 60. 1st well to be drilled in 2H11Thenewfrontierof Espírito Santo hasproven to be a veryactivepetrolific system 17
  • 61.
  • 62. 5 blocks operated by OGX (100% owned), 3 of which are located close to Maracaibo Basin (~80 bnboe discovered and ~50 bnboe already produced)
  • 63. Beginning of the Seismic Campaign in 2H11Balancedportfolioofexploratoryassets, combiningproductionregionswithlessexploredareasnext to theMaracaibobasin, oneofthemostprolificprovinces in the world 18
  • 64. Portfolio Breakdown 19% Onshore 8% Deep Water Oildiscoveries of 4.1 bn bbl are already under production development in the shallow waters of Campos Basin OGX Portfolio Potential: Breakdown 73% Shallow Water 21% Gas 79% Oil Note: “POS “ defined as geological probability of success (1) The OGX portfolio potential was calculated by OGX based on volume estimates contained in the DeGolyer and MacNaughton Reports (2) We consider the 3C contingent resources in the arithmetic summation of our potential portfolio based on the assumption that these resources will be converted to 2C and 1C resources after the appraisal campaign and that they will be converted into reserves after the removal of contingencies (3) We consider the high estimate and not Pg-adjusted delineation area prospective resources as we believe the delineation area is part of the 3C area (4) Prospective resources mean estimates Pg-adjusted. Colombia considered two Colombian basins, the Lower and Middle Magdalena Valleys Basins(5) Includes petroleum potential quantities in one Colombian basin, the Cesar-Ranchería Basin(6) OGX net interests in the table are not the same as OGX net interests contained in the DeGolyer and MacNaughton September 2009 report due to the fact that OGX now holds 100% of the interests in the concessions included in that report (7) Gas volumes were converted by OGX to barrels of oil, using a conversion rate of 5,615 ft³ of natural gas to one boe 19
  • 66.
  • 67. Max. well depth: 20,000 ft
  • 68.
  • 69. Max. well depth: 20,000 ft
  • 70.
  • 71. Max. well depth: 25,000 ft
  • 72.
  • 73. Max. well depth: 14,750 ft
  • 74.
  • 75. Max. well depth: 11,500 ft
  • 77.
  • 78. Max. well depth: 25,000 ft
  • 79.
  • 80. Max. well depth : 20,000 ft
  • 81.
  • 82. Max. well depth: 20,000 ft
  • 83. Contract Expires: Nov.2013Drilling campaign expanded – 8 rigs already operating simultaneously Exploration Drilling Campaign 21
  • 84.
  • 85.
  • 86.
  • 87.
  • 89. OGX Team: ~270 employees
  • 91. 3D Room / IOSCOperational Capabilities and Structure 22
  • 93.
  • 94. Seismic campaign to better image the areas and reduce risks
  • 95. Discover the maximum amount of oil
  • 97. 2nd phase strategy (from Dec/10 to Mar/13)
  • 99. Focus on the appraisal drilling campaign to delineate existing discoveries
  • 100. Continue exploratory program with drilling of wildcat wells
  • 101. Begin production in October 2011
  • 102. Drilling of 41 wells with hydrocarbons
  • 103. OGX analysis supports recoverable resources of 4.1 billion barrels
  • 104. Oil columns of up to ~250 meters
  • 105. Net pay up to ~150 meters
  • 106. Well results confirm OGX’s geological models for the Campos Basin
  • 107. DSTs (drill stem tests) support conservative production estimate of 10 – 20 kbpd
  • 108. One of the best DSTs ever performed in Brazil, with a production potential of 40,000 barrels per day
  • 109. OGX production estimates are supported by results from other fields in Campos using current technologyNotes:1 Number of wells concluded in 2010 and included in D&M’s reports2 Number of wells concluded in 2011 24
  • 110. Campos Basin: Focusing on Wildcat & Appraisal Wells Appraisal wells Wildcat Wells Note:Drilling area as per D&M’s Dec/10 reports and net pay 26 wildcat wells and 20 appraisal wells drilled with hydrocarbons and results which support expectations 25
  • 111.
  • 113. Average production per well 10 – 20 kbpd
  • 114. 12 FPSOs and 11 WHPs
  • 115. 5 FPSOs and 2 WHPs already secured
  • 122. 1 FPSO and 1 WHP
  • 124. Oil of 23° - 28° API
  • 126.
  • 129. 3 FPSOs and 2 WHPs
  • 131. Oil of 20° API
  • 133. Average production per well 10 – 20 kbpdIllustrative 26
  • 134.
  • 135. Oil Quality of 20o API
  • 136.
  • 137. Oil Quality of 23o API
  • 138.
  • 139. Oil Quality of 19o API
  • 140. Tested in Jul/20113 drill-stem tests already performed in horizontal wells prepared for production and more to come in the second half 27
  • 141.
  • 143. Waterdepthof 140 metersFlexible lines delivered Anchor system (moorings and piles) delivered Installation support vessel delivered EWT approved by ANP (National Petroleum Agency) Preliminary and Installation License Electricalsubmersiblepump Horizontal Well OGX first oil expected for November through Extended Well Test (EWT) Illustrative frames 28
  • 144.
  • 145. Wet Christmas Tree (WCT): Already installed
  • 146. Umbilical Terminal Assembly (UTA): Contracted
  • 147. Hydraulic Power Unit (HPU): Delivered in April, 2011
  • 148. Flexible Lines: Contracted with Wellstream
  • 149. Electrical Submersible Pump (ESP): Contracted with Baker Hughes
  • 150. 80 kbpd of processing capacity & 950,000 barrels of storage capacity
  • 153. Produced by GE Oil & Gas
  • 155. Installation Vessel – Anchor System, Flexible Lines and Umbilicals: Contracted with WS and Aker
  • 156. Mud line and Subsurface analysis for FPSO mooring and WHP piles: Contracted with FUGRO – already completed
  • 157. Waimea Area Survey: Contracted with FUGRO
  • 159.
  • 160. Loaded with anchorage equipment for OSX-129
  • 161. Campos Basin: Final Steps Towards Production Flexible lines / umbilicals connection and risers installation Moorings and Piles installation Arrival of the FPSO OSX-1 Beginningofproduction 1 3 2 Arrival of the Buoy and installation Buoy hook-up and connection to the FPSO 5 4 6 Illustrative frames 30
  • 162.
  • 164. 1st production well, OGX-26HP, ready for production
  • 165. 2nd production well, OGX-55HP, currently being drilled
  • 166. 3rd production well, OGX-60HP, currently being drilled
  • 167. Average production per well 10–20 kbpd
  • 170. OSX-1 expected arrival for October/2011
  • 171. OGX-55HP and OGX-60HP wells to be hooked-up to OSX-1 after the declaration of commerciality next year
  • 172. With 3 production wells on stream next year, OGX should reach production levels of ~50 kbpdProductionWell 1 (OGX-26HP) ProductionWell 3 (OGX-60HP) InjectionWell 2 InjectionWell 1 ProductionWell 2 (OGX-55HP) Development Wells Illustrative frame 31
  • 173. Operational Expenditures (Leased Equipment) Opex <US$ 16/bbl FPSOOil capacity: 100 K bpd Liquid capacity: 160 K bpd Oil will be offloaded WHPCapacity: 30 wellsDrilling package on topside WHP Subsea Flow Lines Power line Gas Lift line Service line Water Injection line Production line Test line Drilling + Completion Development wells with dry completion Gaswillbereinjected, used for gasliftorpowergeneration WaterInjection Capital Expenditures Campos Basin: Replicable Development Concept Capex US$ 2/bbl Note: Please see details in the Appendix slide: “Campos Basin: Typical Production Project” 32
  • 174.
  • 175. OSX-2 and OSX-3 to be built in world-class Singaporean shipyards by SBM and Modec
  • 176. OSX-4 and OSX-5 hulls already acquired by OSX
  • 177. WHP-1 and WHP-2 with detailed engineering ongoing (EPC awarded to Techint by OSX)FPSOs and WHPs Expected Deliveries Production equipment allocated to begin operations until 2013 33
  • 178.
  • 179. Average Day rate of US$ 263 k
  • 180.
  • 181. Expected Average day rate of US$ 290 k
  • 182.
  • 183. Expected Average day rate of US$ 290 k
  • 184.
  • 185. Four production wells on-stream by the end of 2013
  • 186. Detailed engineering ongoing (EPC awarded to Techint by OSX)
  • 187.
  • 188. Three production wells on-stream by the end of 2013
  • 189.
  • 190.
  • 191. Order placed for Leasing contract and EPCI under procurementSecured Production Equipment 34
  • 192.
  • 193. OGX plans to drill on average five horizontal wells prior to the arrival of the WHPs from semi-submersible rigs
  • 194.
  • 195. Max. well depth: 20,000 ft
  • 197.
  • 198. Max. well depth: 20,000 ft
  • 199.
  • 200. Flex FPSOs have capacity of processing oil for a broader range of APIs and GOR (gas/oil ratio)
  • 201. Standard design (same characteristics for all FPSOs)
  • 202.
  • 203. Max. well depth: 25,000 ft
  • 204.
  • 205. Max. well depth: 25,000 ft
  • 206.
  • 207. Max. well depth: 20,000 ft
  • 208.
  • 209. Max. well depth : 20,000 ft
  • 211. Campos Basin: Oil Production Ramp-Up 150 CAGR : 174% Oil Production Target (kbpd) ¹ 50 20 2011 2012 2013 Note: 1 To be reached through the end of the period 36
  • 212.
  • 214. Low capital and operating costs
  • 215. Production of 5.7 M m³per day in 2013 (2.7 M m³per day net to OGX S.A. or ~15 kboepd)
  • 216. Second seismic crew contracted to work on the southern blocks
  • 217. Recently approved leasing agreement of 2 additional rigs
  • 218. Gas to be sold to MPX Power Plants
  • 219. MPX has obtained an additional 1,859 MW of installation license, totaling 3,722 MW
  • 220. MPX Parnaíba thermoelectric complex will reach a total capacity of 1,500 MW
  • 221. Energy generated by MPX’s power plants will be sold to the energy marketsGavião Azul Gavião Real Legend: Seismic Lines 37
  • 222.
  • 223.
  • 224.
  • 225. Campos and Parnaíbadiscoveries (4.2 bnboe) can support 730,000 boepd of production level
  • 226. Additional potential resources (6.6 bnboe) would allow OGX to reach and sustain a plateau of 1.4 million boepd from 2019 and beyond
  • 227. Expected demand of 48 offshore units
  • 228. Total of 23 units estimated for OGX’s Campos Basin discoveries (12 FPSOs and 11 WHPs)
  • 229. Strategy to expedite development with production equipment contracted 2-3 years in advance39
  • 231. OGX Financial Sources and Uses (2Q11 – 4Q13) Financial Sources and Uses Notes: ¹ Includes net financial results ² Represents 40% of Exploration capex (contemplating all OGX basins) and 60% of Development capex (contemplating Campos and Parnaíba discoveries only) 41
  • 233. OngoingActivities Parnaíba Basin Campos Basin Santos Basin OGX Blocks Oil & Gas Fields 1OGX Maranhão has 70% W.I 43
  • 234. Concluded Wells (1 of 3) Concluded Wells (1 of 4) 44
  • 235. Concluded Wells (2 of 4) 45
  • 236. Concluded Wells (3 of 4) ¹ OGX Maranhão has 70% W.I. ² OGX has 50% W.I. and Maersk is the operator 46
  • 237. Concluded Wells (4 of 4) ¹ OGX Maranhão has 70% W.I. ² OGX has 50% W.I. and Maersk is the operator 47
  • 238.
  • 239. Water depth: 100 to 150 meters
  • 240. Recoverable volume: 500 million bbl (low Gas:OilRatio (GOR)): all gas produced will be used for power generation or gas reinjection, if applicable
  • 242. 1 FPSO: 100 Kbblpd
  • 243. 1 WHP: 30 wells
  • 244. Drilled wells:16 horizontal production wells and 9 injection wells
  • 245. 5 horizontal production wells pre-drilled from semi-submersible rig
  • 246. 11 production and 9 injection wells drilled from WHP
  • 247. Capex:estimated unit cost of approximately US$ 2 / barrel
  • 248. Pre-drilled wells = US$ 50M (75 days per well)
  • 249. WHP drilled wells = US$ 20M (75 days per well)
  • 250. Well completion = US$ 15M (30 days per well)
  • 251. Package of sub-sea flow lines = US$ 65M
  • 252. Opex:estimated unit cost lower than US$ 16 / barrel
  • 253. Leased equipment day rates with high local content (FPSOs US$ 350k / day & WHPs US$ 160k /day)
  • 254. Operating and maintenance expenditures of US$ 85k / day
  • 255. Variable operating costs of US$ 3.5 / barrel
  • 256. Abandonment costs at end of field life of US$ 100M
  • 258. Achieve production plateau in 3 quarters
  • 259. Plateau maintained for an additional 4 years
  • 260. 20 to 22 years of production decline from the plateau thereafter48