•   This procedure provides the fundamental components
•   necessary for the deactivation of the
•   mechanical/electrical energy sources through a
•   lockout/block-out/tagout system.




                                                         2
•   General
•   Employees are exposed to a variety of energy
•   sources when performing daily repairs, modifications
•   and adjustments to their operating equipment.
•   To eliminate the hazards associated with
•   these activities, employers will instruct employees
•   in the correct methods to employ when
•   performing these operations.



                                                           3
•   Definitions
•   • Hazardous energy sources — Classify a hazardous
•   energy source as mechanical, electrical,
•   pneumatic, hydraulic, chemical, thermal or
•   gravity.
•   • Lockout device — A device (a padlock or a
•   combination of padlock and multiple-lock hasp
•   hardware) you can use to prevent a hazardous
•   energy source from being re-energized.
•   • Tagout device — A warning tag that an
•   employee attaches to critical areas to communicate
•   why you should not re-energize an
•   energy source. The tag contains the name of
•   the employee, the date and time the employee
•   initiated the tag and a brief description of
•   work to be performed.
•   • Authorized employee — A person who locks
•   out or tags out to perform the maintenance or
•   service task.
•   • Affected employee — A person who is exposed        4
•   to lockout/tagout procedures
•   Program elements
•   Follow these steps prior to initiating any repairs,
•   modifications and/or adjustments to operating
•   equipment:




                                                          5
•   Notify an affected person with jurisdiction
•   over the equipment to deactivate energy
•   sources;
•   2. The authorized person, who will work on the
•   equipment, will identify all sources of power
•   that he/she must lock out, block or release;
•   3. To ensure employees cannot re-energize the
•   equipment while maintenance activities are
•   performed, the employee will lock out/blank
•   out all potential energy sources. Assign employees
•   padlocks with their names or identification
•   numbers affixed to the locks. Individually
•   key the locks to prevent another employee
•   from removing the lock inadvertently. If more
•   than one employee is assigned to work on the
•   equipment, use a multi-lockout hasp so that
•   all employees working on the equipment will          6
•   apply their locks and ensure their safety
•   Affix a tagout device to all components or systems
•   de-energized to indicate that a lockout
•   procedure has been performed;
•   5. Prior to performing any work activities, the
•   authorized person will test the systems to
•   ensure he or she properly deactivated the
•   equipment;
•   6. Upon completion of the work, the authorized
•   person and the supervisor will verify the
•   equipment on the system is safe to operate.
•   Give special consideration to the installation of
•   guards and covers for electrical wiring, and to
•   ensure all piping systems have been properly
•   reconnected. Also notify the affected worker
                                                         7
•   when the machine is OK to use
•   Special conditions
•   During certain operations, it may be necessary
•   to energize the equipment for a short period of
•   time. Notify and direct employees in the immediate
•   area to stay clear of the equipment. If you
•   plan to deactivate the operation again, have the
•   authorized person repeat the third, fourth and
•   fifth steps in the preceding paragraph before
•   work resumes.
•   In some instances work will carry over to another
•   shift. A designated person must affix a department
•   lock to the equipment to ensure it is not energized
•   during the transition. When the next shift
•   employee comes to work on the piece of equipment,
•   he or she will repeat the second through
•   the fifth preceding steps before work resumes on
•   the equipment.                                        8
•   Electrical work
•   Prior to doing any electrical work, a qualified
•   person must:
•   • Lock out the system;
•   • Open the disconnect;
•   • Make a visible inspection of the electrical
•   panel to ensure that all blades on knife switches
•   are open or that the circuit is open;
•   • Check the voltage tester on a known energized
•   voltage source;
•   • Check the voltage on the load side of the
•   circuit to make sure it is de-energized;
•   • After performing the voltage test, re-check
•   the tester on a known source to ensure that it
•   was operating correctly;
•   • Remove any fuses that are in the motor disconnect
•   box;
•   • Close the box and place a tag and his or her
•   lock on the disconnect switch prior to doing
•   any other work;
•   • Prior to working any capacitors, discharge and
•   ground them, and then check with the voltage
•   tester.
                                                          9

Mais conteúdo relacionado

Mais procurados

Control of Hazardous Energy
Control of Hazardous EnergyControl of Hazardous Energy
Control of Hazardous EnergyAndy Mihans
 
Lockout/Tagout by Horticultural Insurance
Lockout/Tagout by Horticultural InsuranceLockout/Tagout by Horticultural Insurance
Lockout/Tagout by Horticultural InsuranceAtlantic Training, LLC.
 
Unit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolationUnit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolationwirethehouse
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standardAnbr Cama
 
Ne s1 manual nt341bx
Ne s1 manual nt341bx Ne s1 manual nt341bx
Ne s1 manual nt341bx Alain Hua
 
120A- WOBC H05 Electrical safety day 2
120A- WOBC H05 Electrical safety day 2120A- WOBC H05 Electrical safety day 2
120A- WOBC H05 Electrical safety day 2phase3-120A
 
De energization and lockout safety reminder training
De energization  and lockout safety reminder trainingDe energization  and lockout safety reminder training
De energization and lockout safety reminder trainingTerry Penney
 
Limitorque QX Electronic Actuator User Instructions
Limitorque QX Electronic Actuator User InstructionsLimitorque QX Electronic Actuator User Instructions
Limitorque QX Electronic Actuator User InstructionsMead O'Brien, Inc.
 
Product presentation usa
Product presentation  usaProduct presentation  usa
Product presentation usameltric
 
Industrial Automatic Voltage Regulator Manufacturers
Industrial Automatic Voltage Regulator ManufacturersIndustrial Automatic Voltage Regulator Manufacturers
Industrial Automatic Voltage Regulator ManufacturersPower Engineers
 

Mais procurados (16)

Control of Hazardous Energy
Control of Hazardous EnergyControl of Hazardous Energy
Control of Hazardous Energy
 
Lockout/Tagout by Horticultural Insurance
Lockout/Tagout by Horticultural InsuranceLockout/Tagout by Horticultural Insurance
Lockout/Tagout by Horticultural Insurance
 
Unit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolationUnit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolation
 
Elearningtemplateppt
ElearningtemplatepptElearningtemplateppt
Elearningtemplateppt
 
Lock Out Tag Out (LOTO) by UW
Lock Out Tag Out (LOTO) by UWLock Out Tag Out (LOTO) by UW
Lock Out Tag Out (LOTO) by UW
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standard
 
Ne s1 manual nt341bx
Ne s1 manual nt341bx Ne s1 manual nt341bx
Ne s1 manual nt341bx
 
120A- WOBC H05 Electrical safety day 2
120A- WOBC H05 Electrical safety day 2120A- WOBC H05 Electrical safety day 2
120A- WOBC H05 Electrical safety day 2
 
De energization and lockout safety reminder training
De energization  and lockout safety reminder trainingDe energization  and lockout safety reminder training
De energization and lockout safety reminder training
 
B10d en
B10d enB10d en
B10d en
 
Rotork PAX1 Series Linear Actuator
Rotork PAX1 Series Linear ActuatorRotork PAX1 Series Linear Actuator
Rotork PAX1 Series Linear Actuator
 
Limitorque QX Electronic Actuator User Instructions
Limitorque QX Electronic Actuator User InstructionsLimitorque QX Electronic Actuator User Instructions
Limitorque QX Electronic Actuator User Instructions
 
Product presentation usa
Product presentation  usaProduct presentation  usa
Product presentation usa
 
Industrial Automatic Voltage Regulator Manufacturers
Industrial Automatic Voltage Regulator ManufacturersIndustrial Automatic Voltage Regulator Manufacturers
Industrial Automatic Voltage Regulator Manufacturers
 
Paul smart a
Paul smart aPaul smart a
Paul smart a
 
Loto
LotoLoto
Loto
 

Semelhante a Lock out tag out procedures

Semelhante a Lock out tag out procedures (20)

LOTO Training.pdf
LOTO Training.pdfLOTO Training.pdf
LOTO Training.pdf
 
Loto presentation
Loto presentationLoto presentation
Loto presentation
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.ppt
 
Loto online slides
Loto online slidesLoto online slides
Loto online slides
 
Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)
 
LOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxLOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptx
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Lockout Tagout by KU
Lockout Tagout by KULockout Tagout by KU
Lockout Tagout by KU
 
7115 Lockout 2019
7115 Lockout 20197115 Lockout 2019
7115 Lockout 2019
 
OSHA Lockout Safety General Industry
OSHA Lockout Safety General IndustryOSHA Lockout Safety General Industry
OSHA Lockout Safety General Industry
 
shock_arc_flash
shock_arc_flashshock_arc_flash
shock_arc_flash
 
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Fulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For reviewFulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For review
 
LOTO.pptx
LOTO.pptxLOTO.pptx
LOTO.pptx
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Hazardous Energy Control by MSHA
Hazardous Energy Control by MSHAHazardous Energy Control by MSHA
Hazardous Energy Control by MSHA
 
Module 4 Working Near or Live Parts.pdf
Module 4 Working Near or Live Parts.pdfModule 4 Working Near or Live Parts.pdf
Module 4 Working Near or Live Parts.pdf
 
electrical safety ppt.ppt
electrical safety ppt.pptelectrical safety ppt.ppt
electrical safety ppt.ppt
 
Procedure 1
Procedure 1Procedure 1
Procedure 1
 

Mais de YAWAR HASSAN

Welding and cutting safety
Welding and cutting safetyWelding and cutting safety
Welding and cutting safetyYAWAR HASSAN
 
Safety and health rules and regulations
Safety and health rules and regulationsSafety and health rules and regulations
Safety and health rules and regulationsYAWAR HASSAN
 
Safety and health in constrcution
Safety and health in constrcutionSafety and health in constrcution
Safety and health in constrcutionYAWAR HASSAN
 
Protecting yourself in the sun
Protecting yourself in the sunProtecting yourself in the sun
Protecting yourself in the sunYAWAR HASSAN
 
Personal protective equipment
Personal protective equipmentPersonal protective equipment
Personal protective equipmentYAWAR HASSAN
 
Osha record k eeping
Osha record k eepingOsha record k eeping
Osha record k eepingYAWAR HASSAN
 
Introduction to osh training
Introduction to osh trainingIntroduction to osh training
Introduction to osh trainingYAWAR HASSAN
 
Introduction to fire prevention plans
Introduction to fire prevention plansIntroduction to fire prevention plans
Introduction to fire prevention plansYAWAR HASSAN
 
Hse supervision skills
Hse supervision skillsHse supervision skills
Hse supervision skillsYAWAR HASSAN
 
Hse policy statement and description
Hse policy statement and descriptionHse policy statement and description
Hse policy statement and descriptionYAWAR HASSAN
 

Mais de YAWAR HASSAN (20)

Welding and cutting safety
Welding and cutting safetyWelding and cutting safety
Welding and cutting safety
 
Trenching safety
Trenching safetyTrenching safety
Trenching safety
 
Tool box talks
Tool box talksTool box talks
Tool box talks
 
Stairways safety
Stairways safetyStairways safety
Stairways safety
 
Slings safety
Slings safetySlings safety
Slings safety
 
Scissor lift safety
Scissor lift safetyScissor lift safety
Scissor lift safety
 
Scaffolding safety
Scaffolding safetyScaffolding safety
Scaffolding safety
 
Safety management
Safety managementSafety management
Safety management
 
Safety and health rules and regulations
Safety and health rules and regulationsSafety and health rules and regulations
Safety and health rules and regulations
 
Safety and health in constrcution
Safety and health in constrcutionSafety and health in constrcution
Safety and health in constrcution
 
Protecting yourself in the sun
Protecting yourself in the sunProtecting yourself in the sun
Protecting yourself in the sun
 
Personal protective equipment
Personal protective equipmentPersonal protective equipment
Personal protective equipment
 
Permits
PermitsPermits
Permits
 
Osha record k eeping
Osha record k eepingOsha record k eeping
Osha record k eeping
 
Lead and silica
Lead and silicaLead and silica
Lead and silica
 
Ladders safety
Ladders safetyLadders safety
Ladders safety
 
Introduction to osh training
Introduction to osh trainingIntroduction to osh training
Introduction to osh training
 
Introduction to fire prevention plans
Introduction to fire prevention plansIntroduction to fire prevention plans
Introduction to fire prevention plans
 
Hse supervision skills
Hse supervision skillsHse supervision skills
Hse supervision skills
 
Hse policy statement and description
Hse policy statement and descriptionHse policy statement and description
Hse policy statement and description
 

Lock out tag out procedures

  • 2. This procedure provides the fundamental components • necessary for the deactivation of the • mechanical/electrical energy sources through a • lockout/block-out/tagout system. 2
  • 3. General • Employees are exposed to a variety of energy • sources when performing daily repairs, modifications • and adjustments to their operating equipment. • To eliminate the hazards associated with • these activities, employers will instruct employees • in the correct methods to employ when • performing these operations. 3
  • 4. Definitions • • Hazardous energy sources — Classify a hazardous • energy source as mechanical, electrical, • pneumatic, hydraulic, chemical, thermal or • gravity. • • Lockout device — A device (a padlock or a • combination of padlock and multiple-lock hasp • hardware) you can use to prevent a hazardous • energy source from being re-energized. • • Tagout device — A warning tag that an • employee attaches to critical areas to communicate • why you should not re-energize an • energy source. The tag contains the name of • the employee, the date and time the employee • initiated the tag and a brief description of • work to be performed. • • Authorized employee — A person who locks • out or tags out to perform the maintenance or • service task. • • Affected employee — A person who is exposed 4 • to lockout/tagout procedures
  • 5. Program elements • Follow these steps prior to initiating any repairs, • modifications and/or adjustments to operating • equipment: 5
  • 6. Notify an affected person with jurisdiction • over the equipment to deactivate energy • sources; • 2. The authorized person, who will work on the • equipment, will identify all sources of power • that he/she must lock out, block or release; • 3. To ensure employees cannot re-energize the • equipment while maintenance activities are • performed, the employee will lock out/blank • out all potential energy sources. Assign employees • padlocks with their names or identification • numbers affixed to the locks. Individually • key the locks to prevent another employee • from removing the lock inadvertently. If more • than one employee is assigned to work on the • equipment, use a multi-lockout hasp so that • all employees working on the equipment will 6 • apply their locks and ensure their safety
  • 7. Affix a tagout device to all components or systems • de-energized to indicate that a lockout • procedure has been performed; • 5. Prior to performing any work activities, the • authorized person will test the systems to • ensure he or she properly deactivated the • equipment; • 6. Upon completion of the work, the authorized • person and the supervisor will verify the • equipment on the system is safe to operate. • Give special consideration to the installation of • guards and covers for electrical wiring, and to • ensure all piping systems have been properly • reconnected. Also notify the affected worker 7 • when the machine is OK to use
  • 8. Special conditions • During certain operations, it may be necessary • to energize the equipment for a short period of • time. Notify and direct employees in the immediate • area to stay clear of the equipment. If you • plan to deactivate the operation again, have the • authorized person repeat the third, fourth and • fifth steps in the preceding paragraph before • work resumes. • In some instances work will carry over to another • shift. A designated person must affix a department • lock to the equipment to ensure it is not energized • during the transition. When the next shift • employee comes to work on the piece of equipment, • he or she will repeat the second through • the fifth preceding steps before work resumes on • the equipment. 8
  • 9. Electrical work • Prior to doing any electrical work, a qualified • person must: • • Lock out the system; • • Open the disconnect; • • Make a visible inspection of the electrical • panel to ensure that all blades on knife switches • are open or that the circuit is open; • • Check the voltage tester on a known energized • voltage source; • • Check the voltage on the load side of the • circuit to make sure it is de-energized; • • After performing the voltage test, re-check • the tester on a known source to ensure that it • was operating correctly; • • Remove any fuses that are in the motor disconnect • box; • • Close the box and place a tag and his or her • lock on the disconnect switch prior to doing • any other work; • • Prior to working any capacitors, discharge and • ground them, and then check with the voltage • tester. 9