ABSTRACT



The main aim of this project is to study
the various types of electrical and
mechanical equipment involved in the
process of generation of Electrical
power.
INTRODUCTION


KTPS-V Station was commissioned in 1996.



It was the first major thermal power station
in AP.



KTPS V Stage had achieved 94.5% plant load
factor.
WORKING PRINCIPLE


The thermal power station is a power plant in
which the prime mover is steam driven.



Water is heated, turns into steam and spins a
steam turbine which drives an electrical
generator.



The coal is used as a major source of fuel.



The thermal power plant works on the principle
PARTS OF THERMAL POWER
PLANT
TYPES OF CIRCUITS
For simplicity let us divide the whole
arrangement into four circuits.
1. Steam and water circuit
2. Air and gas circuit
3. Coal and ash circuit
4. Cooling water circuit.


1.STEAM AND WATER
CIRCUIT
boiler

Drum

Super
heater

IP Turbine

Re Heater

Hp turbine

LP Turbine

Condenser
BOILER


A boiler is a device for generating steam for
power, processing or heating purposes.



The boiler used here is a two pass, tower type,
reheat natural circulation single drum,
balanced draft and dry bottom (open hopper
type) boiler and is designed for burning coal as
principal fuel.
SCHMETIC DIAGRAM OF
BOILER
CLASSFICATION OF
BOILERS


Boilers are mainly classified into two types.
They are
1. Fire tube boiler
2.Water tube boiler
CONDENSER


Condenser is a
Surface heat
exchanger.



Exhaust steam from
LP turbine enters
into the condenser,
where it
condensates into
water by exchanging
its heat energy to
cooling water.
FEED WATER FLOW FROM
CONDENSER
Condenser

CEPs

LPH

HP heaters

BFPs

Deaerator

Economiser

Drum

boiler
ECONOMISER


An economiser
extracts apart of this
heat from the flue
gases.



It uses extracted
heat for heating the
feed water before it
enters into the
steam drum.
2.AIR AND GAS CIRCUIT
PRIMARY AIR FAN(PA FAN)
 The primary air has got two functions.
1.Pre heating the coal.
2. Transportation of fuel into furnace.
PA fan

Air
Heater

Mills

Boiler
FORCED DRAFT FAN(FD
FAN)


The function of FD FAN is to supply sufficient
quantity of air required for complete
combustion.



The air flow is as shown below
FD Fan

Air
Heater

Furnace
AIR PRE HEATERS


Air pre heater function is to heat the air with
the help of flue gases.



The air heater used in KTPS-V is a
Regenerative Tri-sector air heater.
The flue gases flow is as shown :



Boiler

Air
preheater

ESP

ID Fan

Chimney
INDUCED DRAFT FAN (ID
FAN)


The function of Induced Draft fan is to suck the
gases out of furnaces and throw them into the
stack.



Boiler is provided with two no. of Induced Draft
Fans.
ELECTROSTATIC
PRECIPITATOR


The main function of ESP is to clean the gases
which are being released into atmosphere.
COAL AND ASH CIRCUIT


The coal flow is as shown below:

Coal
storage
plant

Crushers

Bunkers

Mills

Boiler
COAL HANDLING PLANT
ASH HANDLING PLANT






At the bottom of the furnace, there is a hopper
for collection of bottom ash.
Fly ash is captured and removed from the flue
gas by electrostatic precipitators.
The flow of ash is as shown below
Boiler

Air pre
Heater

ESP

Ash
handling
plant

Ash
pond
COOLING WATER CIRCUIT
WATER SUPPLY




Water requirement for the KTPS is provided
from Kinnerasani Project.
The total water required for the station is 1,
50,000 tons per day.
Primary Fuel Supply:



KTPS is linked to Singareni Collieries
Company limited (S.C.C.L.) for supply of coal
from Manuguru, Yellandu and Rudrampur
mines.
STEAM TURBINE


Steam turbine is a
rotating machine
which converts the
heat energy of
steam into
mechanical
energy.
Description of Steam
Turbines
•

HP Turbine

•

IP Turbine

•

LP Turbine

HIGH PRESSURE TURBINE:
 In high pressure turbine steam is expanded to do
work.
 High pressure turbine having 25 reaction stages.
o
 Steam admitted at 540 c and pressure 150
kg/sq.cm.
TYPES OF TURBINES
IP TURBINE:
 Exhaust steam from hp turbine, after passing
through re heater is admitted for second phase of
expansion of steam.
 IP turbine having 17 reaction stages.
LOW PRESSURE TURBINE:
 Exhaust steam from IP turbine admitted to lp
turbine for the last phase of expansion of steam.
 LP turbine having 8 reaction stages
Excitation system


The excitation system comprises of an exciter
and automatic voltage regulator.



The duty of an exciter is to provide the
necessary field current to the rotor winding of
the alternator.



Brush less excitation is used in KTPS Vth
stage.
BRUSHLESS EXCITATION
SYSTEM:
Excitation system


The excitation system comprises of an exciter
and automatic voltage regulator.



The duty of an exciter is to provide the
necessary field current to the rotor winding of
the alternator.



Brush less excitation is used in KTPS Vth
stage.
SALIENT FEATUREs OF K.T.P.S


TOTAL INSTALLED CAPACITY:

1)

KTPS-A Station

: 4*60 = 240 MW

2)

KTPS-B Station

: 2*120 = 240 MW

3)

KTPS-C Station

: 2*120 = 240 MW

4)

KTPS-V Stage

: 2*250 = 500 MW

5)

KTPS-VI Stage

: 1*500=500 MW

Total installed capacity = 1720 MW
CONCLUSION






In a modern thermal power plant the Rankine
Cycle is modified to include superheating of
steam, regenerative feed water heating and
reheating of the steam.
Reheating the steam after it has partially
expanded, improves the thermal cycle efficiency
by 4 to 5%.Regenerative feed water heating by
using Low pressure and High pressure heaters
also improves the thermal cycle efficiency by 6 to
7%.
So the overall efficiency of a modern thermal
power plant is about 42%.
An Overview of Thermal Power Plant
An Overview of Thermal Power Plant

Mais conteúdo relacionado

Mais procurados

Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing System
Salil Vaidya
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
Nitin Mahalle
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
SHIVAJI CHOUDHURY
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plants
SHIVAJI CHOUDHURY
 

Mais procurados (20)

Thermal power station
Thermal power stationThermal power station
Thermal power station
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing System
 
Waste Heat Recovery Devices by Varun Pratap Singh
Waste Heat Recovery Devices by Varun Pratap SinghWaste Heat Recovery Devices by Varun Pratap Singh
Waste Heat Recovery Devices by Varun Pratap Singh
 
Thermal power plant
 Thermal power plant  Thermal power plant
Thermal power plant
 
An inside view of thermal power stations and DDCMIS in power plants
An inside view of thermal power stations and DDCMIS in power plantsAn inside view of thermal power stations and DDCMIS in power plants
An inside view of thermal power stations and DDCMIS in power plants
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plants
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
Power plant high pressure boilers
Power plant high pressure boilers Power plant high pressure boilers
Power plant high pressure boilers
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
 
Modern thermal power plant
Modern thermal power plantModern thermal power plant
Modern thermal power plant
 
STEAM POWER PLANT
STEAM POWER PLANTSTEAM POWER PLANT
STEAM POWER PLANT
 
Thermal plant instrumentation and control
Thermal plant instrumentation and controlThermal plant instrumentation and control
Thermal plant instrumentation and control
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power Plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
 

Semelhante a An Overview of Thermal Power Plant

presentation_thermal_power_plant_1447503788_165600.pptx
presentation_thermal_power_plant_1447503788_165600.pptxpresentation_thermal_power_plant_1447503788_165600.pptx
presentation_thermal_power_plant_1447503788_165600.pptx
rajam575648
 

Semelhante a An Overview of Thermal Power Plant (20)

training report
training reporttraining report
training report
 
kstps training report
kstps training reportkstps training report
kstps training report
 
National thermal power corporation
National thermal power corporationNational thermal power corporation
National thermal power corporation
 
thermal power plant suratgarh ppt
thermal power plant suratgarh ppt thermal power plant suratgarh ppt
thermal power plant suratgarh ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ppt
PptPpt
Ppt
 
Ppt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distributionPpt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distribution
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
boiler and cogeneration training material
boiler and cogeneration training materialboiler and cogeneration training material
boiler and cogeneration training material
 
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt complete
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
Pintu raj
Pintu rajPintu raj
Pintu raj
 
hindalco power
hindalco powerhindalco power
hindalco power
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
coal based thermal power plant
 
POWER PLANT.pdf
POWER PLANT.pdfPOWER PLANT.pdf
POWER PLANT.pdf
 
Mini project ppt on working of steam turbine and its auxiliaries
Mini project ppt on working of steam turbine and its auxiliariesMini project ppt on working of steam turbine and its auxiliaries
Mini project ppt on working of steam turbine and its auxiliaries
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
presentation_thermal_power.pptx
presentation_thermal_power.pptxpresentation_thermal_power.pptx
presentation_thermal_power.pptx
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
 
presentation_thermal_power_plant_1447503788_165600.pptx
presentation_thermal_power_plant_1447503788_165600.pptxpresentation_thermal_power_plant_1447503788_165600.pptx
presentation_thermal_power_plant_1447503788_165600.pptx
 

Último

Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Último (20)

TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 

An Overview of Thermal Power Plant

  • 1.
  • 2. ABSTRACT  The main aim of this project is to study the various types of electrical and mechanical equipment involved in the process of generation of Electrical power.
  • 3. INTRODUCTION  KTPS-V Station was commissioned in 1996.  It was the first major thermal power station in AP.  KTPS V Stage had achieved 94.5% plant load factor.
  • 4. WORKING PRINCIPLE  The thermal power station is a power plant in which the prime mover is steam driven.  Water is heated, turns into steam and spins a steam turbine which drives an electrical generator.  The coal is used as a major source of fuel.  The thermal power plant works on the principle
  • 5. PARTS OF THERMAL POWER PLANT
  • 6.
  • 7. TYPES OF CIRCUITS For simplicity let us divide the whole arrangement into four circuits. 1. Steam and water circuit 2. Air and gas circuit 3. Coal and ash circuit 4. Cooling water circuit. 
  • 8. 1.STEAM AND WATER CIRCUIT boiler Drum Super heater IP Turbine Re Heater Hp turbine LP Turbine Condenser
  • 9. BOILER  A boiler is a device for generating steam for power, processing or heating purposes.  The boiler used here is a two pass, tower type, reheat natural circulation single drum, balanced draft and dry bottom (open hopper type) boiler and is designed for burning coal as principal fuel.
  • 11. CLASSFICATION OF BOILERS  Boilers are mainly classified into two types. They are 1. Fire tube boiler 2.Water tube boiler
  • 12. CONDENSER  Condenser is a Surface heat exchanger.  Exhaust steam from LP turbine enters into the condenser, where it condensates into water by exchanging its heat energy to cooling water.
  • 13. FEED WATER FLOW FROM CONDENSER Condenser CEPs LPH HP heaters BFPs Deaerator Economiser Drum boiler
  • 14. ECONOMISER  An economiser extracts apart of this heat from the flue gases.  It uses extracted heat for heating the feed water before it enters into the steam drum.
  • 15. 2.AIR AND GAS CIRCUIT PRIMARY AIR FAN(PA FAN)  The primary air has got two functions. 1.Pre heating the coal. 2. Transportation of fuel into furnace. PA fan Air Heater Mills Boiler
  • 16. FORCED DRAFT FAN(FD FAN)  The function of FD FAN is to supply sufficient quantity of air required for complete combustion.  The air flow is as shown below FD Fan Air Heater Furnace
  • 17. AIR PRE HEATERS  Air pre heater function is to heat the air with the help of flue gases.  The air heater used in KTPS-V is a Regenerative Tri-sector air heater. The flue gases flow is as shown :  Boiler Air preheater ESP ID Fan Chimney
  • 18. INDUCED DRAFT FAN (ID FAN)  The function of Induced Draft fan is to suck the gases out of furnaces and throw them into the stack.  Boiler is provided with two no. of Induced Draft Fans.
  • 19. ELECTROSTATIC PRECIPITATOR  The main function of ESP is to clean the gases which are being released into atmosphere.
  • 20. COAL AND ASH CIRCUIT  The coal flow is as shown below: Coal storage plant Crushers Bunkers Mills Boiler
  • 22. ASH HANDLING PLANT    At the bottom of the furnace, there is a hopper for collection of bottom ash. Fly ash is captured and removed from the flue gas by electrostatic precipitators. The flow of ash is as shown below Boiler Air pre Heater ESP Ash handling plant Ash pond
  • 24. WATER SUPPLY   Water requirement for the KTPS is provided from Kinnerasani Project. The total water required for the station is 1, 50,000 tons per day.
  • 25. Primary Fuel Supply:  KTPS is linked to Singareni Collieries Company limited (S.C.C.L.) for supply of coal from Manuguru, Yellandu and Rudrampur mines.
  • 26. STEAM TURBINE  Steam turbine is a rotating machine which converts the heat energy of steam into mechanical energy.
  • 27. Description of Steam Turbines • HP Turbine • IP Turbine • LP Turbine HIGH PRESSURE TURBINE:  In high pressure turbine steam is expanded to do work.  High pressure turbine having 25 reaction stages. o  Steam admitted at 540 c and pressure 150 kg/sq.cm.
  • 28. TYPES OF TURBINES IP TURBINE:  Exhaust steam from hp turbine, after passing through re heater is admitted for second phase of expansion of steam.  IP turbine having 17 reaction stages. LOW PRESSURE TURBINE:  Exhaust steam from IP turbine admitted to lp turbine for the last phase of expansion of steam.  LP turbine having 8 reaction stages
  • 29. Excitation system  The excitation system comprises of an exciter and automatic voltage regulator.  The duty of an exciter is to provide the necessary field current to the rotor winding of the alternator.  Brush less excitation is used in KTPS Vth stage.
  • 31. Excitation system  The excitation system comprises of an exciter and automatic voltage regulator.  The duty of an exciter is to provide the necessary field current to the rotor winding of the alternator.  Brush less excitation is used in KTPS Vth stage.
  • 32. SALIENT FEATUREs OF K.T.P.S  TOTAL INSTALLED CAPACITY: 1) KTPS-A Station : 4*60 = 240 MW 2) KTPS-B Station : 2*120 = 240 MW 3) KTPS-C Station : 2*120 = 240 MW 4) KTPS-V Stage : 2*250 = 500 MW 5) KTPS-VI Stage : 1*500=500 MW Total installed capacity = 1720 MW
  • 33. CONCLUSION    In a modern thermal power plant the Rankine Cycle is modified to include superheating of steam, regenerative feed water heating and reheating of the steam. Reheating the steam after it has partially expanded, improves the thermal cycle efficiency by 4 to 5%.Regenerative feed water heating by using Low pressure and High pressure heaters also improves the thermal cycle efficiency by 6 to 7%. So the overall efficiency of a modern thermal power plant is about 42%.