SlideShare uma empresa Scribd logo
1 de 64
Order Process
  {   The how to of what to do
   Banner
       Flyer
       Goldframe
       Digital Screen
       Ads
       Social Media
       What If? Scenarios and Dilemmas




Marketing Products
Banner Process
  {   Explanation of banner process with possible
      scenarios
   Banners are available in these sizes:
         8x8 Banners
         8x6 Banners
         8x3 Banners
     Banners are available in these materials
         Paper
         Vinyl




Banner General Info
Banner:          • $280 for External Depts
                           • $140 for Campus Depts
            8x8            • $70 for Student Orgs



          Banner:          • $240 for External Depts
                           • $120 for Campus Depts
            8x6            • $60 for Student Orgs



          Banner:          • $200 for External Depts
                           • $100 for Campus Depts
            8x3            • $50 for Student Orgs


Banner Pricing
*All Banners include 4 Hours of design time
Banner Designed
                                                                         Confirm
 Does customer      Front office gives to                                                     Confirm Banner
                                             Designer drops off       Copy, Proof, and
Want Banner saved    sales (cc Sales on                                                      dates are available
                                             proof to front office    Design Dates w/
   or tossed?       email if not present)                                                   to be hung w/ traffic
                                                                          Traffic


                                                                                              Discuss Banner
                       Sales Proof w/         Designer assigned       Place Order with       Copy and Proof
Banner Take Down
                           Client                 to project            Front Office         Dates and Design
                                                                                               with Client



                                                                      Sales enters copy
                    Sales notifies traffic    Traffic delivers to                            Meeting set with
 Banner Re Hang                                                        and image into
                     of finalized proof             design                                        Sales
                                                                          basecamp




 Banner Hung by       Sales gives to                                  Front Office enters
                                             Copy finalizes copy                              Does the banner
  production on     design to complete                                   timeline into
                                             and sends to traffic                              Need Design?
     Friday’s             order                                            basecamp


                                                                                                Client comes
                      Designers gives                                                         in, confirms with
Banner Printed by                             Traffic gives initial   Front Office gives
                    completed order to                                                      front desk available
   designers                                 copy to copy editors      order to traffic
                       Front Office                                                          dates to banner to
                                                                                                     hang
Note:
                                                     Green and Purple
                                                     Frames relate to
                  Client Wants
Sales Proof w/
                  Changes on
                                   Designer Edits    previous slide frames
    Client                             Proof
                      Proof




   Client                           Designer
                  Sales Proof w/
  Approves                         Notifies Front
                      Client
   Proof                              Office




 Sales notifies
   traffic of                                               Client
finalized proof                     Sales Proof w/
                                                          Approves
                                        Client
                                                           Proof



    Sales Proofing                                       Sales notifies

    with Client                                            traffic of
                                                        finalized proof
   Design time is slated for 2 weeks
    Proof has a 7-10 day turn around time
    Copy has a 72 hour turn around time
    Print has a 48 hour turn around time
    Banners can only be hung in 2 week intervals
        Anything longer and a week must separate two week
         hang times
    Banners are Hung on Friday Only
    Copy and Proof Due dates can not be on Friday or
     Monday (This can the timeline)


Banner Design Timeline Notes
Traffic gives
 Ask to recycle
                                                                  finalized order to
banner or throw       Re-hang banner          Hang Banner
                                                                  designers to have
     away
                                                                        printed




Sales places print                          Traffic delivers
                     Front Office gives                          Copy finalizes copy
only material on                            order to copy to
                      order to traffic                           and gives to traffic
    basecamp                                     proof




Sales places the     Sales sets copy and   Sales obtains print
                                                                 Front office assigns
order with Front       print dates and     only material from
                                                                    client to Sales
    Offices          checks with traffic          client




                        Client comes
                       in/calls/emails     Front Office Checks     Confirms Print
                      about print only       available dates           Only
                           inquiry




Banner Print – 5 Day Turn Around Time
Determines
                       design is
                       required




                    Sales obtains
                     print only
                     copy from
   Determines a         client      Sales sets copy
  change in dates
  based on when
                                    and print dates
     copy was                        and confirms
     received                         with traffic




Banner Scenario
Monday     • Copy read by End of Day Wednesday
            • Print by Friday of the same week.



            • Copy read by End of Day Thursday

 Tuesday    • Print by Monday of the following week
            • Hung Friday of that following week


            • Copy read by End of Day Friday

Wednesday   • Print by Tuesday of Following Week
            • Hung Friday of that following week


            • Copy read by End of Day Tuesday of Following Week

Thursday    • Print by Wednesday of Following Week
            • Hung Friday of that following week


            • Copy read by End of Day Wednesday of Following Week

 Friday     • Print by Friday of Following Week
            • Hung Friday of that following week




Timeline of a Print Banner
based on received day
   Copy has a 72 hour turn around time
      Print has a 48 hour turn around time
      Banners can only be hung in 2 week intervals
          Anything longer and a week must separate two
           week hang times
      Banners are Hung on Friday Only
      Copy Due dates can not be on Friday or
       Monday (This can push back the 5 day
       timeline)




Banner Print Timeline Notes
Flyer process
  {   Designed, Print-Only, Print Services, Mailer
   Color Flyers
            Full Bleed
            Non-Full Bleed
        Black and White Flyers
            White Paper
            Color Paper
        Glossy
        Card Stack
        Traditional Paper Weight




Types of Flyers offered
   Full Page (1-UP) 8 ½ * 11
        Half Page (2-UP) 8 ½ * 5 ½
        Third Page (3-UP) 8 ½ * 3 ½
        Quarter Page (4-UP) 4 ¼ * 5 ½
        Any other types as specified size by the client




Flyer Sizing
8.5 x 11                            Student Orgs    Campus Dept.    External Dept
B/W One Sided                   $            0.05   $        0.10   $        0.20
B/W Double Sided                $            0.10   $        0.20   $        0.40
One Sided                       $            0.25   $        0.50   $        1.00
Double Sided                    $            0.50   $        1.00   $        2.00
Additional Color Paper 8.5x11   $            0.02   $        0.04   $        0.08
Additional Cover Paper 8.5x11   $            0.02   $        0.04   $        0.08
11 x 17
B/W One Sided                   $            0.15   $        0.30   $        0.60
B/W Double Sided                $            0.25   $        0.50   $        1.00
One Sided                       $            0.45   $        0.90   $        1.80
Double Sided                    $            0.75   $        1.50   $        3.00
Additional Color Paper 11x17    $            0.03   $        0.06   $        0.12
Additional Cover Paper 11x17    $            0.03   $        0.06   $        0.12
Miscellaneous
Foam Core 24x36                 $            2.50   $        5.00   $       10.00
Foam Core 40x60                 $            5.00   $       10.00   $       20.00
Lamination                      $            1.00   $        2.00   $        4.00
Poster Board                    $            3.20   $        6.40   $       12.80
Cut/Fold *Per 500 sheets        $            2.00   $        4.00   $        8.00
Binding                         $            1.25   $        2.50   $        5.00




Flyer Pricing
Client comes in to
  ask to have flyer
       printed



     Copy Center          Copy Center
  receives the images   Notifies Customer
     to be printed      of completed Job




   Sales assigned to    Copy Center Prints
    print only job      Flyers ( 48 hr Max)



Flyer Process – Print Only
   Copy – 3 Day (72 Hour) Turn-around time
         Max.
        Print – 1 Day (24 Hour) Turn-around time Max.
        Proof and Copy dates are not to be placed on a
         Monday or Friday generally speaking. Doing
         so could potentially push back the above turn-
         around times




General flyer Timeline - Print
Flyer Process – Design
                                                                                            Copy Center notifies
Client comes in for Flyer                                    Designer assigned to        client of order completed
                             Traffic delivers to design
         Design                                                    project               and cc’s Sales in the email
                                                                                                notification.




  Front Office Assigns a     Copy finalizes copy and       Designer drops off proof       Flyer Printed by Copy
        Sales Rep               sends to traffic                to front office                   Center




                                                           Front office gives to sales
Sales confirms timeline w/   Traffic gives initial copy                                   Front office gives final
                                                            (cc Sales on email if not
          traffic                 to copy editors                                          order to copy center
                                                                    present)




      Sales Obtains          Front office gives order to                                 Designer gives completed
                                                             Sales proof w/ client
      copy/images                       traffic                                            order to Front Office




Sales Places an order with     Sales Enters copy and        Sales notifies traffic of     Sales gives to design to
        front office            image on basecamp               finalized proof               complete order
Note:
                                                     Green and
                                                     Purple Frames
                  Client Wants
Sales Proof w/
                  Changes on
                                   Designer Edits    relate to
    Client                             Proof         previous slide
                      Proof
                                                     frames


   Client                           Designer
                  Sales Proof w/
  Approves                         Notifies Front
                      Client
   Proof                              Office




 Sales notifies
   traffic of                                               Client
finalized proof                     Sales Proof w/
                                                          Approves
                                        Client
                                                           Proof



    Sales Proofing                                       Sales notifies

    with Client                                            traffic of
                                                        finalized proof
   Design time – 2 Week Turn Around Time
          Proof time – 7-10 Day Turn Around Time
              Note: There is no “Max” on these as we would
               like to give as much time as possible to create
               outstanding and exceptional work.
          Copy – 3 Day (72 Hour) Turn-around time
           Print – 1 Day (24 Hour) Turn-around time
          Copy and Proof Due dates can not be on Friday
           or Monday (This can push the timeline)




General Flyer Timelines - Design
Designer gives           Front Desk gives to
Customer comes in to           Front Office gives       Traffic gives initial
                                                                                  completed order to           Charlie ( Done
    order Flyers                order to traffic       copy to copy editors
                                                                                     Front Office.             Electronically)




                                                                                                             We as Sales call to
Front Office asks if it is     Front Office enters     Copy finalizes copy      Sales gives to designer     make sure the order is
 Design or Print Only        timeline into basecamp    and sends to traffic       to complete order           received at Print
                                                                                                             services. (Note 2)




                                                                                                             Print services sends
                             Sales enters copy and      Traffic delivers to     Sales notifies traffic of
Sales Person assigned                                                                                       final to the Marketing
                             images on Basecamp               design                finalized proof
                                                                                                                     Office




 Sales Determines that                                                                                         Front Office gets
client wants full bleed      Sales places order with    Designer assigned                                    leftovers on mailers
                                                                                 Sales proof w/ Client
and needs to be sent to            Front Office              project                                          and/or front office
     Print Services                                                                                               disburses.




                                                                                  Front office gives to
    Sales confirms           Sales obtains copy and    Designer drops off
                                                                                sales (cc Sales on email
  timeline w/ Traffic                images            proof to front office
                                                                                     if not present)




                Flyer Process – Print/Mailer
                Svcs
   Copy – 3 Day (72 Hour) Turn-around time
        Design time – 2 Week Turn Around Time
        Proof time – 7-10 Day Turn Around Time
            Note: There is no “Max” on these as we would like
             to give as much time as possible to create
             outstanding and exceptional work.
        Print Services – 2 Week Turn-Around Time
        Mailing Services – 2 Week Turn Around Time
        Proof and Copy dates are not to be placed on a
         Monday or Friday generally speaking. Doing so
         could potentially push back the above turn-around
         times


General Flyer Time Line –
Print/Mailer Svcs
Based on Copy Turned in to Front Office by Sept 1st.

Note: Proof Date is 9 Days because Day 10 would
have been due on a Friday.


                                                   Print         Mailer
    Copy          Design           Proof
                                                  Services      Services

                                   9 Days
                  2 Weeks (14
    3 Days                        (Note: See       14 Days        14 Days
                     Days)
                                   below)


     Copy                         Proofed           Print          Mailer
                  Designed
   Finalized                      Sept 27th      Services Oct   Services Oct
                 by Sept 18th       (NOTE)
   Sept 4th                                          11th           25th



       General Flyer Time Line –
       Print/Mailer Svcs Example
Gold frame Process
  {   Explanation of gold frame process with possible
      scenarios
   Gold Frames are available in these sizes:
        26”x 40”
    Gold frame pricing

                    •External Dept: $80.00
       1st Copy     •Campus Dept: $40.00
                    •Student Org: $20.00


                    •External Dept: $40.00
     Additional
                    •Campus Dept: $20.00
       Copy         •Student Org: $10.00



Gold frame General Info
Gold Frame Designed
                                                                                        Confirm gold frame
                                                                                                                 Discuss gold frame Copy
 Does customer Want        Designer drops off proof        Designer assigned to        spaces and dates dates
                                                                                                                   and Proof Dates and
Banner saved or tossed?         to front office                  project              are available to be hung
                                                                                                                    Design with Client
                                                                                             w/ traffic




                           Front office gives to sales                                       Confirm
Gold frame Take Down        (cc Sales on email if not    Traffic delivers to design   Copy, Proof, and Design     Meeting set with Sales
                                    present)                                             Dates w/ Traffic




  Gold frame Hung by                                     Copy finalizes copy and      Place Order with Front       Does the gold frame
                             Sales Proof w/ Client
      production                                            sends to traffic                  Office                 Need Design?




                                                                                                                        Client comes
                                                                                                                  in, confirms with front
 Gold frame Printed by      Sales notifies traffic of    Traffic gives initial copy    Sales enters copy and
                                                                                                                 desk available dates and
       designers                finalized proof               to copy editors          image into basecamp
                                                                                                                 spaces for gold frame to
                                                                                                                            hang




   Designers gives
                            Sales gives to design to     Front Office gives order       Front Office enters
completed order to Front
                                complete order                  to traffic            timeline into basecamp
        Office
Note:
                                                     Green and Purple
                                                     Frames relate to
                  Client Wants
Sales Proof w/
                  Changes on
                                   Designer Edits    previous slide frames
    Client                             Proof
                      Proof




   Client                           Designer
                  Sales Proof w/
  Approves                         Notifies Front
                      Client
   Proof                              Office




 Sales notifies
   traffic of                                               Client
finalized proof                     Sales Proof w/
                                                          Approves
                                        Client
                                                           Proof



    Sales Proofing                                       Sales notifies

    with Client                                            traffic of
                                                        finalized proof
   Design time is slated for 2 weeks
    Proof has a 7-10 day turn around time
    Copy has a 72 hour turn around time
    Print has a 48 hour turn around time
    Gold frames can be hung as long as the client wishes.
    Only 3 max may be up at the same time for an event.
    Client will be charged a re-hang fee after the first 3
     weeks.
    Copy and Proof Due dates can not be on Friday or
     Monday (This can alter the timeline)


Banner Design Timeline Notes
Ask client if they                            Traffic gives
 want to keep the                           finalized order to     Copy finalizes copy
                      Hang Gold frame
  gold frame or                             designers to have      and gives to traffic
  throw it away                                   printed




 Sales places the      Sales places print                           Traffic delivers
                                            Front Office gives
 order with Front      only material on                             order to copy to
                                             order to traffic
     Offices               basecamp                                      proof




Sales sets copy and   Sales obtains print
                                            Front office assigns     Confirms Print
  print dates and     only material from
                                               client to Sales           Only
checks with traffic          client




                                               Client comes
                                              in/calls/emails      Front Office Checks
                                             about print only        available dates
                                                  inquiry




Gold frame Print – 4 Day Turn Around Time
Determines
                       design is
                       required




                    Sales obtains
                     print only
                     copy from
   Determines a         client      Sales sets copy
  change in dates
  based on when
                                    and print dates
     copy was                        and confirms
     received                         with traffic




Gold Frame Scenario
Monday     • Copy read by End of Day Wednesday
            • Print by Thursday of the same week.



            • Copy read by End of Day Thursday

 Tuesday    • Print by Friday of the same week
            • (Dates could change based on due dates landing on Mon or Fri)


            • Copy read by End of Day Friday

Wednesday   • Print by Tuesday of Following Week
            • (Dates could change based on due dates landing on Mon or Fri)




Thursday    • Copy read by End of Day Tuesday of Following Week
            • Print by Wednesday of Following Week



            • Copy read by End of Day Wednesday of Following Week

 Friday     • Print by Friday of Following Week
            • (Dates could change based on due dates landing on Mon or Fri)




Timeline of a Print Gold
frame based on received day
   Copy has a 72 hour turn around time
      Print has a 24 hour turn around time
      Gold frames can be hung as long as the client
       wishes.
      Only 3 max may be up at the same time for an
       event.
      Client will be charged a re-hang fee after the
       first 3 weeks.
      Copy Due dates can not be on Friday or
       Monday (This can push back the 4 day
       timeline)




Gold frame Print Timeline Notes
Digital Screen
Process
  {   From Design to Board
   Bolton
        Library
        Lubar (For Business related advertising only)
            Also across 3 lcd/led panels




Locations for Digital Screens
   All Design Time Based
            External Dept - $50 per hour
            Campus Dept - $25 per hour
            Student Org - $12.50 per hour
        For Digital Screen already designed, direct
         client to respective Digital Screen Building.




Digital Screen Pricing
Copy Finalizes Copy       Traffic Delivers to
  Client comes in
                         and sends to traffic           design




                                                   Andy assigns a
                         Traffic gives initial                             Front office sends
Client assigned Sales                              designer to the
                        copy to copy editors                               order to respective
                                                       project




                                                                            Designer gives
   Sales confirms        Front Office gives      Designer drops off
                                                                          completed order to
 timeline w/ Traffic      order to traffic       proof to front office
                                                                             Front Office




                        Front Office Enters      Front office gives to
   Sales Obtains                                                          Sales gives to Design
                           timeline into          sales (cc Sales on
   Copy/Images                                                             to complete order
                             basecamp            email if not present )




                         Sales Enters Copy
 Sales Places order                                                       Sales notifies traffic
                           and Image on          Sales Proof w/ Client
 with Front Office                                                         of finalized proof
                             Basecamp



General Digital Screen
Process
Note:
                                                     Green and Purple
                                                     Frames relate to
                  Client Wants
Sales Proof w/
                  Changes on
                                   Designer Edits    previous slide frames
    Client                             Proof
                      Proof




   Client                           Designer
                  Sales Proof w/
  Approves                         Notifies Front
                      Client
   Proof                              Office




 Sales notifies
   traffic of                                               Client
finalized proof                     Sales Proof w/
                                                          Approves
                                        Client
                                                           Proof



    Sales Proofing                                       Sales notifies

    with Client                                            traffic of
                                                        finalized proof
   Copy has a 72 hour turn around time
    Design time is slated for 2 weeks
    Proof has a 7-10 day turn around time
    Digital Screen to be in 2 weeks before start date
    Copy and Proof Due dates can not be on Friday or
     Monday (This can push the timeline)




Digital Screen Timeline Notes
Digital Sign
    Copy        Design           Proofing
                                                            Time
  (72 Hours)   (2 Weeks)      (7-10 Days)
                                                           (2 Weeks)




                             Oct 25th (7 Days)         November 13th<-
   Oct 4th     Oct 18th    Oct 30th (12 Days) <- Non    First Possible day for

                              Monday Due Dates          Digital Screen to run




Process Timeline Example
   Copy has a 72 hour turn around time
      Print has a 24 hour turn around time
      Gold frames can be hung as long as the client
       wishes.
      Only 3 max may be up at the same time for an
       event.
      Client will be charged a re-hang fee after the
       first 3 weeks.
      Copy Due dates can not be on Friday or
       Monday (This can push back the 4 day
       timeline)




Gold frame Print Timeline Notes
   Sizes: Sizes available in Vertical and Horizontal
            Full Page            3/8 Page
            ¾ Page               1/6 Page
            ½ Page               1/8 Page
            1/3 Page             1/12 Page
            ¼ Page               3”x2 7/8” Post-it Notes
       Online:
            Masthead Leaderboard              Medium Rectangle
                 Exclusive                    Wide Skyscraper
                 Rotational                   Bottom Leaderboard
            Pencil Bar (1000X35 pixels)       Half Banner
       Type
            Color
            Black and White

Ad Types offered – Shepard Express

    Print Ad Sizes              Online Ad Types
     
         Full Page                 - Leaderboard (468 x 60 px)
     
         ½ Page                    - Rectangle (300 x 250 px)
     
         1/3 Page                  - Button (125 x 125 px)
     
         ¼ Page Horizontal         - Micro (Custom px)
     
         ¼ Page Vertical
     
         1/8 Page Horizontal
     
         1/8 Page Vertical
     
         1/16 Page Horizontal
     
         1/16 Page Vertical




Ad Types Offered - Post
Ad Size         Color    B&W
Full Page       840.16   662.16
½ Page          453.90   320.40
1/3 Page        347.10   213.60   Ad Type       Price (CPM)
¼ Page          242.79   153.79                 Cost Per
Horizontal                                      Thousand
                                                Impressions
¼ Page Vertical 259.88   170.88
                                  Leaderboard   $10.00 CPM
1/8 Page        143.65   76.90
Horizontal
                                  Rectangle     $7.00 CPM
1/8 Page        152.19   85.44
Vertical
                                  Button        $3.00 CPM
1/16 Page       87.22    42.72
Horizontal
1/16 Page       95.76    51.26    Micro         $2.00 CPM
Vertical
   Sizing:
             Full Page
             ½ Page
             1/3 Page
             ¼ Page
             1/6 Page
             1/8 Page
             1/12 Page
         Color Only




Ad Types Offered – The Onion
Size        Price
Full Page   $830
½ Page      $600
1/3 Page    $450
¼ Page      $350
1/6 Page    $270
1/8 Page    $200
1/12 Page   $150
   If a Client Asks for us to just send an ad and they already have the ad
    designed, provide the client with the below info based on the Ad
    company they wish to advertise with.
Ad Company                  Contact Name/Number      Contact Email


UWM Post                    Stephanie Fisher         Fisher.stephanie@gmail.co
                            262-719-5364             m


Shepard Express             Dallas Ziebel            dallas@shepex.com
                            414-292-3806


The Onion                   Josh Hoppert             jhoppert@theonion.com




        Print Only
Copy Finalizes Copy       Traffic Delivers to
  Client comes in
                         and sends to traffic           design




                                                   Andy assigns a
                         Traffic gives initial                             Front office sends
Client assigned Sales                              designer to the
                        copy to copy editors                                order to Ad Rep
                                                       project




                                                                            Designer gives
   Sales confirms        Front Office gives      Designer drops off
                                                                          completed order to
 timeline w/ Traffic      order to traffic       proof to front office
                                                                             Front Office




                        Front Office Enters      Front office gives to
   Sales Obtains                                                          Sales gives to Design
                           timeline into          sales (cc Sales on
   Copy/Images                                                             to complete order
                             basecamp            email if not present )




                         Sales Enters Copy
 Sales Places order                                                       Sales notifies traffic
                           and Image on          Sales Proof w/ Client
 with Front Office                                                         of finalized proof
                             Basecamp




General Ad Process
Note:
                                                     Green and Purple
                                                     Frames relate to
                  Client Wants
Sales Proof w/
                  Changes on
                                   Designer Edits    previous slide frames
    Client                             Proof
                      Proof




   Client                           Designer
                  Sales Proof w/
  Approves                         Notifies Front
                      Client
   Proof                              Office




 Sales notifies
   traffic of                                               Client
finalized proof                     Sales Proof w/
                                                          Approves
                                        Client
                                                           Proof



    Sales Proofing                                       Sales notifies

    with Client                                            traffic of
                                                        finalized proof
   Copy has a 72 hour turn around time
    Design time is slated for 2 weeks
    Proof has a 7-10 day turn around time
    Ad must be due the Thursday before the Publication
     Date (Our side)
    Most ad companies require ad in by Friday before
     publication
    Copy and Proof Due dates can not be on Friday or
     Monday (This can push the timeline back)



Ad Timeline Notes
The Onion •Tuesday Publication

      Shepard
                •Thursday Publication
      Express

     UWM Post •Monday Publication



Publication Dates
Based on Copy Turned in to Front Office by Sept 1st.
Note: Proof Date is 9 Days because Day 10 would
have been due on a Friday.

Note 2: Based on a Monday Publication


        Copy                          Proofed           Final Due           Ad Runs
                      Designed
      Finalized                       Sept 27th         Date Sept          Mon Oct 1st
                     by Sept 18th      (NOTE*)
      Sept 4th                                             28th            (NOTE 2)

                                                                            Varies Based
                     2 Weeks (14    9 Days (Note:
       3 Days                                              1 Day           on Publication
                        Days)         See below)
                                                                                Date

                                                         Send to Post
                                                             (Due           Ad Run Date
        Copy            Design          Proof
                                                       Thursday, sent to     (Monday)
                                                       Post Fri by noon)




       General Ad Timeline
Social Media Process
  {   A Guide to Social Media How To’s
• Self-Created by Social Media Directors
   Facebook Updates    • Sent from Client to push on our
                         facebook



                       • Self-Created by Social Media Directors
    Twitter “Tweets”
                       • Sent from client to push on our twitter




    Facebook/Twitter   • We can create a facebook page for the
       Creations         client




Social Media we offer
All current social media is gratuitous with
   other forms of Marketing and Advertising.




Pricing
Front Office gives     Traffic gives initial
   Client comes in
                          order to traffic     copy to copy editors




                         Front Office Enters
                                               Copy Finalizes Copy
 Client assigned Sales      timeline into
                                                and sends to traffic
                              basecamp




                         Sales Enters Copy
    Sales confirms                              Traffic Delivers to
                           and Image on
  timeline w/ Traffic                             Social Media
                             Basecamp




                                               Social Media pushes
                         Sales Places order
  Sales Obtains Copy                               out facebook
                         with Front Office
                                               updates and tweets




General Social Media Process
   Copy has a 72 hour turn around time
    Social Media has a 24 hour turn around time to begin
     pushing out material.
    Generally fast turn around time for quick
     marketing/advertising.
    Copy and dates can not be on Friday or Monday (This
     can push the timeline)




Social Media Timeline Notes
Social Media
     Copy       Final Turn In
                                Pushed Out
   (72 Hours)     (1 Day)
                                  (1 Day)




  Oct 4th       Oct 5th         Oct 6th


Process Timeline Example
What if? Scenarios
and Dilemmas
  {   A Quick Guide on “What to do” when something
      goes array.
   Client is Late on delivering Copy, what do?
            Notify of possible push back in finalized order
            Modify Order
                 This can be eliminating items, or doing a different
                  marketing approach to alleviate the soon
                  approaching deadline
            Cancel Order

            NOTE: Always check with Traffic and
             Design on new dates to ensure designers
             have time to complete the already pushed
             back dates



Client
   Sales misses a deadline, what can you do?
           Notify Sales of missed deadline
           Sales can offer additional supplementary
            marketing to make up for their mistake
           Always apologize and notify the client when
            deadline is missed. Sometimes the client doesn’t
            realize it either!
       Copy Missed and/or not proofed correctly




Sales
   Order is Lost
        Overbooked an Item
        Missed Deadline


        Front Office needs to put in order only
             Items were missed with Copy Center puts in orders
        Front Office overbooked, and had to push back a
         banner 2 weeks. Sales offered free Lubar screen in an
         effort to
             Minimize loss on profit of the banner
             Allows more advertisement vs. a discount
             Value vs. customer service oriented




Front office
   Designer is late on a proof, what do?
           Make sure the designer notifies Sales
           Sales can confer for a new proof date
           Sales can also notify to explain to client and
            propose new proof date and/or off additional for
            make up in time.




design

Mais conteúdo relacionado

Destaque (7)

Gebeurtenis
GebeurtenisGebeurtenis
Gebeurtenis
 
Pertemuan 1
Pertemuan 1Pertemuan 1
Pertemuan 1
 
Pertemuan 5
Pertemuan 5Pertemuan 5
Pertemuan 5
 
Gebeurtenis
GebeurtenisGebeurtenis
Gebeurtenis
 
Pertemuan 4
Pertemuan 4Pertemuan 4
Pertemuan 4
 
Tugas sia-1
Tugas sia-1Tugas sia-1
Tugas sia-1
 
Gebeurtenis
GebeurtenisGebeurtenis
Gebeurtenis
 

Semelhante a Process compiled

Portfolio For Linked In
Portfolio For Linked InPortfolio For Linked In
Portfolio For Linked Inrandysch
 
Protean-The collaboration suite
Protean-The collaboration suiteProtean-The collaboration suite
Protean-The collaboration suiteguestb99fe9a
 
Session digital media_101_
Session digital media_101_Session digital media_101_
Session digital media_101_Shane Crombie
 
Session digital media_101_
Session digital media_101_Session digital media_101_
Session digital media_101_GroupM
 
Manitobah product development phase gates
Manitobah product development phase gatesManitobah product development phase gates
Manitobah product development phase gatesTeddy Pai
 
Motion graphics worksheet web banners
Motion graphics worksheet  web bannersMotion graphics worksheet  web banners
Motion graphics worksheet web bannersirrealimagens
 
Eventech Profile
Eventech ProfileEventech Profile
Eventech ProfileHatim Jamal
 
About Lmpact
About LmpactAbout Lmpact
About Lmpactluo hui
 
Newport Pro Capabilities
Newport Pro CapabilitiesNewport Pro Capabilities
Newport Pro Capabilitiesocbanker
 
R Gould Resume
R Gould ResumeR Gould Resume
R Gould Resumeguestdb8d8
 
Customer Development/Lean Startup 092609 class 7 and 8
Customer Development/Lean Startup 092609 class 7 and 8Customer Development/Lean Startup 092609 class 7 and 8
Customer Development/Lean Startup 092609 class 7 and 8Stanford University
 
Social Experience Design (SXD) - Design Council (London) 11/2011
Social Experience Design (SXD) - Design Council (London) 11/2011Social Experience Design (SXD) - Design Council (London) 11/2011
Social Experience Design (SXD) - Design Council (London) 11/2011Jason Till
 
DesignBay.com: white-labeled crowdsourcing [ad]
DesignBay.com: white-labeled crowdsourcing [ad]DesignBay.com: white-labeled crowdsourcing [ad]
DesignBay.com: white-labeled crowdsourcing [ad]Ilya Vedrashko
 
Brands in control
Brands in controlBrands in control
Brands in controlBrandSquare
 
Diamond Vertical Marketing Presentation For Microsoft Dynamics Partners, 061912
Diamond Vertical Marketing Presentation For Microsoft Dynamics Partners, 061912Diamond Vertical Marketing Presentation For Microsoft Dynamics Partners, 061912
Diamond Vertical Marketing Presentation For Microsoft Dynamics Partners, 061912FredDiamond
 

Semelhante a Process compiled (20)

Portfolio For Linked In
Portfolio For Linked InPortfolio For Linked In
Portfolio For Linked In
 
Protean-The collaboration suite
Protean-The collaboration suiteProtean-The collaboration suite
Protean-The collaboration suite
 
Session digital media_101_
Session digital media_101_Session digital media_101_
Session digital media_101_
 
Session digital media_101_
Session digital media_101_Session digital media_101_
Session digital media_101_
 
Brand Portfolio 2012
Brand Portfolio 2012Brand Portfolio 2012
Brand Portfolio 2012
 
Resume
ResumeResume
Resume
 
Manitobah product development phase gates
Manitobah product development phase gatesManitobah product development phase gates
Manitobah product development phase gates
 
Biamp Award Write Up
Biamp Award Write UpBiamp Award Write Up
Biamp Award Write Up
 
Motion graphics worksheet web banners
Motion graphics worksheet  web bannersMotion graphics worksheet  web banners
Motion graphics worksheet web banners
 
Eventech Profile
Eventech ProfileEventech Profile
Eventech Profile
 
Brand portfolio abr
Brand portfolio abrBrand portfolio abr
Brand portfolio abr
 
About Lmpact
About LmpactAbout Lmpact
About Lmpact
 
Newport Pro Capabilities
Newport Pro CapabilitiesNewport Pro Capabilities
Newport Pro Capabilities
 
R Gould Resume
R Gould ResumeR Gould Resume
R Gould Resume
 
Customer Development/Lean Startup 092609 class 7 and 8
Customer Development/Lean Startup 092609 class 7 and 8Customer Development/Lean Startup 092609 class 7 and 8
Customer Development/Lean Startup 092609 class 7 and 8
 
Social Experience Design (SXD) - Design Council (London) 11/2011
Social Experience Design (SXD) - Design Council (London) 11/2011Social Experience Design (SXD) - Design Council (London) 11/2011
Social Experience Design (SXD) - Design Council (London) 11/2011
 
DesignBay.com: white-labeled crowdsourcing [ad]
DesignBay.com: white-labeled crowdsourcing [ad]DesignBay.com: white-labeled crowdsourcing [ad]
DesignBay.com: white-labeled crowdsourcing [ad]
 
Brands in control
Brands in controlBrands in control
Brands in control
 
Packaging Premedia Services
Packaging Premedia ServicesPackaging Premedia Services
Packaging Premedia Services
 
Diamond Vertical Marketing Presentation For Microsoft Dynamics Partners, 061912
Diamond Vertical Marketing Presentation For Microsoft Dynamics Partners, 061912Diamond Vertical Marketing Presentation For Microsoft Dynamics Partners, 061912
Diamond Vertical Marketing Presentation For Microsoft Dynamics Partners, 061912
 

Último

Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxdhanalakshmis0310
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxAmita Gupta
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 

Último (20)

Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 

Process compiled

  • 1. Order Process { The how to of what to do
  • 2. Banner  Flyer  Goldframe  Digital Screen  Ads  Social Media  What If? Scenarios and Dilemmas Marketing Products
  • 3. Banner Process { Explanation of banner process with possible scenarios
  • 4. Banners are available in these sizes:  8x8 Banners  8x6 Banners  8x3 Banners  Banners are available in these materials  Paper  Vinyl Banner General Info
  • 5. Banner: • $280 for External Depts • $140 for Campus Depts 8x8 • $70 for Student Orgs Banner: • $240 for External Depts • $120 for Campus Depts 8x6 • $60 for Student Orgs Banner: • $200 for External Depts • $100 for Campus Depts 8x3 • $50 for Student Orgs Banner Pricing *All Banners include 4 Hours of design time
  • 6. Banner Designed Confirm Does customer Front office gives to Confirm Banner Designer drops off Copy, Proof, and Want Banner saved sales (cc Sales on dates are available proof to front office Design Dates w/ or tossed? email if not present) to be hung w/ traffic Traffic Discuss Banner Sales Proof w/ Designer assigned Place Order with Copy and Proof Banner Take Down Client to project Front Office Dates and Design with Client Sales enters copy Sales notifies traffic Traffic delivers to Meeting set with Banner Re Hang and image into of finalized proof design Sales basecamp Banner Hung by Sales gives to Front Office enters Copy finalizes copy Does the banner production on design to complete timeline into and sends to traffic Need Design? Friday’s order basecamp Client comes Designers gives in, confirms with Banner Printed by Traffic gives initial Front Office gives completed order to front desk available designers copy to copy editors order to traffic Front Office dates to banner to hang
  • 7. Note: Green and Purple Frames relate to Client Wants Sales Proof w/ Changes on Designer Edits previous slide frames Client Proof Proof Client Designer Sales Proof w/ Approves Notifies Front Client Proof Office Sales notifies traffic of Client finalized proof Sales Proof w/ Approves Client Proof Sales Proofing Sales notifies with Client traffic of finalized proof
  • 8. Design time is slated for 2 weeks  Proof has a 7-10 day turn around time  Copy has a 72 hour turn around time  Print has a 48 hour turn around time  Banners can only be hung in 2 week intervals  Anything longer and a week must separate two week hang times  Banners are Hung on Friday Only  Copy and Proof Due dates can not be on Friday or Monday (This can the timeline) Banner Design Timeline Notes
  • 9. Traffic gives Ask to recycle finalized order to banner or throw Re-hang banner Hang Banner designers to have away printed Sales places print Traffic delivers Front Office gives Copy finalizes copy only material on order to copy to order to traffic and gives to traffic basecamp proof Sales places the Sales sets copy and Sales obtains print Front office assigns order with Front print dates and only material from client to Sales Offices checks with traffic client Client comes in/calls/emails Front Office Checks Confirms Print about print only available dates Only inquiry Banner Print – 5 Day Turn Around Time
  • 10. Determines design is required Sales obtains print only copy from Determines a client Sales sets copy change in dates based on when and print dates copy was and confirms received with traffic Banner Scenario
  • 11. Monday • Copy read by End of Day Wednesday • Print by Friday of the same week. • Copy read by End of Day Thursday Tuesday • Print by Monday of the following week • Hung Friday of that following week • Copy read by End of Day Friday Wednesday • Print by Tuesday of Following Week • Hung Friday of that following week • Copy read by End of Day Tuesday of Following Week Thursday • Print by Wednesday of Following Week • Hung Friday of that following week • Copy read by End of Day Wednesday of Following Week Friday • Print by Friday of Following Week • Hung Friday of that following week Timeline of a Print Banner based on received day
  • 12. Copy has a 72 hour turn around time  Print has a 48 hour turn around time  Banners can only be hung in 2 week intervals  Anything longer and a week must separate two week hang times  Banners are Hung on Friday Only  Copy Due dates can not be on Friday or Monday (This can push back the 5 day timeline) Banner Print Timeline Notes
  • 13. Flyer process { Designed, Print-Only, Print Services, Mailer
  • 14. Color Flyers  Full Bleed  Non-Full Bleed  Black and White Flyers  White Paper  Color Paper  Glossy  Card Stack  Traditional Paper Weight Types of Flyers offered
  • 15. Full Page (1-UP) 8 ½ * 11  Half Page (2-UP) 8 ½ * 5 ½  Third Page (3-UP) 8 ½ * 3 ½  Quarter Page (4-UP) 4 ¼ * 5 ½  Any other types as specified size by the client Flyer Sizing
  • 16. 8.5 x 11 Student Orgs Campus Dept. External Dept B/W One Sided $ 0.05 $ 0.10 $ 0.20 B/W Double Sided $ 0.10 $ 0.20 $ 0.40 One Sided $ 0.25 $ 0.50 $ 1.00 Double Sided $ 0.50 $ 1.00 $ 2.00 Additional Color Paper 8.5x11 $ 0.02 $ 0.04 $ 0.08 Additional Cover Paper 8.5x11 $ 0.02 $ 0.04 $ 0.08 11 x 17 B/W One Sided $ 0.15 $ 0.30 $ 0.60 B/W Double Sided $ 0.25 $ 0.50 $ 1.00 One Sided $ 0.45 $ 0.90 $ 1.80 Double Sided $ 0.75 $ 1.50 $ 3.00 Additional Color Paper 11x17 $ 0.03 $ 0.06 $ 0.12 Additional Cover Paper 11x17 $ 0.03 $ 0.06 $ 0.12 Miscellaneous Foam Core 24x36 $ 2.50 $ 5.00 $ 10.00 Foam Core 40x60 $ 5.00 $ 10.00 $ 20.00 Lamination $ 1.00 $ 2.00 $ 4.00 Poster Board $ 3.20 $ 6.40 $ 12.80 Cut/Fold *Per 500 sheets $ 2.00 $ 4.00 $ 8.00 Binding $ 1.25 $ 2.50 $ 5.00 Flyer Pricing
  • 17. Client comes in to ask to have flyer printed Copy Center Copy Center receives the images Notifies Customer to be printed of completed Job Sales assigned to Copy Center Prints print only job Flyers ( 48 hr Max) Flyer Process – Print Only
  • 18. Copy – 3 Day (72 Hour) Turn-around time Max.  Print – 1 Day (24 Hour) Turn-around time Max.  Proof and Copy dates are not to be placed on a Monday or Friday generally speaking. Doing so could potentially push back the above turn- around times General flyer Timeline - Print
  • 19. Flyer Process – Design Copy Center notifies Client comes in for Flyer Designer assigned to client of order completed Traffic delivers to design Design project and cc’s Sales in the email notification. Front Office Assigns a Copy finalizes copy and Designer drops off proof Flyer Printed by Copy Sales Rep sends to traffic to front office Center Front office gives to sales Sales confirms timeline w/ Traffic gives initial copy Front office gives final (cc Sales on email if not traffic to copy editors order to copy center present) Sales Obtains Front office gives order to Designer gives completed Sales proof w/ client copy/images traffic order to Front Office Sales Places an order with Sales Enters copy and Sales notifies traffic of Sales gives to design to front office image on basecamp finalized proof complete order
  • 20. Note: Green and Purple Frames Client Wants Sales Proof w/ Changes on Designer Edits relate to Client Proof previous slide Proof frames Client Designer Sales Proof w/ Approves Notifies Front Client Proof Office Sales notifies traffic of Client finalized proof Sales Proof w/ Approves Client Proof Sales Proofing Sales notifies with Client traffic of finalized proof
  • 21. Design time – 2 Week Turn Around Time  Proof time – 7-10 Day Turn Around Time  Note: There is no “Max” on these as we would like to give as much time as possible to create outstanding and exceptional work.  Copy – 3 Day (72 Hour) Turn-around time Print – 1 Day (24 Hour) Turn-around time  Copy and Proof Due dates can not be on Friday or Monday (This can push the timeline) General Flyer Timelines - Design
  • 22. Designer gives Front Desk gives to Customer comes in to Front Office gives Traffic gives initial completed order to Charlie ( Done order Flyers order to traffic copy to copy editors Front Office. Electronically) We as Sales call to Front Office asks if it is Front Office enters Copy finalizes copy Sales gives to designer make sure the order is Design or Print Only timeline into basecamp and sends to traffic to complete order received at Print services. (Note 2) Print services sends Sales enters copy and Traffic delivers to Sales notifies traffic of Sales Person assigned final to the Marketing images on Basecamp design finalized proof Office Sales Determines that Front Office gets client wants full bleed Sales places order with Designer assigned leftovers on mailers Sales proof w/ Client and needs to be sent to Front Office project and/or front office Print Services disburses. Front office gives to Sales confirms Sales obtains copy and Designer drops off sales (cc Sales on email timeline w/ Traffic images proof to front office if not present) Flyer Process – Print/Mailer Svcs
  • 23. Copy – 3 Day (72 Hour) Turn-around time  Design time – 2 Week Turn Around Time  Proof time – 7-10 Day Turn Around Time  Note: There is no “Max” on these as we would like to give as much time as possible to create outstanding and exceptional work.  Print Services – 2 Week Turn-Around Time  Mailing Services – 2 Week Turn Around Time  Proof and Copy dates are not to be placed on a Monday or Friday generally speaking. Doing so could potentially push back the above turn-around times General Flyer Time Line – Print/Mailer Svcs
  • 24. Based on Copy Turned in to Front Office by Sept 1st. Note: Proof Date is 9 Days because Day 10 would have been due on a Friday. Print Mailer Copy Design Proof Services Services 9 Days 2 Weeks (14 3 Days (Note: See 14 Days 14 Days Days) below) Copy Proofed Print Mailer Designed Finalized Sept 27th Services Oct Services Oct by Sept 18th (NOTE) Sept 4th 11th 25th General Flyer Time Line – Print/Mailer Svcs Example
  • 25. Gold frame Process { Explanation of gold frame process with possible scenarios
  • 26. Gold Frames are available in these sizes:  26”x 40”  Gold frame pricing •External Dept: $80.00 1st Copy •Campus Dept: $40.00 •Student Org: $20.00 •External Dept: $40.00 Additional •Campus Dept: $20.00 Copy •Student Org: $10.00 Gold frame General Info
  • 27. Gold Frame Designed Confirm gold frame Discuss gold frame Copy Does customer Want Designer drops off proof Designer assigned to spaces and dates dates and Proof Dates and Banner saved or tossed? to front office project are available to be hung Design with Client w/ traffic Front office gives to sales Confirm Gold frame Take Down (cc Sales on email if not Traffic delivers to design Copy, Proof, and Design Meeting set with Sales present) Dates w/ Traffic Gold frame Hung by Copy finalizes copy and Place Order with Front Does the gold frame Sales Proof w/ Client production sends to traffic Office Need Design? Client comes in, confirms with front Gold frame Printed by Sales notifies traffic of Traffic gives initial copy Sales enters copy and desk available dates and designers finalized proof to copy editors image into basecamp spaces for gold frame to hang Designers gives Sales gives to design to Front Office gives order Front Office enters completed order to Front complete order to traffic timeline into basecamp Office
  • 28. Note: Green and Purple Frames relate to Client Wants Sales Proof w/ Changes on Designer Edits previous slide frames Client Proof Proof Client Designer Sales Proof w/ Approves Notifies Front Client Proof Office Sales notifies traffic of Client finalized proof Sales Proof w/ Approves Client Proof Sales Proofing Sales notifies with Client traffic of finalized proof
  • 29. Design time is slated for 2 weeks  Proof has a 7-10 day turn around time  Copy has a 72 hour turn around time  Print has a 48 hour turn around time  Gold frames can be hung as long as the client wishes.  Only 3 max may be up at the same time for an event.  Client will be charged a re-hang fee after the first 3 weeks.  Copy and Proof Due dates can not be on Friday or Monday (This can alter the timeline) Banner Design Timeline Notes
  • 30. Ask client if they Traffic gives want to keep the finalized order to Copy finalizes copy Hang Gold frame gold frame or designers to have and gives to traffic throw it away printed Sales places the Sales places print Traffic delivers Front Office gives order with Front only material on order to copy to order to traffic Offices basecamp proof Sales sets copy and Sales obtains print Front office assigns Confirms Print print dates and only material from client to Sales Only checks with traffic client Client comes in/calls/emails Front Office Checks about print only available dates inquiry Gold frame Print – 4 Day Turn Around Time
  • 31. Determines design is required Sales obtains print only copy from Determines a client Sales sets copy change in dates based on when and print dates copy was and confirms received with traffic Gold Frame Scenario
  • 32. Monday • Copy read by End of Day Wednesday • Print by Thursday of the same week. • Copy read by End of Day Thursday Tuesday • Print by Friday of the same week • (Dates could change based on due dates landing on Mon or Fri) • Copy read by End of Day Friday Wednesday • Print by Tuesday of Following Week • (Dates could change based on due dates landing on Mon or Fri) Thursday • Copy read by End of Day Tuesday of Following Week • Print by Wednesday of Following Week • Copy read by End of Day Wednesday of Following Week Friday • Print by Friday of Following Week • (Dates could change based on due dates landing on Mon or Fri) Timeline of a Print Gold frame based on received day
  • 33. Copy has a 72 hour turn around time  Print has a 24 hour turn around time  Gold frames can be hung as long as the client wishes.  Only 3 max may be up at the same time for an event.  Client will be charged a re-hang fee after the first 3 weeks.  Copy Due dates can not be on Friday or Monday (This can push back the 4 day timeline) Gold frame Print Timeline Notes
  • 34. Digital Screen Process { From Design to Board
  • 35. Bolton  Library  Lubar (For Business related advertising only)  Also across 3 lcd/led panels Locations for Digital Screens
  • 36. All Design Time Based  External Dept - $50 per hour  Campus Dept - $25 per hour  Student Org - $12.50 per hour  For Digital Screen already designed, direct client to respective Digital Screen Building. Digital Screen Pricing
  • 37. Copy Finalizes Copy Traffic Delivers to Client comes in and sends to traffic design Andy assigns a Traffic gives initial Front office sends Client assigned Sales designer to the copy to copy editors order to respective project Designer gives Sales confirms Front Office gives Designer drops off completed order to timeline w/ Traffic order to traffic proof to front office Front Office Front Office Enters Front office gives to Sales Obtains Sales gives to Design timeline into sales (cc Sales on Copy/Images to complete order basecamp email if not present ) Sales Enters Copy Sales Places order Sales notifies traffic and Image on Sales Proof w/ Client with Front Office of finalized proof Basecamp General Digital Screen Process
  • 38. Note: Green and Purple Frames relate to Client Wants Sales Proof w/ Changes on Designer Edits previous slide frames Client Proof Proof Client Designer Sales Proof w/ Approves Notifies Front Client Proof Office Sales notifies traffic of Client finalized proof Sales Proof w/ Approves Client Proof Sales Proofing Sales notifies with Client traffic of finalized proof
  • 39. Copy has a 72 hour turn around time  Design time is slated for 2 weeks  Proof has a 7-10 day turn around time  Digital Screen to be in 2 weeks before start date  Copy and Proof Due dates can not be on Friday or Monday (This can push the timeline) Digital Screen Timeline Notes
  • 40. Digital Sign Copy Design Proofing Time (72 Hours) (2 Weeks) (7-10 Days) (2 Weeks) Oct 25th (7 Days) November 13th<- Oct 4th Oct 18th Oct 30th (12 Days) <- Non First Possible day for Monday Due Dates Digital Screen to run Process Timeline Example
  • 41. Copy has a 72 hour turn around time  Print has a 24 hour turn around time  Gold frames can be hung as long as the client wishes.  Only 3 max may be up at the same time for an event.  Client will be charged a re-hang fee after the first 3 weeks.  Copy Due dates can not be on Friday or Monday (This can push back the 4 day timeline) Gold frame Print Timeline Notes
  • 42. Sizes: Sizes available in Vertical and Horizontal  Full Page 3/8 Page  ¾ Page 1/6 Page  ½ Page 1/8 Page  1/3 Page 1/12 Page  ¼ Page 3”x2 7/8” Post-it Notes  Online:  Masthead Leaderboard Medium Rectangle  Exclusive Wide Skyscraper  Rotational Bottom Leaderboard  Pencil Bar (1000X35 pixels) Half Banner  Type  Color  Black and White Ad Types offered – Shepard Express
  • 43.
  • 44. Print Ad Sizes Online Ad Types  Full Page - Leaderboard (468 x 60 px)  ½ Page - Rectangle (300 x 250 px)  1/3 Page - Button (125 x 125 px)  ¼ Page Horizontal - Micro (Custom px)  ¼ Page Vertical  1/8 Page Horizontal  1/8 Page Vertical  1/16 Page Horizontal  1/16 Page Vertical Ad Types Offered - Post
  • 45. Ad Size Color B&W Full Page 840.16 662.16 ½ Page 453.90 320.40 1/3 Page 347.10 213.60 Ad Type Price (CPM) ¼ Page 242.79 153.79 Cost Per Horizontal Thousand Impressions ¼ Page Vertical 259.88 170.88 Leaderboard $10.00 CPM 1/8 Page 143.65 76.90 Horizontal Rectangle $7.00 CPM 1/8 Page 152.19 85.44 Vertical Button $3.00 CPM 1/16 Page 87.22 42.72 Horizontal 1/16 Page 95.76 51.26 Micro $2.00 CPM Vertical
  • 46. Sizing:  Full Page  ½ Page  1/3 Page  ¼ Page  1/6 Page  1/8 Page  1/12 Page  Color Only Ad Types Offered – The Onion
  • 47. Size Price Full Page $830 ½ Page $600 1/3 Page $450 ¼ Page $350 1/6 Page $270 1/8 Page $200 1/12 Page $150
  • 48. If a Client Asks for us to just send an ad and they already have the ad designed, provide the client with the below info based on the Ad company they wish to advertise with. Ad Company Contact Name/Number Contact Email UWM Post Stephanie Fisher Fisher.stephanie@gmail.co 262-719-5364 m Shepard Express Dallas Ziebel dallas@shepex.com 414-292-3806 The Onion Josh Hoppert jhoppert@theonion.com Print Only
  • 49. Copy Finalizes Copy Traffic Delivers to Client comes in and sends to traffic design Andy assigns a Traffic gives initial Front office sends Client assigned Sales designer to the copy to copy editors order to Ad Rep project Designer gives Sales confirms Front Office gives Designer drops off completed order to timeline w/ Traffic order to traffic proof to front office Front Office Front Office Enters Front office gives to Sales Obtains Sales gives to Design timeline into sales (cc Sales on Copy/Images to complete order basecamp email if not present ) Sales Enters Copy Sales Places order Sales notifies traffic and Image on Sales Proof w/ Client with Front Office of finalized proof Basecamp General Ad Process
  • 50. Note: Green and Purple Frames relate to Client Wants Sales Proof w/ Changes on Designer Edits previous slide frames Client Proof Proof Client Designer Sales Proof w/ Approves Notifies Front Client Proof Office Sales notifies traffic of Client finalized proof Sales Proof w/ Approves Client Proof Sales Proofing Sales notifies with Client traffic of finalized proof
  • 51. Copy has a 72 hour turn around time  Design time is slated for 2 weeks  Proof has a 7-10 day turn around time  Ad must be due the Thursday before the Publication Date (Our side)  Most ad companies require ad in by Friday before publication  Copy and Proof Due dates can not be on Friday or Monday (This can push the timeline back) Ad Timeline Notes
  • 52. The Onion •Tuesday Publication Shepard •Thursday Publication Express UWM Post •Monday Publication Publication Dates
  • 53. Based on Copy Turned in to Front Office by Sept 1st. Note: Proof Date is 9 Days because Day 10 would have been due on a Friday. Note 2: Based on a Monday Publication Copy Proofed Final Due Ad Runs Designed Finalized Sept 27th Date Sept Mon Oct 1st by Sept 18th (NOTE*) Sept 4th 28th (NOTE 2) Varies Based 2 Weeks (14 9 Days (Note: 3 Days 1 Day on Publication Days) See below) Date Send to Post (Due Ad Run Date Copy Design Proof Thursday, sent to (Monday) Post Fri by noon) General Ad Timeline
  • 54. Social Media Process { A Guide to Social Media How To’s
  • 55. • Self-Created by Social Media Directors Facebook Updates • Sent from Client to push on our facebook • Self-Created by Social Media Directors Twitter “Tweets” • Sent from client to push on our twitter Facebook/Twitter • We can create a facebook page for the Creations client Social Media we offer
  • 56. All current social media is gratuitous with other forms of Marketing and Advertising. Pricing
  • 57. Front Office gives Traffic gives initial Client comes in order to traffic copy to copy editors Front Office Enters Copy Finalizes Copy Client assigned Sales timeline into and sends to traffic basecamp Sales Enters Copy Sales confirms Traffic Delivers to and Image on timeline w/ Traffic Social Media Basecamp Social Media pushes Sales Places order Sales Obtains Copy out facebook with Front Office updates and tweets General Social Media Process
  • 58. Copy has a 72 hour turn around time  Social Media has a 24 hour turn around time to begin pushing out material.  Generally fast turn around time for quick marketing/advertising.  Copy and dates can not be on Friday or Monday (This can push the timeline) Social Media Timeline Notes
  • 59. Social Media Copy Final Turn In Pushed Out (72 Hours) (1 Day) (1 Day) Oct 4th Oct 5th Oct 6th Process Timeline Example
  • 60. What if? Scenarios and Dilemmas { A Quick Guide on “What to do” when something goes array.
  • 61. Client is Late on delivering Copy, what do?  Notify of possible push back in finalized order  Modify Order  This can be eliminating items, or doing a different marketing approach to alleviate the soon approaching deadline  Cancel Order  NOTE: Always check with Traffic and Design on new dates to ensure designers have time to complete the already pushed back dates Client
  • 62. Sales misses a deadline, what can you do?  Notify Sales of missed deadline  Sales can offer additional supplementary marketing to make up for their mistake  Always apologize and notify the client when deadline is missed. Sometimes the client doesn’t realize it either!  Copy Missed and/or not proofed correctly Sales
  • 63. Order is Lost  Overbooked an Item  Missed Deadline  Front Office needs to put in order only  Items were missed with Copy Center puts in orders  Front Office overbooked, and had to push back a banner 2 weeks. Sales offered free Lubar screen in an effort to  Minimize loss on profit of the banner  Allows more advertisement vs. a discount  Value vs. customer service oriented Front office
  • 64. Designer is late on a proof, what do?  Make sure the designer notifies Sales  Sales can confer for a new proof date  Sales can also notify to explain to client and propose new proof date and/or off additional for make up in time. design

Notas do Editor

  1. Opening slide that articulates the reason/ purpose for this “Deck” -&gt; Process (This is to help with incoming new student staff for understanding work flow, so on and so forth)
  2. Table of contents ! =D
  3. Red: To Creative Director
  4. Red Boxes: Unsure part of the process
  5. NOTE:I feel that we should be notified when a proof is complete, not the Front Desk first.NOTE 2: This shouldn’t be how we have to figure out if the order has progressed. This can possibly push back dates and times, and that is an issue I don’t want created.
  6. Red Frame- It seems here the Traffic, once they receive the order, would create the timeline of due dates in basecamp, as they are following the order.
  7. Red Box: Should I also mention the things Sales needs when placing the order such as: Proof Date, Run date for the ad?
  8. Can we really do Facebook creations?
  9. Red Frame- It seems here the Traffic, once they receive the order, would create the timeline of due dates in basecamp, as they are following the order. Specified #tag and amount times, the link to norris health centerWork order never got to Renee -&gt; No notification and nothing was sent out. -&gt; Send out electronically.