• All projects need some level of project
  management.

• Project management processes and practices
  are used to coordinate resources to achieve
  predictable results.
Organizations expect projects to be:-

  Completed Faster



                     Cost Effective.




 Higher Quality.
• Objectives can be met through the effective
  project management processes.
• Consider the size, complexity, and other
  characteristics of your project.
• Build the right project management
  processes to effectively manage and control
  your project.
A Project management best practices.




              Plan



  Monitor                 Control
There are three major deliveries from planning
process:-

                  Project Definition



                       Planning


Project Management                     Project Workshop
Procedures
Project Definition
Best Practices : Plan the work by utilizing
     the project definition document

 •   Project Overview
 •   Objectives
 •   Scope
 •   Assumption and Risk
 •   Organization
 •   Initial effort, cost and duration estimate.
Project workplan
Best Practices : Project workplan


 • The workplan provides the step by step
   instruction to construct and managing the
   project.
 • Workplan includes
   – Assigning resources
   – Estimated the work
Best Practices : Project management
             procedure up in front
The project management procedures outline the
resources that will be used to manage the project.

                      Quality Management



 Issue Management                               Risk Management
                            PROJECT



Communication Management                   Scope Management
Contd….
 Quality management can be considered to have three
    main components: quality control ,quality assurance
    and quality improvement.
    Quality management is focused not only on product
    quality, but also the means to achieve it.
 Issue Management refers to the discipline and process
    of managing business issues .
Contd….
• Project Scope Management managing the agreed work
  within the stakeholders and managers.
  A clear and well defined scope is very important for the
  completion of any minor or major project on time.
• Risk management involves assessing and quantifying
  business risks, then taking measures to control or reduce
  them.
• Communications management is the
  systematic planning implementing, monitoring, and
  revision of all the channels of communication within
  an organization , and between organizations
• Manage and Control:-
  • Only challenge is to execute your plans and
    processes correctly.


• Manage the work plan:-
  • Monitor the schedule
  • Monitor the budget
Best Practices : Look for Warning signs

Look for other signs that the project may be in
  trouble. These could include the following:
•   Budget starts to get bigger.
•   Unscheduled overtime to hit the deadlines.
•   Team morale starts to decline.
•   Deliverable quality or service quality starts to
    deteriorate.
Best Practices : Ensure that sponsor
approves the scope changes requests
In general, the project sponsor is the person funding the
project. For infrastructure projects like an Exchange
migration, the sponsor might be the CIO or CFO.
 Requests for scope changes will most often come from
stakeholders—many of whom may be managers in their
own right. One manager might want chat services for
their area. Another might want an exception to the size
limits you have placed on mailboxes.
Contd….

It doesn't matter how important a change is to a
stakeholder, they cannot make scope-change
decisions, and they cannot give your team the
approval to make the change.

 In proper scope-change management, the sponsor
must give the approval, since they are the only ones
who can add additional funding to cover the changes
and know if the project impact is acceptable.
Best Practices : Guard against scope creeps
Scope creep is a term used to define a series of small
scope changes that are made to the project without
scope-change management procedures being used.


Best Practices :Identify risks in front
Risks refer to potential events or circumstances
outside the project team’s control that will have an
adverse impact on the project. Technically, the value of
those results may be positive or negative.
Best Practices : Continue to assess the
potential risk throughout the project.
Once the project begins, periodically perform an
updated risk assessment to determine if other risks
have surfaced that need to be managed.

Manage Issues:
All projects of any size and complexity will have issues
arise that need to be dealt with and resolved. If you
have not done as good a job managing risks, chances
are you will have more issues to deal with than you
might have otherwise.
Cont…
Issues are big problems. For instance, the Exchange
servers you ordered are not ready and configured on
time. Or perhaps the Windows 2000 is not set up
correctly and needs to be redesigned.

The project manager should manage open issues
diligently to ensure that they are being resolved.
Issues, by their nature, must be resolved with a sense
of urgency.
Conclusion
There are always complexities in dealing with newer technology and ensuring
that all the pieces integrate together.

There are also challenges in implementing infrastructure with as little impact
on your customers as possible. All of these challenges can be overcome
through a proper mix of planning, monitoring, controlling, and executing.

The planning, monitoring, and controlling aspects are where project
management processes and techniques are needed. Proper planning and
management of the migration effort will take more time up front but will be
more than rewarded with efficiencies and savings throughout the rest of the
project.
 The project management best practices:-

•       Plan the work by utilizing a project definition
    document.
•       Define project management procedures up front.
•       Look for other warning signs.
•       Ensure that the sponsor approves scope-change
    requests.
•       Guard against scope creep.
•       Identify risks up front.
•       Continue to assess potential risks throughout the
    project.
•       Resolve issues as quickly as possible.
Thank You

       References :-www.techrepublic.com,
                    www.wikipedia.com
                    and Google images

Mais conteúdo relacionado

Mais procurados

Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Mena M. Eissa
 
Project management fundamentals
Project management fundamentalsProject management fundamentals
Project management fundamentalsshantdey
 
Project Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupProject Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupTùng Trần Thanh
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsThink For A Change
 
Project scope management
Project scope managementProject scope management
Project scope managementAnit Roy
 
PMBOK(Project Management Body of Knowledge)
PMBOK(Project Management Body of Knowledge)PMBOK(Project Management Body of Knowledge)
PMBOK(Project Management Body of Knowledge)Mohammad Mohammadi
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management DetailsAnand Bobade
 
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation SlidesProject Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation SlidesSlideTeam
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management MethodologyC.Y Wong
 
Project Deliverables Powerpoint Presentation Slides
Project Deliverables Powerpoint Presentation SlidesProject Deliverables Powerpoint Presentation Slides
Project Deliverables Powerpoint Presentation SlidesSlideTeam
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1Anand Bobade
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management FundamentalsOxfordCambridge
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Failjpstewar
 
Project Management Kickoff Meeting Template Powerpoint Presentation Slides
Project Management Kickoff Meeting Template Powerpoint Presentation SlidesProject Management Kickoff Meeting Template Powerpoint Presentation Slides
Project Management Kickoff Meeting Template Powerpoint Presentation SlidesSlideTeam
 
Agile and waterfall
Agile and waterfallAgile and waterfall
Agile and waterfallJohn Morse
 
Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Agus Suhanto
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 
PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2Anand Bobade
 

Mais procurados (20)

Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1
 
Project management fundamentals
Project management fundamentalsProject management fundamentals
Project management fundamentals
 
Project Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupProject Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP Workgroup
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management Concepts
 
Project scope management
Project scope managementProject scope management
Project scope management
 
PMBOK(Project Management Body of Knowledge)
PMBOK(Project Management Body of Knowledge)PMBOK(Project Management Body of Knowledge)
PMBOK(Project Management Body of Knowledge)
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management Details
 
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation SlidesProject Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management Methodology
 
Project Deliverables Powerpoint Presentation Slides
Project Deliverables Powerpoint Presentation SlidesProject Deliverables Powerpoint Presentation Slides
Project Deliverables Powerpoint Presentation Slides
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1
 
project management
project managementproject management
project management
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Fail
 
Project Management Kickoff Meeting Template Powerpoint Presentation Slides
Project Management Kickoff Meeting Template Powerpoint Presentation SlidesProject Management Kickoff Meeting Template Powerpoint Presentation Slides
Project Management Kickoff Meeting Template Powerpoint Presentation Slides
 
Agile and waterfall
Agile and waterfallAgile and waterfall
Agile and waterfall
 
Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2
 

Destaque

Nine best practices of project management
Nine best practices of project managementNine best practices of project management
Nine best practices of project managementGlen Alleman
 
10 things to improve project management
10 things to improve project management10 things to improve project management
10 things to improve project managementStriking Group Pty Ltd
 
Reducing Technical Debt
Reducing Technical DebtReducing Technical Debt
Reducing Technical DebtHayim Makabee
 
The five expertise of a software architect
The five expertise of a software architectThe five expertise of a software architect
The five expertise of a software architectLior Bar-On
 
Project Management Best Practices
Project Management Best PracticesProject Management Best Practices
Project Management Best PracticesRohana K Amarakoon
 
The Role of the Software Architect (short version)
The Role of the Software Architect (short version)The Role of the Software Architect (short version)
The Role of the Software Architect (short version)Hayim Makabee
 
Cost and time estimation methods pros and cons
Cost and time estimation methods pros and consCost and time estimation methods pros and cons
Cost and time estimation methods pros and consPragnendra Rahevar
 
Event-Driven Architecture (EDA)
Event-Driven Architecture (EDA)Event-Driven Architecture (EDA)
Event-Driven Architecture (EDA)WSO2
 
The Role of the Software Architect
The Role of the Software ArchitectThe Role of the Software Architect
The Role of the Software ArchitectHayim Makabee
 
Leadership challenges in project management
Leadership challenges in project managementLeadership challenges in project management
Leadership challenges in project managementalokkushwah07
 
A Comprehensive Introduction to Everything SOA
A Comprehensive Introduction to Everything SOAA Comprehensive Introduction to Everything SOA
A Comprehensive Introduction to Everything SOAMehmet Akyuz
 
Leadership In Project Management
Leadership In Project ManagementLeadership In Project Management
Leadership In Project Managementguest484a666
 
Top 10 senior technical architect interview questions and answers
Top 10 senior technical architect interview questions and answersTop 10 senior technical architect interview questions and answers
Top 10 senior technical architect interview questions and answerstonychoper5406
 

Destaque (13)

Nine best practices of project management
Nine best practices of project managementNine best practices of project management
Nine best practices of project management
 
10 things to improve project management
10 things to improve project management10 things to improve project management
10 things to improve project management
 
Reducing Technical Debt
Reducing Technical DebtReducing Technical Debt
Reducing Technical Debt
 
The five expertise of a software architect
The five expertise of a software architectThe five expertise of a software architect
The five expertise of a software architect
 
Project Management Best Practices
Project Management Best PracticesProject Management Best Practices
Project Management Best Practices
 
The Role of the Software Architect (short version)
The Role of the Software Architect (short version)The Role of the Software Architect (short version)
The Role of the Software Architect (short version)
 
Cost and time estimation methods pros and cons
Cost and time estimation methods pros and consCost and time estimation methods pros and cons
Cost and time estimation methods pros and cons
 
Event-Driven Architecture (EDA)
Event-Driven Architecture (EDA)Event-Driven Architecture (EDA)
Event-Driven Architecture (EDA)
 
The Role of the Software Architect
The Role of the Software ArchitectThe Role of the Software Architect
The Role of the Software Architect
 
Leadership challenges in project management
Leadership challenges in project managementLeadership challenges in project management
Leadership challenges in project management
 
A Comprehensive Introduction to Everything SOA
A Comprehensive Introduction to Everything SOAA Comprehensive Introduction to Everything SOA
A Comprehensive Introduction to Everything SOA
 
Leadership In Project Management
Leadership In Project ManagementLeadership In Project Management
Leadership In Project Management
 
Top 10 senior technical architect interview questions and answers
Top 10 senior technical architect interview questions and answersTop 10 senior technical architect interview questions and answers
Top 10 senior technical architect interview questions and answers
 

Semelhante a Project Management Best Practices for Successful Projects

APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsJacobs Engineering
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project Management Ch 14.ppt
Project Management Ch 14.pptProject Management Ch 14.ppt
Project Management Ch 14.pptUjalaBatool7
 
Managing the Consulting Engagement
Managing the Consulting EngagementManaging the Consulting Engagement
Managing the Consulting EngagementSaumya Ganguly
 
An introduction to project management
An introduction to project management An introduction to project management
An introduction to project management Siva Teja Boddeti
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project ManagementRasan Samarasinghe
 
Software Project Management - Staffing
Software Project Management - StaffingSoftware Project Management - Staffing
Software Project Management - StaffingTanishqRongta1
 
Project management
Project managementProject management
Project managementBiswa Prusty
 
Introduction to-project-management-dabc
Introduction to-project-management-dabcIntroduction to-project-management-dabc
Introduction to-project-management-dabcChandrasekhar Reddy
 
Project integration management
Project integration managementProject integration management
Project integration managementSaad Al Jabri
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planningJeanette C. Patindol
 
PMO (Project Management Office)
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)Dilawar Abbas
 
project mgmt chapter 1.pptx
project mgmt chapter 1.pptxproject mgmt chapter 1.pptx
project mgmt chapter 1.pptxDejeneDay
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementMohamad Ashrafi
 
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfx-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfEidTahir
 

Semelhante a Project Management Best Practices for Successful Projects (20)

APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cards
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project Management Ch 14.ppt
Project Management Ch 14.pptProject Management Ch 14.ppt
Project Management Ch 14.ppt
 
MODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptxMODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptx
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
Managing the Consulting Engagement
Managing the Consulting EngagementManaging the Consulting Engagement
Managing the Consulting Engagement
 
An introduction to project management
An introduction to project management An introduction to project management
An introduction to project management
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
Software Project Management - Staffing
Software Project Management - StaffingSoftware Project Management - Staffing
Software Project Management - Staffing
 
Project management
Project managementProject management
Project management
 
Introduction to-project-management-dabc
Introduction to-project-management-dabcIntroduction to-project-management-dabc
Introduction to-project-management-dabc
 
Project integration management
Project integration managementProject integration management
Project integration management
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planning
 
PMO (Project Management Office)
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)
 
project mgmt chapter 1.pptx
project mgmt chapter 1.pptxproject mgmt chapter 1.pptx
project mgmt chapter 1.pptx
 
Project management
Project managementProject management
Project management
 
Unit 1 PM.pptx
Unit 1 PM.pptxUnit 1 PM.pptx
Unit 1 PM.pptx
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfx-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
 

Último

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 

Último (20)

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 

Project Management Best Practices for Successful Projects

  • 1.
  • 2. Introduction • All projects need some level of project management. • Project management processes and practices are used to coordinate resources to achieve predictable results.
  • 3. Organizations expect projects to be:- Completed Faster Cost Effective. Higher Quality.
  • 4. • Objectives can be met through the effective project management processes. • Consider the size, complexity, and other characteristics of your project. • Build the right project management processes to effectively manage and control your project.
  • 5. A Project management best practices. Plan Monitor Control
  • 6. There are three major deliveries from planning process:- Project Definition Planning Project Management Project Workshop Procedures
  • 7. Project Definition Best Practices : Plan the work by utilizing the project definition document • Project Overview • Objectives • Scope • Assumption and Risk • Organization • Initial effort, cost and duration estimate.
  • 8. Project workplan Best Practices : Project workplan • The workplan provides the step by step instruction to construct and managing the project. • Workplan includes – Assigning resources – Estimated the work
  • 9. Best Practices : Project management procedure up in front The project management procedures outline the resources that will be used to manage the project. Quality Management Issue Management Risk Management PROJECT Communication Management Scope Management
  • 10. Contd…. Quality management can be considered to have three main components: quality control ,quality assurance and quality improvement. Quality management is focused not only on product quality, but also the means to achieve it. Issue Management refers to the discipline and process of managing business issues .
  • 11. Contd…. • Project Scope Management managing the agreed work within the stakeholders and managers. A clear and well defined scope is very important for the completion of any minor or major project on time. • Risk management involves assessing and quantifying business risks, then taking measures to control or reduce them. • Communications management is the systematic planning implementing, monitoring, and revision of all the channels of communication within an organization , and between organizations
  • 12. • Manage and Control:- • Only challenge is to execute your plans and processes correctly. • Manage the work plan:- • Monitor the schedule • Monitor the budget
  • 13. Best Practices : Look for Warning signs Look for other signs that the project may be in trouble. These could include the following: • Budget starts to get bigger. • Unscheduled overtime to hit the deadlines. • Team morale starts to decline. • Deliverable quality or service quality starts to deteriorate.
  • 14. Best Practices : Ensure that sponsor approves the scope changes requests In general, the project sponsor is the person funding the project. For infrastructure projects like an Exchange migration, the sponsor might be the CIO or CFO. Requests for scope changes will most often come from stakeholders—many of whom may be managers in their own right. One manager might want chat services for their area. Another might want an exception to the size limits you have placed on mailboxes.
  • 15. Contd…. It doesn't matter how important a change is to a stakeholder, they cannot make scope-change decisions, and they cannot give your team the approval to make the change. In proper scope-change management, the sponsor must give the approval, since they are the only ones who can add additional funding to cover the changes and know if the project impact is acceptable.
  • 16. Best Practices : Guard against scope creeps Scope creep is a term used to define a series of small scope changes that are made to the project without scope-change management procedures being used. Best Practices :Identify risks in front Risks refer to potential events or circumstances outside the project team’s control that will have an adverse impact on the project. Technically, the value of those results may be positive or negative.
  • 17. Best Practices : Continue to assess the potential risk throughout the project. Once the project begins, periodically perform an updated risk assessment to determine if other risks have surfaced that need to be managed. Manage Issues: All projects of any size and complexity will have issues arise that need to be dealt with and resolved. If you have not done as good a job managing risks, chances are you will have more issues to deal with than you might have otherwise.
  • 18. Cont… Issues are big problems. For instance, the Exchange servers you ordered are not ready and configured on time. Or perhaps the Windows 2000 is not set up correctly and needs to be redesigned. The project manager should manage open issues diligently to ensure that they are being resolved. Issues, by their nature, must be resolved with a sense of urgency.
  • 19. Conclusion There are always complexities in dealing with newer technology and ensuring that all the pieces integrate together. There are also challenges in implementing infrastructure with as little impact on your customers as possible. All of these challenges can be overcome through a proper mix of planning, monitoring, controlling, and executing. The planning, monitoring, and controlling aspects are where project management processes and techniques are needed. Proper planning and management of the migration effort will take more time up front but will be more than rewarded with efficiencies and savings throughout the rest of the project.
  • 20.  The project management best practices:- • Plan the work by utilizing a project definition document. • Define project management procedures up front. • Look for other warning signs. • Ensure that the sponsor approves scope-change requests. • Guard against scope creep. • Identify risks up front. • Continue to assess potential risks throughout the project. • Resolve issues as quickly as possible.
  • 21. Thank You References :-www.techrepublic.com, www.wikipedia.com and Google images