SlideShare uma empresa Scribd logo
1 de 16
Baixar para ler offline
Army Reserve
Directorate of
Public Works
         COL Pat Briley
81st Regional Support Command
         Ft Jackson, SC
“Wildcats Never Quit”




                  Specialist Thomas D. Caughman Building
                                            Home to The
                     81st Regional Support Command
11 October 2012         COL Patrick Briley / 803-751-1890 / patrick.briley@us.army.mil
Director of Public Works




Mission: To                                                              Vision: To Be the
Provide Facility                    Colonel Patrick O. Briley
                                                                         Premier RSC DPW
Support for Army                                                         supporting our
Reserve Soldiers,                        Deputy Director                 customers with first-
Civilians, and                                                           class solutions/services
Families within the                                                      integrating innovation,
SE CONUS & PR                                                            technology, and value
                                        Frank D. Eubanks




BUSINESS OPERATIONS &     FACILITY PLANS &              FACILITY MAINTENANCE &    ENVIRONMENTAL DIVISION
 INTEGRATION DIVISION   ENGINEERING DIVISION             OPERATIONS DIVISION




   Fred Eastwood        LTC Lawrence Habig                       David Dunn           Dan Thomas
   803-751-9985           803-751-9625                          803-751-9657          803-751-9947
Typical RSC

What the typical RSC Looks Like:
     35 Armed Forces Reserve Centers (AFRC)
     275 US Army Reserve Centers (USARC)
                                                                                           99th RSC
     8 Equipment Concentration Sites (ECSs)
     30 Area Maintenance Support Activities (AMSAs)
     4 Local Training Areas (LTA)                            63rd RSC      88th RSC
     89 M Square Feet




  How we Differ from an AC DPW:
  • Our workforce excludes:
       Plumbing Shop
       Electrical Shop
       Carpentry Shop
       Roads and Grounds
       All other organic structure to actually perform
      environmental, maintenance and operation
      services and support
  • 1,200+ Utility Service Providers – Private and
      Publicly owned (H2O, Sewer, Gas, Elec)                                               81st RSC
  • We support multiple units with differing missions in the same real property facility
  • We do not use Service Orders. All of our work is done as a Work Order and executed
      using Government Purchase Card or through some form of contract action
USARC
                                                    11th Avn Cmd
                                                    70th Tng Div (FT)
                                                    100th Div (OS)
                                84th Tng Cmd (UR)


                                                                                 108th Tng Cmd (IET)
                               290th   MP Bde

                                                                                                            USACAPOC
                                                                                                                                 9 MG Commands
                                                                        415th   Cml Bde
                                                                                                                                14 BG Commands
                              87th AR Spt Cmd                                                                                   18 Supported GO Cmds
                                                            335th TSC
                              4/75th BCTD                                                                                         located outside AOR
                  412th TEC                                 3rd MDSC                         81st RSC
                              ARSC
                              DSC                                                                                                                    Square
                                                                                                       State      # Soldiers   # Units    # Bldgs    Footage
                                                                359th Sig Bde
                                                                                                       AL               6044         45         77       803,592
                              926th Engr Bde                                                           FL              10010         92         84       1,333,664
                                                                                                       GA               8237         78        104       2,070,407
                                                                                                       KY               4755         39         81         799,893
                                                350th CA Cmd
      377th TSC                                                                                        LA               2388         33         57         513,252
                                                                                                       MS               2304         26         38         752,060
                                                                                                       NC               7102         53         93         939,579
                                                                        143rd ESC
                                                                                                       PR               4725        NA         NA              NA
                                                                                                       SC               4569         47         54         691,298
                                                                           ARMEDCOM                    TN               4108         39         44         533,754
                                                                                                       Total         53,928        497         635       8,436,682
81st Regional Support Command                                                                           Region Size = 412,622 sq miles
       Area of Responsibility                                                                           # of Facilities = 299




                                                                                                        1st MSC
Current North Carolina Facility Map




11 October 2012    COL Patrick Briley / 803-751-1890 / patrick.briley@us.army.mil
Current North Carolina Facilities




11 October 2012   COL Patrick Briley / 803-751-1890 / patrick.briley@us.army.mil
Military Construction (MILCON)
Location                    Facility                    Date of Completion
Statham, GA                 Reserve Center Complex      Oct 2012
Knightdale, (Raleigh), NC   Reserve Center Complex      Jan 2013
Ft Buchanan, PR             Ft Buchanan AFRC            April 2013???
Mayaguez, PR                Mayaguez AFRC               April 2013???
Caguas, PR                  Caguas USARC                April 2013???
Sanford, (Orlando), FL      Reserve Center Complex      April 2013 (gb 10 Mar)
Warner Robins, GA           Reserve Center Complex      April 2013 (gb 17 Mar)
Tallahassee, FL             Reserve Center Complex      May 2013 (gb 24 Mar)
Millington, TN              TEMF / AMSA                 July 2013 (gb 5 May)
Cape Coral, FL              Reserve Center Complex      July 2013 (gb 28 Jul)
Panama City, FL             Reserve Center Complex      Oct 2013 (gb TBD)
Orangeburg, SC              Reserve Center Complex      Oct 2013 (gb 4 Aug)
Lake Park, FL               Reserve Center Complex      Oct 2013 (gb 19 May)
Greensboro, NC              Reserve Center Complex      April 2014
Ft Gordon, GA               Technical Training Center   April 2014
Ft Bragg, NC                Reserve Center Complex      Late 2016
Clearwater / MacDill AFB    Aviation Support Facility   Late 2017
Starkville, MS              Reserve Center Complex      2018
Meridian, MS                Reserve Center Complex      2019
Asheville, NC               Reserve Center Complex      2019
Miramar, FL                 Reserve Center Complex      2019     gb = ground breaking
                                                                 rc = ribbon cutting
New North Carolina Facilities
                              MILCON
                              Knightdale (2012)                         Proposing FFR
                              $18.5M Ongoing                            Rocky Mount




                                                   $18.5M
MILCON
Asheville (2017) MILCON                                                        MILCON
Not awarded      Greensboro (2013)                                             Wilmington
                    $20.2M Ongoing
                                                                               (2011)
                                              MILCON                           $12.5M Completed
                                              Ft Bragg (2014)
                                              Not awarded
11 October 2012   COL Patrick Briley / 803-751-1890 / patrick.briley@us.army.mil
FY13 Dirty Dozen Facilities
1) KY046    Louisville USARC             Will Dispose/Move units
2) GA032    Macon USARC                  Plan for demo/FFR
3) MS008    Jackson USARC                Must repair
4) AL085    Ft Rucker ECS                Minor MILCON
5) FL134    Miami AMSA                   Must repair
6) GA002    Augusta USARC                Repair/Leadership involvement
7) GA103    Dobbins USARC                TBD
8) SC019    Myrtle Beach USARC           Will repair
9) MS005    Hattiesburg USARC            Will repair
10) TN014   Nashville USARC              Will repair
11) FL134   Miami AMSA #47               Miramar MILCON
12) NC039   Rocky Mount USARC            New roof this FY/repair early FY13

                                 Louisville, KY




MACON, GA
How USAR Does Business

    Opportunities
    Military Construction – MILCON, Full Facility Restoration, Minor MILCON
    Service Contracts - grounds keeping, custodial, refuse, utilities, etc.
    Sustainment Contracts - HVAC maintenance, HVAC emergent repair,
             roof repair/replacement, electrical, signage, painting, etc.
    Environmental – mold abatement, storm water, training, etc.
    Energy – assessments, alternatives, efficiencies, etc

    Purchase Vehicles
    Government Purchase Card
    Contracting through US Army Corps of Engineers
    Contracting through Mission & Installation Contracting Command

    How to get in the door for government work?


11 October 2012     COL Patrick Briley / 803-751-1890 / patrick.briley@us.army.mil
Current Projects on Work Order Priority List (WOPL)




 Rocky Mount – replace roof; repair roof-mounted HVAC; replace all exterior
  doors; replace OMS gate; replace all carpeting and flooring; paint entire
  interior
 Winterville – replace HVAC; repair parking lot
 High Point – replace 4 ton heater
 Charlotte – Repair chiller; replace 3 ton DX system; install ceiling fans and
  exhaust systems; replace 3 entry doors; replace all carpet and insulated
  glass; renovate kitchen; renovate entire admin area; repair exhaust fans in
  rigging tower; install stair tread in all stairways; upgrade lighting
 Concord – HVAC duct work; install AC mini split systems; new signage
 Winston-Salem – HVAC repairs; replace compressors; roof repairs
 Garner – replace 7 ton heat pump; replace all carpet; replace all exterior
  lighting; upgrade interior lighting; replace all flooring; replace all ceiling tiles;
  clean all duct work; repaint entire interior of building; reseal pavement
 Wilson – replace thermostats
Current Projects on Work Order Priority List (WOPL)


   Continued
 Cary – install mini split AC systems; expansion tank and mixing valve
  replacement; replace boiler; repair cracks in foundation and walls
 Ft Bragg – replace access gate and surveillance system; furnace repair
 Kinston – replace all lighting; replace all exterior doors; renovate interior
  walls and repaint; replace all flooring
 Asheville – replace all windows; replace all faucets; construct wall; exterior
  grounds work; demo concrete parking area, pave, and restripe
 Salisbury – replace all interior lighting; replace all carpet, ceiling tiles, VCT;
  clean duct work; paint entire interior; restripe parking lots
 Morehead City – Repair travel way; replace all exterior doors; replace all
  existing carpet, ceiling tiles, and clean all duct work; paint interior
 Greensboro – repaint interior; replace all carpet, vinyl flooring, and ceiling
  tiles; reseal entire parking lot
 Brevard – repair cracks in parking lot
 Lumberton – Clean parking areas; seal and restripe parking area
Contacts
    COL Pat Briley, Director of Public Works/Regional Engineer                           803-751-1890
            patrick.briley@us.army.mil

    Mr. Frank Eubanks, Deputy Director of Public Works                                   803-751-9653
             frank.d.eubanks@us.army.mil

    Mr. David Dunn, Facility Maintenance & Operations Division Chief 803-751-9657
             david.t.dunn@us.army.mil

    Mr. Louie Sadle, Regional Facilities Operations Specialist                           803-751-3343
             ii.sadle@us.army.mil




11 October 2012         COL Patrick Briley / 803-751-1890 / patrick.briley@us.army.mil

Mais conteúdo relacionado

Semelhante a Army Reserve DPW Supports Soldiers in Southeast Region

Cots Presentation1
Cots Presentation1Cots Presentation1
Cots Presentation1Tom Terlizzi
 
20121009 Allons State of the Battalion Brief
20121009 Allons State of the Battalion Brief20121009 Allons State of the Battalion Brief
20121009 Allons State of the Battalion Brief215FAR_Allons
 
Sadler roicc cherry point brief for small business outreach march 2012
Sadler roicc cherry point brief for small business outreach   march 2012Sadler roicc cherry point brief for small business outreach   march 2012
Sadler roicc cherry point brief for small business outreach march 2012NC Military Business Center
 
09 10 vss cameras
09 10 vss cameras09 10 vss cameras
09 10 vss camerasGpsLazio
 

Semelhante a Army Reserve DPW Supports Soldiers in Southeast Region (6)

Cots Presentation1
Cots Presentation1Cots Presentation1
Cots Presentation1
 
20121009 Allons State of the Battalion Brief
20121009 Allons State of the Battalion Brief20121009 Allons State of the Battalion Brief
20121009 Allons State of the Battalion Brief
 
GGTronics ssdac
GGTronics ssdacGGTronics ssdac
GGTronics ssdac
 
Sadler roicc cherry point brief for small business outreach march 2012
Sadler roicc cherry point brief for small business outreach   march 2012Sadler roicc cherry point brief for small business outreach   march 2012
Sadler roicc cherry point brief for small business outreach march 2012
 
microprocessor
microprocessormicroprocessor
microprocessor
 
09 10 vss cameras
09 10 vss cameras09 10 vss cameras
09 10 vss cameras
 

Mais de NC Military Business Center

Fort Bragg Small Business Outreach Event_March 18, 14
Fort Bragg Small Business Outreach Event_March 18, 14Fort Bragg Small Business Outreach Event_March 18, 14
Fort Bragg Small Business Outreach Event_March 18, 14NC Military Business Center
 
FEDCON Summit: Bonding & Surety for Federal Construction Projects
FEDCON Summit: Bonding & Surety for Federal Construction ProjectsFEDCON Summit: Bonding & Surety for Federal Construction Projects
FEDCON Summit: Bonding & Surety for Federal Construction ProjectsNC Military Business Center
 
FEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysFEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysNC Military Business Center
 
FEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysFEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysNC Military Business Center
 
FEDCON Summit: Department of Transportation Construction Opportunities
FEDCON Summit:  Department of Transportation Construction OpportunitiesFEDCON Summit:  Department of Transportation Construction Opportunities
FEDCON Summit: Department of Transportation Construction OpportunitiesNC Military Business Center
 
FEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
FEDCON Summit: Labor Laws & Affirmative Action for Federal ContractsFEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
FEDCON Summit: Labor Laws & Affirmative Action for Federal ContractsNC Military Business Center
 
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...NC Military Business Center
 
FEDCON Summit: Installation Energy Programs, Projects & Industry Experience
FEDCON Summit: Installation Energy Programs, Projects & Industry ExperienceFEDCON Summit: Installation Energy Programs, Projects & Industry Experience
FEDCON Summit: Installation Energy Programs, Projects & Industry ExperienceNC Military Business Center
 
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...NC Military Business Center
 
FEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry PanelFEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry PanelNC Military Business Center
 
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced AnalyticsHuman/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced AnalyticsNC Military Business Center
 

Mais de NC Military Business Center (20)

Camp Lejeune Small Business Outreach Event
Camp Lejeune Small Business Outreach EventCamp Lejeune Small Business Outreach Event
Camp Lejeune Small Business Outreach Event
 
MCAS Cherry Point Small Business Outreach Event
MCAS Cherry Point Small Business Outreach EventMCAS Cherry Point Small Business Outreach Event
MCAS Cherry Point Small Business Outreach Event
 
Spawar slides
Spawar slidesSpawar slides
Spawar slides
 
Fort Bragg Small Business Outreach Event_March 18, 14
Fort Bragg Small Business Outreach Event_March 18, 14Fort Bragg Small Business Outreach Event_March 18, 14
Fort Bragg Small Business Outreach Event_March 18, 14
 
FEDCON Summit: Bonding & Surety for Federal Construction Projects
FEDCON Summit: Bonding & Surety for Federal Construction ProjectsFEDCON Summit: Bonding & Surety for Federal Construction Projects
FEDCON Summit: Bonding & Surety for Federal Construction Projects
 
FEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysFEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/Delays
 
FEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysFEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/Delays
 
FEDCON Summit: Department of Transportation Construction Opportunities
FEDCON Summit:  Department of Transportation Construction OpportunitiesFEDCON Summit:  Department of Transportation Construction Opportunities
FEDCON Summit: Department of Transportation Construction Opportunities
 
FEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
FEDCON Summit: Labor Laws & Affirmative Action for Federal ContractsFEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
FEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
 
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
 
FEDCON Summit: Installation Energy Programs, Projects & Industry Experience
FEDCON Summit: Installation Energy Programs, Projects & Industry ExperienceFEDCON Summit: Installation Energy Programs, Projects & Industry Experience
FEDCON Summit: Installation Energy Programs, Projects & Industry Experience
 
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
 
FEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry PanelFEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry Panel
 
FEDCON Summit: Marine Corps Installations East
FEDCON Summit: Marine Corps Installations EastFEDCON Summit: Marine Corps Installations East
FEDCON Summit: Marine Corps Installations East
 
FEDCON Summit: NCMBC Tools for Contractors
FEDCON Summit: NCMBC Tools for ContractorsFEDCON Summit: NCMBC Tools for Contractors
FEDCON Summit: NCMBC Tools for Contractors
 
FEDCON Summit: Public Private Ventures
FEDCON Summit: Public Private VenturesFEDCON Summit: Public Private Ventures
FEDCON Summit: Public Private Ventures
 
FEDCON Summit: Teaming Arrangements
FEDCON Summit: Teaming ArrangementsFEDCON Summit: Teaming Arrangements
FEDCON Summit: Teaming Arrangements
 
FEDCON Summit: Veterans Affairs
FEDCON Summit: Veterans AffairsFEDCON Summit: Veterans Affairs
FEDCON Summit: Veterans Affairs
 
Medical Technologies
Medical TechnologiesMedical Technologies
Medical Technologies
 
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced AnalyticsHuman/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
 

Army Reserve DPW Supports Soldiers in Southeast Region

  • 1. Army Reserve Directorate of Public Works COL Pat Briley 81st Regional Support Command Ft Jackson, SC
  • 2. “Wildcats Never Quit” Specialist Thomas D. Caughman Building Home to The 81st Regional Support Command 11 October 2012 COL Patrick Briley / 803-751-1890 / patrick.briley@us.army.mil
  • 3. Director of Public Works Mission: To Vision: To Be the Provide Facility Colonel Patrick O. Briley Premier RSC DPW Support for Army supporting our Reserve Soldiers, Deputy Director customers with first- Civilians, and class solutions/services Families within the integrating innovation, SE CONUS & PR technology, and value Frank D. Eubanks BUSINESS OPERATIONS & FACILITY PLANS & FACILITY MAINTENANCE & ENVIRONMENTAL DIVISION INTEGRATION DIVISION ENGINEERING DIVISION OPERATIONS DIVISION Fred Eastwood LTC Lawrence Habig David Dunn Dan Thomas 803-751-9985 803-751-9625 803-751-9657 803-751-9947
  • 4. Typical RSC What the typical RSC Looks Like:  35 Armed Forces Reserve Centers (AFRC)  275 US Army Reserve Centers (USARC) 99th RSC  8 Equipment Concentration Sites (ECSs)  30 Area Maintenance Support Activities (AMSAs)  4 Local Training Areas (LTA) 63rd RSC 88th RSC  89 M Square Feet How we Differ from an AC DPW: • Our workforce excludes:  Plumbing Shop  Electrical Shop  Carpentry Shop  Roads and Grounds  All other organic structure to actually perform environmental, maintenance and operation services and support • 1,200+ Utility Service Providers – Private and Publicly owned (H2O, Sewer, Gas, Elec) 81st RSC • We support multiple units with differing missions in the same real property facility • We do not use Service Orders. All of our work is done as a Work Order and executed using Government Purchase Card or through some form of contract action
  • 5. USARC 11th Avn Cmd 70th Tng Div (FT) 100th Div (OS) 84th Tng Cmd (UR) 108th Tng Cmd (IET) 290th MP Bde USACAPOC 9 MG Commands 415th Cml Bde 14 BG Commands 87th AR Spt Cmd 18 Supported GO Cmds 335th TSC 4/75th BCTD located outside AOR 412th TEC 3rd MDSC 81st RSC ARSC DSC Square State # Soldiers # Units # Bldgs Footage 359th Sig Bde AL 6044 45 77 803,592 926th Engr Bde FL 10010 92 84 1,333,664 GA 8237 78 104 2,070,407 KY 4755 39 81 799,893 350th CA Cmd 377th TSC LA 2388 33 57 513,252 MS 2304 26 38 752,060 NC 7102 53 93 939,579 143rd ESC PR 4725 NA NA NA SC 4569 47 54 691,298 ARMEDCOM TN 4108 39 44 533,754 Total 53,928 497 635 8,436,682 81st Regional Support Command Region Size = 412,622 sq miles Area of Responsibility # of Facilities = 299 1st MSC
  • 6. Current North Carolina Facility Map 11 October 2012 COL Patrick Briley / 803-751-1890 / patrick.briley@us.army.mil
  • 7. Current North Carolina Facilities 11 October 2012 COL Patrick Briley / 803-751-1890 / patrick.briley@us.army.mil
  • 8. Military Construction (MILCON) Location Facility Date of Completion Statham, GA Reserve Center Complex Oct 2012 Knightdale, (Raleigh), NC Reserve Center Complex Jan 2013 Ft Buchanan, PR Ft Buchanan AFRC April 2013??? Mayaguez, PR Mayaguez AFRC April 2013??? Caguas, PR Caguas USARC April 2013??? Sanford, (Orlando), FL Reserve Center Complex April 2013 (gb 10 Mar) Warner Robins, GA Reserve Center Complex April 2013 (gb 17 Mar) Tallahassee, FL Reserve Center Complex May 2013 (gb 24 Mar) Millington, TN TEMF / AMSA July 2013 (gb 5 May) Cape Coral, FL Reserve Center Complex July 2013 (gb 28 Jul) Panama City, FL Reserve Center Complex Oct 2013 (gb TBD) Orangeburg, SC Reserve Center Complex Oct 2013 (gb 4 Aug) Lake Park, FL Reserve Center Complex Oct 2013 (gb 19 May) Greensboro, NC Reserve Center Complex April 2014 Ft Gordon, GA Technical Training Center April 2014 Ft Bragg, NC Reserve Center Complex Late 2016 Clearwater / MacDill AFB Aviation Support Facility Late 2017 Starkville, MS Reserve Center Complex 2018 Meridian, MS Reserve Center Complex 2019 Asheville, NC Reserve Center Complex 2019 Miramar, FL Reserve Center Complex 2019 gb = ground breaking rc = ribbon cutting
  • 9. New North Carolina Facilities MILCON Knightdale (2012) Proposing FFR $18.5M Ongoing Rocky Mount $18.5M MILCON Asheville (2017) MILCON MILCON Not awarded Greensboro (2013) Wilmington $20.2M Ongoing (2011) MILCON $12.5M Completed Ft Bragg (2014) Not awarded 11 October 2012 COL Patrick Briley / 803-751-1890 / patrick.briley@us.army.mil
  • 10. FY13 Dirty Dozen Facilities 1) KY046 Louisville USARC Will Dispose/Move units 2) GA032 Macon USARC Plan for demo/FFR 3) MS008 Jackson USARC Must repair 4) AL085 Ft Rucker ECS Minor MILCON 5) FL134 Miami AMSA Must repair 6) GA002 Augusta USARC Repair/Leadership involvement 7) GA103 Dobbins USARC TBD 8) SC019 Myrtle Beach USARC Will repair 9) MS005 Hattiesburg USARC Will repair 10) TN014 Nashville USARC Will repair 11) FL134 Miami AMSA #47 Miramar MILCON 12) NC039 Rocky Mount USARC New roof this FY/repair early FY13 Louisville, KY MACON, GA
  • 11. How USAR Does Business Opportunities Military Construction – MILCON, Full Facility Restoration, Minor MILCON Service Contracts - grounds keeping, custodial, refuse, utilities, etc. Sustainment Contracts - HVAC maintenance, HVAC emergent repair, roof repair/replacement, electrical, signage, painting, etc. Environmental – mold abatement, storm water, training, etc. Energy – assessments, alternatives, efficiencies, etc Purchase Vehicles Government Purchase Card Contracting through US Army Corps of Engineers Contracting through Mission & Installation Contracting Command How to get in the door for government work? 11 October 2012 COL Patrick Briley / 803-751-1890 / patrick.briley@us.army.mil
  • 12.
  • 13.
  • 14. Current Projects on Work Order Priority List (WOPL)  Rocky Mount – replace roof; repair roof-mounted HVAC; replace all exterior doors; replace OMS gate; replace all carpeting and flooring; paint entire interior  Winterville – replace HVAC; repair parking lot  High Point – replace 4 ton heater  Charlotte – Repair chiller; replace 3 ton DX system; install ceiling fans and exhaust systems; replace 3 entry doors; replace all carpet and insulated glass; renovate kitchen; renovate entire admin area; repair exhaust fans in rigging tower; install stair tread in all stairways; upgrade lighting  Concord – HVAC duct work; install AC mini split systems; new signage  Winston-Salem – HVAC repairs; replace compressors; roof repairs  Garner – replace 7 ton heat pump; replace all carpet; replace all exterior lighting; upgrade interior lighting; replace all flooring; replace all ceiling tiles; clean all duct work; repaint entire interior of building; reseal pavement  Wilson – replace thermostats
  • 15. Current Projects on Work Order Priority List (WOPL) Continued  Cary – install mini split AC systems; expansion tank and mixing valve replacement; replace boiler; repair cracks in foundation and walls  Ft Bragg – replace access gate and surveillance system; furnace repair  Kinston – replace all lighting; replace all exterior doors; renovate interior walls and repaint; replace all flooring  Asheville – replace all windows; replace all faucets; construct wall; exterior grounds work; demo concrete parking area, pave, and restripe  Salisbury – replace all interior lighting; replace all carpet, ceiling tiles, VCT; clean duct work; paint entire interior; restripe parking lots  Morehead City – Repair travel way; replace all exterior doors; replace all existing carpet, ceiling tiles, and clean all duct work; paint interior  Greensboro – repaint interior; replace all carpet, vinyl flooring, and ceiling tiles; reseal entire parking lot  Brevard – repair cracks in parking lot  Lumberton – Clean parking areas; seal and restripe parking area
  • 16. Contacts COL Pat Briley, Director of Public Works/Regional Engineer 803-751-1890 patrick.briley@us.army.mil Mr. Frank Eubanks, Deputy Director of Public Works 803-751-9653 frank.d.eubanks@us.army.mil Mr. David Dunn, Facility Maintenance & Operations Division Chief 803-751-9657 david.t.dunn@us.army.mil Mr. Louie Sadle, Regional Facilities Operations Specialist 803-751-3343 ii.sadle@us.army.mil 11 October 2012 COL Patrick Briley / 803-751-1890 / patrick.briley@us.army.mil