Center-wide Facilities Planning:
               Tools and Best Practices
                            NASA Project Management Challenge 2010
                                      February 9-10, 2010
                                        Track: Facilities

                                             Presenters:
                   Lovely Krishen, Ph.D., Lead Risk Analyst-Transition Team Lead
                                         Futron Corporation

                                 Perri E. Fox, Transition Manager
                                  NASA-Johnson Space Center



Used with permission
Outline
  • Introduction
  • NASA-JSC Center-wide Facilities Review
    Objectives
  • Facilities Assessment Approach
          – Fiscal Year 2007
          – Fiscal Year 2008
          – Fiscal Year 2009
  • Facilities Information Management Approach
          – Information Capture Requirements
          – JSC Facilities Review Database (JFReD)
          – Reporting and Metrics
  • Next Steps
  • Summary
  • Backup Slides
February 9, 2010                2
Introduction
     • With the transition and retirement of
       Space Shuttle Program, NASA-
       Johnson Space Center Transition
       Management office initiated an ongoing
       center-wide facilities review and
       planning effort
     • A Transition-driven effort that assists
       Center and Agency strategic planning
       for facility utilization, resources, and
       budgeting
     • Pre-decisional data capture initiated
       and updated over 3 years and going…
February 9, 2010        3
Definition of a Facility
     • Though primarily focused on real property, a
       facility represents a significant (or core)
       capability or asset and becomes a factor in
       the overall center “supply” that meets the
       “demand” of mission, program, or project
       requirements
     • Includes labs, aircraft, test stands,
       specialized equipment, storage areas,
       mission operations/planning areas or entire
       buildings
     • Does not include office space or other
       personnel support areas (break rooms,
       general conference rooms, restrooms,
       equipment closets, etc.)

February 9, 2010             4
Facilities Review Objectives
     • From Fiscal Year 2007 onwards, JSC Transition
       Integration Panel activities conducted a yearly
       Facilities Review and Assessment with the following
       objectives:
            – Capturing comprehensive facility listing, description and
              baseline cost estimates for Programs, Center and Agency
              planning purposes
            – Assessing budget associated with closeout, gaps and
              utilization of the facilities (Workforce and Dollars) tied to
              Core Capabilities
                   • Over a 5-7-year transition-related planning and decision
                     implementation horizon
            – Linking utilization of buildings/facilities for overall Center
              Master Planning effort
            – Supporting Center Director-level risk-based decisions
              regarding current facilities close-outs, consolidations, gap
              funding, refurbishment, maintenance, mothballing, and
              demolition
February 9, 2010                            5
Timeline of Facilities Review
       FY2007                                               FY2008                                                     FY2009
                                                                                                            1008:               0809: FY09
                                                                                 0608-0908:                 FY09                JFReD Users
 10/06-12/06:                                                                   Exploration                 JFReD               Forum
 JSC Transition                                                             Requirements                    Users                                0909-present: New
 Integration                                                               for Institutional                Forum                                  JFReD Release;
 Panel (JTIP)                                                                  Capabilities                                                          Center Demo;
 Facilities Study                                                                                 0908:                                               Phase II Data
                                                                            (ERIC) Phase I
 Team Kickoff                                                                                      FY08                           0409: HSF          Capture; FY09
                                              0208: PPBE-10                        mapping
 under SSP                                                                                     Facilities                         Capabilities     Baseline; ERIC-
                                              Kick-off and JICB                                Baseline                           Forum             JFReD updates
         03/07: JTIP                          Preliminary                                                                   0309:
         Facilities Review                    Assessment            0308: Phase II                                       PPBE-11
         Released/                            Report                Facilities Data                                        Kickoff
         Reported to Joint                                          Capture and                             1208-0109:   and JICB
         Integration Control                                        Validation                              ERIC Phase     Report           0609-0709:
                                                                                          0608:
         Board (JICB)                                                                                       II Technical                    PPBE-11,
                                                                                          PPBE-10
                                                                                                            Interchange                     Space
                                                                                          Updated
                      04/07: JSC                                                                            Meeting                         Utilization
                                                                                          Report
                      Transition                                          0408: Human                       (TIM) and                       TIM
                                                                                                                           0209: JFReD
                      Management                                          Spaceflight                       Facilities     Training and
                      and Facilities                                      Capabilities                      Mapping        JSC
                      Review moved                                        Forum Report
                                                                                                                           Facilities
                      to Center                       12/07-1/08: iJICB                                                    Phase I Data
                      Director’s office               report, Phase I                                                      Capture
                                                      Facilities Data
                                                      capture and
                                                      validation
                                          10/07-11/07:
                                          JFReD
                                          Requirements
                    06/07-09/07:JSC       refined, FY07
                    Facilities Review     data imported,
                    Database (JFReD)      and training
                    Developed             with JTIP users

February 9, 2010                                                            6
Fiscal Year 2007: JSC Facilities
                       Assessment Approach
      • JSC Transition Integration (TI) Manager formed splinter team
        to develop and update a JSC Facilities list
             – Data was provided by the Center Operations Directorate at JSC
             – Starting point was the Mission Dependency Index (MDI)
               facilities from the Real Property Inventory (RPI)
             – Listing by Facility “owners” - the Institutional Directorate Line
               Organizations (DLOs)
      • Assessed current and future Usage requirements over a 5-
        year timeline by Shuttle Program, ISS, and Constellation
        Program
      • Based on lapse in usage requirements, analyzed potential
        closeout candidates and facilities with gaps in usage
      • Captured in a master Excel™ spreadsheet with pivot tables
        for limited reporting capability
      • JSC TI Manager conducted individual facilities usage
        discussions with funding programs, DLO facilities owners,
        and COD facility planners to elevate to Agency levels
February 9, 2010                           7
FY07 Assessment: Identified Improvements

      • Facilities Planning and Decision path needed more input from
        Center Operations (Facilities Utilization and Capital
        Improvement Planning) as well as Center Management
      • Capture Last Need Dates for Shuttle and First Need dates for
        Constellation
      • Assess additional decision-making factors:
             – Facility-associated human capital levels
             – Maintenance and operations (M&O) costs for the facilities
               (Center as well as DLO estimates),
             – Cost estimates of mothballing, closeout, transfer, or
               consolidation
             – Potential environmental, historical, and property disposition
               impacts for those facilities with lack of usage requirements
      • Track, manage and report facility assessment information
        with better capability than limited spreadsheet
      • Tie facility assessment data into annual PPBE cost estimating
        process and Human Spaceflight Capability gap assessments
February 9, 2010                          8
Fiscal Year 2008: JSC Facilities
                       Assessment Approach
  • Conducted Facilities assessment in 2 phases
          – Phase I for Facility data listing, Usage levels, Last need dates and
            First need dates
          – Phase II for M&O costs and close-out impacts (Property,
            Environmental, Historical) and assessing whether facility is part of
            Agency core capability
  • Additional decision data captured and validation performed
          – Usage levels (percentage range) assessed for each facility over a
            7-year transition-related planning horizon
          – Facility-associated Full-time equivalents (FTEs-civil servants) and
            Work-year equivalents (WYEs-contractors) workforce estimates
            captured
          – ISS, SSP, and CxP funding programs reviewed DLO inputs and
            concurred or offered updates
  • Transition Manager function part of Center Director’s staff
          – Analysis reports/trends vetted through the Center Director


February 9, 2010                          9
Fiscal Year 2008: JSC Facilities
                   Assessment Approach - continued
 •    Established the JSC Facilities Review Database (JFReD) to archive and
      manage facilities planning information
        – Trained and stood up a User Group to capture, integrate and validate
          facilities data content for DLO Facility owners and Program Facility funding
          organizations
        – Users Forum implemented a yearly survey, shared lessons learned, and
          provided new requirements based on process and software improvements
        – Special JFReD release provided configuration management of data and
          tracking and data mining capability
 •    Produced analysis and updates for JICB, HSF Capabilities Forum,
      PPBE-10, and Government Accountability Office (GAO) reporting
        – Data milestones established at many of these time points to track changes
          within and between fiscal years
 •    Analysis of Closeout candidates, Gaps, and utilization (over- or under-
      utilized) profiles provided
        – “At-risk” facilities identified (those with requirements lapses as identified core
          capabilities)
 •    First true baselined facilities listing for JSC
        – Agency pathfinder for assessing facilities and preparing decision-ready
          reports and analysis
February 9, 2010                              10
FY08 Assessment: Identified Improvements

   •     Track and capture Facility listing updates with increased accuracy
           – Provide rationale for deleting facilities from the baselined record
           – Send email alerts to facility users and stakeholders for changes in facility
             data
           – Provide a DB parent-child relationship to allow facility owners to track
             major plus support facilities covered by a single budget line item
   •     Simplify cost data capture and tie to FTE/WYE associated with the
         facilities
           – Validate Center M&O (“running the city costs”) first – then add on estimate
             for DLO-based M&O costs
   •     Reference JSC Risks associated with transitioning facilities
   •     Find areas of commonality in updating ERIC and JFReD facility listing
         data
   •     Provide automated mining and metrics reporting functions
   •     Incorporate Constellation Projects as facility users/Funding
         organizations


February 9, 2010                              11
Fiscal Year 2009: JSC Facilities
                           Assessment Approach
  •     Focused on refining and tracking baselined Facilities listing
          – Phase I complete
                   • Total Facilities Listing and Details updated
                   • DLO Facility Usage Data Captured
                   • Constellation First Need Dates (FNDs) by CxP Projects
                   • Funding/Managing Programs Facility Usage Validation
          – Phase II – Slightly Changed Approach from FY08
                   • Focus on more accurate CM&O cost estimates
                   • Focus on per-facility estimated FTE and WYE data and associated total operating
                     costs
  •     Analysis of FY09 Costs and Resource Trends
  •     Conducted preliminary ERIC-to-JFReD facilities mapping and found
        inconsistencies
  •     Released Parent-child functionality to help track cost groupings and
        configuration management functionality (email alerts, admin
        updates,etc.)
  •     Released Metrics charts functionality to automate data mining,
        completion metrics, and create tailored trending charts

February 9, 2010                                      12
FY09 Assessment: Identified Improvements
  •     Track and report facilities status
          – Moving from candidate for closeout and gap to actual disposition (facility
            mothballed, inactive, closed, transferred, etc.)
  •     Identify facility type by technical or non-technical function to allow for
        capabilities tracking
          – Laboratory, test stand, storage, operational support, etc.
  •     Add functionality to group facilities by technical capability
          – Associated facilities allow for tracking groups of facilities that comprise a
            core technical or support capability that the Center may then “offer” the
            programs
  •     Integrate update and linkages to Facility inventory listings, locator
        software, ERIC, and other facility data listings
          – Allow for direct data field or spreadsheet-based automated data updates in
            JFReD
  •     Work with JSC Risk manager to help mitigate identified risks
        associated with transitioning or dispositioned facilities
  •     Link to property listing within transitioning facilities
  •     Facilitate discussions to resolve discrepancies between DLO and
        Program facility requirements.
February 9, 2010                               13
Facilities Information Management
                         Approach
     • Center-wide Facilities data integration requires the
       following:
            – Updated and web-based centralized inputs instantly
              available to multiple users across sites/centers
            – Analysis and decision/metrics packages available to users
              at several levels: Level III (Resident Projects, Division),
              Level II (Resident Programs, DLO/Transition
              Manager/Center Director), and Level I (Headquarters
              Transition functions)
            – Ability to archive data, capture trends, and track
              decisions/actions within a given Fiscal year or over a multi-
              Fiscal year time period
            – Multiple sorting, filtering, and specialized view options
            – Field-specific edit/lock capabilities (tied to user status)
            – Data captured in easily identified and validated fields
            – Automated and tailored reporting features (analyses and
              metrics products)


February 9, 2010                       14
JFReD Description and Capability
     •The JSC Facilities Review Database (JFReD) is…
          – A user-interface, web-based application with advanced data archiving and
             reporting capabilities that helps synthesize integrated analysis and
             decision/metrics reports for the JSC Transition Manager and Center
             Management
     •Established User Group with JSC and Headquarters members
     •Tracks/assesses Facilities Usage requirements and associated
     Resource profiles over a multi-year timeframe with pre-decisional inputs
     from
          – Managing DLO Facility owners
          – Funding Programs
          – Center Operations – infrastructure planning
     •Evolving to integrate with other Facility data capture exercises:
          – At JSC: Geospatial/GIS; Engineering website
          – Agency: Exploration Requirements for Institutional Capabilities (ERIC)
             application; Major Facilities Inventory
     •Provider of Best Practices and Lessons Learned in information
     management of infrastructure planning and disposition

February 9, 2010
JFReD Main Website




February 9, 2010           16
Facility Listing Page




February 9, 2010
Parent-Child Facility Listing Example




February 9, 2010             18
Facility Data Page




February 9, 2010
Usage Data Page




February 9, 2010
Cost Data Page




February 9, 2010
JFReD Report Generator – Part I




February 9, 2010                  22
JFReD Report Generator – Part II




February 9, 2010                  23
Canned Reports Main Page




February 9, 2010              24
Truncated Transition Detailed Report




February 9, 2010              25
Close-out Candidates Report




February 9, 2010                26
Utilization Report




February 9, 2010           27
Usage Variance Report




February 9, 2010             28
Associated Facilities Page With Sample Data




February 9, 2010
Notional Associated Facilities Report




February 9, 2010            30
JFReD Metrics Exporting Tool




February 9, 2010
Total Facilities Breakdown by Owning DLOs




February 9, 2010     32
Fiscal Year Distribution of Closeout Candidates




 February 9, 2010      33
Estimated M&O Cost Totals




February 9, 2010               34
Reported FTE levels




February 9, 2010            35
Reported T&R Impacts




February 9, 2010            36
Summary Best Practices
 • Center-wide Facilities Planning requires flexible approach to facility usage
   and cost capture
     – Changing Program requirements will drive usage levels and institutional
       facilities decisions – keep it fluid
 • Continue mapping facilities to Center-wide major Strategic capabilities and
   associated funding profiles
 • Integrate Facility data capture tools at the Center level to keep strategic
   planning and tactical implementation goals aligned
 • Maintain accurate and traceable facilities listing and strict configuration
   control procedures
 • Provide avenues to import data content for those organizations that do not
   have regular User participation
 • Leverage PPBE yearly cost exercises in validating and updating data
   content
 • Engage User groups/Data content owners in tool and process upgrades
   on a regular basis
 • Collaborate closely with Agency Facilities Planning entities and experts to
   standardize terminology, requirements, and IT integration practices
  • Think risk and risk mitigation – cross-data capture in risk and knowledge
     management data repositories is vital to minimizing loss of NASA’s
     valuable skills, assets, and knowledge
February 9, 2010
Next Steps
     • JFReD tool and JSC Facilities Review process
       versatile enough for assessing the following future
       initiatives:
            – Management of Center-owned risks and cost threats for
              mitigation planning/resource allocation
            – Facilities funding approaches such as “buy-by-the-yard”
            – Center-level or major facilities/capability level scalability
              issues
            – Facility-based Inter-Task Agreements (ITAs)
            – Per-facility Center Property, Records, and Software
              disposition metrics (including ITAR/Export Control,
              Environmental, and Core Capability/Human Capital issues)
            – JSC Facilities potential new funding “customers” (ESMD,
              ETDP, SCAP,TCWG, Non-NASA government, or non-
              government)
            – Long-term Center resources planning (JSC Advanced
              Planning, Center Operations 2025 planning, Knowledge
              and skills preservation, etc.)

February 9, 2010                       38
Wrap-up
     •Upcoming Cost and Technical Capabilities Grouping Assessment
     •Continued Effort to ensure connectivity with Center Facilities
     Utilization, Facility inventory lists, Facility locator application
     (GIS), and Risk databases
     •Suggested demos and TIMs with Headquarters to discuss
     standardizing infrastructure data management requirements and
     promoting connectivity among facility and capability assessments

     Though initially developed to assess potential
     gaps and closeouts from transitioning facilities,
     JFReD has become a versatile infrastructure
     decision management application - ready to
     incorporate data from other sources as well as
     prepare presentation-ready analysis and
     status/metrics reports


February 9, 2010
Back-up Slides

  February 9, 2010
JSC FY07 Facilities Spreadsheet




February 9, 2010       41
JSC FY07 Sample Pivot Table




February 9, 2010    42
JFReD Software Requirements
                           Document




February 9, 2010               43
JFReD User Guide Document




February 9, 2010              44
JFReD Users Group Sample Survey




February 9, 2010        45

Mais conteúdo relacionado

Mais procurados

Hurley.robert
Hurley.robertHurley.robert
Hurley.robert
NASAPMC
 
Carsile.azarbain
Carsile.azarbainCarsile.azarbain
Carsile.azarbain
NASAPMC
 
T carlson mbontrager_wtippin_lsinger_v2
T carlson mbontrager_wtippin_lsinger_v2T carlson mbontrager_wtippin_lsinger_v2
T carlson mbontrager_wtippin_lsinger_v2
NASAPMC
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
NASAPMC
 
Armstrong
ArmstrongArmstrong
Armstrong
NASAPMC
 
Nona.cheeks
Nona.cheeksNona.cheeks
Nona.cheeks
NASAPMC
 
R simpson elee
R simpson eleeR simpson elee
R simpson elee
NASAPMC
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
NASAPMC
 
Dickerson mark
Dickerson markDickerson mark
Dickerson mark
NASAPMC
 
Newman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_caseNewman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_case
NASAPMC
 
Carol.scott
Carol.scottCarol.scott
Carol.scott
NASAPMC
 
Keer.beth
Keer.bethKeer.beth
Keer.beth
NASAPMC
 
Lau.cheevon
Lau.cheevonLau.cheevon
Lau.cheevon
NASAPMC
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
NASAPMC
 
Bladwin.kristen
Bladwin.kristenBladwin.kristen
Bladwin.kristen
NASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
NASAPMC
 
Dennehy richard mrozinski
Dennehy richard mrozinskiDennehy richard mrozinski
Dennehy richard mrozinski
NASAPMC
 

Mais procurados (19)

Hurley.robert
Hurley.robertHurley.robert
Hurley.robert
 
Carsile.azarbain
Carsile.azarbainCarsile.azarbain
Carsile.azarbain
 
T carlson mbontrager_wtippin_lsinger_v2
T carlson mbontrager_wtippin_lsinger_v2T carlson mbontrager_wtippin_lsinger_v2
T carlson mbontrager_wtippin_lsinger_v2
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
 
Armstrong
ArmstrongArmstrong
Armstrong
 
Ortiz
OrtizOrtiz
Ortiz
 
Nona.cheeks
Nona.cheeksNona.cheeks
Nona.cheeks
 
R simpson elee
R simpson eleeR simpson elee
R simpson elee
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
 
Dickerson mark
Dickerson markDickerson mark
Dickerson mark
 
Newman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_caseNewman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_case
 
Sparrow
SparrowSparrow
Sparrow
 
Carol.scott
Carol.scottCarol.scott
Carol.scott
 
Keer.beth
Keer.bethKeer.beth
Keer.beth
 
Lau.cheevon
Lau.cheevonLau.cheevon
Lau.cheevon
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
 
Bladwin.kristen
Bladwin.kristenBladwin.kristen
Bladwin.kristen
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Dennehy richard mrozinski
Dennehy richard mrozinskiDennehy richard mrozinski
Dennehy richard mrozinski
 

Destaque

Mike.ryschkewitsch
Mike.ryschkewitschMike.ryschkewitsch
Mike.ryschkewitsch
NASAPMC
 
Laliberte,eric nasa pm challenge 2012 pm in changing global environment
Laliberte,eric nasa pm challenge 2012   pm in changing global environmentLaliberte,eric nasa pm challenge 2012   pm in changing global environment
Laliberte,eric nasa pm challenge 2012 pm in changing global environment
NASAPMC
 
Hughitt brian
Hughitt brianHughitt brian
Hughitt brian
NASAPMC
 
Eric.druker
Eric.drukerEric.druker
Eric.druker
NASAPMC
 
Smith.marshall.bryant
Smith.marshall.bryantSmith.marshall.bryant
Smith.marshall.bryant
NASAPMC
 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarie
NASAPMC
 

Destaque (6)

Mike.ryschkewitsch
Mike.ryschkewitschMike.ryschkewitsch
Mike.ryschkewitsch
 
Laliberte,eric nasa pm challenge 2012 pm in changing global environment
Laliberte,eric nasa pm challenge 2012   pm in changing global environmentLaliberte,eric nasa pm challenge 2012   pm in changing global environment
Laliberte,eric nasa pm challenge 2012 pm in changing global environment
 
Hughitt brian
Hughitt brianHughitt brian
Hughitt brian
 
Eric.druker
Eric.drukerEric.druker
Eric.druker
 
Smith.marshall.bryant
Smith.marshall.bryantSmith.marshall.bryant
Smith.marshall.bryant
 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarie
 

Semelhante a Krishen

Krishen.lovel
Krishen.lovelKrishen.lovel
Krishen.lovel
NASAPMC
 
Seattle City Council Budget Briefing
Seattle City Council Budget BriefingSeattle City Council Budget Briefing
Seattle City Council Budget Briefing
jseattle
 
Ruszkowski.james
Ruszkowski.jamesRuszkowski.james
Ruszkowski.james
NASAPMC
 
Tmc short presentation march 2012
Tmc short presentation   march 2012Tmc short presentation   march 2012
Tmc short presentation march 2012
itssa-presentations
 
GeoKettle, GeoMondrian et Spatialytics : une suite open source de GeoBI
GeoKettle, GeoMondrian et Spatialytics : une suite open source de GeoBIGeoKettle, GeoMondrian et Spatialytics : une suite open source de GeoBI
GeoKettle, GeoMondrian et Spatialytics : une suite open source de GeoBI
ACSG Section Montréal
 
Satellite Applications Catapult Centre Overview
Satellite Applications Catapult Centre OverviewSatellite Applications Catapult Centre Overview
Satellite Applications Catapult Centre Overview
A. Rocketeer
 
David.graham
David.grahamDavid.graham
David.graham
NASAPMC
 
Metropolitan Police 1
Metropolitan Police 1Metropolitan Police 1
Metropolitan Police 1
mbimmler
 

Semelhante a Krishen (20)

Krishen.lovel
Krishen.lovelKrishen.lovel
Krishen.lovel
 
Seattle City Council Budget Briefing
Seattle City Council Budget BriefingSeattle City Council Budget Briefing
Seattle City Council Budget Briefing
 
Your Role as a Control Account Manager in the Integrated Baseline Review (IBR)
Your Role as a Control Account Manager in the Integrated Baseline Review (IBR)Your Role as a Control Account Manager in the Integrated Baseline Review (IBR)
Your Role as a Control Account Manager in the Integrated Baseline Review (IBR)
 
JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008
 
Ruszkowski.james
Ruszkowski.jamesRuszkowski.james
Ruszkowski.james
 
Best Practices in the Indian Servicing Sector
Best Practices in the Indian Servicing SectorBest Practices in the Indian Servicing Sector
Best Practices in the Indian Servicing Sector
 
Neocs Update20 Jul09
Neocs Update20 Jul09Neocs Update20 Jul09
Neocs Update20 Jul09
 
Icon ecpma09
Icon ecpma09Icon ecpma09
Icon ecpma09
 
State Of It At Shu Presentation Final 20110210
State Of It At Shu Presentation Final 20110210State Of It At Shu Presentation Final 20110210
State Of It At Shu Presentation Final 20110210
 
Pepperdine itsm presentation 10.11
Pepperdine itsm presentation 10.11Pepperdine itsm presentation 10.11
Pepperdine itsm presentation 10.11
 
Satellite Applications Catapult Centre
Satellite Applications Catapult CentreSatellite Applications Catapult Centre
Satellite Applications Catapult Centre
 
JPO MRAP Program Brief 2012
JPO  MRAP Program Brief 2012JPO  MRAP Program Brief 2012
JPO MRAP Program Brief 2012
 
9-23-2010 LTC UD Updates
9-23-2010 LTC UD Updates9-23-2010 LTC UD Updates
9-23-2010 LTC UD Updates
 
Tmc short presentation march 2012
Tmc short presentation   march 2012Tmc short presentation   march 2012
Tmc short presentation march 2012
 
GeoKettle, GeoMondrian et Spatialytics : une suite open source de GeoBI
GeoKettle, GeoMondrian et Spatialytics : une suite open source de GeoBIGeoKettle, GeoMondrian et Spatialytics : une suite open source de GeoBI
GeoKettle, GeoMondrian et Spatialytics : une suite open source de GeoBI
 
4 g technology
4 g technology4 g technology
4 g technology
 
由政府採購體系檢視國內政府與業界有關系統工程之落差
由政府採購體系檢視國內政府與業界有關系統工程之落差由政府採購體系檢視國內政府與業界有關系統工程之落差
由政府採購體系檢視國內政府與業界有關系統工程之落差
 
Satellite Applications Catapult Centre Overview
Satellite Applications Catapult Centre OverviewSatellite Applications Catapult Centre Overview
Satellite Applications Catapult Centre Overview
 
David.graham
David.grahamDavid.graham
David.graham
 
Metropolitan Police 1
Metropolitan Police 1Metropolitan Police 1
Metropolitan Police 1
 

Mais de NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
NASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
NASAPMC
 
Yew manson
Yew mansonYew manson
Yew manson
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
NASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
NASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahm
NASAPMC
 
Snow lee
Snow leeSnow lee
Snow lee
NASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
NASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
NASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
NASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
NASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
NASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
NASAPMC
 
Paradis william
Paradis williamParadis william
Paradis william
NASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
NASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
NASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
NASAPMC
 

Mais de NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Último

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Último (20)

AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 

Krishen

  • 1. Center-wide Facilities Planning: Tools and Best Practices NASA Project Management Challenge 2010 February 9-10, 2010 Track: Facilities Presenters: Lovely Krishen, Ph.D., Lead Risk Analyst-Transition Team Lead Futron Corporation Perri E. Fox, Transition Manager NASA-Johnson Space Center Used with permission
  • 2. Outline • Introduction • NASA-JSC Center-wide Facilities Review Objectives • Facilities Assessment Approach – Fiscal Year 2007 – Fiscal Year 2008 – Fiscal Year 2009 • Facilities Information Management Approach – Information Capture Requirements – JSC Facilities Review Database (JFReD) – Reporting and Metrics • Next Steps • Summary • Backup Slides February 9, 2010 2
  • 3. Introduction • With the transition and retirement of Space Shuttle Program, NASA- Johnson Space Center Transition Management office initiated an ongoing center-wide facilities review and planning effort • A Transition-driven effort that assists Center and Agency strategic planning for facility utilization, resources, and budgeting • Pre-decisional data capture initiated and updated over 3 years and going… February 9, 2010 3
  • 4. Definition of a Facility • Though primarily focused on real property, a facility represents a significant (or core) capability or asset and becomes a factor in the overall center “supply” that meets the “demand” of mission, program, or project requirements • Includes labs, aircraft, test stands, specialized equipment, storage areas, mission operations/planning areas or entire buildings • Does not include office space or other personnel support areas (break rooms, general conference rooms, restrooms, equipment closets, etc.) February 9, 2010 4
  • 5. Facilities Review Objectives • From Fiscal Year 2007 onwards, JSC Transition Integration Panel activities conducted a yearly Facilities Review and Assessment with the following objectives: – Capturing comprehensive facility listing, description and baseline cost estimates for Programs, Center and Agency planning purposes – Assessing budget associated with closeout, gaps and utilization of the facilities (Workforce and Dollars) tied to Core Capabilities • Over a 5-7-year transition-related planning and decision implementation horizon – Linking utilization of buildings/facilities for overall Center Master Planning effort – Supporting Center Director-level risk-based decisions regarding current facilities close-outs, consolidations, gap funding, refurbishment, maintenance, mothballing, and demolition February 9, 2010 5
  • 6. Timeline of Facilities Review FY2007 FY2008 FY2009 1008: 0809: FY09 0608-0908: FY09 JFReD Users 10/06-12/06: Exploration JFReD Forum JSC Transition Requirements Users 0909-present: New Integration for Institutional Forum JFReD Release; Panel (JTIP) Capabilities Center Demo; Facilities Study 0908: Phase II Data (ERIC) Phase I Team Kickoff FY08 0409: HSF Capture; FY09 0208: PPBE-10 mapping under SSP Facilities Capabilities Baseline; ERIC- Kick-off and JICB Baseline Forum JFReD updates 03/07: JTIP Preliminary 0309: Facilities Review Assessment 0308: Phase II PPBE-11 Released/ Report Facilities Data Kickoff Reported to Joint Capture and 1208-0109: and JICB Integration Control Validation ERIC Phase Report 0609-0709: 0608: Board (JICB) II Technical PPBE-11, PPBE-10 Interchange Space Updated 04/07: JSC Meeting Utilization Report Transition 0408: Human (TIM) and TIM 0209: JFReD Management Spaceflight Facilities Training and and Facilities Capabilities Mapping JSC Review moved Forum Report Facilities to Center 12/07-1/08: iJICB Phase I Data Director’s office report, Phase I Capture Facilities Data capture and validation 10/07-11/07: JFReD Requirements 06/07-09/07:JSC refined, FY07 Facilities Review data imported, Database (JFReD) and training Developed with JTIP users February 9, 2010 6
  • 7. Fiscal Year 2007: JSC Facilities Assessment Approach • JSC Transition Integration (TI) Manager formed splinter team to develop and update a JSC Facilities list – Data was provided by the Center Operations Directorate at JSC – Starting point was the Mission Dependency Index (MDI) facilities from the Real Property Inventory (RPI) – Listing by Facility “owners” - the Institutional Directorate Line Organizations (DLOs) • Assessed current and future Usage requirements over a 5- year timeline by Shuttle Program, ISS, and Constellation Program • Based on lapse in usage requirements, analyzed potential closeout candidates and facilities with gaps in usage • Captured in a master Excel™ spreadsheet with pivot tables for limited reporting capability • JSC TI Manager conducted individual facilities usage discussions with funding programs, DLO facilities owners, and COD facility planners to elevate to Agency levels February 9, 2010 7
  • 8. FY07 Assessment: Identified Improvements • Facilities Planning and Decision path needed more input from Center Operations (Facilities Utilization and Capital Improvement Planning) as well as Center Management • Capture Last Need Dates for Shuttle and First Need dates for Constellation • Assess additional decision-making factors: – Facility-associated human capital levels – Maintenance and operations (M&O) costs for the facilities (Center as well as DLO estimates), – Cost estimates of mothballing, closeout, transfer, or consolidation – Potential environmental, historical, and property disposition impacts for those facilities with lack of usage requirements • Track, manage and report facility assessment information with better capability than limited spreadsheet • Tie facility assessment data into annual PPBE cost estimating process and Human Spaceflight Capability gap assessments February 9, 2010 8
  • 9. Fiscal Year 2008: JSC Facilities Assessment Approach • Conducted Facilities assessment in 2 phases – Phase I for Facility data listing, Usage levels, Last need dates and First need dates – Phase II for M&O costs and close-out impacts (Property, Environmental, Historical) and assessing whether facility is part of Agency core capability • Additional decision data captured and validation performed – Usage levels (percentage range) assessed for each facility over a 7-year transition-related planning horizon – Facility-associated Full-time equivalents (FTEs-civil servants) and Work-year equivalents (WYEs-contractors) workforce estimates captured – ISS, SSP, and CxP funding programs reviewed DLO inputs and concurred or offered updates • Transition Manager function part of Center Director’s staff – Analysis reports/trends vetted through the Center Director February 9, 2010 9
  • 10. Fiscal Year 2008: JSC Facilities Assessment Approach - continued • Established the JSC Facilities Review Database (JFReD) to archive and manage facilities planning information – Trained and stood up a User Group to capture, integrate and validate facilities data content for DLO Facility owners and Program Facility funding organizations – Users Forum implemented a yearly survey, shared lessons learned, and provided new requirements based on process and software improvements – Special JFReD release provided configuration management of data and tracking and data mining capability • Produced analysis and updates for JICB, HSF Capabilities Forum, PPBE-10, and Government Accountability Office (GAO) reporting – Data milestones established at many of these time points to track changes within and between fiscal years • Analysis of Closeout candidates, Gaps, and utilization (over- or under- utilized) profiles provided – “At-risk” facilities identified (those with requirements lapses as identified core capabilities) • First true baselined facilities listing for JSC – Agency pathfinder for assessing facilities and preparing decision-ready reports and analysis February 9, 2010 10
  • 11. FY08 Assessment: Identified Improvements • Track and capture Facility listing updates with increased accuracy – Provide rationale for deleting facilities from the baselined record – Send email alerts to facility users and stakeholders for changes in facility data – Provide a DB parent-child relationship to allow facility owners to track major plus support facilities covered by a single budget line item • Simplify cost data capture and tie to FTE/WYE associated with the facilities – Validate Center M&O (“running the city costs”) first – then add on estimate for DLO-based M&O costs • Reference JSC Risks associated with transitioning facilities • Find areas of commonality in updating ERIC and JFReD facility listing data • Provide automated mining and metrics reporting functions • Incorporate Constellation Projects as facility users/Funding organizations February 9, 2010 11
  • 12. Fiscal Year 2009: JSC Facilities Assessment Approach • Focused on refining and tracking baselined Facilities listing – Phase I complete • Total Facilities Listing and Details updated • DLO Facility Usage Data Captured • Constellation First Need Dates (FNDs) by CxP Projects • Funding/Managing Programs Facility Usage Validation – Phase II – Slightly Changed Approach from FY08 • Focus on more accurate CM&O cost estimates • Focus on per-facility estimated FTE and WYE data and associated total operating costs • Analysis of FY09 Costs and Resource Trends • Conducted preliminary ERIC-to-JFReD facilities mapping and found inconsistencies • Released Parent-child functionality to help track cost groupings and configuration management functionality (email alerts, admin updates,etc.) • Released Metrics charts functionality to automate data mining, completion metrics, and create tailored trending charts February 9, 2010 12
  • 13. FY09 Assessment: Identified Improvements • Track and report facilities status – Moving from candidate for closeout and gap to actual disposition (facility mothballed, inactive, closed, transferred, etc.) • Identify facility type by technical or non-technical function to allow for capabilities tracking – Laboratory, test stand, storage, operational support, etc. • Add functionality to group facilities by technical capability – Associated facilities allow for tracking groups of facilities that comprise a core technical or support capability that the Center may then “offer” the programs • Integrate update and linkages to Facility inventory listings, locator software, ERIC, and other facility data listings – Allow for direct data field or spreadsheet-based automated data updates in JFReD • Work with JSC Risk manager to help mitigate identified risks associated with transitioning or dispositioned facilities • Link to property listing within transitioning facilities • Facilitate discussions to resolve discrepancies between DLO and Program facility requirements. February 9, 2010 13
  • 14. Facilities Information Management Approach • Center-wide Facilities data integration requires the following: – Updated and web-based centralized inputs instantly available to multiple users across sites/centers – Analysis and decision/metrics packages available to users at several levels: Level III (Resident Projects, Division), Level II (Resident Programs, DLO/Transition Manager/Center Director), and Level I (Headquarters Transition functions) – Ability to archive data, capture trends, and track decisions/actions within a given Fiscal year or over a multi- Fiscal year time period – Multiple sorting, filtering, and specialized view options – Field-specific edit/lock capabilities (tied to user status) – Data captured in easily identified and validated fields – Automated and tailored reporting features (analyses and metrics products) February 9, 2010 14
  • 15. JFReD Description and Capability •The JSC Facilities Review Database (JFReD) is… – A user-interface, web-based application with advanced data archiving and reporting capabilities that helps synthesize integrated analysis and decision/metrics reports for the JSC Transition Manager and Center Management •Established User Group with JSC and Headquarters members •Tracks/assesses Facilities Usage requirements and associated Resource profiles over a multi-year timeframe with pre-decisional inputs from – Managing DLO Facility owners – Funding Programs – Center Operations – infrastructure planning •Evolving to integrate with other Facility data capture exercises: – At JSC: Geospatial/GIS; Engineering website – Agency: Exploration Requirements for Institutional Capabilities (ERIC) application; Major Facilities Inventory •Provider of Best Practices and Lessons Learned in information management of infrastructure planning and disposition February 9, 2010
  • 18. Parent-Child Facility Listing Example February 9, 2010 18
  • 22. JFReD Report Generator – Part I February 9, 2010 22
  • 23. JFReD Report Generator – Part II February 9, 2010 23
  • 24. Canned Reports Main Page February 9, 2010 24
  • 25. Truncated Transition Detailed Report February 9, 2010 25
  • 29. Associated Facilities Page With Sample Data February 9, 2010
  • 30. Notional Associated Facilities Report February 9, 2010 30
  • 31. JFReD Metrics Exporting Tool February 9, 2010
  • 32. Total Facilities Breakdown by Owning DLOs February 9, 2010 32
  • 33. Fiscal Year Distribution of Closeout Candidates February 9, 2010 33
  • 34. Estimated M&O Cost Totals February 9, 2010 34
  • 37. Summary Best Practices • Center-wide Facilities Planning requires flexible approach to facility usage and cost capture – Changing Program requirements will drive usage levels and institutional facilities decisions – keep it fluid • Continue mapping facilities to Center-wide major Strategic capabilities and associated funding profiles • Integrate Facility data capture tools at the Center level to keep strategic planning and tactical implementation goals aligned • Maintain accurate and traceable facilities listing and strict configuration control procedures • Provide avenues to import data content for those organizations that do not have regular User participation • Leverage PPBE yearly cost exercises in validating and updating data content • Engage User groups/Data content owners in tool and process upgrades on a regular basis • Collaborate closely with Agency Facilities Planning entities and experts to standardize terminology, requirements, and IT integration practices • Think risk and risk mitigation – cross-data capture in risk and knowledge management data repositories is vital to minimizing loss of NASA’s valuable skills, assets, and knowledge February 9, 2010
  • 38. Next Steps • JFReD tool and JSC Facilities Review process versatile enough for assessing the following future initiatives: – Management of Center-owned risks and cost threats for mitigation planning/resource allocation – Facilities funding approaches such as “buy-by-the-yard” – Center-level or major facilities/capability level scalability issues – Facility-based Inter-Task Agreements (ITAs) – Per-facility Center Property, Records, and Software disposition metrics (including ITAR/Export Control, Environmental, and Core Capability/Human Capital issues) – JSC Facilities potential new funding “customers” (ESMD, ETDP, SCAP,TCWG, Non-NASA government, or non- government) – Long-term Center resources planning (JSC Advanced Planning, Center Operations 2025 planning, Knowledge and skills preservation, etc.) February 9, 2010 38
  • 39. Wrap-up •Upcoming Cost and Technical Capabilities Grouping Assessment •Continued Effort to ensure connectivity with Center Facilities Utilization, Facility inventory lists, Facility locator application (GIS), and Risk databases •Suggested demos and TIMs with Headquarters to discuss standardizing infrastructure data management requirements and promoting connectivity among facility and capability assessments Though initially developed to assess potential gaps and closeouts from transitioning facilities, JFReD has become a versatile infrastructure decision management application - ready to incorporate data from other sources as well as prepare presentation-ready analysis and status/metrics reports February 9, 2010
  • 40. Back-up Slides February 9, 2010
  • 41. JSC FY07 Facilities Spreadsheet February 9, 2010 41
  • 42. JSC FY07 Sample Pivot Table February 9, 2010 42
  • 43. JFReD Software Requirements Document February 9, 2010 43
  • 44. JFReD User Guide Document February 9, 2010 44
  • 45. JFReD Users Group Sample Survey February 9, 2010 45