Executing successful partnerships with NASA -
    International Partners’ Perspectives

                     ESA Remarks

              2010 NASA PM Challenge
          9-10 February 2010, Galveston, Tx


                    Andreas Diekmann
                     ESA Washington Office
  955 L’Enfant Plaza SW – Suite 7800 – Washington, DC 20024
    Tel: (202) 488 4158; Email: andreas.diekmann@esa.int
• 2000 staff + 2000 on-site contractors
   • Strong international orientation (internally + externally)
   • Research and Development Agency -> Operations handed over to operators
                                             (Arianespace, Eumetsat,..)
          Approved programmes per field of activity
   4500
                              Technology
   4000
   3500
          Navigation
   3000   Telecom
M€ 2500
          HSF + human exploration
   2000
          Earth Observation
   1500
   1000   Launchers
    500   Science + robotic exploration
      0                                       Basic Activities
      2010   2011      2012   2013   2014   2015   2016   2017   2018   2019


                                                                               2
M€               ESA Budget - Funding Sources
4500
4000
3500        EC + others
3000
2500          ESA
              Decided in 2008
2000
1500        ESA
1000        Decided before 2008

500
                      ESA Science & Basic Activities
     0
     2010     2011   2012   2013   2014   2015   2016   2017   2018   2019



                                                                      3
European public space players

                 18 ESA Member States         27 EU Member States



                        ESA                 Space                EU
                       Council              Council            Councils


                                  European Space Policy

   national
Space agencies
                         ESA                                     EC
      national        Inter-governmental                           supranational

                                                                FP7,
    National                                                    other
     Space
    programs            ESA
                      Programs             ESA/EC co-funded:    space-related
                                             Galileo, GMES        activities
                                                                            4
History of NASA-ESA/ Europe space cooperation

• March 1959: US offer to European scientists to fly experiments on
  US satellites
• 1960ies: Close relations between NASA and ESRO
• 1969: NASA offers Europe to participate in post-Apollo activities
  (Shuttle, Space Station) -> resulting in Spacelab (Shuttle
  cooperation did not materialise)
• 1983: First ESA astronaut on Space Shuttle (STS-9 Spacelab)
• 1984: President Reagan’s invitation to participate in Space Station
  Programme
• 1990ies: Cooperative science missions (SOHO, Ulysses, Hubble)



                                                                      5
Current NASA-ESA space cooperation
• International Space Station
• Space exploration (human, robotic)
• Space Science (Cassini/Huygens, Hubble,
  JWST,…)
• Earth Science (joint search for new cooperation
  opportunities)
• Space Transportation (recent MoU)
• Space Situational Awareness (exchange of info)
                                                6
P eculiarities of NASA-ESA space cooperation
• NASA is ESA’s most significant cooperation partner (in
  terms of history and volume of cooperation).
• ESA/European space engineering and management
  culture is based on NASA model.
• In many cases, there is long continuity of personal
  contacts between ESA and NASA programme and project
  managers.
• ESA is much smaller than NASA. Therefore, (a) NASA
  mostly in leadership role, (b) the prominent mode of
  cooperation so far: contributions to each others
  missions; new trend: more integrated cooperation.

                                                     7
I ngredients of a successful cooperation –
    from a project m anager’s view (1/ 2)
• “Collaboration in a project should be like a marriage, not
  like a business contract” – in terms of demands on trust,
  transparency and credibility – “surprises” to be avoided.
• Nevertheless, early, clear and detailed formulation and
  documentation of the project baseline (programmatic,
  technical and management) and establishment of
  mechanism to control that baseline.
• Early and clear definition of inter-Agency interfaces
  (minimize the number and complexity of interfaces!)
• Regular and frequent communication.

                                                          8
I ngredients of a successful cooperation –
    from a project m anager’s view (2/ 2)
• Recognition/Acceptance of differences in the processes
  of ESA and NASA – do not invent specific processes just
  for the specific project (however PM see need for
  “common processes and standards”).
• Joint teams are important, but should not result in
  blurring of the responsibilities of each partner.
• International cooperation requires the involvement of
  various capacities on both sides in addition to project
  management (e.g. external relations, legal service).
  Good communication and careful distribution of roles are
  important.
                                                       9
Conclusions
• There is a strong cooperation heritage and fundament –
  often manifested in trustful and long-lasting personal
  relationships between project managers on both sides.
• Programmatic decisions can sometimes complicate or
  disrupt matters.
• The future may show
   – more integrated cooperative programmes/projects (not just a
     “contribution-mode” of cooperation).
   – More partners in a project (intern., commercial, academia)
  This may pose new challenges for project managers.
• Our PM cultures are similar. This should help overcoming
  those challenges.
                                                               10
Executing Successful Partnerships
                       With NASA
         An International Partner’s Perspective:
                    Lessons Learned
                       2010 NASA PM Challenge
                           Galveston, Texas
                                  Graham Gibbs
                 Counsellor Space Affairs - Canadian Space Agency
                               Canadian Embassy
                                   Washington
                                 February 9, 2010
Used with Permission
Executing Successful Partnerships with NASA


                      OUTLINE
• Overview Canada-United Civil Space Cooperation

• The Big Picture

• Space Science and Earth Observation

• International Space Station Lessons Learned for PMs

• Applying Lessons Learned to International Exploration

• Conclusions

ATTACHED: A more detailed version of the presentation
Executing Successful Partnerships with NASA

Canada – United States Civil Space Cooperation

       • Human Space Flight (Shuttle & ISS)
       • Astronaut Corps (Cdn astronauts embedded at JSC)
       • Life & Microgravity Science (Shuttle & ISS)
       • Earth Science and Observation (Instruments & RADARSAT)
       • Astronomy (JWST and Cdn MOST)
       • Heliophysics (THEMIS & International Living With a Star)
       • Exploration (Mars Phoenix & MSL et al)
        • Earth Science & Observation (RADARSAT)

               • Ice Monitoring & Cooperation with the
                 Canadian Ice Service (RADARSAT)

                • Earth Science & Observation (RADARSAT)
Executing Successful Partnerships with NASA


The Big Picture Lessons Learned
  From the Private Sector:
        The best agreements;
         Might be difficult to negotiate
          but don't have to be referred to later.
         Fair (profitable) for both/all parties.

  From the Public (Space) Sector:
      Be prepared for national prerogatives,
      Understand differing cultures,
      Accept the risks as well as the benefits,
      Funding; consistency & no-exchange,
      Be prepared to seek compromises.
Executing Successful Partnerships with NASA


Space Science and Earth Observation 1 of 2
   Some Realities to Consider - Positive and Negative

          International collaboration among scientists,

          International Announcements of Opportunity –
            most often competitive,

          Projects usually on no-exchange-of-funds basis,

          Obligations subject to "availability of appropriated funds",

          Barters e.g. launch-for-data
Executing Successful Partnerships with NASA


Space Science and Earth Observation 2 of 2
   Some Realities to Consider - Positive and Negative
           Partners responsibilities are deliverables -
            not financial investment,

           Agreements legally binding or
            political/morale commitments,

           Data sharing,

           National Security interests –
            technology transfer, data policies etc.
Executing Successful Partnerships with NASA

                       ISS Lessons Learned
                  Implications for Project Managers
 Managing the classical parameters (cost, schedule, performance)
  is no longer sufficient

 Must manage through political changes that can/will have
  fundamental impact on program

 Diplomatic skills are essential to the "first among equals" concept

 International cooperation takes considerable extra time & effort

 Flexibility and understanding are essential
Applying Lessons Learned to
    International Exploration of Space
 We will not be able to identify every contingency in advance so
  structure for cooperation must allow for flexibility.

 High-level political leadership may be necessary to garner
  international support/participation e.g. the ISS & GEO examples.

 Recognize the many similarities in partners plans/aspirations for
  exploration.

 Exploration beyond Earth orbit is an intrinsically global enterprise.

 International partnerships provide tangible benefits
  e.g. broadening public & political support, sharing cost & risk,
  enrich scientific & technical content, sustainability.
Executing Successful Partnerships with NASA


                    Conclusions
• Agreements should be mutually beneficial and binding
• Expect to share the risks as well as the benefits
• Expect to compromise
• Appreciate differing cultures, methods, national prerogatives
• Cooperation most often on a no-exchange of funds basis
• Barters work
• Partners responsibilities are “deliverables” not financial
• Be prepared to manage through political changes
• Cooperation can be hard but going alone can be harder
• Be a reliable and welcomed partner
• US ITARS – live with it !!
• NASA is a generous partner (though at times difficult!)
Executing Successful Partnerships with NASA




             Thank You
                 Graham Gibbs
Counsellor Space Affairs - Canadian Space Agency
               Canadian Embassy
           graham.gibbs@asc-csa.gc.ca
               www.asc-csa.gc.ca
HANDOUT
 Executing Successful Partnerships
              With NASA
An International Partner’s Perspective:
           Lessons Learned
        2010 NASA PM Challenge
            Galveston, Texas
                    Graham Gibbs
   Counsellor Space Affairs - Canadian Space Agency
                 Canadian Embassy
                     Washington
                   February 9, 2010
Executing Successful Partnerships with NASA


                    OUTLINE
• Overview Canada-United Civil Space Cooperation

• The Big Picture

• Space Science and Earth Observation

• International Space Station

• Group on Earth Observations

• The Global Exploration Strategy and the
  International Space Exploration Coordination Group

• Conclusions
Executing Successful Partnerships with NASA

Canada – United States Civil Space Cooperation

       • Human Space Flight (Shuttle & ISS)
       • Astronaut Corps (Cdn astronauts embedded at JSC)
       • Life & Microgravity Science (Shuttle & ISS)
       • Earth Science and Observation (Instruments & RADARSAT)
       • Astronomy (JWST and Cdn MOST)
       • Heliophysics (THEMIS & International Living With a Star)
       • Exploration (Mars Phoenix & MSL et al)
        • Earth Science & Observation (RADARSAT)

               • Ice Monitoring & Cooperation with the
                 Canadian Ice Service (RADARSAT)

                • Earth Science & Observation (RADARSAT)
Executing Successful Partnerships with NASA


The Big Picture Lessons Learned
  From the Private Sector:
        The best agreements;
         Might be difficult to negotiate
          but don't have to be referred to later.
         Fair (profitable) for both/all parties.

  From the Public (Space) Sector:
      Be prepared for national prerogatives,
      Understand differing cultures,
      Accept the risks as well as the benefits,
      Funding; consistency & no-exchange,
      Be prepared to seek compromises.
Executing Successful Partnerships with NASA


Space Science and Earth Observation 1 of 2
   Some Realities to Consider - Positive and Negative

          International collaboration among scientists,

          International Announcements of Opportunity –
            most often competitive,

          Projects usually on no-exchange-of-funds basis,

          Obligations subject to "availability of appropriated funds",

          Barters e.g. launch-for-data
Executing Successful Partnerships with NASA


Space Science and Earth Observation 2 of 2
   Some Realities to Consider - Positive and Negative
           Partners responsibilities are deliverables -
            not financial investment,

           Agreements legally binding or
            political/morale commitments,

           Data sharing,

           National Security interests –
            technology transfer, data policies etc.
Executing Successful Partnerships with NASA


     Evolution of the ISS and Its Partnership
          Anticipate the Unexpected !



 US Initiative-January 1984 (State of Union Address)
 A Cold War demonstration of U.S. leadership and alliances
 From Cold War instrument into post-Cold War cooperation
 All partners now providing "critical elements" instead of
  "enhancements"
                 Specific contributions – some duplication
                 Shared Operations
                 Long Term Science
                 "Single" Destination in Space
Executing Successful Partnerships with NASA

             Structure of the ISS Partnership
IGA Art. 1: "…, under the lead role of the United States for overall
              management and coordination …"
                                   Intergovernmental Agreement:
                                   • Legal Regime
               IGA                 • Top-Level Political Commitments
                                   • Multilateral (15 nations)


 NASA/CSA            NASA/ESA           NASA/GOJ             NASA/FSA

  Memoranda of Understanding:
  • Detailed Implementation                             Implementing
  • Roles & Responsibilities                            Arrangements
  • Obligations & Rights
Executing Successful Partnerships with NASA

                       ISS Lessons Learned
                  Implications for Project Managers
 Managing the classical parameters (cost, schedule, performance)
  is no longer sufficient

 Must manage through political changes that can/will have
  fundamental impact on program

 Diplomatic skills are essential to the "first among equals" concept

 International cooperation takes considerable extra time & effort

 Flexibility and understanding are essential
EARTH OBSERVATION SUMMIT I

                 Launched at the Ministerial Level:
Political Support and Commitment is Essential for any Mega Project




Washington, D.C.
 July 31, 2003
GEO Societal Benefit Areas

                                                        Biodiversity

Energy Management




            Climate                               Ecosystems
                              Disasters



                                                         Health
   Weather                                Water
                        Agriculture
Executing Successful Partnerships with NASA

            Global Exploration Strategy:
          The Framework for Coordination
• August 2006, 14 space agencies discussed the
  definition of a vision for globally coordinated space
  exploration.

• May 2007, release of
Executing Successful Partnerships with NASA

What is the Global Exploration Strategy?
• A high-level compelling story of the value of exploration that can be
  used to explain this effort to policy makers and the general public

• A blueprint that will serve as a starting point for:
   – Coordination: coordination among participants to maximize what
      can be accomplished
   – Collaboration: discussions between participants regarding areas
      of potential collaboration


                   The strategy focuses on
             destinations within the solar system
           where humans may one day live and work
Applying Lessons Learned to
    International Exploration of Space
 We will not be able to identify every contingency in advance so
  structure for cooperation must allow for flexibility.

 High-level political leadership may be necessary to garner
  international support/participation e.g. the ISS & GEO examples.

 Recognize the many similarities in partners plans/aspirations for
  exploration.

 Exploration beyond Earth orbit is an intrinsically global enterprise.

 International partnerships provide tangible benefits
  e.g. broadening public & political support, sharing cost & risk,
  enrich scientific & technical content, sustainability.
Executing Successful Partnerships with NASA


                    Conclusions
• Agreements should be mutually beneficial and binding
• Expect to share the risks as well as the benefits
• Expect to compromise
• Appreciate differing cultures, methods, national prerogatives
• Cooperation most often on a no-exchange of funds basis
• Barters work
• Partners responsibilities are “deliverables” not financial
• Be prepared to manage through political changes
• Cooperation can be hard but going alone can be harder
• Be a reliable and welcomed partner
• US ITARS – live with it !!
• NASA is a generous partner (though at times difficult!)
Back-Up Charts

   Factors Contributing to
 Canada’s Success with NASA
             And
Examples of Niche Contributions
Factors Contributing to Our Success
• Recognition: Canada - small space faring nation
• Ability to "identify" & "nurture" S&T niches
• Focus on areas where Canada excels
   o   Develop world-class expertise
   o   Unique leadership and contribution
   o   Desired and valued partner
• Deliberate & focused investments

• Anticipate the future through advanced R&D

• “Space Team Canada” approach i.e. govt, industry, academia
Examples of Niche Contributions
     RADARSAT- 1
     • Launch for data arrangement with NASA and NOAA
     • Nov 1995 to May 2008
     • Data for National Ice Service
     • Data for NASA, NOAA and USGS research
     • 1999 first mapping of Antarctica
                    RADARSAT- 2
                    • Public-Private-Partnership
                    • Some data sharing between
                      Canadian and U.S. Ice Service
                    • Opportunities for joint research
       RADARSAT-CONSTELLATION
       • Studies underway
       • Preliminary discussion for cooperation with
         NASA, NOAA and USGS

               EARTH OBSERVATION
Examples of Niche Contributions
                  James Webb Space Telescope
                  U.S. with ESA and CSA instruments
                                                       CSA
                  CSA: Fine Guidance Sensor           MOST
                       (critical for pointing)
                       Tuneable Filter Imager

ASTRONOMY
CSA
Cassiope
                        THEMIS           HELIOPHYSICS
                        Canadian
  ePOP                  Ground segment
instrument
MOST
Canada's "Humble" Space Telescope!




Opportunities for U.S. Guest Principal Investigators
Examples of Niche Contributions
         The Early Beginnings of
   Canada's Human Space Flight Program


• 1969 NASA approached Canada and Europe to join the Shuttle program
• 1969- 1975 technical studies led to Canadarm
• 1975 Canada-US Agreement:
    • Canada to fund R&D and 1st flight unit
    • US to buy 3 flight units
    • US responsible for R&O
    • Canada granted privileged access to Shuttle
• 1981 1st flight of Canadarm
• 1983 Canadian astronauts corps established
• 1984 1st Canadian astronaut mission

    HUMAN SPACE FLIGHT
Examples of Niche Contributions
               HUMAN
                   SPACE
                     FLIGHT




HUMAN SPACE FLIGHT
Criteria for Canada’s Participation in Exploration

          Contributions
      •   Early, Scalable,Transferable
      •   Critical, Visible and Welcomed
          Decision Criteria
      •   Visible to the Canadian Public
      •   Meets Canadian science goals
      •   Uses Canadian enabling/heritage technologies
      •   Develops sustainable core competencies
      •   Results in Canadians flying in space
      •   Consistent with the Global Exploration Strategy
Executing Successful Partnerships with NASA
    - International Partners’ Perspectives




            YOSHInori YOSHImura
           JAXA Washington Office

                  Feb. 9, 2010
            @NASA PM Challenge 2010
JAXA Organization and Resources
                                                                                                As of April 2009
                                         President
     Total Personnel                                                                  Annual Budget
           1670                            Executive                               199 B yen (2 B US$)
                                           Directors


           Policy Coordination              Admin. Management                       Technical Management

    Space             Space        Inst. of Space &       Lunar &          Human Space       Aviation         Aerospace R&D
Transportation      Applications    Astro. Science       Planetary         Systems and    Program Group         Directorate
   Mission            Mission                           Exploration         Utilization
 Directorate        Directorate                       Program Group          Mission
                                                                            Directorate




          Contribution to
           Realization of                               Challenge to
                                                                                                     Research &
     “Safe and Secure Society"                        Unknown Frontier
                                                                                                     Development
  Environment Observation                        Space Science                            Independent Ability for Space
  Disaster Monitoring                            Lunar and Planetary                     Activity
  Satellite Navigation &                        Exploration                                Contribution to Aerospace Industry
 Communication                                    International Space Station
Outline of the 2nd Mid-term Plan
                              (2008-2013)
Two major areas of activities in the 2nd Mid-term Plan
• Contribution toward a secure and prosperous
   society
    –     to place a special emphasis on
         (1) Global environment observation
         (2) Disaster monitoring and communication
         (3) Navigation by satellites
•       Expansion of human frontiers
    –     to utilize Kibo (Japanese Experiment Module) of ISS as
          a new platform for space activities of Japan and other
          countries;
    –     to promote space science program with a special
          emphasis on the fields which Japan possesses
          advantage;
    –     to formulate a Moon and planetary exploration program    2
Project Overview of the 2nd Mid-term Plan
    Environment           Contributions toward a Secure and Prosperous Society (R&D)
                   Global Precipitation                                                           Navigation Satellite
                     Measurement                                  Greenhouse Gases
                        Satellite/                                Observing Satellite
                     Dual-frequency                                  (GOSAT)
                   Precipitation Radar          Greenhouse
   Precipitation      (GPM/DPR)                 effect gases                                                       1st Quasi-Zenith
        Global Change Observation                                                                                      Satellite
                                                Cloud Aerosol Radiation
        Mission-Water(GCOM-W)
                                              Mission/Cloud Profiling Radar
                                                   (EarthCARE/CPR)                                                   GPS
                Global Change                                                                            Availability enhancement
 Moisture    Observation Mission-                 Cloud/Aerosol                                               ・Performance
             Climate(GCOM-C)                                                                                   enhancement


International Space Station(ISS)           Expansion of Human Frontiers                                  Space Explorer
                                                       Space Science                                                Successor of
   ISS/Japanese
                                                                                                                  SELenological and
 Experiment Module
                                                                                                                     ENgineering
     (JEM) Kibo
                                                                                                                  Explorer (SELENE)
                                                                                                                      KAGUYA
                                                                                         Int‟l Mercury
                                                               Venus Climate              Exploration               Successor of
                                              Radio Astronomy     Orbiter                   Project               Asteroid Explorer
                             X-ray Astronomy Satellite (ASTRO- (PLANET-C)               (BepiColombo)
        H-ⅡTransfer Vehicle                                                                                        (HAYABUSA)
                            Satellite (ASTRO-         G)
            (HTV)
                                     H)
                                           Development of Advanced Technologies                            Aeronautics
         Space Transportation


                 H-IIB
                                                                  Advanced Solid
             launch vehicle                                                                              MHI
                                                                     Rocket                                   Next Generation SST
                                                                                         To Contribute toward
                              LNG Propulsion System                                industry needs using fundamental
                                  (GX Rocket)                                                    tech
                                                                                                                                 3
International Cooperation with USA


• International cooperation between the United States and
  Japan started in 1969, when "The Japan-U.S. Joint
  Communiqué" on cooperation in space development was
  signed.
• Since then, JAXA has been participating in international
  projects, many of which are led by NASA. This includes
  the International Space Station as well as Earth Science,
  and Space Science missions.




                                                              4
Current Cooperative Projects with NASA
1.        ISS Cooperation
      •        Japanese Experiment Module “KIBO” and HTV/H2-B
      •        ISS Development, Operation and Utilization

2.        Space Exploration Cooperation (exploring future opportunities)
      •        International Space Exploration Coordination Group (ISECG)

3.        Earth Science Cooperation
      •        Aqua (AMSR-E), TRMM, DAICHI(ALOS), IBUKI (GOSAT), GPM , GCOM
      •        Decadal Survey Missions & GEOSS (exploring future opportunities)

4.        Space Science Cooperation
      •        Fermi, HINODE, SWIFT, NOZOMI, ASCA, ASTRO-H, KAGUYA, SUZAKU,
               HAYABUSA, HALCA, GEOTAIL
      •        Astrophysics & Planetary Science & Heliophysics


     Cooperation Levels:
           –   Level 0: Information & Data Exchange (Earth & Space Science)
           –   Level 1: Payload Provision (Earth & Space Science)
           –   Level 2: Joint HW Development (TRMM,GPM, etc.)
           –   Level 3: Joint Program (ISS)

                                                                                  5
Maintaining a close partnership with NASA
     has become indispensable for JAXA

• Almost all JAXA programs and projects involve some
  level of cooperation with NASA.
• JAXA uses almost identical development process and
  technical standards with NASA.

                    Please note that:

• JAXA covers almost same areas of activities as NASA
  does but with 1/10th the amount of resources (in terms of
  budget and JAXA staff).
• When NASA makes changes to its programs, the
  changes can impact JAXA – quickly and severely!
Lessons Learned (Things that should be done)

• Enthusiasm and tolerance are the key traits to emphasize when one
  seeks to engage partners and to sustain a partnership.
• Common goals and objectives need to be identified and shared
  among the partners to align their efforts.
• Cooperation must be based on mutual benefits.
• The best leaders are those who lead in a benevolent and reassuring
  fashion that supports partners‟ goals.
• An effective partnership is one that emphasizes:
   – Mutual respect & trust - personal relationships are key
   – Commitment to meet responsibilities and to the success of the
     joint project
• High level political endorsement is required to initiate large scale
  cooperation programs (e.g. future exploration initiatives).
• Public support is the key to sustaining large scale cooperation
  program (e.g. ISS and future exploration initiatives).
Lessons Learned (Things to avoid)

• Keep overall program goals (including those of your
  partners) in mind – not just NASA‟s goals.
• Don‟t try to do everything alone. Consider involving
  close partners in „critical path‟ roles (e.g. JAXA‟s
  provision of the HTV for the Space Station).
• Avoid making unilateral decisions – try first to indicate a
  common path and build a consensus.
• Listen to the suggestions of your partners – once in a
  while you may learn something!
• In managing joint projects, don‟t be „exclusive‟ – try to be
  „inclusive‟ whenever you can.
Conclusion

 As the world‟s largest and most successful space agency,
  NASA inspires and frequently leads space exploration and
      space applications programs throughout the world.


“You can always count on Americans to do the right thing,
             after they've tried everything else.”
                                      – Sir Winston Churchill



  I hope you do always the right thing… but without
                 doing everything else!
Backup Charts
Space Strategy and Organizations
            Cabinet Secretariat
                                                                      The Space
Cabinet                                                               Basic Law
                  The Strategic Headquarters                           (May 2008)
                  for Space Policy
                                        * Headed by Prime Minister
          Cabinet Office
                Council for S&T Policy (CSTP)                The Space Basic Plan
                                         Space Panel


          Ministry of Education, Culture, Sports,
          Science and Technology (MEXT)

                  Space Activities Commission (SAC)                  Japan Aerospace
                                                                     Exploration Agency
          Ministry of Internal Affairs & Communications

          Ministry of the Environment

                                                                JAXA Mid-term Plan
Basic Space Law of Japan

 Japan’s Space Basic Law was enacted on 26 May, 2008.
  Pillars of the Law are Diplomacy on Space, Industrial
  Development, and Security
 Secretariat of Strategic Headquarters for Space
  Development was established on 26 August, 2008.
  set up in the Cabinet Secretariat as the governmental space
  development management office.
 Space Basic Plan will be established in May 2009 approved
  by the Prime Minister.
 Review and modify the HQs for Space Policy, JAXA, and
  SAC within the next year


                                                                12
Outline of Basic Space Law
✔ Peaceful Use of Space
Promotion of Space Development and Utilization in line with international
agreements for space activities.
    (i.e. Space Development and Utilization shall be carried out pursuant to the treaties and other
       international agreements on space development and utilization in accordance with the idea of pacifist
       principles in the Constitution of Japan.)
✔ Improvement of Citizens' Lives, etc.
Utilization of Satellites contributing to Improvement of Citizens’ Lives, National
Security, etc.
✔ Promotion of Industries
Ensuring Autonomous Launch Capability Satellites, etc.
Promotion of Private Businesses on Space Development and Utilization
Maintenance and Improvement of Reliability of Technologies on Space
Development and Utilization
✔ Development of Human Society
Promotion of Space Science to contribute to realizing dreams of, and the
betterment of lives for, humankind.
✔ Promotion of International Cooperation, etc.
Promotion of International Cooptation for contributing to enhancing Japan’s role
in the international society and to the furtherance of Japan’s interests.
✔ Consideration of Environment Preservation
Promotion of Space development in harmony with the Environment,
and Ensuring International Cooperation on preservation of the Environment.
                                                                                                               13
JAXA Field Centers

  Reason Offices                                                Kakuda Space Ctr.
                                        Noshiro Testing Ctr.
 Washington, DC, USA

   Huston, TX, USA

    Paris, France
                                                                      Tsukuba Space Center
  Bangkok, Thailand                  Earth Observation Ctr.




                       Usuda Deep Space Ctr.
                                                                                    Katsuura T & C Stn.
                                                               JAXA Tokyo Office

Kagoshima Space Center

                                                               Aerospace Research Ctr.


                                        Sagamihara Campus


     Okinawa T & C Stn.                                                     Ogasawara Downrange Stn.
100M
                                    JAXA Budget Trend
        3000


                                                                                                           JAXA

                                                                                                           NASDA
        2500
                                                                                                           NAL

                                                                                                           IA
                                                                                                           S S

        2000




        1500




        1000




        500




          0
               1996   1997   1998   1999   2000   2001   2002   2003   2004   2005   2006   2007   2008   2009



                                                                Establishment of JAXA
                                                                    October, 2003                                  15
JAXA Budget for FY 2009
        Ratio for each field of program in JAXA Budget from GOJ
    Space Science                    Others
       $179M                                                       Reliability
                            41.1B      $411M                      Improvement
         17.9B
                             21%                            $92M Program
          9%                                                9.2 B
                                                             5%
Space Technology
   $165M
     16.5B
      9%
                                                                 Space Flight
                                                                 And Operation
Space Applications
    $312M                                                            $364M
      31.2B                                                     36.4 B
       16%                                                       19%
                                                   $402M
                                          ISS 40.2 B
       Total : $1.925B               $1= 100
                                              21%
                                                     (Total : 192.5B)
              ※ Budget was increased 2.6% from FY2008 (Total 187.5B)        16
ISS
      KIBO/Japanese Experiment Module




•KIBO means “hope” in Japanese
•JAXA’s share of Utilization and Operation= 12.8%   (in US Segment)
                                                                      17
ISS
                        HTV (H-II Transfer Vehicle)
- Unmanned cargo transfer spacecraft that will deliver up to 6 tons of supplies to ISS
- Key space transportation system technology of Japan together with the H-IIB launch
vehicle
- Successfully launched on Sep. 11, 2009 and disposed on Nov.1, 2009




                                                                HTV (Proto-flight model)
       HTV (Image)
                                                                December 25, 2008
                                                                                           18
H-IIB Launch Vehicle
HTV
      -JAXA and Mitsubishi Heavy Industries, LTD (MHI) are jointly
          developing H-ⅡB in order to launch HTV and to increase
          international competitiveness by providing wider range of
          launch capacity.
      -H-IIB has 2 liquid rocket engines ( LE-7A) in the first stage
      -Its first stage body is expanded from 4m to 5.2m in
          diameter from H-IIA

       Comparison of H-IIA and H-IIB

                                        H-IIA202      H-IIB

          Specifications   Length (m)     53           56
                           Mass (t)       289          551
                           SRB-A           2            4

       Maximum Launch GTO                  4.1          8
       Capacity (t) Orbit for HTV          -           16.5
                                                                 19
ISS
                       HTV (H-II Transfer Vehicle)
HTV plays a significant role in ISS operation and utilization

  HTV unique capabilities
     HTV transports external equipments indispensable for sustaining ISS system
      functions such as attitude control (ISS gyro) and electrical power (batteries);
      external experiment payloads; large (standard rack size) internal system
      equipments and experiment payloads; water and food for astronauts.




            ISS Gyro             Batteries          Internal Standard Racks

     After rendezvous flight to the ISS, HTV is docked to the
      ISS US-side port. The HTV pressurized section is the
      area where astronauts work for internal cargo transfer.

  HTV launch schedule
                                   2009      2010   2011   2012   2013    2014   2015

        One launch per year
                                                                                        20
Global Earth Observation System of Systems
                 (GEOSS)
 10 year Implementation Plan

                           9 Societal Benefit Areas


            Disasters             Climate           Water




   Health    Agriculture    Weather   Ecosystems   Energy   Biodiversity




                                                                           21
“IBUKI”GOSAT
         Greenhouse gases observing satellite(GOSAT)

 To monitor the distribution of the density of
carbon dioxide, etc. and contribute to the
activities for the prevention of global
warming. Monitoring at 3-day intervals.
 “IBUKI” was successfully launched on
Jan.23, 2009 (JST) and is now carried out
the initial calibration and validation
operations including comparing IBUKI data
and data acquired on the ground, confirming
the data accuracy, and making
compensations based on the data.
                                                                                   Successfully Deployed
                                                                             The photo taken by FGAN, Germany

 Current terrestrial observation points          GOSAT’s observation points (standard mode:56,000
 (257points)                                     points)




                                                                                                          22
GPM
                    (Global Precipitation Measurement)

-NASA and JAXA are working together to build and launch the GPM Core Satellite
-The core is the central precipitation-measuring observatory of GPM
  Dual-frequency Precipitation Radar (DPR)
  a high-resolution, multi-channel passive microwave (PMW) rain radiometer known as the
GPM Microwave Imager (GMI)
-The Core will also serve as the calibration reference system for a constellation of support
satellites.




                                                                                               23
GCOM
To continue global-scale observations of sea water temperatures and soil water, etc.
for the purpose of elucidating the global climate change and water circulation
mechanisms.
                                                                              Distribution of sea ice in
 Global Change Observation Mission                                               north polar region
                              (GCOM) The Advanced
   Water cycle observation satellite
                                                                              24 September 2007
                                                                              (the smallest on record)
               (GCOM-W)                     Microwave Scanning
 【scheduled to be launched in the period       Radiometer 2
       of the 2nd Mid-term Plan】


         Precipitation         Vapor
                              amounts
                                                                               Distribution of
          Sea surface          Sea ice
                                                                               sea ice on 22
         temperatures
                                                                               September
           Soil water       Snow depths                                        2005


                                                                  Monitoring of vegetation change
    Climate change observation satellite      multi-wavelength
                                                                      Autumn 2005                   Autumn 2006
               (GCOM-C)                             optical
                                                radiometer
                                                                                                  Vegetation index during
           vegetation        Land surface                                                         growing season is low
                             temperature
          sea surface          seawater
         temperatures            color                                                         wheatland

             clouds,                                             Crops yields of wheat was reduced low                 high
                                                                 by half in 2006 because of dry
             aerosol                                             weather.
                                                                                                      Vegetation index

                                                                                                                       24
International Charter - Space and Major Disasters

 to provide a unified system of space data acquisition and
  delivery to those affected by natural disasters through
  Authorized Users
 to support the provisions of the Charter
 to help to mitigate the effects of disasters on human life and
  property

JAXA joined in February 2005




                                                               25
Space Science and Space Explorer
Ex)
-Fermi
-HINODE
-SWIFT
-NOZOMI
-ASCA
-ASTRO-H
-KAGUYA
-SUZAKU
-HAYABUSA
-HALCA
-GEOTAIL
                                   26
KAGUYA
- To obtain data and information necessary for elucidating the Moon’s origin
  and its evolution as well as for exploring the possibility of utilizing the Moon
  in the future.
- To Acquire core technologies relating to the full-scale exploration of the
  Moon in the future.
- Launched Sep. 14, 2007, nominal operation during December 21, 2007 –
  October 30, 2008, extended operation till early summer, 2009.
- Collaboration with NASA for KAGUYA tracking for critical operation, KAGUYA
  data delivery for NASA LRO/LCROSS and future lunar mission planning,
  and KAGUYA data promotion and public outreach.
   Lunar Explorer                                                      3D image
   「KAGUYA」                                                        by Terrain Camera




 KAGUYA has 15 missions and observes the Moon from a lunar polar orbit at the altitude
 of 100km.                                                                           27
HAYABUSA
Demonstration of the technology needed for sample return from asteroid, using electric
propulsion, autonomous navigation, material sampling in small gravity field, and direct re-
entry from interplanetary orbit.

Launch on May 2003
Touch-down and Lift-off from Asteroid on Nov. 2005
Earth return on Jun. 2010

JPL supports telemetry, command, tracking operation, and orbit determination in critical
phases such as launch, earth swing-by, rendezvous with asteroid, and Earth reentry.
                                                             Roundtrip between Earth and
  Asteroid Explorer             Touch-down and Lift-off                 Asteroid
      Hayabusa                     from Asteroid surface       Earth return on June 2010




                                                                                          28

Mais conteúdo relacionado

Semelhante a Inter succes partnerships

EUNAWE Presentation Project Officer
EUNAWE Presentation Project OfficerEUNAWE Presentation Project Officer
EUNAWE Presentation Project Officerunawe
 
NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...
NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...
NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...American Astronautical Society
 
WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...
WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...
WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...grssieee
 
A Study On Space Debris
A Study On Space DebrisA Study On Space Debris
A Study On Space DebrisTara Hardin
 
PDFsam_merge.pdf
PDFsam_merge.pdf PDFsam_merge.pdf
PDFsam_merge.pdf WinnieChu21
 
110105 htap pilot_aqco_p_esip_dc
110105 htap pilot_aqco_p_esip_dc110105 htap pilot_aqco_p_esip_dc
110105 htap pilot_aqco_p_esip_dcRudolf Husar
 
C0.5: CEOS and Oceans - Chu Ishida, Alex Held
C0.5: CEOS and Oceans - Chu Ishida, Alex HeldC0.5: CEOS and Oceans - Chu Ishida, Alex Held
C0.5: CEOS and Oceans - Chu Ishida, Alex HeldBlue Planet Symposium
 
Lightning Talks: All EartCube Funded Projects
Lightning Talks: All EartCube Funded ProjectsLightning Talks: All EartCube Funded Projects
Lightning Talks: All EartCube Funded ProjectsEarthCube
 
Interagency Space debries Coordination committee.pdf
Interagency Space debries Coordination committee.pdfInteragency Space debries Coordination committee.pdf
Interagency Space debries Coordination committee.pdfAbhijeetkibe
 
SC7 Workshop 2: Big Data Challenges in building GEOSS
SC7 Workshop 2: Big Data Challenges in building GEOSSSC7 Workshop 2: Big Data Challenges in building GEOSS
SC7 Workshop 2: Big Data Challenges in building GEOSSBigData_Europe
 
Andrew.petro
Andrew.petroAndrew.petro
Andrew.petroNASAPMC
 
Andrew.petro
Andrew.petroAndrew.petro
Andrew.petroNASAPMC
 
Creating a Thriving Workplace: A conversation about the successes and challen...
Creating a Thriving Workplace: A conversation about the successes and challen...Creating a Thriving Workplace: A conversation about the successes and challen...
Creating a Thriving Workplace: A conversation about the successes and challen...CICoEPilot
 
Philippine Initiatives on the Applications of Space Technology on Hazard Mit...
Philippine Initiatives on the Applications of Space Technology  on Hazard Mit...Philippine Initiatives on the Applications of Space Technology  on Hazard Mit...
Philippine Initiatives on the Applications of Space Technology on Hazard Mit...UN-SPIDER
 
Community Webinar: Tune up for AGU
Community Webinar: Tune up for AGUCommunity Webinar: Tune up for AGU
Community Webinar: Tune up for AGUEarthCube
 

Semelhante a Inter succes partnerships (20)

EUNAWE Presentation Project Officer
EUNAWE Presentation Project OfficerEUNAWE Presentation Project Officer
EUNAWE Presentation Project Officer
 
How NASA Develops Project Management
How NASA Develops Project ManagementHow NASA Develops Project Management
How NASA Develops Project Management
 
NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...
NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...
NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...
 
FDL 2018 Virtual Briefing 1
FDL 2018 Virtual Briefing 1FDL 2018 Virtual Briefing 1
FDL 2018 Virtual Briefing 1
 
WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...
WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...
WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...
 
A Study On Space Debris
A Study On Space DebrisA Study On Space Debris
A Study On Space Debris
 
Herring Noaa Spring08
Herring Noaa Spring08Herring Noaa Spring08
Herring Noaa Spring08
 
PDFsam_merge.pdf
PDFsam_merge.pdf PDFsam_merge.pdf
PDFsam_merge.pdf
 
110105 htap pilot_aqco_p_esip_dc
110105 htap pilot_aqco_p_esip_dc110105 htap pilot_aqco_p_esip_dc
110105 htap pilot_aqco_p_esip_dc
 
C0.5: CEOS and Oceans - Chu Ishida, Alex Held
C0.5: CEOS and Oceans - Chu Ishida, Alex HeldC0.5: CEOS and Oceans - Chu Ishida, Alex Held
C0.5: CEOS and Oceans - Chu Ishida, Alex Held
 
Lightning Talks: All EartCube Funded Projects
Lightning Talks: All EartCube Funded ProjectsLightning Talks: All EartCube Funded Projects
Lightning Talks: All EartCube Funded Projects
 
Interagency Space debries Coordination committee.pdf
Interagency Space debries Coordination committee.pdfInteragency Space debries Coordination committee.pdf
Interagency Space debries Coordination committee.pdf
 
SC7 Workshop 2: Big Data Challenges in building GEOSS
SC7 Workshop 2: Big Data Challenges in building GEOSSSC7 Workshop 2: Big Data Challenges in building GEOSS
SC7 Workshop 2: Big Data Challenges in building GEOSS
 
Investments in the Future: NASA's Technology Programs
Investments in the Future: NASA's Technology ProgramsInvestments in the Future: NASA's Technology Programs
Investments in the Future: NASA's Technology Programs
 
Andrew.petro
Andrew.petroAndrew.petro
Andrew.petro
 
Andrew.petro
Andrew.petroAndrew.petro
Andrew.petro
 
Creating a Thriving Workplace: A conversation about the successes and challen...
Creating a Thriving Workplace: A conversation about the successes and challen...Creating a Thriving Workplace: A conversation about the successes and challen...
Creating a Thriving Workplace: A conversation about the successes and challen...
 
Philippine Initiatives on the Applications of Space Technology on Hazard Mit...
Philippine Initiatives on the Applications of Space Technology  on Hazard Mit...Philippine Initiatives on the Applications of Space Technology  on Hazard Mit...
Philippine Initiatives on the Applications of Space Technology on Hazard Mit...
 
Community Webinar: Tune up for AGU
Community Webinar: Tune up for AGUCommunity Webinar: Tune up for AGU
Community Webinar: Tune up for AGU
 
Goddard 2015: Bernhard Hufenbach, ESA
Goddard 2015: Bernhard Hufenbach, ESAGoddard 2015: Bernhard Hufenbach, ESA
Goddard 2015: Bernhard Hufenbach, ESA
 

Mais de NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 

Mais de NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Último

Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 

Último (20)

Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 

Inter succes partnerships

  • 1. Executing successful partnerships with NASA - International Partners’ Perspectives ESA Remarks 2010 NASA PM Challenge 9-10 February 2010, Galveston, Tx Andreas Diekmann ESA Washington Office 955 L’Enfant Plaza SW – Suite 7800 – Washington, DC 20024 Tel: (202) 488 4158; Email: andreas.diekmann@esa.int
  • 2. • 2000 staff + 2000 on-site contractors • Strong international orientation (internally + externally) • Research and Development Agency -> Operations handed over to operators (Arianespace, Eumetsat,..) Approved programmes per field of activity 4500 Technology 4000 3500 Navigation 3000 Telecom M€ 2500 HSF + human exploration 2000 Earth Observation 1500 1000 Launchers 500 Science + robotic exploration 0 Basic Activities 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2
  • 3. M€ ESA Budget - Funding Sources 4500 4000 3500 EC + others 3000 2500 ESA Decided in 2008 2000 1500 ESA 1000 Decided before 2008 500 ESA Science & Basic Activities 0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 3
  • 4. European public space players 18 ESA Member States 27 EU Member States ESA Space EU Council Council Councils European Space Policy national Space agencies ESA EC national Inter-governmental supranational FP7, National other Space programs ESA Programs ESA/EC co-funded: space-related Galileo, GMES activities 4
  • 5. History of NASA-ESA/ Europe space cooperation • March 1959: US offer to European scientists to fly experiments on US satellites • 1960ies: Close relations between NASA and ESRO • 1969: NASA offers Europe to participate in post-Apollo activities (Shuttle, Space Station) -> resulting in Spacelab (Shuttle cooperation did not materialise) • 1983: First ESA astronaut on Space Shuttle (STS-9 Spacelab) • 1984: President Reagan’s invitation to participate in Space Station Programme • 1990ies: Cooperative science missions (SOHO, Ulysses, Hubble) 5
  • 6. Current NASA-ESA space cooperation • International Space Station • Space exploration (human, robotic) • Space Science (Cassini/Huygens, Hubble, JWST,…) • Earth Science (joint search for new cooperation opportunities) • Space Transportation (recent MoU) • Space Situational Awareness (exchange of info) 6
  • 7. P eculiarities of NASA-ESA space cooperation • NASA is ESA’s most significant cooperation partner (in terms of history and volume of cooperation). • ESA/European space engineering and management culture is based on NASA model. • In many cases, there is long continuity of personal contacts between ESA and NASA programme and project managers. • ESA is much smaller than NASA. Therefore, (a) NASA mostly in leadership role, (b) the prominent mode of cooperation so far: contributions to each others missions; new trend: more integrated cooperation. 7
  • 8. I ngredients of a successful cooperation – from a project m anager’s view (1/ 2) • “Collaboration in a project should be like a marriage, not like a business contract” – in terms of demands on trust, transparency and credibility – “surprises” to be avoided. • Nevertheless, early, clear and detailed formulation and documentation of the project baseline (programmatic, technical and management) and establishment of mechanism to control that baseline. • Early and clear definition of inter-Agency interfaces (minimize the number and complexity of interfaces!) • Regular and frequent communication. 8
  • 9. I ngredients of a successful cooperation – from a project m anager’s view (2/ 2) • Recognition/Acceptance of differences in the processes of ESA and NASA – do not invent specific processes just for the specific project (however PM see need for “common processes and standards”). • Joint teams are important, but should not result in blurring of the responsibilities of each partner. • International cooperation requires the involvement of various capacities on both sides in addition to project management (e.g. external relations, legal service). Good communication and careful distribution of roles are important. 9
  • 10. Conclusions • There is a strong cooperation heritage and fundament – often manifested in trustful and long-lasting personal relationships between project managers on both sides. • Programmatic decisions can sometimes complicate or disrupt matters. • The future may show – more integrated cooperative programmes/projects (not just a “contribution-mode” of cooperation). – More partners in a project (intern., commercial, academia) This may pose new challenges for project managers. • Our PM cultures are similar. This should help overcoming those challenges. 10
  • 11. Executing Successful Partnerships With NASA An International Partner’s Perspective: Lessons Learned 2010 NASA PM Challenge Galveston, Texas Graham Gibbs Counsellor Space Affairs - Canadian Space Agency Canadian Embassy Washington February 9, 2010 Used with Permission
  • 12. Executing Successful Partnerships with NASA OUTLINE • Overview Canada-United Civil Space Cooperation • The Big Picture • Space Science and Earth Observation • International Space Station Lessons Learned for PMs • Applying Lessons Learned to International Exploration • Conclusions ATTACHED: A more detailed version of the presentation
  • 13. Executing Successful Partnerships with NASA Canada – United States Civil Space Cooperation • Human Space Flight (Shuttle & ISS) • Astronaut Corps (Cdn astronauts embedded at JSC) • Life & Microgravity Science (Shuttle & ISS) • Earth Science and Observation (Instruments & RADARSAT) • Astronomy (JWST and Cdn MOST) • Heliophysics (THEMIS & International Living With a Star) • Exploration (Mars Phoenix & MSL et al) • Earth Science & Observation (RADARSAT) • Ice Monitoring & Cooperation with the Canadian Ice Service (RADARSAT) • Earth Science & Observation (RADARSAT)
  • 14. Executing Successful Partnerships with NASA The Big Picture Lessons Learned From the Private Sector: The best agreements;  Might be difficult to negotiate but don't have to be referred to later.  Fair (profitable) for both/all parties. From the Public (Space) Sector:  Be prepared for national prerogatives,  Understand differing cultures,  Accept the risks as well as the benefits,  Funding; consistency & no-exchange,  Be prepared to seek compromises.
  • 15. Executing Successful Partnerships with NASA Space Science and Earth Observation 1 of 2 Some Realities to Consider - Positive and Negative  International collaboration among scientists,  International Announcements of Opportunity – most often competitive,  Projects usually on no-exchange-of-funds basis,  Obligations subject to "availability of appropriated funds",  Barters e.g. launch-for-data
  • 16. Executing Successful Partnerships with NASA Space Science and Earth Observation 2 of 2 Some Realities to Consider - Positive and Negative  Partners responsibilities are deliverables - not financial investment,  Agreements legally binding or political/morale commitments,  Data sharing,  National Security interests – technology transfer, data policies etc.
  • 17. Executing Successful Partnerships with NASA ISS Lessons Learned Implications for Project Managers  Managing the classical parameters (cost, schedule, performance) is no longer sufficient  Must manage through political changes that can/will have fundamental impact on program  Diplomatic skills are essential to the "first among equals" concept  International cooperation takes considerable extra time & effort  Flexibility and understanding are essential
  • 18. Applying Lessons Learned to International Exploration of Space  We will not be able to identify every contingency in advance so structure for cooperation must allow for flexibility.  High-level political leadership may be necessary to garner international support/participation e.g. the ISS & GEO examples.  Recognize the many similarities in partners plans/aspirations for exploration.  Exploration beyond Earth orbit is an intrinsically global enterprise.  International partnerships provide tangible benefits e.g. broadening public & political support, sharing cost & risk, enrich scientific & technical content, sustainability.
  • 19. Executing Successful Partnerships with NASA Conclusions • Agreements should be mutually beneficial and binding • Expect to share the risks as well as the benefits • Expect to compromise • Appreciate differing cultures, methods, national prerogatives • Cooperation most often on a no-exchange of funds basis • Barters work • Partners responsibilities are “deliverables” not financial • Be prepared to manage through political changes • Cooperation can be hard but going alone can be harder • Be a reliable and welcomed partner • US ITARS – live with it !! • NASA is a generous partner (though at times difficult!)
  • 20. Executing Successful Partnerships with NASA Thank You Graham Gibbs Counsellor Space Affairs - Canadian Space Agency Canadian Embassy graham.gibbs@asc-csa.gc.ca www.asc-csa.gc.ca
  • 21. HANDOUT Executing Successful Partnerships With NASA An International Partner’s Perspective: Lessons Learned 2010 NASA PM Challenge Galveston, Texas Graham Gibbs Counsellor Space Affairs - Canadian Space Agency Canadian Embassy Washington February 9, 2010
  • 22. Executing Successful Partnerships with NASA OUTLINE • Overview Canada-United Civil Space Cooperation • The Big Picture • Space Science and Earth Observation • International Space Station • Group on Earth Observations • The Global Exploration Strategy and the International Space Exploration Coordination Group • Conclusions
  • 23. Executing Successful Partnerships with NASA Canada – United States Civil Space Cooperation • Human Space Flight (Shuttle & ISS) • Astronaut Corps (Cdn astronauts embedded at JSC) • Life & Microgravity Science (Shuttle & ISS) • Earth Science and Observation (Instruments & RADARSAT) • Astronomy (JWST and Cdn MOST) • Heliophysics (THEMIS & International Living With a Star) • Exploration (Mars Phoenix & MSL et al) • Earth Science & Observation (RADARSAT) • Ice Monitoring & Cooperation with the Canadian Ice Service (RADARSAT) • Earth Science & Observation (RADARSAT)
  • 24. Executing Successful Partnerships with NASA The Big Picture Lessons Learned From the Private Sector: The best agreements;  Might be difficult to negotiate but don't have to be referred to later.  Fair (profitable) for both/all parties. From the Public (Space) Sector:  Be prepared for national prerogatives,  Understand differing cultures,  Accept the risks as well as the benefits,  Funding; consistency & no-exchange,  Be prepared to seek compromises.
  • 25. Executing Successful Partnerships with NASA Space Science and Earth Observation 1 of 2 Some Realities to Consider - Positive and Negative  International collaboration among scientists,  International Announcements of Opportunity – most often competitive,  Projects usually on no-exchange-of-funds basis,  Obligations subject to "availability of appropriated funds",  Barters e.g. launch-for-data
  • 26. Executing Successful Partnerships with NASA Space Science and Earth Observation 2 of 2 Some Realities to Consider - Positive and Negative  Partners responsibilities are deliverables - not financial investment,  Agreements legally binding or political/morale commitments,  Data sharing,  National Security interests – technology transfer, data policies etc.
  • 27. Executing Successful Partnerships with NASA Evolution of the ISS and Its Partnership Anticipate the Unexpected !  US Initiative-January 1984 (State of Union Address)  A Cold War demonstration of U.S. leadership and alliances  From Cold War instrument into post-Cold War cooperation  All partners now providing "critical elements" instead of "enhancements"  Specific contributions – some duplication  Shared Operations  Long Term Science  "Single" Destination in Space
  • 28. Executing Successful Partnerships with NASA Structure of the ISS Partnership IGA Art. 1: "…, under the lead role of the United States for overall management and coordination …" Intergovernmental Agreement: • Legal Regime IGA • Top-Level Political Commitments • Multilateral (15 nations) NASA/CSA NASA/ESA NASA/GOJ NASA/FSA Memoranda of Understanding: • Detailed Implementation Implementing • Roles & Responsibilities Arrangements • Obligations & Rights
  • 29. Executing Successful Partnerships with NASA ISS Lessons Learned Implications for Project Managers  Managing the classical parameters (cost, schedule, performance) is no longer sufficient  Must manage through political changes that can/will have fundamental impact on program  Diplomatic skills are essential to the "first among equals" concept  International cooperation takes considerable extra time & effort  Flexibility and understanding are essential
  • 30. EARTH OBSERVATION SUMMIT I Launched at the Ministerial Level: Political Support and Commitment is Essential for any Mega Project Washington, D.C. July 31, 2003
  • 31. GEO Societal Benefit Areas Biodiversity Energy Management Climate Ecosystems Disasters Health Weather Water Agriculture
  • 32. Executing Successful Partnerships with NASA Global Exploration Strategy: The Framework for Coordination • August 2006, 14 space agencies discussed the definition of a vision for globally coordinated space exploration. • May 2007, release of
  • 33. Executing Successful Partnerships with NASA What is the Global Exploration Strategy? • A high-level compelling story of the value of exploration that can be used to explain this effort to policy makers and the general public • A blueprint that will serve as a starting point for: – Coordination: coordination among participants to maximize what can be accomplished – Collaboration: discussions between participants regarding areas of potential collaboration The strategy focuses on destinations within the solar system where humans may one day live and work
  • 34. Applying Lessons Learned to International Exploration of Space  We will not be able to identify every contingency in advance so structure for cooperation must allow for flexibility.  High-level political leadership may be necessary to garner international support/participation e.g. the ISS & GEO examples.  Recognize the many similarities in partners plans/aspirations for exploration.  Exploration beyond Earth orbit is an intrinsically global enterprise.  International partnerships provide tangible benefits e.g. broadening public & political support, sharing cost & risk, enrich scientific & technical content, sustainability.
  • 35. Executing Successful Partnerships with NASA Conclusions • Agreements should be mutually beneficial and binding • Expect to share the risks as well as the benefits • Expect to compromise • Appreciate differing cultures, methods, national prerogatives • Cooperation most often on a no-exchange of funds basis • Barters work • Partners responsibilities are “deliverables” not financial • Be prepared to manage through political changes • Cooperation can be hard but going alone can be harder • Be a reliable and welcomed partner • US ITARS – live with it !! • NASA is a generous partner (though at times difficult!)
  • 36. Back-Up Charts Factors Contributing to Canada’s Success with NASA And Examples of Niche Contributions
  • 37. Factors Contributing to Our Success • Recognition: Canada - small space faring nation • Ability to "identify" & "nurture" S&T niches • Focus on areas where Canada excels o Develop world-class expertise o Unique leadership and contribution o Desired and valued partner • Deliberate & focused investments • Anticipate the future through advanced R&D • “Space Team Canada” approach i.e. govt, industry, academia
  • 38.
  • 39. Examples of Niche Contributions RADARSAT- 1 • Launch for data arrangement with NASA and NOAA • Nov 1995 to May 2008 • Data for National Ice Service • Data for NASA, NOAA and USGS research • 1999 first mapping of Antarctica RADARSAT- 2 • Public-Private-Partnership • Some data sharing between Canadian and U.S. Ice Service • Opportunities for joint research RADARSAT-CONSTELLATION • Studies underway • Preliminary discussion for cooperation with NASA, NOAA and USGS EARTH OBSERVATION
  • 40. Examples of Niche Contributions James Webb Space Telescope U.S. with ESA and CSA instruments CSA CSA: Fine Guidance Sensor MOST (critical for pointing) Tuneable Filter Imager ASTRONOMY CSA Cassiope THEMIS HELIOPHYSICS Canadian ePOP Ground segment instrument
  • 41. MOST Canada's "Humble" Space Telescope! Opportunities for U.S. Guest Principal Investigators
  • 42.
  • 43. Examples of Niche Contributions The Early Beginnings of Canada's Human Space Flight Program • 1969 NASA approached Canada and Europe to join the Shuttle program • 1969- 1975 technical studies led to Canadarm • 1975 Canada-US Agreement: • Canada to fund R&D and 1st flight unit • US to buy 3 flight units • US responsible for R&O • Canada granted privileged access to Shuttle • 1981 1st flight of Canadarm • 1983 Canadian astronauts corps established • 1984 1st Canadian astronaut mission HUMAN SPACE FLIGHT
  • 44. Examples of Niche Contributions HUMAN SPACE FLIGHT HUMAN SPACE FLIGHT
  • 45.
  • 46.
  • 47. Criteria for Canada’s Participation in Exploration Contributions • Early, Scalable,Transferable • Critical, Visible and Welcomed Decision Criteria • Visible to the Canadian Public • Meets Canadian science goals • Uses Canadian enabling/heritage technologies • Develops sustainable core competencies • Results in Canadians flying in space • Consistent with the Global Exploration Strategy
  • 48. Executing Successful Partnerships with NASA - International Partners’ Perspectives YOSHInori YOSHImura JAXA Washington Office Feb. 9, 2010 @NASA PM Challenge 2010
  • 49. JAXA Organization and Resources As of April 2009 President Total Personnel Annual Budget 1670 Executive 199 B yen (2 B US$) Directors Policy Coordination Admin. Management Technical Management Space Space Inst. of Space & Lunar & Human Space Aviation Aerospace R&D Transportation Applications Astro. Science Planetary Systems and Program Group Directorate Mission Mission Exploration Utilization Directorate Directorate Program Group Mission Directorate Contribution to Realization of Challenge to Research & “Safe and Secure Society" Unknown Frontier Development  Environment Observation  Space Science  Independent Ability for Space  Disaster Monitoring  Lunar and Planetary Activity  Satellite Navigation & Exploration  Contribution to Aerospace Industry Communication  International Space Station
  • 50. Outline of the 2nd Mid-term Plan (2008-2013) Two major areas of activities in the 2nd Mid-term Plan • Contribution toward a secure and prosperous society – to place a special emphasis on (1) Global environment observation (2) Disaster monitoring and communication (3) Navigation by satellites • Expansion of human frontiers – to utilize Kibo (Japanese Experiment Module) of ISS as a new platform for space activities of Japan and other countries; – to promote space science program with a special emphasis on the fields which Japan possesses advantage; – to formulate a Moon and planetary exploration program 2
  • 51. Project Overview of the 2nd Mid-term Plan Environment Contributions toward a Secure and Prosperous Society (R&D) Global Precipitation Navigation Satellite Measurement Greenhouse Gases Satellite/ Observing Satellite Dual-frequency (GOSAT) Precipitation Radar Greenhouse Precipitation (GPM/DPR) effect gases 1st Quasi-Zenith Global Change Observation Satellite Cloud Aerosol Radiation Mission-Water(GCOM-W) Mission/Cloud Profiling Radar (EarthCARE/CPR) GPS Global Change Availability enhancement Moisture Observation Mission- Cloud/Aerosol ・Performance Climate(GCOM-C) enhancement International Space Station(ISS) Expansion of Human Frontiers Space Explorer Space Science Successor of ISS/Japanese SELenological and Experiment Module ENgineering (JEM) Kibo Explorer (SELENE) KAGUYA Int‟l Mercury Venus Climate Exploration Successor of Radio Astronomy Orbiter Project Asteroid Explorer X-ray Astronomy Satellite (ASTRO- (PLANET-C) (BepiColombo) H-ⅡTransfer Vehicle (HAYABUSA) Satellite (ASTRO- G) (HTV) H) Development of Advanced Technologies Aeronautics Space Transportation H-IIB Advanced Solid launch vehicle MHI Rocket Next Generation SST To Contribute toward LNG Propulsion System industry needs using fundamental (GX Rocket) tech 3
  • 52. International Cooperation with USA • International cooperation between the United States and Japan started in 1969, when "The Japan-U.S. Joint Communiqué" on cooperation in space development was signed. • Since then, JAXA has been participating in international projects, many of which are led by NASA. This includes the International Space Station as well as Earth Science, and Space Science missions. 4
  • 53. Current Cooperative Projects with NASA 1. ISS Cooperation • Japanese Experiment Module “KIBO” and HTV/H2-B • ISS Development, Operation and Utilization 2. Space Exploration Cooperation (exploring future opportunities) • International Space Exploration Coordination Group (ISECG) 3. Earth Science Cooperation • Aqua (AMSR-E), TRMM, DAICHI(ALOS), IBUKI (GOSAT), GPM , GCOM • Decadal Survey Missions & GEOSS (exploring future opportunities) 4. Space Science Cooperation • Fermi, HINODE, SWIFT, NOZOMI, ASCA, ASTRO-H, KAGUYA, SUZAKU, HAYABUSA, HALCA, GEOTAIL • Astrophysics & Planetary Science & Heliophysics Cooperation Levels: – Level 0: Information & Data Exchange (Earth & Space Science) – Level 1: Payload Provision (Earth & Space Science) – Level 2: Joint HW Development (TRMM,GPM, etc.) – Level 3: Joint Program (ISS) 5
  • 54. Maintaining a close partnership with NASA has become indispensable for JAXA • Almost all JAXA programs and projects involve some level of cooperation with NASA. • JAXA uses almost identical development process and technical standards with NASA. Please note that: • JAXA covers almost same areas of activities as NASA does but with 1/10th the amount of resources (in terms of budget and JAXA staff). • When NASA makes changes to its programs, the changes can impact JAXA – quickly and severely!
  • 55. Lessons Learned (Things that should be done) • Enthusiasm and tolerance are the key traits to emphasize when one seeks to engage partners and to sustain a partnership. • Common goals and objectives need to be identified and shared among the partners to align their efforts. • Cooperation must be based on mutual benefits. • The best leaders are those who lead in a benevolent and reassuring fashion that supports partners‟ goals. • An effective partnership is one that emphasizes: – Mutual respect & trust - personal relationships are key – Commitment to meet responsibilities and to the success of the joint project • High level political endorsement is required to initiate large scale cooperation programs (e.g. future exploration initiatives). • Public support is the key to sustaining large scale cooperation program (e.g. ISS and future exploration initiatives).
  • 56. Lessons Learned (Things to avoid) • Keep overall program goals (including those of your partners) in mind – not just NASA‟s goals. • Don‟t try to do everything alone. Consider involving close partners in „critical path‟ roles (e.g. JAXA‟s provision of the HTV for the Space Station). • Avoid making unilateral decisions – try first to indicate a common path and build a consensus. • Listen to the suggestions of your partners – once in a while you may learn something! • In managing joint projects, don‟t be „exclusive‟ – try to be „inclusive‟ whenever you can.
  • 57. Conclusion As the world‟s largest and most successful space agency, NASA inspires and frequently leads space exploration and space applications programs throughout the world. “You can always count on Americans to do the right thing, after they've tried everything else.” – Sir Winston Churchill I hope you do always the right thing… but without doing everything else!
  • 59. Space Strategy and Organizations Cabinet Secretariat The Space Cabinet Basic Law The Strategic Headquarters (May 2008) for Space Policy * Headed by Prime Minister Cabinet Office Council for S&T Policy (CSTP) The Space Basic Plan Space Panel Ministry of Education, Culture, Sports, Science and Technology (MEXT) Space Activities Commission (SAC) Japan Aerospace Exploration Agency Ministry of Internal Affairs & Communications Ministry of the Environment JAXA Mid-term Plan
  • 60. Basic Space Law of Japan  Japan’s Space Basic Law was enacted on 26 May, 2008. Pillars of the Law are Diplomacy on Space, Industrial Development, and Security  Secretariat of Strategic Headquarters for Space Development was established on 26 August, 2008. set up in the Cabinet Secretariat as the governmental space development management office.  Space Basic Plan will be established in May 2009 approved by the Prime Minister.  Review and modify the HQs for Space Policy, JAXA, and SAC within the next year 12
  • 61. Outline of Basic Space Law ✔ Peaceful Use of Space Promotion of Space Development and Utilization in line with international agreements for space activities. (i.e. Space Development and Utilization shall be carried out pursuant to the treaties and other international agreements on space development and utilization in accordance with the idea of pacifist principles in the Constitution of Japan.) ✔ Improvement of Citizens' Lives, etc. Utilization of Satellites contributing to Improvement of Citizens’ Lives, National Security, etc. ✔ Promotion of Industries Ensuring Autonomous Launch Capability Satellites, etc. Promotion of Private Businesses on Space Development and Utilization Maintenance and Improvement of Reliability of Technologies on Space Development and Utilization ✔ Development of Human Society Promotion of Space Science to contribute to realizing dreams of, and the betterment of lives for, humankind. ✔ Promotion of International Cooperation, etc. Promotion of International Cooptation for contributing to enhancing Japan’s role in the international society and to the furtherance of Japan’s interests. ✔ Consideration of Environment Preservation Promotion of Space development in harmony with the Environment, and Ensuring International Cooperation on preservation of the Environment. 13
  • 62. JAXA Field Centers Reason Offices Kakuda Space Ctr. Noshiro Testing Ctr. Washington, DC, USA Huston, TX, USA Paris, France Tsukuba Space Center Bangkok, Thailand Earth Observation Ctr. Usuda Deep Space Ctr. Katsuura T & C Stn. JAXA Tokyo Office Kagoshima Space Center Aerospace Research Ctr. Sagamihara Campus Okinawa T & C Stn. Ogasawara Downrange Stn.
  • 63. 100M JAXA Budget Trend 3000 JAXA NASDA 2500 NAL IA S S 2000 1500 1000 500 0 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 Establishment of JAXA October, 2003 15
  • 64. JAXA Budget for FY 2009 Ratio for each field of program in JAXA Budget from GOJ Space Science Others $179M Reliability 41.1B $411M Improvement 17.9B 21% $92M Program 9% 9.2 B 5% Space Technology $165M 16.5B 9% Space Flight And Operation Space Applications $312M $364M 31.2B 36.4 B 16% 19% $402M ISS 40.2 B Total : $1.925B $1= 100 21% (Total : 192.5B) ※ Budget was increased 2.6% from FY2008 (Total 187.5B) 16
  • 65. ISS KIBO/Japanese Experiment Module •KIBO means “hope” in Japanese •JAXA’s share of Utilization and Operation= 12.8% (in US Segment) 17
  • 66. ISS HTV (H-II Transfer Vehicle) - Unmanned cargo transfer spacecraft that will deliver up to 6 tons of supplies to ISS - Key space transportation system technology of Japan together with the H-IIB launch vehicle - Successfully launched on Sep. 11, 2009 and disposed on Nov.1, 2009 HTV (Proto-flight model) HTV (Image) December 25, 2008 18
  • 67. H-IIB Launch Vehicle HTV -JAXA and Mitsubishi Heavy Industries, LTD (MHI) are jointly developing H-ⅡB in order to launch HTV and to increase international competitiveness by providing wider range of launch capacity. -H-IIB has 2 liquid rocket engines ( LE-7A) in the first stage -Its first stage body is expanded from 4m to 5.2m in diameter from H-IIA Comparison of H-IIA and H-IIB H-IIA202 H-IIB Specifications Length (m) 53 56 Mass (t) 289 551 SRB-A 2 4 Maximum Launch GTO 4.1 8 Capacity (t) Orbit for HTV - 16.5 19
  • 68. ISS HTV (H-II Transfer Vehicle) HTV plays a significant role in ISS operation and utilization HTV unique capabilities  HTV transports external equipments indispensable for sustaining ISS system functions such as attitude control (ISS gyro) and electrical power (batteries); external experiment payloads; large (standard rack size) internal system equipments and experiment payloads; water and food for astronauts. ISS Gyro Batteries Internal Standard Racks  After rendezvous flight to the ISS, HTV is docked to the ISS US-side port. The HTV pressurized section is the area where astronauts work for internal cargo transfer. HTV launch schedule 2009 2010 2011 2012 2013 2014 2015 One launch per year 20
  • 69. Global Earth Observation System of Systems (GEOSS) 10 year Implementation Plan 9 Societal Benefit Areas Disasters Climate Water Health Agriculture Weather Ecosystems Energy Biodiversity 21
  • 70. “IBUKI”GOSAT Greenhouse gases observing satellite(GOSAT) To monitor the distribution of the density of carbon dioxide, etc. and contribute to the activities for the prevention of global warming. Monitoring at 3-day intervals. “IBUKI” was successfully launched on Jan.23, 2009 (JST) and is now carried out the initial calibration and validation operations including comparing IBUKI data and data acquired on the ground, confirming the data accuracy, and making compensations based on the data. Successfully Deployed The photo taken by FGAN, Germany Current terrestrial observation points GOSAT’s observation points (standard mode:56,000 (257points) points) 22
  • 71. GPM (Global Precipitation Measurement) -NASA and JAXA are working together to build and launch the GPM Core Satellite -The core is the central precipitation-measuring observatory of GPM Dual-frequency Precipitation Radar (DPR) a high-resolution, multi-channel passive microwave (PMW) rain radiometer known as the GPM Microwave Imager (GMI) -The Core will also serve as the calibration reference system for a constellation of support satellites. 23
  • 72. GCOM To continue global-scale observations of sea water temperatures and soil water, etc. for the purpose of elucidating the global climate change and water circulation mechanisms. Distribution of sea ice in Global Change Observation Mission north polar region (GCOM) The Advanced Water cycle observation satellite 24 September 2007 (the smallest on record) (GCOM-W) Microwave Scanning 【scheduled to be launched in the period Radiometer 2 of the 2nd Mid-term Plan】 Precipitation Vapor amounts Distribution of Sea surface Sea ice sea ice on 22 temperatures September Soil water Snow depths 2005 Monitoring of vegetation change Climate change observation satellite multi-wavelength Autumn 2005 Autumn 2006 (GCOM-C) optical radiometer Vegetation index during vegetation Land surface growing season is low temperature sea surface seawater temperatures color wheatland clouds, Crops yields of wheat was reduced low high by half in 2006 because of dry aerosol weather. Vegetation index 24
  • 73. International Charter - Space and Major Disasters  to provide a unified system of space data acquisition and delivery to those affected by natural disasters through Authorized Users  to support the provisions of the Charter  to help to mitigate the effects of disasters on human life and property JAXA joined in February 2005 25
  • 74. Space Science and Space Explorer Ex) -Fermi -HINODE -SWIFT -NOZOMI -ASCA -ASTRO-H -KAGUYA -SUZAKU -HAYABUSA -HALCA -GEOTAIL 26
  • 75. KAGUYA - To obtain data and information necessary for elucidating the Moon’s origin and its evolution as well as for exploring the possibility of utilizing the Moon in the future. - To Acquire core technologies relating to the full-scale exploration of the Moon in the future. - Launched Sep. 14, 2007, nominal operation during December 21, 2007 – October 30, 2008, extended operation till early summer, 2009. - Collaboration with NASA for KAGUYA tracking for critical operation, KAGUYA data delivery for NASA LRO/LCROSS and future lunar mission planning, and KAGUYA data promotion and public outreach. Lunar Explorer 3D image 「KAGUYA」 by Terrain Camera KAGUYA has 15 missions and observes the Moon from a lunar polar orbit at the altitude of 100km. 27
  • 76. HAYABUSA Demonstration of the technology needed for sample return from asteroid, using electric propulsion, autonomous navigation, material sampling in small gravity field, and direct re- entry from interplanetary orbit. Launch on May 2003 Touch-down and Lift-off from Asteroid on Nov. 2005 Earth return on Jun. 2010 JPL supports telemetry, command, tracking operation, and orbit determination in critical phases such as launch, earth swing-by, rendezvous with asteroid, and Earth reentry. Roundtrip between Earth and Asteroid Explorer Touch-down and Lift-off Asteroid Hayabusa from Asteroid surface Earth return on June 2010 28