Architecture for Cost
                                                     Analytics Process
                                                          Environment
                                                                                                                      Tony Harvey
                                                                                               Daren Elliott
                                                                                    NASA 2012 PM Challenge
                                                                                          February 22, 2012
                                    Los Angeles  Washington, D.C.  Boston  Chantilly  Huntsville  Dayton  Santa Barbara
             Albuquerque  Colorado Springs  Goddard Space Flight Center  Johnson Space Center  Ogden  Patuxent River  Washington Navy Yard
                     Ft. Meade  Ft. Monmouth  Dahlgren  Quantico  Cleveland  Montgomery  Silver Spring  San Diego  Tampa  Tacoma
                                 Aberdeen  Oklahoma City  Eglin AFB  San Antonio  New Orleans  Denver  Vandenberg AFB

PRT 114 03 January 2012                                                                                                                             1 of 42
Outline/Agenda


 Project Lifecycle Process
   Context
 Cost Analytics Framework
   Overview
 Fundamental Cost Data
 Data Iteration
 Cost Analytics
 Tools for Cost Analytics
 Cost Analytics in the
   Project Lifecycle




  PRT 114 03 January 2012     Approved For Public Release                2 of 42
Project Lifecycle Process Overview

 High-level Project Lifecycle
          Definition Phase (Pre-Phase A)
                  Simple Definition of Functionality with Value Proposition (High Level Cost
                   and Schedule )
          Acquisition Phase (Phase A)
                  Detailed Definition with Cost and Schedule through End-of-Life
          Development Phase (Phases B to D)
                  Cost and Schedule updates
          Operation Phase (Phase E)
                  Cost and Schedule Updates
 Use Cost Analytics in Each Phase




  PRT 114 03 January 2012                   Approved For Public Release                         3 of 42
Project Life Cycle Conceptual View
              Definition Phase           Acquisition Phase               Development Phase         Operations Phase

                    Concept
                    Definition


                    Feasibility             Measurement
                     Analysis                 Criteria


                                               Project
                                              Definition


                                           Cost / Schedule                         Management
                                             Calibration                            Decisions


                                                                                      Project
                                                                                  Implementation
                     Analysis
                      Tools                                                        Performance       Management
                                                                                     Analysis         Decisions

         Project Analytics Data Store                                                                   Project
                                                                                                      Modification/
                                                                                                       Sustaining
                              Project
           Project
                            Management
          Database                           Reporting                                               Performance
                             Database
                                              Tools                                                    Analysis



PRT 114 03 January 2012                             Approved For Public Release                                       4 of 42
Infrastructure Goals


 Functionality
          Provide Cost and Schedule Data Management
          Provide Cost and Schedule Analysis Tools
          Provide Project Engineering support for Performance analyses
          Provide Program Management support for Schedule and Budget
           excursion analyses
 Maintainability
          Support Easy Database Changes
          Support Easy Tool Additions
          Support Data Load/Unload




  PRT 114 03 January 2012           Approved For Public Release               5 of 42
Infrastructure Options

 Infrastructure Options for Technology Solution
         Use a Web UI and MS/SQLServer
              Hosted on Network Servers
              Accessible to Authorized Users in NDC domain

         Use Desktop Application and Apache Derby Database
              Installed and Executed on a PC/Laptop
              Restricted to PC Users
              Uses Network Drives for inter-User communications




 PRT 114 03 January 2012                 Approved For Public Release         6 of 42
Web Infrastructure


        Network
        Servers                                                          MOP
                                                                   Cost Analysis Data


                                      Authenticated Database




                                               IP Network / JSC VPN




Users



                                                         (2) Log into                        (3) File
                                                                                                          (4) Create
                                                      Infrastructure to                   Uploaded into
                            (1) Prepare Cost                                                               Reports
                                                            upload                             DB
                            Data XLS File(s)




  PRT 114 03 January 2012                                   Approved For Public Release                                7 of 42
Desktop Infrastructure


                                                                                             Network Drive
                                                                                       Transfer/Reporting Medium




    Embedded
    Database                               User
                                     Cost Analysis Data




                                        (2) File                     (3) Export Cost
                                     Uploaded into                       Data and
                  (1) Prepare Cost
                                          DB                             Reports
                  Data XLS File(s)




PRT 114 03 January 2012                      Approved For Public Release                                           8 of 42
Fundamental Cost Data

 QUESTION: What do you get when you… ?
          Identify EVERY Cost Driver and capture them in an Excel Spreadsheet
          Identify the Schedule Tasks associated with each Cost Item
          Separate different Cost Data Types into separate Tabs
                  E.g. Material, Travel, Level of Effort, Software Development scope

 ANSWER: Something like…

     CxP MOP Cost Analysis Data Requirements (CADRe)
 CADRe data is a NASA HQ requirement to demonstrate “credible
   cost estimates”
 MOP delivered CADRe data to HQ up to MOP PDR

 A Normalized data format was used for the MOP CADRe data
   suitable for storage in a relational database
 Tecolote developed a CADRe database on an MOD network server



  PRT 114 03 January 2012                         Approved For Public Release           9 of 42
Changing to Schedule Oriented Cost data

 MOP CADRe data was Cost Data allocated to Fiscal
  Years
 When the Schedule changed the Cost data needed to be
  changed to re-spread it across Fiscal Years to reflect the
  Schedule changes
 Recently the CADRe data has been redesigned to
  become Schedule Oriented
         Cost Items are associated with Schedule Tasks
         Changes to the Project Schedule automatically re-spread the cost




 PRT 114 03 January 2012           Approved For Public Release               10 of 42
CADRe data

 What data is supported?
         Schedule Data
                 MS/Project files can be used to supply schedule data
                 All costs are associated with a Schedule Task
         Work Breakdown Structure (WBS) Data
                 CADRe data can use ANY Project defined WBS
                 All costs are associated with a WBS Item
         Travel Cost Data
         Material Cost Data
         Level of Effort Cost Data
         Software Development Cost Data




 PRT 114 03 January 2012                   Approved For Public Release                11 of 42
Schedule Data
                                                                                                                            Low         Likeliest         High
  Schedule Task Name               Start       End        Duration    Predecessors          % Complete     Status Date    Multiplier    Multiplier       Multiplier
MSProj11                           10/3/2011  9/30/2020        2347                                  10%      15Jun2012           0.9                1           1.2
Kickoff                            10/3/2011  10/3/2011           0                                 100%      15Jun2012             1                1             1
APA Development                    10/3/2011  4/26/2013         410                                  62%      15Jun2012           0.9                1           1.2
APA Design                         10/3/2011 10/21/2011          15                     1           100%      15Jun2012           0.9                1           1.2
APA PBR                           10/21/2011 10/21/2011           0                     3           100%      15Jun2012             1                1             1
APA Implementation                10/24/2011  3/29/2013         375                                  63%      15Jun2012           0.9                1           1.2
APA User Interface                10/24/2011  3/29/2013         375                     4            50%      15Jun2012           0.9                1           1.2
APA Constraints Checker           10/24/2011  11/2/2012         270                     4            70%      15Jun2012           0.9                1           1.2
APA Database Manager              10/24/2011  11/9/2012         275                     4            60%      15Jun2012           0.9                1           1.2
APA Schedule Manager              10/24/2011  8/24/2012         220                     4            80%      15Jun2012           0.9                1           1.2




                                                                                                                                 Subject Matter
                                                                                                                                 Expert




        PRT 114 03 January 2012                                       Approved For Public Release                                                              12 of 42
WBS Data




                                    WBS #                                WBS Name
                          1.                Another Planning Application
                          1.1               APA Management
                          1.2               APA Development
                          1.2.1             APA Systems Engineering
                          1.2.2             APA Implementation
                          1.2.2.1           APA User Interface
                          1.2.2.2           APA Constraints Checker
                          1.2.2.3           APA Database Manager
                          1.2.2.4           APA Schedule Manager
                          1.2.3             APA Deployment
                          1.3               APA Sustaining
                          1.4               APA Modifications




PRT 114 03 January 2012                               Approved For Public Release              13 of 42
Material Cost Data



                                            Activity Material                                                Purchase Unit Price FY of
WBS #              WBS Name                  Type     Type       Material Description            BOE           Type       $      price
1.       Another Planning Application         Dev   COTS HW     Development Server              BOM #3       Buy               $5,000    10




           Single                   Unit
           Config Num              Spares                          Cost        Low                Likeliest   High
            Qty Configs             Qty         Assoc. Task     Distribution Multiplier           Multiplier Multiplier          FY11         FY12
                    1          1        -     APA Development   Start                    0.90            1             1.2              $0    $5,253




                                                                 Schedule Task Name                Start            End        Duration

                                                                MSProj11                           10/3/2011       9/30/2020        2347
                                                                Kickoff                            10/3/2011       10/3/2011           0
                                                                APA Development                    10/3/2011       4/26/2013         410




     PRT 114 03 January 2012                               Approved For Public Release                                                            14 of 42
Travel Cost Data


                                                                   Num        Daily Trip
                                           Activity    Num   Num Days Per Lodging Travel BY of Total Cost
WBS #                WBS Name               Type      People Trips /Trip Diem Cost  Cost price    (BY)
1.         Another Planning Application      Dev        2           4         3       $75             $150    $1,000   10         $13,400




         BY of                           Cost            Low            Likeliest          High
         price       Assoc. Task      Distribution     Multiplier       Multiplier        Multiplier         FY11      FY12     FY13        FY14
         10        APA Development   Level                  1                1.1              1.2             $0       $9,855   $5,783       $0




                                          Schedule Task Name              Start            End        Duration

                                      MSProj11                           10/3/2011        9/30/2020           2347
                                      Kickoff                            10/3/2011        10/3/2011              0
                                      APA Development                    10/3/2011        4/26/2013            410




     PRT 114 03 January 2012                                Approved For Public Release                                                            15 of 42
Level of Effort (LOE) Data



                                               Activity                        Level of
 WBS #             WBS Name          Cost Type  Type       Assoc. Task          Effort       FY11   FY12       FY13         FY14       FY15
1.1        APA Management            FTE          Dev     APA Development              0.5      -      0.50        0.29         -          -
1.2.1      APA Systems Engineering   EP           Dev     APA Design                   4.0      -      0.20         -           -          -
1.2.3      APA Deployment            EP           Dev     APA Deployment               4.0      -       -          0.28         -          -
1.3        APA Sustaining            EP           Sus     APA Sustaining               2.0      -       -          1.02        2.00       2.00
1.4        APA Modifications         EP           Mod     APA Modification             -        -       -           -           -          -




                                                                             Schedule Task Name     Start       End        Duration
                                                                           APA Development          10/3/2011 4/26/2013          410
                                                                           APA Design               10/3/2011 10/21/2011          15
                                                                           APA Deployment            4/1/2013 4/26/2013           20
                                                                           APA Sustaining           3/29/2013 9/30/2020         1957




         PRT 114 03 January 2012                             Approved For Public Release                                                 16 of 42
(SEER) Software Data

                                                                 Cost           Activity   Size          Newly           Size Pre- % change to
     WBS #                           WBS Name                    Type            Type      Units       Developed          exists    Pre-exist
1.2.2.1              APA User Interface                         EP                Dev      KSLOC                    70             -                  0%
1.2.2.2              APA Constraints Checker                    EP                Dev      KSLOC                -                      81            10%
1.2.2.3              APA Database Manager                       EP                Dev      KSLOC                -                      50            10%
1.2.2.4              APA Schedule Manager                       EP                Dev      KSLOC                -                      90            10%


                                                                       Software
      Size        % change          COTS Type -   # Separate           Phase At
     Reuse        to Reuse             Size       Programs             Estimate         Language         Application Type
           -                 0%   None                2              Proposal              Java         Graphical User Interface
           -                 0%   None                2              Proposal              Java             Expert System
           -                 0%   None                2              Proposal              Java           Data Warehousing
           -                 0%   None                2              Proposal              Java           Data Warehousing



          Development             Development ROM Size /        Staff             Assoc. Task for
            Method                 Standard   Staff Year        Years                Phase1                FY11          FY12     FY13        FY14
               Incremental    DO-178B Level C             4.0          8.75   APA User Interface                -         5.74         3.01     -
                 RUP Full     DO-178B Level C             4.0          3.43   APA Constraints Checker           -         3.12         0.30     -
                  Spiral      DO-178B Level C             4.0          1.83   APA Database Manager              -         1.64         0.19     -
                  Spiral      DO-178B Level C             4.0          3.70   APA Schedule Manager              -         3.70           -      -




                                                                                             Schedule Task Name                   Start         End        Duration

                                                                                           APA User Interface                    10/24/2011    3/29/2013         375
                                                                                           APA Constraints Checker               10/24/2011    11/2/2012         270
                                                                                           APA Database Manager                  10/24/2011    11/9/2012         275
                                                                                           APA Schedule Manager                  10/24/2011    8/24/2012         220

          PRT 114 03 January 2012                                        Approved For Public Release                                                                   17 of 42
Data Iteration

 Cost Estimation Events are used to record Multiple Data
  Snapshots in the Database
         MCR, SDR, PDR, CDR, etc.
         Quarterly Baseline Reviews
         Monthly Status Reports
         Weekly Project Reviews
 Multiple data snapshots provide more opportunities for
  Cost Analysis
         Performance analyses from comparing two snapshots
              Schedule Performance Analyses
              Cost Performance Analyses

         Trending analyses
              Changes in scope over time
              Changes in Cost Estimate over time
              Changes in Schedule over time


 PRT 114 03 January 2012                 Approved For Public Release                    18 of 42
Basic Cost Analytics
Requirements
+ Design

                                                 Effort                                      Cost Loaded
                                             Work to be done                                    Schedule
                                             (i.e. estimated labor +                       A plan to do the work
                                             material cost)
Technology
                                              Productivity
                                                Metrics

Resources

                                                                                              Cost Profiles
                                                                                                     Cost analytics


          Budget


06   07   08   09   10   11   12   13   14




           PRT 114 03 January 2012                                     Approved For Public Release                    19 of 42
Extended Cost Analytics
Requirements
+ Design                                                                                                                        Total Project Cost
                                                                                                                                     (w/ LOE)
                                                 Effort                                      Cost Loaded                        p
                                             Work to be done                                    Schedule
                                             (i.e. estimated labor +                       A plan to do the work
                                             material cost)
Technology
                                                                                                                                                $

                                              Productivity                                                                      Project Risks
                                                Metrics

Resources
                                               Emperical
                                               Heuristics                                     Cost Profiles                        Project
                                                                        External                     Cost analytics             Completion Date
                                                                        Events
          Budget                              Utilization
                                              Capacity to do
                                                  work
06   07   08   09   10   11   12   13   14




                                                                                                      = Source of Uncertainty
           PRT 114 03 January 2012                                     Approved For Public Release                                                  20 of 42
Tools for Cost Analytics

 SEER-SEM for Software Estimation
 ACEIT for Cost Estimation

 ACEIT for Cost and Schedule Confidence Level
  Analyses
 Schedule Comparison for Schedule Performance
  Analyses
 Cost Profile Comparison for Cost Performance Analysis




 PRT 114 03 January 2012   Approved For Public Release    21 of 42
Cost Analytics in the Project Lifecycle

 Definition Phase (Pre-Phase A)
         Project Business Case Justification
 Acquisition Phase (Phase A)
         Detailed Budget Analyses
 Development Phase (Phases B to D)
         Development Cost and Schedule Performance Analyses
 Operation Phase (Phase E)
         Operations Cost and Schedule Performance Analyses




 PRT 114 03 January 2012             Approved For Public Release   22 of 42
Process/ Data Flow Architecture

                           Data Mined from
  Project Business
                            Development                                            Project
       Case
                               Process                                            Dashboard




  Project Scorecard
                           Updated Cost /                              Project
  + Detailed Cost /                                                                       Heuristic Data /
                           Schedule Data                              Analytics
   Schedule Data                                                                             Metrics
                                                                      Database




                            Planning Data                                           Multi-
                                                                    Budget Data
                               Updates                                             Project
                                                                                  Dashboard



Pre-Phase A                                                     Phases A to E


PRT 114 03 January 2012                      Approved For Public Release                                     23 of 42
Data Collection - Project Definition

 Primary Focus is the “Business Case”
          Use Business Case Surveys
          Use Business Case Scorecard
          Use CADRe Detailed Cost Data
          Collect Risk (Threat) Data
          Collect “Replaceable” Costs
               Costs that will occur if Project is NOT performed
               Costs that will be replaced if Project IS performed

          Create Business Case Summary from input data
               Summarize detailed cost/schedule data
               Derive ROI data




  PRT 114 03 January 2012                Approved For Public Release   24 of 42
Business Case Data
                                                                  Quantitative     Cost Savings                          ROI/NRI after 10 years     $381,000

                                                                                           Balanced Project Scorecard
                                                                                                                        Category          Rating    Score
 Status items created include                                                                                        Reuse
                                                                                                                      Extensibility
                                                                                                                                      >80%
                                                                                                                                      Med
                                                                                                                                                             27
                                                                                                                                                              9
                                                                                                                                      Multiple
                                                                                     Future Software Cost Avoidance
          Project Scorecard                                                                                          Reusability
                                                                                                                      Flexibility
                                                                                                                                      Groups
                                                                                                                                      Significant
                                                                                                                                                              9
                                                                                                                                                             15
                                                                                                                      Standards       Compliant              27
                                                                                                                      Ops Need        Mandatory              45
          Cost Profile                                              Qualitative

                                                                                                                      Ops Scope
                                                                                                                                      Multiple
                                                                                                                                      Groups                  9
                                                                                          Customer Satisfaction
                                                                                                                      $ Avoidance     Med                    15
          Savings (ROI) profile                                                                                      Accessibility Some                     12
                                                                                                                      Security      Low                      18
                                                                                         Integration Complexity
          Project Schedule/ Milestone Chart                                                                          TouchPoints Med                         6
                                                                                                                                                            192
                                                                                                                                      Qual Score
                                                                                                                                      Context           56%




  PRT 114 03 January 2012           Approved For Public Release                                                                                         25 of 42
Data Collection - Project Development

 Cost and Schedule Data is collected and stored throughout the
   Project Lifecycle


 – Capture the pre-kickoff baseline data
 – Establish reporting cycles for capturing
   data iterations
 – Process Data for status and performance
   analyses




  PRT 114 03 January 2012      Approved For Public Release        26 of 42
Project Schedule Status

 Schedule data captured in database

 Summary Status charts created for Project Dashboard




 PRT 114 03 January 2012   Approved For Public Release   27 of 42
Project Cost Performance




 Shows Planned vs. Actual Cost Performance

 Burn-down Chart shows Baseline Cost-to-complete over time and
   Actual Costs



 PRT 114 03 January 2012   Approved For Public Release            28 of 42
Project Schedule Performance Metrics


                                                  Percent    Start Finish                                   Old      Projected
Name               Start        Finish  Duration Complete     Slip Slip PDWS PDWP ADWP    SV    SPI  SCPI Duration   Duration
Task 1           1-Jan-00     12-Jan-00    12      100%        0      2   10  10   12      0     1   0.834  12           12
Task 2           5-Jan-00     14-Jan-00    10      80%         0      0   10   8   10     -2    0.8   0.8   10          10.5
Task 3           8-Jan-00     17-Jan-00    10      70%         0      0    8   7    8     -1   0.875 0.875  10         10.43
Task 4          14-Jan-00     18-Jan-00    5        0%         0      0    2   0    2     -2     0   0.715   5           7




        Provides Performance Indices for Schedule Tasks much like EVM
         indices
        Compares two iterations of the Project’s schedule
        Measures actual progress against planned progress during interval
         between schedules
        Identifies Schedule items that need attention
        Provides Projected Task Duration based on measured performance
                                                             EXAMPLE


    PRT 114 03 January 2012                                 Approved For Public Release                                      29 of 42
Project Excursions (What-Ifs)

 Program Management must handle many pressures to control
   projects due to
          Budget Cuts
          Project Overruns
          Multiple Projects Competing for limited Funds
 Cost Analytics must support
          Schedule Excursions
          Budget Constraint Excursions




  PRT 114 03 January 2012           Approved For Public Release   30 of 42
Web Framework Status

 There is a CxP MOP CADRe Database on an MOD Network Server

 The Web UI to the MOP CADRe DB can be used to Import and
   Export data
 CxP MOP users can request access to the Web UI

 CxP MOP users can be authorized to access to the Web UI

 The SEER-SEM tool runs on user request to create Software
   Development Estimates
 The new Database Schema for Schedule Based Cost Data has been
   defined




  PRT 114 03 January 2012   Approved For Public Release           31 of 42
Desktop Framework Status

 Developed Primarily as an Analytics Tool Development Platform

 The UI supports multiple database instances

 Tools exist to
          Import Schedule Based Cost Data
          Export Cost Data Spreadsheets
          Update CADRe data from Project Schedules
          Create Schedule Performance Status
          Create a Milestone Excursion ACEIT model data
          Perform Budget Constraint Analyses




  PRT 114 03 January 2012          Approved For Public Release    32 of 42
Thank You
                                  Tony Harvey (aharvey@tecolote.com)




PRT 114 PRT 114 03 2012
        03 January January 2012               Approved For Public Release   33 of 42
Backup

 CADRe Submission to HQ
 Detailed Process Flow Charts

 Multi-Layered Management Concept

 Detailed Business Case Results




 PRT 114 03 January 2012   Approved For Public Release            34 of 42
When is CADRe Data Required?
       NASA HQ requires CADRe submissions 5 times in a project’s life
      Program
      Phases
                                              Formulation                                               Implementation

 Flight Projects Pre-Phase A: Phase A:                   Phase B:                     Phase C:         Phase D:             Phase E:
                                                                                                                                          Phase F:
   Life Cycle      Concept     Concept                                                                Fabrication,         Operations &
                                                                                                                                          Disposal
     Phases         Studies  Development            Preliminary Design           Detailed Design    Assembly & Test        Sustainment
                                          SDR                         PDR                     CDR          Launc
  Traditional                                                                                              h
   Waterfall
 Development
  or Directed                             1         1a               2           2a                 3                  4              5
   Missions
                                 Down
      AO-Driven                  Select                                   CR
                                          Select Step 2
       Projects                  Step 1
                                                1                    2          2a                  3                  4              5
Legend
               GPMC Mission Decision Review/ICR                   All parts of CADRe due 30 days
                                                           2
                                                                                                                   4        CADRe, All Parts
                                                                  after site review
  1
               All parts of CADRe due 30 days                                                                               90 days after launch,
               after site review                                                                                            as built or as deployed
                                                           2a     CADRe update, if necessary                                configuration
 1a            CADRe update, if necessary
                                                                                                                   5        CADRe, Part C only
                                                           3      Update as necessary                                       during
               CADRe delivered; based on                          30 days after CDR
  11
                                                                                                                            last year of planned
               Concept Study Report (CSR)
                                                                                                                            project life
               and winning proposal
       PRT 114 03 January 2012                                  Approved For Public Release                                                          35 of 42
Project Process Details




PRT 114 03 January 2012   Approved For Public Release     36 of 42
Program Management Detail




PRT 114 03 January 2012    Approved For Public Release   37 of 42
Multi-Layered Management Concept




PRT 114 03 January 2012           Approved For Public Release   38 of 42
Project Cost Profile

      Provides statement of Resource Requirements over time
               Total Cost per BCC
               By Tasks using WBS
                   Shows Cost Breakdown over time
                   Collect CADRe Data at Detailed Level
                   Identify Summary WBS Items in Detailed Data

               By Activity Type
                     Shows cost separated by Development, Modification, and Sustaining
                                                                                                                $2,000
     Source      Activity
    Data Type     Type      Cost Type   FY10      FY11        FY12      FY13       FY14      FY15               $1,800

SW              Dev         FTE             -           -        -           -         -         -
                                                                                                                $1,600
SW              Mod         FTE             -           -        -           -         -         -
SW              Sus         FTE             -           -        -           -         -         -              $1,400
SW              Dev         EP            17.49        8.72      -           -         -         -
                                                                                                                $1,200
SW              Mod         EP              -          3.87     7.74        7.71      3.85       -
SW              Sus         EP              -          0.51     1.03        1.03      0.51       -              $1,000




                                                                                                       RY$, M
LOE             Dev         FTE            1.00        0.50      -           -         -         -
LOE             Mod         FTE             -           -        -           -         -         -               $800

LOE             Sus         FTE             -          1.00     2.00        2.00      1.00       -
                                                                                                                 $600
LOE             Dev         EP              -           -        -           -         -         -
LOE             Mod         EP              -           -        -           -         -         -               $400
LOE             Sus         EP              -          5.00    10.00       10.00      5.00       -
                                                                                                                 $200
Trav            Dev         Travel      $319.91     $165.10    $0.00       $0.00     $0.00     $0.00
Trav            Mod         Travel        $0.00   $1,807.01    $0.00       $0.00     $0.00     $0.00               $0
Trav            Sus         Travel        $0.00       $0.00    $0.00       $0.00 $1,736.13     $0.00                 FY07   FY08   FY09   FY10   FY11   FY12     FY13     FY14   FY15   FY16   FY17   FY18   FY19   FY20

Mat             Dev         Material      $0.00       $0.00    $0.00       $0.00     $0.00     $0.00                     Task I           Task II              Task III             Task IV            Task V
Mat             Mod         Material      $0.00       $0.00    $0.00       $0.00     $0.00     $0.00
Mat             Sus         Material      $0.00       $0.00    $0.00       $0.00     $0.00     $0.00




        PRT 114 03 January 2012                                        Approved For Public Release                                                                                                                     39 of 42
ROI Chart

 Shows Costs vs. Savings
          Per BCC
 Calculate Savings From
          CADRe Detailed Cost Data
          “Replaceable” Costs
                Costs that will occur if Project is NOT performed
                Costs that will be replaced if Project IS performed

 As Costs change ROI can be Re-Calculated




  PRT 114 03 January 2012                 Approved For Public Release           40 of 42
Project Scorecard
                                                Quantitative       Cost Savings                              ROI/NRI after 10 years         $381,000

 Provides Qualitative                                                        Balanced Project Scorecard
                                                                                                            Category          Rating       Score
   Rating                                                                                                 Reuse           >80%                      27
                                                                                                          Extensibility   Med                        9
 Final Score can be                                                  Future Software Cost Avoidance
                                                                                                                          Multiple
                                                                                                          Reusability     Groups                     9
   used for Option                                                                                        Flexibility     Significant               15
                                                                                                          Standards       Compliant                 27
   comparison                                      Qualitative
                                                                                                          Ops Need        Mandatory                 45
                                                                                                                          Multiple

 Identical to current                                                      Customer Satisfaction
                                                                                                          Ops Scope
                                                                                                          $ Avoidance
                                                                                                                          Groups
                                                                                                                          Med
                                                                                                                                                     9
                                                                                                                                                    15
   BCC scorecard                                                                                          Accessibility Some                        12
                                                                                                          Security      Low                         18
          With textual rating                                              Integration Complexity
                                                                                                          TouchPoints Med                            6
                                                                                                                                                   192
           drop-down lists                                                                                              Qual Score
                                 Quantitative     Cost Savings        10 yr ROI            $381,000              $381,000
                                                                                                                        Context         $381,000 56%
 Data provided by                                       Qualitative Criteria              Option 1              Option 2              Option 3
   Project team and               Qualitative
                                    Scores
                                                       Future      Reuse
                                                   Software Cost Extensibility
                                                                                             >80%
                                                                                             Med
                                                                                                                  < 10%
                                                                                                                   High
                                                                                                                                        30-40%
                                                                                                                                          Low
   stored in DB                                      Avoidance Reusability
                                                                   Flexibility
                                                                                        Multiple Groups
                                                                                          Significant
                                                                                                               Limited Use
                                                                                                                Complete
                                                                                                                                   Throughout MOD
                                                                                                                                          Little
                                                                   Standards              Compliant           Non-standard                Little
                                                     Customer Ops Need                   Mandatory            Nice to have            Big benefits
                                                    Satisfaction Ops Scope              Multiple Groups        Limited Use         Throughout MOD
                                                                   $ Avoidance               Med                  None                    Low
                                                                   Accessibility             Some               Restricted           Not restricted
                                                    Integration Security                      Low                  High                   Low
                                                    Complexity TouchPoints                   Med                   Med                    Med
                                                                   Numerical Score            192                   57                     141
                                                                   Qual Score Context         56%                  17%                    41%

  PRT 114 03 January 2012              Approved For Public Release                                                                             41 of 42
Project Schedule/ Milestone Chart
 Provides Summary Schedule Data

 Schedule Data is collected in CADRe data

 CADRe data can be updated from Project Schedule

 CADRe data identifies Summary Schedule items

 Milestone Chart created from Project Schedule data held in the
    CADRe data




 PRT 114 03 January 2012          Approved For Public Release      42 of 42

Mais conteúdo relacionado

Mais procurados

Murphy.dar jean.jean
Murphy.dar jean.jeanMurphy.dar jean.jean
Murphy.dar jean.jeanNASAPMC
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frankNASAPMC
 
Mahmood porter
Mahmood porterMahmood porter
Mahmood porterNASAPMC
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsenNASAPMC
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreysNASAPMC
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joeNASAPMC
 
Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1NASAPMC
 
Matt.gonzales
Matt.gonzalesMatt.gonzales
Matt.gonzalesNASAPMC
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinalNASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.garyNASAPMC
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.yNASAPMC
 
Carmichael.kevin
Carmichael.kevinCarmichael.kevin
Carmichael.kevinNASAPMC
 
Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.rNASAPMC
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthewNASAPMC
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paulNASAPMC
 
R simpson elee
R simpson eleeR simpson elee
R simpson eleeNASAPMC
 
Semancik.susan
Semancik.susanSemancik.susan
Semancik.susanNASAPMC
 
Sandra smalley
Sandra smalleySandra smalley
Sandra smalleyNASAPMC
 
Esker.linda
Esker.lindaEsker.linda
Esker.lindaNASAPMC
 
Noneman.steven
Noneman.stevenNoneman.steven
Noneman.stevenNASAPMC
 

Mais procurados (20)

Murphy.dar jean.jean
Murphy.dar jean.jeanMurphy.dar jean.jean
Murphy.dar jean.jean
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
 
Mahmood porter
Mahmood porterMahmood porter
Mahmood porter
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
 
Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1
 
Matt.gonzales
Matt.gonzalesMatt.gonzales
Matt.gonzales
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinal
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
 
Carmichael.kevin
Carmichael.kevinCarmichael.kevin
Carmichael.kevin
 
Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.r
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
 
R simpson elee
R simpson eleeR simpson elee
R simpson elee
 
Semancik.susan
Semancik.susanSemancik.susan
Semancik.susan
 
Sandra smalley
Sandra smalleySandra smalley
Sandra smalley
 
Esker.linda
Esker.lindaEsker.linda
Esker.linda
 
Noneman.steven
Noneman.stevenNoneman.steven
Noneman.steven
 

Destaque

Mitchell.michael
Mitchell.michaelMitchell.michael
Mitchell.michaelNASAPMC
 
Adesh.jain
Adesh.jainAdesh.jain
Adesh.jainNASAPMC
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.ciolettiNASAPMC
 
Chris.hardcastle
Chris.hardcastleChris.hardcastle
Chris.hardcastleNASAPMC
 
Rider.stephen
Rider.stephenRider.stephen
Rider.stephenNASAPMC
 
Seftas.george
Seftas.georgeSeftas.george
Seftas.georgeNASAPMC
 
Cynthia.calhoun
Cynthia.calhounCynthia.calhoun
Cynthia.calhounNASAPMC
 
Costello kenneth
Costello kennethCostello kenneth
Costello kennethNASAPMC
 
Millis.marc
Millis.marcMillis.marc
Millis.marcNASAPMC
 
Bryan.oconnor
Bryan.oconnorBryan.oconnor
Bryan.oconnorNASAPMC
 
Richard.grammier
Richard.grammierRichard.grammier
Richard.grammierNASAPMC
 
Lisa mc cann
Lisa mc cannLisa mc cann
Lisa mc cannNASAPMC
 
Kline.robinson
Kline.robinsonKline.robinson
Kline.robinsonNASAPMC
 
Gwyn.smith
Gwyn.smithGwyn.smith
Gwyn.smithNASAPMC
 
Zimmerman barbier
Zimmerman barbierZimmerman barbier
Zimmerman barbierNASAPMC
 
Le roy ward
Le roy wardLe roy ward
Le roy wardNASAPMC
 
Backup hesenperger kottmeyer
Backup hesenperger kottmeyerBackup hesenperger kottmeyer
Backup hesenperger kottmeyerNASAPMC
 
Fletcher risk vs_innovation_120220
Fletcher risk vs_innovation_120220Fletcher risk vs_innovation_120220
Fletcher risk vs_innovation_120220NASAPMC
 
Boyer.roger
Boyer.rogerBoyer.roger
Boyer.rogerNASAPMC
 

Destaque (20)

Mitchell.michael
Mitchell.michaelMitchell.michael
Mitchell.michael
 
Mino
MinoMino
Mino
 
Adesh.jain
Adesh.jainAdesh.jain
Adesh.jain
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.cioletti
 
Chris.hardcastle
Chris.hardcastleChris.hardcastle
Chris.hardcastle
 
Rider.stephen
Rider.stephenRider.stephen
Rider.stephen
 
Seftas.george
Seftas.georgeSeftas.george
Seftas.george
 
Cynthia.calhoun
Cynthia.calhounCynthia.calhoun
Cynthia.calhoun
 
Costello kenneth
Costello kennethCostello kenneth
Costello kenneth
 
Millis.marc
Millis.marcMillis.marc
Millis.marc
 
Bryan.oconnor
Bryan.oconnorBryan.oconnor
Bryan.oconnor
 
Richard.grammier
Richard.grammierRichard.grammier
Richard.grammier
 
Lisa mc cann
Lisa mc cannLisa mc cann
Lisa mc cann
 
Kline.robinson
Kline.robinsonKline.robinson
Kline.robinson
 
Gwyn.smith
Gwyn.smithGwyn.smith
Gwyn.smith
 
Zimmerman barbier
Zimmerman barbierZimmerman barbier
Zimmerman barbier
 
Le roy ward
Le roy wardLe roy ward
Le roy ward
 
Backup hesenperger kottmeyer
Backup hesenperger kottmeyerBackup hesenperger kottmeyer
Backup hesenperger kottmeyer
 
Fletcher risk vs_innovation_120220
Fletcher risk vs_innovation_120220Fletcher risk vs_innovation_120220
Fletcher risk vs_innovation_120220
 
Boyer.roger
Boyer.rogerBoyer.roger
Boyer.roger
 

Semelhante a Harvey elliott

Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?Digite Inc
 
Collaborate 2012 - the never ending road of project management presentation c...
Collaborate 2012 - the never ending road of project management presentation c...Collaborate 2012 - the never ending road of project management presentation c...
Collaborate 2012 - the never ending road of project management presentation c...Chain Sys Corporation
 
Prime Dimensions Capabilities
Prime Dimensions CapabilitiesPrime Dimensions Capabilities
Prime Dimensions Capabilitiesdrowan
 
Mapping Manager Product Overview
Mapping Manager Product OverviewMapping Manager Product Overview
Mapping Manager Product OverviewRakesh Kumar
 
Aras Innovator PLM Deployment Methodology
Aras Innovator PLM Deployment MethodologyAras Innovator PLM Deployment Methodology
Aras Innovator PLM Deployment MethodologyAras
 
Persistent Analytical Instrumentation Expertise
Persistent Analytical Instrumentation ExpertisePersistent Analytical Instrumentation Expertise
Persistent Analytical Instrumentation ExpertiseSebastien RATTIER
 
Chen.tim
Chen.timChen.tim
Chen.timNASAPMC
 
BI the Agile Way
BI the Agile WayBI the Agile Way
BI the Agile Waynvvrajesh
 
Utilizing Kubotek ECO Manager Product Suite to Reduce Engineering Costs
Utilizing Kubotek ECO Manager Product Suite to Reduce Engineering CostsUtilizing Kubotek ECO Manager Product Suite to Reduce Engineering Costs
Utilizing Kubotek ECO Manager Product Suite to Reduce Engineering CostsKubotek USA
 
Centralizing sequence analysis
Centralizing sequence analysisCentralizing sequence analysis
Centralizing sequence analysisDenis C. Bauer
 
Study of solution development methodology for small size projects.
Study of solution development methodology for small size projects.Study of solution development methodology for small size projects.
Study of solution development methodology for small size projects.Joon ho Park
 
The Color of Money - Priortization of User Tasks
The Color of Money - Priortization of User TasksThe Color of Money - Priortization of User Tasks
The Color of Money - Priortization of User TasksLen Conte
 
Walley.tina
Walley.tinaWalley.tina
Walley.tinaNASAPMC
 
Rebecca White, Pmp
Rebecca White, PmpRebecca White, Pmp
Rebecca White, PmpRebeccaWhite
 
Application migration guideline document
Application migration guideline documentApplication migration guideline document
Application migration guideline documentThomas Bronack
 

Semelhante a Harvey elliott (20)

Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?
 
Feasible
FeasibleFeasible
Feasible
 
Collaborate 2012 - the never ending road of project management presentation c...
Collaborate 2012 - the never ending road of project management presentation c...Collaborate 2012 - the never ending road of project management presentation c...
Collaborate 2012 - the never ending road of project management presentation c...
 
Prime Dimensions Capabilities
Prime Dimensions CapabilitiesPrime Dimensions Capabilities
Prime Dimensions Capabilities
 
Mapping Manager Product Overview
Mapping Manager Product OverviewMapping Manager Product Overview
Mapping Manager Product Overview
 
Aras Innovator PLM Deployment Methodology
Aras Innovator PLM Deployment MethodologyAras Innovator PLM Deployment Methodology
Aras Innovator PLM Deployment Methodology
 
Unit03: Process and Business Models
Unit03: Process and Business ModelsUnit03: Process and Business Models
Unit03: Process and Business Models
 
Brochure for pmvt
Brochure for pmvtBrochure for pmvt
Brochure for pmvt
 
Persistent Analytical Instrumentation Expertise
Persistent Analytical Instrumentation ExpertisePersistent Analytical Instrumentation Expertise
Persistent Analytical Instrumentation Expertise
 
Energy and engineering services leverages growth
Energy and engineering services leverages growthEnergy and engineering services leverages growth
Energy and engineering services leverages growth
 
Chen.tim
Chen.timChen.tim
Chen.tim
 
BI the Agile Way
BI the Agile WayBI the Agile Way
BI the Agile Way
 
Utilizing Kubotek ECO Manager Product Suite to Reduce Engineering Costs
Utilizing Kubotek ECO Manager Product Suite to Reduce Engineering CostsUtilizing Kubotek ECO Manager Product Suite to Reduce Engineering Costs
Utilizing Kubotek ECO Manager Product Suite to Reduce Engineering Costs
 
Centralizing sequence analysis
Centralizing sequence analysisCentralizing sequence analysis
Centralizing sequence analysis
 
Study of solution development methodology for small size projects.
Study of solution development methodology for small size projects.Study of solution development methodology for small size projects.
Study of solution development methodology for small size projects.
 
Lean six-sigma-project-charter-template
Lean six-sigma-project-charter-templateLean six-sigma-project-charter-template
Lean six-sigma-project-charter-template
 
The Color of Money - Priortization of User Tasks
The Color of Money - Priortization of User TasksThe Color of Money - Priortization of User Tasks
The Color of Money - Priortization of User Tasks
 
Walley.tina
Walley.tinaWalley.tina
Walley.tina
 
Rebecca White, Pmp
Rebecca White, PmpRebecca White, Pmp
Rebecca White, Pmp
 
Application migration guideline document
Application migration guideline documentApplication migration guideline document
Application migration guideline document
 

Mais de NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerryNASAPMC
 

Mais de NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
 

Último

Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 

Último (20)

Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 

Harvey elliott

  • 1. Architecture for Cost Analytics Process Environment Tony Harvey Daren Elliott NASA 2012 PM Challenge February 22, 2012  Los Angeles  Washington, D.C.  Boston  Chantilly  Huntsville  Dayton  Santa Barbara  Albuquerque  Colorado Springs  Goddard Space Flight Center  Johnson Space Center  Ogden  Patuxent River  Washington Navy Yard  Ft. Meade  Ft. Monmouth  Dahlgren  Quantico  Cleveland  Montgomery  Silver Spring  San Diego  Tampa  Tacoma  Aberdeen  Oklahoma City  Eglin AFB  San Antonio  New Orleans  Denver  Vandenberg AFB PRT 114 03 January 2012 1 of 42
  • 2. Outline/Agenda  Project Lifecycle Process Context  Cost Analytics Framework Overview  Fundamental Cost Data  Data Iteration  Cost Analytics  Tools for Cost Analytics  Cost Analytics in the Project Lifecycle PRT 114 03 January 2012 Approved For Public Release 2 of 42
  • 3. Project Lifecycle Process Overview  High-level Project Lifecycle  Definition Phase (Pre-Phase A)  Simple Definition of Functionality with Value Proposition (High Level Cost and Schedule )  Acquisition Phase (Phase A)  Detailed Definition with Cost and Schedule through End-of-Life  Development Phase (Phases B to D)  Cost and Schedule updates  Operation Phase (Phase E)  Cost and Schedule Updates  Use Cost Analytics in Each Phase PRT 114 03 January 2012 Approved For Public Release 3 of 42
  • 4. Project Life Cycle Conceptual View Definition Phase Acquisition Phase Development Phase Operations Phase Concept Definition Feasibility Measurement Analysis Criteria Project Definition Cost / Schedule Management Calibration Decisions Project Implementation Analysis Tools Performance Management Analysis Decisions Project Analytics Data Store Project Modification/ Sustaining Project Project Management Database Reporting Performance Database Tools Analysis PRT 114 03 January 2012 Approved For Public Release 4 of 42
  • 5. Infrastructure Goals  Functionality  Provide Cost and Schedule Data Management  Provide Cost and Schedule Analysis Tools  Provide Project Engineering support for Performance analyses  Provide Program Management support for Schedule and Budget excursion analyses  Maintainability  Support Easy Database Changes  Support Easy Tool Additions  Support Data Load/Unload PRT 114 03 January 2012 Approved For Public Release 5 of 42
  • 6. Infrastructure Options  Infrastructure Options for Technology Solution  Use a Web UI and MS/SQLServer  Hosted on Network Servers  Accessible to Authorized Users in NDC domain  Use Desktop Application and Apache Derby Database  Installed and Executed on a PC/Laptop  Restricted to PC Users  Uses Network Drives for inter-User communications PRT 114 03 January 2012 Approved For Public Release 6 of 42
  • 7. Web Infrastructure Network Servers MOP Cost Analysis Data Authenticated Database IP Network / JSC VPN Users (2) Log into (3) File (4) Create Infrastructure to Uploaded into (1) Prepare Cost Reports upload DB Data XLS File(s) PRT 114 03 January 2012 Approved For Public Release 7 of 42
  • 8. Desktop Infrastructure Network Drive Transfer/Reporting Medium Embedded Database User Cost Analysis Data (2) File (3) Export Cost Uploaded into Data and (1) Prepare Cost DB Reports Data XLS File(s) PRT 114 03 January 2012 Approved For Public Release 8 of 42
  • 9. Fundamental Cost Data  QUESTION: What do you get when you… ?  Identify EVERY Cost Driver and capture them in an Excel Spreadsheet  Identify the Schedule Tasks associated with each Cost Item  Separate different Cost Data Types into separate Tabs  E.g. Material, Travel, Level of Effort, Software Development scope  ANSWER: Something like… CxP MOP Cost Analysis Data Requirements (CADRe)  CADRe data is a NASA HQ requirement to demonstrate “credible cost estimates”  MOP delivered CADRe data to HQ up to MOP PDR  A Normalized data format was used for the MOP CADRe data suitable for storage in a relational database  Tecolote developed a CADRe database on an MOD network server PRT 114 03 January 2012 Approved For Public Release 9 of 42
  • 10. Changing to Schedule Oriented Cost data  MOP CADRe data was Cost Data allocated to Fiscal Years  When the Schedule changed the Cost data needed to be changed to re-spread it across Fiscal Years to reflect the Schedule changes  Recently the CADRe data has been redesigned to become Schedule Oriented  Cost Items are associated with Schedule Tasks  Changes to the Project Schedule automatically re-spread the cost PRT 114 03 January 2012 Approved For Public Release 10 of 42
  • 11. CADRe data  What data is supported?  Schedule Data  MS/Project files can be used to supply schedule data  All costs are associated with a Schedule Task  Work Breakdown Structure (WBS) Data  CADRe data can use ANY Project defined WBS  All costs are associated with a WBS Item  Travel Cost Data  Material Cost Data  Level of Effort Cost Data  Software Development Cost Data PRT 114 03 January 2012 Approved For Public Release 11 of 42
  • 12. Schedule Data Low Likeliest High Schedule Task Name Start End Duration Predecessors % Complete Status Date Multiplier Multiplier Multiplier MSProj11 10/3/2011 9/30/2020 2347 10% 15Jun2012 0.9 1 1.2 Kickoff 10/3/2011 10/3/2011 0 100% 15Jun2012 1 1 1 APA Development 10/3/2011 4/26/2013 410 62% 15Jun2012 0.9 1 1.2 APA Design 10/3/2011 10/21/2011 15 1 100% 15Jun2012 0.9 1 1.2 APA PBR 10/21/2011 10/21/2011 0 3 100% 15Jun2012 1 1 1 APA Implementation 10/24/2011 3/29/2013 375 63% 15Jun2012 0.9 1 1.2 APA User Interface 10/24/2011 3/29/2013 375 4 50% 15Jun2012 0.9 1 1.2 APA Constraints Checker 10/24/2011 11/2/2012 270 4 70% 15Jun2012 0.9 1 1.2 APA Database Manager 10/24/2011 11/9/2012 275 4 60% 15Jun2012 0.9 1 1.2 APA Schedule Manager 10/24/2011 8/24/2012 220 4 80% 15Jun2012 0.9 1 1.2 Subject Matter Expert PRT 114 03 January 2012 Approved For Public Release 12 of 42
  • 13. WBS Data WBS # WBS Name 1. Another Planning Application 1.1 APA Management 1.2 APA Development 1.2.1 APA Systems Engineering 1.2.2 APA Implementation 1.2.2.1 APA User Interface 1.2.2.2 APA Constraints Checker 1.2.2.3 APA Database Manager 1.2.2.4 APA Schedule Manager 1.2.3 APA Deployment 1.3 APA Sustaining 1.4 APA Modifications PRT 114 03 January 2012 Approved For Public Release 13 of 42
  • 14. Material Cost Data Activity Material Purchase Unit Price FY of WBS # WBS Name Type Type Material Description BOE Type $ price 1. Another Planning Application Dev COTS HW Development Server BOM #3 Buy $5,000 10 Single Unit Config Num Spares Cost Low Likeliest High Qty Configs Qty Assoc. Task Distribution Multiplier Multiplier Multiplier FY11 FY12 1 1 - APA Development Start 0.90 1 1.2 $0 $5,253 Schedule Task Name Start End Duration MSProj11 10/3/2011 9/30/2020 2347 Kickoff 10/3/2011 10/3/2011 0 APA Development 10/3/2011 4/26/2013 410 PRT 114 03 January 2012 Approved For Public Release 14 of 42
  • 15. Travel Cost Data Num Daily Trip Activity Num Num Days Per Lodging Travel BY of Total Cost WBS # WBS Name Type People Trips /Trip Diem Cost Cost price (BY) 1. Another Planning Application Dev 2 4 3 $75 $150 $1,000 10 $13,400 BY of Cost Low Likeliest High price Assoc. Task Distribution Multiplier Multiplier Multiplier FY11 FY12 FY13 FY14 10 APA Development Level 1 1.1 1.2 $0 $9,855 $5,783 $0 Schedule Task Name Start End Duration MSProj11 10/3/2011 9/30/2020 2347 Kickoff 10/3/2011 10/3/2011 0 APA Development 10/3/2011 4/26/2013 410 PRT 114 03 January 2012 Approved For Public Release 15 of 42
  • 16. Level of Effort (LOE) Data Activity Level of WBS # WBS Name Cost Type Type Assoc. Task Effort FY11 FY12 FY13 FY14 FY15 1.1 APA Management FTE Dev APA Development 0.5 - 0.50 0.29 - - 1.2.1 APA Systems Engineering EP Dev APA Design 4.0 - 0.20 - - - 1.2.3 APA Deployment EP Dev APA Deployment 4.0 - - 0.28 - - 1.3 APA Sustaining EP Sus APA Sustaining 2.0 - - 1.02 2.00 2.00 1.4 APA Modifications EP Mod APA Modification - - - - - - Schedule Task Name Start End Duration APA Development 10/3/2011 4/26/2013 410 APA Design 10/3/2011 10/21/2011 15 APA Deployment 4/1/2013 4/26/2013 20 APA Sustaining 3/29/2013 9/30/2020 1957 PRT 114 03 January 2012 Approved For Public Release 16 of 42
  • 17. (SEER) Software Data Cost Activity Size Newly Size Pre- % change to WBS # WBS Name Type Type Units Developed exists Pre-exist 1.2.2.1 APA User Interface EP Dev KSLOC 70 - 0% 1.2.2.2 APA Constraints Checker EP Dev KSLOC - 81 10% 1.2.2.3 APA Database Manager EP Dev KSLOC - 50 10% 1.2.2.4 APA Schedule Manager EP Dev KSLOC - 90 10% Software Size % change COTS Type - # Separate Phase At Reuse to Reuse Size Programs Estimate Language Application Type - 0% None 2 Proposal Java Graphical User Interface - 0% None 2 Proposal Java Expert System - 0% None 2 Proposal Java Data Warehousing - 0% None 2 Proposal Java Data Warehousing Development Development ROM Size / Staff Assoc. Task for Method Standard Staff Year Years Phase1 FY11 FY12 FY13 FY14 Incremental DO-178B Level C 4.0 8.75 APA User Interface - 5.74 3.01 - RUP Full DO-178B Level C 4.0 3.43 APA Constraints Checker - 3.12 0.30 - Spiral DO-178B Level C 4.0 1.83 APA Database Manager - 1.64 0.19 - Spiral DO-178B Level C 4.0 3.70 APA Schedule Manager - 3.70 - - Schedule Task Name Start End Duration APA User Interface 10/24/2011 3/29/2013 375 APA Constraints Checker 10/24/2011 11/2/2012 270 APA Database Manager 10/24/2011 11/9/2012 275 APA Schedule Manager 10/24/2011 8/24/2012 220 PRT 114 03 January 2012 Approved For Public Release 17 of 42
  • 18. Data Iteration  Cost Estimation Events are used to record Multiple Data Snapshots in the Database  MCR, SDR, PDR, CDR, etc.  Quarterly Baseline Reviews  Monthly Status Reports  Weekly Project Reviews  Multiple data snapshots provide more opportunities for Cost Analysis  Performance analyses from comparing two snapshots  Schedule Performance Analyses  Cost Performance Analyses  Trending analyses  Changes in scope over time  Changes in Cost Estimate over time  Changes in Schedule over time PRT 114 03 January 2012 Approved For Public Release 18 of 42
  • 19. Basic Cost Analytics Requirements + Design Effort Cost Loaded Work to be done Schedule (i.e. estimated labor + A plan to do the work material cost) Technology Productivity Metrics Resources Cost Profiles Cost analytics Budget 06 07 08 09 10 11 12 13 14 PRT 114 03 January 2012 Approved For Public Release 19 of 42
  • 20. Extended Cost Analytics Requirements + Design Total Project Cost (w/ LOE) Effort Cost Loaded p Work to be done Schedule (i.e. estimated labor + A plan to do the work material cost) Technology $ Productivity Project Risks Metrics Resources Emperical Heuristics Cost Profiles Project External Cost analytics Completion Date Events Budget Utilization Capacity to do work 06 07 08 09 10 11 12 13 14 = Source of Uncertainty PRT 114 03 January 2012 Approved For Public Release 20 of 42
  • 21. Tools for Cost Analytics  SEER-SEM for Software Estimation  ACEIT for Cost Estimation  ACEIT for Cost and Schedule Confidence Level Analyses  Schedule Comparison for Schedule Performance Analyses  Cost Profile Comparison for Cost Performance Analysis PRT 114 03 January 2012 Approved For Public Release 21 of 42
  • 22. Cost Analytics in the Project Lifecycle  Definition Phase (Pre-Phase A)  Project Business Case Justification  Acquisition Phase (Phase A)  Detailed Budget Analyses  Development Phase (Phases B to D)  Development Cost and Schedule Performance Analyses  Operation Phase (Phase E)  Operations Cost and Schedule Performance Analyses PRT 114 03 January 2012 Approved For Public Release 22 of 42
  • 23. Process/ Data Flow Architecture Data Mined from Project Business Development Project Case Process Dashboard Project Scorecard Updated Cost / Project + Detailed Cost / Heuristic Data / Schedule Data Analytics Schedule Data Metrics Database Planning Data Multi- Budget Data Updates Project Dashboard Pre-Phase A Phases A to E PRT 114 03 January 2012 Approved For Public Release 23 of 42
  • 24. Data Collection - Project Definition  Primary Focus is the “Business Case”  Use Business Case Surveys  Use Business Case Scorecard  Use CADRe Detailed Cost Data  Collect Risk (Threat) Data  Collect “Replaceable” Costs  Costs that will occur if Project is NOT performed  Costs that will be replaced if Project IS performed  Create Business Case Summary from input data  Summarize detailed cost/schedule data  Derive ROI data PRT 114 03 January 2012 Approved For Public Release 24 of 42
  • 25. Business Case Data Quantitative Cost Savings ROI/NRI after 10 years $381,000 Balanced Project Scorecard Category Rating Score  Status items created include Reuse Extensibility >80% Med 27 9 Multiple Future Software Cost Avoidance  Project Scorecard Reusability Flexibility Groups Significant 9 15 Standards Compliant 27 Ops Need Mandatory 45  Cost Profile Qualitative Ops Scope Multiple Groups 9 Customer Satisfaction $ Avoidance Med 15  Savings (ROI) profile Accessibility Some 12 Security Low 18 Integration Complexity  Project Schedule/ Milestone Chart TouchPoints Med 6 192 Qual Score Context 56% PRT 114 03 January 2012 Approved For Public Release 25 of 42
  • 26. Data Collection - Project Development  Cost and Schedule Data is collected and stored throughout the Project Lifecycle – Capture the pre-kickoff baseline data – Establish reporting cycles for capturing data iterations – Process Data for status and performance analyses PRT 114 03 January 2012 Approved For Public Release 26 of 42
  • 27. Project Schedule Status  Schedule data captured in database  Summary Status charts created for Project Dashboard PRT 114 03 January 2012 Approved For Public Release 27 of 42
  • 28. Project Cost Performance  Shows Planned vs. Actual Cost Performance  Burn-down Chart shows Baseline Cost-to-complete over time and Actual Costs PRT 114 03 January 2012 Approved For Public Release 28 of 42
  • 29. Project Schedule Performance Metrics Percent Start Finish Old Projected Name Start Finish Duration Complete Slip Slip PDWS PDWP ADWP SV SPI SCPI Duration Duration Task 1 1-Jan-00 12-Jan-00 12 100% 0 2 10 10 12 0 1 0.834 12 12 Task 2 5-Jan-00 14-Jan-00 10 80% 0 0 10 8 10 -2 0.8 0.8 10 10.5 Task 3 8-Jan-00 17-Jan-00 10 70% 0 0 8 7 8 -1 0.875 0.875 10 10.43 Task 4 14-Jan-00 18-Jan-00 5 0% 0 0 2 0 2 -2 0 0.715 5 7  Provides Performance Indices for Schedule Tasks much like EVM indices  Compares two iterations of the Project’s schedule  Measures actual progress against planned progress during interval between schedules  Identifies Schedule items that need attention  Provides Projected Task Duration based on measured performance EXAMPLE PRT 114 03 January 2012 Approved For Public Release 29 of 42
  • 30. Project Excursions (What-Ifs)  Program Management must handle many pressures to control projects due to  Budget Cuts  Project Overruns  Multiple Projects Competing for limited Funds  Cost Analytics must support  Schedule Excursions  Budget Constraint Excursions PRT 114 03 January 2012 Approved For Public Release 30 of 42
  • 31. Web Framework Status  There is a CxP MOP CADRe Database on an MOD Network Server  The Web UI to the MOP CADRe DB can be used to Import and Export data  CxP MOP users can request access to the Web UI  CxP MOP users can be authorized to access to the Web UI  The SEER-SEM tool runs on user request to create Software Development Estimates  The new Database Schema for Schedule Based Cost Data has been defined PRT 114 03 January 2012 Approved For Public Release 31 of 42
  • 32. Desktop Framework Status  Developed Primarily as an Analytics Tool Development Platform  The UI supports multiple database instances  Tools exist to  Import Schedule Based Cost Data  Export Cost Data Spreadsheets  Update CADRe data from Project Schedules  Create Schedule Performance Status  Create a Milestone Excursion ACEIT model data  Perform Budget Constraint Analyses PRT 114 03 January 2012 Approved For Public Release 32 of 42
  • 33. Thank You Tony Harvey (aharvey@tecolote.com) PRT 114 PRT 114 03 2012 03 January January 2012 Approved For Public Release 33 of 42
  • 34. Backup  CADRe Submission to HQ  Detailed Process Flow Charts  Multi-Layered Management Concept  Detailed Business Case Results PRT 114 03 January 2012 Approved For Public Release 34 of 42
  • 35. When is CADRe Data Required? NASA HQ requires CADRe submissions 5 times in a project’s life Program Phases Formulation Implementation Flight Projects Pre-Phase A: Phase A: Phase B: Phase C: Phase D: Phase E: Phase F: Life Cycle Concept Concept Fabrication, Operations & Disposal Phases Studies Development Preliminary Design Detailed Design Assembly & Test Sustainment SDR PDR CDR Launc Traditional h Waterfall Development or Directed 1 1a 2 2a 3 4 5 Missions Down AO-Driven Select CR Select Step 2 Projects Step 1 1 2 2a 3 4 5 Legend GPMC Mission Decision Review/ICR All parts of CADRe due 30 days 2 4 CADRe, All Parts after site review 1 All parts of CADRe due 30 days 90 days after launch, after site review as built or as deployed 2a CADRe update, if necessary configuration 1a CADRe update, if necessary 5 CADRe, Part C only 3 Update as necessary during CADRe delivered; based on 30 days after CDR 11 last year of planned Concept Study Report (CSR) project life and winning proposal PRT 114 03 January 2012 Approved For Public Release 35 of 42
  • 36. Project Process Details PRT 114 03 January 2012 Approved For Public Release 36 of 42
  • 37. Program Management Detail PRT 114 03 January 2012 Approved For Public Release 37 of 42
  • 38. Multi-Layered Management Concept PRT 114 03 January 2012 Approved For Public Release 38 of 42
  • 39. Project Cost Profile  Provides statement of Resource Requirements over time  Total Cost per BCC  By Tasks using WBS  Shows Cost Breakdown over time  Collect CADRe Data at Detailed Level  Identify Summary WBS Items in Detailed Data  By Activity Type  Shows cost separated by Development, Modification, and Sustaining $2,000 Source Activity Data Type Type Cost Type FY10 FY11 FY12 FY13 FY14 FY15 $1,800 SW Dev FTE - - - - - - $1,600 SW Mod FTE - - - - - - SW Sus FTE - - - - - - $1,400 SW Dev EP 17.49 8.72 - - - - $1,200 SW Mod EP - 3.87 7.74 7.71 3.85 - SW Sus EP - 0.51 1.03 1.03 0.51 - $1,000 RY$, M LOE Dev FTE 1.00 0.50 - - - - LOE Mod FTE - - - - - - $800 LOE Sus FTE - 1.00 2.00 2.00 1.00 - $600 LOE Dev EP - - - - - - LOE Mod EP - - - - - - $400 LOE Sus EP - 5.00 10.00 10.00 5.00 - $200 Trav Dev Travel $319.91 $165.10 $0.00 $0.00 $0.00 $0.00 Trav Mod Travel $0.00 $1,807.01 $0.00 $0.00 $0.00 $0.00 $0 Trav Sus Travel $0.00 $0.00 $0.00 $0.00 $1,736.13 $0.00 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 Mat Dev Material $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Task I Task II Task III Task IV Task V Mat Mod Material $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mat Sus Material $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 PRT 114 03 January 2012 Approved For Public Release 39 of 42
  • 40. ROI Chart  Shows Costs vs. Savings  Per BCC  Calculate Savings From  CADRe Detailed Cost Data  “Replaceable” Costs  Costs that will occur if Project is NOT performed  Costs that will be replaced if Project IS performed  As Costs change ROI can be Re-Calculated PRT 114 03 January 2012 Approved For Public Release 40 of 42
  • 41. Project Scorecard Quantitative Cost Savings ROI/NRI after 10 years $381,000  Provides Qualitative Balanced Project Scorecard Category Rating Score Rating Reuse >80% 27 Extensibility Med 9  Final Score can be Future Software Cost Avoidance Multiple Reusability Groups 9 used for Option Flexibility Significant 15 Standards Compliant 27 comparison Qualitative Ops Need Mandatory 45 Multiple  Identical to current Customer Satisfaction Ops Scope $ Avoidance Groups Med 9 15 BCC scorecard Accessibility Some 12 Security Low 18  With textual rating Integration Complexity TouchPoints Med 6 192 drop-down lists Qual Score Quantitative Cost Savings 10 yr ROI $381,000 $381,000 Context $381,000 56%  Data provided by Qualitative Criteria Option 1 Option 2 Option 3 Project team and Qualitative Scores Future Reuse Software Cost Extensibility >80% Med < 10% High 30-40% Low stored in DB Avoidance Reusability Flexibility Multiple Groups Significant Limited Use Complete Throughout MOD Little Standards Compliant Non-standard Little Customer Ops Need Mandatory Nice to have Big benefits Satisfaction Ops Scope Multiple Groups Limited Use Throughout MOD $ Avoidance Med None Low Accessibility Some Restricted Not restricted Integration Security Low High Low Complexity TouchPoints Med Med Med Numerical Score 192 57 141 Qual Score Context 56% 17% 41% PRT 114 03 January 2012 Approved For Public Release 41 of 42
  • 42. Project Schedule/ Milestone Chart  Provides Summary Schedule Data  Schedule Data is collected in CADRe data  CADRe data can be updated from Project Schedule  CADRe data identifies Summary Schedule items  Milestone Chart created from Project Schedule data held in the CADRe data PRT 114 03 January 2012 Approved For Public Release 42 of 42