Mohsen Maddahi
Address: Bahonar, Shiraz, Iran
Cell: +989133453513,+989178256394
Email: mohsen.maddahi@yahoo.com
PROFESSIONAL PROFILE
COMMON
 Member of technical team in three parties meetings with client and end-user.
 Member of technical team on contracts process, providing service requisitions, contract strategy and tender strategy documents.
 Head section of production/process departments.
 Vendor technical assistant.
PROCESS – DOWNSTREAM - OIL & GAS TREATMENT FACILITIES
 Provide procedure for commissioning start up and operation of oil and gas facilities.(including the devices under licensors) and
supervision on operation with confirm analysis of product and find alternatives for solve Off spec. Products
 Start up Operation leader in Sirri NGL plant, workover operation leader in South Azadegan production field.
 Using HYSYS software in case of predict the function of plant
 Troubleshooting and analyzing process data at Upstream and Downstream oil and gas industries.
 Familiar with process design documentation such as PFDs, P&IDs, UFDs, UDDs, Design Basis and Operating of oil and gas
refinery units, etc
 Review vendor and construction drawings issue site engineering requests.
WELL PRODUCTION & INTERVENTION - UPSTREAM – GAS CONDENSATE AND HEAVY OIL RESERVOIR
 Design and supervision for ASPHALTINE problems. Well survey, downhole sampling and chemical injection.
 Operation design and supervision together with data analyzing and preparing final report for Well acidizing, chemical injection,
wellbore washing and perforation.
 Well Production monitoring, data analysis and plan for workovers including choke optimization, well-bore acidizing, N2 lifting,
wireline and/or tubing convey perforation, rig less operations, slickline/coiled-tubing and deliverability welltesting.
 Analyze multirate Welltest data by PROSPER
 Risk assessment, holding kickoff meeting and cooperation with other disciplines on project executions as production coordinator.
 Preparing and providing documents such as procedures based on FEED doc. data, official letters, minutes of meeting, etc. (in
English).
 Well Completion Designing for workover rig, Planning and Supervision.
10	YEARS	And	6	Months	Working	Experiences	based	on	Employer	and	Project:	
1. Company:    CNPC International Ltd. (Iran), North Azadegan Project, Iran 
2. Company:    CNPC International Ltd. (Iran), South Azadegan Project, Iran 
3. Company:    Oil Industries Commissioning & Operation Company (OICO) Co. SIRI NGL Gas Recovery Plant ,SIRI Island, Iran, 
4. Company:    Oil Industries Engineering & Construction Company (OIEC) Co. South Pars Gas Complex phases  
9&10,Assaluyeh, Iran 
5. Company:    ENI Iran B.V. Co. South PARS Gas Complex phases 4&5 , Assaluyeh, Iran 
Mohsen Maddahi • +989133453513• Mohsen.maddahi@yahoo.com 
Petroleum engineer‐Senior Process engineer 
AIT university 
 
  Page 2 
1) Company: CNPC International Ltd. (Iran),
North Azadegan Project, Iran
Jan 2015 – present
Position(s):
Production Coordinator
Achievements:
Downstream Field:
 Supervision on construction and issue SER forms for construction revisions
 Involving with Commissioning & Start up and Plant Performance Test
 Production Management.
Preparing department flow
Preparing required production services and handling the contracts process for finding qualified contractors
Upstream Field:
 Acidizing and Welltesting supervisions
 Daily well site inspection and data monitoring
2) Company: CNPC International Ltd. (Iran),
South Azadegan Project, Iran
June 2012 – Jan 2015
Position(s):
“Well operation and Testing Superintendent” since June 2012.
Promoted to “Production Department Coordinator” since March 2013.
Achievements:
Downstream Field:
 Flow orifice design (borehole, thickness and calculations for Bernouli equation) and implement an accurate metering system.
 Surface facilities Management. Includes Issuing Operational Manual and supervising on surface facilities.
Upstream Field:
 Execute rig-less operations (Slick line and Coiled tubing) for Acidizing, Nitrogen lifting, Diesel lifting, perforation and etc.
 Execute work over rig operations. Planning and Implementation of Well tests after the workover rig.
Responsibilities:
 Supervise operations to kill the well by bull heading. Perform Well injectivity test
 Well acidizing, chemical injection, wellbore washing and perforation design and supervision
 Daily production monitoring, optimization and candidate well selection for treatment
 Production data analysis, forecasts, well test design and interpretation
 Well performance analysis, well completion evaluation and modification
 Troubleshooting planning, and preparation and supervision of workover programs
Mohsen Maddahi • +989133453513• Mohsen.maddahi@yahoo.com 
Petroleum engineer‐Senior Process engineer 
AIT university 
 
  Page 3 
 Preparation and supervision of rig less (slickline and coiled tubing) well intervention operations
 Preparation of contracts (technical documents, contract strategy, evaluation, tendering, etc.)
3) Company: Oil Industries Commissioning & Operation Company (OICO) Co.
SIRI NGL Gas Recovery Plant ,SIRI Island, Iran,
June 2010 – June 2012
Position(s):
Process supervisor
Vendor technical assistant
Achievements:
 Pre-commissioning, Commissioning and NGL plant startup including: commissioning and startup of Feed gas Compressors,
Gas turbine Generators.
 Commissioning and operation of Distribution Control System (DCS)
 Troubleshooting of process design issues and implement the alternatives.
Responsibilities:
 Engineering concerns of plant design for modifying designs and solve operation problems.
 Preparing Operational Test Procedures (OTP) and implementation
 Following electrical team of Technical office during re-commissioning and commissioning tasks of electrical issues.
 Pre-commissioning and commissioning tasks of Instrument issues.
 Pre-commissioning and commissioning tasks of Mechanical issues
 startup of complicated (unman control system) and huge Mechanical system of the Compressors (centrifugal types and
reciprocating types) and cooperating with specialist of the vendor representatives.
 Startup of Screw types compressors of air and nitrogen.
4) Company: Oil Industries Engineering & Construction Company (OIEC) Co.
South Pars Gas Complex phases 9&10 , Assaluyeh, Iran
October 2008 – May 2010
Position(s): Process supervisor in Engineering Division of pre-commissioning, commissioning and start up department, operation and
handover team.
Achievements:
 Pre-commissioning, Commissioning and startup including: LPG fractionation and treatment units
 Filling the C3 and C4 storage units and export the products.
 Troubleshooting of refrigerant compressor functional logic programs, plant design issues and implement the alternatives for
operation.
Responsibilities:
Mohsen Maddahi • +989133453513• Mohsen.maddahi@yahoo.com 
Petroleum engineer‐Senior Process engineer 
AIT university 
 
  Page 4 
 To prepare procedures and supervising on Pre-commissioning and commissioning Leak tests and indicate separated
packages on marked up P&IDs in Propane and Butane Treatment & Drying Units
 To prepare procedures and supervising on pipelines flushing operations and indicate separated packages on marked up
P&IDs in Propane and Butane Treatment & Drying Units
 To prepare procedure and supervising on loading and filling chemicals(reactors and filter vessels) according to vendor
documents
 Prepare and performing Operational Test Procedures (OTP)
 Preparing Startup operation document using previous experiences, FEED and vendor documents.
 Prepare documents for Amine filtration package in unit 116 (Sequence test, Precoat test and start up) and supervision on the
performed actions. (60 step Automatic sequence for three filtration packages in absence of “Amma Filter Group” as its
vendor).
 Prepare documents for startup of Propane and Butane cryogenic storages (Dry out , Cooling, LPG flare system)
 Preparing documents as startup procedure for Ethane Regeneration Gas Compressor 116-K-101 A/B
 Preparing documents as startup procedure for Refrigeration Compressor 147-K-101 A/B, and finding optimum operating point
through performance curves.
 Cooperation for performance test and prepare the handover documents for plant performance test.
5) Company: ENI Iran B.V. Co.
South PARS Gas Complex phases 4&5 , Assaluyeh, Iran
October 2006 – June 2008
Petroleum Engineer in Engineering Division of Operation & Production Department
Achievements:
 Commissioning and startup, performance test and handover.
 Products: 50 MMSCF/D Sweet Gas (C1), 2000 Metric ton treated liquid Propane per day, 2000 Metric ton treated liquid
Butane per day and 40000 Bbl. Condensate per day.
Responsibilities:
 Operation supervision in field and Central control Room (CCR)
 Retrieving the process history in case of shut down event at any level (total plant shutdown, unit or equipment shutdown) for
finding and solving the causes of shutdown.
 Offer advices for changing type of Dryer beds in Dehydration units that finally was ended to prepare a new process line for
regeneration gas outlet to regenerate Dryer beds.
 Solving Hydrate Formation problem in Letdown station in Reception Units by simulate Hydrate formation temperature at
desired pressure.
 Offer advices and prepare required documents for Cold box cleaning during annual shut down.
 Plant routine check by preparing data sheets for the plant especially following units:
 reception facilities, Gas sweetening, dehydration units, LPG Fractionation and treatment, export & storages units, propane
refrigeration cycle units, Boilers, GTG’s and also compressors in export gas unit.
 Monitoring the specification of all plant products (condensate, LPG, Sulfur, Ethane, Sales Gas)
Mohsen Maddahi • +989133453513• Mohsen.maddahi@yahoo.com 
Petroleum engineer‐Senior Process engineer 
AIT university 
 
  Page 5 
EDUCATION
2000–2005 Petroleum University of Technology, Ahvaz, Iran
B.Sc.inPetroleumEngineering–ReservoirEngineering
B.Sc. Project: Laboratory Resistivity Measurement for Detection of Petrophysical Parameters of Reservoir Formation
SKILLS
FOREIGN LANGUAGE
 Excellent in comprehension good in speaking and writing English.
Technical
 PROSPER
 PVT sim
 HYSYS (Steady State simulation)
 PIPESIM
Common
 Fully Experienced with Microsoft Office
LIST OF CERTIFICATES
 Perfect employee as “offshore /onshore Process engineer” for ENI Co.
 Appreciation letter for teaching junior engineers in “Process engineers training Course” for OICO Co.
 Perfect employee as “Well operation and testing superintendent” for CNPCI Production Department
 Perfect employee as “Petroleum engineer” for CNPCI Production Department
 One year Excellent staff certificate for Azadegan project Oil Field from CNPCI
REFERENCES
References and Certificates are available upon request.
Attachments:
certificates
Mohsen Maddahi • +989133453513• Mohsen.maddahi@yahoo.com 
Petroleum engineer‐Senior Process engineer 
AIT university 
 
  Page 6 
Attachment 1/5
 Perfect employee as “offshore /onshore Process engineer” for ENI Co.
Mohsen Maddahi • +989133453513• Mohsen.maddahi@yahoo.com 
Petroleum engineer‐Senior Process engineer 
AIT university 
 
  Page 7 
Attachment 2/5
 Appreciation letter for teaching junior engineers in “Process engineers training Course” for OICO Co.
Mohsen Maddahi • +989133453513• Mohsen.maddahi@yahoo.com 
Petroleum engineer‐Senior Process engineer 
AIT university 
 
  Page 8 
Attachment 3/5
 One year Excellent staff certificate for Azadegan project Oil Field from CNPCI - current page
Mohsen Maddahi • +989133453513• 
Mohsen.maddahi@yahoo.com 
Petroleum engineer 
AIT university 
 
                                        Page:  9
 
Attachment 4/5:
 Perfect employee as “Well operation and testing superintendent” for CNPCI Production Department
Mohsen Maddahi • +989133453513• 
Mohsen.maddahi@yahoo.com 
Petroleum engineer 
AIT university 
 
                                        Page:10
 
Attachment 5/5:
 Perfect employee as “Petroleum engineer” for CNPCI Production Department

Mais conteúdo relacionado

Mais procurados (19)

Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CV
 
SHREYAS__SABNIS CV
SHREYAS__SABNIS CVSHREYAS__SABNIS CV
SHREYAS__SABNIS CV
 
Cv(Haytham Ashrey)
Cv(Haytham Ashrey)Cv(Haytham Ashrey)
Cv(Haytham Ashrey)
 
Suprotim dey LATEST CV
Suprotim dey  LATEST CVSuprotim dey  LATEST CV
Suprotim dey LATEST CV
 
Operation Refinery - Mayur resume
Operation Refinery - Mayur resumeOperation Refinery - Mayur resume
Operation Refinery - Mayur resume
 
Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
 
CV 15 Sep2016
CV 15 Sep2016CV 15 Sep2016
CV 15 Sep2016
 
Jayadevan_Pattali
Jayadevan_PattaliJayadevan_Pattali
Jayadevan_Pattali
 
Mohammad Rehan Akbar Khan 2- CV
Mohammad Rehan Akbar Khan 2- CVMohammad Rehan Akbar Khan 2- CV
Mohammad Rehan Akbar Khan 2- CV
 
khaled-2
khaled-2khaled-2
khaled-2
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
sengu cv
sengu cvsengu cv
sengu cv
 
Mohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi_Resume
Mohsin Hashmi_Resume
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
Hemant Sharma Resume 2015
Hemant Sharma Resume 2015Hemant Sharma Resume 2015
Hemant Sharma Resume 2015
 
main resume milind naukri
main resume milind naukrimain resume milind naukri
main resume milind naukri
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
 
Personal Resume of Darrell CordeiroV3
Personal Resume of Darrell CordeiroV3Personal Resume of Darrell CordeiroV3
Personal Resume of Darrell CordeiroV3
 

Destaque

Destaque (16)

Webinar Material (Source: Review Pro)
Webinar Material (Source: Review Pro)Webinar Material (Source: Review Pro)
Webinar Material (Source: Review Pro)
 
WrightR_Resume
WrightR_ResumeWrightR_Resume
WrightR_Resume
 
Session 3 (catch up)
Session 3 (catch up)Session 3 (catch up)
Session 3 (catch up)
 
MOUNTAINEERZ
MOUNTAINEERZMOUNTAINEERZ
MOUNTAINEERZ
 
Sksinha
SksinhaSksinha
Sksinha
 
sksinha
sksinhasksinha
sksinha
 
Session 1 / bsinoquet / bponchaut
Session 1 / bsinoquet / bponchautSession 1 / bsinoquet / bponchaut
Session 1 / bsinoquet / bponchaut
 
sksinha
sksinhasksinha
sksinha
 
sksinha
sksinhasksinha
sksinha
 
English yearly scheme of work year three 2015
English yearly scheme of work year three 2015English yearly scheme of work year three 2015
English yearly scheme of work year three 2015
 
Apoptosis
ApoptosisApoptosis
Apoptosis
 
Chemical Engineer
Chemical EngineerChemical Engineer
Chemical Engineer
 
My latest cv as chemical engineer in pdf
My latest cv as chemical engineer in pdfMy latest cv as chemical engineer in pdf
My latest cv as chemical engineer in pdf
 
Polyurethane and polyurea
Polyurethane  and polyureaPolyurethane  and polyurea
Polyurethane and polyurea
 
Polyurethane By. Muhammad . shafiq randhawa
Polyurethane  By. Muhammad . shafiq randhawaPolyurethane  By. Muhammad . shafiq randhawa
Polyurethane By. Muhammad . shafiq randhawa
 
R. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteR. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas Website
 

Semelhante a Cv

Semelhante a Cv (20)

Senior Process Engineer, Sep
Senior Process  Engineer, SepSenior Process  Engineer, Sep
Senior Process Engineer, Sep
 
Hammad Ashraf CV
Hammad Ashraf CVHammad Ashraf CV
Hammad Ashraf CV
 
Girish kumar yadav
Girish kumar yadavGirish kumar yadav
Girish kumar yadav
 
new updated CV
new updated CVnew updated CV
new updated CV
 
Gattu Hari
Gattu HariGattu Hari
Gattu Hari
 
M.ZALNOUN
M.ZALNOUNM.ZALNOUN
M.ZALNOUN
 
Resume with cover latter pdf
Resume with cover latter pdfResume with cover latter pdf
Resume with cover latter pdf
 
Circulem viate
Circulem viateCirculem viate
Circulem viate
 
Eng.Mahmouh-Oil&gas Consultant
Eng.Mahmouh-Oil&gas ConsultantEng.Mahmouh-Oil&gas Consultant
Eng.Mahmouh-Oil&gas Consultant
 
Resume - Imane Mansouri
Resume - Imane MansouriResume - Imane Mansouri
Resume - Imane Mansouri
 
Instrument engineer CV
Instrument engineer CVInstrument engineer CV
Instrument engineer CV
 
My Updated CV
My  Updated CVMy  Updated CV
My Updated CV
 
Mohamed Hamed'cv
Mohamed Hamed'cvMohamed Hamed'cv
Mohamed Hamed'cv
 
Resume Irshad Ahmed
Resume Irshad AhmedResume Irshad Ahmed
Resume Irshad Ahmed
 
CV_Vijay
CV_VijayCV_Vijay
CV_Vijay
 
Sasikumar A
Sasikumar ASasikumar A
Sasikumar A
 
Rahulvikram2016
Rahulvikram2016Rahulvikram2016
Rahulvikram2016
 
Resume Irshad Ahmed
Resume Irshad AhmedResume Irshad Ahmed
Resume Irshad Ahmed
 
Resume Shahid
Resume ShahidResume Shahid
Resume Shahid
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 

Último

Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 

Último (20)

Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 

Cv

  • 1. Mohsen Maddahi Address: Bahonar, Shiraz, Iran Cell: +989133453513,+989178256394 Email: mohsen.maddahi@yahoo.com PROFESSIONAL PROFILE COMMON  Member of technical team in three parties meetings with client and end-user.  Member of technical team on contracts process, providing service requisitions, contract strategy and tender strategy documents.  Head section of production/process departments.  Vendor technical assistant. PROCESS – DOWNSTREAM - OIL & GAS TREATMENT FACILITIES  Provide procedure for commissioning start up and operation of oil and gas facilities.(including the devices under licensors) and supervision on operation with confirm analysis of product and find alternatives for solve Off spec. Products  Start up Operation leader in Sirri NGL plant, workover operation leader in South Azadegan production field.  Using HYSYS software in case of predict the function of plant  Troubleshooting and analyzing process data at Upstream and Downstream oil and gas industries.  Familiar with process design documentation such as PFDs, P&IDs, UFDs, UDDs, Design Basis and Operating of oil and gas refinery units, etc  Review vendor and construction drawings issue site engineering requests. WELL PRODUCTION & INTERVENTION - UPSTREAM – GAS CONDENSATE AND HEAVY OIL RESERVOIR  Design and supervision for ASPHALTINE problems. Well survey, downhole sampling and chemical injection.  Operation design and supervision together with data analyzing and preparing final report for Well acidizing, chemical injection, wellbore washing and perforation.  Well Production monitoring, data analysis and plan for workovers including choke optimization, well-bore acidizing, N2 lifting, wireline and/or tubing convey perforation, rig less operations, slickline/coiled-tubing and deliverability welltesting.  Analyze multirate Welltest data by PROSPER  Risk assessment, holding kickoff meeting and cooperation with other disciplines on project executions as production coordinator.  Preparing and providing documents such as procedures based on FEED doc. data, official letters, minutes of meeting, etc. (in English).  Well Completion Designing for workover rig, Planning and Supervision. 10 YEARS And 6 Months Working Experiences based on Employer and Project: 1. Company:    CNPC International Ltd. (Iran), North Azadegan Project, Iran  2. Company:    CNPC International Ltd. (Iran), South Azadegan Project, Iran  3. Company:    Oil Industries Commissioning & Operation Company (OICO) Co. SIRI NGL Gas Recovery Plant ,SIRI Island, Iran,  4. Company:    Oil Industries Engineering & Construction Company (OIEC) Co. South Pars Gas Complex phases   9&10,Assaluyeh, Iran  5. Company:    ENI Iran B.V. Co. South PARS Gas Complex phases 4&5 , Assaluyeh, Iran 
  • 2. Mohsen Maddahi • +989133453513• Mohsen.maddahi@yahoo.com  Petroleum engineer‐Senior Process engineer  AIT university      Page 2  1) Company: CNPC International Ltd. (Iran), North Azadegan Project, Iran Jan 2015 – present Position(s): Production Coordinator Achievements: Downstream Field:  Supervision on construction and issue SER forms for construction revisions  Involving with Commissioning & Start up and Plant Performance Test  Production Management. Preparing department flow Preparing required production services and handling the contracts process for finding qualified contractors Upstream Field:  Acidizing and Welltesting supervisions  Daily well site inspection and data monitoring 2) Company: CNPC International Ltd. (Iran), South Azadegan Project, Iran June 2012 – Jan 2015 Position(s): “Well operation and Testing Superintendent” since June 2012. Promoted to “Production Department Coordinator” since March 2013. Achievements: Downstream Field:  Flow orifice design (borehole, thickness and calculations for Bernouli equation) and implement an accurate metering system.  Surface facilities Management. Includes Issuing Operational Manual and supervising on surface facilities. Upstream Field:  Execute rig-less operations (Slick line and Coiled tubing) for Acidizing, Nitrogen lifting, Diesel lifting, perforation and etc.  Execute work over rig operations. Planning and Implementation of Well tests after the workover rig. Responsibilities:  Supervise operations to kill the well by bull heading. Perform Well injectivity test  Well acidizing, chemical injection, wellbore washing and perforation design and supervision  Daily production monitoring, optimization and candidate well selection for treatment  Production data analysis, forecasts, well test design and interpretation  Well performance analysis, well completion evaluation and modification  Troubleshooting planning, and preparation and supervision of workover programs
  • 3. Mohsen Maddahi • +989133453513• Mohsen.maddahi@yahoo.com  Petroleum engineer‐Senior Process engineer  AIT university      Page 3   Preparation and supervision of rig less (slickline and coiled tubing) well intervention operations  Preparation of contracts (technical documents, contract strategy, evaluation, tendering, etc.) 3) Company: Oil Industries Commissioning & Operation Company (OICO) Co. SIRI NGL Gas Recovery Plant ,SIRI Island, Iran, June 2010 – June 2012 Position(s): Process supervisor Vendor technical assistant Achievements:  Pre-commissioning, Commissioning and NGL plant startup including: commissioning and startup of Feed gas Compressors, Gas turbine Generators.  Commissioning and operation of Distribution Control System (DCS)  Troubleshooting of process design issues and implement the alternatives. Responsibilities:  Engineering concerns of plant design for modifying designs and solve operation problems.  Preparing Operational Test Procedures (OTP) and implementation  Following electrical team of Technical office during re-commissioning and commissioning tasks of electrical issues.  Pre-commissioning and commissioning tasks of Instrument issues.  Pre-commissioning and commissioning tasks of Mechanical issues  startup of complicated (unman control system) and huge Mechanical system of the Compressors (centrifugal types and reciprocating types) and cooperating with specialist of the vendor representatives.  Startup of Screw types compressors of air and nitrogen. 4) Company: Oil Industries Engineering & Construction Company (OIEC) Co. South Pars Gas Complex phases 9&10 , Assaluyeh, Iran October 2008 – May 2010 Position(s): Process supervisor in Engineering Division of pre-commissioning, commissioning and start up department, operation and handover team. Achievements:  Pre-commissioning, Commissioning and startup including: LPG fractionation and treatment units  Filling the C3 and C4 storage units and export the products.  Troubleshooting of refrigerant compressor functional logic programs, plant design issues and implement the alternatives for operation. Responsibilities:
  • 4. Mohsen Maddahi • +989133453513• Mohsen.maddahi@yahoo.com  Petroleum engineer‐Senior Process engineer  AIT university      Page 4   To prepare procedures and supervising on Pre-commissioning and commissioning Leak tests and indicate separated packages on marked up P&IDs in Propane and Butane Treatment & Drying Units  To prepare procedures and supervising on pipelines flushing operations and indicate separated packages on marked up P&IDs in Propane and Butane Treatment & Drying Units  To prepare procedure and supervising on loading and filling chemicals(reactors and filter vessels) according to vendor documents  Prepare and performing Operational Test Procedures (OTP)  Preparing Startup operation document using previous experiences, FEED and vendor documents.  Prepare documents for Amine filtration package in unit 116 (Sequence test, Precoat test and start up) and supervision on the performed actions. (60 step Automatic sequence for three filtration packages in absence of “Amma Filter Group” as its vendor).  Prepare documents for startup of Propane and Butane cryogenic storages (Dry out , Cooling, LPG flare system)  Preparing documents as startup procedure for Ethane Regeneration Gas Compressor 116-K-101 A/B  Preparing documents as startup procedure for Refrigeration Compressor 147-K-101 A/B, and finding optimum operating point through performance curves.  Cooperation for performance test and prepare the handover documents for plant performance test. 5) Company: ENI Iran B.V. Co. South PARS Gas Complex phases 4&5 , Assaluyeh, Iran October 2006 – June 2008 Petroleum Engineer in Engineering Division of Operation & Production Department Achievements:  Commissioning and startup, performance test and handover.  Products: 50 MMSCF/D Sweet Gas (C1), 2000 Metric ton treated liquid Propane per day, 2000 Metric ton treated liquid Butane per day and 40000 Bbl. Condensate per day. Responsibilities:  Operation supervision in field and Central control Room (CCR)  Retrieving the process history in case of shut down event at any level (total plant shutdown, unit or equipment shutdown) for finding and solving the causes of shutdown.  Offer advices for changing type of Dryer beds in Dehydration units that finally was ended to prepare a new process line for regeneration gas outlet to regenerate Dryer beds.  Solving Hydrate Formation problem in Letdown station in Reception Units by simulate Hydrate formation temperature at desired pressure.  Offer advices and prepare required documents for Cold box cleaning during annual shut down.  Plant routine check by preparing data sheets for the plant especially following units:  reception facilities, Gas sweetening, dehydration units, LPG Fractionation and treatment, export & storages units, propane refrigeration cycle units, Boilers, GTG’s and also compressors in export gas unit.  Monitoring the specification of all plant products (condensate, LPG, Sulfur, Ethane, Sales Gas)
  • 5. Mohsen Maddahi • +989133453513• Mohsen.maddahi@yahoo.com  Petroleum engineer‐Senior Process engineer  AIT university      Page 5  EDUCATION 2000–2005 Petroleum University of Technology, Ahvaz, Iran B.Sc.inPetroleumEngineering–ReservoirEngineering B.Sc. Project: Laboratory Resistivity Measurement for Detection of Petrophysical Parameters of Reservoir Formation SKILLS FOREIGN LANGUAGE  Excellent in comprehension good in speaking and writing English. Technical  PROSPER  PVT sim  HYSYS (Steady State simulation)  PIPESIM Common  Fully Experienced with Microsoft Office LIST OF CERTIFICATES  Perfect employee as “offshore /onshore Process engineer” for ENI Co.  Appreciation letter for teaching junior engineers in “Process engineers training Course” for OICO Co.  Perfect employee as “Well operation and testing superintendent” for CNPCI Production Department  Perfect employee as “Petroleum engineer” for CNPCI Production Department  One year Excellent staff certificate for Azadegan project Oil Field from CNPCI REFERENCES References and Certificates are available upon request. Attachments: certificates