2. ANNUAL GENERAL MEETING
22 November 2010
Andrew Woskett, Managing Director
Minotaur Exploration Limited
ACN: 108 483 601
ASX: MEP
Monday, 22 November 2010
3. Background
MINOTAUR
EXPLORATION
I joined Minotaur on 1 March 2010 and I am delighted to be part of such a great team
I am an engineer with 30 years multi-disciplinary, mining industry experience & in technology
plus a Masters in Commercial Law, Fellow of AusIMM
I have been directly responsible for creating numerous large, new gold & copper processing
operations, such as:
Bougainville Copper concentrator & mine area infrastructure
Kalgoorlie Super Pit, Fimiston plant & Gidgee fluidised bed Roaster
Kanowna Belle
Marymia, Granny Smith mods
Ballarat Goldfields
Iv’e managed studies for a range of new projects in gold, silica, coal, iron ore, copper and
coal-to-liquid fuels, such as:
Cockatoo Island - restructured the high grade {64% Fe} iron ore fines operation, defined new
mineable reserves and extended the life of mine by several years, saving it from closure
Olympic Dam - planned the new open pit operation & organisation (for WMR)
Pilbara Iron - planned the Hamersley iron expansion to 230Mtpa
Extension Hill - PFS for a 5Mtpa hematite/magnetite plant and open pit mine
Eneabba Coal - PFS for a 500ktpa DRI pig iron nugget plant & open pit mine
www.minotaurexploration.com.au
Monday, 22 November 2010
4. today’s Agenda:
MINOTAUR
EXPLORATION
www.minotaurexploration.com.au
Monday, 22 November 2010
5. today’s Agenda:
MINOTAUR
EXPLORATION
1. About Minotaur today; facts & figures
2. Minotaur’s achievements through 2010
3. Minotaur’s aims for the end of 2011
4. Minotaur’s aims for the end of 2012
5. Cloncurry IOCG exploration
6. Mutooroo Fe exploration and a regional perspective
7. Poochera Kaolin; the pathway to commercialisation
8. usual Disclaimer
9. Q&A
www.minotaurexploration.com.au
Monday, 22 November 2010
6. About Minotaur
MINOTAUR
EXPLORATION
Equity: 92.7M shares on issue
Top 5 hold 23.7%: Oz Minerals (8.67%); Newmont (5.74%)
52 week range: 16.5c - 38c
Last Price (as @ 19 Nov): $0.245
Market Capitalisation: $22.7M
Cash (31 Oct): $6.2M
Listed Investments: $7.5M
Enterprise Value: =$9.0M (the disturbingly low value that the market ascribes to our real assets)
Exploration Assets valued @: $0.097 per share (as @ 19 November 2010)
www.minotaurexploration.com.au
Monday, 22 November 2010
8. Minotaur’s priorities through 2010:
MINOTAUR
EXPLORATION
exploration mainly in:
Queensland
New South Wales
South Australia
and
Victoria
www.minotaurexploration.com.au
Monday, 22 November 2010
9. Minotaur’s priorities through 2010:
MINOTAUR
EXPLORATION
exploration mainly in: where the focus has been on:
Queensland defining and drilling new IOCG Copper-gold targets
New South Wales defining and drilling new Base metals (Pb, Zn) targets
South Australia investigating IOCG style (Cu-Au), Magnetite, Kaolin,
and and Gold prospects
Victoria acquiring new VMS style base metal targets & Gold
www.minotaurexploration.com.au
Monday, 22 November 2010
10. Minotaur ‘s achievements in 2010:
MINOTAUR
EXPLORATION
www.minotaurexploration.com.au
Monday, 22 November 2010
11. Minotaur ‘s achievements in 2010:
MINOTAUR
EXPLORATION
Project diversity, well funded by JV’s, investing $7 million through 2010:
Cloncurry (Qld): geophysics completed on multiple IOCG targets, first drillhole
successfully completed, but program now hampered by early
onset of ‘wet‘ season
Aphrodite (SA): IOCG target 35km SE of Olympic Dam. Access approvals gained.
Drilled to 829m depth in October. The gravity anomaly was
tested but not explained by core. New downhole geophysical
methods needed to assess and understand the anomaly
Border (SA): AEM & EM surveys completed on base metals targets, drill in 2011
Mutooroo (SA): High quality sedimentary hosted magnetite deposit discovered.
Drilling delayed by wet, to re-commence in January 2011
Poochera (SA): Highest quality, ‘world class’ kaolin resource characterised.
Planning for a new mine operation from end 2012; +50 year life.
Production to ramp from 50,000 tpa @ start up to +100,000 tpa
(assumes 2 x wet processing modules)
Victoria: Successfully tendered for new VMS tenure; Option taken on
exploration & acquisition of 2 historic gold fields, drilling started
www.minotaurexploration.com.au
Monday, 22 November 2010
12. Minotaur’s vision for end 2011:
MINOTAUR
EXPLORATION
www.minotaurexploration.com.au
Monday, 22 November 2010
13. Minotaur’s vision for end 2011:
MINOTAUR
EXPLORATION
Project outcomes:
Cloncurry: drill testing done on multiple IOCG anomalies for new mineral deposits
Mutooroo: have completed a Scoping Study of 1 billion tonne Magnetite target with
possible mineralisation upside to 3 billion tonnes. An initial JORC
Inferred resource reported.
A case made to JV to proceed to PFS from March 2012
Poochera: have completed PFS & DFS studies into Kaolin commercialisation.
Offtake agreements in place, ready to make an Investment
decision to proceed to design, construction and commissioning in 2012
Victoria: have delineated and drilled VMS style base metals targets.
Identified Gold resource and potential production prospects
www.minotaurexploration.com.au
Monday, 22 November 2010
14. Minotaur’s vision for end 2012:
MINOTAUR
EXPLORATION
www.minotaurexploration.com.au
Monday, 22 November 2010
15. Minotaur’s vision for end 2012:
MINOTAUR
EXPLORATION
Project outcomes:
Cloncurry: intensive drilling completed on several new IOCG mineral deposits
Mutooroo: PFS completed. A case made to JV for progression of a $50M BFS, from
March 2013, into a 40Mtpa magnetite mining & processing operation
Poochera: design, construction & commissioning complete; readying for first
commercial production early in 2013
Victoria: VMS base metals targets advanced to new discovery stage.
Gold resources advanced to production proposition
www.minotaurexploration.com.au
Monday, 22 November 2010
16. Cloncurry IOCG
MINOTAUR
EXPLORATION
Australia’s most productive
copper belt, but
surface deposits are depleted
vast areas are under cover (obscured)
and are under-explored
geophysics “sees through” the cover
to locate potentially mineralised
targets (anomalies)
looking for ‘Ernest Henry’ style iron oxide,
copper-gold (IOCG) orebodies
multiple IOCG targets over 546 km2
Ernest Henry
30km N of Ernst Henry IOCG mine
JV with Japan Oil Gas & Metals Corp
JOGMEC earning 51%
Cloncurry
JOGMEC funding $4M over 3 years
www.minotaurexploration.com.au
Monday, 22 November 2010
17. Cloncurry IOCG
MINOTAUR
EXPLORATION
ground geophysics
completed
geophysical anomalies
selected for drilling
aka Eloise, Osborne,
Ernest Henry
drilling to resume in
2011, after Wet season
Drill Targets at:
Gypsy Plains, drilled 12 Nov to
401.5m target depth, core being
transported to Adelaide for full
technical assessment
Cormorant
Cotswold
Woolshed Flat
www.minotaurexploration.com.au
Monday, 22 November 2010
18. Cloncurry
MINOTAUR
EXPLORATION
Cloncurry River flows (Saturday 13 November) as a result of first rains overnight
www.minotaurexploration.com.au
Monday, 22 November 2010
19. Mutooroo Fe
MINOTAUR
EXPLORATION
a major new magnetite deposit
JV: Minotaur 40.1%, Sumitomo 59.9%
Australia’s next big iron province?
90km SW of Broken Hill
35km from E-W rail line
Heavy duty rail link 300km to Port
Pirie
a case could well arise for regional
consolidation of new infrastructure to
deliver multi-user Processing, Rail, Port,
Power, Water supply facilities etc,
supporting all magnetite mines in the
area
www.minotaurexploration.com.au
Monday, 22 November 2010
20. Mutooroo Fe
MINOTAUR
EXPLORATION
2 RC holes drilled to 200m
thick magnetite beds
intersected under thin cover
consistently high quality (~69%)
magnetite concentrates made
from composited drill chips
low level Heli-Mag data reveals
extensive regional arrangement
of magnetised siltstone beds
Work Plan (rain delayed):
★ 8 x RC & Diamond holes
planned along 40km strike
extent of highly magnetised
sedimentary beds
★ Concentrate quality testing
★ to estimate size of the
potential Exploration Target(s);
aiming for ~3b tonnes
The
term
"Explora/on
Target"
should
not
be
misconstrued
as
an
es/mate
of
Mineral
Resources
and
Reserves
as
defined
by
the
JORC
Code
(2004),
and
the
term
has
not
been
used
in
that
context.
It
is
uncertain
if
further
explora/on
will
result
in
the
www.minotaurexploration.com.au determina/on
of
a
Mineral
Resource.
Refer
Cl
18
of
the
JORC
Code
(2004).
Monday, 22 November 2010
21. Mutooroo Fe
MINOTAUR
EXPLORATION
08RCMUT-‐02 08RCMUT-‐01
www.minotaurexploration.com.au
Monday, 22 November 2010
22. Mutooroo Fe
MINOTAUR
EXPLORATION
Magnetite Pellet Fines - Quality Criteria08RCMUT-‐01
08RCMUT-‐02
BF Pellet
MUT01/02
Species fines grade Comment Result
(target %) DTRC %
Fe >60.0 69.3 pure magnetite is 72.4% Fe (maximum grade achievable)
FeO >25 ~26.4 calculated by differences
SiO2<5% preferred for Blast Furnace (‘BF’) feed.
SiO2 <5.5 3.57
For DRI grade Si+Al <2% (preferred) and certainly <3%
Al2O3 1.0-1.5 0.36 low Al2O3 can be considered ‘preferred’ by BF
CaO <3.0 0.10 moderate CaO can offset flux addition in BF
MgO <3.0 0.05 moderate MgO can offset flux addition in BF
TiO2 <0.75 0.06 Concentrate is unsaleable if TiO2 > 1%
Mn <0.050 0.02 Mn increases coke rate in BF
P <0.030 0.01 P<0.08% preferred as P reports to pig iron smelt
S <0.010 <0.01 S contributes to acid rain (SO2) gases in BF exhaust
DTRC: Davis Tube Recovery Concentrate
Mutooroo DTRC grade, to date, ticks all the boxes
BF:
Blast Furnace; a steel making furnace
www.minotaurexploration.com.au
Monday, 22 November 2010
23. Mutooroo Fe
MINOTAUR
EXPLORATION
A Regional Vision:
Australia’s next big iron province?
several aspiring developers side-by-side
multiple zones each potentially hosting
hundreds of millions of tonnes of
magnetite rich siltstones
Regional potential for ~10bt ore, with a
foreseeable 100 year life of mining @
nominal 100Mtpa mining rate, producing
25Mtpa of concentrate, comprising:
4-5 processing operations for 5-10Mtpa
concentrate each, at ~$2b Capex each, or 6 autogenous grinding mills @ 28MW each
one 25Mtpa Super Plant and assoc
infrastructure at ~$6b, saving ~$5b
overall, with scale to include a Pellet Plant
(producing a value added product)
equal to CITIC’s $5.5b for 28Mtpa huge
magnetite project at Cape Preston, WA
(see photos)
450MW Power station, combined cycle, gas fired
www.minotaurexploration.com.au (photos sourced from http://www.citicpacificmining.com/resources/news)
Monday, 22 November 2010
24. Poochera Kaolin
MINOTAUR
EXPLORATION
Granite decomposes to granitic kaolin through tropical weathering
!
Finished product size is 92% passing 2 microns
(or 2 thousandths of one millimetre).
World trade of highest quality ‘China Clay’
exceeds 10 million tonnes per year.
Used in plastics, paints, paper coatings, tyres,
www.minotaurexploration.com.au pharmaceuticals, ceramics
Monday, 22 November 2010
25. Poochera Kaolin, ‘world class’
MINOTAUR
EXPLORATION
MEP 100%
Poochera kaolin ticks all the quality boxes
20Mt Inferred Kaolin resource
5m - 30m below surface, soft digging
92% < 2um hydrous kaolin product
world class ‘Ultra white’ & ‘Ultra bright’
hydrous kaolin qualities;
Reflectance (ISO): R457 = 90.7
pilot plant producing world class
calcined product: R457 = 92.4
potential for new operation
producing +100kt pa for over 50 years * *
100km from Port Thevenard, SA
marketing exposure expected to
lead to preliminary Offtake discussions Note: * elevated Alumina level is beneficial
Pre-feasibility study in H1 of 2011
www.minotaurexploration.com.au
Monday, 22 November 2010
26. so, to conclude......Minotaur has:
MINOTAUR
EXPLORATION
a divers ified portfolio with real growth as s ets
www.minotaurexploration.com.au
Monday, 22 November 2010
27. Disclaimer and Competent Person’s Statement
MINOTAUR
EXPLORATION
This
presenta/on
has
been
prepared
by
the
management
of
Minotaur
Explora/on
Limited
(ASX:
MEP)
for
the
general
benefit
of
analysts,
brokers
and
investors
and
does
not
cons/tute
specific
advice
to
any
par/cular
party
or
persons.
Informa/on
herein
is
based
on
publicly
available
informa/on,
internally
developed
data
and
other
sources.
Where
an
opinion,
projec/on
or
forward
looking
statement
is
expressed
in
this
presenta/on,
it
is
based
on
the
assump/ons
and
limita/ons
men/oned
herein
and
is
an
expression
of
present
opinion
only.
No
warran/es
or
representa/ons
are
made
or
implied
as
to
origin,
validity,
accuracy,
completeness,
currency
or
reliability
of
the
informa/on.
MEP
specifically
disclaims
and
excludes
all
liability
(to
the
extent
permiVed
by
law)
for
losses,
claims,
damages,
demands,
costs
and
expenses
of
whatever
nature
arising
in
any
way
out
of
or
in
connec/on
with
the
informa/on,
its
accuracy,
completeness
or
by
reason
of
reliance
by
any
person
on
any
of
it.
Where
MEP
expresses
or
implies
an
expecta/on
or
belief
as
to
the
success
of
future
explora/on
and
the
economic
viability
of
future
project
evalua/ons,
such
expecta/on
or
belief
is
expressed
in
good
faith
and
is
believed
to
have
a
reasonable
basis.
However,
such
projected
outcomes
are
subject
to
risks,
uncertain/es
and
other
factors
which
could
cause
actual
results
to
differ
materially
from
projected
future
results.
Such
risks
include,
but
are
not
limited
to,
explora/on
success,
metal
price
vola/lity,
changes
to
current
mineral
resource
es/mates
or
targets,
changes
to
assump/ons
for
capital
and
opera/ng
costs
as
well
as
poli/cal
and
opera/onal
risks
and
government
regulatory
outcomes.
MEP
disclaims
any
obliga/on
to
advise
any
person
if
it
becomes
aware
of
any
inaccuracy
in
or
omission
from
any
forecast
or
to
update
such
forecast.
Information in the foregoing presentation that relates to Exploration Results, Mineral Resources or Ore Reserves
is based on information compiled by Dr A. P. Belperio, who is a Director and full-time employee of the Company
and a Fellow of the Australasian Institute of Mining and Metallurgy. Dr A. P. Belperio has a minimum of 5 years
experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity that he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Dr A. P. Belperio
consents to inclusion in the presentation of matters based on his information in the form and context in which it
appears.
www.minotaurexploration.com.au
Monday, 22 November 2010
28. and if imitation is the highes t form of flattery....
MINOTAUR
EXPLORATION
www.minotaurexploration.com.au
Monday, 22 November 2010
29. ANNUAL GENERAL MEETING
22 November 2010
Questions please............then a cup of tea.
Minotaur Exploration Limited
ACN: 108 483 601
ASX: MEP
Monday, 22 November 2010