SA Mining & Energy Infrastructure Conference, Adelaide	

                         12-13 April 2011   	

               Andrew Woskett, Managing Director	




               Minotaur Exploration Limited
                       ACN: 108 483 601       	

   	

                          ASX: MEP
The Braemar Infrastructure Challenge




                	

                                                                                         	

1.ā€Æ   Disclaimer
2.ā€Æ
                                                         	

      Introduction to the Braemar Iron Formation: where, what and why it is signiļ¬cant

                            	

3.ā€Æ   A mining development scenario: how big could it be
4.ā€Æ   Infrastructure proļ¬le:
      ļ‚§ā€Æ   Beneļ¬ciation
      ļ‚§ā€Æ   Power & Water
      ļ‚§ā€Æ   Concentrate Slurry/Rail
      ļ‚§ā€Æ   Pellitisation
      ļ‚§ā€Æ   Port
Cautionary Statements



This presentation has been prepared by the management of Minotaur Exploration Limited (ASX: MEP) for the general benefit of
analysts, brokers and investors and does not constitute specific advice to any particular party or persons. Information herein is based
on publicly available information, internally developed data and other sources. Where an opinion, projection or forward looking
statement is expressed in this presentation, it is based on the assumptions and limitations mentioned herein and is an expression of
present opinion only. No warranties or representations are made or implied as to origin, validity, accuracy, completeness, currency or
reliability of the information. MEP specifically disclaims and excludes all liability (to the extent permitted by law) for losses, claims,
damages, demands, costs and expenses of whatever nature arising in any way out of or in connection with the information, its
accuracy, completeness or by reason of reliance by any person on any of it. Where MEP expresses or implies an expectation or
belief as to the success of future exploration and the economic viability of future project evaluations, such expectation or belief is
expressed in good faith and is believed to have a reasonable basis. However, such projected outcomes are subject to risks,
uncertainties and other factors which could cause actual results to differ materially from projected future results. Such risks include,
but are not limited to, exploration success, metal price volatility, changes to current mineral resource estimates or targets, changes to
assumptions for capital and operating costs as well as political and operational risks and government regulatory outcomes. MEP
disclaims any obligation to advise any person if it becomes aware of any inaccuracy in or omission from any forecast or to update
such forecast.




   The following presentation is a visualisation of possible infrastructure solutions to
   support potential future iron ore mine developments. Locations nominated for the
 provision of infrastructure facilities are for illustration purposes only and should not be

                                                                                    	

 considered viable technical, economic, environmental, social or State solutions for any
                                      future requirements
Braemar Ironstones: The next big (Fe) thing


  This presentation is based on a range of views and assumptions held by Minotaur alone and Minotaur does not purport to speak on
behalf of other mineral exploration companies with interests on the Braemar Iron Formation. Minotaur has not sought nor has it received
                            any authorisation to make forward looking statements on behalf of other entities.




This presentation conceptualises a development scenario for magnetite deposits on the Braemar Iron Formation. Being a concept, there is currently
 no supporting technical or economic justification. The integrated, multi-user infrastructure facilities envisaged are hypothetical in nature and scope
 and do not, in Minotaur s understanding, reflect third party intentions as presently contemplated. There can be no level of certainty that this or any
                                                                 concept may eventuate
Braemar Ironstones: what is it?




ļ‚²ā€Æa signiļ¬cant regional sequence of highly magnetised sediments containing the magnetite form of iron	

ļ‚²ā€ÆThe Braemar Iron Formation is emerging to potentially become Australia s next big iron ore province	

ļ‚²ā€Æ100km SW of Broken Hill	

ļ‚²ā€ÆHeavy duty rail link 300km to Port Pirie or 325km to Port Germaine
Braemar Ironstones: Explorers




ļ‚²ā€Æ several ASX listed explorers are active along the Braemar and all are reporting exploration success                                                                                                                                                                        	

ļ‚²ā€Æ multiple zones, each potentially hosting hundreds of millions of tonnes of magnetite rich siltstones                                                                                                                                                                             	

ļ‚²ā€Æ Regional potential for total Exploration Target of up to 20,000 million tonnes                                                                                                                                           (Minotaur guesstimate)                         of in-
   situ Fe mineralised siltstone, circa 15-25% Fe content	

ļ‚²ā€Æ Could anticipate ~10 billion tonnes of mineable magnetite ore to be deļ¬ned through exploration
   The	
 Ā term	
 Ā "Explora/on	
 Ā Target"	
 Ā should	
 Ā not	
 Ā be	
 Ā misconstrued	
 Ā as	
 Ā an	
 Ā es/mate	
 Ā of	
 Ā Mineral	
 Ā Resources	
 Ā and	
 Ā Reserves	
 Ā as	
 Ā deļ¬ned	
 Ā by	
 Ā the	
 Ā JORC	
 Ā Code	
 Ā (2004),	
 Ā and	
 Ā the	
 Ā term	
 Ā has	
 Ā not	
 Ā been	
 Ā used	
 Ā in	
 Ā that	
 Ā 
                                   context.	
 Ā It	
 Ā is	
 Ā uncertain	
 Ā if	
 Ā further	
 Ā explora/on	
 Ā will	
 Ā result	
 Ā in	
 Ā the	
 Ā determina/on	
 Ā of	
 Ā a	
 Ā Mineral	
 Ā Resource.	
 Ā Refer	
 Ā Cl	
 Ā 18	
 Ā of	
 Ā the	
 Ā JORC	
 Ā Code	
 Ā (2004).	
 Ā 
Braemar Ironstones: the potential scope


                                          ļ‚²ā€ÆAssume ~10 billion tonnes of
                                           mineable magnetite ore can be
                                           deļ¬ned
                                          ļ‚²ā€Æscope for say 5 pits each mining
                                           10-20Mtpa ore and beneļ¬ciating
                                           5Mtpa of concentrate each




ļ‚²ā€Ægives a foreseeable 100 year regional
  life of mining @ nominal 100Mtpa
  mining rate
ļ‚²ā€Æwith annualised output of 25Mtpa of
  blast furnace quality magnetite
  concentrates grading 65% - 70% Fe
Braemar Ironstones: Processing for 25Mtpa Con


ļ‚²ā€ÆAssume ~10 billion tonnes of mineable
 magnetite ore can be deļ¬ned
ļ‚²ā€Æscope for say 5 pits each mining 20Mtpa
 ore and beneļ¬ciating 5Mtpa of
 concentrate each
ļ‚²ā€Æ@ nominal 100Mtpa mining rate gives a
 foreseeable 100 year regional life of ore
 mining 
ļ‚²ā€Æwith annualised output of 25Mtpa of blast                             6 fully autogenous grinding mills @ 28MW each
 furnace quality magnetite concentrates
 grading 65% - 70% Fe
ļ‚²ā€ÆBeneļ¬ciation scenarios:	

  ļ¶ā€Æ 5 processing operations for 5Mtpa
     concentrate each, at +$2b Capex each,
                      
or        	

  ļ¶ā€Æ one 25Mtpa Super Plant and assoc
     infrastructure at ~$6b, saving ~$5b
     overall, with scale to include a Pellet
     Plant (producing a value added product)              	

 ļ¶ā€Æ equivalent to CITIC s $5.5b for 28Mtpa
    huge magnetite project at Cape Preston,
    WA
 photos sourced from www.citicpacificmining.com/resources/news
                                                                        450MW Power station, combined cycle, gas fired
Braemar Ironstones: Off Plot Infrastructure



ļ‚²ā€ÆWater

ļ‚²ā€ÆPower

ļ‚²ā€ÆRail

ļ‚²ā€ÆConcentrate Slurry Pipeline

ļ‚²ā€ÆPort

ļ‚²ā€ÆPellet Plant
Braemar Ironstones: Water for 25Mtpa Con


Water Supply scenarios:	

ą¹ā€Æmagnetite comminution and magnetic
recovery circuits use vast amounts of
clean (demineralised) water 
ą¹ā€Æprocess circuit will consume ~50Gl per
year (50,000 Mega litres pa or 135 Mega
litres per day)
ą¹ā€Æa desal (RO) plant will be required on
Spencer Gulf (BHPB s proposed facility for
ODX is to supply additional 200 Ml/day from
Port Bonython area)




                                                                              Proposed Olympic Dam Expansion Desalination Plant, Point Lowly, 200Ml per day capacity	

                                                                                                          Source: ODX EIS p136-154, Fig 5.32	




                                                                              ą¹ā€Æ350km transfer pipeline, 1m diameter, plus 4 pump
                                                                                stations to deliver water to process facility
                                                                              ą¹ā€Æannual operating power demand of 150,000 MWh
                CITIC Desalination Plant Feb 2011
      photo sourced from www.citicpacificmining.com/en/news/progress-images
Braemar Ironstones: Power for 25Mtpa Con

Power Supply scenarios:	

ą¹ā€Æpower demand of ~450MW
(ODX requires additional 650MW generation)

ą¹ā€Æconsuming 3,000 GWh pa
(ODX to consume additional 4,400 GWh pa)




         graphics sourced from www.petratherm.com.au/expmodel.html




                                                                     ą¹ā€Æpotential for geothermal energy from shallow hot
                                                                      rocks nearby at Petratherm s Paralana project
                                                                     ą¹ā€Æpotential for meshed 275kV transmission NEM
                                                                      network between Paralana-Port Augusta-Broken
                                                                      Hill, supplying 500MW into grid
                                                                     ą¹ā€Æall in all, 1000km of new HV transmission network
                                                                          Disclosure: MEP holds an economic interest in Petratherm (ASX: PTR)
Braemar Ironstones: Transfer 25Mtpa Con to Port

Concentrate Transfer scenarios:	

ą¹ā€ÆRail:
  ā€¢ā€Æ325km to Port Germaine (25km north of Port
   Pirie)
  ā€¢ā€ÆARTC to upgrade E-W corridor in 2012
  ā€¢ā€Æ35km spur required into train loading bins
  ā€¢ā€Æ ballon loop required at each end for train turn
   around and 24 hour loading/unloading
  ā€¢ā€Æ2000m long trains, 25 tonne/axle, 100 tonne
   wagons, 20,000 tonne capacity
ą¹ā€ÆSlurry Pipeline:
  ā€¢ā€Æ360km buried pipeline to Port Germaine
  ā€¢ā€Ærequires 600mm diameter Con delivery pipe +
   Return Water Line
  ā€¢ā€ÆExamples:
    āœ“ā€Æ Century Zinc s 300mm diameter concentrate pipeline
       is 304km long, concentrate in slurry
    āœ“ā€Æ Minas Rio iron project, Brazil, 600mm diameter
       pipeline is 522km long, to transport 24.5Mtpa
  ā€¢ā€Æ2-3 intermediate Pump Stations
  ā€¢ā€ÆPort Dewatering station & Concentrate storage
Braemar Ironstones: Port for 25Mtpa Con




  Berthing for 200,000DWT Cape Size vessels
  ļ‚Ŗā€Æ   125 ships loaded per year
  ļ‚Ŗā€Æ   4,000tph loading rate
  ļ‚Ŗā€Æ   320m long
  ļ‚Ŗā€Æ   20m draft
  ļ‚Ŗā€Æ   jetty length ~3km ?
Braemar Ironstones: Downstream option for Con




                                                                               CITIC Stacker Reclaimer Feb 2011
                                                               photo sourced from www.citicpacificmining.com/en/news/progress-images


Pelletisation
ą¹ā€Æ Concentrate is agglomerated to form pellets for direct injection into a steel making Blast Furnace
ą¹ā€Æ Pellet plants are common in China. OneSteel has a 1.2Mtpa pellet plant at Whyalla steel making plant
ą¹ā€Æ in 2010 Iran commissioned a 5Mt pa plant (see photo) costing US$600 million
ą¹ā€Æ Pelletisation adds value to the concentrate product and is required before feeding into Blast Furnace
ą¹ā€Æ Pellets are easier to ship (no moisture content), less likely to release fugitive dust emissions
ą¹ā€Æ Australia is underweight in downstream value-add components of the steel making supply chain
The Braemar ā€“ evolving to be Australiaā€™s next big Fe Infrastructure province?	




                       Minotaur Exploration Limited    	

                                           	

 	

                               ACN: 108 483 601
                                  ASX: MEP
                     www.minotaurexploration.com.au

More Related Content

Similar to MInotaur Mining & Energy Infrastructure 12 april 2011

21 June 2011 - MEP SA Transport Infrastructure Presentation
21 June 2011 - MEP SA Transport Infrastructure Presentation21 June 2011 - MEP SA Transport Infrastructure Presentation
21 June 2011 - MEP SA Transport Infrastructure PresentationMinotaur Exploration
Ā 
MEP Proactive Investors March 2011
MEP Proactive Investors March 2011MEP Proactive Investors March 2011
MEP Proactive Investors March 2011Minotaur Exploration
Ā 
Broken Hill Resources & Energy Symposium 24 May 2011
Broken Hill Resources & Energy Symposium 24 May 2011Broken Hill Resources & Energy Symposium 24 May 2011
Broken Hill Resources & Energy Symposium 24 May 2011Minotaur Exploration
Ā 
Minotaur Exploration - Proactive Investors Sydney
Minotaur Exploration - Proactive Investors SydneyMinotaur Exploration - Proactive Investors Sydney
Minotaur Exploration - Proactive Investors SydneyMinotaur Exploration
Ā 
Australia China Resources Symposium Adelaide
Australia China Resources Symposium AdelaideAustralia China Resources Symposium Adelaide
Australia China Resources Symposium AdelaideMinotaur Exploration
Ā 
18 May11 - Proactive Investors, Sydney
18 May11 - Proactive Investors, Sydney18 May11 - Proactive Investors, Sydney
18 May11 - Proactive Investors, SydneyMinotaur Exploration
Ā 
MONTORO PLANS TITAN MT GEOPHYSICS ON PECORS ā€“SERPENT RIVER PROPERTY, ELLIOT L...
MONTORO PLANS TITAN MT GEOPHYSICS ON PECORS ā€“SERPENT RIVER PROPERTY, ELLIOT L...MONTORO PLANS TITAN MT GEOPHYSICS ON PECORS ā€“SERPENT RIVER PROPERTY, ELLIOT L...
MONTORO PLANS TITAN MT GEOPHYSICS ON PECORS ā€“SERPENT RIVER PROPERTY, ELLIOT L...Follow me on Twitter @Stockshaman
Ā 
Choosing Right Transformer
Choosing Right TransformerChoosing Right Transformer
Choosing Right Transformerpacificcresttrans
Ā 
Reservoir minerals inc july 19 2012 v001 g90s48
Reservoir minerals inc  july 19 2012 v001 g90s48Reservoir minerals inc  july 19 2012 v001 g90s48
Reservoir minerals inc july 19 2012 v001 g90s48reservoirminerals
Ā 
RMC Corporate Presentation - May 2014
RMC Corporate Presentation - May 2014RMC Corporate Presentation - May 2014
RMC Corporate Presentation - May 2014reservoirminerals
Ā 
May 2013 Champion Corporate Presentation - English
May 2013 Champion Corporate Presentation - EnglishMay 2013 Champion Corporate Presentation - English
May 2013 Champion Corporate Presentation - EnglishChampionMines
Ā 
April 2013 Champion Corporate Presentation - English
April 2013 Champion Corporate Presentation - EnglishApril 2013 Champion Corporate Presentation - English
April 2013 Champion Corporate Presentation - EnglishChampionMines
Ā 
Presentation Africa Downunder - August 2012
Presentation Africa Downunder - August 2012Presentation Africa Downunder - August 2012
Presentation Africa Downunder - August 2012WorldTitaniumResources
Ā 
MEP Proactive Investors - March 2011
MEP Proactive Investors - March 2011MEP Proactive Investors - March 2011
MEP Proactive Investors - March 2011Minotaur Exploration
Ā 
Sitios Ć³ptimos para la energĆ­a de mareas
Sitios Ć³ptimos para la energĆ­a de mareasSitios Ć³ptimos para la energĆ­a de mareas
Sitios Ć³ptimos para la energĆ­a de mareasEnergy 4 Impact
Ā 
Oct. 2013 Champion Corporate Presentation - English
Oct. 2013 Champion Corporate Presentation - EnglishOct. 2013 Champion Corporate Presentation - English
Oct. 2013 Champion Corporate Presentation - EnglishChampionMines
Ā 
7 Million Dollar Joint Venture Partner Request Synopsis
7 Million Dollar Joint Venture Partner  Request Synopsis7 Million Dollar Joint Venture Partner  Request Synopsis
7 Million Dollar Joint Venture Partner Request SynopsisMichael Mattison
Ā 
Sept. 2013 Champion Corporate Presentation - English
Sept. 2013 Champion Corporate Presentation - EnglishSept. 2013 Champion Corporate Presentation - English
Sept. 2013 Champion Corporate Presentation - EnglishChampionMines
Ā 
Montoro(IMT.V) intersects nearly 100 mtrs of sulphide mineralization
Montoro(IMT.V) intersects nearly 100 mtrs  of sulphide mineralizationMontoro(IMT.V) intersects nearly 100 mtrs  of sulphide mineralization
Montoro(IMT.V) intersects nearly 100 mtrs of sulphide mineralizationFollow me on Twitter @Stockshaman
Ā 

Similar to MInotaur Mining & Energy Infrastructure 12 april 2011 (20)

21 June 2011 - MEP SA Transport Infrastructure Presentation
21 June 2011 - MEP SA Transport Infrastructure Presentation21 June 2011 - MEP SA Transport Infrastructure Presentation
21 June 2011 - MEP SA Transport Infrastructure Presentation
Ā 
MEP Proactive Investors March 2011
MEP Proactive Investors March 2011MEP Proactive Investors March 2011
MEP Proactive Investors March 2011
Ā 
Broken Hill Resources & Energy Symposium 24 May 2011
Broken Hill Resources & Energy Symposium 24 May 2011Broken Hill Resources & Energy Symposium 24 May 2011
Broken Hill Resources & Energy Symposium 24 May 2011
Ā 
Minotaur Exploration - Proactive Investors Sydney
Minotaur Exploration - Proactive Investors SydneyMinotaur Exploration - Proactive Investors Sydney
Minotaur Exploration - Proactive Investors Sydney
Ā 
Australia China Resources Symposium Adelaide
Australia China Resources Symposium AdelaideAustralia China Resources Symposium Adelaide
Australia China Resources Symposium Adelaide
Ā 
18 May11 - Proactive Investors, Sydney
18 May11 - Proactive Investors, Sydney18 May11 - Proactive Investors, Sydney
18 May11 - Proactive Investors, Sydney
Ā 
MONTORO PLANS TITAN MT GEOPHYSICS ON PECORS ā€“SERPENT RIVER PROPERTY, ELLIOT L...
MONTORO PLANS TITAN MT GEOPHYSICS ON PECORS ā€“SERPENT RIVER PROPERTY, ELLIOT L...MONTORO PLANS TITAN MT GEOPHYSICS ON PECORS ā€“SERPENT RIVER PROPERTY, ELLIOT L...
MONTORO PLANS TITAN MT GEOPHYSICS ON PECORS ā€“SERPENT RIVER PROPERTY, ELLIOT L...
Ā 
Choosing Right Transformer
Choosing Right TransformerChoosing Right Transformer
Choosing Right Transformer
Ā 
Reservoir minerals inc july 19 2012 v001 g90s48
Reservoir minerals inc  july 19 2012 v001 g90s48Reservoir minerals inc  july 19 2012 v001 g90s48
Reservoir minerals inc july 19 2012 v001 g90s48
Ā 
RMC Corporate Presentation - May 2014
RMC Corporate Presentation - May 2014RMC Corporate Presentation - May 2014
RMC Corporate Presentation - May 2014
Ā 
Soviet expertise, Canadian security
Soviet expertise, Canadian securitySoviet expertise, Canadian security
Soviet expertise, Canadian security
Ā 
May 2013 Champion Corporate Presentation - English
May 2013 Champion Corporate Presentation - EnglishMay 2013 Champion Corporate Presentation - English
May 2013 Champion Corporate Presentation - English
Ā 
April 2013 Champion Corporate Presentation - English
April 2013 Champion Corporate Presentation - EnglishApril 2013 Champion Corporate Presentation - English
April 2013 Champion Corporate Presentation - English
Ā 
Presentation Africa Downunder - August 2012
Presentation Africa Downunder - August 2012Presentation Africa Downunder - August 2012
Presentation Africa Downunder - August 2012
Ā 
MEP Proactive Investors - March 2011
MEP Proactive Investors - March 2011MEP Proactive Investors - March 2011
MEP Proactive Investors - March 2011
Ā 
Sitios Ć³ptimos para la energĆ­a de mareas
Sitios Ć³ptimos para la energĆ­a de mareasSitios Ć³ptimos para la energĆ­a de mareas
Sitios Ć³ptimos para la energĆ­a de mareas
Ā 
Oct. 2013 Champion Corporate Presentation - English
Oct. 2013 Champion Corporate Presentation - EnglishOct. 2013 Champion Corporate Presentation - English
Oct. 2013 Champion Corporate Presentation - English
Ā 
7 Million Dollar Joint Venture Partner Request Synopsis
7 Million Dollar Joint Venture Partner  Request Synopsis7 Million Dollar Joint Venture Partner  Request Synopsis
7 Million Dollar Joint Venture Partner Request Synopsis
Ā 
Sept. 2013 Champion Corporate Presentation - English
Sept. 2013 Champion Corporate Presentation - EnglishSept. 2013 Champion Corporate Presentation - English
Sept. 2013 Champion Corporate Presentation - English
Ā 
Montoro(IMT.V) intersects nearly 100 mtrs of sulphide mineralization
Montoro(IMT.V) intersects nearly 100 mtrs  of sulphide mineralizationMontoro(IMT.V) intersects nearly 100 mtrs  of sulphide mineralization
Montoro(IMT.V) intersects nearly 100 mtrs of sulphide mineralization
Ā 

More from Minotaur Exploration

Minotaur 5 dec14_sa expl mining conf
Minotaur 5 dec14_sa expl mining confMinotaur 5 dec14_sa expl mining conf
Minotaur 5 dec14_sa expl mining confMinotaur Exploration
Ā 
The Artemis Cu-Au Deposit Presentation given by A. P. Belperio
The Artemis Cu-Au Deposit  Presentation given by A. P. BelperioThe Artemis Cu-Au Deposit  Presentation given by A. P. Belperio
The Artemis Cu-Au Deposit Presentation given by A. P. BelperioMinotaur Exploration
Ā 
The Artemis Cu-Au Deposit by A.P.Belperio
The Artemis Cu-Au Deposit by A.P.BelperioThe Artemis Cu-Au Deposit by A.P.Belperio
The Artemis Cu-Au Deposit by A.P.BelperioMinotaur Exploration
Ā 
MEP investment-case 20 Sep 2014
MEP investment-case 20 Sep 2014MEP investment-case 20 Sep 2014
MEP investment-case 20 Sep 2014Minotaur Exploration
Ā 
Managing Director Presents at Proactive Investors' Investor Luncheons
Managing Director Presents at Proactive Investors' Investor LuncheonsManaging Director Presents at Proactive Investors' Investor Luncheons
Managing Director Presents at Proactive Investors' Investor LuncheonsMinotaur Exploration
Ā 
Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...
Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...
Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...Minotaur Exploration
Ā 
Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...
Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...
Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...Minotaur Exploration
Ā 
Managing Director 2013 AGM Presentation
Managing Director 2013 AGM PresentationManaging Director 2013 AGM Presentation
Managing Director 2013 AGM PresentationMinotaur Exploration
Ā 
20:20 Resources Investor Series
20:20 Resources Investor Series20:20 Resources Investor Series
20:20 Resources Investor SeriesMinotaur Exploration
Ā 
Mines & Money Melbourne 2013 Presentation
Mines & Money Melbourne 2013 PresentationMines & Money Melbourne 2013 Presentation
Mines & Money Melbourne 2013 PresentationMinotaur Exploration
Ā 
Mep creating discovery opportunities aug13
Mep creating discovery opportunities aug13Mep creating discovery opportunities aug13
Mep creating discovery opportunities aug13Minotaur Exploration
Ā 
Andrew Woskett Presentation at 20:20 Resources Investor Series in Sydney
Andrew Woskett Presentation at 20:20 Resources Investor Series in SydneyAndrew Woskett Presentation at 20:20 Resources Investor Series in Sydney
Andrew Woskett Presentation at 20:20 Resources Investor Series in SydneyMinotaur Exploration
Ā 
Presentation given by Managing Director, Andrew Woskett at South Australia Re...
Presentation given by Managing Director, Andrew Woskett at South Australia Re...Presentation given by Managing Director, Andrew Woskett at South Australia Re...
Presentation given by Managing Director, Andrew Woskett at South Australia Re...Minotaur Exploration
Ā 
Managing Directors Presentation 2012 AGM
Managing Directors Presentation 2012 AGMManaging Directors Presentation 2012 AGM
Managing Directors Presentation 2012 AGMMinotaur Exploration
Ā 
Dr Tony Belperio's presentation at The Mining 2012 Resources Convention
Dr Tony Belperio's presentation at The Mining 2012 Resources ConventionDr Tony Belperio's presentation at The Mining 2012 Resources Convention
Dr Tony Belperio's presentation at The Mining 2012 Resources ConventionMinotaur Exploration
Ā 
Mutooroo Magnetite Project Update October 2012
Mutooroo Magnetite Project Update October 2012Mutooroo Magnetite Project Update October 2012
Mutooroo Magnetite Project Update October 2012Minotaur Exploration
Ā 
MEP AMEC presentation 14 july 2012
MEP AMEC presentation 14 july 2012MEP AMEC presentation 14 july 2012
MEP AMEC presentation 14 july 2012Minotaur Exploration
Ā 
Australia china resources symposium andrew woskett_chinese version_july12
Australia china resources symposium andrew woskett_chinese version_july12Australia china resources symposium andrew woskett_chinese version_july12
Australia china resources symposium andrew woskett_chinese version_july12Minotaur Exploration
Ā 
Andrew Woskett Presentation to 2012 Broken Hill Symposium
Andrew Woskett Presentation to 2012 Broken Hill SymposiumAndrew Woskett Presentation to 2012 Broken Hill Symposium
Andrew Woskett Presentation to 2012 Broken Hill SymposiumMinotaur Exploration
Ā 
Sa explorers &_mining_conference_2011_muster_dam_inferred_resource
Sa explorers &_mining_conference_2011_muster_dam_inferred_resourceSa explorers &_mining_conference_2011_muster_dam_inferred_resource
Sa explorers &_mining_conference_2011_muster_dam_inferred_resourceMinotaur Exploration
Ā 

More from Minotaur Exploration (20)

Minotaur 5 dec14_sa expl mining conf
Minotaur 5 dec14_sa expl mining confMinotaur 5 dec14_sa expl mining conf
Minotaur 5 dec14_sa expl mining conf
Ā 
The Artemis Cu-Au Deposit Presentation given by A. P. Belperio
The Artemis Cu-Au Deposit  Presentation given by A. P. BelperioThe Artemis Cu-Au Deposit  Presentation given by A. P. Belperio
The Artemis Cu-Au Deposit Presentation given by A. P. Belperio
Ā 
The Artemis Cu-Au Deposit by A.P.Belperio
The Artemis Cu-Au Deposit by A.P.BelperioThe Artemis Cu-Au Deposit by A.P.Belperio
The Artemis Cu-Au Deposit by A.P.Belperio
Ā 
MEP investment-case 20 Sep 2014
MEP investment-case 20 Sep 2014MEP investment-case 20 Sep 2014
MEP investment-case 20 Sep 2014
Ā 
Managing Director Presents at Proactive Investors' Investor Luncheons
Managing Director Presents at Proactive Investors' Investor LuncheonsManaging Director Presents at Proactive Investors' Investor Luncheons
Managing Director Presents at Proactive Investors' Investor Luncheons
Ā 
Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...
Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...
Presentation given by Managing Director Andrew Woskett at Qld Exploration Cou...
Ā 
Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...
Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...
Presentation Given By Managing Director Andrew Woskett At The Symposium Broke...
Ā 
Managing Director 2013 AGM Presentation
Managing Director 2013 AGM PresentationManaging Director 2013 AGM Presentation
Managing Director 2013 AGM Presentation
Ā 
20:20 Resources Investor Series
20:20 Resources Investor Series20:20 Resources Investor Series
20:20 Resources Investor Series
Ā 
Mines & Money Melbourne 2013 Presentation
Mines & Money Melbourne 2013 PresentationMines & Money Melbourne 2013 Presentation
Mines & Money Melbourne 2013 Presentation
Ā 
Mep creating discovery opportunities aug13
Mep creating discovery opportunities aug13Mep creating discovery opportunities aug13
Mep creating discovery opportunities aug13
Ā 
Andrew Woskett Presentation at 20:20 Resources Investor Series in Sydney
Andrew Woskett Presentation at 20:20 Resources Investor Series in SydneyAndrew Woskett Presentation at 20:20 Resources Investor Series in Sydney
Andrew Woskett Presentation at 20:20 Resources Investor Series in Sydney
Ā 
Presentation given by Managing Director, Andrew Woskett at South Australia Re...
Presentation given by Managing Director, Andrew Woskett at South Australia Re...Presentation given by Managing Director, Andrew Woskett at South Australia Re...
Presentation given by Managing Director, Andrew Woskett at South Australia Re...
Ā 
Managing Directors Presentation 2012 AGM
Managing Directors Presentation 2012 AGMManaging Directors Presentation 2012 AGM
Managing Directors Presentation 2012 AGM
Ā 
Dr Tony Belperio's presentation at The Mining 2012 Resources Convention
Dr Tony Belperio's presentation at The Mining 2012 Resources ConventionDr Tony Belperio's presentation at The Mining 2012 Resources Convention
Dr Tony Belperio's presentation at The Mining 2012 Resources Convention
Ā 
Mutooroo Magnetite Project Update October 2012
Mutooroo Magnetite Project Update October 2012Mutooroo Magnetite Project Update October 2012
Mutooroo Magnetite Project Update October 2012
Ā 
MEP AMEC presentation 14 july 2012
MEP AMEC presentation 14 july 2012MEP AMEC presentation 14 july 2012
MEP AMEC presentation 14 july 2012
Ā 
Australia china resources symposium andrew woskett_chinese version_july12
Australia china resources symposium andrew woskett_chinese version_july12Australia china resources symposium andrew woskett_chinese version_july12
Australia china resources symposium andrew woskett_chinese version_july12
Ā 
Andrew Woskett Presentation to 2012 Broken Hill Symposium
Andrew Woskett Presentation to 2012 Broken Hill SymposiumAndrew Woskett Presentation to 2012 Broken Hill Symposium
Andrew Woskett Presentation to 2012 Broken Hill Symposium
Ā 
Sa explorers &_mining_conference_2011_muster_dam_inferred_resource
Sa explorers &_mining_conference_2011_muster_dam_inferred_resourceSa explorers &_mining_conference_2011_muster_dam_inferred_resource
Sa explorers &_mining_conference_2011_muster_dam_inferred_resource
Ā 

Recently uploaded

countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024Kweku Zurek
Ā 
Top Rated Call Girls In Podanur šŸ“± {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur šŸ“± {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur šŸ“± {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur šŸ“± {7001035870} VIP Escorts Podanurdharasingh5698
Ā 
Osisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 ResultsOsisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 ResultsOsisko Gold Royalties Ltd
Ā 
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...tanu pandey
Ā 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024nicola_mining
Ā 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
Ā 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfProbe Gold
Ā 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
Ā 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxMollyBrown86
Ā 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Philip Rabenok
Ā 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingFalcon Invoice Discounting
Ā 
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)kojalkojal131
Ā 
Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Ltd
Ā 
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...SUHANI PANDEY
Ā 
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
Ā 
Call Girls in Panjabi Bagh, Delhi šŸ’Æ Call Us šŸ”9953056974 šŸ” Escort Service
Call Girls in Panjabi Bagh, Delhi šŸ’Æ Call Us šŸ”9953056974 šŸ” Escort ServiceCall Girls in Panjabi Bagh, Delhi šŸ’Æ Call Us šŸ”9953056974 šŸ” Escort Service
Call Girls in Panjabi Bagh, Delhi šŸ’Æ Call Us šŸ”9953056974 šŸ” Escort Service9953056974 Low Rate Call Girls In Saket, Delhi NCR
Ā 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024gstubel
Ā 
Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024KDDI
Ā 

Recently uploaded (20)

countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
Ā 
Top Rated Call Girls In Podanur šŸ“± {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur šŸ“± {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur šŸ“± {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur šŸ“± {7001035870} VIP Escorts Podanur
Ā 
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdfITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
Ā 
Osisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 ResultsOsisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 Results
Ā 
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Ā 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
Ā 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
Ā 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
Ā 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
Ā 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
Ā 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024
Ā 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
Ā 
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Ā 
Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings Presentation
Ā 
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
Ā 
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
Ā 
Call Girls in Panjabi Bagh, Delhi šŸ’Æ Call Us šŸ”9953056974 šŸ” Escort Service
Call Girls in Panjabi Bagh, Delhi šŸ’Æ Call Us šŸ”9953056974 šŸ” Escort ServiceCall Girls in Panjabi Bagh, Delhi šŸ’Æ Call Us šŸ”9953056974 šŸ” Escort Service
Call Girls in Panjabi Bagh, Delhi šŸ’Æ Call Us šŸ”9953056974 šŸ” Escort Service
Ā 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
Ā 
SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024
Ā 
Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024
Ā 

MInotaur Mining & Energy Infrastructure 12 april 2011

  • 1. SA Mining & Energy Infrastructure Conference, Adelaide 12-13 April 2011 Andrew Woskett, Managing Director Minotaur Exploration Limited ACN: 108 483 601 ASX: MEP
  • 2. The Braemar Infrastructure Challenge 1.ā€Æ Disclaimer 2.ā€Æ Introduction to the Braemar Iron Formation: where, what and why it is signiļ¬cant 3.ā€Æ A mining development scenario: how big could it be 4.ā€Æ Infrastructure proļ¬le: ļ‚§ā€Æ Beneļ¬ciation ļ‚§ā€Æ Power & Water ļ‚§ā€Æ Concentrate Slurry/Rail ļ‚§ā€Æ Pellitisation ļ‚§ā€Æ Port
  • 3. Cautionary Statements This presentation has been prepared by the management of Minotaur Exploration Limited (ASX: MEP) for the general benefit of analysts, brokers and investors and does not constitute specific advice to any particular party or persons. Information herein is based on publicly available information, internally developed data and other sources. Where an opinion, projection or forward looking statement is expressed in this presentation, it is based on the assumptions and limitations mentioned herein and is an expression of present opinion only. No warranties or representations are made or implied as to origin, validity, accuracy, completeness, currency or reliability of the information. MEP specifically disclaims and excludes all liability (to the extent permitted by law) for losses, claims, damages, demands, costs and expenses of whatever nature arising in any way out of or in connection with the information, its accuracy, completeness or by reason of reliance by any person on any of it. Where MEP expresses or implies an expectation or belief as to the success of future exploration and the economic viability of future project evaluations, such expectation or belief is expressed in good faith and is believed to have a reasonable basis. However, such projected outcomes are subject to risks, uncertainties and other factors which could cause actual results to differ materially from projected future results. Such risks include, but are not limited to, exploration success, metal price volatility, changes to current mineral resource estimates or targets, changes to assumptions for capital and operating costs as well as political and operational risks and government regulatory outcomes. MEP disclaims any obligation to advise any person if it becomes aware of any inaccuracy in or omission from any forecast or to update such forecast. The following presentation is a visualisation of possible infrastructure solutions to support potential future iron ore mine developments. Locations nominated for the provision of infrastructure facilities are for illustration purposes only and should not be considered viable technical, economic, environmental, social or State solutions for any future requirements
  • 4. Braemar Ironstones: The next big (Fe) thing This presentation is based on a range of views and assumptions held by Minotaur alone and Minotaur does not purport to speak on behalf of other mineral exploration companies with interests on the Braemar Iron Formation. Minotaur has not sought nor has it received any authorisation to make forward looking statements on behalf of other entities. This presentation conceptualises a development scenario for magnetite deposits on the Braemar Iron Formation. Being a concept, there is currently no supporting technical or economic justification. The integrated, multi-user infrastructure facilities envisaged are hypothetical in nature and scope and do not, in Minotaur s understanding, reflect third party intentions as presently contemplated. There can be no level of certainty that this or any concept may eventuate
  • 5. Braemar Ironstones: what is it? ļ‚²ā€Æa signiļ¬cant regional sequence of highly magnetised sediments containing the magnetite form of iron ļ‚²ā€ÆThe Braemar Iron Formation is emerging to potentially become Australia s next big iron ore province ļ‚²ā€Æ100km SW of Broken Hill ļ‚²ā€ÆHeavy duty rail link 300km to Port Pirie or 325km to Port Germaine
  • 6. Braemar Ironstones: Explorers ļ‚²ā€Æ several ASX listed explorers are active along the Braemar and all are reporting exploration success ļ‚²ā€Æ multiple zones, each potentially hosting hundreds of millions of tonnes of magnetite rich siltstones ļ‚²ā€Æ Regional potential for total Exploration Target of up to 20,000 million tonnes (Minotaur guesstimate) of in- situ Fe mineralised siltstone, circa 15-25% Fe content ļ‚²ā€Æ Could anticipate ~10 billion tonnes of mineable magnetite ore to be deļ¬ned through exploration The Ā term Ā "Explora/on Ā Target" Ā should Ā not Ā be Ā misconstrued Ā as Ā an Ā es/mate Ā of Ā Mineral Ā Resources Ā and Ā Reserves Ā as Ā deļ¬ned Ā by Ā the Ā JORC Ā Code Ā (2004), Ā and Ā the Ā term Ā has Ā not Ā been Ā used Ā in Ā that Ā  context. Ā It Ā is Ā uncertain Ā if Ā further Ā explora/on Ā will Ā result Ā in Ā the Ā determina/on Ā of Ā a Ā Mineral Ā Resource. Ā Refer Ā Cl Ā 18 Ā of Ā the Ā JORC Ā Code Ā (2004). Ā 
  • 7. Braemar Ironstones: the potential scope ļ‚²ā€ÆAssume ~10 billion tonnes of mineable magnetite ore can be deļ¬ned ļ‚²ā€Æscope for say 5 pits each mining 10-20Mtpa ore and beneļ¬ciating 5Mtpa of concentrate each ļ‚²ā€Ægives a foreseeable 100 year regional life of mining @ nominal 100Mtpa mining rate ļ‚²ā€Æwith annualised output of 25Mtpa of blast furnace quality magnetite concentrates grading 65% - 70% Fe
  • 8. Braemar Ironstones: Processing for 25Mtpa Con ļ‚²ā€ÆAssume ~10 billion tonnes of mineable magnetite ore can be deļ¬ned ļ‚²ā€Æscope for say 5 pits each mining 20Mtpa ore and beneļ¬ciating 5Mtpa of concentrate each ļ‚²ā€Æ@ nominal 100Mtpa mining rate gives a foreseeable 100 year regional life of ore mining ļ‚²ā€Æwith annualised output of 25Mtpa of blast 6 fully autogenous grinding mills @ 28MW each furnace quality magnetite concentrates grading 65% - 70% Fe ļ‚²ā€ÆBeneļ¬ciation scenarios: ļ¶ā€Æ 5 processing operations for 5Mtpa concentrate each, at +$2b Capex each, or ļ¶ā€Æ one 25Mtpa Super Plant and assoc infrastructure at ~$6b, saving ~$5b overall, with scale to include a Pellet Plant (producing a value added product) ļ¶ā€Æ equivalent to CITIC s $5.5b for 28Mtpa huge magnetite project at Cape Preston, WA photos sourced from www.citicpacificmining.com/resources/news 450MW Power station, combined cycle, gas fired
  • 9. Braemar Ironstones: Off Plot Infrastructure ļ‚²ā€ÆWater ļ‚²ā€ÆPower ļ‚²ā€ÆRail ļ‚²ā€ÆConcentrate Slurry Pipeline ļ‚²ā€ÆPort ļ‚²ā€ÆPellet Plant
  • 10. Braemar Ironstones: Water for 25Mtpa Con Water Supply scenarios: ą¹ā€Æmagnetite comminution and magnetic recovery circuits use vast amounts of clean (demineralised) water ą¹ā€Æprocess circuit will consume ~50Gl per year (50,000 Mega litres pa or 135 Mega litres per day) ą¹ā€Æa desal (RO) plant will be required on Spencer Gulf (BHPB s proposed facility for ODX is to supply additional 200 Ml/day from Port Bonython area) Proposed Olympic Dam Expansion Desalination Plant, Point Lowly, 200Ml per day capacity Source: ODX EIS p136-154, Fig 5.32 ą¹ā€Æ350km transfer pipeline, 1m diameter, plus 4 pump stations to deliver water to process facility ą¹ā€Æannual operating power demand of 150,000 MWh CITIC Desalination Plant Feb 2011 photo sourced from www.citicpacificmining.com/en/news/progress-images
  • 11. Braemar Ironstones: Power for 25Mtpa Con Power Supply scenarios: ą¹ā€Æpower demand of ~450MW (ODX requires additional 650MW generation) ą¹ā€Æconsuming 3,000 GWh pa (ODX to consume additional 4,400 GWh pa) graphics sourced from www.petratherm.com.au/expmodel.html ą¹ā€Æpotential for geothermal energy from shallow hot rocks nearby at Petratherm s Paralana project ą¹ā€Æpotential for meshed 275kV transmission NEM network between Paralana-Port Augusta-Broken Hill, supplying 500MW into grid ą¹ā€Æall in all, 1000km of new HV transmission network Disclosure: MEP holds an economic interest in Petratherm (ASX: PTR)
  • 12. Braemar Ironstones: Transfer 25Mtpa Con to Port Concentrate Transfer scenarios: ą¹ā€ÆRail: ā€¢ā€Æ325km to Port Germaine (25km north of Port Pirie) ā€¢ā€ÆARTC to upgrade E-W corridor in 2012 ā€¢ā€Æ35km spur required into train loading bins ā€¢ā€Æ ballon loop required at each end for train turn around and 24 hour loading/unloading ā€¢ā€Æ2000m long trains, 25 tonne/axle, 100 tonne wagons, 20,000 tonne capacity ą¹ā€ÆSlurry Pipeline: ā€¢ā€Æ360km buried pipeline to Port Germaine ā€¢ā€Ærequires 600mm diameter Con delivery pipe + Return Water Line ā€¢ā€ÆExamples: āœ“ā€Æ Century Zinc s 300mm diameter concentrate pipeline is 304km long, concentrate in slurry āœ“ā€Æ Minas Rio iron project, Brazil, 600mm diameter pipeline is 522km long, to transport 24.5Mtpa ā€¢ā€Æ2-3 intermediate Pump Stations ā€¢ā€ÆPort Dewatering station & Concentrate storage
  • 13. Braemar Ironstones: Port for 25Mtpa Con Berthing for 200,000DWT Cape Size vessels ļ‚Ŗā€Æ 125 ships loaded per year ļ‚Ŗā€Æ 4,000tph loading rate ļ‚Ŗā€Æ 320m long ļ‚Ŗā€Æ 20m draft ļ‚Ŗā€Æ jetty length ~3km ?
  • 14. Braemar Ironstones: Downstream option for Con CITIC Stacker Reclaimer Feb 2011 photo sourced from www.citicpacificmining.com/en/news/progress-images Pelletisation ą¹ā€Æ Concentrate is agglomerated to form pellets for direct injection into a steel making Blast Furnace ą¹ā€Æ Pellet plants are common in China. OneSteel has a 1.2Mtpa pellet plant at Whyalla steel making plant ą¹ā€Æ in 2010 Iran commissioned a 5Mt pa plant (see photo) costing US$600 million ą¹ā€Æ Pelletisation adds value to the concentrate product and is required before feeding into Blast Furnace ą¹ā€Æ Pellets are easier to ship (no moisture content), less likely to release fugitive dust emissions ą¹ā€Æ Australia is underweight in downstream value-add components of the steel making supply chain
  • 15. The Braemar ā€“ evolving to be Australiaā€™s next big Fe Infrastructure province? Minotaur Exploration Limited ACN: 108 483 601 ASX: MEP www.minotaurexploration.com.au