                                     Resolution 2011 - 174

    Resolution Approving a Partner Agreement with the Minneapolis Parks Foundation and
    Establishment of a Non-appointed Citizen’s Advisory Committee Process for Preliminary
     Visioning and Implementation Study of the Waterworks Site in Downtown Minneapolis


Whereas, The Minneapolis Park & Recreation Board (“MPRB”) is authorized to contract with
public and private entities;

Whereas, The MPRB is the owner of a property known as the Waterworks site, formerly referred
to as the Fuji Ya site located at 420 1st Street South in downtown Minneapolis;

Whereas, The Waterworks site is current underutilized, especially given its downtown riverfront
location, prominent views, and historical and cultural significance;

Whereas, Until recently, the MPRB was unable to pursue enhancements on the site due to
legal actions;

Whereas, The MPRB, Minneapolis Parks Foundation (“Foundation”) and broader community
have a deep interest in enhancing the Waterworks site as a signature element of the
Minneapolis park system;

Whereas, The MPRB enjoys a close working relationship with the Foundation;

Whereas, The Foundation has secured funding, through a major donor, to support a preliminary
visioning and implementation study of the site that will explore a range of alternatives;

Whereas, The Foundation will contract with site design and park finance professionals;

Whereas, The MPRB supports the study and welcomes the Foundation as an active partner in
completing the study process; and

Whereas, The MPRB will facilitate a community engagement process for the project;

RESOLVED, That the Board of Commissioners approve a partner agreement with the
Foundation for preliminary visioning and implementation study of the Waterworks site in
downtown Minneapolis;

RESOLVED, That the Board of Commissioners authorizea non-appointed citizens advisory
committee process for the project; and

RESOLVED, That the President and Secretary of the Board are authorized to take all necessary
administrative actions to implement this resolution.
Posted by http://MillCityTimes.com

Adopted by the Park & Recreation Board
In formal meeting assembled on September 21, 2011

                                                    ______________________________
                                                    John Erwin, President



                                                    ______________________________
                                                    Karen Robinson, Secretary
Approved:

_________________________________
R.T. Rybak, Mayor
Posted by http://MillCityTimes.com




TO:           Planning Committee

FROM:         Bruce Chamberlain, Assistant Superintendent for Planning Services

DATE:         September 7, 2011

SUBJECT:      Resolution approving a partner agreement with the Minneapolis Parks
              Foundation and establishment of a non-appointed citizen’s advisory committee
              process for preliminary visioning and implementation study of the Waterworks
              site in downtown Minneapolis.


BACKGROUND

The Waterworks site (formerly referred to as the Fuji Ya site) in downtown Minneapolis offers an
exciting city-building opportunity. It is adjacent to West River Road and overlooks Saint Anthony
Falls with dramatic views up and down the Mississippi River. The property was once home to
the Fuji Ya restaurant, a beloved destination that afforded visitors a unique vantage point from
which to experience the power and spirit of the river. Further back in time, the site held one of
the many grain mills along the Minneapolis riverfront as well as a hydropower waterworks plant
(thus the newly minted Waterworks site name). Mill ruins still exist on the property – some
exposed, some buried and some contained within the restaurant building.

Since the Minneapolis Park & Recreation Board purchased the property over two decades ago
to build West River Road, the site has been utilized for fee parking but not much more. Title
restrictions imposed by the State of Minnesota have not allowed the Park Board to put the
portion of the site unneeded for the parkway back into private use as originally intended. Now,
the vibrancy of downtown has exploded around the Waterworks site and the time to explore
exciting and bold alternative futures for public use of the site has arrived.

The Waterworks site has an opportunity to become a signature element of the Minneapolis Park
system and this belief has been embraced by the Minneapolis Parks Foundation. The Parks
Foundation has received a generous donation to conduct preliminary design visioning and an
implementation study for public use of the site. The study would explore alternative futures for
the Waterworks site that could include combinations of outdoor space, community gathering,
supportive enterprise and design innovation. The effort is viewed by the Foundation as an
opportunity to further the 21st Century Park vision for Minneapolis begun with the Minneapolis
Riverfront Design Competition.

The project is viewed by the Parks Foundation and Staff as a critical preliminary step in a reuse
strategy for the Waterworks site. It would be a relatively short-duration effort of three to four
months in length. Its primary intention is to explore multiple ideas for the site and test those
ideas for implementation feasibility and community excitement. If approved by the Board, the
Minneapolis Parks Foundation will enter into an agreement with the Park Board to collaborate
on the visioning and implementation study. Project responsibilities would be as follows:
Posted by http://MillCityTimes.com

        The Foundation would:
               Establish contractual relationships with consultants for completion of the
                 project.
               Raise the full amount of funds necessary to complete the project and fully
                 compensate project consultants.
               Work collaboratively with the Park Board to direct the work of project
                 consultants.
               Actively participate in the community engagement process.
               Work collaboratively with the Park Board on public relations and project
                 communication efforts.

        The Park Board would:
               Approve project consultant’s scope of work.
               Organize and facilitate the community engagement process.
               Review and approve interim and final deliverables prepared by project
                  consultants.
               Work collaboratively with the Foundation on public relations and project
                  communications.
               Provide the Foundation and project consultants with any pertinent
                  background materials, mapping, surveys, etc. in its possession.

LEGAL REVIEW

The Partner Agreement has been reviewed by MPRB legal counsel.

FUNDING/COST SUMMARY

N/A

RECOMMENDATION

Staff believes this is an exciting first step in envisioning the future of the Waterworks site and its
pivotal role in bridging city and park. Because of the preliminary nature and short duration of the
project and to engage the broadest spectrum of the community staff recommends that a non-
appointed citizen’s advisory committee is well-suited to the effort. This approach will allow for
broad community engagement with the process and set the stage for a future, more in-depth
master planning effort where an appointed citizen’s advisory committee will be warranted.

Staff recommends approval of a partner agreement with the Minneapolis Parks Foundation and
establishment of a non-appointed citizen’s advisory committee process for preliminary visioning
and implementation study of the Waterworks site in downtown Minneapolis.
ATTACHMENTS

Attachment A – Partner Agreement

RELATED BOARD ACTIONS

None.


Prepared by: Bruce Chamberlain, Assistant Superintendent for Planning Services
Approved by: Jayne Miller, Superintendent
Posted by http://MillCityTimes.com


Attachment A


      MINNEAPOLIS PARK AND RECREATION BOARD PROJECT PARTNER
       AGREEMENT WITH THE MINNEAPOLIS PARKS FOUNDATION FOR
      PRELIMINARY VISIONING AND IMPLEMENTATION STUDY OF THE
            WATERWORKS SITE IN DOWNTOWN MINNEAPOLIS


       THIS AGREEMENT, is made and entered into as of the ____ day of , 2011
by and between the MINNEAPOLIS PARK AND RECREATION BOARD (the "MPRB") and
the MINNEAPOLIS PARKS FOUNDATION, a Minnesota non-profit corporation (the
"Foundation").


        WHEREAS, the MPRB is the owner of a property known as the Waterworks site (the
“Site”), formerly referred to as the Fuji Ya site located at 420 1st Street South in downtown
Minneapolis;

      WHEREAS, the Site is current underutilized given its downtown riverfront location,
prominent views, and historical and cultural significance;

        WHEREAS, until recently, the MPRB was unable to pursue enhancements on the Site
due to legal actions;

       WHEREAS, the MPRB, the Foundation and the broader community have a deep interest
in enhancing the Site as a signature element of the Minneapolispark system;

        WHEREAS, the Foundation has secured funding, through a major donor, to support a
preliminary visioning and implementation study of the Site that will explore a range of
alternatives;

        WHEREAS, the MPRB supports the study and welcomes the Foundation as an active
partner in completing the study process;

       NOW, THEREFORE, it is agreed by and between the parties hereto that:

Section I.     Scope of Work
       The project will include the creation of alternative uses and design concepts for the future
       of the Site and evaluation of those alternatives for their financial, market and
       implementation feasibility. The work of the project will be conducted within the context
       of a community engagement process where the ideas explored and project outcomes will
       be informed by input from the general public through a non-appointed Citizen Advisory
       Committee.

       The project is considered a preliminary analysis of future possibilities for the Site and a
       launching point for more in-depth design and programming conducted beyond the scope
       of this Agreement.
Posted by http://MillCityTimes.com

Section II.   Acknowledgement of Funds
       With this agreement, the Foundation acknowledges that it possesses and has earmarked
       funds necessary to fully compensate project consultants engaged to complete the project.

Section III. Responsibilities
       The Foundation will:
              Establish contractual relationships with consultants for completion of the
                project.
              Raise the full amount of funds necessary to complete the project and fully
                compensate project consultants.
              Work collaboratively with the MPRB to direct the work of project consultants.
              Actively participate in the community engagement process.
              Work collaboratively with the MPRB on public relations and project
                communication efforts.

       The MPRB will:
              Approve project consultant’s scope of work.
              Organize and facilitate the community engagement process.
              Review and approve interim and final deliverables prepared by project
               consultants.
              Work collaboratively with the Foundation on public relations and project
               communications.
              Provide the Foundation and project consultants with any pertinent background
               materials, mapping, surveys, etc. in its possession.

Section IV. Completion
       The project is expected to take three to four months to complete. This Agreement shall be
       in full force and effect from the date first written above through February 29, 2012 unless
       terminated earlier in accordance with Section VIII of this Agreement or extended
       pursuant to Section IX of this Agreement.

Section V.  Notices
       Communication and details concerning this Agreement shall be directed to the following:

       Minneapolis Park and Recreation Board:
       Bruce Chamberlain, ASLA
       Assistant Superintendent for Planning
       2117 West River Road
       Minneapolis, MN 55411
       p. 612.230.6467
       bchamberlain@minneapolisparks.org

       Minneapolis Parks Foundation:
       Cecily Hines, President
       3954 Bryant Ave South
       Minneapolis, MN 55409
       p. 612.822.2656
       chines@mplsparksfoundation.org
Posted by http://MillCityTimes.com



Section VI. General Conditions
       This Agreement is to be construed and governed by the laws of the State of Minnesota.

Section VII. Indemnification
       The Foundation shall hold harmless, defend and indemnify the MPRB and its staff from
       any and all claims, actions, suits, charges and judgments whatsoever that arise out of the
       Foundation's performance or nonperformance of the services or subject matter called for
       in this Agreement.

Section VIII. Termination
       Either party may terminate this Agreement or any portion thereof, with or without cause,
       by giving thirty (30) days prior written notice. Should the Agreement be terminated,
       compensation of project consultants shall be the sole responsibility of the Foundation.

Section IX. Administrative Adjustments
       The term of this Agreement may be extended for an additional period of six (6) months
       provided that at least thirty (30) days prior to the end of the Term of this Agreement, the
       party seeking such an extension has written approval from the other party for the
       extension, such approval shall not be unreasonably withheld.

        IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the
date first written above.

                                              MINNEAPOLIS PARKS FOUNDATION

                                              By
                                                             Its President

                                              Date______________________________________

                                              MINNEAPOLIS PARK AND
                                              RECREATION BOARD

                                              By
                                                             Its President

                                              Date______________________________________


                                              By                                             ______
                                                                     Its Secretary

                                              Date______________________________________

Mais conteúdo relacionado

Mais procurados

Treatment plant relocation
Treatment plant relocationTreatment plant relocation
Treatment plant relocationDacia Johnson
 
006 Coastal Communities Adapting to Change (CCATCH)
006 Coastal Communities Adapting to Change (CCATCH)006 Coastal Communities Adapting to Change (CCATCH)
006 Coastal Communities Adapting to Change (CCATCH)djhutch
 
ROBERT J BOSCO 2014
ROBERT J BOSCO 2014ROBERT J BOSCO 2014
ROBERT J BOSCO 2014Bob Bosco
 
Planning Sustainability In A Rural Environment
Planning Sustainability In A Rural EnvironmentPlanning Sustainability In A Rural Environment
Planning Sustainability In A Rural EnvironmentDavid Eades
 
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - JupiterAPA Florida
 
DS-17-043 - Parks Master Plan
DS-17-043 - Parks Master PlanDS-17-043 - Parks Master Plan
DS-17-043 - Parks Master PlanCityofKilleen
 
BWG Stormwater-Study
BWG Stormwater-StudyBWG Stormwater-Study
BWG Stormwater-Studyjpetr0s
 
Urban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsUrban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsJohnny Browaeys - 庄博闻
 
English Avenue Neighborhood Association Visioning Session
English Avenue Neighborhood Association Visioning SessionEnglish Avenue Neighborhood Association Visioning Session
English Avenue Neighborhood Association Visioning SessionJBHackk
 
Killeen Parks Master Plan
Killeen Parks Master PlanKilleen Parks Master Plan
Killeen Parks Master PlanCityofKilleen
 
Item 8.3 Promenade Rezoning
Item 8.3 Promenade RezoningItem 8.3 Promenade Rezoning
Item 8.3 Promenade Rezoningarounddublin
 
Terry Ave 4-5-05
Terry Ave 4-5-05Terry Ave 4-5-05
Terry Ave 4-5-05tfooq
 
Emeryville Parks and Recreation Strategic Plan
Emeryville Parks and Recreation Strategic PlanEmeryville Parks and Recreation Strategic Plan
Emeryville Parks and Recreation Strategic PlanE'ville Eye
 
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINALPALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINALWilliam J. Pehaim
 

Mais procurados (20)

Treatment plant relocation
Treatment plant relocationTreatment plant relocation
Treatment plant relocation
 
006 Coastal Communities Adapting to Change (CCATCH)
006 Coastal Communities Adapting to Change (CCATCH)006 Coastal Communities Adapting to Change (CCATCH)
006 Coastal Communities Adapting to Change (CCATCH)
 
ROBERT J BOSCO 2014
ROBERT J BOSCO 2014ROBERT J BOSCO 2014
ROBERT J BOSCO 2014
 
Selected Projects
Selected ProjectsSelected Projects
Selected Projects
 
Planning Sustainability In A Rural Environment
Planning Sustainability In A Rural EnvironmentPlanning Sustainability In A Rural Environment
Planning Sustainability In A Rural Environment
 
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
 
DS-17-043 - Parks Master Plan
DS-17-043 - Parks Master PlanDS-17-043 - Parks Master Plan
DS-17-043 - Parks Master Plan
 
BWG Stormwater-Study
BWG Stormwater-StudyBWG Stormwater-Study
BWG Stormwater-Study
 
Urban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsUrban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case Descriptions
 
English Avenue Neighborhood Association Visioning Session
English Avenue Neighborhood Association Visioning SessionEnglish Avenue Neighborhood Association Visioning Session
English Avenue Neighborhood Association Visioning Session
 
Killeen Parks Master Plan
Killeen Parks Master PlanKilleen Parks Master Plan
Killeen Parks Master Plan
 
Item 8.3 Promenade Rezoning
Item 8.3 Promenade RezoningItem 8.3 Promenade Rezoning
Item 8.3 Promenade Rezoning
 
Terry Ave 4-5-05
Terry Ave 4-5-05Terry Ave 4-5-05
Terry Ave 4-5-05
 
Wildwood_Final_Report
Wildwood_Final_ReportWildwood_Final_Report
Wildwood_Final_Report
 
Emeryville Parks and Recreation Strategic Plan
Emeryville Parks and Recreation Strategic PlanEmeryville Parks and Recreation Strategic Plan
Emeryville Parks and Recreation Strategic Plan
 
MMRC Presentation to MMTC 2016 06-06
MMRC Presentation to MMTC 2016 06-06MMRC Presentation to MMTC 2016 06-06
MMRC Presentation to MMTC 2016 06-06
 
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINALPALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
 
Broadview Heights Master Plan: Public Meeting #3
Broadview Heights Master Plan: Public Meeting #3Broadview Heights Master Plan: Public Meeting #3
Broadview Heights Master Plan: Public Meeting #3
 
Chapter1
Chapter1Chapter1
Chapter1
 
2015_Bridge_Road
2015_Bridge_Road2015_Bridge_Road
2015_Bridge_Road
 

Destaque

DMNA Annual Meeting Agenda 10-11-11
DMNA Annual Meeting Agenda 10-11-11DMNA Annual Meeting Agenda 10-11-11
DMNA Annual Meeting Agenda 10-11-11Mill City Times
 
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011Mill City Times
 
1100 2nd St S RFP_2010 2
1100 2nd St S RFP_2010 21100 2nd St S RFP_2010 2
1100 2nd St S RFP_2010 2Mill City Times
 
Re - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCARe - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCAMill City Times
 
Minneapolis RiverCurrent 10-13-11
Minneapolis RiverCurrent 10-13-11Minneapolis RiverCurrent 10-13-11
Minneapolis RiverCurrent 10-13-11Mill City Times
 
Third Ward NeighborhoodFest 2011
Third Ward NeighborhoodFest 2011Third Ward NeighborhoodFest 2011
Third Ward NeighborhoodFest 2011Mill City Times
 

Destaque (7)

DMNA Annual Meeting Agenda 10-11-11
DMNA Annual Meeting Agenda 10-11-11DMNA Annual Meeting Agenda 10-11-11
DMNA Annual Meeting Agenda 10-11-11
 
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
 
1100 2nd St S RFP_2010 2
1100 2nd St S RFP_2010 21100 2nd St S RFP_2010 2
1100 2nd St S RFP_2010 2
 
Re - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCARe - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCA
 
Gold Medal Plaza
Gold Medal PlazaGold Medal Plaza
Gold Medal Plaza
 
Minneapolis RiverCurrent 10-13-11
Minneapolis RiverCurrent 10-13-11Minneapolis RiverCurrent 10-13-11
Minneapolis RiverCurrent 10-13-11
 
Third Ward NeighborhoodFest 2011
Third Ward NeighborhoodFest 2011Third Ward NeighborhoodFest 2011
Third Ward NeighborhoodFest 2011
 

Semelhante a Fuji Ya - Waterworks Site Resolution from Minneapolis Park Board

Executive Summary: Schematic Design, Finance Strategy and Next Steps
Executive Summary: Schematic Design, Finance Strategy and Next StepsExecutive Summary: Schematic Design, Finance Strategy and Next Steps
Executive Summary: Schematic Design, Finance Strategy and Next StepsRiverFirst Initiative
 
Hosford-Abernethy Presentation / Southeast Uplift Green Space Workshop
Hosford-Abernethy Presentation / Southeast Uplift Green Space WorkshopHosford-Abernethy Presentation / Southeast Uplift Green Space Workshop
Hosford-Abernethy Presentation / Southeast Uplift Green Space Workshopamylewin
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay Adina Levin
 
20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...
20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...
20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...Park Pride
 
Stakeholder Experiences in Collaborative Learning (2014)
Stakeholder Experiences in Collaborative Learning (2014)Stakeholder Experiences in Collaborative Learning (2014)
Stakeholder Experiences in Collaborative Learning (2014)Katy Thostenson
 
SFPA_2016 Impact Report_Final_WEB
SFPA_2016 Impact Report_Final_WEBSFPA_2016 Impact Report_Final_WEB
SFPA_2016 Impact Report_Final_WEBrpnorton
 
The Bay Sarasota - Timeline from Master Plan to Phase 1 Plan
The Bay Sarasota - Timeline from Master Plan to Phase 1 PlanThe Bay Sarasota - Timeline from Master Plan to Phase 1 Plan
The Bay Sarasota - Timeline from Master Plan to Phase 1 Planapallegar
 
2010.1164_MUCC_final_report_08-2014-630
2010.1164_MUCC_final_report_08-2014-6302010.1164_MUCC_final_report_08-2014-630
2010.1164_MUCC_final_report_08-2014-630Dondré Young
 
Water Wise Roadmap
Water Wise RoadmapWater Wise Roadmap
Water Wise RoadmapBPWWC
 
Southside Green - Opening Presentation
Southside Green - Opening PresentationSouthside Green - Opening Presentation
Southside Green - Opening PresentationM. Damon Weiss
 
Hello 4. Through a google search, present one case study on Indirect.pdf
Hello 4. Through a google search, present one case study on Indirect.pdfHello 4. Through a google search, present one case study on Indirect.pdf
Hello 4. Through a google search, present one case study on Indirect.pdfartimagein
 
Cultivating Vibrant & Resilient Communities, One Garden at a Time
Cultivating Vibrant & Resilient Communities, One Garden at a TimeCultivating Vibrant & Resilient Communities, One Garden at a Time
Cultivating Vibrant & Resilient Communities, One Garden at a TimeBringFoodHome
 
Work Sample_Yijing(Giulia)He
Work Sample_Yijing(Giulia)HeWork Sample_Yijing(Giulia)He
Work Sample_Yijing(Giulia)HeYijing He
 
Water Wise Showcase handout
Water Wise Showcase handoutWater Wise Showcase handout
Water Wise Showcase handoutBPWWC
 
MAPC's Sustainable Communities Regional Planning Grant Project Posters
MAPC's Sustainable Communities Regional Planning Grant Project PostersMAPC's Sustainable Communities Regional Planning Grant Project Posters
MAPC's Sustainable Communities Regional Planning Grant Project PostersMetropolitan Area Planning Council
 
SF Recreation and Park 2016-2020 Strategic Plan and SF City Charter
SF Recreation and Park  2016-2020 Strategic Plan and SF City CharterSF Recreation and Park  2016-2020 Strategic Plan and SF City Charter
SF Recreation and Park 2016-2020 Strategic Plan and SF City CharterGoldenGateParkPreservationAlliance
 
CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15
CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15
CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15Susan McCulloch
 

Semelhante a Fuji Ya - Waterworks Site Resolution from Minneapolis Park Board (20)

Executive Summary: Schematic Design, Finance Strategy and Next Steps
Executive Summary: Schematic Design, Finance Strategy and Next StepsExecutive Summary: Schematic Design, Finance Strategy and Next Steps
Executive Summary: Schematic Design, Finance Strategy and Next Steps
 
Hosford-Abernethy Presentation / Southeast Uplift Green Space Workshop
Hosford-Abernethy Presentation / Southeast Uplift Green Space WorkshopHosford-Abernethy Presentation / Southeast Uplift Green Space Workshop
Hosford-Abernethy Presentation / Southeast Uplift Green Space Workshop
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay
 
20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...
20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...
20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...
 
Stakeholder Experiences in Collaborative Learning (2014)
Stakeholder Experiences in Collaborative Learning (2014)Stakeholder Experiences in Collaborative Learning (2014)
Stakeholder Experiences in Collaborative Learning (2014)
 
SFPA_2016 Impact Report_Final_WEB
SFPA_2016 Impact Report_Final_WEBSFPA_2016 Impact Report_Final_WEB
SFPA_2016 Impact Report_Final_WEB
 
The Bay Sarasota - Timeline from Master Plan to Phase 1 Plan
The Bay Sarasota - Timeline from Master Plan to Phase 1 PlanThe Bay Sarasota - Timeline from Master Plan to Phase 1 Plan
The Bay Sarasota - Timeline from Master Plan to Phase 1 Plan
 
2010.1164_MUCC_final_report_08-2014-630
2010.1164_MUCC_final_report_08-2014-6302010.1164_MUCC_final_report_08-2014-630
2010.1164_MUCC_final_report_08-2014-630
 
Water Wise Roadmap
Water Wise RoadmapWater Wise Roadmap
Water Wise Roadmap
 
Southside Green - Opening Presentation
Southside Green - Opening PresentationSouthside Green - Opening Presentation
Southside Green - Opening Presentation
 
Hello 4. Through a google search, present one case study on Indirect.pdf
Hello 4. Through a google search, present one case study on Indirect.pdfHello 4. Through a google search, present one case study on Indirect.pdf
Hello 4. Through a google search, present one case study on Indirect.pdf
 
Bay Village Master Plan final presentation
Bay Village Master Plan final presentationBay Village Master Plan final presentation
Bay Village Master Plan final presentation
 
Cultivating Vibrant & Resilient Communities, One Garden at a Time
Cultivating Vibrant & Resilient Communities, One Garden at a TimeCultivating Vibrant & Resilient Communities, One Garden at a Time
Cultivating Vibrant & Resilient Communities, One Garden at a Time
 
Work Sample_Yijing(Giulia)He
Work Sample_Yijing(Giulia)HeWork Sample_Yijing(Giulia)He
Work Sample_Yijing(Giulia)He
 
Water Wise Showcase handout
Water Wise Showcase handoutWater Wise Showcase handout
Water Wise Showcase handout
 
LHResume
LHResumeLHResume
LHResume
 
MAPC's Sustainable Communities Regional Planning Grant Project Posters
MAPC's Sustainable Communities Regional Planning Grant Project PostersMAPC's Sustainable Communities Regional Planning Grant Project Posters
MAPC's Sustainable Communities Regional Planning Grant Project Posters
 
SF Recreation and Park 2016-2020 Strategic Plan and SF City Charter
SF Recreation and Park  2016-2020 Strategic Plan and SF City CharterSF Recreation and Park  2016-2020 Strategic Plan and SF City Charter
SF Recreation and Park 2016-2020 Strategic Plan and SF City Charter
 
RiverFirst Vision (Final 2012)
RiverFirst Vision (Final 2012)RiverFirst Vision (Final 2012)
RiverFirst Vision (Final 2012)
 
CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15
CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15
CityofMartinsvilleUptownRevitalizationPhase1HarvestReport2-23-15
 

Mais de Mill City Times

Great River Outing - Gems Along the Mississippi Trail
Great River Outing - Gems Along the Mississippi TrailGreat River Outing - Gems Along the Mississippi Trail
Great River Outing - Gems Along the Mississippi TrailMill City Times
 
Minneapolis RiverCurrent 11-10-11
Minneapolis RiverCurrent 11-10-11Minneapolis RiverCurrent 11-10-11
Minneapolis RiverCurrent 11-10-11Mill City Times
 
DMNA November Board Meeting Agenda 11-8-11
DMNA November Board Meeting Agenda 11-8-11DMNA November Board Meeting Agenda 11-8-11
DMNA November Board Meeting Agenda 11-8-11Mill City Times
 
Minneapolis RiverCurrent 11-3-11
Minneapolis RiverCurrent 11-3-11Minneapolis RiverCurrent 11-3-11
Minneapolis RiverCurrent 11-3-11Mill City Times
 
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...Mill City Times
 
Chute Square Park Press Release 102711
Chute Square Park Press Release 102711Chute Square Park Press Release 102711
Chute Square Park Press Release 102711Mill City Times
 
Minneapolis RiverCurrent 10-28-11
Minneapolis RiverCurrent 10-28-11Minneapolis RiverCurrent 10-28-11
Minneapolis RiverCurrent 10-28-11Mill City Times
 
Minneapolis RiverCurrent 10-19-11
Minneapolis RiverCurrent 10-19-11Minneapolis RiverCurrent 10-19-11
Minneapolis RiverCurrent 10-19-11Mill City Times
 
East Downtown Council Job Posting for Executive Assistant
East Downtown Council Job Posting for Executive AssistantEast Downtown Council Job Posting for Executive Assistant
East Downtown Council Job Posting for Executive AssistantMill City Times
 
Vikings Stadium Proposal Risk Analysis Report
Vikings Stadium Proposal Risk Analysis ReportVikings Stadium Proposal Risk Analysis Report
Vikings Stadium Proposal Risk Analysis ReportMill City Times
 
Minneapolis RiverCurrent 10-6-11
Minneapolis RiverCurrent 10-6-11Minneapolis RiverCurrent 10-6-11
Minneapolis RiverCurrent 10-6-11Mill City Times
 
Minneapolis RiverCurrent 9-29-11
Minneapolis RiverCurrent 9-29-11Minneapolis RiverCurrent 9-29-11
Minneapolis RiverCurrent 9-29-11Mill City Times
 
Minneapolis RiverCurrent 9-22-11
Minneapolis RiverCurrent 9-22-11Minneapolis RiverCurrent 9-22-11
Minneapolis RiverCurrent 9-22-11Mill City Times
 
For distribution RiverFIRST Letter From Diane Hofstede 9.7.11
For distribution RiverFIRST Letter From Diane Hofstede 9.7.11For distribution RiverFIRST Letter From Diane Hofstede 9.7.11
For distribution RiverFIRST Letter From Diane Hofstede 9.7.11Mill City Times
 
Sanctuary Pink Tasting Menu
Sanctuary Pink Tasting MenuSanctuary Pink Tasting Menu
Sanctuary Pink Tasting MenuMill City Times
 
Loft Development Assistant Posting 9 2011_final
Loft Development Assistant Posting 9 2011_finalLoft Development Assistant Posting 9 2011_final
Loft Development Assistant Posting 9 2011_finalMill City Times
 
Minneapolis RiverCurrent 9-15-11
Minneapolis RiverCurrent 9-15-11Minneapolis RiverCurrent 9-15-11
Minneapolis RiverCurrent 9-15-11Mill City Times
 
Dredge Thompson Photos from Big River Magazine
Dredge Thompson Photos from Big River MagazineDredge Thompson Photos from Big River Magazine
Dredge Thompson Photos from Big River MagazineMill City Times
 
Minneapolis RiverCurrent 9-8-11
Minneapolis RiverCurrent 9-8-11Minneapolis RiverCurrent 9-8-11
Minneapolis RiverCurrent 9-8-11Mill City Times
 
Minneapolis RiverCurrent 9-1-11
Minneapolis RiverCurrent 9-1-11Minneapolis RiverCurrent 9-1-11
Minneapolis RiverCurrent 9-1-11Mill City Times
 

Mais de Mill City Times (20)

Great River Outing - Gems Along the Mississippi Trail
Great River Outing - Gems Along the Mississippi TrailGreat River Outing - Gems Along the Mississippi Trail
Great River Outing - Gems Along the Mississippi Trail
 
Minneapolis RiverCurrent 11-10-11
Minneapolis RiverCurrent 11-10-11Minneapolis RiverCurrent 11-10-11
Minneapolis RiverCurrent 11-10-11
 
DMNA November Board Meeting Agenda 11-8-11
DMNA November Board Meeting Agenda 11-8-11DMNA November Board Meeting Agenda 11-8-11
DMNA November Board Meeting Agenda 11-8-11
 
Minneapolis RiverCurrent 11-3-11
Minneapolis RiverCurrent 11-3-11Minneapolis RiverCurrent 11-3-11
Minneapolis RiverCurrent 11-3-11
 
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
 
Chute Square Park Press Release 102711
Chute Square Park Press Release 102711Chute Square Park Press Release 102711
Chute Square Park Press Release 102711
 
Minneapolis RiverCurrent 10-28-11
Minneapolis RiverCurrent 10-28-11Minneapolis RiverCurrent 10-28-11
Minneapolis RiverCurrent 10-28-11
 
Minneapolis RiverCurrent 10-19-11
Minneapolis RiverCurrent 10-19-11Minneapolis RiverCurrent 10-19-11
Minneapolis RiverCurrent 10-19-11
 
East Downtown Council Job Posting for Executive Assistant
East Downtown Council Job Posting for Executive AssistantEast Downtown Council Job Posting for Executive Assistant
East Downtown Council Job Posting for Executive Assistant
 
Vikings Stadium Proposal Risk Analysis Report
Vikings Stadium Proposal Risk Analysis ReportVikings Stadium Proposal Risk Analysis Report
Vikings Stadium Proposal Risk Analysis Report
 
Minneapolis RiverCurrent 10-6-11
Minneapolis RiverCurrent 10-6-11Minneapolis RiverCurrent 10-6-11
Minneapolis RiverCurrent 10-6-11
 
Minneapolis RiverCurrent 9-29-11
Minneapolis RiverCurrent 9-29-11Minneapolis RiverCurrent 9-29-11
Minneapolis RiverCurrent 9-29-11
 
Minneapolis RiverCurrent 9-22-11
Minneapolis RiverCurrent 9-22-11Minneapolis RiverCurrent 9-22-11
Minneapolis RiverCurrent 9-22-11
 
For distribution RiverFIRST Letter From Diane Hofstede 9.7.11
For distribution RiverFIRST Letter From Diane Hofstede 9.7.11For distribution RiverFIRST Letter From Diane Hofstede 9.7.11
For distribution RiverFIRST Letter From Diane Hofstede 9.7.11
 
Sanctuary Pink Tasting Menu
Sanctuary Pink Tasting MenuSanctuary Pink Tasting Menu
Sanctuary Pink Tasting Menu
 
Loft Development Assistant Posting 9 2011_final
Loft Development Assistant Posting 9 2011_finalLoft Development Assistant Posting 9 2011_final
Loft Development Assistant Posting 9 2011_final
 
Minneapolis RiverCurrent 9-15-11
Minneapolis RiverCurrent 9-15-11Minneapolis RiverCurrent 9-15-11
Minneapolis RiverCurrent 9-15-11
 
Dredge Thompson Photos from Big River Magazine
Dredge Thompson Photos from Big River MagazineDredge Thompson Photos from Big River Magazine
Dredge Thompson Photos from Big River Magazine
 
Minneapolis RiverCurrent 9-8-11
Minneapolis RiverCurrent 9-8-11Minneapolis RiverCurrent 9-8-11
Minneapolis RiverCurrent 9-8-11
 
Minneapolis RiverCurrent 9-1-11
Minneapolis RiverCurrent 9-1-11Minneapolis RiverCurrent 9-1-11
Minneapolis RiverCurrent 9-1-11
 

Último

Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in designnooreen17
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...katerynaivanenko1
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdfvaibhavkanaujia
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...Rishabh Aryan
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
cda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptcda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptMaryamAfzal41
 
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Yantram Animation Studio Corporation
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作7tz4rjpd
 

Último (20)

Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in design
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdf
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
cda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptcda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis ppt
 
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作
 

Fuji Ya - Waterworks Site Resolution from Minneapolis Park Board

  • 1. Posted by http://MillCityTimes.com Resolution 2011 - 174 Resolution Approving a Partner Agreement with the Minneapolis Parks Foundation and Establishment of a Non-appointed Citizen’s Advisory Committee Process for Preliminary Visioning and Implementation Study of the Waterworks Site in Downtown Minneapolis Whereas, The Minneapolis Park & Recreation Board (“MPRB”) is authorized to contract with public and private entities; Whereas, The MPRB is the owner of a property known as the Waterworks site, formerly referred to as the Fuji Ya site located at 420 1st Street South in downtown Minneapolis; Whereas, The Waterworks site is current underutilized, especially given its downtown riverfront location, prominent views, and historical and cultural significance; Whereas, Until recently, the MPRB was unable to pursue enhancements on the site due to legal actions; Whereas, The MPRB, Minneapolis Parks Foundation (“Foundation”) and broader community have a deep interest in enhancing the Waterworks site as a signature element of the Minneapolis park system; Whereas, The MPRB enjoys a close working relationship with the Foundation; Whereas, The Foundation has secured funding, through a major donor, to support a preliminary visioning and implementation study of the site that will explore a range of alternatives; Whereas, The Foundation will contract with site design and park finance professionals; Whereas, The MPRB supports the study and welcomes the Foundation as an active partner in completing the study process; and Whereas, The MPRB will facilitate a community engagement process for the project; RESOLVED, That the Board of Commissioners approve a partner agreement with the Foundation for preliminary visioning and implementation study of the Waterworks site in downtown Minneapolis; RESOLVED, That the Board of Commissioners authorizea non-appointed citizens advisory committee process for the project; and RESOLVED, That the President and Secretary of the Board are authorized to take all necessary administrative actions to implement this resolution.
  • 2. Posted by http://MillCityTimes.com Adopted by the Park & Recreation Board In formal meeting assembled on September 21, 2011 ______________________________ John Erwin, President ______________________________ Karen Robinson, Secretary Approved: _________________________________ R.T. Rybak, Mayor
  • 3. Posted by http://MillCityTimes.com TO: Planning Committee FROM: Bruce Chamberlain, Assistant Superintendent for Planning Services DATE: September 7, 2011 SUBJECT: Resolution approving a partner agreement with the Minneapolis Parks Foundation and establishment of a non-appointed citizen’s advisory committee process for preliminary visioning and implementation study of the Waterworks site in downtown Minneapolis. BACKGROUND The Waterworks site (formerly referred to as the Fuji Ya site) in downtown Minneapolis offers an exciting city-building opportunity. It is adjacent to West River Road and overlooks Saint Anthony Falls with dramatic views up and down the Mississippi River. The property was once home to the Fuji Ya restaurant, a beloved destination that afforded visitors a unique vantage point from which to experience the power and spirit of the river. Further back in time, the site held one of the many grain mills along the Minneapolis riverfront as well as a hydropower waterworks plant (thus the newly minted Waterworks site name). Mill ruins still exist on the property – some exposed, some buried and some contained within the restaurant building. Since the Minneapolis Park & Recreation Board purchased the property over two decades ago to build West River Road, the site has been utilized for fee parking but not much more. Title restrictions imposed by the State of Minnesota have not allowed the Park Board to put the portion of the site unneeded for the parkway back into private use as originally intended. Now, the vibrancy of downtown has exploded around the Waterworks site and the time to explore exciting and bold alternative futures for public use of the site has arrived. The Waterworks site has an opportunity to become a signature element of the Minneapolis Park system and this belief has been embraced by the Minneapolis Parks Foundation. The Parks Foundation has received a generous donation to conduct preliminary design visioning and an implementation study for public use of the site. The study would explore alternative futures for the Waterworks site that could include combinations of outdoor space, community gathering, supportive enterprise and design innovation. The effort is viewed by the Foundation as an opportunity to further the 21st Century Park vision for Minneapolis begun with the Minneapolis Riverfront Design Competition. The project is viewed by the Parks Foundation and Staff as a critical preliminary step in a reuse strategy for the Waterworks site. It would be a relatively short-duration effort of three to four months in length. Its primary intention is to explore multiple ideas for the site and test those ideas for implementation feasibility and community excitement. If approved by the Board, the Minneapolis Parks Foundation will enter into an agreement with the Park Board to collaborate on the visioning and implementation study. Project responsibilities would be as follows:
  • 4. Posted by http://MillCityTimes.com The Foundation would:  Establish contractual relationships with consultants for completion of the project.  Raise the full amount of funds necessary to complete the project and fully compensate project consultants.  Work collaboratively with the Park Board to direct the work of project consultants.  Actively participate in the community engagement process.  Work collaboratively with the Park Board on public relations and project communication efforts. The Park Board would:  Approve project consultant’s scope of work.  Organize and facilitate the community engagement process.  Review and approve interim and final deliverables prepared by project consultants.  Work collaboratively with the Foundation on public relations and project communications.  Provide the Foundation and project consultants with any pertinent background materials, mapping, surveys, etc. in its possession. LEGAL REVIEW The Partner Agreement has been reviewed by MPRB legal counsel. FUNDING/COST SUMMARY N/A RECOMMENDATION Staff believes this is an exciting first step in envisioning the future of the Waterworks site and its pivotal role in bridging city and park. Because of the preliminary nature and short duration of the project and to engage the broadest spectrum of the community staff recommends that a non- appointed citizen’s advisory committee is well-suited to the effort. This approach will allow for broad community engagement with the process and set the stage for a future, more in-depth master planning effort where an appointed citizen’s advisory committee will be warranted. Staff recommends approval of a partner agreement with the Minneapolis Parks Foundation and establishment of a non-appointed citizen’s advisory committee process for preliminary visioning and implementation study of the Waterworks site in downtown Minneapolis. ATTACHMENTS Attachment A – Partner Agreement RELATED BOARD ACTIONS None. Prepared by: Bruce Chamberlain, Assistant Superintendent for Planning Services Approved by: Jayne Miller, Superintendent
  • 5. Posted by http://MillCityTimes.com Attachment A MINNEAPOLIS PARK AND RECREATION BOARD PROJECT PARTNER AGREEMENT WITH THE MINNEAPOLIS PARKS FOUNDATION FOR PRELIMINARY VISIONING AND IMPLEMENTATION STUDY OF THE WATERWORKS SITE IN DOWNTOWN MINNEAPOLIS THIS AGREEMENT, is made and entered into as of the ____ day of , 2011 by and between the MINNEAPOLIS PARK AND RECREATION BOARD (the "MPRB") and the MINNEAPOLIS PARKS FOUNDATION, a Minnesota non-profit corporation (the "Foundation"). WHEREAS, the MPRB is the owner of a property known as the Waterworks site (the “Site”), formerly referred to as the Fuji Ya site located at 420 1st Street South in downtown Minneapolis; WHEREAS, the Site is current underutilized given its downtown riverfront location, prominent views, and historical and cultural significance; WHEREAS, until recently, the MPRB was unable to pursue enhancements on the Site due to legal actions; WHEREAS, the MPRB, the Foundation and the broader community have a deep interest in enhancing the Site as a signature element of the Minneapolispark system; WHEREAS, the Foundation has secured funding, through a major donor, to support a preliminary visioning and implementation study of the Site that will explore a range of alternatives; WHEREAS, the MPRB supports the study and welcomes the Foundation as an active partner in completing the study process; NOW, THEREFORE, it is agreed by and between the parties hereto that: Section I. Scope of Work The project will include the creation of alternative uses and design concepts for the future of the Site and evaluation of those alternatives for their financial, market and implementation feasibility. The work of the project will be conducted within the context of a community engagement process where the ideas explored and project outcomes will be informed by input from the general public through a non-appointed Citizen Advisory Committee. The project is considered a preliminary analysis of future possibilities for the Site and a launching point for more in-depth design and programming conducted beyond the scope of this Agreement.
  • 6. Posted by http://MillCityTimes.com Section II. Acknowledgement of Funds With this agreement, the Foundation acknowledges that it possesses and has earmarked funds necessary to fully compensate project consultants engaged to complete the project. Section III. Responsibilities The Foundation will:  Establish contractual relationships with consultants for completion of the project.  Raise the full amount of funds necessary to complete the project and fully compensate project consultants.  Work collaboratively with the MPRB to direct the work of project consultants.  Actively participate in the community engagement process.  Work collaboratively with the MPRB on public relations and project communication efforts. The MPRB will:  Approve project consultant’s scope of work.  Organize and facilitate the community engagement process.  Review and approve interim and final deliverables prepared by project consultants.  Work collaboratively with the Foundation on public relations and project communications.  Provide the Foundation and project consultants with any pertinent background materials, mapping, surveys, etc. in its possession. Section IV. Completion The project is expected to take three to four months to complete. This Agreement shall be in full force and effect from the date first written above through February 29, 2012 unless terminated earlier in accordance with Section VIII of this Agreement or extended pursuant to Section IX of this Agreement. Section V. Notices Communication and details concerning this Agreement shall be directed to the following: Minneapolis Park and Recreation Board: Bruce Chamberlain, ASLA Assistant Superintendent for Planning 2117 West River Road Minneapolis, MN 55411 p. 612.230.6467 bchamberlain@minneapolisparks.org Minneapolis Parks Foundation: Cecily Hines, President 3954 Bryant Ave South Minneapolis, MN 55409 p. 612.822.2656 chines@mplsparksfoundation.org
  • 7. Posted by http://MillCityTimes.com Section VI. General Conditions This Agreement is to be construed and governed by the laws of the State of Minnesota. Section VII. Indemnification The Foundation shall hold harmless, defend and indemnify the MPRB and its staff from any and all claims, actions, suits, charges and judgments whatsoever that arise out of the Foundation's performance or nonperformance of the services or subject matter called for in this Agreement. Section VIII. Termination Either party may terminate this Agreement or any portion thereof, with or without cause, by giving thirty (30) days prior written notice. Should the Agreement be terminated, compensation of project consultants shall be the sole responsibility of the Foundation. Section IX. Administrative Adjustments The term of this Agreement may be extended for an additional period of six (6) months provided that at least thirty (30) days prior to the end of the Term of this Agreement, the party seeking such an extension has written approval from the other party for the extension, such approval shall not be unreasonably withheld. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the date first written above. MINNEAPOLIS PARKS FOUNDATION By Its President Date______________________________________ MINNEAPOLIS PARK AND RECREATION BOARD By Its President Date______________________________________ By ______ Its Secretary Date______________________________________