L A W   O F F I C E S   O F      1500 K STREET, NW ♦ SUITE 330 ♦ WASHINGTON, DC 20005

GKRSE                                 202.408.5400 ♦ F AX : 202.408.5406 ♦ W EBSITE : www.gkrse-law.com


                                          June 23, 2011


Ms. Kimberly D. Bose
Secretary
Federal Energy Regulatory Commission
888 First Street, NE
Washington, D.C. 20426

                Re:      Crown Hydro, LLC
                         Crown Hydro Project, FERC Project No. 11175-024
                         Response to May 25, 2011 Show Cause Letter

Dear Ms. Bose:

         Crown Hydro, LLC, the holder of the above hydroelectric license, offers the following
project update in response to your May 25, 2011 show cause letter. For the reasons set forth
below, Crown Hydro respectfully requests that the Federal Energy Regulatory Commission not
initiate any license termination proceedings. Instead, Crown Hydro asks that the FERC continue
to hold these proceedings in abeyance until such time as Crown Hydro reports back to the FERC
in a period not to exceed 45 days following the close of the Minnesota Legislature’s special
session this summer. As explained in this letter, Crown Hydro expects the Minnesota legislature
will enact legislation this summer as part of its special session which will remove the historical
impediment to this project from obtaining local site control and thereby allow the project to
move forward with final construction.

2009 – 2011

       As your letter indicates, Crown Hydro provided its last status updates by submitting
comprehensive progress reports in June and December, 2009. During 2010, Crown Hydro
continued some work on securing site control, but spent much of its time exploring additional
financing opportunities and hiring new consultants to help move the project forward.

The Current Proposal

        Beginning in 2011, Crown Hydro has once again spent significant time and resources in
obtaining site control of the “third” powerhouse site referenced in the June 2009 update – i.e., a
site just slightly up-river (approximately 150 feet) from the original project site but nonetheless
within the project boundary as set forth in ordering paragraph (B)(2) of the March 19, 1999,
FERC Order Issuing License. The new site has been substantially designed and engineered and




                                        http://MillCityTimes.com
http://MillCityTimes.com
Ms. Kimberly D. Bose
June 23, 2011
Page 2


because it would be built entirely underground, the facility would have minimal impact to the
public.

       Crown Hydro continues to own two 1700 mm AxialFlow Kaplan turbines along with two
1575 kW Propencia synchromous generators, together with engineering and controls
manufactured by Canadian Hydro Components, Ltd. The maximum capacity for the equipment
remains at 3.2 MW. The equipment is currently in professional storage and remains ready and
capable of being placed in service.

       The proposed current site requires the temporary use of a small parcel owned by the
Minneapolis Parks & Recreation Board during project construction, an underground easement
for permanent placement of the facility, and the use of underground tunnels previously used for
hydropower production by Minneapolis milling companies, which tunnels have now come under
the control by the Park Board by a grant of the City of Minneapolis.

        Beginning in March 2011, Crown Hydro once again initiated discussions with the Park
Board about obtaining the Park Board’s consent for use of its property. On April 20, 2011,
Crown Hydro presented to the Park Board’s Planning Committee, with the full Board present.
At the end of that meeting, the Planning Committee directed the Park Board’s Chairman, assisted
by the Park Board’s Executive Director, staff, and legal counsel, to work with Crown Hydro in
developing the framework of an agreement under which the Park Board would provide access to
and use of its property for the project. As in previous years, the Park Board’s primary concern
was ensuring minimum flow over the St. Anthony Falls spillway so as to ensure what certain
members of the Park Board considered an acceptable aesthetic experience for the public. Crown
Hydro’s and the Park Board’s most recent efforts at reaching agreement are detailed below.

The Minnesota Legislature’s Interest In Facilitating Qualifying Hydro Projects

        As the FERC is aware, Minnesota has one of the most aggressive renewable energy
portfolio requirements in the nation. For its largest utility, Northern States Power Company
d/b/a Xcel Energy, Inc., 30% of its energy must come from eligible renewable energy sources by
the year 2020. Small hydroelectric facilities like the Crown Hydro project qualify as eligible
sources for the state’s RPS.

        Given the state’s paramount interest in renewable energy, and because of the Park
Board’s historic reluctance to provide use of its property on reasonable terms, the Minnesota
Legislature is currently moving forward the adoption of legislation that would effectively
preempt the Park Board and other similarly-situated political subdivisions with respect to the
respective municipal governments’ need to grant any “permit, entitlement, license, authorization
or consent of any kind,” for small, eligible hydroelectric facilities. On May 2, 2012, the
Committee on Environment, Energy and Natural Resources Policy and Finance, Minnesota
House of Representatives, passed HF 1440, a copy of which along with its status summary is
attached as Exhibit 1. HF 1440 is now on general orders and awaits passage by the full House.



                                                                            L AW   OFFI C ES   O F



                                       http://MillCityTimes.com          GKRSE
http://MillCityTimes.com
Ms. Kimberly D. Bose
June 23, 2011
Page 3


        The companion bill in the Minnesota Senate is SF 1190. SF 1190 was introduced and
had its first reading, and was referred to the Local Government and Elections Committee. A
copy of SF 1191 and its legislative status summary is attached as Exhibit 2.

       The Minnesota Legislature adjourned by its constitutional deadline on May 23, 2011
without the Legislature and Governor agreeing on a state budget. While it appears that the state
is headed for a temporary shut-down of non-essential services, the Governor is expected to call a
special session of the legislature some time in July so that a budget can be passed and all
governmental services funded. Based on discussions with legislative leadership, including
authors of the above bills, Crown Hydro expects the Legislature to pass legislation that closely
resembles HF 1440 during the special session. As a result, Crown Hydro expects that the
Legislature will soon provide access and use of property necessary for the project that the Park
Board has been unwilling to provide.

         Attached as Exhibits 3 and 4 are letters of support from key Minnesota legislators who
will be primarily responsible for enactment of the expected legislation. Exhibit No. 3 is a joint
letter from Representatives Michael Beard and Denny McNamara. Representative Beard is the
main author of HF 1440 and Representative McNamara is the Chair, Committee on Environment,
Energy, and Natural Resources Policy and Finance. Exhibit 4 is from Senator Gen Olson, chief
author of the legislation in the Senate and the Senate’s President Pro Tempore. As can be seen
by the letters, the Legislature is prepared to provide the necessary site control.

Discussions With Park Board

        Even though the Legislature is poised to provide Crown Hydro and similarly-situated
federally-approved projects the necessary land use and related authorizations through state
legislation, Crown Hydro has continued to work in good faith with the Park Board on finding a
local resolution. To that end, Crown Hydro representatives met with the Park Board’s Executive
Director, staff and counsel regularly in April and May. The purpose of the meetings was, as
directed by the Park Board’s Planning Committee, to develop the framework for a mutual
agreement under which the project could utilize Park Board property.

        The first framework agreement, structured under a letter of intent, contemplated a
straightforward development and use agreement under which Crown Hydro was prepared to pay
the Park Board (1) $500,000 upon the commercial operation date, and (2) a minimum annual
license/use fee in the amount of $70,000, which amount could increase depending on the level of
the project’s energy production. A copy of that draft letter of intent is attached as Exhibit 5.

        After Crown Hydro and Park Board staff reached agreement in principal with respect to
the “lessor/lessee” letter of intent (Exhibit 5), the Park Board, led by the board’s chairman John
Erwin, preferred instead that the Park Board be a joint owner of the project, but an owner with
somebody other than Crown Hydro, LLC’s current sole owner, William Hawks, a Minneapolis
businessman. That is, the Park Board insisted that Crown Hydro’s use of Park Board property
was conditioned on, among other matters, that Mr. Hawks no longer be directly or indirectly
involved with the project. In effect, the Park Board was forcing Mr. Hawks to sell his ownership

                                                                             L AW   OFFI C ES   O F



                                        http://MillCityTimes.com          GKRSE
http://MillCityTimes.com
Ms. Kimberly D. Bose
June 23, 2011
Page 4


in Crown Hydro to a third party acceptable to the Park Board. That the Park Board was in
essence requiring Mr. Hawks to make a forced sale was disappointing to Mr. Hawks, particularly
given his tireless commitment over the last decade and investment in the project of more than six
million dollars. In the end, however, it was because of his commitment to making sure this
project could move forward that Mr. Hawks agreed to the Park Board’s forced sale, even though
the requirement would obviously diminish Mr. Hawk’s negotiating leverage in any third party
sale.

        After much work, the parties reached agreement in principal on how a third party/Park
Board joint venture project would work, and that agreement is reflected in the draft letter of
intent dated as of May 13, 2011, which LOI the Park Board’s Superintendent sent the Park Board
for its adoption as part of an overall packet for the Park Board’s May 18, 2011 regularly
scheduled meeting. The May 13 LOI, along with full board packet, is attached as Exhibit 6.

       In both the lessor/lessee and joint venture letters of intent, the Park Board sought to
assure minimum flows over the St. Anthony spillway to protect what certain members of the
Park Board considered most important to them: the aesthetics of the falls. Article 404 of the
Crown Hydro license establishes the minimum flows for the project. It provides that Crown
Hydro will operate the project so that some water always flows over St. Anthony Falls except as
follows: (a) during periods of very low flows when the project could not operate at 200 cfs
without drying up the falls, the project may only operate from nightfall to dawn; (b) between
December 15 and March 15, the project will operate with whatever flows are available even if it
dries up the falls; and (c) during low flows in July and August, the project may operate with up
to 500 cfs during daylight hours even if it reduces flows over the spillway and up to 1,000 cfs
from nightfall until dawn.

        In the May 13 LOI, Crown Hydro agreed to effectively shut down the project during
daylight summer hours in order to satisfy a Park Board requirement that the project maintain a
minimum of 2000 cfs over the falls, during the daylight hours of June 21 – September 21,
generally regarded as the falls’ “prime viewing periods” a much more restrictive flow regime
than required by the 1999 License. While the restrictions would obviously impact project energy
production, and therefore affect project gross revenues according to the power purchase
agreement with Northern States Power, discussed below, Crown Hydro was willing to agree to
depart from the 1999 License’s flow requirements if necessary to satisfy the Park Board’s desire
to control flow over St. Anthony Falls.1

       The May 13 LOI represented an agreement in principal between Crown Hydro, the Park
Board’s Chairman, its Executive Director and the Park Board’s counsel. Following the submittal
of the May 13 LOI by the Park Board’s Superintendent to the full board, Crown Hydro

1
        It is important to note that while Crown Hydro was willing to relinquish some of its flow
rights provided under the 1999 License as a compromise with the Park Board, Crown Hydro was
very cognizant during its discussions with the Park Board, that only the FERC, and not Crown
Hydro or the Park Board can set flow restrictions for a hydroelectric project licensed on a
navigable water of the United States.
                                                                             L AW   OFFI C ES   O F



                                       http://MillCityTimes.com           GKRSE
http://MillCityTimes.com
Ms. Kimberly D. Bose
June 23, 2011
Page 5


representatives met informally with the Park Board Chairman, along with another Park Board
Commissioner and Park Board counsel on Sunday, May 15. At that meeting, the Park Board
Chairman and fellow Commissioners expressed confidence that the May 13 LOI would be
approved by the board on May 18. Following May 18, the parties would begin work on
definitive agreements between Crown Hydro, the Park Board, and a new third-party investor.

       On the night of Monday, May 16, however, Crown Hydro representatives received an
email message from the Park Board’s primary counsel (the partner of the Park Board lawyer with
whom Crown Hydro had just spent the previous weeks in negotiations). In the email, the Park
Board counsel announced that there were “revisions” to the letter of intent. As can be seen by
Exhibit 7, however, the unilateral “revisions” that the Park Board made to a previously
negotiated document so completely changed the character of the document so as to make it
wholly unworkable, both practically and financially.

        As can be seen from Exhibit 7, the single largest change (in addition to many others) was
that instead of exercising some measure of control of water over the spillway so as to protect the
spillway’s aesthetics during its prime viewing periods, the Park Board instead required that it
have “complete operating control” over the facility from June 15 to September 15, and for all
other times of the year, the new third party owner would be required to maintain a minimum
flow of 2000 cfs over St. Anthony Falls. Attached as Exhibit 8 is a letter from professional
engineer Mr. Joel Toso. As Mr. Toso states, a requirement under which the Park Board could
effectively shut down the project at any time and for any reason from June 15 – September 15,
combined with a requirement that the project maintain a minimum of 2000 cfs at all other times
effectively destroy’s the project’s economics. Thus, as it turned out, the Park Board required as
a condition of its consent that Mr. Hawks sell 100% of his interest in Crown Hydro, LLC, to
which Mr. Hawks agreed, only then for the Park Board to make it both economically and
practically impossible for him to do so.



Status of Power Purchase Agreement

        On January 23, 2003, Crown Hydro executed a power purchase agreement with Northern
States Power Company d/b/a Xcel Energy, Inc. under which NSP has agreed to purchase 100%
of the project’s energy production for an initial term of 20 years. Because of the project’s
inability to secure Park Board authorization, the project remains to this date in abeyance under
the PPA’s Force Majeure provision (pursuant to Article 14 whereby a “governmental
authority’s” failure to act which “prevents or delays” project performance constitutes Force
Majeure). Crown Hydro remains in active discussions with NSP regarding the terms of the PPA
and related matters.

Status of Renewable Development Grant

       On January 17, 2002, Crown Hydro also executed a Renewable Development Fund Grant
Contract Terms and Conditions under which NSP granted the project a total of $5.1 million as

                                                                             L AW   OFFI C ES   O F



                                        http://MillCityTimes.com          GKRSE
http://MillCityTimes.com
Ms. Kimberly D. Bose
June 23, 2011
Page 6


part of NSP’s Renewable Development Fund administered under Minn. Stat. § 11C.779, of
which approximately $1.5 million has been expended to date. The RDF contract also remains in
abeyance pending a determination on whether the project will be able to obtain local site control,
and Crown Hydro also remains in discussions with NSP on this matter.

Request for Further Abeyance

       Crown Hydro is fully aware that its failure to obtain local site control from the Park
Board has caused its 1999 License to remain open and the project unconstructed for a long
period of time. Nobody finds that more regrettable than Crown Hydro and Crown Hydro truly
appreciates the FERC’s patience and willingness to work with it as it finds a solution which has
long vexed it.

        Fortunately, as the letters from the Minnesota legislators attest, it appears that local site
control will be in hand by the end of this summer. Crown Hydro respectfully requests that the
FERC defer any action with respect to any termination proceedings until such time as the special
session is over and it is known whether HF 1411 or something substantially similar has been
passed into law. Within [30] days of the end of the special session, Crown Hydro will provide
the FERC a supplemental update, at which time the FERC will have more information from
which to make any decisions affecting Crown Hydro and FERC License No. 11175-024. At this
time, Crown Hydro will also address and bring current (to the extent practicable) any overdue
activities, plans, and filings required by the 1999 License.




       In the interim, please do not hesitate to ask any questions or seek additional information.


                                                          Respectfully Submitted




                                                          Donald H. Clarke
                                                          Law Offices of GKRSE
                                                          1500 K Street NW, Suite 330
                                                          Washington DC, 20005
                                                          Tel (202) 408-5400
                                                          Fax (202) 408-5406
                                                          dhclarke@gkrse-law.com

                                                                                   L AW   OFFI C ES   O F



                                         http://MillCityTimes.com             GKRSE
http://MillCityTimes.com
Ms. Kimberly D. Bose
June 23, 2011
Page 7


                                                        Counsel to Crown Hydro, LLC




Exhibits

       Exhibit 1:   HF 1440 along with status summary
       Exhibit 2:   SF 1191 along with status summary
       Exhibit 3:   Joint Letter from Representatives Michael Beard and Denny McNamara
       Exhibit 4:   Letter from Senator Gen Olson
       Exhibit 5:   Lessor/lessee draft Letter of Intent
       Exhibit 6:   May 13 Letter of Intent along with full board packet
       Exhibit 7:   May 13 LOI as revised by Park Board
       Exhibit 8:   Letter from Mr. Joel Toso


cc:    Minneapolis Parks & Recreation Board
       Bill Grant, Deputy Commissioner of Energy
       Barbara Johnson, President, Minneapolis City Council
       Senator Gen Olson
       Representative Michael Beard
       Representative Denny McNamara




                                                                             L AW   OFFI C ES   O F



                                       http://MillCityTimes.com            GKRSE
http://MillCityTimes.com




EXHIBIT 1




 http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




EXHIBIT 2




 http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




EXHIBIT 3




 http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




EXHIBIT 4




 http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




EXHIBIT 5




 http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




EXHIBIT 6




 http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




EXHIBIT 7




 http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com
http://MillCityTimes.com




EXHIBIT 8




 http://MillCityTimes.com
http://MillCityTimes.com
                                                                       Wenck Associates, Inc.
                                                                       1800 Pioneer Creek Center
                                                                       P.O. Box 249
                                                                       Maple Plain, MN 55359-0249

                                                                       (763) 479-4200
                                                                       Fax (763) 479-4242
                                                                       E-mail: wenckmp@wenck.com


June 22, 2011




Mr. Todd Guerrero
Attorney
Fredrikson & Byron, P.A.
200 South Sixth Street
Suite 4000
Minneapolis, MN 55402

Re:    Crown Hydro Project Feasibility under Recent Minneapolis Park and Recreation
       Board Letter of Intent

Dear Todd:

The purpose of this letter is to document our opinion of the Crown Hydro project
feasibility under the May 16, 2011 Letter of Intent (LOI) with the Minneapolis Park and
Recreation Board. As part of the Crown Hydro team, we worked with the Park Board
staff on establishing minimum flow rates and operating procedures that would maintain
project viability. These were documented in the May 13th draft LOI. The LOI as
modified by the Park Board and dated May 16, 2011 requires that the Park Board has
"complete operational control" from June 15 - September 15, therefore be able to shut
down the project at any time during that period. It further requires that the facility
maintain a minimum 2000 cfs at all other times of the year. These significant changes
make the project economically unfeasible.

Sincerely,
WENCK ASSOCIATES, INC.




Joel Toso, P.E.
Principal Engineer




                              http://MillCityTimes.com
http://MillCityTimes.com




http://MillCityTimes.com

Mais conteúdo relacionado

Mais procurados

Cauvery water dispute
Cauvery water disputeCauvery water dispute
Cauvery water disputeJayPillai8
 
Water disputes
Water disputesWater disputes
Water disputeszaztha1
 
Canada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jainCanada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jainPRIYANK JAIN
 
Item # 1a - March 14, 2022 CCM Minutes
Item # 1a - March 14, 2022 CCM MinutesItem # 1a - March 14, 2022 CCM Minutes
Item # 1a - March 14, 2022 CCM Minutesahcitycouncil
 
K Roek AWEA Windpower 2009 Presentation
K Roek AWEA Windpower 2009 PresentationK Roek AWEA Windpower 2009 Presentation
K Roek AWEA Windpower 2009 Presentationkaroek
 
PW Ventures Vs Nichols
PW Ventures Vs NicholsPW Ventures Vs Nichols
PW Ventures Vs Nicholsjhoysradt
 
Special Remarks Bokhwan Yu
Special Remarks Bokhwan YuSpecial Remarks Bokhwan Yu
Special Remarks Bokhwan YuOECD Environment
 
Agus pulangui maris
Agus pulangui marisAgus pulangui maris
Agus pulangui marisErnesto Neri
 
Item # 6 PACE Program Interlocal Agmt w/AACOG
Item # 6   PACE Program Interlocal Agmt w/AACOGItem # 6   PACE Program Interlocal Agmt w/AACOG
Item # 6 PACE Program Interlocal Agmt w/AACOGahcitycouncil
 
CREA 2015 Legislative Wrap Up
CREA 2015 Legislative Wrap UpCREA 2015 Legislative Wrap Up
CREA 2015 Legislative Wrap UpHeather Williams
 
Honolulu Authority for Rapid Transit - The Hawaii State Legislature - City an...
Honolulu Authority for Rapid Transit - The Hawaii State Legislature - City an...Honolulu Authority for Rapid Transit - The Hawaii State Legislature - City an...
Honolulu Authority for Rapid Transit - The Hawaii State Legislature - City an...Clifton M. Hasegawa & Associates, LLC
 
Item # 4&5 PACE Program Public Hearing & Resolution to Establish
Item # 4&5 PACE Program Public Hearing & Resolution to EstablishItem # 4&5 PACE Program Public Hearing & Resolution to Establish
Item # 4&5 PACE Program Public Hearing & Resolution to Establishahcitycouncil
 
UC-Denver GEM program Renewable Energy Trends, Solar Overview
UC-Denver GEM program Renewable Energy Trends, Solar OverviewUC-Denver GEM program Renewable Energy Trends, Solar Overview
UC-Denver GEM program Renewable Energy Trends, Solar Overviewronmiller74
 

Mais procurados (20)

Cauvery water dispute
Cauvery water disputeCauvery water dispute
Cauvery water dispute
 
Water disputes
Water disputesWater disputes
Water disputes
 
Canada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jainCanada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jain
 
Bakun
BakunBakun
Bakun
 
Feldman to Somerville Community Corporation (SCC). November 2006
Feldman to Somerville Community Corporation (SCC). November 2006Feldman to Somerville Community Corporation (SCC). November 2006
Feldman to Somerville Community Corporation (SCC). November 2006
 
Item # 1a - March 14, 2022 CCM Minutes
Item # 1a - March 14, 2022 CCM MinutesItem # 1a - March 14, 2022 CCM Minutes
Item # 1a - March 14, 2022 CCM Minutes
 
K Roek AWEA Windpower 2009 Presentation
K Roek AWEA Windpower 2009 PresentationK Roek AWEA Windpower 2009 Presentation
K Roek AWEA Windpower 2009 Presentation
 
Min mcpb 2012-03-15
Min mcpb 2012-03-15Min mcpb 2012-03-15
Min mcpb 2012-03-15
 
PW Ventures Vs Nichols
PW Ventures Vs NicholsPW Ventures Vs Nichols
PW Ventures Vs Nichols
 
2014 0191
2014 01912014 0191
2014 0191
 
Special Remarks Bokhwan Yu
Special Remarks Bokhwan YuSpecial Remarks Bokhwan Yu
Special Remarks Bokhwan Yu
 
Agus pulangui maris
Agus pulangui marisAgus pulangui maris
Agus pulangui maris
 
Item # 6 PACE Program Interlocal Agmt w/AACOG
Item # 6   PACE Program Interlocal Agmt w/AACOGItem # 6   PACE Program Interlocal Agmt w/AACOG
Item # 6 PACE Program Interlocal Agmt w/AACOG
 
CREA 2015 Legislative Wrap Up
CREA 2015 Legislative Wrap UpCREA 2015 Legislative Wrap Up
CREA 2015 Legislative Wrap Up
 
Honolulu Authority for Rapid Transit - The Hawaii State Legislature - City an...
Honolulu Authority for Rapid Transit - The Hawaii State Legislature - City an...Honolulu Authority for Rapid Transit - The Hawaii State Legislature - City an...
Honolulu Authority for Rapid Transit - The Hawaii State Legislature - City an...
 
Cameetingnotes
CameetingnotesCameetingnotes
Cameetingnotes
 
Item # 4&5 PACE Program Public Hearing & Resolution to Establish
Item # 4&5 PACE Program Public Hearing & Resolution to EstablishItem # 4&5 PACE Program Public Hearing & Resolution to Establish
Item # 4&5 PACE Program Public Hearing & Resolution to Establish
 
Water disputes
Water disputesWater disputes
Water disputes
 
UC-Denver GEM program Renewable Energy Trends, Solar Overview
UC-Denver GEM program Renewable Energy Trends, Solar OverviewUC-Denver GEM program Renewable Energy Trends, Solar Overview
UC-Denver GEM program Renewable Energy Trends, Solar Overview
 
121814 Update
121814 Update121814 Update
121814 Update
 

Destaque

Sample - Letter for Termination for Just Cause
Sample - Letter for Termination for Just Cause Sample - Letter for Termination for Just Cause
Sample - Letter for Termination for Just Cause Laura Lee
 
Sample Warning Letter to Contractor
Sample Warning Letter to ContractorSample Warning Letter to Contractor
Sample Warning Letter to Contractorspiritualcuff8973
 
How To Write a Letter of Explanation to the IRS. From Success Tax Relief.
How To Write a  Letter  of Explanation to the IRS. From Success Tax Relief.How To Write a  Letter  of Explanation to the IRS. From Success Tax Relief.
How To Write a Letter of Explanation to the IRS. From Success Tax Relief.Success Tax Relief
 
Notice to Explain SAMPLE FORM (First Notice)
Notice to Explain SAMPLE FORM (First Notice)Notice to Explain SAMPLE FORM (First Notice)
Notice to Explain SAMPLE FORM (First Notice)PoL Sangalang
 
Sample Employment Letter
Sample Employment LetterSample Employment Letter
Sample Employment LetterAltapacific
 
H 1 B LCA Compliance
H 1 B LCA ComplianceH 1 B LCA Compliance
H 1 B LCA ComplianceDesh Kapoor
 

Destaque (10)

Sample - Letter for Termination for Just Cause
Sample - Letter for Termination for Just Cause Sample - Letter for Termination for Just Cause
Sample - Letter for Termination for Just Cause
 
Hahp termination letter
Hahp termination letterHahp termination letter
Hahp termination letter
 
H1b Visa Transfer Process
H1b Visa Transfer ProcessH1b Visa Transfer Process
H1b Visa Transfer Process
 
Sample Warning Letter to Contractor
Sample Warning Letter to ContractorSample Warning Letter to Contractor
Sample Warning Letter to Contractor
 
How To Write a Letter of Explanation to the IRS. From Success Tax Relief.
How To Write a  Letter  of Explanation to the IRS. From Success Tax Relief.How To Write a  Letter  of Explanation to the IRS. From Success Tax Relief.
How To Write a Letter of Explanation to the IRS. From Success Tax Relief.
 
Confirmation Employment Letter
Confirmation Employment LetterConfirmation Employment Letter
Confirmation Employment Letter
 
Wipro Experience
Wipro ExperienceWipro Experience
Wipro Experience
 
Notice to Explain SAMPLE FORM (First Notice)
Notice to Explain SAMPLE FORM (First Notice)Notice to Explain SAMPLE FORM (First Notice)
Notice to Explain SAMPLE FORM (First Notice)
 
Sample Employment Letter
Sample Employment LetterSample Employment Letter
Sample Employment Letter
 
H 1 B LCA Compliance
H 1 B LCA ComplianceH 1 B LCA Compliance
H 1 B LCA Compliance
 

Semelhante a Law Firm Responds to FERC on Crown Hydro Project Status

Winds of Change in Klickitat CountyThe Harvest Wind ProjectM..pdf
Winds of Change in Klickitat CountyThe Harvest Wind ProjectM..pdfWinds of Change in Klickitat CountyThe Harvest Wind ProjectM..pdf
Winds of Change in Klickitat CountyThe Harvest Wind ProjectM..pdfinfo335653
 
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockJen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockHoboken Resistance
 
How to Become a Vendor to the Refinery Industry
How to Become a Vendor to the Refinery IndustryHow to Become a Vendor to the Refinery Industry
How to Become a Vendor to the Refinery IndustryPortArthurSBS
 
Tymoczko to Bloomberg 10-12-2010
Tymoczko to Bloomberg 10-12-2010Tymoczko to Bloomberg 10-12-2010
Tymoczko to Bloomberg 10-12-2010Adam Cohen
 
Lubbock Municipal Auditorium and Coliseum Presentation
Lubbock Municipal Auditorium and Coliseum PresentationLubbock Municipal Auditorium and Coliseum Presentation
Lubbock Municipal Auditorium and Coliseum PresentationLubbockPublicInfo
 
Re - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCARe - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCAMill City Times
 
Tymoczko to Gilson 10-12-2010
Tymoczko to Gilson 10-12-2010Tymoczko to Gilson 10-12-2010
Tymoczko to Gilson 10-12-2010Adam Cohen
 
Draft Proposal For Noble Ridge 2
Draft Proposal For Noble Ridge  2Draft Proposal For Noble Ridge  2
Draft Proposal For Noble Ridge 2Noble Ridge
 
Wikman building report from multnomah county
Wikman building report from multnomah countyWikman building report from multnomah county
Wikman building report from multnomah countyWikman Multi-Media
 
Item # 1a - September 11, 2023 City Council Meeting Minutes
Item # 1a - September 11, 2023  City Council Meeting MinutesItem # 1a - September 11, 2023  City Council Meeting Minutes
Item # 1a - September 11, 2023 City Council Meeting Minutesahcitycouncil
 
California State Lands Commission - City of Hermosa Beach State Tidelands Trust
California State Lands Commission - City of Hermosa Beach State Tidelands TrustCalifornia State Lands Commission - City of Hermosa Beach State Tidelands Trust
California State Lands Commission - City of Hermosa Beach State Tidelands TrustStopHermosaBeachOil
 
Item # 1a - January 22, 2024 CCM Minutes
Item # 1a - January 22, 2024 CCM MinutesItem # 1a - January 22, 2024 CCM Minutes
Item # 1a - January 22, 2024 CCM Minutesahcitycouncil
 
Motion to Intervene in ET Rover Pipeline Application for Eminent Domain befor...
Motion to Intervene in ET Rover Pipeline Application for Eminent Domain befor...Motion to Intervene in ET Rover Pipeline Application for Eminent Domain befor...
Motion to Intervene in ET Rover Pipeline Application for Eminent Domain befor...Marcellus Drilling News
 

Semelhante a Law Firm Responds to FERC on Crown Hydro Project Status (20)

Winds of Change in Klickitat CountyThe Harvest Wind ProjectM..pdf
Winds of Change in Klickitat CountyThe Harvest Wind ProjectM..pdfWinds of Change in Klickitat CountyThe Harvest Wind ProjectM..pdf
Winds of Change in Klickitat CountyThe Harvest Wind ProjectM..pdf
 
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockJen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
 
Oregonians in Action
Oregonians in ActionOregonians in Action
Oregonians in Action
 
Babcock work-samplev5
Babcock work-samplev5Babcock work-samplev5
Babcock work-samplev5
 
Min mcpb 2012-09-20
Min mcpb 2012-09-20Min mcpb 2012-09-20
Min mcpb 2012-09-20
 
How to Become a Vendor to the Refinery Industry
How to Become a Vendor to the Refinery IndustryHow to Become a Vendor to the Refinery Industry
How to Become a Vendor to the Refinery Industry
 
April 3, 2012 Agenda packet Part I
April 3, 2012 Agenda packet Part IApril 3, 2012 Agenda packet Part I
April 3, 2012 Agenda packet Part I
 
Tymoczko to Bloomberg 10-12-2010
Tymoczko to Bloomberg 10-12-2010Tymoczko to Bloomberg 10-12-2010
Tymoczko to Bloomberg 10-12-2010
 
Lubbock Municipal Auditorium and Coliseum Presentation
Lubbock Municipal Auditorium and Coliseum PresentationLubbock Municipal Auditorium and Coliseum Presentation
Lubbock Municipal Auditorium and Coliseum Presentation
 
Haleiwa Park
Haleiwa ParkHaleiwa Park
Haleiwa Park
 
Babcock Work Sample.v3
Babcock Work Sample.v3Babcock Work Sample.v3
Babcock Work Sample.v3
 
Re - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCARe - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCA
 
Tymoczko to Gilson 10-12-2010
Tymoczko to Gilson 10-12-2010Tymoczko to Gilson 10-12-2010
Tymoczko to Gilson 10-12-2010
 
Draft Proposal For Noble Ridge 2
Draft Proposal For Noble Ridge  2Draft Proposal For Noble Ridge  2
Draft Proposal For Noble Ridge 2
 
Hsc decision hapa trail 121913
Hsc decision hapa trail 121913Hsc decision hapa trail 121913
Hsc decision hapa trail 121913
 
Wikman building report from multnomah county
Wikman building report from multnomah countyWikman building report from multnomah county
Wikman building report from multnomah county
 
Item # 1a - September 11, 2023 City Council Meeting Minutes
Item # 1a - September 11, 2023  City Council Meeting MinutesItem # 1a - September 11, 2023  City Council Meeting Minutes
Item # 1a - September 11, 2023 City Council Meeting Minutes
 
California State Lands Commission - City of Hermosa Beach State Tidelands Trust
California State Lands Commission - City of Hermosa Beach State Tidelands TrustCalifornia State Lands Commission - City of Hermosa Beach State Tidelands Trust
California State Lands Commission - City of Hermosa Beach State Tidelands Trust
 
Item # 1a - January 22, 2024 CCM Minutes
Item # 1a - January 22, 2024 CCM MinutesItem # 1a - January 22, 2024 CCM Minutes
Item # 1a - January 22, 2024 CCM Minutes
 
Motion to Intervene in ET Rover Pipeline Application for Eminent Domain befor...
Motion to Intervene in ET Rover Pipeline Application for Eminent Domain befor...Motion to Intervene in ET Rover Pipeline Application for Eminent Domain befor...
Motion to Intervene in ET Rover Pipeline Application for Eminent Domain befor...
 

Mais de Mill City Times

Great River Outing - Gems Along the Mississippi Trail
Great River Outing - Gems Along the Mississippi TrailGreat River Outing - Gems Along the Mississippi Trail
Great River Outing - Gems Along the Mississippi TrailMill City Times
 
Minneapolis RiverCurrent 11-10-11
Minneapolis RiverCurrent 11-10-11Minneapolis RiverCurrent 11-10-11
Minneapolis RiverCurrent 11-10-11Mill City Times
 
1100 2nd St S RFP_2010 2
1100 2nd St S RFP_2010 21100 2nd St S RFP_2010 2
1100 2nd St S RFP_2010 2Mill City Times
 
DMNA November Board Meeting Agenda 11-8-11
DMNA November Board Meeting Agenda 11-8-11DMNA November Board Meeting Agenda 11-8-11
DMNA November Board Meeting Agenda 11-8-11Mill City Times
 
Minneapolis RiverCurrent 11-3-11
Minneapolis RiverCurrent 11-3-11Minneapolis RiverCurrent 11-3-11
Minneapolis RiverCurrent 11-3-11Mill City Times
 
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...Mill City Times
 
Chute Square Park Press Release 102711
Chute Square Park Press Release 102711Chute Square Park Press Release 102711
Chute Square Park Press Release 102711Mill City Times
 
Minneapolis RiverCurrent 10-28-11
Minneapolis RiverCurrent 10-28-11Minneapolis RiverCurrent 10-28-11
Minneapolis RiverCurrent 10-28-11Mill City Times
 
Minneapolis RiverCurrent 10-19-11
Minneapolis RiverCurrent 10-19-11Minneapolis RiverCurrent 10-19-11
Minneapolis RiverCurrent 10-19-11Mill City Times
 
East Downtown Council Job Posting for Executive Assistant
East Downtown Council Job Posting for Executive AssistantEast Downtown Council Job Posting for Executive Assistant
East Downtown Council Job Posting for Executive AssistantMill City Times
 
Minneapolis RiverCurrent 10-13-11
Minneapolis RiverCurrent 10-13-11Minneapolis RiverCurrent 10-13-11
Minneapolis RiverCurrent 10-13-11Mill City Times
 
Vikings Stadium Proposal Risk Analysis Report
Vikings Stadium Proposal Risk Analysis ReportVikings Stadium Proposal Risk Analysis Report
Vikings Stadium Proposal Risk Analysis ReportMill City Times
 
Third Ward NeighborhoodFest 2011
Third Ward NeighborhoodFest 2011Third Ward NeighborhoodFest 2011
Third Ward NeighborhoodFest 2011Mill City Times
 
DMNA Annual Meeting Agenda 10-11-11
DMNA Annual Meeting Agenda 10-11-11DMNA Annual Meeting Agenda 10-11-11
DMNA Annual Meeting Agenda 10-11-11Mill City Times
 
Minneapolis RiverCurrent 10-6-11
Minneapolis RiverCurrent 10-6-11Minneapolis RiverCurrent 10-6-11
Minneapolis RiverCurrent 10-6-11Mill City Times
 
Resolution Adopting Amended Chapter 11 of the Minneapolis Park and Recreation...
Resolution Adopting Amended Chapter 11 of the Minneapolis Park and Recreation...Resolution Adopting Amended Chapter 11 of the Minneapolis Park and Recreation...
Resolution Adopting Amended Chapter 11 of the Minneapolis Park and Recreation...Mill City Times
 
Minneapolis RiverCurrent 9-29-11
Minneapolis RiverCurrent 9-29-11Minneapolis RiverCurrent 9-29-11
Minneapolis RiverCurrent 9-29-11Mill City Times
 
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011Mill City Times
 
Minneapolis RiverCurrent 9-22-11
Minneapolis RiverCurrent 9-22-11Minneapolis RiverCurrent 9-22-11
Minneapolis RiverCurrent 9-22-11Mill City Times
 

Mais de Mill City Times (20)

Gold Medal Plaza
Gold Medal PlazaGold Medal Plaza
Gold Medal Plaza
 
Great River Outing - Gems Along the Mississippi Trail
Great River Outing - Gems Along the Mississippi TrailGreat River Outing - Gems Along the Mississippi Trail
Great River Outing - Gems Along the Mississippi Trail
 
Minneapolis RiverCurrent 11-10-11
Minneapolis RiverCurrent 11-10-11Minneapolis RiverCurrent 11-10-11
Minneapolis RiverCurrent 11-10-11
 
1100 2nd St S RFP_2010 2
1100 2nd St S RFP_2010 21100 2nd St S RFP_2010 2
1100 2nd St S RFP_2010 2
 
DMNA November Board Meeting Agenda 11-8-11
DMNA November Board Meeting Agenda 11-8-11DMNA November Board Meeting Agenda 11-8-11
DMNA November Board Meeting Agenda 11-8-11
 
Minneapolis RiverCurrent 11-3-11
Minneapolis RiverCurrent 11-3-11Minneapolis RiverCurrent 11-3-11
Minneapolis RiverCurrent 11-3-11
 
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
 
Chute Square Park Press Release 102711
Chute Square Park Press Release 102711Chute Square Park Press Release 102711
Chute Square Park Press Release 102711
 
Minneapolis RiverCurrent 10-28-11
Minneapolis RiverCurrent 10-28-11Minneapolis RiverCurrent 10-28-11
Minneapolis RiverCurrent 10-28-11
 
Minneapolis RiverCurrent 10-19-11
Minneapolis RiverCurrent 10-19-11Minneapolis RiverCurrent 10-19-11
Minneapolis RiverCurrent 10-19-11
 
East Downtown Council Job Posting for Executive Assistant
East Downtown Council Job Posting for Executive AssistantEast Downtown Council Job Posting for Executive Assistant
East Downtown Council Job Posting for Executive Assistant
 
Minneapolis RiverCurrent 10-13-11
Minneapolis RiverCurrent 10-13-11Minneapolis RiverCurrent 10-13-11
Minneapolis RiverCurrent 10-13-11
 
Vikings Stadium Proposal Risk Analysis Report
Vikings Stadium Proposal Risk Analysis ReportVikings Stadium Proposal Risk Analysis Report
Vikings Stadium Proposal Risk Analysis Report
 
Third Ward NeighborhoodFest 2011
Third Ward NeighborhoodFest 2011Third Ward NeighborhoodFest 2011
Third Ward NeighborhoodFest 2011
 
DMNA Annual Meeting Agenda 10-11-11
DMNA Annual Meeting Agenda 10-11-11DMNA Annual Meeting Agenda 10-11-11
DMNA Annual Meeting Agenda 10-11-11
 
Minneapolis RiverCurrent 10-6-11
Minneapolis RiverCurrent 10-6-11Minneapolis RiverCurrent 10-6-11
Minneapolis RiverCurrent 10-6-11
 
Resolution Adopting Amended Chapter 11 of the Minneapolis Park and Recreation...
Resolution Adopting Amended Chapter 11 of the Minneapolis Park and Recreation...Resolution Adopting Amended Chapter 11 of the Minneapolis Park and Recreation...
Resolution Adopting Amended Chapter 11 of the Minneapolis Park and Recreation...
 
Minneapolis RiverCurrent 9-29-11
Minneapolis RiverCurrent 9-29-11Minneapolis RiverCurrent 9-29-11
Minneapolis RiverCurrent 9-29-11
 
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
 
Minneapolis RiverCurrent 9-22-11
Minneapolis RiverCurrent 9-22-11Minneapolis RiverCurrent 9-22-11
Minneapolis RiverCurrent 9-22-11
 

Último

15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
14042024_First India Newspaper Jaipur.pdf
14042024_First India Newspaper Jaipur.pdf14042024_First India Newspaper Jaipur.pdf
14042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Emerging issues in migration policies.ppt
Emerging issues in migration policies.pptEmerging issues in migration policies.ppt
Emerging issues in migration policies.pptNandinituteja1
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptUsmanKaran
 
11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...The Lifesciences Magazine
 
Transforming Andhra Pradesh: TDP's Legacy in Road Connectivity
Transforming Andhra Pradesh: TDP's Legacy in Road ConnectivityTransforming Andhra Pradesh: TDP's Legacy in Road Connectivity
Transforming Andhra Pradesh: TDP's Legacy in Road Connectivitynarsireddynannuri1
 
Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxunark75
 
lok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxlok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxdigiyvbmrkt
 
Power in International Relations (Pol 5)
Power in International Relations (Pol 5)Power in International Relations (Pol 5)
Power in International Relations (Pol 5)ssuser583c35
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxSasikiranMarri
 

Último (14)

15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 
14042024_First India Newspaper Jaipur.pdf
14042024_First India Newspaper Jaipur.pdf14042024_First India Newspaper Jaipur.pdf
14042024_First India Newspaper Jaipur.pdf
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf
 
Emerging issues in migration policies.ppt
Emerging issues in migration policies.pptEmerging issues in migration policies.ppt
Emerging issues in migration policies.ppt
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.ppt
 
11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf
 
12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf
 
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
 
Transforming Andhra Pradesh: TDP's Legacy in Road Connectivity
Transforming Andhra Pradesh: TDP's Legacy in Road ConnectivityTransforming Andhra Pradesh: TDP's Legacy in Road Connectivity
Transforming Andhra Pradesh: TDP's Legacy in Road Connectivity
 
Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptx
 
lok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxlok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptx
 
Power in International Relations (Pol 5)
Power in International Relations (Pol 5)Power in International Relations (Pol 5)
Power in International Relations (Pol 5)
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptx
 

Law Firm Responds to FERC on Crown Hydro Project Status

  • 1. http://MillCityTimes.com L A W O F F I C E S O F 1500 K STREET, NW ♦ SUITE 330 ♦ WASHINGTON, DC 20005 GKRSE 202.408.5400 ♦ F AX : 202.408.5406 ♦ W EBSITE : www.gkrse-law.com June 23, 2011 Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 Re: Crown Hydro, LLC Crown Hydro Project, FERC Project No. 11175-024 Response to May 25, 2011 Show Cause Letter Dear Ms. Bose: Crown Hydro, LLC, the holder of the above hydroelectric license, offers the following project update in response to your May 25, 2011 show cause letter. For the reasons set forth below, Crown Hydro respectfully requests that the Federal Energy Regulatory Commission not initiate any license termination proceedings. Instead, Crown Hydro asks that the FERC continue to hold these proceedings in abeyance until such time as Crown Hydro reports back to the FERC in a period not to exceed 45 days following the close of the Minnesota Legislature’s special session this summer. As explained in this letter, Crown Hydro expects the Minnesota legislature will enact legislation this summer as part of its special session which will remove the historical impediment to this project from obtaining local site control and thereby allow the project to move forward with final construction. 2009 – 2011 As your letter indicates, Crown Hydro provided its last status updates by submitting comprehensive progress reports in June and December, 2009. During 2010, Crown Hydro continued some work on securing site control, but spent much of its time exploring additional financing opportunities and hiring new consultants to help move the project forward. The Current Proposal Beginning in 2011, Crown Hydro has once again spent significant time and resources in obtaining site control of the “third” powerhouse site referenced in the June 2009 update – i.e., a site just slightly up-river (approximately 150 feet) from the original project site but nonetheless within the project boundary as set forth in ordering paragraph (B)(2) of the March 19, 1999, FERC Order Issuing License. The new site has been substantially designed and engineered and http://MillCityTimes.com
  • 2. http://MillCityTimes.com Ms. Kimberly D. Bose June 23, 2011 Page 2 because it would be built entirely underground, the facility would have minimal impact to the public. Crown Hydro continues to own two 1700 mm AxialFlow Kaplan turbines along with two 1575 kW Propencia synchromous generators, together with engineering and controls manufactured by Canadian Hydro Components, Ltd. The maximum capacity for the equipment remains at 3.2 MW. The equipment is currently in professional storage and remains ready and capable of being placed in service. The proposed current site requires the temporary use of a small parcel owned by the Minneapolis Parks & Recreation Board during project construction, an underground easement for permanent placement of the facility, and the use of underground tunnels previously used for hydropower production by Minneapolis milling companies, which tunnels have now come under the control by the Park Board by a grant of the City of Minneapolis. Beginning in March 2011, Crown Hydro once again initiated discussions with the Park Board about obtaining the Park Board’s consent for use of its property. On April 20, 2011, Crown Hydro presented to the Park Board’s Planning Committee, with the full Board present. At the end of that meeting, the Planning Committee directed the Park Board’s Chairman, assisted by the Park Board’s Executive Director, staff, and legal counsel, to work with Crown Hydro in developing the framework of an agreement under which the Park Board would provide access to and use of its property for the project. As in previous years, the Park Board’s primary concern was ensuring minimum flow over the St. Anthony Falls spillway so as to ensure what certain members of the Park Board considered an acceptable aesthetic experience for the public. Crown Hydro’s and the Park Board’s most recent efforts at reaching agreement are detailed below. The Minnesota Legislature’s Interest In Facilitating Qualifying Hydro Projects As the FERC is aware, Minnesota has one of the most aggressive renewable energy portfolio requirements in the nation. For its largest utility, Northern States Power Company d/b/a Xcel Energy, Inc., 30% of its energy must come from eligible renewable energy sources by the year 2020. Small hydroelectric facilities like the Crown Hydro project qualify as eligible sources for the state’s RPS. Given the state’s paramount interest in renewable energy, and because of the Park Board’s historic reluctance to provide use of its property on reasonable terms, the Minnesota Legislature is currently moving forward the adoption of legislation that would effectively preempt the Park Board and other similarly-situated political subdivisions with respect to the respective municipal governments’ need to grant any “permit, entitlement, license, authorization or consent of any kind,” for small, eligible hydroelectric facilities. On May 2, 2012, the Committee on Environment, Energy and Natural Resources Policy and Finance, Minnesota House of Representatives, passed HF 1440, a copy of which along with its status summary is attached as Exhibit 1. HF 1440 is now on general orders and awaits passage by the full House. L AW OFFI C ES O F http://MillCityTimes.com GKRSE
  • 3. http://MillCityTimes.com Ms. Kimberly D. Bose June 23, 2011 Page 3 The companion bill in the Minnesota Senate is SF 1190. SF 1190 was introduced and had its first reading, and was referred to the Local Government and Elections Committee. A copy of SF 1191 and its legislative status summary is attached as Exhibit 2. The Minnesota Legislature adjourned by its constitutional deadline on May 23, 2011 without the Legislature and Governor agreeing on a state budget. While it appears that the state is headed for a temporary shut-down of non-essential services, the Governor is expected to call a special session of the legislature some time in July so that a budget can be passed and all governmental services funded. Based on discussions with legislative leadership, including authors of the above bills, Crown Hydro expects the Legislature to pass legislation that closely resembles HF 1440 during the special session. As a result, Crown Hydro expects that the Legislature will soon provide access and use of property necessary for the project that the Park Board has been unwilling to provide. Attached as Exhibits 3 and 4 are letters of support from key Minnesota legislators who will be primarily responsible for enactment of the expected legislation. Exhibit No. 3 is a joint letter from Representatives Michael Beard and Denny McNamara. Representative Beard is the main author of HF 1440 and Representative McNamara is the Chair, Committee on Environment, Energy, and Natural Resources Policy and Finance. Exhibit 4 is from Senator Gen Olson, chief author of the legislation in the Senate and the Senate’s President Pro Tempore. As can be seen by the letters, the Legislature is prepared to provide the necessary site control. Discussions With Park Board Even though the Legislature is poised to provide Crown Hydro and similarly-situated federally-approved projects the necessary land use and related authorizations through state legislation, Crown Hydro has continued to work in good faith with the Park Board on finding a local resolution. To that end, Crown Hydro representatives met with the Park Board’s Executive Director, staff and counsel regularly in April and May. The purpose of the meetings was, as directed by the Park Board’s Planning Committee, to develop the framework for a mutual agreement under which the project could utilize Park Board property. The first framework agreement, structured under a letter of intent, contemplated a straightforward development and use agreement under which Crown Hydro was prepared to pay the Park Board (1) $500,000 upon the commercial operation date, and (2) a minimum annual license/use fee in the amount of $70,000, which amount could increase depending on the level of the project’s energy production. A copy of that draft letter of intent is attached as Exhibit 5. After Crown Hydro and Park Board staff reached agreement in principal with respect to the “lessor/lessee” letter of intent (Exhibit 5), the Park Board, led by the board’s chairman John Erwin, preferred instead that the Park Board be a joint owner of the project, but an owner with somebody other than Crown Hydro, LLC’s current sole owner, William Hawks, a Minneapolis businessman. That is, the Park Board insisted that Crown Hydro’s use of Park Board property was conditioned on, among other matters, that Mr. Hawks no longer be directly or indirectly involved with the project. In effect, the Park Board was forcing Mr. Hawks to sell his ownership L AW OFFI C ES O F http://MillCityTimes.com GKRSE
  • 4. http://MillCityTimes.com Ms. Kimberly D. Bose June 23, 2011 Page 4 in Crown Hydro to a third party acceptable to the Park Board. That the Park Board was in essence requiring Mr. Hawks to make a forced sale was disappointing to Mr. Hawks, particularly given his tireless commitment over the last decade and investment in the project of more than six million dollars. In the end, however, it was because of his commitment to making sure this project could move forward that Mr. Hawks agreed to the Park Board’s forced sale, even though the requirement would obviously diminish Mr. Hawk’s negotiating leverage in any third party sale. After much work, the parties reached agreement in principal on how a third party/Park Board joint venture project would work, and that agreement is reflected in the draft letter of intent dated as of May 13, 2011, which LOI the Park Board’s Superintendent sent the Park Board for its adoption as part of an overall packet for the Park Board’s May 18, 2011 regularly scheduled meeting. The May 13 LOI, along with full board packet, is attached as Exhibit 6. In both the lessor/lessee and joint venture letters of intent, the Park Board sought to assure minimum flows over the St. Anthony spillway to protect what certain members of the Park Board considered most important to them: the aesthetics of the falls. Article 404 of the Crown Hydro license establishes the minimum flows for the project. It provides that Crown Hydro will operate the project so that some water always flows over St. Anthony Falls except as follows: (a) during periods of very low flows when the project could not operate at 200 cfs without drying up the falls, the project may only operate from nightfall to dawn; (b) between December 15 and March 15, the project will operate with whatever flows are available even if it dries up the falls; and (c) during low flows in July and August, the project may operate with up to 500 cfs during daylight hours even if it reduces flows over the spillway and up to 1,000 cfs from nightfall until dawn. In the May 13 LOI, Crown Hydro agreed to effectively shut down the project during daylight summer hours in order to satisfy a Park Board requirement that the project maintain a minimum of 2000 cfs over the falls, during the daylight hours of June 21 – September 21, generally regarded as the falls’ “prime viewing periods” a much more restrictive flow regime than required by the 1999 License. While the restrictions would obviously impact project energy production, and therefore affect project gross revenues according to the power purchase agreement with Northern States Power, discussed below, Crown Hydro was willing to agree to depart from the 1999 License’s flow requirements if necessary to satisfy the Park Board’s desire to control flow over St. Anthony Falls.1 The May 13 LOI represented an agreement in principal between Crown Hydro, the Park Board’s Chairman, its Executive Director and the Park Board’s counsel. Following the submittal of the May 13 LOI by the Park Board’s Superintendent to the full board, Crown Hydro 1 It is important to note that while Crown Hydro was willing to relinquish some of its flow rights provided under the 1999 License as a compromise with the Park Board, Crown Hydro was very cognizant during its discussions with the Park Board, that only the FERC, and not Crown Hydro or the Park Board can set flow restrictions for a hydroelectric project licensed on a navigable water of the United States. L AW OFFI C ES O F http://MillCityTimes.com GKRSE
  • 5. http://MillCityTimes.com Ms. Kimberly D. Bose June 23, 2011 Page 5 representatives met informally with the Park Board Chairman, along with another Park Board Commissioner and Park Board counsel on Sunday, May 15. At that meeting, the Park Board Chairman and fellow Commissioners expressed confidence that the May 13 LOI would be approved by the board on May 18. Following May 18, the parties would begin work on definitive agreements between Crown Hydro, the Park Board, and a new third-party investor. On the night of Monday, May 16, however, Crown Hydro representatives received an email message from the Park Board’s primary counsel (the partner of the Park Board lawyer with whom Crown Hydro had just spent the previous weeks in negotiations). In the email, the Park Board counsel announced that there were “revisions” to the letter of intent. As can be seen by Exhibit 7, however, the unilateral “revisions” that the Park Board made to a previously negotiated document so completely changed the character of the document so as to make it wholly unworkable, both practically and financially. As can be seen from Exhibit 7, the single largest change (in addition to many others) was that instead of exercising some measure of control of water over the spillway so as to protect the spillway’s aesthetics during its prime viewing periods, the Park Board instead required that it have “complete operating control” over the facility from June 15 to September 15, and for all other times of the year, the new third party owner would be required to maintain a minimum flow of 2000 cfs over St. Anthony Falls. Attached as Exhibit 8 is a letter from professional engineer Mr. Joel Toso. As Mr. Toso states, a requirement under which the Park Board could effectively shut down the project at any time and for any reason from June 15 – September 15, combined with a requirement that the project maintain a minimum of 2000 cfs at all other times effectively destroy’s the project’s economics. Thus, as it turned out, the Park Board required as a condition of its consent that Mr. Hawks sell 100% of his interest in Crown Hydro, LLC, to which Mr. Hawks agreed, only then for the Park Board to make it both economically and practically impossible for him to do so. Status of Power Purchase Agreement On January 23, 2003, Crown Hydro executed a power purchase agreement with Northern States Power Company d/b/a Xcel Energy, Inc. under which NSP has agreed to purchase 100% of the project’s energy production for an initial term of 20 years. Because of the project’s inability to secure Park Board authorization, the project remains to this date in abeyance under the PPA’s Force Majeure provision (pursuant to Article 14 whereby a “governmental authority’s” failure to act which “prevents or delays” project performance constitutes Force Majeure). Crown Hydro remains in active discussions with NSP regarding the terms of the PPA and related matters. Status of Renewable Development Grant On January 17, 2002, Crown Hydro also executed a Renewable Development Fund Grant Contract Terms and Conditions under which NSP granted the project a total of $5.1 million as L AW OFFI C ES O F http://MillCityTimes.com GKRSE
  • 6. http://MillCityTimes.com Ms. Kimberly D. Bose June 23, 2011 Page 6 part of NSP’s Renewable Development Fund administered under Minn. Stat. § 11C.779, of which approximately $1.5 million has been expended to date. The RDF contract also remains in abeyance pending a determination on whether the project will be able to obtain local site control, and Crown Hydro also remains in discussions with NSP on this matter. Request for Further Abeyance Crown Hydro is fully aware that its failure to obtain local site control from the Park Board has caused its 1999 License to remain open and the project unconstructed for a long period of time. Nobody finds that more regrettable than Crown Hydro and Crown Hydro truly appreciates the FERC’s patience and willingness to work with it as it finds a solution which has long vexed it. Fortunately, as the letters from the Minnesota legislators attest, it appears that local site control will be in hand by the end of this summer. Crown Hydro respectfully requests that the FERC defer any action with respect to any termination proceedings until such time as the special session is over and it is known whether HF 1411 or something substantially similar has been passed into law. Within [30] days of the end of the special session, Crown Hydro will provide the FERC a supplemental update, at which time the FERC will have more information from which to make any decisions affecting Crown Hydro and FERC License No. 11175-024. At this time, Crown Hydro will also address and bring current (to the extent practicable) any overdue activities, plans, and filings required by the 1999 License. In the interim, please do not hesitate to ask any questions or seek additional information. Respectfully Submitted Donald H. Clarke Law Offices of GKRSE 1500 K Street NW, Suite 330 Washington DC, 20005 Tel (202) 408-5400 Fax (202) 408-5406 dhclarke@gkrse-law.com L AW OFFI C ES O F http://MillCityTimes.com GKRSE
  • 7. http://MillCityTimes.com Ms. Kimberly D. Bose June 23, 2011 Page 7 Counsel to Crown Hydro, LLC Exhibits Exhibit 1: HF 1440 along with status summary Exhibit 2: SF 1191 along with status summary Exhibit 3: Joint Letter from Representatives Michael Beard and Denny McNamara Exhibit 4: Letter from Senator Gen Olson Exhibit 5: Lessor/lessee draft Letter of Intent Exhibit 6: May 13 Letter of Intent along with full board packet Exhibit 7: May 13 LOI as revised by Park Board Exhibit 8: Letter from Mr. Joel Toso cc: Minneapolis Parks & Recreation Board Bill Grant, Deputy Commissioner of Energy Barbara Johnson, President, Minneapolis City Council Senator Gen Olson Representative Michael Beard Representative Denny McNamara L AW OFFI C ES O F http://MillCityTimes.com GKRSE
  • 88. http://MillCityTimes.com Wenck Associates, Inc. 1800 Pioneer Creek Center P.O. Box 249 Maple Plain, MN 55359-0249 (763) 479-4200 Fax (763) 479-4242 E-mail: wenckmp@wenck.com June 22, 2011 Mr. Todd Guerrero Attorney Fredrikson & Byron, P.A. 200 South Sixth Street Suite 4000 Minneapolis, MN 55402 Re: Crown Hydro Project Feasibility under Recent Minneapolis Park and Recreation Board Letter of Intent Dear Todd: The purpose of this letter is to document our opinion of the Crown Hydro project feasibility under the May 16, 2011 Letter of Intent (LOI) with the Minneapolis Park and Recreation Board. As part of the Crown Hydro team, we worked with the Park Board staff on establishing minimum flow rates and operating procedures that would maintain project viability. These were documented in the May 13th draft LOI. The LOI as modified by the Park Board and dated May 16, 2011 requires that the Park Board has "complete operational control" from June 15 - September 15, therefore be able to shut down the project at any time during that period. It further requires that the facility maintain a minimum 2000 cfs at all other times of the year. These significant changes make the project economically unfeasible. Sincerely, WENCK ASSOCIATES, INC. Joel Toso, P.E. Principal Engineer http://MillCityTimes.com