Copyright - Leanintuit - Mar 2013
Lean Project Management
Oxymoron or Possible?
Mike Edwards
TorontoXP - May 21, 2013
@mikeeedwards mike@leanintuit.com
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Two project managers!
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Why do PMs seem to
be such a burden !??!
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Lets follow the
evolution of a PM
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
First go hire a virgin PM
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Watch them have some success ...
while they don’t know any better!
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
2/2 New document (2/2)2013-04-02 19:52:36
PMP
Then encourage them to get certified!
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
They have the holy grail!
• PM Body of Knowledge (PMBOK)
• Program Management Standard
• Portfolio Management Standard
• Risk Management Standard
• Earned Value Standard
• Configuration Management Standard
• Work Breakdown Structure Standard
• Scheduling Standard
• Estimating Standard
• Competency Development Framework
• PMBOK Government Extension
• PMBOK Construction Extension
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Then it starts happening!
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Sound Familiar?
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Does Project
Management make
sense?
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
It’s a complex world!
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Lean!
Eliminate
Waste
High Product
Integrity
Team & People
Focus
Always
Delivering
Always
Learning
Optimizing
the whole
Value
Partially done work
Extra Processes
Extra Features
Task Switching
Waiting
Motion
Defects
Management Activities
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Examining current state
People
Process Product
People’s
Satisfaction
Quality
Business risk,
schedule and cost
pressure
They’re People
not Resources!
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
People
Clients Everyone!
The
Public
Sponsor
Banker
TestersProje ager Develop
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Let’s build something!
• All you have to do is have the
developer draw a picture in 5 mins
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
People
Ownership
Leadership
Collaboration
EmpoweredDisempowered
ServantMaster
InclusiveExclusive
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Process
Focus on how you use a process
Not what process is used
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
PMI Processes
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
61©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK®
Guide) – Fifth Edition
3
4. Project
Integration
Management
5. Project Scope
Management
6. Project Time
Management
7. Project Cost
Management
8. Project
Quality
Management
9. Project
Human Resource
Management
10. Project
Communications
Management
11. Project Risk
Management
12. Project
Procurement
Management
13. Project
Stakeholder
Management
Project Management Process Groups
Knowledge Areas Initiating
Process
Group
Closing
Process
Group
Monitoring
and Controlling
Process Group
Executing
Process
Group
Planning
Process
Group
4.1 Develop
Project Charter
13.1 Identify
Stakeholders
4.2 Develop Project
Management Plan
5.1 Plan Scope
Management
5.2 Collect
Requirements
5.3 Define Scope
5.4 Create WBS
6.1 Plan Schedule
Management
6.2 Define
Activities
6.3 Sequence
Activities
6.4 Estimate
Activity Resources
6.5 Estimate
Activity Durations
6.6 Develop
Schedule
7.1 Plan Cost
Management
7.2 Estimate Costs
7.3 Determine
Budget
8.1 Plan Quality
Management
9.1 Plan Human
Resource
Management
10.1 Plan
Communications
Management
11.1 Plan Risk
Management
11.2 Identify Risks
11.3 Perform
Qualitative Risk
Analysis
11.4 Perform
Quantitative Risk
Analysis
11.5 Plan Risk
Responses
12.1 Plan
Procurement
Management
13.2 Plan
Stakeholder
Management
4.3 Direct and
Manage Project
Work
8.2 Perform Quality
Assurance
9.2 Acquire Project
Team
9.3 Develop Project
Team
9.4 Manage Project
Team
10.2 Manage
Communications
12.2 Conduct
Procurements
13.3 Manage
Stakeholder
Engagement
4.4 Monitor and
Control Project
Work
4.5 Perform
Integrated Change
Control
5.5 Validate Scope
5.6 Control Scope
6.7 Control
Schedule
7.4 Control Costs
8.3 Control Quality
10.3 Control
Communications
11.6 Control Risks
12.3 Control
Procurements
13.4 Control
Stakeholder
Engagement
4.6 Close Project
or Phase
12.4 Close
Procurements
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Process
Improving
Process
Application
OngoingOnce
EvolvingEstablished
ScaledRigid
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Product
IT organizations only exists to
deliver valuable products & tools to
enable our customers to succeed
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Product
Product Definition
Achievement Focus
Response to change
LearnedDefined
CustomerProject
AdaptiveControl
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
What do the
results tell us?
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Your assessment results?
People
Process Product
People’s
Satisfaction
Quality
Business risk,
schedule and cost
pressure
They’re People
not Resources!
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
People
Process Product
People’s
Satisfaction
Quality
Business risk,
schedule and cost
pressure
They’re People
not Resources!
Your assessment results?
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Where to
from here?
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
Where to from here?
• First figure out where you are
• Listen to the people
• Everyone must commit to an
improvement program
• Iterate! (aka: Do it again!)
• For best results - get help!
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
A word about
certifications!
Thursday, 23 May, 13
Copyright - Leanintuit - Mar 2013
http://leanpmsolutions.com/the-lean-pmo-is-possible/
Thursday, 23 May, 13

Mais conteúdo relacionado

Mais procurados

Project Portfolio Management 2015
Project Portfolio Management 2015Project Portfolio Management 2015
Project Portfolio Management 2015Peter Schellinck
 
Having a PMO with agile flavor
Having a PMO with agile flavorHaving a PMO with agile flavor
Having a PMO with agile flavorImad Alsadeq
 
The Agile PMO: Ensuring visibility and governance
The Agile PMO: Ensuring visibility and governanceThe Agile PMO: Ensuring visibility and governance
The Agile PMO: Ensuring visibility and governanceMatt Holitza
 
DSDM – Linking Agile program management, Agile project management and Agile...
DSDM – Linking Agile program management, Agile project management and Agile...DSDM – Linking Agile program management, Agile project management and Agile...
DSDM – Linking Agile program management, Agile project management and Agile...Association for Project Management
 
2012 catalog-no-pricing
2012 catalog-no-pricing2012 catalog-no-pricing
2012 catalog-no-pricingISTAdmin
 
Project management 2016 event
Project management 2016 eventProject management 2016 event
Project management 2016 eventRobert Twiddy
 
PMO Agility Canvas - PMI OKC Chapter Mtg. May 2015
PMO Agility Canvas - PMI OKC Chapter Mtg. May 2015PMO Agility Canvas - PMI OKC Chapter Mtg. May 2015
PMO Agility Canvas - PMI OKC Chapter Mtg. May 2015Dave Prior
 
Agile Project Management
Agile Project Management Agile Project Management
Agile Project Management CUPE_Projects
 
Agile and the PMO
Agile and the PMOAgile and the PMO
Agile and the PMOBestoutcome
 

Mais procurados (20)

Mikel huth
Mikel huthMikel huth
Mikel huth
 
Project Portfolio Management 2015
Project Portfolio Management 2015Project Portfolio Management 2015
Project Portfolio Management 2015
 
Having a PMO with agile flavor
Having a PMO with agile flavorHaving a PMO with agile flavor
Having a PMO with agile flavor
 
Michael Nir The Agile PMO keynote
Michael Nir   The Agile PMO keynoteMichael Nir   The Agile PMO keynote
Michael Nir The Agile PMO keynote
 
Guide to Project Portfolio Management
Guide to Project Portfolio ManagementGuide to Project Portfolio Management
Guide to Project Portfolio Management
 
The Agile PMO: Ensuring visibility and governance
The Agile PMO: Ensuring visibility and governanceThe Agile PMO: Ensuring visibility and governance
The Agile PMO: Ensuring visibility and governance
 
The Next Generation PMO
The Next Generation PMOThe Next Generation PMO
The Next Generation PMO
 
DSDM – Linking Agile program management, Agile project management and Agile...
DSDM – Linking Agile program management, Agile project management and Agile...DSDM – Linking Agile program management, Agile project management and Agile...
DSDM – Linking Agile program management, Agile project management and Agile...
 
The agile PMO - Agile Business Conference 10.2014 London Michael nir
The agile PMO - Agile Business Conference 10.2014 London Michael nir   The agile PMO - Agile Business Conference 10.2014 London Michael nir
The agile PMO - Agile Business Conference 10.2014 London Michael nir
 
The Agile PMO
The Agile PMOThe Agile PMO
The Agile PMO
 
Agile PMO - PM
Agile PMO - PMAgile PMO - PM
Agile PMO - PM
 
2012 catalog-no-pricing
2012 catalog-no-pricing2012 catalog-no-pricing
2012 catalog-no-pricing
 
Portfolio Office Welcome Pack
Portfolio Office Welcome PackPortfolio Office Welcome Pack
Portfolio Office Welcome Pack
 
Project management 2016 event
Project management 2016 eventProject management 2016 event
Project management 2016 event
 
Ready for-change-2017 spoce event slides
Ready for-change-2017 spoce event slidesReady for-change-2017 spoce event slides
Ready for-change-2017 spoce event slides
 
Agile programme management, Wednesday 21st January 2015
Agile programme management, Wednesday 21st January 2015Agile programme management, Wednesday 21st January 2015
Agile programme management, Wednesday 21st January 2015
 
PMO Agility Canvas - PMI OKC Chapter Mtg. May 2015
PMO Agility Canvas - PMI OKC Chapter Mtg. May 2015PMO Agility Canvas - PMI OKC Chapter Mtg. May 2015
PMO Agility Canvas - PMI OKC Chapter Mtg. May 2015
 
Agile Practice Guide Notes
Agile Practice Guide NotesAgile Practice Guide Notes
Agile Practice Guide Notes
 
Agile Project Management
Agile Project Management Agile Project Management
Agile Project Management
 
Agile and the PMO
Agile and the PMOAgile and the PMO
Agile and the PMO
 

Destaque

Brand identity in Production Crew
Brand identity in Production CrewBrand identity in Production Crew
Brand identity in Production Creweh6418
 
Being agile while standing in a waterfall
Being agile while standing in a waterfallBeing agile while standing in a waterfall
Being agile while standing in a waterfallMike Edwards
 
Being agile while standing in a waterfall pm connect
Being agile while standing in a waterfall   pm connectBeing agile while standing in a waterfall   pm connect
Being agile while standing in a waterfall pm connectMike Edwards
 
Catch the sentence
Catch the sentenceCatch the sentence
Catch the sentenceJihyun Park
 
Being agile while standing in a waterfall pm connect
Being agile while standing in a waterfall   pm connectBeing agile while standing in a waterfall   pm connect
Being agile while standing in a waterfall pm connectMike Edwards
 
Being agile while standing in a waterfall
Being agile while standing in a waterfallBeing agile while standing in a waterfall
Being agile while standing in a waterfallMike Edwards
 
Leading for Change
Leading for Change Leading for Change
Leading for Change Mike Edwards
 

Destaque (8)

Brand identity in Production Crew
Brand identity in Production CrewBrand identity in Production Crew
Brand identity in Production Crew
 
Pitch
PitchPitch
Pitch
 
Being agile while standing in a waterfall
Being agile while standing in a waterfallBeing agile while standing in a waterfall
Being agile while standing in a waterfall
 
Being agile while standing in a waterfall pm connect
Being agile while standing in a waterfall   pm connectBeing agile while standing in a waterfall   pm connect
Being agile while standing in a waterfall pm connect
 
Catch the sentence
Catch the sentenceCatch the sentence
Catch the sentence
 
Being agile while standing in a waterfall pm connect
Being agile while standing in a waterfall   pm connectBeing agile while standing in a waterfall   pm connect
Being agile while standing in a waterfall pm connect
 
Being agile while standing in a waterfall
Being agile while standing in a waterfallBeing agile while standing in a waterfall
Being agile while standing in a waterfall
 
Leading for Change
Leading for Change Leading for Change
Leading for Change
 

Semelhante a Lean project mgmt oxymoron or possible - toronto xp - may 2013

Project management in Supply Chain
Project management in Supply ChainProject management in Supply Chain
Project management in Supply ChainMegha Kotak, PMP
 
Implementing PM Systems
Implementing PM SystemsImplementing PM Systems
Implementing PM SystemsDaren Maynard
 
What is Agile and the Agile Mindset
What is Agile and the Agile MindsetWhat is Agile and the Agile Mindset
What is Agile and the Agile MindsetPMIUKChapter
 
SPS Abu Dhabi Communicating The Business Value of SharePoint
SPS Abu Dhabi Communicating The Business Value of SharePointSPS Abu Dhabi Communicating The Business Value of SharePoint
SPS Abu Dhabi Communicating The Business Value of SharePointNaomi Moneypenny
 
Contmporary Project Management a millenials Perspective
Contmporary Project Management a millenials PerspectiveContmporary Project Management a millenials Perspective
Contmporary Project Management a millenials PerspectiveErnest Mnkandla
 
Agile IT Project Management
Agile IT Project ManagementAgile IT Project Management
Agile IT Project ManagementSupreeth Rajan
 
RPO Webinar #3: Change Management-Ensuring a Successful Implementation
RPO Webinar #3: Change Management-Ensuring a Successful ImplementationRPO Webinar #3: Change Management-Ensuring a Successful Implementation
RPO Webinar #3: Change Management-Ensuring a Successful ImplementationHROAssoc
 
Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0Project Management Academy
 
Project Management Journey
Project Management JourneyProject Management Journey
Project Management JourneyChristine Aykac
 
Agile project management - a deep dive 2.2
Agile project management  - a deep dive 2.2Agile project management  - a deep dive 2.2
Agile project management - a deep dive 2.2Mohammad Faiz
 
The Four Dimensions of Performance Improvement
The Four Dimensions of Performance ImprovementThe Four Dimensions of Performance Improvement
The Four Dimensions of Performance ImprovementTechWell
 
4. Project Management For Entrepreneurs By Nominchuluun
4. Project Management For Entrepreneurs By Nominchuluun4. Project Management For Entrepreneurs By Nominchuluun
4. Project Management For Entrepreneurs By NominchuluunUurdmandakh Gongor
 
ACMP Workshop Sneak Peek
ACMP Workshop Sneak PeekACMP Workshop Sneak Peek
ACMP Workshop Sneak PeekTim Creasey
 
Preview: 3 Steps to Monitoring in a Connected Enterprise
Preview: 3 Steps to Monitoring in a Connected Enterprise Preview: 3 Steps to Monitoring in a Connected Enterprise
Preview: 3 Steps to Monitoring in a Connected Enterprise xMatters Inc
 
PMP Training Project Scope Management Part 1
PMP Training Project Scope Management Part 1PMP Training Project Scope Management Part 1
PMP Training Project Scope Management Part 1Skillogic Solutions
 
Mars Presentation at the Supply Chain Insights Global Summit 2018
Mars Presentation at the Supply Chain Insights Global Summit 2018Mars Presentation at the Supply Chain Insights Global Summit 2018
Mars Presentation at the Supply Chain Insights Global Summit 2018Lora Cecere
 
Odoo Experience 2018 - Project Methodology: The Editor Stance
Odoo Experience 2018 - Project Methodology: The Editor StanceOdoo Experience 2018 - Project Methodology: The Editor Stance
Odoo Experience 2018 - Project Methodology: The Editor StanceElínAnna Jónasdóttir
 

Semelhante a Lean project mgmt oxymoron or possible - toronto xp - may 2013 (20)

Project management in Supply Chain
Project management in Supply ChainProject management in Supply Chain
Project management in Supply Chain
 
Implementing PM Systems
Implementing PM SystemsImplementing PM Systems
Implementing PM Systems
 
What is Agile and the Agile Mindset
What is Agile and the Agile MindsetWhat is Agile and the Agile Mindset
What is Agile and the Agile Mindset
 
SPS Abu Dhabi Communicating The Business Value of SharePoint
SPS Abu Dhabi Communicating The Business Value of SharePointSPS Abu Dhabi Communicating The Business Value of SharePoint
SPS Abu Dhabi Communicating The Business Value of SharePoint
 
Contmporary Project Management a millenials Perspective
Contmporary Project Management a millenials PerspectiveContmporary Project Management a millenials Perspective
Contmporary Project Management a millenials Perspective
 
Agile IT Project Management
Agile IT Project ManagementAgile IT Project Management
Agile IT Project Management
 
RPO Webinar #3: Change Management-Ensuring a Successful Implementation
RPO Webinar #3: Change Management-Ensuring a Successful ImplementationRPO Webinar #3: Change Management-Ensuring a Successful Implementation
RPO Webinar #3: Change Management-Ensuring a Successful Implementation
 
Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0
 
Project Management Journey
Project Management JourneyProject Management Journey
Project Management Journey
 
Agile project management - a deep dive 2.2
Agile project management  - a deep dive 2.2Agile project management  - a deep dive 2.2
Agile project management - a deep dive 2.2
 
The Four Dimensions of Performance Improvement
The Four Dimensions of Performance ImprovementThe Four Dimensions of Performance Improvement
The Four Dimensions of Performance Improvement
 
4. Project Management For Entrepreneurs By Nominchuluun
4. Project Management For Entrepreneurs By Nominchuluun4. Project Management For Entrepreneurs By Nominchuluun
4. Project Management For Entrepreneurs By Nominchuluun
 
India General Election: A Great Display of Planning, Execution
India General Election: A Great Display of Planning, ExecutionIndia General Election: A Great Display of Planning, Execution
India General Election: A Great Display of Planning, Execution
 
ACMP Workshop Sneak Peek
ACMP Workshop Sneak PeekACMP Workshop Sneak Peek
ACMP Workshop Sneak Peek
 
Quality Management Practice in IT Projects
Quality Management Practice in IT ProjectsQuality Management Practice in IT Projects
Quality Management Practice in IT Projects
 
Preview: 3 Steps to Monitoring in a Connected Enterprise
Preview: 3 Steps to Monitoring in a Connected Enterprise Preview: 3 Steps to Monitoring in a Connected Enterprise
Preview: 3 Steps to Monitoring in a Connected Enterprise
 
PMP Training Project Scope Management Part 1
PMP Training Project Scope Management Part 1PMP Training Project Scope Management Part 1
PMP Training Project Scope Management Part 1
 
Mars Presentation at the Supply Chain Insights Global Summit 2018
Mars Presentation at the Supply Chain Insights Global Summit 2018Mars Presentation at the Supply Chain Insights Global Summit 2018
Mars Presentation at the Supply Chain Insights Global Summit 2018
 
Odoo Experience 2018 - Project Methodology: The Editor Stance
Odoo Experience 2018 - Project Methodology: The Editor StanceOdoo Experience 2018 - Project Methodology: The Editor Stance
Odoo Experience 2018 - Project Methodology: The Editor Stance
 
Michigan Agile Presentation
Michigan Agile PresentationMichigan Agile Presentation
Michigan Agile Presentation
 

Mais de Mike Edwards

So you want change lets talk fear - agile tdusa
So you want change   lets talk fear - agile tdusaSo you want change   lets talk fear - agile tdusa
So you want change lets talk fear - agile tdusaMike Edwards
 
Bullshit stop telling me it's impossible
Bullshit stop telling me it's impossibleBullshit stop telling me it's impossible
Bullshit stop telling me it's impossibleMike Edwards
 
Bullsh*t stop telling me it's impossible
Bullsh*t stop telling me it's impossibleBullsh*t stop telling me it's impossible
Bullsh*t stop telling me it's impossibleMike Edwards
 
Leading for change
Leading for changeLeading for change
Leading for changeMike Edwards
 
Value from meh to wow
Value from meh to wowValue from meh to wow
Value from meh to wowMike Edwards
 
Shifting value into high gear
Shifting value into high gearShifting value into high gear
Shifting value into high gearMike Edwards
 
Shifting value into high gear
Shifting value into high gearShifting value into high gear
Shifting value into high gearMike Edwards
 
Responsibility at the core of great things
Responsibility at the core of great thingsResponsibility at the core of great things
Responsibility at the core of great thingsMike Edwards
 
Being agile while standing in a waterfall
Being agile while standing in a waterfallBeing agile while standing in a waterfall
Being agile while standing in a waterfallMike Edwards
 
Lean project management oxymoron or possible - ottawa - apr 2013
Lean project management   oxymoron or possible - ottawa - apr 2013Lean project management   oxymoron or possible - ottawa - apr 2013
Lean project management oxymoron or possible - ottawa - apr 2013Mike Edwards
 
Lean pmo oxymoron or possible - potsdam
Lean pmo   oxymoron or possible - potsdamLean pmo   oxymoron or possible - potsdam
Lean pmo oxymoron or possible - potsdamMike Edwards
 
Lean PMO - Oxymoron or Possible - SDEC'12
Lean PMO  - Oxymoron or Possible - SDEC'12Lean PMO  - Oxymoron or Possible - SDEC'12
Lean PMO - Oxymoron or Possible - SDEC'12Mike Edwards
 

Mais de Mike Edwards (12)

So you want change lets talk fear - agile tdusa
So you want change   lets talk fear - agile tdusaSo you want change   lets talk fear - agile tdusa
So you want change lets talk fear - agile tdusa
 
Bullshit stop telling me it's impossible
Bullshit stop telling me it's impossibleBullshit stop telling me it's impossible
Bullshit stop telling me it's impossible
 
Bullsh*t stop telling me it's impossible
Bullsh*t stop telling me it's impossibleBullsh*t stop telling me it's impossible
Bullsh*t stop telling me it's impossible
 
Leading for change
Leading for changeLeading for change
Leading for change
 
Value from meh to wow
Value from meh to wowValue from meh to wow
Value from meh to wow
 
Shifting value into high gear
Shifting value into high gearShifting value into high gear
Shifting value into high gear
 
Shifting value into high gear
Shifting value into high gearShifting value into high gear
Shifting value into high gear
 
Responsibility at the core of great things
Responsibility at the core of great thingsResponsibility at the core of great things
Responsibility at the core of great things
 
Being agile while standing in a waterfall
Being agile while standing in a waterfallBeing agile while standing in a waterfall
Being agile while standing in a waterfall
 
Lean project management oxymoron or possible - ottawa - apr 2013
Lean project management   oxymoron or possible - ottawa - apr 2013Lean project management   oxymoron or possible - ottawa - apr 2013
Lean project management oxymoron or possible - ottawa - apr 2013
 
Lean pmo oxymoron or possible - potsdam
Lean pmo   oxymoron or possible - potsdamLean pmo   oxymoron or possible - potsdam
Lean pmo oxymoron or possible - potsdam
 
Lean PMO - Oxymoron or Possible - SDEC'12
Lean PMO  - Oxymoron or Possible - SDEC'12Lean PMO  - Oxymoron or Possible - SDEC'12
Lean PMO - Oxymoron or Possible - SDEC'12
 

Último

Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 

Último (20)

Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 

Lean project mgmt oxymoron or possible - toronto xp - may 2013

  • 1. Copyright - Leanintuit - Mar 2013 Lean Project Management Oxymoron or Possible? Mike Edwards TorontoXP - May 21, 2013 @mikeeedwards mike@leanintuit.com Thursday, 23 May, 13
  • 2. Copyright - Leanintuit - Mar 2013 Two project managers! Thursday, 23 May, 13
  • 3. Copyright - Leanintuit - Mar 2013 Why do PMs seem to be such a burden !??! Thursday, 23 May, 13
  • 4. Copyright - Leanintuit - Mar 2013 Lets follow the evolution of a PM Thursday, 23 May, 13
  • 5. Copyright - Leanintuit - Mar 2013 First go hire a virgin PM Thursday, 23 May, 13
  • 6. Copyright - Leanintuit - Mar 2013 Watch them have some success ... while they don’t know any better! Thursday, 23 May, 13
  • 7. Copyright - Leanintuit - Mar 2013 2/2 New document (2/2)2013-04-02 19:52:36 PMP Then encourage them to get certified! Thursday, 23 May, 13
  • 8. Copyright - Leanintuit - Mar 2013 They have the holy grail! • PM Body of Knowledge (PMBOK) • Program Management Standard • Portfolio Management Standard • Risk Management Standard • Earned Value Standard • Configuration Management Standard • Work Breakdown Structure Standard • Scheduling Standard • Estimating Standard • Competency Development Framework • PMBOK Government Extension • PMBOK Construction Extension Thursday, 23 May, 13
  • 9. Copyright - Leanintuit - Mar 2013 Then it starts happening! Thursday, 23 May, 13
  • 10. Copyright - Leanintuit - Mar 2013 Sound Familiar? Thursday, 23 May, 13
  • 11. Copyright - Leanintuit - Mar 2013 Does Project Management make sense? Thursday, 23 May, 13
  • 12. Copyright - Leanintuit - Mar 2013 It’s a complex world! Thursday, 23 May, 13
  • 13. Copyright - Leanintuit - Mar 2013 Lean! Eliminate Waste High Product Integrity Team & People Focus Always Delivering Always Learning Optimizing the whole Value Partially done work Extra Processes Extra Features Task Switching Waiting Motion Defects Management Activities Thursday, 23 May, 13
  • 14. Copyright - Leanintuit - Mar 2013 Examining current state People Process Product People’s Satisfaction Quality Business risk, schedule and cost pressure They’re People not Resources! Thursday, 23 May, 13
  • 15. Copyright - Leanintuit - Mar 2013 People Clients Everyone! The Public Sponsor Banker TestersProje ager Develop Thursday, 23 May, 13
  • 16. Copyright - Leanintuit - Mar 2013 Let’s build something! • All you have to do is have the developer draw a picture in 5 mins Thursday, 23 May, 13
  • 17. Copyright - Leanintuit - Mar 2013 People Ownership Leadership Collaboration EmpoweredDisempowered ServantMaster InclusiveExclusive Thursday, 23 May, 13
  • 18. Copyright - Leanintuit - Mar 2013 Process Focus on how you use a process Not what process is used Thursday, 23 May, 13
  • 19. Copyright - Leanintuit - Mar 2013 PMI Processes Thursday, 23 May, 13
  • 20. Copyright - Leanintuit - Mar 2013 61©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition 3 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human Resource Management 10. Project Communications Management 11. Project Risk Management 12. Project Procurement Management 13. Project Stakeholder Management Project Management Process Groups Knowledge Areas Initiating Process Group Closing Process Group Monitoring and Controlling Process Group Executing Process Group Planning Process Group 4.1 Develop Project Charter 13.1 Identify Stakeholders 4.2 Develop Project Management Plan 5.1 Plan Scope Management 5.2 Collect Requirements 5.3 Define Scope 5.4 Create WBS 6.1 Plan Schedule Management 6.2 Define Activities 6.3 Sequence Activities 6.4 Estimate Activity Resources 6.5 Estimate Activity Durations 6.6 Develop Schedule 7.1 Plan Cost Management 7.2 Estimate Costs 7.3 Determine Budget 8.1 Plan Quality Management 9.1 Plan Human Resource Management 10.1 Plan Communications Management 11.1 Plan Risk Management 11.2 Identify Risks 11.3 Perform Qualitative Risk Analysis 11.4 Perform Quantitative Risk Analysis 11.5 Plan Risk Responses 12.1 Plan Procurement Management 13.2 Plan Stakeholder Management 4.3 Direct and Manage Project Work 8.2 Perform Quality Assurance 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team 10.2 Manage Communications 12.2 Conduct Procurements 13.3 Manage Stakeholder Engagement 4.4 Monitor and Control Project Work 4.5 Perform Integrated Change Control 5.5 Validate Scope 5.6 Control Scope 6.7 Control Schedule 7.4 Control Costs 8.3 Control Quality 10.3 Control Communications 11.6 Control Risks 12.3 Control Procurements 13.4 Control Stakeholder Engagement 4.6 Close Project or Phase 12.4 Close Procurements Thursday, 23 May, 13
  • 21. Copyright - Leanintuit - Mar 2013 Thursday, 23 May, 13
  • 22. Copyright - Leanintuit - Mar 2013 Process Improving Process Application OngoingOnce EvolvingEstablished ScaledRigid Thursday, 23 May, 13
  • 23. Copyright - Leanintuit - Mar 2013 Product IT organizations only exists to deliver valuable products & tools to enable our customers to succeed Thursday, 23 May, 13
  • 24. Copyright - Leanintuit - Mar 2013 Thursday, 23 May, 13
  • 25. Copyright - Leanintuit - Mar 2013 Thursday, 23 May, 13
  • 26. Copyright - Leanintuit - Mar 2013 Product Product Definition Achievement Focus Response to change LearnedDefined CustomerProject AdaptiveControl Thursday, 23 May, 13
  • 27. Copyright - Leanintuit - Mar 2013 What do the results tell us? Thursday, 23 May, 13
  • 28. Copyright - Leanintuit - Mar 2013 Your assessment results? People Process Product People’s Satisfaction Quality Business risk, schedule and cost pressure They’re People not Resources! Thursday, 23 May, 13
  • 29. Copyright - Leanintuit - Mar 2013 People Process Product People’s Satisfaction Quality Business risk, schedule and cost pressure They’re People not Resources! Your assessment results? Thursday, 23 May, 13
  • 30. Copyright - Leanintuit - Mar 2013 Where to from here? Thursday, 23 May, 13
  • 31. Copyright - Leanintuit - Mar 2013 Where to from here? • First figure out where you are • Listen to the people • Everyone must commit to an improvement program • Iterate! (aka: Do it again!) • For best results - get help! Thursday, 23 May, 13
  • 32. Copyright - Leanintuit - Mar 2013 A word about certifications! Thursday, 23 May, 13
  • 33. Copyright - Leanintuit - Mar 2013 http://leanpmsolutions.com/the-lean-pmo-is-possible/ Thursday, 23 May, 13