SlideShare uma empresa Scribd logo
1 de 14
When it was installed in 1975, the air handler unit (AHU) at a major
Atlanta, Georgia, medical center was a state-of-the-art technological
breakthrough. It cycled fresh outside air and provided heating and
cooling for nearly 60 percent of the hospital.



                                   “ Though the scope of the project
                                   was greater than imagined, it
                                   didn’t interfere with operations at
                                   all. In fact, the hospital’s chief
                                   engineer noted the hospital staff
                                   didn’t even know McKenney’s was
                                   there.”
A lot changes over 35-plus years. For the
more than 400-bed facility, the massive
piece of equipment had become more of
a “dinosaur” than an innovator. There was
no way to efficiently modulate the cooling
capacity.
As a result, heating and cooling was
inefficient and expensive. Facing a
Significant cost to replace the AHU, hospital
officials turned to McKenney’s for
recommendations on how to improve
energy efficiency by modifying the existing
equipment.
McKenney’s was already familiar with many of the hospital’s mechanical
systems.
It had conducted design/assist and contract work for the hospital’s
HVAC, plumbing, service and building controls since 1994.

                           Beginning in the summer of 2009, a team of
                           McKenney’s Energy Services engineers
                           began to measure the HVAC system energy
                           usage.
                           For several months, McKenney’s gathered
                           nearly 250,000 energy usage data points
                           from the main AHU and chiller plant as part
                           of its comprehensive analysis. This extended
                           measurement period gave an accurate
                           picture of energy usage during a wide range
                           of outside air temperatures.
According to the hospital’s chief engineer,
                          McKenney’s worked around-the-clock to
                          gather the necessary data.



The goal was to identify some cost-saving
options, so everything from the supply air
temperature, coils and exhaust air
temperature was analyzed.
Gathering from actual versus extrapolated data, McKenney’s presented
a current state energy usage report (along with backup data) and a
proposed future state energy usage report to hospital officials.
It also offered comprehensive recommendations to improve energy
savings.

                       The findings revealed that the single plenum
                       design of the AHU severely limited facility wide
                       temperature control.
                       When one area of the hospital (e.g., operating
                       rooms) wanted cooler temperatures, the
                       antiquated system lowered the temperature in
                       other parts of the building as well.
                       As a result, all of this air had to be reheated,
                       causing a massive waste of energy.
To alleviate this, McKenney’s recommended
                        that the hospital decrease chilled water flow
                        requirements by adding new chilled water
                        control valves.
                        McKenney’s also recommended the addition
                        of a variable-speed drive pump for the chilled
                        water.

The hospital’s chief engineer noted that once the recommendations
were implemented they had an immediate impact.
Previously, the hospital was running two or three chillers at once to
handle the workload.
Now, the facility could run a single chiller at higher water
temperatures and run the variable speed pumps slower when
necessary for big energy and cost savings.
With the variable controls, the pumps can
be run more efficiently using as little as 40
percent of the energy previously needed.
In addition, the control valves enabled the
hospital to customize temperature
settings for specific areas throughout the
facility.
The facility can now see how the sweeping
                    changes are improving efficiency via an energy
                    management reporting system from
                    McKenney’s.
                    The chief engineer monitors usage and savings in
                    real-time and meets with the McKenney’s team
                    regularly to review findings and implement on-
                    going HVAC system modifications to improve
                    efficiency.

The improvements are also enabling the hospital to meet certain
parameters for healthcare facility guidelines.
Now, the onsite engineering team is working with hospital staff to
establish “set points” throughout the facility, an initiative that
should save the hospital even more in cost and energy usage.
According to the chief engineer,
McKenney’s exceeded expectations.
Though the scope of the project was
greater than imagined, it didn’t interfere
with operations at all. In fact, the chief
engineer noted the hospital staff didn’t
even know McKenney’s was there.
Project Team
 Owner: Chief Engineer, major Atlanta, Georgia medical center
 Engineer/Contractor: McKenney’s Healthcare Group McKenney’s Energy
 Services

The Challenge
  Enhance energy efficiency of vintage air handler unit (AHU)
  Measure energy usage data and benchmark against proposed energy
  savings
The Solution
  Conducted an energy audit using McKenney’s comprehensive processes
  and cuttingedge equipment
  Compiled data and developed clear, concise energy usage reports
  Upgraded AHU chilled water coil control and reset condenser water
  supply temp
  Reduced the number of chillers and pumps required to meet chilled
  water flow requirements

The Results
  Positioned hospital to reduce central plant energy costs by 16% for
  investment pay back in fewer than 18 months
  Potential $98,000 annual net savings (1.4 million kWh at $0.07/kWh)
  Reduced chilled water flow, reheat flow and condensed water supply
  temperature requirements
Atlanta Office: 1056 Moreland Industrial Boulevard
                 Atlanta, Georgia 30316
                 P: 404-622-5000
Charlotte Office: 3601 Performance Road
                  Charlotte, North Carolina 28214
                  P: 704-357-1200

            sales@mckenneys.com
         www.mckenneys.com

Mais conteúdo relacionado

Mais de McKenney's Inc

Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingMcKenney's Inc
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GAMcKenney's Inc
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsMcKenney's Inc
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementMcKenney's Inc
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildMcKenney's Inc
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionMcKenney's Inc
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationMcKenney's Inc
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)McKenney's Inc
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectMcKenney's Inc
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney's Inc
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingMcKenney's Inc
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsMcKenney's Inc
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney's Inc
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationMcKenney's Inc
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by DesignMcKenney's Inc
 
Playing Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionPlaying Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionMcKenney's Inc
 
A High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use ConstructionA High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use ConstructionMcKenney's Inc
 
Timely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems InstallationTimely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems InstallationMcKenney's Inc
 
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GA
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GARooftop Data Center Chilled Water Plant Installation | Atlanta, GA
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GAMcKenney's Inc
 
Pre-fab Headers Keep Job Ahead of Schedule
Pre-fab Headers Keep Job Ahead of SchedulePre-fab Headers Keep Job Ahead of Schedule
Pre-fab Headers Keep Job Ahead of ScheduleMcKenney's Inc
 

Mais de McKenney's Inc (20)

Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GA
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems Replacement
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality Construction
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems Installation
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate Harvesting
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial Buildings
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems Installation
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by Design
 
Playing Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionPlaying Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality Construction
 
A High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use ConstructionA High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use Construction
 
Timely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems InstallationTimely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems Installation
 
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GA
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GARooftop Data Center Chilled Water Plant Installation | Atlanta, GA
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GA
 
Pre-fab Headers Keep Job Ahead of Schedule
Pre-fab Headers Keep Job Ahead of SchedulePre-fab Headers Keep Job Ahead of Schedule
Pre-fab Headers Keep Job Ahead of Schedule
 

Último

Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 

Último (20)

Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 

McKenney's, Inc. Hospital Energy Efficiency & Sustainability Case Study

  • 1.
  • 2. When it was installed in 1975, the air handler unit (AHU) at a major Atlanta, Georgia, medical center was a state-of-the-art technological breakthrough. It cycled fresh outside air and provided heating and cooling for nearly 60 percent of the hospital. “ Though the scope of the project was greater than imagined, it didn’t interfere with operations at all. In fact, the hospital’s chief engineer noted the hospital staff didn’t even know McKenney’s was there.”
  • 3. A lot changes over 35-plus years. For the more than 400-bed facility, the massive piece of equipment had become more of a “dinosaur” than an innovator. There was no way to efficiently modulate the cooling capacity. As a result, heating and cooling was inefficient and expensive. Facing a Significant cost to replace the AHU, hospital officials turned to McKenney’s for recommendations on how to improve energy efficiency by modifying the existing equipment.
  • 4. McKenney’s was already familiar with many of the hospital’s mechanical systems. It had conducted design/assist and contract work for the hospital’s HVAC, plumbing, service and building controls since 1994. Beginning in the summer of 2009, a team of McKenney’s Energy Services engineers began to measure the HVAC system energy usage. For several months, McKenney’s gathered nearly 250,000 energy usage data points from the main AHU and chiller plant as part of its comprehensive analysis. This extended measurement period gave an accurate picture of energy usage during a wide range of outside air temperatures.
  • 5. According to the hospital’s chief engineer, McKenney’s worked around-the-clock to gather the necessary data. The goal was to identify some cost-saving options, so everything from the supply air temperature, coils and exhaust air temperature was analyzed.
  • 6. Gathering from actual versus extrapolated data, McKenney’s presented a current state energy usage report (along with backup data) and a proposed future state energy usage report to hospital officials. It also offered comprehensive recommendations to improve energy savings. The findings revealed that the single plenum design of the AHU severely limited facility wide temperature control. When one area of the hospital (e.g., operating rooms) wanted cooler temperatures, the antiquated system lowered the temperature in other parts of the building as well. As a result, all of this air had to be reheated, causing a massive waste of energy.
  • 7.
  • 8. To alleviate this, McKenney’s recommended that the hospital decrease chilled water flow requirements by adding new chilled water control valves. McKenney’s also recommended the addition of a variable-speed drive pump for the chilled water. The hospital’s chief engineer noted that once the recommendations were implemented they had an immediate impact. Previously, the hospital was running two or three chillers at once to handle the workload. Now, the facility could run a single chiller at higher water temperatures and run the variable speed pumps slower when necessary for big energy and cost savings.
  • 9. With the variable controls, the pumps can be run more efficiently using as little as 40 percent of the energy previously needed. In addition, the control valves enabled the hospital to customize temperature settings for specific areas throughout the facility.
  • 10. The facility can now see how the sweeping changes are improving efficiency via an energy management reporting system from McKenney’s. The chief engineer monitors usage and savings in real-time and meets with the McKenney’s team regularly to review findings and implement on- going HVAC system modifications to improve efficiency. The improvements are also enabling the hospital to meet certain parameters for healthcare facility guidelines. Now, the onsite engineering team is working with hospital staff to establish “set points” throughout the facility, an initiative that should save the hospital even more in cost and energy usage.
  • 11. According to the chief engineer, McKenney’s exceeded expectations. Though the scope of the project was greater than imagined, it didn’t interfere with operations at all. In fact, the chief engineer noted the hospital staff didn’t even know McKenney’s was there.
  • 12. Project Team Owner: Chief Engineer, major Atlanta, Georgia medical center Engineer/Contractor: McKenney’s Healthcare Group McKenney’s Energy Services The Challenge Enhance energy efficiency of vintage air handler unit (AHU) Measure energy usage data and benchmark against proposed energy savings
  • 13. The Solution Conducted an energy audit using McKenney’s comprehensive processes and cuttingedge equipment Compiled data and developed clear, concise energy usage reports Upgraded AHU chilled water coil control and reset condenser water supply temp Reduced the number of chillers and pumps required to meet chilled water flow requirements The Results Positioned hospital to reduce central plant energy costs by 16% for investment pay back in fewer than 18 months Potential $98,000 annual net savings (1.4 million kWh at $0.07/kWh) Reduced chilled water flow, reheat flow and condensed water supply temperature requirements
  • 14. Atlanta Office: 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 Charlotte Office: 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 sales@mckenneys.com www.mckenneys.com