2. Project Name
Project Location
Atlanta, Georgia
Project Team
Retail
Markets
Owner: Oliver McMillan
General Contractor: Balfour Beatty Construction
Architects: Smallwood, Reynolds, Stewart, Stewart and
Associates Inc. / Gensler / Papageorge Haymes Partners
Buckhead Atlanta Central
District Water Plant
Engineer: Jordan & Skala Engineers
Contractor: McKenney’s, Inc.
Specializations
Pipe Shop Prefab
Sheet Metal Shop Prefab
Building Information Modeling
Mixed-use & Multifamily
Central Plants
3. McKenney’s helped revive a multi-stage project—including a central
district water plant—for the Buckhead Atlanta luxury destination.
4. The Challenge
Among the many complexities involved with the project, the central
water plant, ductwork and plumbing needed to serve three parcels
spanning one-and-a-half blocks on a busy urban street, each with a
different completion schedule. This was to be accomplished using
equipment that had been stored for over three years.
The Solution
To keep everything on track, McKenney’s enlisted Building Information
Modeling technology for virtual construction, coordination and clash
detection between the trades. The team then installed the water plant
along with prefabricated plumbing and underground piping at various
stages of the project to supply the infrastructure for the entire
development. McKenney’s tested and evaluated the dormant
equipment—and made updates and repairs—to return them to like-
new performance.
The content of this document is not intended as an endorsement.
5. The Results
Despite the change in owner and designs, staggered completion
schedules and the multiple city blocks scope, the project is
progressing as scheduled, on budget and is operating per design
expectations.
6. 1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
sales@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214
P: 704-357-1200
Atlanta Office:
Charlotte Office:
www.mckenneys.com