Ganga held captive
 The Ganga in her full and natural flow when the          The river flow after the dam when almost all the
Maneri Bhali 1 dam is not functioning and no water                 water is diverted into tunnels.
is diverted. (taken at exactly the same spot as the        (taken at exactly the same spot as the picture
                   picture beside)                                              beside)




This is the plight of our National river Ganga. White Himalayas with lush greenery all around & a milky
white flowing Ganga is no longer a visible sight. After the construction of rather useless 3 dams, Ganga
has reduced to a dry bed. There is only a small patch left that is still untouched & is the only path where
she still flows in her original pristine form. But soon this sight shall also be taken away from us as she’ll
reduce to a set of tunnels & lakes.

                                                                 The Government has planned a series of
                                                                 hydro projects on the last stretch of
                                                                 unhampered, free flowing Ganga between
                                                                 Uttarkashi District (Maneri) and Gangotri.

                                                                 Since these projects are planned as a
                                                                 cascade, consecutively following one after
                                                                 the other, the entire stretch of 80 km of
                                                                 river will be reduced to no more than a
                                                                 series of reservoirs and canals.

                                                                 Currently their proposals have provision of
                                                                 leaving 2 to 3 cumecs flowing in the river
                                                                 bed - this means basically hardly 2 feet of
                                                                 water where the river bed is 8 to 10 feet
                                                                 wide. In fact downstream of the existing
                                                                 dams like Maneri Bhali I and 2 one can
barely wet one's ankles and this is supposed to suffice for the Ganga River.

STATUS OF PROPOSED PROJECTS BETWEEN GANGOTRI AND RISHIKESH.



    1. Bhairon Ghati 1 and 2 (between Gangotri and Uttarkashi) - 47.6 I 240 MW's
       (temporarily suspended after prof. G.D. Agrawal fast unto death.)

    2. Loharinag - Pala (between Gangotri and Uttarkashi) - 600 MW's (under construction)
       Builders: NTPC Ltd.

         Current status: Temporary suspension of construction till the next meeting of National
Ganga River Basin Authority. However, after the survey by the team from the Environment
ministry the plan to continue with this dam has been indicated) Power Minister Mr. Shinde, halting
work on the project via letter dated19-02-2009 given to prof. G.D. Agrawal. In this letter he also assured
that no further projects would be undertaken on the Ganga. This was never followed.

    3. Pala - Maneri (between Gangotri and Uttarkashi) - 480 MW's (proposed)
       (temporarily suspended after prof. G.D. Agrawal fast unto death. However, after the survey by
       the team from the Environment ministry the plan to continue with this dam has been
       indicated)

    4.   Maneri Bhali 1 (between Gangotri and Uttarkashi) - 90 MW's (completed in 60's-70's).
    5.   Maneri Bhali 2 (between Uttarkashi and Rishikesh) - 304 MW's (completed in 2008).
    6.   Tehri dam (between Uttarkashi and Rishikesh) - 2400MW's (completed in 2006).
    7.   Koteshwar hydro project (between Uttarkashi and Rishikesh) - 4OOMW's (under construction)
    8.   Kotlibhel lA hydro project (between Uttarkalhi and Rishikesh) - 200MW's (proposed)
    9.   Kotlibhel 2(between Uttarkashi and Rishikesh) - 520MW's (proposed)


Environmental & Technical problems:

    1. Gangotri Glacier’s Retreat will Increase with Dams:
    2. Water Quality Degradation: No Ganga-Jal as we know it:
    3. Ruin of Ganga’s Ecosystem:Loss Of Biodiversity and Endangered Species status for
       Wildlife.
    4. This area is in Seismic zone 5 and heavy blasting , tunneling, reservoir would cause a
       dangerous chaos in terms of earth quake.
    5. Environmental impact assessment (EIA) report major defects in Loharinag Pala and Pala
       Maneri EIA
           a. The EIA of Pala Maneri and Loharinag Pala make the most astounding statement 'apart
               from village temples, no monuments of cultural, religious, historical, archaeological
               importance are found and hence no impact is envisaged.'The sanctity of the Ganga is
               not even thought worth mentioning.
           b. Present MoEF has admitted that EIAs study each project separately while the study of
               the cumulative impact of all the projects on the river is not done, which in fact would give
               the true picture as to the environmental damage. This in the case of fragile Ganga’s
               ecosystem acquires magnified significance.

Cultural significance:
1. Ganga was declared a National River by the Prime Minister on 4th November 2008: Just as
       there are strict laws protecting the national bird, the national flag and all national monuments and
       just as we have the prevention of insults to national honor act 1971, similarly it is intolerable that
       the Ganga should be compromised in any manner what so ever
    2. Every citizen of this country has a Right to practice his/her faith. Ganga forms an integral
       part of the Indian civilization, tradition and culture. To take a bath and worship the Ganga at any
       spot along her banks is an integral part of our culture. How can a government take this right away
       from millions of its citizens?
    3. Past history regarding dam building on Ganga: After united opposition under the leadership of
       Madan Mohan Malviya and the participation of people from all over India and the various kings,
       the British were forced to sign the 1916 treaty whereby no further work would be done by the
       British on the Ganga without the prior consent of the Hindus. It is ironical that a colonial
       government respected the wishes of its citizens more than the present day democratic
       government in such a vital issue.

Feasibility of these projects:

a) Sub-planned Performance of Pre-existing dams on Ganga: The Maneri Pali I and The Tehri dam
are performing poorly due to Increased silt and dropping water levels.

(b) True Costs Of Hydro Power much more than stated costs: As per studies of Dr Bharat
Jhunjhunwala, an economist, the hidden social-cost of hydro-power is at least 300% more than financial
costs.

CONCLUSION (For the Upstream between Gangotri to Rishikesh) - WHAT THE GOVT. NEEDS TO
DO

    1. To permanently cancel the Loharinag Pala, Pala Maneri and Bhairon Ghati 1&2 projects
irrespective of work done.

   2. To ensure a free Ganga between Uttarkashi and Rishikesh and hence to cancel Koteshwar,
Kotlibhel lA and Kotlibhel 2;

    3. To ensure that no new projects come up on the Ganga now or in the future and restore the
precious ecology destroyed by these current projects.

    4.  To proactively take steps to save Himalyan Water Towers and promote the ecosystem. In
       the longer run, easing the power deficit without solving the water-supply crisis will just intensify
       future shortages of water.
    5. To release sufficient water in hydro-projects already constructed from Gangotri to Rishikesh and
       finally in phases to decommission all existent hydro-projects on the Ganga.




                                                                                          From:-
                                                                   Hemant Dhyani, Mallika Bhanot
                                                                      Ganga- Ahvaan, Uttarkashi.

Mais conteúdo relacionado

Mais de ManushiIndia

Ganga proposasl for national river
Ganga   proposasl for national riverGanga   proposasl for national river
Ganga proposasl for national river
ManushiIndia
 
Part 5 : The History of Nehru Place Street Vendors
Part 5 : The History of Nehru Place Street VendorsPart 5 : The History of Nehru Place Street Vendors
Part 5 : The History of Nehru Place Street Vendors
ManushiIndia
 
Government’s Warfare against Cycle Rickshaws
Government’s Warfare against Cycle RickshawsGovernment’s Warfare against Cycle Rickshaws
Government’s Warfare against Cycle Rickshaws
ManushiIndia
 
Part 3 : Agenda for Action : Towards People Friendly World Class Cities
Part 3 : Agenda for Action : Towards People Friendly World Class CitiesPart 3 : Agenda for Action : Towards People Friendly World Class Cities
Part 3 : Agenda for Action : Towards People Friendly World Class Cities
ManushiIndia
 
Part 2 : History of Sewa Nagar Pilot Project
Part 2 : History of Sewa Nagar Pilot ProjectPart 2 : History of Sewa Nagar Pilot Project
Part 2 : History of Sewa Nagar Pilot Project
ManushiIndia
 
Part 1: Laws Liberty & Livelihood : A Call for A Bottom-up Agenda of Economi...
Part 1: Laws Liberty & Livelihood : A Call for A Bottom-up Agenda of Economi...Part 1: Laws Liberty & Livelihood : A Call for A Bottom-up Agenda of Economi...
Part 1: Laws Liberty & Livelihood : A Call for A Bottom-up Agenda of Economi...
ManushiIndia
 
Part 4 : Desperate Vendors Commit Suicides in Protest
Part 4 : Desperate Vendors Commit Suicides in ProtestPart 4 : Desperate Vendors Commit Suicides in Protest
Part 4 : Desperate Vendors Commit Suicides in Protest
ManushiIndia
 
Zealous Reformers, Deadly Laws
Zealous Reformers, Deadly LawsZealous Reformers, Deadly Laws
Zealous Reformers, Deadly Laws
ManushiIndia
 
The Broom Wielding Goddess of Good Governance
The Broom Wielding Goddess of Good GovernanceThe Broom Wielding Goddess of Good Governance
The Broom Wielding Goddess of Good Governance
ManushiIndia
 
Enhancing Women’s Representation In Legislatures
Enhancing Women’s Representation In LegislaturesEnhancing Women’s Representation In Legislatures
Enhancing Women’s Representation In Legislatures
ManushiIndia
 

Mais de ManushiIndia (13)

Yamuna in Delhi
Yamuna in DelhiYamuna in Delhi
Yamuna in Delhi
 
Ganga proposasl for national river
Ganga   proposasl for national riverGanga   proposasl for national river
Ganga proposasl for national river
 
Ganga For Moef Presentation By Sunita Narayan
Ganga For Moef   Presentation By Sunita NarayanGanga For Moef   Presentation By Sunita Narayan
Ganga For Moef Presentation By Sunita Narayan
 
Save Ganga Presentation By Mallika Bhanot
Save Ganga Presentation By Mallika BhanotSave Ganga Presentation By Mallika Bhanot
Save Ganga Presentation By Mallika Bhanot
 
Part 5 : The History of Nehru Place Street Vendors
Part 5 : The History of Nehru Place Street VendorsPart 5 : The History of Nehru Place Street Vendors
Part 5 : The History of Nehru Place Street Vendors
 
Government’s Warfare against Cycle Rickshaws
Government’s Warfare against Cycle RickshawsGovernment’s Warfare against Cycle Rickshaws
Government’s Warfare against Cycle Rickshaws
 
Part 3 : Agenda for Action : Towards People Friendly World Class Cities
Part 3 : Agenda for Action : Towards People Friendly World Class CitiesPart 3 : Agenda for Action : Towards People Friendly World Class Cities
Part 3 : Agenda for Action : Towards People Friendly World Class Cities
 
Part 2 : History of Sewa Nagar Pilot Project
Part 2 : History of Sewa Nagar Pilot ProjectPart 2 : History of Sewa Nagar Pilot Project
Part 2 : History of Sewa Nagar Pilot Project
 
Part 1: Laws Liberty & Livelihood : A Call for A Bottom-up Agenda of Economi...
Part 1: Laws Liberty & Livelihood : A Call for A Bottom-up Agenda of Economi...Part 1: Laws Liberty & Livelihood : A Call for A Bottom-up Agenda of Economi...
Part 1: Laws Liberty & Livelihood : A Call for A Bottom-up Agenda of Economi...
 
Part 4 : Desperate Vendors Commit Suicides in Protest
Part 4 : Desperate Vendors Commit Suicides in ProtestPart 4 : Desperate Vendors Commit Suicides in Protest
Part 4 : Desperate Vendors Commit Suicides in Protest
 
Zealous Reformers, Deadly Laws
Zealous Reformers, Deadly LawsZealous Reformers, Deadly Laws
Zealous Reformers, Deadly Laws
 
The Broom Wielding Goddess of Good Governance
The Broom Wielding Goddess of Good GovernanceThe Broom Wielding Goddess of Good Governance
The Broom Wielding Goddess of Good Governance
 
Enhancing Women’s Representation In Legislatures
Enhancing Women’s Representation In LegislaturesEnhancing Women’s Representation In Legislatures
Enhancing Women’s Representation In Legislatures
 

Último

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Último (20)

REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 

Ganga held captive

  • 1. Ganga held captive The Ganga in her full and natural flow when the The river flow after the dam when almost all the Maneri Bhali 1 dam is not functioning and no water water is diverted into tunnels. is diverted. (taken at exactly the same spot as the (taken at exactly the same spot as the picture picture beside) beside) This is the plight of our National river Ganga. White Himalayas with lush greenery all around & a milky white flowing Ganga is no longer a visible sight. After the construction of rather useless 3 dams, Ganga has reduced to a dry bed. There is only a small patch left that is still untouched & is the only path where she still flows in her original pristine form. But soon this sight shall also be taken away from us as she’ll reduce to a set of tunnels & lakes. The Government has planned a series of hydro projects on the last stretch of unhampered, free flowing Ganga between Uttarkashi District (Maneri) and Gangotri. Since these projects are planned as a cascade, consecutively following one after the other, the entire stretch of 80 km of river will be reduced to no more than a series of reservoirs and canals. Currently their proposals have provision of leaving 2 to 3 cumecs flowing in the river bed - this means basically hardly 2 feet of water where the river bed is 8 to 10 feet wide. In fact downstream of the existing dams like Maneri Bhali I and 2 one can
  • 2. barely wet one's ankles and this is supposed to suffice for the Ganga River. STATUS OF PROPOSED PROJECTS BETWEEN GANGOTRI AND RISHIKESH. 1. Bhairon Ghati 1 and 2 (between Gangotri and Uttarkashi) - 47.6 I 240 MW's (temporarily suspended after prof. G.D. Agrawal fast unto death.) 2. Loharinag - Pala (between Gangotri and Uttarkashi) - 600 MW's (under construction) Builders: NTPC Ltd. Current status: Temporary suspension of construction till the next meeting of National Ganga River Basin Authority. However, after the survey by the team from the Environment ministry the plan to continue with this dam has been indicated) Power Minister Mr. Shinde, halting work on the project via letter dated19-02-2009 given to prof. G.D. Agrawal. In this letter he also assured that no further projects would be undertaken on the Ganga. This was never followed. 3. Pala - Maneri (between Gangotri and Uttarkashi) - 480 MW's (proposed) (temporarily suspended after prof. G.D. Agrawal fast unto death. However, after the survey by the team from the Environment ministry the plan to continue with this dam has been indicated) 4. Maneri Bhali 1 (between Gangotri and Uttarkashi) - 90 MW's (completed in 60's-70's). 5. Maneri Bhali 2 (between Uttarkashi and Rishikesh) - 304 MW's (completed in 2008). 6. Tehri dam (between Uttarkashi and Rishikesh) - 2400MW's (completed in 2006). 7. Koteshwar hydro project (between Uttarkashi and Rishikesh) - 4OOMW's (under construction) 8. Kotlibhel lA hydro project (between Uttarkalhi and Rishikesh) - 200MW's (proposed) 9. Kotlibhel 2(between Uttarkashi and Rishikesh) - 520MW's (proposed) Environmental & Technical problems: 1. Gangotri Glacier’s Retreat will Increase with Dams: 2. Water Quality Degradation: No Ganga-Jal as we know it: 3. Ruin of Ganga’s Ecosystem:Loss Of Biodiversity and Endangered Species status for Wildlife. 4. This area is in Seismic zone 5 and heavy blasting , tunneling, reservoir would cause a dangerous chaos in terms of earth quake. 5. Environmental impact assessment (EIA) report major defects in Loharinag Pala and Pala Maneri EIA a. The EIA of Pala Maneri and Loharinag Pala make the most astounding statement 'apart from village temples, no monuments of cultural, religious, historical, archaeological importance are found and hence no impact is envisaged.'The sanctity of the Ganga is not even thought worth mentioning. b. Present MoEF has admitted that EIAs study each project separately while the study of the cumulative impact of all the projects on the river is not done, which in fact would give the true picture as to the environmental damage. This in the case of fragile Ganga’s ecosystem acquires magnified significance. Cultural significance:
  • 3. 1. Ganga was declared a National River by the Prime Minister on 4th November 2008: Just as there are strict laws protecting the national bird, the national flag and all national monuments and just as we have the prevention of insults to national honor act 1971, similarly it is intolerable that the Ganga should be compromised in any manner what so ever 2. Every citizen of this country has a Right to practice his/her faith. Ganga forms an integral part of the Indian civilization, tradition and culture. To take a bath and worship the Ganga at any spot along her banks is an integral part of our culture. How can a government take this right away from millions of its citizens? 3. Past history regarding dam building on Ganga: After united opposition under the leadership of Madan Mohan Malviya and the participation of people from all over India and the various kings, the British were forced to sign the 1916 treaty whereby no further work would be done by the British on the Ganga without the prior consent of the Hindus. It is ironical that a colonial government respected the wishes of its citizens more than the present day democratic government in such a vital issue. Feasibility of these projects: a) Sub-planned Performance of Pre-existing dams on Ganga: The Maneri Pali I and The Tehri dam are performing poorly due to Increased silt and dropping water levels. (b) True Costs Of Hydro Power much more than stated costs: As per studies of Dr Bharat Jhunjhunwala, an economist, the hidden social-cost of hydro-power is at least 300% more than financial costs. CONCLUSION (For the Upstream between Gangotri to Rishikesh) - WHAT THE GOVT. NEEDS TO DO 1. To permanently cancel the Loharinag Pala, Pala Maneri and Bhairon Ghati 1&2 projects irrespective of work done. 2. To ensure a free Ganga between Uttarkashi and Rishikesh and hence to cancel Koteshwar, Kotlibhel lA and Kotlibhel 2; 3. To ensure that no new projects come up on the Ganga now or in the future and restore the precious ecology destroyed by these current projects. 4. To proactively take steps to save Himalyan Water Towers and promote the ecosystem. In the longer run, easing the power deficit without solving the water-supply crisis will just intensify future shortages of water. 5. To release sufficient water in hydro-projects already constructed from Gangotri to Rishikesh and finally in phases to decommission all existent hydro-projects on the Ganga. From:- Hemant Dhyani, Mallika Bhanot Ganga- Ahvaan, Uttarkashi.